GB2083078A - Metal refining process - Google Patents

Metal refining process Download PDF

Info

Publication number
GB2083078A
GB2083078A GB8126740A GB8126740A GB2083078A GB 2083078 A GB2083078 A GB 2083078A GB 8126740 A GB8126740 A GB 8126740A GB 8126740 A GB8126740 A GB 8126740A GB 2083078 A GB2083078 A GB 2083078A
Authority
GB
United Kingdom
Prior art keywords
refining
lance
melt
tuyeres
cycle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB8126740A
Other versions
GB2083078B (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
British Steel Corp
Original Assignee
British Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by British Steel Corp filed Critical British Steel Corp
Priority to GB8126740A priority Critical patent/GB2083078B/en
Publication of GB2083078A publication Critical patent/GB2083078A/en
Application granted granted Critical
Publication of GB2083078B publication Critical patent/GB2083078B/en
Expired legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
    • C21C5/28Manufacture of steel in the converter
    • C21C5/30Regulating or controlling the blowing
    • C21C5/35Blowing from above and through the bath

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)

Abstract

A process for refining steel by top blowing with below melt tuyere injection in which at the commencement of the refining cycle the refining gas lance (3) is located at a predetermined height above the melt (2), and the gas flow rate to the below melt tuyere or tuyeres is set at a predetermined level, comprising the steps of reducing the height of the lance and the gas flow rate to the tuyeres in one or more stages during the course of the refining cycle and increasing the height of the lance and the gas flow rate to the tuyeres towards the end of the refining cycle. <IMAGE>

Description

SPECIFICATION Metal refining process This invention relates to a process for refining metal and more particularly to a steel refining process of the kind including a refining cycle during which a refining gas, such as oxygen, is blown on to the upper surface of a melt contained in a refining vessel by means of an overhead lance, and additionally a stirring or processing gas, sometimes together with entrained solid reactants in powder or granular form, is injected directly into the melt by means of one or more tuyeres projecting through the wall of the vessel below the level of the melt therein.
According to the invention there is provided a process for refining steel of the kind comprising blowing a refining gas onto the upper surface of a melt contained in a refining vessel by means of an overhead lance, and additionally injecting a stirring or processing gas directly into the melt by means of one or more tuyeres projecting into the melt below the surface thereof, in which at the commencement of the refining cycle the refining gas lance is located at a predetermined height above the melt, and the gas flow rate to the below melttuyere ortuyeres is set at a predetermined level, including the steps of reducing the height of the lance and the gas flow rate to the tuyeres in one or more stages during the course of the refining cycle, and increasing the height of the lance and the gas flow rate to the tuyeres towards the end of the refining cycle.
The lance may be lowered in height from its initial position in a number of stages and may similarly be increased towards the end of the refining cycle over a number of stages. The lance height may in some instances be returned to its initial level by the end of the refining cycle.
Similarly the gas flow rates to the tuyere or tuyeres may be reduced by a number of stages and then increased by a number of stages. Again, the final gas flow rate may be the same as the initial -gas flow rate.
We have found in practice that the combination of process steps herein defined has a surprisingly beneficial effect upon the quality of steel produced during refining. Thus a relatively high early gas flow rate to the tuyere ortuyeres provides a high initial stirring rate within the melt which prevents excessive slag oxidation (during a period when the lance is at a relatively high level for the purpose of slag fluxing) and promotes decarburisation. With the lowering of the lance and the increase in the rate of decarburisation to a maximum during what can generally be called the middle part of the refining cycle, significant bath stirring from lance gas reaction occurs and gas injection rates can be reduced to a level appropriate to provide circulation deep within the melt.Later in the refining cycle as the lance is raised, for final refining purposes, and the rate of decarburisation commences to fall, increase in gas flow to the tuyeres to provide an increased internal stirring permits final carbon removal and ensures a minimum build-up of slag iron oxides.
It will be appreciated that the specific lance heights and gas flow rates to the tuyeres will vary depending upon the composition of the input metal and the refining vessel, and the quantity and quality of scrap and other additives such as lime; and will also vary in dependence on the steel to be produced, the size of the converter, the nature of the refining lance and the form and number of injection tuyeres.
One example of the invention will now be described by way of example with reference to the accompanying drawings in which: Figure 1 is a schematic elevation of plant for carrying ou the process of the invention; and Figure 2 is an illustration in tabular form of the relationship between lance height and injection gas flow rate in a refining process of the invention.
In the particular embodiment illustrated, a 16 minute refining cycle was utilised for a nominal 140 tonne converter vessel 1, the input material comprising blast furnace metal 2 incorporating approximately 1% silicon.
It is to be noted that a three orifice overhead oxygen lance 3 having a blowing rate of approximately 16,000 cubic feet per minute was used.
At the same time, two double concentric tube tuyeres 4 were used to inject stirring gas comprising air sheathed by an inert gas into the vessel.
It will be observed from Figure 2 that the lance height (indicated by line 5) at the commencement of refining was just over 1.4 m above the melt surface and the total input gas flow (indicated by line 6) rate was initially 12,000 m3/h. After 4 min the lance height was reduced to 1 m and the total gas flow rate to 1,000 m3/h. Lime additions (as shown by line 7) were made to the melt for this first 6 min of the refining cycle at the end of which the total gas flow rate was reduced to 800 m3/h. After 13 min, and approaching the end of the refining cycle, the gas flow rate was increased to 1,000 m3/h, and after 14 min the lance height was increased to approximately 1.2 m.
The combination of lance movements and injection gas flow variations was found to be particularly and surprisingly effective in the production of a refined steel.
Two further examples of the operation of the embodiment of the invention illustrated will now be described.
The first example is the production of silicon-killed boron grade steel having an initial melt composition including 4.6% carbon,0.89% manganese, 0.11% phosphorus, 0.16% sulphur and 1.8% silicon. The refining cycle took 14.7 minutes. 15.7 tonnes of lime were added during the first 5 minutes of the cycle.
The lance outlet was initially 1.8 m above the melt. It was reduced to 1.4 m after 3 minutes and 1.1 m after 7.2 minutes. After 14 minutes the lance was raised to 1.8 m. The total tuyere gas flow rate commenced at 1000 m3/hour (to achieve rapid silicon removal), was reduced to 650 m3/hour after two minutes, and then increased to 800 m3/hour after 14 minutes. The final steel composition included 0.14% carbon, 0.42% Manganese, 0.017% Phosphorus and 0.12% Sulphur.
The second example is the production of a balanced grade steel having an initial melt composition including 4.5% carbon, 0.80% Manganese, 0.1% Phosphorus, 0.026% Sulphur and 0.97% Silicon. The refining cycle took 15.5 minutes. 11.4 tonnes of lime were added during the first 5.3 minutes of the cycle.
The lance outlet was initially 1.9 m above the melt. It was reduced to 1.5 m after 4.5 minutes and 1.1 m after 5.2 minutes. After 14.5 minutes the lance was raised to 1.5 m. The total tuyere gas flow rate com-menced at 850 m3/hour, was reduced to 650 m3/hour after tern minutes, and then increased to 850 m3/hour after 14 minutes. The final steel composition includes 0.075% Carbon, 0.30% Manganese, 0.005% Phosphorus and 0.015% Sulphur.

Claims (9)

1. A process for refining steel of the kind comprising blowing a refining gas on to the upper surface of a melt contained in a refining vessel by means of an overhead lance, and additionally injecting a stirring or processing gas directly into the melt by means of one or more tuyeres projecting into the melt below the surface thereof, in which at the commencement of the refining cycle the refining gas lance is located at a predetermined height above the melt, and the gas flow rate to the below melt tuyere or tuyeres is set at a predetermined level, including the steps of reducing the height of the lance and the gas flow rate to the tuyeres in one or more stages during the course of the refining cycle, and increasing the height of the lance and the gas flow rate to the tuyere or tuyeres towards the end of the refining cycle.
2. A process as claimed in Claim 1 wherein the lance is lowered in height from its initial position in a plurality of stages.
3. A process as claimed in Claim 1 or 2 wherein the height of the lance is increased towards the end of the refining cycle by a single stage.
4. A process as claimed in any one of the preceding claims wherein the lance is returned to its initial level by the end of the refining cycle.
5. A process as claimed in any one of the preceding claims wherein the gas flow rate to the tuyere or tuyeres is reduced by a single stage.
6. A process as claimed in any one of the preceding claims where 'the gas flow rate to the tuyere or tuyeres is increa. ;d towards the end of the refining cycle by a single stage.
7. A process as claimed in any one of the preceding claims for refining a ferrous melt of between 130 to 160 tonnes wherein the lance outlet height is initially at between 1.5 m and 2.0 m above the melt, is subsequently reduced to between 1.0 m and 1.5 m during the refining cycle, and is then increased to between 1.5 m and 2.0 mtowardsthe end of the refining cycle.
8. A process as claimed in Claim 7 wherein the gas flow rate to the tuyere or tuyeres is initially bet ween 700 ninth and 1000 rn3/h, is subsequently reduced to between 500 rn3/h and 70G m3/h during the refining cycle, and is then increased to between 700 m3/h and 1000 rn3/h towards the end of the refin ing cycle.
9. Processes for refining steel substantially as shown in and as hereinbefore described with refer ence to the accompanying drawings.
GB8126740A 1980-09-03 1981-09-03 Metal refining process Expired GB2083078B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB8126740A GB2083078B (en) 1980-09-03 1981-09-03 Metal refining process

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB8028485 1980-09-03
GB8126740A GB2083078B (en) 1980-09-03 1981-09-03 Metal refining process

Publications (2)

Publication Number Publication Date
GB2083078A true GB2083078A (en) 1982-03-17
GB2083078B GB2083078B (en) 1983-11-16

Family

ID=26276772

Family Applications (1)

Application Number Title Priority Date Filing Date
GB8126740A Expired GB2083078B (en) 1980-09-03 1981-09-03 Metal refining process

Country Status (1)

Country Link
GB (1) GB2083078B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4411697A (en) * 1981-06-19 1983-10-25 British Steel Corporation Metal refining processes
JPS6057187A (en) * 1983-09-09 1985-04-02 新日本製鐵株式会社 Molten metal induction heater

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4411697A (en) * 1981-06-19 1983-10-25 British Steel Corporation Metal refining processes
JPS6057187A (en) * 1983-09-09 1985-04-02 新日本製鐵株式会社 Molten metal induction heater
EP0144559A1 (en) * 1983-09-09 1985-06-19 Nippon Steel Corporation Apparatus for induction heating of molten metal
JPS614033B2 (en) * 1983-09-09 1986-02-06 Nippon Steel Corp

Also Published As

Publication number Publication date
GB2083078B (en) 1983-11-16

Similar Documents

Publication Publication Date Title
US3929464A (en) Desulfurization of molten ferrous metals
US1032655A (en) Method of manufacturing steel.
US4358314A (en) Metal refining process
US2950186A (en) Method for top blowing pulverulent burnt lime and oxygen into cast iron for refining same
GB2083078A (en) Metal refining process
KR890002218B1 (en) Process for producing steel in a converter from pig iron and ferrous scrap
US2741554A (en) Method of refining iron
EP0360954B1 (en) Method of melting cold material including iron
CN107250386A (en) The blowing rifle component for manufacturing and refining for metal
JP6766796B2 (en) How to sedate slag
US3826647A (en) Method of obtaining low-phosphorus contents in medium-and high-carbon steels in a bottom-blown oxygen steelmaking furnace
JPS6333512A (en) Pre-treating method for molten iron
US3807989A (en) Refining hematite pig iron
JPS5743919A (en) Method for blow refining in top and/or bottom-blown converter
JPS6211044B2 (en)
RU2159289C1 (en) Method of steel melting in converter
US3807988A (en) Refining hematite pig iron in a converter
KR19980080961A (en) Basic oxygen steelmaking method with iron oxide pellet adduct
US3374088A (en) Method for producing low silicon ferromanganese alloys
US3782921A (en) Production of steel with a controlled phosphorus content
RU2121512C1 (en) Method of steel melting in converter
US4130419A (en) Process for the purification, modification and heating of a cast-iron melt
KR850001607B1 (en) Method for increasing vessel lining life for basic oxygen furnaces
SU1330168A1 (en) Method of melting steel in oxygen converter
SU1101452A1 (en) Method for smelting steel in converter

Legal Events

Date Code Title Description
732 Registration of transactions, instruments or events in the register (sect. 32/1977)
PCNP Patent ceased through non-payment of renewal fee

Effective date: 19980903