GB2539064A - Flood prevention system and method - Google Patents

Flood prevention system and method Download PDF

Info

Publication number
GB2539064A
GB2539064A GB1604557.7A GB201604557A GB2539064A GB 2539064 A GB2539064 A GB 2539064A GB 201604557 A GB201604557 A GB 201604557A GB 2539064 A GB2539064 A GB 2539064A
Authority
GB
United Kingdom
Prior art keywords
water
asset
sump
drainage
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB1604557.7A
Other versions
GB201604557D0 (en
Inventor
Hannah Smith Alexis
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of GB201604557D0 publication Critical patent/GB201604557D0/en
Publication of GB2539064A publication Critical patent/GB2539064A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B11/00Drainage of soil, e.g. for agricultural purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/041Structures or apparatus for, or methods of, protecting banks, coasts, or harbours using active mechanical means, e.g. fluidizing or pumping
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/22Lining sumps in trenches or other foundation pits
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/32Parts, components, construction details, accessories, interior equipment, specially adapted for tents, e.g. guy-line equipment, skirts, thresholds
    • E04H15/62Pegs, stakes or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/14Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate against other dangerous influences, e.g. tornadoes, floods
    • E04H9/145Floods

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Ocean & Marine Engineering (AREA)
  • Paleontology (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Agronomy & Crop Science (AREA)
  • Sewage (AREA)

Abstract

The system 100 includes a perimeter barrier 14 around an asset or zone 22 to be protected and a soak way system 32-34 disposed sub-surface within the protected zone and designed to collect surface water from within the protected zone. A sump 30 is provided within the protected zone 22 and includes a pump 170 for pumping water from the sump to outside of the protected zone beyond the perimeter barrier. A series of sensors 102 106 detect the presence of ground water inside and outside of the protected zone and within the sump 30 and a control unit 108 coupled to the sensors controls the operation of the pump which removes water from the sump at a rate sufficient for preventing flooding within the protected zone 32. A control unit 108 can provide warning of impending flooding. Also disclosed is a method of protecting the asset from flood water.

Description

FLOOD PREVENTION SYSTEM AND METHOD
Field of the Invention
The present invention relates to a flood control system and method and in the preferred embodiments to a system and method able to prevent floodwater ingress into an asset, such as a dwelling or other building or location within a protected zone.
Background of the Invention
Flooding is a phenomenon which is experienced in many countries and has devastating consequences on inhabitants and businesses. Environmental changes are also bringing flooding to areas not previously affected and increasing flooding to flood prone zones.
A variety of flood defences have been developed, most of which involve the construction of permanent high barriers around a zone to be protected, as well as more traditional approaches such as use of sand bag barriers. Such approaches, while able to mitigate the effects of flooding to some degree, are often not effective, particularly when flooding causes an increase in the water table within the area sought to be protected.
Examples of drainage systems in a building are disclosed in US-5,501,044 and US-6,575,666. These systems have limited application particularly in protecting assets in a flood area.
Summary of the Present Invention
The present invention seeks to provide an improved system and method of preventing flooding within an asset protected zone and in the preferred 30 embodiments a system which optimises flood water management.
According to an aspect of the present invention, there is provided a flood management system for protecting an asset from flood water, including: a perimeter barrier disposed alongside and around an asset to be protected, the barrier including an upstanding wall for blocking surface water ingress into the protected asset and a subsurface barrier wall, the barrier wall being a discrete structure from the asset to be protected; a drainage system within the protected asset including at least one drainage unit disposed subsurface and adjacent the subsurface barrier wall; at least one subsurface sump to which the drainage system is fluidically coupled for collecting water from the drainage system, the at least one sump having a water level sensor disposed to sense water level in the sump; a pumping unit connected to the at least one sump; a drainage conduit coupled to the pumping unit, the drainage conduit extending beyond the perimeter barrier outside of the asset; and a trigger mechanism coupled to the water level sensor and the pumping unit, wherein the trigger mechanism is operable to activate the pumping unit when 15 the water level in the sump reaches or exceeds a threshold level so as to remove water from the sump and thereby from the asset.
The asset may be a building but more typically may be a zone which includes at least some ground surface. In one example, the zone may incorporate one of more buildings such as houses, gardens, driveways and so on. In another example, the zone may include a sports pitch, an industrial unit, hospital and so on, even a park area and pond.
The system provides a barrier wall, impervious to flood water, which can surround the asset. The other elements of the system ensure that the asset can remain dry, not only from water ingress outside the asset and barrier wall but also, in the preferred embodiment, from water arriving into the asset such as rain water.
This is described in more detail below. The preferred embodiment acts to manage the water table within the asset, that is in the area delimited by the barrier wall, such that the ground and any buildings within the assets remain dry. In practice, this is achieved by managing the water table, achieved by the positioning of the drainage, sump or sumps and pumping of water out of the asset. The water table in the asset may very well be different from that outside the asset, typically lower, ensuring that the asset remains dry.
Thus, in an embodiment, the asset may include at least one building, wherein at least a part of the at least one building is spaced from the perimeter barrier. The asset may include exposed ground surface.
The barrier is preferably a low lying wall. In the example described below, the upstanding wall has a height of around 800 millimetres, and typically is preferably less than 1.5 metres or 1 metre. In practice, the upstanding wall should preferably not be above head height and most preferably of a height consistent with a low lying garden wall.
The at least one drainage unit is preferably a drainage channel, although in some embodiments could be a bore hole or other drainage mechanism, coupled to a sump. As the preferred embodiments use drainage channels, they are referred to as such in what follows, though it is to be understood that systems could be designed with such other drainage mechanisms, as the skilled person will be able to envisage readily having regard to the teachings herein.
Preferably, the or each drainage channel is spaced from the subsurface barrier wall. Most preferably, the or each drainage channel is spaced from the subsurface barrier wall by a distance permitting flow of ground water passing under the subsurface barrier wall into the channel or channels. In a practical embodiment, the or each drainage channel is spaced around one metre from the subsurface barrier wall. There may be provided other drainage channels, or units, further into the asset, or protected zone.
The at least one drainage unit is preferably disposed at a depth substantially the same as a depth of the subsurface barrier wall.
The or at least one drainage channel may be open at a top thereof at least adjacent the sump. The or at least one drainage channel may be connected to the sump at a depth lower than a threshold water level. In practice, this arrangement can allow for rain water to be drained naturally into the ground, by spilling out of the drainage channel or channels without operating any pumping unit in the sump, which can save substantial energy usage.
The threshold water level is an acceptable water table level in the asset. In practice this can be a level at which the water table does not rise above ground level, that is does not lead to flooding in the asset, or protected zone. In some embodiments, the threshold level may be chosen to be below ground level.
Advantageously, the system includes a pumping unit disposed to pump water from the sump to outside the asset. The pumping unit may include one or a plurality of pumps. In an embodiment, both pumps are activated when water flow is determined to exceed a threshold rate.
The system may include a water level sensor disposed to measure water level in the sump. The water level sensor may be a hydrostatic sensor.
Preferably, the system includes one or more sensors for measuring surface or ground water inside the asset and/or one or more sensors for measuring surface or ground water outside the asset. These sensors may also be hydrostatic sensors.
Advantageously, the system includes a control unit coupled to the sensor or sensors, the control unit incorporating or being coupled to the trigger mechanism.
The control unit may be disposed in the asset. Preferably, the control unit includes a telemetry unit to monitor and manage water levels and pump unit activity, and a communications unit to send flood related alerts and/or alarms to a remote management station.
According to another aspect of the present invention, there is provided a method of protecting an asset from flood water including the steps of: forming a perimeter barrier alongside and around an asset to be protected, the barrier including an upstanding wall for blocking surface water ingress into the protected zone and a subsurface barrier wall, the barrier wall being a discrete structure from the asset to be protected; forming a drainage system within the protected asset, the drainage system including at least one drainage unit disposed subsurface and adjacent the subsurface barrier wall; providing at least one sump subsurface in the protected asset, to which the drainage system is fluidically coupled for collecting water from the drainage system, the at least one sump having a water level sensor disposed to sense water level in the sump, a pumping unit being connected to the at least one sump; providing a drainage conduit coupled to the pumping unit, the drainage conduit extending beyond the perimeter barrier outside of the asset; a trigger mechanism being coupled to the water level sensor and the pumping unit, wherein the trigger mechanism is operable to activate the pumping unit when the water level in the sump reaches or exceeds a threshold level so as to remove water from the sump and thereby from the asset.
The method can usefully provide apparatus which can be fitted to an existing asset, such as a house and garden, a group of houses of a village, to an industrial unit and surrounding ground space, to sports facility such as a football pitch, and so on. It is not necessary to modify the structure of the asset itself.
In an embodiment, therefore, the asset may include at least one building and wherein the perimeter barrier is at least partially spaced from the at least one building. The asset may include exposed ground surface.
The method preferably includes the step of determining water porosity of soil where the perimeter barrier is to be formed and determining the depth of the subsurface barrier wall on the basis of the determined soil porosity.
Advantageously, the subsurface barrier wall is formed to have a greater depth in porous soil and a lesser depth in less porous soil.
The method may include the step of spacing the at least one drainage unit from the perimeter barrier. Preferably, the method includes the step of determining the spacing of the at least one drainage unit on the basis of the porosity of the soil. It may also or alternatively include the step of determining the depth at which the at least one drainage unit is disposed on the basis of determined soil porosity.
The preferred embodiments of system disclosed herein can provide: a) a barrier built around a property or other area to be protected, which prevents surface water entering the protected area whilst allowing access for pedestrians and vehicles; b) a drainage system that removes ground water from below and surface water from above the property; c) a pumping system that evacuates collected water to outside the barrier; d) a local control system that operates the pumping station; e) a telemetry system that allows remote management of the system and for instance SMS and email alerts to designated recipients.
The barrier preferably has at least one opening, such as a gate which can be left open and closed when the asset requires protection, such as when water is detected either within the area of the asset or outside the barrier, or both.
Other aspects and advantages of the teachings herein are disclosed in the
following specific description.
Summary of the Drawings
Embodiments of the present invention are described below, by way of example only, with reference to the accompanying drawings, in which: Figure 1 is a schematic diagram of a flood defence system according to an embodiment of the invention; Figure 2 is a plan view of the detail of an example of a part of a flood defence system according to the invention; Figure 3 is a plan view of the detail of a part of a flood defence wall according to the invention; Figure 4 is a plan view of the detail of an example of a part of a flood defence system similar to Figure 2 and showing a plurality of sensor elements; Figure 5 is a transverse cross-sectional view of a part of a flood defence 20 wall of the embodiment of Figure 4; Figure 6 is a cross-sectional view of an embodiment of sump for the system taught herein; Figure 7 is a cross-sectional view of another embodiment of sump for the system taught herein; and Figure 8 is a schematic diagram of a control unit for the system taught herein.
Description of the Preferred Embodiments
There are described below various embodiments of flood defence system to illustrate the teachings herein. The skilled person will appreciate that the specific design, shape and dimensions of the various elements of the system will be dependent upon the zone to be protected and the nature of the flood risk.
The term "asset" used herein refers to the contents of the area protected by the system and method taught herein. The asset may include one or more buildings, ground level structures such as gardens, paths, roadways and so on.
The term "protected zone" is used to denote an asset or the area of an asset. Referring first to Figure 1, this shows in schematic form an embodiment of flood defence system 10 for protecting an asset, which in this example includes a building, such as a dwelling 12, and surrounding garden, from being flooded. The system 10 includes a perimeter barrier 14 which surrounds the building 12 and specifically the entire asset or protected zone 22. The barrier 14 may include (not shown) one or more access points, such as openable flood gates, for gaining access to the asset or protected zone 22 and any building or buildings 12 located within the zone 22. Flood gates and other access points will provide openable or removable fluid impermeable panels disposable in associated openings in the wall 14. When closed, the flood gates and wall an water impenetrable barrier to protect the zone or asset within the barrier. As the teachings herein are not directed to designs of flood gates or other removable barriers and these are therefore not described in detail herein.
The perimeter barrier 14 includes a first upstanding wall 16, which is constructed to have a height sufficient to be greater than the maximum expected height of surface flood water 18. In practice, the wall is preferably below eye level height, such as less than 1.5 metres, preferably less than 1 metre. In practice, however, if potential flood water will exceed such heights, the wall could be made higher.
The barrier 14 also includes a buried footing 20 which acts not only as a support foundation for the upstanding wall 16 but also as a subsurface barrier wall useful in reducing the level of the water table within the protected zone 22, as is explained in detail below.
The perimeter barrier 14, and in particular the upstanding wall 16 and the buried footing 20, may have varying heights and depths in dependence upon the lay of the land around the perimeter of the protected zone 22, so may be greater in cases where parts of the land is at a lower altitude, and lesser where the land that is at a greater altitude, for example. Furthermore, the depth of the buried footing 20 may also be varied in dependence upon the nature of the ground. Specifically, the subsurface barrier 20 has a depth which controls the flow of ground water into the protected zone 22 and the amount of ground water permitted within the protected zone 22, as is explained in detail below. Typically, the footing 20 will be deeper in more porous soil and shallower in less porous soil. Where the soil is impervious, the footing may be very shallow and in some instances omitted.
The barrier 20 is a separate structure from the asset, including any building in the asset. Specifically, the barrier preferably does not form part of a protected building per se, such that the barrier can be constructed after and around any such building. The barrier may be close to or abut a building in some embodiments, but remains a distinct structure. It is not excluded that the barrier could be physically connected to a building, such as being positioned up against the wall of a building.
The barrier 20 is not positioned below a building.
Within the protected zone 22 there is provided at least one buried channel or drain 32, 34 and these preferably extend alongside but are spaced from the perimeter wall 14, and are coupled to a sump 30, which is a buried water collection chamber.
The sump 30 has dimensions, in terms of depth and diameter, which enable the sump 30 to store sufficient quantities (volume) of collected water before being pumped out of the sump 30, and also for retaining the level of water within the sump 30 to below a preferred level, indicated in the drawings by reference numeral 40. This will in practice, as is explained below, provide a limit to the water table within the protected zone 22. Disposed within the sump 30 is a pumping unit, also described in further detail below, and a conduit or tubing for taking water out of the protected zone 22, as depicted by the arrow 44 in Figure 1.
The drains 32 and 34 are disposed at a depth consistent with the depth of the subsurface barrier 20, typically being at substantially the same depth although may be slightly higher or lower than this, as is explained below. The drains 32, 34 are also spaced from the subsurface barrier 20 to allow for ground water from outside the protected zone to flow into the drain 34, as depicted by arrow 46.
Typically, the drains 32, 34 will be around one metre from the subsurface barrier 20, although this will be dependent upon the porosity of the soil.
The drains are typically buried open channels able to allow the flow of water therealong, and are connected to the sump 30 so that the water they collect is fed 5 into the sump 30 for removal from the protected zone 22.
Prior to installation of the system 10 one or more surveys are undertaken around the property 12, the perimeter of the protected zone and the ground within the protected zone, as well as the local environment. These surveys are intended to determine factors such as: mean water table level, soil state and geological composition, particularly soil permeability, historical risk of flooding and historical flood levels. The results of the survey are then used to design a bespoke flood protection system for the particular property 12. Specifically, the variables can typically include: subsurface barrier wall 20 depth, barrier wall 16 construction and height, drain depth, dimensions and position relative to the barrier wall 14, pumping station (sump 30) capacity, as well as placement of sensors 102-106, described in further detail below.
The barrier wall 14 in the preferred embodiment is formed of four primary components. The buried footing 20 is in the form of a concrete foundation. The upstanding wall 16 preferably includes an anchor system of rebars and steel mesh, a composite construction panel comprising an insulated polystyrene core approximately 50mm in width encased in a welded wire mesh either side, which connect to each other via braces shot through the core and welded in place. On the outside of the frame and skeleton structure, there is preferably a dry spray concrete, such as spraycrete, as a layer between 50-100mm thick completely encasing the construction panel and rebars.
The subsurface barrier wall 20 is laid down around the periphery of the zone 22 to be protected according to specifications determined during the site survey. The concrete used is preferably high density and waterproof, with a system of rebars and mesh reinforcements (not shown but which will be apparent to the skilled person from the teachings herein) set in place before the concrete is poured/sprayed. These are used to anchor the upstanding wall 16 to the foundations 20. The lower part of the rebars are preferably either 'C' or 'L' shaped, providing strength against the lateral forces caused by rising water levels outside the barrier wall structure 14. Rebars are preferably set at pre-determined intervals along the line of the wall structure 14 and emerge vertically from the foundations 20 to a height just below the top of the barrier wall 14. Rebars are advantageously configured in a staggered sequence along the length of the wall 14, with each successive rebar emerging on either the front or back face of the wall. Construction panels are cut to pre-determined dimensions and lowered in position between the staggered rebars. A hydrostatic layer is preferably laid on the concrete beneath the panels to increase waterproofing, with a bitumen layer advantageously used in addition, where appropriate. Binding wire may be used to join the panel's wire mesh to the rebars, creating a rigid construction ready for the concrete spray (spraycrete) layer. Apertures or gaps are left in the barrier 14 to allow removable waterproof panels or gates to be placed at access points, such as pedestrian gates and driveways. Once formed, the wall 16 represents a strong, impermeable barrier preventing surface water reaching into the protected zone 22.
In the preferred embodiment, the drain system 32-34 includes one or more trenches of approximately 400mm (width) x 400mm (depth) excavated around the property inside the barrier wall 14, with 10mm pea shingle backfill and a porous membrane lining and perforated land drainage pipes. Dimensions are typically determined on the basis of the site survey. The or each trench is excavated to a suitable depth and width and typically will surround the property 12 but may in some cases only partially do so. A porous membrane is laid into the trench floor and sides to create a particle barrier while allowing the ingress of water into the trench. Perforated land drains are laid onto a bed of pea shingle at an inclination down to the sump 30 and then backfilled to the top of the trench. One end of the pipes 32-34 enters the sump 30 to allow waste water to be collected.
As ground water underneath the property 12 rises, the membrane and shingle allows the water to enter the perforated drains and from there flow down the incline into the sump 30. Surface water caused by heavy rainfall inside the barrier 14 can also enter the land drains from the top of the trench, soaking through the shingle to be collected and carried to the sump 30. The differential in pressure created by the water as it exits into the sump 30 ensures rapid draining of the trench.
In a standard installation the subsurface barrier 20 may typically have a depth of around 1.5 metres, while the drains 32-34 will be spaced around 1 metre from the subsurface barrier 20 and be at a depth of around 1.5 metres also or a little higher, that is closer to the ground surface.
In addition to having drains adjacent the perimeter barrier 20 there may be provided drains within the protected zone 22, for instance close to a building 22, as depicted with drain 32 in Figure 1. The drains 32, 34 are buried at a depth which is determined on the basis of the porosity of the soil and in some embodiments also on the expected amount of incoming water into the protected zone 22 from historical records. The intention of the drain system 32, 34 is to allow the removal of ground water from under the soil in the protected zone 22, whether this is ground water emanating from outside the protected zone, ground water within the protected zone, rain water coming into the protected zone or any combination of these. Initial site surveys can determine on the basis of the expected water ingress into the protected zone and soil porosity not only the size of the drains and their ideal drain angle but also their position relative to the perimeter wall 14 and depth to which they are buried. The aim is to ensure that the drains are able to remove sufficient volumes of water to maintain the water table below flooding levels, that is to no more than the level of the ground surface, or below ground surface, in order to prevent flooding in the protected zone 22 and water ingress into any building 12. The provision of subsurface drains will allow a reduction in the level of the water table 100. As illustrated in Figure 1, drainage of ground water within the protected zone 22 creates a curving water table between the drain system 32,34, the sump 30 and the buried barrier wall 20. It is the highest points of the water table which are relevant to the determination of the positioning of the drains 32-34 and the sump 30, as well as the depth of the buried barrier wall 20, these highest points being dependent upon the ability of water to soak through the soil, that is the porosity of the soil, and the speed of drainage provided by the drainage system 30-34. The curvature of the water table can be determined by determining the speed of flow of water through the soil, typically in litres per metre per second.
The system 10 shown in Figure 1 also includes a plurality of sensors 102-106, shown schematically in the Figure. A first sensor 102 is located in the 5 sump 30 and is intended to determine whether the level of water in the sump 30 has reached a threshold requiring pumping of water out of the sump, to outside the protected zone 22. A second sensor 104 is located within the protected zone 22 and in practice is positioned within a sump which in one embodiment is a buried tube having an open or water permeable lower end, for instance provided with a porous mesh across its lower end. The sump tube may have a depth of 2 metres. Located at the bottom of the sump tube is a sensor probe 104 able to obtain a measure of the head or height of water within the tube and therefrom the state of impregnation of the ground. A third, optional, sensor 106 is disposed outside the barrier wall 14, that is outside the protected zone 22 and is arranged to detect the presence of ground water in order to give an early indication of possible flooding.
Further details of the sensors are given below and it is also to be understood that the system 10 is not limited to the provision of three sensors. In some embodiments there may be fewer while in other embodiments there may be more. In addition, there may be provided a plurality of each sensor type, disposed in different locations within and/or outside the protected zone 22. In its simplest form, the system 10 may have no sensors 102-104, in which case there may be a continuously operable pump within the sump 30, switchable only when there is no water in the sump. In other forms, there may be provided a water level sensor 102 in the sump 30, in other more sophisticated systems both a sump sensor 102 and a ground sensor 104. The optional outlying sensor 106 can be provided in what could be described as a complete solution.
The system 100 also includes a control unit, which is depicted schematically at 108, and may in practice be located within the building 12 so that it can be operated by a user, for example an inhabitant of the building 12 and so 30 that the system 108 can provide feedback and warnings to the user.
The control unit 108 is coupled to the sensors 102-106 and also to the pumping unit provided within the sump 30. The control unit 108, in combination with the sensors 102-106 and the pumping unit are designed to optimise the control of water within the protected zone 22 and specifically to reduce unnecessary pumping of water in order maximise efficiency of the system 100, allowing natural water drainage when this is possible. The control unit 108 is also designed to warn users or inhabitants within the protected zone 22, and optionally a remote management station, of the risk of flooding so that protective measures can be taken, such as closing gates and other openings in the barrier wall 14. Further details of advantages and operation of the control system 108 are given below.
Figures 2 to 7 show examples of elements of the system 10 of preferred embodiments of the invention. The skilled person will appreciate that these are embodiments only and not restrictive of the teachings herein.
Referring first to Figure 2, this is a plan view showing a part of a protected zone 22, surrounded by a perimeter barrier 14 of the type disclosed in connection with the example of Figure 1 above. As can be seen, the perimeter barrier 14 has a shape and dimensions suitable for delimiting a desired perimeter zone around, in this example, a building 12. There may be provided one or more access points 102 through the barrier 14, for instance raisable or swingable panel gates. The building 12 includes, in this example, a utility or plant room 110 within which the control unit 108 is located. There is provided a buried electrical duct 120 leading to the sump 30 and in particular to the sensor located within the sump and to the draining pump. The duct 120 may typically have a diameter of 120 mm and be buried to a depth of around 500 mm, these being typical dimensions.
The sub-surface channels 32, 34 are located adjacent the perimeter barrier 14 and outside the perimeter of the building 12, in practice being usefully located also for collecting rain water and other water landing onto the ground in the protected zone 22. The channels 32, 34 are also positioned to collect sub-surface water from a rising water table or ground water coming from outside the perimeter barrier 14, by virtue of being open at their upper sides.
Figure 3 shows a cross-sectional view of an example of the perimeter wall 14 suitable for the embodiment of Figure 2 and other embodiments disclosed herein. The cross-section in Figure 3 shows only a part of the buried footing 20 of the barrier wall 14. In the example of Figure 3, the perimeter barrier 14 is chosen to have a height of around 800 mm and usefully includes buried ducts 122 for electrical wires to and from the control unit 108, with an optional electrical junction box 125 also being buried in the wall 14.
On the outside of the perimeter wall 14, that is outside the protected zone 22, there is provided a small sump 130 at the foot of the barrier wall 14 and having, in this example, a depth of around 250 mm. Disposed within the sump 30 is a water sensor 106, described in further detail below. The sensor 106 includes a wire 126 coupling the sensor to the control unit 108. The sump 130 is typically protected from clogging in a manner which is known in the art, and preferably allows draining of water therein. There will typically be provision against the sump filling with debris and the skilled person will be fully aware of suitable elements for this. The sensor 106 is preferably of a type which will trigger only once a threshold head of water has been reached, for example 200 mm. Any suitable hydrostatic sensor could be used, for example.
Referring now to Figure 4, this shows the arrangement of sensors and cabling for the example system 100 shown in Figures 1 and 2. The skilled person will appreciate that Figure 4 shows an embodiment of the invention and that the number and positioning of the sensors may vary from one implementation to another.
In the example of Figure 4, there is provided an out-of-perimeter sensor 106 arranged as per Figure 3, a sensor 104 disposed within the protected perimeter 22 and in this example adjacent the perimeter wall 14, and a third sensor 102 disposed within the sump 30. Ducting 120-124 connects the sensors 102-106 to the control unit 108 located in the utility or plant room 110 of the building 108.
These ducts 120-124 are preferably all buried below ground surface, as explained above.
The sensor 104 disposed within the protected zone 22 is preferably located within a small sump, having a depth, for example, of around 250 mm in this example but which could be up to 2000 mm deep or even deeper in dependence upon the nature of the zone 22. Sensor 104 can sense the amount of ground water present within the protected zone 22.
There may be provided other sensors similar to the sensors 102-106 shown in Figure 4 and in particular a plurality of sensors 106 disposed outside the perimeter wall 14 and/or a plurality of internal sensors 104 disposed in different locations within the protected zone 22. Provision of a plurality of each of the sensors 102,106 can give a better indication of the existence and location of any ground water either outside or inside the protected zone 22.
Figure 5 shows a plan view of the corner 140 of the perimeter barrier 14, as shown in Figures 2 and 4. As can be seen, the electrical ducting 122 extends through the concrete structure of the perimeter wall 14 to the sensor 106 and there may typically be provided an electrical junction box 150, preferably buried within the structure of the wall 14, for coupling electrical wires to and from the sensor 106 and the control unit 108.
Referring now to Figure 6, this shows a first embodiment of sump 30 of the system 10 taught herein. The sump 30 may have any suitable cross-sectional shape, though typically this may be square, rectangular or circular. The cross-sectional shape of the sump 30 is not relevant to the teachings herein. In the embodiments shown in the drawings, the sump 30 is circular cylindrical and has a cylindrical upstanding wall 152 preferably made of concrete, to which is attached a concrete base 154, which has a shape and size to conform with the outer perimeter of the upstanding wall 152. The base and upstanding wall are preferably secured to one another in substantially liquid-tight manner, although in some embodiments may allow for water drainage therethrough, useful in cases where water is able to drain naturally from within the protected zone 22, for instance as a result of dry ground conditions.
The top of the sump 30 is covered by, in this example, a concrete cover 156, although in other embodiments could be of other materials. In this example there is provided with an access 158 providing a manhole. The access 158 can usefully have brick walls, such that the entirety of the sump 30 can be buried below the surface of the ground 160, leaving access into the interior of the sump 30 through a manhole cover 162, typically made of metal.
In the example of Figure 6, the sump 30 is positioned adjacent the upstanding wall 14. Disposed within the sump 30 is a pump unit 170 to which are connected a lifting bale 172 and a lifting chain 174, the chain 174 extending towards the manhole cover 162 and preferably being hooked nearby, so that the pump unit 170 can be pulled up for maintenance or checking purposes. The pump unit 170 may have a single pump but preferably has a pair of pumps, which may be operated independently of one another or in unison.
Coupled to the pump unit 170 is an inlet tube 180 which has an open upper end 182 disposed at about the same height as inlet pipe 180 into the sump 130, the inlet pipe coupling to the buried channels 32, 34. The height of the pipe inlet 182 determines the maximum amount of water which can be stored within the sump 30 without forcing evacuation of water from within the sump 30. The skilled person will appreciate that the inlet pipe 180 could have different heights, as desired.
In practice, and as is described in further detail below, the inlet pipe 180 acts as a safety element which ensures that the pump 170 will operate when the sump 30 is filled with water, irrespective of what is detected by the sensors 102-106 of the system 10. In other words, even if no further water is detected within the protected zone 22, the pump unit 170 will operate if water within the sump 30 reaches above the height the upper end 182 of the inlet pipe 80.
The outlet of the pump unit 170 is coupled to an outlet pipe 190, which in this example has a closed upper end 192 which is secured to a bracket 194, itself secured to the concrete cover 156. In this example, the outlet pipe 190 includes a junction 200, to a discharge pipe 202, which terminates at an open end 204 beyond the perimeter of the wall 14 and therefore outside the protected zone, in this example for discharge into a drainage channel 210. The discharge pipe 202 is embedded within the structure of the wall 14 and preferably fixed thereto in fluid tight manner such that there is no leakage through the wall 14 at the location of the pipe 202.
Figure 7 shows a slightly modified version of the sump 30 of the system 10, compared to the embodiment shown in Figure 6. In the sketch of Figure 7, the 30 concrete structure of the sump 30 is now shown. The inlet tube 184 from the buried channels 32, 34 is disposed lower within the sump 30 than the embodiment of Figure 6 and the pump inlet pipe 180 is closed and held by a suitable guide support element 220.
The outlet pipe from the pump unit 170 is blocked at its upper end 192, while the junction 200 feeds pumped fluid into the outlet pipe 204, which is coupled through a flexible tubing 206 buried within the ground 160 and exiting just at the top, exterior surface, of the wall 14, thereby pumping water from the sump to the other side of the barrier wall 14 and outside the protected zone 22. The skilled person will appreciate that the specific design of the sump 30 and the arrangement of the pump unit 170 and inlet and outlet pipes thereto is not critical to the teachings herein.
Referring now to Figure 8, this shows in very basic form the principal components of an example of control unit 108. The person skilled in the art will appreciate that a typical control unit 108 would include a variety of other components and elements for providing different functions, displays and warnings, which will all be readily apparent to a person skilled in the art. A control unit 108 will typically include a microprocessor 230, memory 232, a input/output controller 234 and a communications unit 235, all of which can be of a structure and design which will be familiar to the skilled person. The control unit 108 includes a series of inputs 236 for receiving signals from the various sensors 102-106, an output 238 for controlling the motor unit 170 and another input/output 240 for receiving user commands and for providing user data and warnings. The input/output may include a keypad, other control knobs and elements, a display and a visual or acoustic device. Again, these are well-known in the art and therefore not described in detail herein.
The control unit 108 can be disposed within the protected zone 22 and in the embodiments shown within the building 12, but equally could be disposed at a remote monitoring station outside the protected zone 22. It is envisaged that in most embodiments, the control unit 108 will also include communications unit 235 for communicating information to and from a central monitoring station 280, which can monitor operation of the system 10 and the status of the protected zone 22. The central monitoring station 280 may also communicate with a user, for instance over a standard telephone line or cellular telephone connection, and to a rapid response assistance service 280 when the risk of flooding within the protected zone is considered to exceed a threshold risk.
The structure of system 10 disclosed above and shown in the drawings can provide a complete multi-stage property level and area wide flood protection system having the following characteristics.
The preferred embodiments provide a system 10 which could be said to be formed of five distinct elements working together to provide flood protection. The five elements include: 1) a protective barrier wall 14 surrounding the property, designed to keep surface water away whilst allowing pedestrian and vehicle access through appropriate access ways; 2) a system of channels or drains 32, 34 within the protected area 22 for collecting ground water as it rises from below the property 12, feeding it into the sump 30 of the pumping station. The drainage system 32,34 can also absorb 15 surface water from above caused by heavy rainfall; 3) a sump 30 and pumping station 170 designed to remove the drained water to outside the protected area 22. The pumping unit 170 preferably has dual pumps, which can be operated individually or together; 4) a local control system 102-108 which includes one or more hydrostatic 20 sensors, one or more rain gauges and a control module that monitors water levels and activates the pump or pumps 170; and 5) a telemetry system 108 which monitors and manages water levels and pump station activity, sending alerts and alarms to designated recipients via SMS and email messages. The telemetry system can be incorporated into the control unit 108 and include a suitable transceiver unit 235 with the input/output unit 234.
The control unit 108 may in some cases simply monitor water and warn the user of impending flooding, allowing the user to close any barriers in the wall 14 to close off the zone 22. The control unit 108 will make use of the sensors 102-108 for this purpose. The pumping station 170 will pump water out of the sump 30 when the sensor 102 detects water above the predetermined threshold level or the water level reached the top of the inlet pipe 180. In other embodiments, the control unit 108 can make use of the signals from the rain water sensor 104 to determine the rate of collection of water and to alter the rate of pumping of the pump unit 170 to ensure that water is removed from the protected zone 22 at a sufficient rate. Similarly, the control unit 108 may allow rain water to drain naturally into the ground when the sensor 104 does not sense water in the small sump in which it is located indicative of the ground being relatively dry and therefore able to absorb rainwater. The control unit 108 is also able to issue a warning when it is determined from the signals from the outside sensor or sensors 106 that flooding is occurring outside the protected zone 22, that is outside the barrier 14. The warning can be sent to the user and to the remote monitoring station 280, in order to the access points in the wall 14 to be closed off. It is to be appreciated that the access barriers could be automatically operated in some embodiments for instance by motors linked to the control unit 108. As a result, the system 100 provides comprehensive monitoring and management of the protected zone and protection of the zone 22.
The sump and pumping station 30 170 includes three primary elements: input ports 184 into the sump 30 from the land drains 32-34, one or dual pumps 170 to evacuate the collected water and a rising main pipe 190 to expel the collected water to outside the barrier wall 14.
The size of the sump 30, pump 170 capacity and rising main pipe 190 dimensions are determined for each individual zone 22 to be protected. In practice, a sump pit is excavated in a specified position inside the barrier wall 14. Typically this will be 2 metres deep and 2.5 metres diameter. The sump 30 is lowered into position and anchored with poured concrete. Ports are bored into the sump 30 for the input 184 from the land drains which are secured in place with seals. A port for the rising main 190 is also bored and the pump or pumps 170 and pipework 180/190 fitted. The sump pit is then backfilled with shingle as specified.
As the water level rises, the sump sensor 102 activates the system and the pumps drain the water in the sump 30 back to a pre-determined mean level, preferably outside the barrier wall 14. This process repeats for as long as water rises to a depth above a set level.
The local control system 108 has three primary elements: a hydrostatic sensor 102 placed at the bottom of the sump 30, a series of remote sensors 104, 106 is placed around the protected area 22, both inside and outside the barrier wall 14, a digital control module 108 is responsible for controlling the pump or pumps 170 fed by the sensor inputs 236.
The hydrostatic sensor 102 is preferably fitted to the bottom of the sump 30 and connected to the control module 108. The sensor 102 is calibrated to read 0 bar with the sump 30 empty. As the water level rises in the sump 30, the increase in pressure is relayed to the control module 108 which expresses the change in units (for instance millimetres) depth of water in the sump 30. Once a set threshold is passed, the module 108 initiates the pumping station 170 which returns the water to the mean level. If the ingress of water is sufficiently rapid, a further threshold is crossed which activates both pumps simultaneously, increasing the water flow to the rising main. The threshold can be determined by the speed of replenishment of the sump 30, the detected level of ground water by the senor 104, the level of water outside the protected zone 22 or any combination of these. The control system 108, either internally or by external control from a user or the remote management station 280 can also change the threshold level at which pumping commences to evacuate water from the sump 30, which can also be useful when it is determined that there are high volumes of incoming water.
For instance, the control unit 108 and/or the remote management station 280 could be designed to control the pumping unit 170 to pump continuously when it is determined that there is a large volume of incoming flood water. The provision of dual pumps can also provide a backup pump facility in the event of failure of one of the two pumps.
The remote sensors 102, 104, placed both inside and outside the barrier wall 14, monitor water levels within and outside the protected area 22. They are connected to the control module 108, the latter being set to send alarms which in turn can alert designated recipients of the need to close removable barriers in the wall, or other actions necessary to protect the property. Specifically, the system is able to detect the onset of flooding, allowing users to take preventative measures before flooding actually occurs.
The rain gauge sensor 104 provides information on local precipitation and this data can be used with that from the remote sensor 106, providing additional warning of impending flood conditions.
The preferred telemetry system includes the following elements: a communications module and transceiver 234, 235 housed in the main control unit 108, a cellular telephone or satellite telephone communications facility for transmitting and receiving data, a remote management station 250 (see Figure 8) for monitoring and controlling the system 10. The communications module 234-235 is connected to the system processor 230 within the main control unit 108. A mobile telephone sim card may be provided and configured to allow the exchange of data between designated recipients and also to dedicated remote management station 250.
As thresholds are exceeded and pumps 170 activated, data is fed to the remote management station 250 which can be monitored and interacted with from any internet enabled device. The remote station 250 can configure the local control system 108 to change the pumping parameters, for instance when it is detected that there is a high volume of water, as well as to send alerts to designated recipients. Furthermore, the transceiver module 235 in the control unit 108 can be configured to send alerts directly to designated persons, for example by a SMS alert.
The system 10 disclosed herein can therefore provide: a) a barrier 14 built around a property 12 or other area to be protected, which prevents surface water entering the protected area 22 whilst allowing access for pedestrians and vehicles; b) a drainage system 32-34 that removes ground water from below and surface water from above the property; c) a pumping system 170 that evacuates collected water to outside the barrier 14; d) a local control system 108 that operates the pumping station 30; e) a telemetry system that allows remote management of the system and provides SMS and email alerts to designated recipients.
As explained above, the asset may be a building but more typically may be a zone which includes at least some ground surface. In one example, the zone may incorporate one of more buildings such as houses, gardens, driveways and so on. In another example, the zone may include a sports pitch, an industrial unit, hospital and so on, even a park area and pond.
It will be appreciated form the teachings herein that the system and method provide a barrier wall, impervious to flood water, which can surround the asset. The other elements of the system ensure that the asset can remain dry, not only from water ingress outside the asset and barrier wall but also, in the preferred embodiment, from water arriving into the asset such as rain water. This is described in more detail below. The preferred embodiment acts to manage the water table within the asset, that is in the area delimited by the barrier wall, such that the ground and any buildings within the assets remain dry. In practice, this is achieved by managing the water table, achieved by the positioning of the drainage, sump or sumps and pumping of water out of the asset. The water table in the asset may very well be different from that outside the asset, typically lower, ensuring that the asset remains dry.
The system and method do not require any changes to the asset per se, such as structural changes to a building or the like. The structures within the asset 20 can therefore be kept unchanged. Moreover, the system and method can maintain the asset in a virtually untouched condition, for instance a person's house and garden, with the barrier forming a perimeter wall, which can usefully be finished in an aesthetically pleasing manner or otherwise in a manner consistent with the environment or form of the asset.
All optional and preferred features and modifications of the described embodiments and dependent claims are usable in all aspects of the invention taught herein. Furthermore, the individual features of the dependent claims, as well as all optional and preferred features and modifications of the described embodiments are combinable and interchangeable with one another.
The disclosure in British patent application number 1504764.0, form which this application claims priority, and in the abstract accompanying this application are incorporated herein by reference.

Claims (31)

  1. CLAIMS1. A flood management system for protecting an asset from flood water, including: a perimeter barrier disposed alongside and around an asset to be protected, the barrier including an upstanding wall for blocking surface water ingress into the protected asset and a subsurface barrier wall, the barrier wall being a discrete structure from the asset to be protected; a drainage system within the protected asset including at least one drainage unit disposed subsurface and adjacent the subsurface barrier wall; at least one subsurface sump to which the drainage system is fluidically coupled for collecting water from the drainage system, the at least one sump having a water level sensor disposed to sense water level in the sump; a pumping unit connected to the at least one sump; a drainage conduit coupled to the pumping unit, the drainage conduit extending beyond the perimeter barrier outside of the asset; and a trigger mechanism coupled to the water level sensor and the pumping unit, wherein the trigger mechanism is operable to activate the pumping unit when the water level in the sump reaches or exceeds a threshold level so as to remove 20 water from the sump and thereby from the asset.
  2. 2. A flood management system according to claim 1, wherein the asset includes at least one building, wherein at least a part of the at least one building is spaced from the perimeter barrier.
  3. 3. A flood management system according to claim 1 or 2, wherein the asset includes exposed ground surface.
  4. 4. A flood management system according to claim 1, 2 or 3, wherein at least a part of the perimeter barrier has a height not exceeding 1.5 metres or 1 metre.
  5. 5. A flood management system according to any preceding claim, wherein the at least one drainage unit is a drainage channel.
  6. 6. A flood management system according to any preceding claim, 5 wherein the at least one drainage unit is spaced from the subsurface barrier wall.
  7. 7. A flood management system according to claim 6, including at least one drainage unit spaced around one metre from the subsurface barrier wall.
  8. 8. A flood management system according to any preceding claim, wherein the at least one drainage unit is disposed at a depth substantially the same as a depth of the subsurface barrier wall.
  9. 9. A flood management system according to any preceding claim, wherein the or at least one drainage unit is open at a top thereof at least adjacent the sump.
  10. 10. A flood management system according to claim 9, wherein the or at least one drainage unit is connected to the sump at a depth lower than the threshold water level.
  11. 11. A flood management system according to any preceding claim, wherein the threshold water level is an acceptable water table level in the 25 protected zone.
  12. 12. A flood management system according to any preceding claim, wherein the pumping unit includes one or a plurality of pumps.
  13. 13. A flood management system according to claim 12, wherein the plurality pumps are activated when water flow is determined to exceed a threshold rate.
  14. 14. A flood management system according to any preceding claim, including one or more sensors for measuring surface or ground water inside the asset.
  15. 15. A flood management system according to any preceding claim, including one or more sensors for measuring surface or ground water outside the asset.
  16. 16. A flood management system according to any preceding claim, including a control unit coupled to the sensor or sensors, the control unit incorporating or being coupled to the trigger mechanism.
  17. 17. A flood management system according to claim 16, wherein the control unit includes a telemetry unit to monitor and manage water levels and pump unit activity, and a communications unit to send flood related alerts and/or alarms to a remote management station.
  18. 18. A method of protecting an asset from flood water including the steps 20 of: forming a perimeter barrier alongside and around an asset to be protected, the barrier including an upstanding wall for blocking surface water ingress into the protected zone and a subsurface barrier wall, the barrier wall being a discrete structure from the asset to be protected; forming a drainage system within the protected asset, the drainage system including at least one drainage unit disposed subsurface and adjacent the subsurface barrier wall; providing at least one sump subsurface in the protected asset, to which the drainage system is fluidically coupled for collecting water from the drainage 30 system, the at least one sump having a water level sensor disposed to sense water level in the sump, a pumping unit being connected to the at least one sump; providing a drainage conduit coupled to the pumping unit, the drainage conduit extending beyond the perimeter barrier outside of the asset; a trigger mechanism being coupled to the water level sensor and the pumping unit, wherein the trigger mechanism is operable to activate the pumping 5 unit when the water level in the sump reaches or exceeds a threshold level so as to remove water from the sump and thereby from the asset.
  19. 19. A method according to claim 18, wherein the asset includes at least one building and wherein the perimeter barrier is at least partially spaced from the at least one building.
  20. 20. A method according to claim 18 or 19, wherein the asset includes exposed ground surface.
  21. 21. A method according to claim 18, 19 or 20, including the step of determining water porosity of soil where the perimeter barrier is to be formed and determining the depth of the subsurface barrier wall on the basis of the determined soil porosity.
  22. 22. A method according to claim 21, wherein the subsurface barrier wall is formed to have a greater depth in porous soil and a lesser depth in less porous soil.
  23. 23. A method according to any one of claims 18 to 22, including the step of spacing the at least one drainage unit from the perimeter barrier.
  24. 24. A method according to claim 23, including the step of determining the spacing of the at least one drainage unit on the basis of the porosity of the soil.
  25. 25. A method according to claim 23 or 24, including the step of determining the depth at which the at least one drainage unit is disposed on the basis of determined soil porosity.
  26. 26. A method according to any one of claims 18 to 25, including the step of determining a size of the at least one drainage unit on the basis of determined or estimated water flow.
  27. 27. A method according to any one of claims 18 to 26, including the step of disposing in the asset one or more water sensors for measuring surface or ground water within the asset.
  28. 28. A method according to any one of claims 18 to 27, including the step of disposing outside the asset one or more water sensors for measuring surface or ground water outside the asset.
  29. 29. A method according to any one of claims 18 to 28, including the step providing a remote management station able to communicate with the control unit.
  30. 30. A method according to any one of claims 18 to 29, including providing a control unit coupled to the sensor or sensors, the control unit incorporating or being coupled to the trigger mechanism.
  31. 31. A method according to claim 30, wherein the control unit includes a telemetry unit to monitor and manage water levels and pump unit activity, and a communications unit to send flood related alerts and/or alarms to the or a remote management station.
GB1604557.7A 2015-03-20 2016-03-17 Flood prevention system and method Withdrawn GB2539064A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB1504764.0A GB2540331A (en) 2015-03-20 2015-03-20 Flood prevention system and method

Publications (2)

Publication Number Publication Date
GB201604557D0 GB201604557D0 (en) 2016-05-04
GB2539064A true GB2539064A (en) 2016-12-07

Family

ID=53052154

Family Applications (2)

Application Number Title Priority Date Filing Date
GB1504764.0A Withdrawn GB2540331A (en) 2015-03-20 2015-03-20 Flood prevention system and method
GB1604557.7A Withdrawn GB2539064A (en) 2015-03-20 2016-03-17 Flood prevention system and method

Family Applications Before (1)

Application Number Title Priority Date Filing Date
GB1504764.0A Withdrawn GB2540331A (en) 2015-03-20 2015-03-20 Flood prevention system and method

Country Status (3)

Country Link
US (1) US20160273181A1 (en)
GB (2) GB2540331A (en)
WO (1) WO2016151290A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677126A (en) * 2017-01-24 2017-05-17 哈尔滨理工大学 Unit assembly type water-filled rubber anti-flood wall and assembly method thereof
CN109242336A (en) * 2018-09-28 2019-01-18 郑州大学 Mountain flood Critical Rainfall method for early warning under Scenario mode

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170352266A1 (en) * 2016-06-02 2017-12-07 Kyle Lynn Watson Advanced flood gauge
US10975538B2 (en) * 2016-06-13 2021-04-13 Rsa Protective Technologies, Llc Method and system for a retractable floodwall system
CN106968711B (en) * 2017-04-28 2023-07-14 中国恩菲工程技术有限公司 Flood drainage and backwater sharing device for tailing pond
CN107577253A (en) * 2017-08-04 2018-01-12 深圳市盛路物联通讯技术有限公司 A kind of municipal water quantity management method and device
KR102485368B1 (en) 2018-01-15 2023-01-05 삼성전자주식회사 Electronic apparatus, method for controlling thereof and the computer readable recording medium
JP6501961B1 (en) * 2018-10-22 2019-04-17 正通 亀井 Flood resistant building with flood protection and renovation method
CN111199298B (en) * 2018-11-19 2023-06-27 贺州市水利局 Flood forecasting method and system based on neural network
SE542802C2 (en) * 2018-11-22 2020-07-07 Noaq Flood Prot Ab Protective barrier segment for a temporary liquid-damming protective barrier as well as protective barrier comprising such a protective barrier segment
CN110348324B (en) * 2019-06-20 2022-06-14 武汉大学 Flood real-time flooding analysis method and system based on remote sensing big data
JP6723676B1 (en) * 2019-12-20 2020-07-15 正通 亀井 Flood-resistant facility with flood-resistant wall
CN111406624A (en) * 2020-04-27 2020-07-14 宁夏大学 Automatic irrigation system is collected to road rainwater
CN113863394A (en) * 2021-10-20 2021-12-31 金光荣 Anti-floating monitoring control system for basement of building
CN114664041B (en) * 2022-03-15 2022-12-02 中科海慧(北京)科技有限公司 Multi-sensor fusion early warning prediction method based on deep learning
CN114790748B (en) * 2022-05-16 2024-03-12 中铁十一局集团有限公司 Construction method for deep foundation pit close to existing line
GB202308158D0 (en) * 2023-05-31 2023-07-12 Flushu Ltd Water management system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10250792B3 (en) * 2002-10-30 2004-02-19 Innovag Ag Flood control system for buildings has supporting profiled grid around outside of building and covered by two pull out flexible tarpaulins connected pressure-tight to buildings with flood chamber in-between and with hydrostatic pressure
WO2009109735A1 (en) * 2008-03-01 2009-09-11 Simon John Higginson Flotation structure for buoyant flood protection barrier and barrier incorporating such a structure
DE102010046504A1 (en) * 2010-09-24 2012-03-29 Hartmut Wibbeler Flood protection wall
US8500365B1 (en) * 2012-08-09 2013-08-06 Sergey Nikolaevich Vecherin Autonomous, adaptive, concealed flood protection system
WO2013160852A2 (en) * 2012-04-24 2013-10-31 Gujer Rudolf Heinrich Flood protection system

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1878295A (en) * 1927-06-28 1932-09-20 Richmond Walter Process for reclaiming lands and maintaining lands in alpha condition suitable for cultivation or habitation
US5460462A (en) * 1993-09-09 1995-10-24 Regan; Patrick Liquid and flood water barrier wall forming-apparatus
US5501044A (en) * 1994-08-31 1996-03-26 Janesky; Lawrence M. Sub-floor drain conduit for water-control systems
WO2000031347A1 (en) * 1998-11-20 2000-06-02 Adler Richard S Movable barrier wall
JP2002201853A (en) * 2000-12-27 2002-07-19 Nomura Fooshiizu:Kk Movable defense apparatus
US6575666B1 (en) * 2002-06-07 2003-06-10 Lawrence M. Janesky Crawlspace encapsulation system
GB0404954D0 (en) * 2004-03-04 2004-04-07 Forrest John C M An aparatus and method for flood defence
GB2486463A (en) * 2010-12-16 2012-06-20 David William Beddoes Collecting water from a wall cavity
US20130336721A1 (en) * 2012-06-13 2013-12-19 Troy O. McBride Fluid storage in compressed-gas energy storage and recovery systems

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10250792B3 (en) * 2002-10-30 2004-02-19 Innovag Ag Flood control system for buildings has supporting profiled grid around outside of building and covered by two pull out flexible tarpaulins connected pressure-tight to buildings with flood chamber in-between and with hydrostatic pressure
WO2009109735A1 (en) * 2008-03-01 2009-09-11 Simon John Higginson Flotation structure for buoyant flood protection barrier and barrier incorporating such a structure
DE102010046504A1 (en) * 2010-09-24 2012-03-29 Hartmut Wibbeler Flood protection wall
WO2013160852A2 (en) * 2012-04-24 2013-10-31 Gujer Rudolf Heinrich Flood protection system
US8500365B1 (en) * 2012-08-09 2013-08-06 Sergey Nikolaevich Vecherin Autonomous, adaptive, concealed flood protection system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677126A (en) * 2017-01-24 2017-05-17 哈尔滨理工大学 Unit assembly type water-filled rubber anti-flood wall and assembly method thereof
CN109242336A (en) * 2018-09-28 2019-01-18 郑州大学 Mountain flood Critical Rainfall method for early warning under Scenario mode
CN109242336B (en) * 2018-09-28 2021-09-10 郑州大学 Critical rainfall early warning method for torrential flood disasters in multi-scenario mode

Also Published As

Publication number Publication date
GB201504764D0 (en) 2015-05-06
GB2540331A (en) 2017-01-18
US20160273181A1 (en) 2016-09-22
WO2016151290A1 (en) 2016-09-29
GB201604557D0 (en) 2016-05-04

Similar Documents

Publication Publication Date Title
US20160273181A1 (en) Flood Prevention System and Method
US10301836B2 (en) Automatic relief valve system with water level sensing for a fiberglass swimming pool body
US6840710B2 (en) Underground alluvial water storage reservoir and method
JP6304678B2 (en) Water tank and unit panel
KR100665984B1 (en) The construction method of basement self drainage
CN206844171U (en) A kind of water proof structure of basement bottom board
CN106498962B (en) Shallow underground water collecting and drainage system and construction method
JP5204626B2 (en) Groundwater management system
JP2008208521A (en) Rainwater storage facility
JP2012255250A (en) Rainwater disposal facility
CN114382073B (en) Underground continuous wall system for protecting spring vein or underground water and construction method thereof
CN111705825B (en) Drainage and landing permanent-temporary integrated construction method for underground deep foundation pit
CN211816350U (en) Structure for controlling diving, water stopping and water lowering
CN210712967U (en) Impervious anti structure that floats of basement
JP7222602B2 (en) Surface drainage system and its installation method
KR200413305Y1 (en) Convertible de-pressure drainage system
KR100666103B1 (en) Convertible de-pressure drainage method and the system
CN215105433U (en) Decompression drainage device under ultra-deep underground space structure bottom plate
CN115506389B (en) Floating water pressure control system on basement bottom plate
CN210421104U (en) Water collecting device for ultra-deep foundation pit
JP4029305B2 (en) Liquefaction countermeasure structure and liquefaction countermeasure method
CN106759372A (en) Deep basal pit bank protection, the construction method of precipitation integrated construction nearer apart from side slope
CN115573365A (en) Submersible underground water drainage system and construction method thereof
GB2604581A (en) Water management apparatus
CN117230842A (en) Method for preventing coastal geological deep foundation pit from piping