US7486589B2
(en)
|
2006-02-09 |
2009-02-03 |
Schlumberger Technology Corporation |
Methods and apparatus for predicting the hydrocarbon production of a well location
|
US7457194B2
(en)
*
|
2006-09-12 |
2008-11-25 |
Schlumberger Technology Corporation |
Discriminating natural fracture- and stress-induced sonic anisotropy using a combination of image and sonic logs
|
US7882745B2
(en)
*
|
2006-09-20 |
2011-02-08 |
Schlumberger Technology Corporation |
Method and system to invert tectonic boundary or rock mass field in in-situ stress computation
|
US20080109169A1
(en)
*
|
2006-11-07 |
2008-05-08 |
Sreekanth Thumrugoti |
Method and system for characterizing seismic reflection points
|
US7958937B1
(en)
*
|
2007-07-23 |
2011-06-14 |
Well Enhancement & Recovery Systems, Llc |
Process for hydrofracturing an underground aquifer from a water well borehole for increasing water flow production from Denver Basin aquifers
|
CA2706482A1
(en)
*
|
2007-12-21 |
2009-07-02 |
Exxonmobil Upstream Research Company |
Modeling in sedimentary basins
|
US8269501B2
(en)
*
|
2008-01-08 |
2012-09-18 |
William Marsh Rice University |
Methods for magnetic imaging of geological structures
|
US9223041B2
(en)
*
|
2008-01-23 |
2015-12-29 |
Schlubmerger Technology Corporation |
Three-dimensional mechanical earth modeling
|
US8073665B2
(en)
*
|
2008-03-07 |
2011-12-06 |
Schlumberger Technology Corporation |
Analyzing an oilfield network for oilfield production
|
US8301383B2
(en)
*
|
2008-06-02 |
2012-10-30 |
Schlumberger Technology Corporation |
Estimating in situ mechanical properties of sediments containing gas hydrates
|
EP2154551A1
(en)
*
|
2008-08-12 |
2010-02-17 |
Geolab S.a.s. |
Method for recording changes in a hydrocarbon deposit
|
WO2010080366A1
(en)
|
2009-01-09 |
2010-07-15 |
Exxonmobil Upstream Research Company |
Hydrocarbon detection with passive seismic data
|
US20100252268A1
(en)
*
|
2009-04-03 |
2010-10-07 |
Hongren Gu |
Use of calibration injections with microseismic monitoring
|
US8600708B1
(en)
|
2009-06-01 |
2013-12-03 |
Paradigm Sciences Ltd. |
Systems and processes for building multiple equiprobable coherent geometrical models of the subsurface
|
US9418182B2
(en)
|
2009-06-01 |
2016-08-16 |
Paradigm Sciences Ltd. |
Systems and methods for building axes, co-axes and paleo-geographic coordinates related to a stratified geological volume
|
US10060241B2
(en)
|
2009-06-05 |
2018-08-28 |
Schlumberger Technology Corporation |
Method for performing wellbore fracture operations using fluid temperature predictions
|
US8498852B2
(en)
*
|
2009-06-05 |
2013-07-30 |
Schlumberger Tehcnology Corporation |
Method and apparatus for efficient real-time characterization of hydraulic fractures and fracturing optimization based thereon
|
US20110029291A1
(en)
*
|
2009-07-31 |
2011-02-03 |
Xiaowei Weng |
Method for fracture surface extraction from microseismic events cloud
|
GB2473251B
(en)
|
2009-09-07 |
2013-09-18 |
Statoilhydro Asa |
Method of assessing hydrocarbon source rock candidate
|
EP2315045B1
(en)
*
|
2009-10-22 |
2012-08-01 |
Sick Ag |
Measurement of distances or changes in distances
|
US8743115B1
(en)
|
2009-10-23 |
2014-06-03 |
Paradigm Sciences Ltd. |
Systems and methods for coordinated editing of seismic data in dual model
|
US8886502B2
(en)
*
|
2009-11-25 |
2014-11-11 |
Halliburton Energy Services, Inc. |
Simulating injection treatments from multiple wells
|
US9176245B2
(en)
*
|
2009-11-25 |
2015-11-03 |
Halliburton Energy Services, Inc. |
Refining information on subterranean fractures
|
US8437962B2
(en)
*
|
2009-11-25 |
2013-05-07 |
Halliburton Energy Services, Inc. |
Generating probabilistic information on subterranean fractures
|
US8898044B2
(en)
|
2009-11-25 |
2014-11-25 |
Halliburton Energy Services, Inc. |
Simulating subterranean fracture propagation
|
US8386226B2
(en)
*
|
2009-11-25 |
2013-02-26 |
Halliburton Energy Services, Inc. |
Probabilistic simulation of subterranean fracture propagation
|
US8392165B2
(en)
*
|
2009-11-25 |
2013-03-05 |
Halliburton Energy Services, Inc. |
Probabilistic earth model for subterranean fracture simulation
|
US9410421B2
(en)
*
|
2009-12-21 |
2016-08-09 |
Schlumberger Technology Corporation |
System and method for microseismic analysis
|
EP2564309A4
(en)
|
2010-04-30 |
2017-12-20 |
Exxonmobil Upstream Research Company |
Method and system for finite volume simulation of flow
|
WO2012015521A1
(en)
|
2010-07-29 |
2012-02-02 |
Exxonmobil Upstream Research Company |
Method and system for reservoir modeling
|
AU2011283193B2
(en)
|
2010-07-29 |
2014-07-17 |
Exxonmobil Upstream Research Company |
Methods and systems for machine-learning based simulation of flow
|
US10087721B2
(en)
|
2010-07-29 |
2018-10-02 |
Exxonmobil Upstream Research Company |
Methods and systems for machine—learning based simulation of flow
|
RU2573746C2
(en)
*
|
2010-07-30 |
2016-01-27 |
Эксонмобил Апстрим Рисерч Компани |
Systems and methods for well performance forecasting
|
US9058446B2
(en)
|
2010-09-20 |
2015-06-16 |
Exxonmobil Upstream Research Company |
Flexible and adaptive formulations for complex reservoir simulations
|
US10428626B2
(en)
*
|
2010-10-18 |
2019-10-01 |
Schlumberger Technology Corporation |
Production estimation in subterranean formations
|
MX2013006752A
(en)
|
2010-12-16 |
2013-12-06 |
Landmark Graphics Corp |
Method and system of plotting correlated data.
|
EA025073B1
(en)
*
|
2011-04-15 |
2016-11-30 |
Лэндмарк Графикс Корпорейшн |
Method and system for hydraulic fracture characterization using microseismic event data
|
US8681583B2
(en)
*
|
2011-08-17 |
2014-03-25 |
Microseismic, Inc. |
Method for calculating spatial and temporal distribution of the Gutenberg-Richter parameter for induced subsurface seismic events and its application to evaluation of subsurface formations
|
CA2842398C
(en)
|
2011-08-23 |
2017-11-28 |
Exxonmobil Upstream Research Company |
Estimating fracture dimensions from microseismic data
|
US11774616B2
(en)
|
2011-08-29 |
2023-10-03 |
Seismic Innovations |
Method and system for microseismic event location error analysis and display
|
US9945970B1
(en)
*
|
2011-08-29 |
2018-04-17 |
Seismic Innovations |
Method and apparatus for modeling microseismic event location estimate accuracy
|
US20140334261A1
(en)
*
|
2011-08-29 |
2014-11-13 |
Jonathan S. Abel |
Method and system for microseismic event location error analysis and display
|
WO2013112719A1
(en)
*
|
2012-01-24 |
2013-08-01 |
Octave Reservoir Technologies, Inc. |
Method and system for displaying microseismic event locations
|
CA2843929C
(en)
|
2011-09-15 |
2018-03-27 |
Exxonmobil Upstream Research Company |
Optimized matrix and vector operations in instruction limited algorithms that perform eos calculations
|
BR112014006032A2
(en)
*
|
2011-09-16 |
2017-04-04 |
Landmark Graphics Corp |
Method for updating a property map during a simulation and non-transient device loader
|
US9001619B2
(en)
*
|
2011-10-19 |
2015-04-07 |
Global Microseismic Services, Inc. |
Method for imaging microseismic events using an azimuthally-dependent focal mechanism
|
US9097821B2
(en)
*
|
2012-01-10 |
2015-08-04 |
Chevron U.S.A. Inc. |
Integrated workflow or method for petrophysical rock typing in carbonates
|
US9377546B2
(en)
*
|
2012-05-06 |
2016-06-28 |
Schlumberger Technology Corporation |
Automatic extraction and characterization of fault and fracture populations
|
CA2873722C
(en)
|
2012-05-14 |
2017-03-21 |
Landmark Graphics Corporation |
Method and system of predicting future hydrocarbon production
|
WO2014036742A1
(en)
|
2012-09-10 |
2014-03-13 |
Schlumberger Canada Limited |
Method for transverse fracturing of a subterranean formation
|
EP2901363A4
(en)
|
2012-09-28 |
2016-06-01 |
Exxonmobil Upstream Res Co |
Fault removal in geological models
|
US20140100797A1
(en)
*
|
2012-10-08 |
2014-04-10 |
Mihira Narayan Acharya |
System and method for determining the production of wells
|
WO2014110542A1
(en)
*
|
2013-01-14 |
2014-07-17 |
Westerngeco Seismic Holdings Limited |
Method of analyzing seismic data
|
US20210311214A1
(en)
*
|
2013-02-11 |
2021-10-07 |
Conocophillips Company |
Method for detecting and quantifying fracture interaction in hydraulic fracturing
|
WO2014159479A1
(en)
*
|
2013-03-14 |
2014-10-02 |
Schlumberger Canada Limited |
Direct fluid indicators in multiple segment prospects
|
US9097097B2
(en)
|
2013-03-20 |
2015-08-04 |
Baker Hughes Incorporated |
Method of determination of fracture extent
|
US9612359B2
(en)
|
2013-06-12 |
2017-04-04 |
Baker Hughes Incorporated |
Generation of fracture networks using seismic data
|
WO2014205162A1
(en)
*
|
2013-06-21 |
2014-12-24 |
Schlumberger Canada Limited |
Determining change in permeability caused by a hydraulic fracture in reservoirs
|
US20150006082A1
(en)
*
|
2013-06-26 |
2015-01-01 |
Baker Hughes Incorporated |
Method and apparatus for microseismic attribute mapping for stimulated reservoir volume evaluation
|
CN104278991B
(en)
*
|
2013-07-09 |
2016-12-28 |
中国石油化工股份有限公司 |
Saline Lake Facies hydrocarbon source rock organic carbon and the polynary well logging computational methods of hydrocarbon potential
|
US9416652B2
(en)
|
2013-08-08 |
2016-08-16 |
Vetco Gray Inc. |
Sensing magnetized portions of a wellhead system to monitor fatigue loading
|
US9903189B2
(en)
|
2013-08-26 |
2018-02-27 |
Halliburton Energy Services, Inc. |
Real-time stimulated reservoir volume calculation
|
US9529103B2
(en)
|
2013-08-26 |
2016-12-27 |
Halliburton Energy Services, Inc. |
Identifying overlapping stimulated reservoir volumes for a multi-stage injection treatment
|
US9523275B2
(en)
*
|
2013-08-26 |
2016-12-20 |
Halliburton Energy Services, Inc. |
Identifying an axis of a stimulated reservoir volume for a stimulation treatment of a subterranean region
|
US9551208B2
(en)
|
2013-08-26 |
2017-01-24 |
Halliburton Energy Services, Inc. |
Identifying uncertainty associated with a stimulated reservoir volume (SRV) calculation
|
US9529104B2
(en)
|
2013-08-26 |
2016-12-27 |
Halliburton Energy Services, Inc. |
Indentifying a stimulated reservoir volume from microseismic data
|
EP3060753B1
(en)
|
2013-10-21 |
2021-04-28 |
Westerngeco LLC |
Seismic data analysis
|
US10795053B2
(en)
|
2013-10-29 |
2020-10-06 |
Emerson Paradigm Holding Llc |
Systems and methods of multi-scale meshing for geologic time modeling
|
US10221667B2
(en)
|
2013-12-13 |
2019-03-05 |
Schlumberger Technology Corporation |
Laser cutting with convex deflector
|
WO2015089458A1
(en)
|
2013-12-13 |
2015-06-18 |
Schlumberger Canada Limited |
Creating radial slots in a wellbore
|
US10422923B2
(en)
|
2014-03-28 |
2019-09-24 |
Emerson Paradigm Holding Llc |
Systems and methods for modeling fracture networks in reservoir volumes from microseismic events
|
WO2016018723A1
(en)
|
2014-07-30 |
2016-02-04 |
Exxonmobil Upstream Research Company |
Method for volumetric grid generation in a domain with heterogeneous material properties
|
CA2965888C
(en)
|
2014-10-27 |
2023-05-23 |
Cgg Services Sa |
Predicting hydraulic fracture treatment effectiveness and productivity in oil and gas reservoirs
|
WO2016069977A1
(en)
|
2014-10-30 |
2016-05-06 |
Schlumberger Canada Limited |
Creating radial slots in a subterranean formation
|
US10803534B2
(en)
|
2014-10-31 |
2020-10-13 |
Exxonmobil Upstream Research Company |
Handling domain discontinuity with the help of grid optimization techniques
|
US11409023B2
(en)
|
2014-10-31 |
2022-08-09 |
Exxonmobil Upstream Research Company |
Methods to handle discontinuity in constructing design space using moving least squares
|
US10197704B2
(en)
|
2014-12-19 |
2019-02-05 |
Baker Hughes, A Ge Company, Llc |
Corrective scaling of interpreted fractures based on the microseismic detection range bias correction
|
US10822922B2
(en)
*
|
2015-01-19 |
2020-11-03 |
International Business Machines Corporation |
Resource identification using historic well data
|
CN108138555A
(en)
*
|
2015-02-23 |
2018-06-08 |
奈克森能量无限责任公司 |
Method, system and the equipment of predicting reservoir property
|
US9690002B2
(en)
|
2015-06-18 |
2017-06-27 |
Paradigm Sciences Ltd. |
Device, system and method for geological-time refinement
|
FR3038091B1
(en)
*
|
2015-06-25 |
2017-07-28 |
Storengy |
METHOD AND DEVICE FOR DETERMINING PERMEABILITY IN A RESERVOIR
|
CA2985577A1
(en)
*
|
2015-07-08 |
2017-01-12 |
Halliburton Energy Services, Inc. |
Improved fracture matching for completion operations
|
US10338246B1
(en)
|
2015-08-31 |
2019-07-02 |
Seismic Innovations |
Method and system for microseismic event wavefront estimation
|
CN105572746A
(en)
*
|
2015-12-11 |
2016-05-11 |
中国石油天然气股份有限公司 |
Method and device for determining drilling position
|
CN105927216B
(en)
*
|
2016-04-25 |
2019-04-16 |
中国矿业大学 |
A kind of fold development area Forecast Means of Reservoir Fractures and device
|
US10466388B2
(en)
|
2016-09-07 |
2019-11-05 |
Emerson Paradigm Holding Llc |
System and method for editing geological models by switching between volume-based models and surface-based structural models augmented with stratigraphic fiber bundles
|
US11879316B2
(en)
*
|
2016-10-04 |
2024-01-23 |
Landmark Graphics Corporation |
Geostatistical analysis of microseismic data in fracture modeling
|
CN106646605A
(en)
*
|
2016-10-16 |
2017-05-10 |
中国地质大学(北京) |
Complex fracture zone rock formation curvature optimization calculation method
|
CN106772673B
(en)
*
|
2016-11-29 |
2018-11-13 |
西南石油大学 |
A kind of shale reservoir crustal stress Forecasting Model System
|
CN106772674B
(en)
*
|
2016-12-01 |
2018-11-16 |
中国石油天然气股份有限公司 |
Method for calculating oil saturation of fractured sandstone reservoir
|
WO2018118374A1
(en)
|
2016-12-23 |
2018-06-28 |
Exxonmobil Upstream Research Company |
Method and system for stable and efficient reservoir simulation using stability proxies
|
CN110850470A
(en)
*
|
2018-08-20 |
2020-02-28 |
中国石油化工股份有限公司 |
Method for calculating ground stress difference coefficient by using seismic data
|
CN109710968B
(en)
*
|
2018-11-14 |
2022-03-01 |
中国石油天然气股份有限公司 |
Basement rock buried hill crack prediction method and device
|
US11156744B2
(en)
|
2019-01-10 |
2021-10-26 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
US10520644B1
(en)
|
2019-01-10 |
2019-12-31 |
Emerson Paradigm Holding Llc |
Imaging a subsurface geological model at a past intermediate restoration time
|
RU2720859C1
(en)
*
|
2019-05-29 |
2020-05-13 |
Общество с ограниченной ответственностью "Газпром добыча Кузнецк" |
Method of horizontal methane coal well design selection
|
CN111045082A
(en)
*
|
2020-01-06 |
2020-04-21 |
中国石油化工股份有限公司 |
Method for constructing hydraulic fracturing fracture space seam network by using microseism event points
|
CN111749687B
(en)
*
|
2020-07-23 |
2023-11-21 |
中海石油国际能源服务(北京)有限公司 |
Multi-layer oil reservoir principal force horizon determination method, device, equipment and storage medium
|
US11921250B2
(en)
|
2022-03-09 |
2024-03-05 |
Saudi Arabian Oil Company |
Geo-mechanical based determination of sweet spot intervals for hydraulic fracturing stimulation
|
CN114779330B
(en)
*
|
2022-04-26 |
2022-12-27 |
中国矿业大学 |
Mining working face main fracture azimuth analysis and prediction method based on microseismic monitoring
|
CN117872472B
(en)
*
|
2023-12-15 |
2024-06-18 |
大庆油田有限责任公司 |
Method for determining irregular section shape of normal fault of sand and mud stratum
|