GB2328469A - Self installing reusable fixed platforms - Google Patents

Self installing reusable fixed platforms Download PDF

Info

Publication number
GB2328469A
GB2328469A GB9717719A GB9717719A GB2328469A GB 2328469 A GB2328469 A GB 2328469A GB 9717719 A GB9717719 A GB 9717719A GB 9717719 A GB9717719 A GB 9717719A GB 2328469 A GB2328469 A GB 2328469A
Authority
GB
United Kingdom
Prior art keywords
assembly
plafform
leg
legs
buoyancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
GB9717719A
Other versions
GB9717719D0 (en
Inventor
Jenan Kazim
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to GB9717719A priority Critical patent/GB2328469A/en
Publication of GB9717719D0 publication Critical patent/GB9717719D0/en
Publication of GB2328469A publication Critical patent/GB2328469A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0052Removal or dismantling of offshore structures from their offshore location
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0069Gravity structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0078Suction piles, suction cans

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A platform assembly comprising i) one or more legs adapted to carry and support a deck assembly, the lowermost in use end of each leg incorporating a mud mat, ii) one or more buoyancy elements, each buoyancy elements being able to be ballasted or deballasted and associated with a respective one of the legs; and wherein the buoyancy elements are adapted to be independently moveable up and down said respective legs and also independently moveable with respect to the deck assembly. In this arrangement the buoyancy units can be utilised as a composite hull for transit as well as acting as gravity foundations.

Description

IMPROVED SELF INSTALLING REUSABLE FIXED PLATFORMS Field of the Invention This invention relates to Self Installing Reusable Fixed (SIRF) Plafforms which are typically used for offshore exploration, drilling and production activities but can also be used as supporting structures for other marine bodies such as the bridges or offshore accommodations. They will have adequate self buoyancy and stability during transportation phases being either self propelled or towed to the location. Once in location they will have the facility to instail themselves as fixed marine structures, supported on the sea bed with a gravity foundation.
Background to the invention There have been a number of developments in this field. The most common being the Jack-Up or Self Elevating Plafforms for which the industry classification exist. These are essentially ships with retractable legs. The legs typically 3 or more penetrate through jacking housing in the hull of the ship and they are sufficiently iong for the intended water depth. In transit the legs are retracted and stick up in the air with the bottom of the leg tagged under the hull of the vessel. When in location, the legs are lowered to the sea bed and the hull which supports the deck is jacked out of the water to the required height. In that condition, all the weight of the hull, deck, jacking facility, functional and environmental loads are supported by the legs. The foundation at the bottom of the legs are either provided by mud mats designed to sit on the top of the sea bed or spat cans which are designed to penetrate into the soil in order to provide the required foundation characteristics. The spat cans are initially forced down by pre-load tanks in the hull which are filled with water to a pre-determined weight and then emptied. This ensures that the spat cans would not penetrate the soil excessively under the in service conditions. The mud mats are required to be heavy enough to prevent uplift and by mobilising the bearing and sliding capacities of the soil they are also designed to satisfy the foundation requirements for the compressive as well as the lateral loads. They are designed to sit on top of the sea bed and not to penetrate significantly. Spat cans have been more commonly used because in order to satisfy all the functional and environmental loading, mud mats are found to be too large and because of their size, they are more difficult to lower to or raise from the sea bed. For removal, the hull is jacked down into the sea providing buoyancy and stability to jack the legs up to their transit position. Other variations on this concept have been to have large concrete bases attached to the bottom of the legs providing either all or part of the buoyancy required for transit and when in location they are ballasted to the sea bed and used as mud mat type gravity foundations. The stability and the buoyancy during lowering of the legs are provided by an additional unit which is also used to jack the deck up to the required elevation.
These concepts have the following disadvantages: They are expensive, utilising large jacking mechanisms and a hull which is only used during transit and installation and remains redundant during in service conditions.
The environmental conditions required for deploying or retrieving the legs are restrictive.
The weight of the hull and the jacks and the extra wind loading on them add extra burden on the legs. This in tum cause the legs to be larger, attracting more wave loading.
The additional mass concentrated at the top of the installation increases its natural period making it dynamically more responsive to the waves.
The large mud mats develop suction and stickiness between the mats and the soil, making them difficult to retrieve. The spat cans penetrate into the soil and a large force is required to pull them free.
It is the object of the present invention to overcome or minimise some or all of the above deficiencies.
Summary of the Invention According to a first aspect of the present invention there is provided a plafform assembly of the type in question comprising: (i) one or more legs adapted to carry and support a deck assembly, the lowermost in use end of each leg incorporating a mud mat; (ii) a deck assembly; (iii) one of more buoyancy elements, each buoyancy element being associates with one of the legs; and wherein the buoyancy elements are adapted to be independently moveable up and down said respective legs and also independently moveable with respect to the deck assembly.
In this arrangement the buoyancy units can be utilised as a composite hull for transit as well as acting as gravity foundations.
Preferably the buoyancy element(s) are adapted to be lowered to the lowermost in use end of the legs and to encapsulate the mud mats and thus form in combination with the mud mats a foundation for each leg.
In a particularly preferred embodiment the plafform assembly incorporates releasable couplings between the bouyancy element(s) and the mud mats.
By having a facility to safely and reliably couple and de-couple the base of the legs which act as small mud mats and the buoyancy element(s) the effect of suction is minimised for ease of retrieval.
Brief Description of the Drawings The specific embodiment of the innovative Self Installing Reusable Fixed Plafform will now be described by way of example only with reference to the accompanying drawings in which : Figure 1 shows a side view of the concept in its transit phase; Figure 2 shows a side view of the concept utilising a truss braced support in its transit phase; Figure 3 shows a cross section of two legs and pods exposing the intemal guide, coupling and support mechanisms; Figure 4 shows cross sections of a leg and the pod exposing the innovative mechanism used to couple and de-couple the leg from the buoyancy elements which in this text will be referred to as pods; Figure 4a shows a horizontal cross section giving a view from above showing the sealing arrangement and the suction pipes necessary for the coupling, de-coupling unit.
Figure 4b shows cross sectional side view of a typical sealing arrangement for the coupling, de-coupling unit; Figure 4c shows cross sections on a leg and the pod exposing the innovative mechanism used to couple and de-couple the leg from the buoyancy elements and the coupling de-coupling mechanism between the bottom of the truss and top of the pod; Figure 5 to 9 show the installation sequence for a 4 leg installation without the truss bracing; Figures 10 to 15 show the installation sequence for a 4 leg installation with a truss bracing.
Description of the Preferred Embodiments Referring to the figure 1, 2, 3, 4, 4a, 4b and 4c the plafform consists of pods (1) which provide buoyancy and stability during the transit phase and gravity foundations during the in-service conditions. They support the deck (3) on pillars (4) at a height required for the design operating envelope for the structure. The legs (2) are moveable vertically through the pods and the deck but they can be temporarily sea fastened to the pods or the deck or both during transit. There are a number of industry standard fastening arrangement which can be used, such as the rack and pinion with brakes, clamps or by welding.
These examples show 4 separate pods and 4 legs but the concept would be equally applicable to any other combination pods and legs, even for one pod and one leg. The legs are also shown as single tubes, but they may need to be trussed towers for deeper water depths. In this example the bottom of the legs are shown to be connected together to ensure that the they do not open out during the installation process.
However, this also may not be necessary depending on the bending stiffness of the legs. The structure is either self propelled or towed to the location as shown in figure 1.
Once in location the legs are lowered so that mud mats at the bottom of the legs rest on the sea bed. Part of the leg may be extended further than the mats and or mats may have skirts to provide sliding stability. The pods are then ballasted or de-ballasted so that the bottom of the deck is at the required elevation allowing for the most extreme environmental event and an air gap. The legs on the ground provide added stability whilst the deck is raised or lowered. In some soil conditions it may be necessary to preload test the leg mud mats prior to raising or lowering of the deck to ensure that the mats can provide the required support. This test is for the loading conditions for the installation phase only which has the minimum deck weight and does not include for the weight of the disposable items, live loads, functional loads and the extreme environmental loads for which the present day spat cans or mud mats are required to be designed and tested for. The load testing of the leg mud mats in this innovative concept is done by fixing the deck to the legs and then de-ballasting the pods. The pre-load on the mats can be calculated from the weight of the ballast water extracted from the pods and therefore additional pre-load tanks are not required. The advantage of using 4 legs and 4 pods is that when one pod is being lowered or raised the other 3 can be designed to provide all the required support and stability either as foundation or as floating bodies.
This sequence is shown on figures 5 to 9. This is done by firstly lowering one of the pods to the sea bed and coupled with the leg forming a gravity foundation, then the diagonally opposite pod is lowered and coupled with the leg and then the other 2. When a pod has been lowered by ballasting or aided by winches over the small mud mats (5) two seal rings (6) are formed generating a volume between the seal rings, the bottom of the pod and top surface of the mats. This volume is isolated from the effect of the sea pressure. Suction pipes (10) are open to the inside of this enclosure and come up either inside or outside of the legs to the top where the water inside the enclosure can be pumped out utilising facilities on the deck. The water pressure in the enclosure is governed by the height of the water column in these pipes. When this height is reduced by pumping the water out, the pressure inside the enclosure reduces and the extemal pressure of the sea forces the pod and the mat to couple together. The pods are then further ballasted to the required weight. This is a cheap, simple and reliable way of utilising the pods which would have otherwise been redundant during the in service conditions as mud mat type gravity foundation. The coupling between the legs and the pods is also very easy to monitor by monitoring the pressure inside the enclosure. For retrieval, the pods are deballasted and or aided by winches to a predetermined load, the pressure inside the enclosure is then increased by pumping water in to the suction pipes and the pod and the leg are de-coupled. The middle of the pods are not in contact with the soil and therefore the suction and stickiness between the base of the pod and the soil which would have been more severe towards the middle of the mat is minimised.
Retrieval procedure is the opposite of the installation.
Having the buoyancy pods as the foundation utilises them for all the phases of transit, installation, operation and retrieval. It also minimises the loading on the legs as explained above. The biggest weakness in the legs is the tendency to buckle due to compressive load and for a given size leg this is a function of the unsupported length of the leg. In order to minimise the effect of this, we have utilised a trussed bracing which can be coupled and de-coupled hydraulically as shown 12 in a similar way as explained above for between the pods and the leg mats. In transit, the truss is coupled on top of the pods and supports the deck, the deck being sea fastened to the deck. When all the pods have been installed as explained above, the truss is also lowered on top of the pods and coupled to them. The top of the truss can also be braced in the horizontal direction with guides for any appurtenances which may be required. This shortens the unsupported length of the legs by the height of the pods plus the height of the truss and thereby either reduces their size or increase the operating water depth. This installation procedure is shown in figures 10 to 15. The retrieval sequence being the opposite. One way of providing the sealing ring arrangement has been shown by way of an example.
This uses a half tube welded on the top surface of the mats in two circles, one inner and one outer as shown marked (7). There are similar rings on the base of the pods making up the sealing element (8) shaped to cradle around the half tube. The sealing elements can be made of a material such as neoprene and will be supported within the seal housing (9). The spacers (11) between the pod and the leg ensures that the seals engage the half tubes within acceptable tolerances.
The present invention overcomes or minimise some or all of the above identified deficiencies: 1. By not requiring a jacking mechanism, 2. By utilising the hull for transit as well as the gravity foundation without requiring an additional buoyancy unit to make it possible to lower or retrieve the legs or the hull, 3. By having a facility to safely and reliably couple and de-couple the base of the legs which act as small mud mats to the hull which would act as the large mud mats having the required weight and contact area with the soil to develop the bearing and sliding capacities needed for the in-service conditions and because they can be de coupled from the leg mud mats, the effect of the suction is minimised for ease of retrieval.
4. By having the facility to lower a truss system over on to the buoyancy pods on the sea bed and coupling them together and thereby reducing the effective length of the legs.
5. By having the facility to lower the hull (pods) in segments so that the installation and retrieval can take place in more severe environmental conditions.

Claims (10)

1. A plafform assembly of the type in question comprising: (i) one or more legs adapted to carry and support a deck assembly, the lowermost in use end of each leg incorporating a mud mat; (ii) a deck assembly; (iii) one or more buoyancy elements, each buoyancy element being able to be ballasted or deballasted and associated with one of the legs; and wherein each buoyancy element is adapted to be independently moveable up and down the respective leg and also relative to the deck assembly
2. A plafform assembly as claimed in claim 1, wherein the or each buoyancy element is adapted to be lowered to the lowermost in use end of the leg and to encapsulate the mud mat and thus form in combination with the mud mat a foundation for the leg.
3. A plafform assembly as claimed in claim 1 or claim 2, wherein the plafform assembly incorporates a releasable coupling between the or each bouyancy element and mud mat.
4. A plafform assembly as claimed in claim 3, wherein the releasable coupling comprises an enclosed volume between the buoyancy element and mud mat with a suction pipe open to the inside of this enclosure and which pipe comes up either inside or outside of the leg to the top where the water inside the enclosure can be pumped out.
5. A plafform assembly as claimed in claim 4, wherein the water pressure in the or each enclosure is governed by the height of the water column in the or each pipe.
6. A plafform assembly as claimed in claim 4 or claim 5, wherein the pressure inside the enclosure is monitored.
7. A plafform assembly as claimed in any preceding claim, wherein a truss bracing is provided and wherein the truss bracing can be coupled and decoupled hydraulically.
8. A plafform assembly as claimed in claim 7, wherein a truss bracing is provided which is adapted to be lowered onto the buoyancy elements(s) on the sea bed and coupled to the buoyancy element(s) by a coupling and decoupling mechanism between the bottom of the bracing truss and the top of the buoyancy element(s).
9. A plafform assembly as claimed in any preceding claim, wherein the leg(s) are moveable vertically through the buoyancy element(s) and the deck but can be temporarily sea fastened to the buoyancy element(s) or the deck or both during transit.
10. A plafform assembly substantially as hereinbefore described with reference to any suitable combination of the accompanying drawings.
GB9717719A 1997-08-22 1997-08-22 Self installing reusable fixed platforms Withdrawn GB2328469A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB9717719A GB2328469A (en) 1997-08-22 1997-08-22 Self installing reusable fixed platforms

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB9717719A GB2328469A (en) 1997-08-22 1997-08-22 Self installing reusable fixed platforms

Publications (2)

Publication Number Publication Date
GB9717719D0 GB9717719D0 (en) 1997-10-29
GB2328469A true GB2328469A (en) 1999-02-24

Family

ID=10817824

Family Applications (1)

Application Number Title Priority Date Filing Date
GB9717719A Withdrawn GB2328469A (en) 1997-08-22 1997-08-22 Self installing reusable fixed platforms

Country Status (1)

Country Link
GB (1) GB2328469A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2375134A (en) * 2001-05-01 2002-11-06 Ocean Technologies Ltd Offshore foundation stability enhancer
CN102167141A (en) * 2011-03-07 2011-08-31 中船重工船舶设计研究中心有限公司 Box-shaped truss type four-stand column deep water platform system with asymmetric soft cabin
WO2011116254A2 (en) 2010-03-19 2011-09-22 National Oilwell Varco, L.P. Jack-up rig with leg-supported ballast loads

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049392A (en) * 2016-06-01 2016-10-26 河海大学 Sleeve truss pile leg and pile shoe foundation

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3717001A (en) * 1971-12-27 1973-02-20 Chicago Bridge & Iron Co Offshore storage structure

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3717001A (en) * 1971-12-27 1973-02-20 Chicago Bridge & Iron Co Offshore storage structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2375134A (en) * 2001-05-01 2002-11-06 Ocean Technologies Ltd Offshore foundation stability enhancer
GB2375134B (en) * 2001-05-01 2005-09-21 Tamacrest Ltd Offshore foundation stability enhancer
WO2011116254A2 (en) 2010-03-19 2011-09-22 National Oilwell Varco, L.P. Jack-up rig with leg-supported ballast loads
CN102167141A (en) * 2011-03-07 2011-08-31 中船重工船舶设计研究中心有限公司 Box-shaped truss type four-stand column deep water platform system with asymmetric soft cabin

Also Published As

Publication number Publication date
GB9717719D0 (en) 1997-10-29

Similar Documents

Publication Publication Date Title
US7963241B2 (en) Dry tree semi-submersible platform for harsh environment and ultra deepwater applications
US3927535A (en) Jack-up type offshore oil production platform apparatus and method
US7717642B2 (en) Buoyancy stabilized pier
US4155671A (en) Marine structures
EP0059651B1 (en) Offshore tower structures
US8684630B2 (en) Underwater reinforced concrete silo for oil drilling and production applications
US4599014A (en) Buoyant guyed tower
US6190089B1 (en) Deep draft semi-submersible offshore structure
JPS59209579A (en) Floating modular device and constitution method thereof
JPH0364650B2 (en)
US4470725A (en) Offshore platform structure intended to be installed in arctic waters, subjected to drifting icebergs
KR20100087094A (en) Method for installing a drilling apparatus on a rig and for preparing drilling operations
US4512684A (en) Mobile offshore structure for arctic exploratory drilling
US4695201A (en) Removable bottom founded structure
US4711601A (en) Method of installing offshore constructions
GB2328469A (en) Self installing reusable fixed platforms
CA1078631A (en) Oil-production platform and method of assembling and installing the same on a sea bed
US3990254A (en) Marine structure for offshore activities
WO2013157958A1 (en) Floating and submersible platform
US4493591A (en) Floatable offshore production structure and method for fabrication, transport and installation of same
US5074716A (en) Offshore jacket having increased buoyancy
US4695197A (en) Elastomeric seal for a removable bottom founded structure
GB2182375A (en) Method of constructing an offshore structure
US4695199A (en) Elastomeric bearing pad and seal for a removable bottom founded structure
US4695200A (en) Membrane seal for a removable bottom founded structure

Legal Events

Date Code Title Description
WAP Application withdrawn, taken to be withdrawn or refused ** after publication under section 16(1)