- Publication number
- GB550718A GB550718A GB550718DA GB550718A GB 550718 A GB550718 A GB 550718A GB 550718D A GB550718D A GB 550718DA GB 550718 A GB550718 A GB 550718A
- Authority
- GB
- United Kingdom
- Prior art keywords
- members
- lattice
- reinforcement
- concrete
- posts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
- E04H12/14—Truss-like structures
Abstract
550,718. Concrete lattice posts, pylons and towers. ASHCRETE (PROPRIETARY), Ltd., LAUTENBERG, G. H., and MACERATA, S. May 19, 1941, No. 6390. [Class 20 (i)] Reinforced-concrete lattice structures, such as water towers, masts, pylons, and the like, are constructed by erecting the reinforcement of the vertical and lattice portions, precasting in the form of hollow or apertured members the upstanding members and/or lattice members, placing such members to enclose the reinforcement and filling in the spaces between the members and the reinforcement, and casting in situ the remaining members not precast. In one form, Fig. 1, comprising three separate posts 10 forming the structure, the reinforcing rods 11 are first positioned, the lower portions of concrete are then cast around the separate reinforcements by means of tubular moulds 14 suspended from a frame 15 sliding on upright guides 16, and an aperture precast concrete spacer 12 is slid on to the reinforcement. The further post portions are then cast around the reinforcements above the spacer and part of the material enters the recesses in the spacer and binds the whole into a monobloc. The process is repeated and where the posts incline towards each other at the top, the moulds are set at the necessary inclination on the frame 15. The adjacent ends of the separate posts enter end caps such as 28, and at the upper end a single post 25 is cast to terminate the structure, the reinforcement from the separate posts passing into and through the post 25. For a water-tower the coverings 32 and 41 for both the uprights and inclined lattice members are precast, the latter being secured to projections 36 on knuckle portions 31 which are temporarily secured by clamps 35 to the upright coverings ; concrete is then cast between the tubular coverings on the uprights and lattice members and the several reinforcements. The precast members may be formed with complementary recesses and projections to interengage.
Publications (1)
Publication Number | Publication Date |
---|---|
GB550718A true GB550718A (en) | 1900-01-01 |
Family
ID=1748625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB550718D Expired GB550718A (en) |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB550718A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202005003425U1 (en) * | 2005-03-03 | 2006-07-20 | Oevermann Gmbh & Co. Kg | Foundation e.g. for offshore wind energy plant has cross tubes, rim tubes and head struts, which are clamped between stop surfaces on base joint elements, head joint elements and shaft foot joint elements |
DE102015210474A1 (en) * | 2015-06-09 | 2016-12-15 | Rwe Innogy Gmbh | Lattice mast structure and method for increasing the stability of a lattice mast structure |
-
0
- GB GB550718D patent/GB550718A/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202005003425U1 (en) * | 2005-03-03 | 2006-07-20 | Oevermann Gmbh & Co. Kg | Foundation e.g. for offshore wind energy plant has cross tubes, rim tubes and head struts, which are clamped between stop surfaces on base joint elements, head joint elements and shaft foot joint elements |
DE102015210474A1 (en) * | 2015-06-09 | 2016-12-15 | Rwe Innogy Gmbh | Lattice mast structure and method for increasing the stability of a lattice mast structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4953280A (en) | Method of manufacturing prestressed concrete culverts | |
US4493177A (en) | Composite, pre-stressed structural member and method of forming same | |
JP3940211B2 (en) | Construction method of horizontal beams for concrete main tower. | |
CN106437031B (en) | The multilayer prefabricated post of one-pass molding with bracket and preparation method thereof and construction method | |
CN103046465A (en) | Reinforcing construction method for foam core die precast hollow plate beam | |
US4700516A (en) | Composite, pre-stressed structural member and method of forming same | |
CN110593114A (en) | Box girder construction method based on large-span box girder multi-hoop truss support bailey bracket | |
CN110206229A (en) | A kind of concrete column splicing structure and its construction method | |
CN207032466U (en) | A kind of superposed type prefabricated reinforced concrete structure system | |
JPH11200320A (en) | Execution method of horizontal beam of concrete main tower | |
GB550718A (en) | ||
JPH06264412A (en) | Prefabrication method of bridge pier and bridge pier concrete block | |
CN108104310A (en) | Assembled frame-shear structure column splitlevel connection structure and assembling method | |
CN109577206B (en) | Hollow high pier formwork system and construction method | |
CN1065312A (en) | A kind of hollow pre-fabricated panels and manufacture method | |
CN206512923U (en) | Multilayer prefabricated post of the one-shot forming with bracket | |
CN213978605U (en) | Assembled pier stud connection structure | |
KR100665246B1 (en) | Precast concrete connection structure using Fiber Reinforced Plastics construction | |
JP2000045229A (en) | Constructing method of bridge | |
CN114414354A (en) | Temporary support test device for large-span box girder erection | |
CN103469788B (en) | Movably-fabricated precast pile and production mould | |
EP0273541B1 (en) | A structure and method for stabilising sloping ground | |
CN110485570A (en) | The support top circulatory system and three-dimensional prefabricated full prefabricated concrete structure method | |
GB725826A (en) | Improvements in or relating to pre-stressed concrete structures having curved or cylindrical walls | |
JPH0742114A (en) | Construction method for concrete-filled steel pipe multi-pillar type bridge pier |