Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filedfiledCritical
Priority to GEAU2000000911priorityCriticalpatent/GEU2001857Y/en
Publication of GEU2001857YpublicationCriticalpatent/GEU2001857Y/en
1. Technical Result Reduce of economic expenses, increase in performance factor and reliability of work. 2. Essence A power station comprises a floating housing 1 made in the form of two pontoons, a generator 8 mounted thereon and cinematically connected therewith consisting of at least three blades 7, rotor 3, which is made in the form of the rods 6 radially fixed on the axle, on which parallel to the axle the semi-cylinders blades 7 are immovably mounted. The edge rotors are separately connected to the central rotor by means of chain-drive 5. 3. Field of Application Power engineering, in particular wind-driven powerplant.
GEAU20000009112000-12-112000-12-11Floating Power Station
GEU2001857Y
(en)