GB279175A - Method of and apparatus for testing the productivity of a formation in a well - Google Patents
Method of and apparatus for testing the productivity of a formation in a wellInfo
- Publication number
- GB279175A GB279175A GB1842926A GB1842926A GB279175A GB 279175 A GB279175 A GB 279175A GB 1842926 A GB1842926 A GB 1842926A GB 1842926 A GB1842926 A GB 1842926A GB 279175 A GB279175 A GB 279175A
- Authority
- GB
- United Kingdom
- Prior art keywords
- well
- pipe
- formation
- valve
- ports
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 230000015572 biosynthetic process Effects 0.000 title abstract 6
- 239000012530 fluid Substances 0.000 abstract 3
- 238000004519 manufacturing process Methods 0.000 abstract 2
- 238000005553 drilling Methods 0.000 abstract 1
- 238000011010 flushing procedure Methods 0.000 abstract 1
- 239000007788 liquid Substances 0.000 abstract 1
- 238000012856 packing Methods 0.000 abstract 1
- 238000007789 sealing Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
- E21B49/08—Obtaining fluid samples or testing fluids, in boreholes or wells
- E21B49/087—Well testing, e.g. testing for reservoir productivity or formation parameters
- E21B49/088—Well testing, e.g. testing for reservoir productivity or formation parameters combined with sampling
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Examining Or Testing Airtightness (AREA)
Abstract
279,175. Simmons, J. T. July 23, 1926. Wells. - To test the productivity of a formation encountered in drilling an oil &c. well without removing the mud - laden flushing liquid from the well, a single string of pipe or casing, closed to the contents of the well, is lowered into the well, and sealing means thereon is caused to shut off the formation from the upper strata; the pipe or casing is then opened to the formation to allow fluids from the latter to ascend therein. As shown, a pipe 23 has at the lower end a valve comprising a member 19 threaded to the pipe and provided with ports 17, 18, the member 19 being mounted on an upper extension 7 of a member 4 with ports 5, 6, and the members 4, 19 being relatively rotatable to bring the ports 17, 18 and 5, 6 into or out of communication; a pin 25 and slot 24 limit such relative rotation. The lower end of the member 4 is bevelled and below it is arranged a conical packer 15 of rubber, lead &c. A reduced bore 2 is formed at the foot of the well and extends into the formation to be tested. The pipe 23 is lowered into the well with the valve 4, 19 closed and the packing 15 is forced info the mouth of the reduced bore 2 to shut off the latter from the mudladen fluid in the well 3. The valve is then opened by rotating the pipe 23, when the well may come into production, or if the pressure is insufficient for production, fluid may flow from the formation into the pipe 23 which, after closing of the valve, is then raised to the surface for examination. A perforated pipe 12, closed at its lower end, may be arranged below the packer 15.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1842926A GB279175A (en) | 1926-07-23 | 1926-07-23 | Method of and apparatus for testing the productivity of a formation in a well |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1842926A GB279175A (en) | 1926-07-23 | 1926-07-23 | Method of and apparatus for testing the productivity of a formation in a well |
Publications (1)
Publication Number | Publication Date |
---|---|
GB279175A true GB279175A (en) | 1927-10-24 |
Family
ID=10112283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB1842926A Expired GB279175A (en) | 1926-07-23 | 1926-07-23 | Method of and apparatus for testing the productivity of a formation in a well |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB279175A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1809859A1 (en) * | 2004-10-22 | 2007-07-25 | Easy Well Solutions AS | A method and a device for setting a casing |
-
1926
- 1926-07-23 GB GB1842926A patent/GB279175A/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1809859A1 (en) * | 2004-10-22 | 2007-07-25 | Easy Well Solutions AS | A method and a device for setting a casing |
EP1809859A4 (en) * | 2004-10-22 | 2013-07-03 | Easy Well Solutions As | A method and a device for setting a casing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US2043225A (en) | Method and apparatus for testing the productivity of the formation in wells | |
US2164195A (en) | Casing tester | |
CN104406910B (en) | Apparatus and method for testing cementation capability of well cementation first and second interfaces under high-temperature high-pressure conditions | |
WO2018184397A1 (en) | Integrated evaluation, testing and simulation apparatus for wellbore sand-control blocking and unblocking, and method | |
US4665983A (en) | Full bore sampler valve with time delay | |
US2160228A (en) | Process and apparatus for cementing oil wells | |
US2189919A (en) | Method and apparatus for formation pressure testing | |
US2708000A (en) | Apparatus for sealing a bore hole casing | |
US2128253A (en) | Hydraulic lock dry pipe valve with well testing and well flowing apparatus | |
US2964109A (en) | Method of eliminating water resistant coating from bore of injection wells | |
RU2509873C1 (en) | Sealing method of production string | |
CN112443288B (en) | Experimental device for evaluating sealing capacity of two interfaces of well cementation cement sheath | |
US2935133A (en) | Formation testing | |
CN108952672A (en) | The drillstem test tubing string and application method of motionless drilling tool | |
US2087297A (en) | Method of shutting off water sands in wells | |
GB279175A (en) | Method of and apparatus for testing the productivity of a formation in a well | |
US2844205A (en) | Method for completing and servicing a well | |
NO332526B1 (en) | Device for plug construction | |
US2155718A (en) | Wash-pipe anchor | |
US1758156A (en) | Method and means for cementing oil wells | |
US2092062A (en) | Apparatus for testing oil wells | |
US2138057A (en) | Method and apparatus for testing wells | |
US2128716A (en) | Well testing device | |
US1838539A (en) | Method and apparatus for obtaining indications of earth formations | |
US1514585A (en) | Testing device for oil wells |