GB2042030A - Method of and apparatus for controlling tide waters - Google Patents

Method of and apparatus for controlling tide waters Download PDF

Info

Publication number
GB2042030A
GB2042030A GB7905241A GB7905241A GB2042030A GB 2042030 A GB2042030 A GB 2042030A GB 7905241 A GB7905241 A GB 7905241A GB 7905241 A GB7905241 A GB 7905241A GB 2042030 A GB2042030 A GB 2042030A
Authority
GB
United Kingdom
Prior art keywords
water
river
flow
weir
tidal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
GB7905241A
Other versions
GB2042030B (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Salo E A
Original Assignee
Salo E A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Salo E A filed Critical Salo E A
Priority to GB7905241A priority Critical patent/GB2042030B/en
Publication of GB2042030A publication Critical patent/GB2042030A/en
Application granted granted Critical
Publication of GB2042030B publication Critical patent/GB2042030B/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/40Swinging or turning gates
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates
    • E02B7/205Barrages controlled by the variations of the water level; automatically functioning barrages

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Barrages (AREA)

Abstract

The salinity intrusion of ocean tidewater into a communicating fresh water river is prevented by laterally restricting the out-flow cross-section of the river with a series of flotation weirs 26 and control weirs 24 so that the surface level of the out-flow cross-section is higher than the surface level of the adjacent tidal salt water. The weirs are located so as to not obstruct the ship channel 12 of the river. <IMAGE>

Description

SPECIFICATION Method of and apparatus for controlling tide waters This invention relates to improvements in a method of and apparatus or system for preventing the tidal intrusion of sea water into a fresh water river.
According to one aspect of the present invention there is provided a method of preventing the tidal intrusion of sea water into a fresh water river comprising laterally reducing at a control station the flow cross-section of the river from each side of the river to a channel in which the surface level of the fresh water outflow from the river is higher than the adjacent tidal level of sea water, and maintaining said channel open for fresh water outflow while preventing flow past said station of both river water and sea water outside of said channel.
According to another aspect of the present invention there is provided a water flow control system for the prevention of the tidal intrusion of sea water into a fresh water river having a generally centrally located dredged ship channel comprising continuous concrete foundational weir gate supports extending from the shores or banks of the river to approximately said channel, a plurality of spaced vertical wall members carried by said supports, said wall members extending parallel to the river, below the mean low low water level and above the mean high high water level, weirs pivotally attached at their lower ends between pairs of said wall members, said weirs being adapted to be raised to block flow between said wall members and to be lowered to unblock flow between said wall members, and means to separately and selectively raise and lower said weirs to flow blocking and flow unblocking positions.
One embodiment of the invention will now be described by way of example, reference being made to the accompanying drawings in which: Figure 1 is a view in perspective of an installation of the weir system of the invention; Figure 2 is an enlarged view taken along lines 2-2 of Fig. 1; Figure 3 is an enlarged view taken along lines 3-3 of Fig. 1; Figure 4 is an enlarged detail view taken along lines 4-4 of Fig. 1, showing the upper end of a flotation weir in floating position; Figure 5 is a view similar to that of Fig. 4 but showing the upper end of the flotation weirs in sunken position; Figure 6 is a view taken along lines 6-6 of Fig. 2, showing also in a schematic way the air supply and control system for the flotation weirs; and Figure 7 is a view taken along lines 7-7 of Fig. 3.
With reference to Fig. 1, a river 10 having a ship channel 1 2 is provided across the full width thereof, except for the ship channel 1 2 which is left clear and open, with a concrete weir base 14 anchored to the river bed 1 6 by pilings 1 8. Pile dolphines are provided to protect the weir works against ship and boat collisions.
Integral with the weir base sections 14 are concrete partition members 22 which extend above the mean high high water level of the river and which also extend below the mean low low water level of the river. Positioned between the partitioned members or walls 22 are a plurality of control weirs indicated generally at 24 and flotation weirs indicated generally at 26. The control weirs 24 are located adjacent the dredged channel 1 2 at each side thereof and the flotation weirs 66 occupy the remainder of the width of the river between the control weirs and the river banks.
The flotation weirs 26 are pivotally attached to wall members 22 by trunnion and trunnion plate connectors 28, 30 (Fig. 6). These weirs 26 are of a light weight construction and are comprised preferably of aluminium I beams 32 and channels 34 and a timber facing 36 on the upstream side. At their free ends, the weirs 26 are provided with flotation members or housings 38 defining therein flotation chambers. The weirs 26 are provided with air inlet lines 40 which extend through the pivot elements 28, 30 and along the undersides of the weir leaves into the flotation members 38 where they terminate in discharge nozzles 42 located closely adjacent the top walls of the float members 38. The system includes an air compressor 46, vent lines 48, and valve control elements 50 (Fig. 6) to selectively connect the compressor 46 to the weir air lines 40 or the vent lines 48.The float members 38 are further provided with water ports 52 and control means therefor comprising a float ball 54 attached to a carrier arm 56 having a pivotal connection with the lower wall 58 of the float member or housing 38.
The control weir leaves 24 comprise trunnion mounting means 60, opposed facing surfaces 62 and 64, and internal support and reinforcement members 66. The control weirs are provided with means for controlling their angular position comprising downhaul sheaves 68, adjusting cables 70, adjusting drum 72, drum drive 74, and motor 76.
The system further includes a control house 80 from which the operation of the individual weirs is controlled and monitored. The control house is provided with a display board 82 which is to be used to communicate suitable instructions to approaching ships and boats to maintain satisfactory traffic control through the channel 1 2.
The operation of the system is as follows.
When the tidal flow is outgoing, the weirs 24 and 26 are disposed in the full flow position exemplified by the horizontal position of the weir in Fig. 5. On the turn of the tide, and even before that under conditions of low river flow and spring tides, the flotation weirs 26 are closed or raised sequentially from shoreside to the control weirs 24. This is accomplished by adjustment of the control means 50 to connect the air compressor 46 with the float members 38 through the lines 40. The incoming air forces the water out of the members 38 through ports 52, causing the weirs to raise to the Fig. 4 position and the float balls 54 to be maintained in sealing relation to the ports 52.The idea is to close or raise as many of the flotation weirs sequentially as may be needed to maintain the fresh water level 86 above the sea water level 88 and to maintain a net fresh water outflow in the channel 1 2. As the tidal inflow increases to a point where the water level downstream of the weir system approaches the upstream level, the control weirs 24 are manipulated through operation of the means 72, 74, 76 to maintain a slight but positive higher level upstream, thereby preventing the intrusive flow of sea water upstream of the weir system.The control weirs 24 are also to be used to modulate the river flow to relieve the channel 1 2 flow when this is needed to prevent an excessive speed of flow in channel 1 2, and to prevent excessive level gradient of the water adjacent to the channel 12, thereby minimizing cross4low that might otherwise cause navigational difficulties.
When the flotation weirs have been raised, the control means 50 are adjusted to the air shut off position shown in Fig. 6 in which the air lines 40 are disconnected from the compressor and the vent lines 48.
When the tidal flow once again becomes outgoing, the flotation weirs are moved to the horizontal or full flow position by selective operation of the control means 50 to connect the weir air lines 40 with the vent lines 48.
This allows the float members 38 to fill with water. The weirs 26 move to the horizontal position as this takes place.
The flotation weirs 26 are, as previously stated, of light weight construction in order to properly operate under hydrostatic balance conditions. The control weirs, on the other hand, are of a somewhat heavier and more rugged construction, being designed for differential hydraulic heads of up to 12 inches plus kinetic effects from water flow. These control weirs 24 are precisely positionable by the power driven drum winches 72 with control of both their upward and their downward movement. Low pitch worm gear drives are preferably used to prevent hydraulic forces from shifting the positions of the weir leaves 24.
The advantages of this weir control system are many. It prevents the intrusion of downstream ocean water into upstream fresh water; it enables the control of chlorides intrusion without objectionable interference with marine traffic; it provides a very substantial savings in cost over previously proposed dam and ship lock systems; it provides relatively little interference with marine traffic as compared to a system of ship locks for the passage of ships past a fixed dam; it eliminates the problems with brackish water, whch are costly to industry, in areas upstream of the location of the weir system; it will enable the restoration in time of the quality of shoreside aquifers which have in the past deteriorated from chlorides intrusion; and its use will eliminate the contaminating effects of sewage and waste waters commonly discharged into tidal waters which presently penetrate miles upstream of rivers upon changes in tide.

Claims (9)

1. A method of preventing the tidal intrusion of sea water into fresh water river comprising laterally reducing at a control station the flow cross-section of the river from each side of the river to a channel in which the surface level of the fresh water outflow from the river is higher than the adjacent tidal level of sea water, and maintaining said channel open for fresh water outflow while preventing flow past said station of both river water and sea water ouside of said channel.
2. A method according to Claim 1 which comprises at a time of development of an incoming tidal flow, progressively constricting the control station the cross-sectional flow area of the river from each shore toward the middle thereof, while preventing water flow therepast in either direction at the upper end of the flow area so constricted, until the outflow level of fresh water in the remaining unconstricted flow area of the river exceeds the opposing level of sea water at said station, maintaining such a disparity in said water levels until the time of development of an outgoing tidal flow, and thereafter progressively unconstricting said cross-sectional flow area in the direction of each shore.
3. A method according to Claim 1 which comprises at times of development of normally incoming tidal flows, progressively constricting at the control station the cross-sectional flow area of the river from each shore toward said channel, while preventing water flow therepast in either direction at the upper end of the flow area so constricted, until the outflow level of fresh water in the remaining unconstricted flow area of the river exceeds the opposing level of sea water at said station, and maintaining such a disparity in said water levels until the time of development of an outgoing tidal flow.
4. A method of preventing the tidal intrusion of sea water into a fresh water river substantially as herein described with reference to the.accompanying drawings.
5. A water flow control system for the prevention of the tidal intrusion of sea water into a fresh water river having a generally centrally located dredged ship channel comprising continuous concrete foundational weir gate supports extending from the shores or banks of the river to approximately said channel, a plurality of spaced vertical wall members carried by said supports, said wall members extending parallel to the river, below the mean low low water level and above the mean high high water level, weirs pivotally attached at their lower ends between pairs of said wall members, said weirs being adapted to be raised to block flow between said wall members and to be lowered to unblock flow between said wall members, and means to separately and selectively raise and lower said weirs to flow blocking and flow unblocking positions.
6. A system according to Claim 5 wherein said means includes flotation members having air chambers therein attached to the upper ends of said weirs, a source of compressed air, conduits to interconnect said source and said chambers, water filling ports in said members and float valve means associated therewith, and control means for each weir operable selectively to interconnect said source with said chamber to empty said chamber of water, close said valve means and float said weir; to disconnect said source and said chamber while maintaining the buoyancy condition of said weir; and to vent said chamber to cause a lowering of the weir to a flow unblocking condition.
7. A system according to Claim 5 or 6 including at least one non-flotation weir disposed immediately adjacent said channel at each side thereof, each non-flotation weir being pivotally attached at its lower end between a pair of said wall members, and drive means for each non-flotation weir positively to control the position of the upper end thereof between levels below mean low low water level and above mean high high water level.
8. A system according to Claim 7 in which the drive means includes adjusting cables at both ends to the weir, downhaul sheaves therefor, winding drums therefor, a motor, and low pitch worm gear drive transmission interconnecting said motor and drums.
9. A water flow control system for the prevention of the tidal intrusion of sea water into a fresh water river constructed, arranged and adapted to operate substantially as herein described with reference to the accompanying drawings.
GB7905241A 1979-02-14 1979-02-14 Method of and apparatus for controlling tide waters Expired GB2042030B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB7905241A GB2042030B (en) 1979-02-14 1979-02-14 Method of and apparatus for controlling tide waters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB7905241A GB2042030B (en) 1979-02-14 1979-02-14 Method of and apparatus for controlling tide waters

Publications (2)

Publication Number Publication Date
GB2042030A true GB2042030A (en) 1980-09-17
GB2042030B GB2042030B (en) 1982-12-01

Family

ID=10503198

Family Applications (1)

Application Number Title Priority Date Filing Date
GB7905241A Expired GB2042030B (en) 1979-02-14 1979-02-14 Method of and apparatus for controlling tide waters

Country Status (1)

Country Link
GB (1) GB2042030B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008004202A2 (en) * 2006-05-26 2008-01-10 Mustafa Brackovic System for preventing overflows
WO2010058336A3 (en) * 2008-11-13 2012-11-29 Mustafa Brackovic System for preventing overflows 2
DK201770235A1 (en) * 2017-03-30 2018-04-16 Steen Olsen Invest Aps Flood protection

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2008004202A2 (en) * 2006-05-26 2008-01-10 Mustafa Brackovic System for preventing overflows
WO2008004202A3 (en) * 2006-05-26 2008-06-12 Mustafa Brackovic System for preventing overflows
WO2010058336A3 (en) * 2008-11-13 2012-11-29 Mustafa Brackovic System for preventing overflows 2
DK201770235A1 (en) * 2017-03-30 2018-04-16 Steen Olsen Invest Aps Flood protection
DK179294B1 (en) * 2017-03-30 2018-04-16 Steen Olsen Invest Aps Flood protection
US11629469B2 (en) 2017-03-30 2023-04-18 Steen Olsen Invest Aps Flood protection

Also Published As

Publication number Publication date
GB2042030B (en) 1982-12-01

Similar Documents

Publication Publication Date Title
US4146346A (en) Apparatus and method for controlling tide waters
US4476396A (en) Low-head hydroelectric generation system
US11286630B2 (en) Pile foundation permeable breakwater with variable permeability and construction method thereof
IE46678B1 (en) Improvements in or relating to a port ramp for access to a roll-on roll-off ship
GB2042030A (en) Method of and apparatus for controlling tide waters
WO2011162812A2 (en) Water control gate and control system therefore
WO2007104917A1 (en) System and method for hydraulic displacement
JPH09279539A (en) Flow control method and device of river
CN108661021B (en) System for controlling interception and collection of source garbage at coastal entrance of river
WO2003057995A1 (en) Device for a total, or partial, operating barrier for a channel and its installation
JP2003129454A (en) Floating gate
JP3613619B2 (en) Water level following float type fishway gate
SU1432132A1 (en) Floating gate
KR20010036824A (en) Equipment for control of sediment transport
KR20010008037A (en) Method for constructing flap weir
McCartney et al. Estuary Waterway Projects—Lessons Learned
Stepanich Sector Gates in Bangkok Klong System
RU2054087C1 (en) Gear for oil localization on water surface
Bijker Coastal Engineering and Offshore Loading Facilities.
JP4635318B2 (en) Water purification system
KR820002207B1 (en) Automatic apparatus for selectively draining sea water
SU1167260A1 (en) Fish-controlling arrangement
RU2237130C1 (en) Plant for underwater gabion laying
SU646002A1 (en) Floating ships lift
Williams Navigation Locks for Coastal Saline Lake Developments

Legal Events

Date Code Title Description
PCNP Patent ceased through non-payment of renewal fee