Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to GEAU2003001160priorityCriticalpatent/GEU20041070Y/en
Publication of GEU20041070YpublicationCriticalpatent/GEU20041070Y/en
1. Technical Result Increase in safety of construction and material saving. 2. Essence A sustaining wall comprises blocks 1, a façade plate 2 and a buttress 3. The buttresses are coupled to each other by a plate 7 combined with a façade plate and have projections 4 and cuts 5 and 6. 3. Field of Application Construction.