GEP19991887B - Method of water tests of concrete materials
- Google Patents
Method of water tests of concrete materials
Info
Publication number
GEP19991887B
GEP19991887BGEAP19984299AGEAP1998004299AGEP19991887BGE P19991887 BGEP19991887 BGE P19991887BGE AP19984299 AGEAP19984299 AGE AP19984299AGE AP1998004299 AGEAP1998004299 AGE AP1998004299AGE P19991887 BGEP19991887 BGE P19991887B
Authority
GE
Georgia
Prior art keywords
specimen
facing
control
providing
concrete materials
Prior art date
Application number
GEAP19984299A
Inventor
Konstantin Chumburidze
George Chumburidze
Original Assignee
Konstantin Chumburidze
George Chumburidze
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Konstantin Chumburidze, George ChumburidzefiledCriticalKonstantin Chumburidze
Publication of GEP19991887BpublicationCriticalpatent/GEP19991887B/en
On-Site Construction Work That Accompanies The Preparation And Application Of Concrete
(AREA)
Abstract
1. Technical result Expansion of functionalities of the method by providing hermiticity tests and the control of working capacity of drainage. 2. Essence On a concrete specimen 3 is created a liquid pressure on the sides of facing, then it is dumped after providing a leak proof fit of facing to the concrete specimen, further a control liquid is submitted under pressure from the open side of the specimen and its quantity is recorded from the opposite side of the specimen. 3. Field of Application Test techniques, the control of the underground conduit with steel facing and to slot-hole drainages. 2 figs.
GEAP19984299A1988-01-201998-05-19Method of water tests of concrete materials
GEP19991887B
(en)
PROCEDURE FOR PROPERTY OR CONSOLIDATION OF INTERCAPEASE WALLS UNDER CONSTRUCTION UNDER THE SOIL LEVEL IN MINES AND CONSTRUCTION OF GALLERIES DEVICE FOR IMPLEMENTATION OF THE PROCEDURE AND CONSOLIDATION ANCHORING IN A DRILLED HOLE IN THE INTERCAPED WALL