IN2013CH06209A - - Google Patents
Info
- Publication number
- IN2013CH06209A IN2013CH06209A IN6209CH2013A IN2013CH06209A IN 2013CH06209 A IN2013CH06209 A IN 2013CH06209A IN 6209CH2013 A IN6209CH2013 A IN 6209CH2013A IN 2013CH06209 A IN2013CH06209 A IN 2013CH06209A
- Authority
- IN
- India
- Prior art keywords
- historical data
- plunger
- lift operations
- well
- plunger lift
- Prior art date
Links
- 238000013499 data model Methods 0.000 abstract 1
- 239000007788 liquid Substances 0.000 abstract 1
- 238000013178 mathematical model Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 238000004441 surface measurement Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
Abstract
[0060] In various aspects, the invention provides a system and methods to improve plunger lift operations, by providing improved estimates for at least one of: a liquid level in a well reservoir at any level, the position of the plunger at any given time, and threshold pressure value and threshold flow rate to make more informed decisions to open, close the valve, and maintain the productivity of the well. The improved estimations include obtaining dynamic operating variables by use of existing surface measurements, and based on historical data and mathematical models developed on the basis of the historical data. This in turn also enables the estimation of other values related to plunger lift operations more accurately.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/IB2014/066887 WO2015101859A1 (en) | 2013-12-31 | 2014-12-14 | Methods for improved plunger lift operation |
IN6209CH2013 IN2013CH06209A (en) | 2013-12-31 | 2014-12-14 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN6209CH2013 IN2013CH06209A (en) | 2013-12-31 | 2014-12-14 |
Publications (1)
Publication Number | Publication Date |
---|---|
IN2013CH06209A true IN2013CH06209A (en) | 2015-09-04 |
Family
ID=52273367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
IN6209CH2013 IN2013CH06209A (en) | 2013-12-31 | 2014-12-14 |
Country Status (2)
Country | Link |
---|---|
IN (1) | IN2013CH06209A (en) |
WO (1) | WO2015101859A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109209304B (en) * | 2018-11-02 | 2024-01-16 | 西安安森智能仪器股份有限公司 | Control method of well plunger control system |
CN114165220A (en) * | 2020-08-21 | 2022-03-11 | 中国石油天然气股份有限公司 | Method and device for controlling plunger lifting system to open and close well |
CN113153224B (en) * | 2021-03-25 | 2022-12-09 | 中国石油天然气股份有限公司 | Diagnosis method and equipment suitable for shale gas well plunger process operation state |
US11952887B2 (en) * | 2021-07-15 | 2024-04-09 | ExxonMobil Technology and Engineering Company | Plunger lift systems and related methods |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4392782A (en) | 1980-11-13 | 1983-07-12 | Comact Pump Corporation | Liquid level controller |
US5094102A (en) | 1989-10-10 | 1992-03-10 | Phillips Petroleum Company | Liquid level detection |
US5285388A (en) | 1990-07-16 | 1994-02-08 | James N. McCoy | Detection of fluid reflection for echo sounding operation |
US5785123A (en) | 1996-06-20 | 1998-07-28 | Amoco Corp. | Apparatus and method for controlling a well plunger system |
US6241014B1 (en) | 1997-08-14 | 2001-06-05 | Texas Electronic Resources, Inc. | Plunger lift controller and method |
US6634426B2 (en) | 2000-10-31 | 2003-10-21 | James N. McCoy | Determination of plunger location and well performance parameters in a borehole plunger lift system |
US6883606B2 (en) | 2002-02-01 | 2005-04-26 | Scientific Microsystems, Inc. | Differential pressure controller |
US7490675B2 (en) | 2005-07-13 | 2009-02-17 | Weatherford/Lamb, Inc. | Methods and apparatus for optimizing well production |
US7819189B1 (en) | 2006-06-06 | 2010-10-26 | Harbison-Fischer, L.P. | Method and system for determining plunger location in a plunger lift system |
US7681641B2 (en) * | 2007-02-28 | 2010-03-23 | Vinson Process Controls Company, Lp | Plunger lift controller and method |
US9297247B2 (en) * | 2011-06-20 | 2016-03-29 | James F. Lea, Jr. | Plunger lift slug controller |
-
2014
- 2014-12-14 WO PCT/IB2014/066887 patent/WO2015101859A1/en active Application Filing
- 2014-12-14 IN IN6209CH2013 patent/IN2013CH06209A/en unknown
Also Published As
Publication number | Publication date |
---|---|
WO2015101859A1 (en) | 2015-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2555547A (en) | System and method for real-time monitoring and estimation of intelligent well system production performance | |
MX2016007053A (en) | History matching multi-porosity solutions. | |
MX2019001488A (en) | Method and apparatus for model-based control of a water distribution system. | |
CA2961145C (en) | Casing wear prediction using integrated physics-driven and data-driven models | |
IN2013CH06209A (en) | ||
GB2573425A (en) | Automated upscaling of relative permeability and capillary pressure in multi-porosity systems | |
WO2016051282A3 (en) | Reservoir resistivity characterization incorporating flow dynamics | |
MX2018002542A (en) | System and method for monitoring the state of a choke valve in a managed pressure drilling system. | |
MX366083B (en) | Own-position estimating device and own-position estimating method. | |
GB2538371A (en) | Well testing and monitoring | |
MX2016003680A (en) | Balance vehicle parking method and apparatus. | |
HUE060006T2 (en) | Fill level measurement, pressure measurement or flow rate measurement with short measurement time | |
GB2538911A (en) | Estimating casing wear using models incorporating bending stiffness | |
MX2015000078A (en) | Saturation estimation using mcsem data and stochastic petrophysical modeling. | |
AU2018253651A1 (en) | Estimating material properties | |
MX2016009813A (en) | Estimation and monitoring of casing wear during a drilling operation using casing wear maps. | |
MY187618A (en) | Flow metering | |
WO2013151686A3 (en) | System and method for reservoir pressure data analysis | |
GB201315895D0 (en) | A method of mapping reservoir fluid movement using gravity sensors | |
GB2544922A (en) | Methods and systems for simulating a hydrocarbon field using a multi-point well connection method | |
GB2572273A (en) | Coupled reservoir-geomechanical models using compaction tables | |
MX364096B (en) | Line displacement evaluation method, line displacement evaluation device, program, and recording medium. | |
GB2540519A (en) | Real time tool erosion prediction monitoring | |
MX357322B (en) | Estimating subterranean fluid viscosity based on nuclear magnetic resonance (nmr) data. | |
MX2015015402A (en) | Closed chamber impulse test with downhole flow rate measurement. |