|
EP0459522B1
(en)
*
|
1990-05-31 |
1995-12-20 |
Nissin Electric Company, Limited |
Fault location method for a parallel two-circuit transmission line with N terminals
|
|
DE69114231T2
(de)
*
|
1990-09-04 |
1996-03-21 |
Hewlett Packard Co |
Verfahren und Gerät zur Überwachung eines Netzes.
|
|
US5198805A
(en)
*
|
1990-09-04 |
1993-03-30 |
Hewlett-Packard Company |
Method and apparatus for monitoring a network and locating a node using signal strength calculations
|
|
EP0474379B1
(en)
*
|
1990-09-04 |
1995-11-22 |
Hewlett-Packard Company |
Method and apparatus for analyzing nodes on a computer network
|
|
GB2270217B
(en)
*
|
1992-08-27 |
1996-04-10 |
Univ Bath |
Detecing faults in power lines
|
|
US5428549A
(en)
*
|
1993-05-28 |
1995-06-27 |
Abb Power T&D Company |
Transmission line fault location system
|
|
US5453903A
(en)
*
|
1993-08-18 |
1995-09-26 |
Abb Power T&D Company, Inc. |
Sub-cycle digital distance relay
|
|
US5455776A
(en)
*
|
1993-09-08 |
1995-10-03 |
Abb Power T & D Company Inc. |
Automatic fault location system
|
|
JP3686430B2
(ja)
*
|
1993-10-19 |
2005-08-24 |
東北電力株式会社 |
送電線サージ識別・標定システム
|
|
WO1995024014A2
(en)
*
|
1994-02-28 |
1995-09-08 |
Abb Power T & D Company Inc. |
One-terminal data fault location system
|
|
GB2288930B
(en)
*
|
1994-04-25 |
1998-01-21 |
Gec Alsthom Ltd |
Methods and apparatus for identifying faulted phases on an electric power transmission line
|
|
DE4441334C1
(de)
*
|
1994-11-08 |
1996-07-11 |
Siemens Ag |
Verfahren zum Feststellen des Ortes eines Fehlers in einem vorgegebenen Überwachungsbereich eines mehrphasigen elektrischen Energieübertragungsleitungssystems
|
|
SE515388C2
(sv)
*
|
1995-09-14 |
2001-07-23 |
Abb Research Ltd |
Anordning för avkänning av elektriska urladdningar i ett provobjekt
|
|
DE19605022A1
(de)
*
|
1996-01-31 |
1997-08-07 |
Siemens Ag |
Verfahren zum Erfassen eines Fehlers auf einem zu überwachenden Leitungsabschnitt einer elektrischen Übertragungsleitung nach dem Distanzschutzprinzip
|
|
DE19609595A1
(de)
*
|
1996-03-12 |
1997-10-23 |
Aeg Energietechnik Gmbh |
Verfahren zur Bestimmung von Betriebsmittelparametern für wenigstens eine Distanzschutzeinrichtung
|
|
US5798932A
(en)
*
|
1996-05-21 |
1998-08-25 |
General Electric Company |
Methods and apparatus for removing error due to decaying offsets from measured power system currents
|
|
SE507043C2
(sv)
*
|
1996-08-29 |
1998-03-16 |
Asea Brown Boveri |
Mätförfarande vid linjefels lokator på HVDC-linjer
|
|
US5839093A
(en)
*
|
1996-12-31 |
1998-11-17 |
Abb Transmit Oy |
System for locating faults and estimating fault resistance in distribution networks with tapped loads
|
|
EP0933643A1
(de)
*
|
1998-02-02 |
1999-08-04 |
Trench Austria GmbH |
Verfahren zur Fehlerortung in Drehstromnetzen
|
|
US6415244B1
(en)
|
1998-03-31 |
2002-07-02 |
Mehta Tech, Inc. |
Power monitoring system and method
|
|
US6336059B1
(en)
*
|
1998-11-17 |
2002-01-01 |
Abb Power T&D Company Inc. |
Reach-measurement method for distance relays and fault locators on series-compensated transmission lines using local information
|
|
GB2345810B
(en)
*
|
1999-01-13 |
2003-07-23 |
Alstom Uk Ltd |
Fault-detection apparatus
|
|
RU2149489C1
(ru)
*
|
1999-02-01 |
2000-05-20 |
Нудельман Года Семенович |
Способ дистанционной защиты и определения места замыкания на землю линии электропередачи
|
|
US6476613B2
(en)
*
|
2000-12-20 |
2002-11-05 |
Abb Ab |
Method of fault location in parallel transmission lines with series compensation
|
|
US6466030B2
(en)
|
2000-12-29 |
2002-10-15 |
Abb Power Automation Ltd. |
Systems and methods for locating faults on a transmission line with a single tapped load
|
|
US6466031B1
(en)
|
2000-12-29 |
2002-10-15 |
Abb Power Automation Ltd. |
Systems and methods for locating faults on a transmission line with multiple tapped loads
|
|
US7031859B2
(en)
*
|
2002-03-11 |
2006-04-18 |
Piesinger Gregory H |
Apparatus and method for identifying cable phase in a three-phase power distribution network
|
|
US6642700B2
(en)
|
2002-03-26 |
2003-11-04 |
Avistar, Inc. |
System, method, field unit, reference unit and computer program product for phase tracking of electrical conductors
|
|
US6879917B2
(en)
|
2002-06-14 |
2005-04-12 |
Progress Energy Carolinas Inc. |
Double-ended distance-to-fault location system using time-synchronized positive-or negative-sequence quantities
|
|
SE525185C2
(sv)
*
|
2002-06-20 |
2004-12-21 |
Abb Ab |
Fellokalisering med hjälp av mätningar av ström och spänning från ena änden av en ledning
|
|
US6988042B2
(en)
*
|
2003-11-25 |
2006-01-17 |
Myongji University |
Method for detecting line-to-line fault location in power network
|
|
US20070063664A1
(en)
*
|
2005-09-22 |
2007-03-22 |
Avistar, Inc. |
Phase identification apparatus having automatic gain control to prevent detector saturation
|
|
RU2316780C1
(ru)
*
|
2006-06-19 |
2008-02-10 |
Общество с ограниченной ответственностью "Исследовательский центр "Бреслер" |
Способ релейной защиты энергообъекта
|
|
US8395871B2
(en)
*
|
2007-02-20 |
2013-03-12 |
Abb Technology Ag |
Device and method for detecting faulted phases in a multi-phase electrical network
|
|
CN101897094B
(zh)
*
|
2007-12-14 |
2013-07-17 |
Abb技术有限公司 |
故障方向确定
|
|
US8340931B2
(en)
*
|
2009-10-05 |
2012-12-25 |
Mehta Tech, Inc. |
Power grid with comparison of differences in remote phasor changes
|
|
RU2479903C1
(ru)
*
|
2012-02-08 |
2013-04-20 |
Общество с ограниченной ответственностью "АТЛАНТ" |
Устройство контроля и управления сигналами релейной защиты и противоаварийной автоматики
|
|
RU2570572C1
(ru)
*
|
2014-10-15 |
2015-12-10 |
Общество с ограниченной ответственностью "АББ" |
Микропроцессорная панель управления
|
|
EP3171185B1
(de)
*
|
2015-11-20 |
2018-06-27 |
Siemens Aktiengesellschaft |
Verfahren und einrichtung zum bestimmen des fehlerortes im falle eines fehlers auf einer elektrischen leitung
|
|
WO2019186490A1
(en)
|
2018-03-31 |
2019-10-03 |
Abb Schweiz Ag |
Method and device for protection in a multi-terminal power transmission system
|
|
CN110082636B
(zh)
*
|
2019-05-07 |
2021-02-26 |
哈尔滨理工大学 |
一种电力电缆故障定位方法及系统
|