FR3142270A1 - Method for determining a network of tubes in a reference space of a motor vehicle - Google Patents

Method for determining a network of tubes in a reference space of a motor vehicle Download PDF

Info

Publication number
FR3142270A1
FR3142270A1 FR2212120A FR2212120A FR3142270A1 FR 3142270 A1 FR3142270 A1 FR 3142270A1 FR 2212120 A FR2212120 A FR 2212120A FR 2212120 A FR2212120 A FR 2212120A FR 3142270 A1 FR3142270 A1 FR 3142270A1
Authority
FR
France
Prior art keywords
connection port
component
tubes
network
hoses
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR2212120A
Other languages
French (fr)
Inventor
Jean-Baptiste Chancerelle
Martin CHARRIER
Pierre-Emmanuel DUMOUCHEL
Steven MASFARAUD
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dessia Tech
Dessia Technologies
Renault SAS
Original Assignee
Dessia Tech
Dessia Technologies
Renault SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dessia Tech, Dessia Technologies, Renault SAS filed Critical Dessia Tech
Priority to FR2212120A priority Critical patent/FR3142270A1/en
Priority to PCT/EP2023/082440 priority patent/WO2024110408A1/en
Publication of FR3142270A1 publication Critical patent/FR3142270A1/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/15Vehicle, aircraft or watercraft design
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/04Constraint-based CAD
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/06Multi-objective optimisation, e.g. Pareto optimisation using simulated annealing [SA], ant colony algorithms or genetic algorithms [GA]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/14Pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Mathematical Optimization (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Pipeline Systems (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

L’invention concerne un procédé de détermination d’un réseau de tubes dans un espace de référence d’un véhicule automobile qui comprend une pluralité de composants (C1, C2, C3, C4), ledit réseau de tubes comprenant une pluralité de tubes principaux (10) s’étendant entre deux composants, le procédé comportant les étapes suivantes mises en œuvre par un calculateur : - pour chaque composant, détermination d’une représentation tridimensionnelle et d’une posture du composant concerné dans l’espace de référence, - chaque tube principal s’étendant depuis un premier port de raccordement d’un premier composant jusqu’à un deuxième port de raccordement d’un deuxième composant, détermination, pour chacun du premier port de raccordement et du deuxième port de raccordement, d’une donnée de posture, et - détermination d’un chemin pour chaque tube principal par calcul d’une trajectoire optimale s’étendant entre le premier port de raccordement et le deuxième port de raccordement et tenant compte de contraintes basées sur la représentation tridimensionnelle et la posture de chaque composant, de la donnée de posture du premier port de raccordement et de la donnée de posture du deuxième port de raccordement. Figure pour l’abrégé : Fig. 2The invention relates to a method for determining a network of tubes in a reference space of a motor vehicle which comprises a plurality of components (C1, C2, C3, C4), said network of tubes comprising a plurality of main tubes (10) extending between two components, the method comprising the following steps implemented by a computer: - for each component, determination of a three-dimensional representation and a posture of the component concerned in the reference space, - each main tube extending from a first connection port of a first component to a second connection port of a second component, determination, for each of the first connection port and the second connection port, of a posture data, and - determination of a path for each main tube by calculating an optimal trajectory extending between the first connection port and the second connection port and taking into account constraints based on the three-dimensional representation and the posture of each component, the posture data of the first connection port and the posture data of the second connection port. Figure for abstract: Fig. 2

Description

Procédé de détermination d’un réseau de tubes dans un espace de référence d’un véhicule automobileMethod for determining a network of tubes in a reference space of a motor vehicle Domaine technique de l'inventionTechnical field of the invention

La présente invention concerne de manière générale l’agencement des composants d’un véhicule automobile.The present invention generally relates to the arrangement of components of a motor vehicle.

L’invention concerne plus particulièrement un procédé de détermination d’un réseau de tubes dans un espace de référence d’un véhicule automobile.The invention relates more particularly to a method for determining a network of tubes in a reference space of a motor vehicle.

L’invention trouve une application particulièrement avantageuse pour l’agencement d’un réseau de durites et/ou de tubulures et/ou de câbles électriques entre les composants d’un moteur à combustion interne du véhicule automobile.The invention finds a particularly advantageous application for the arrangement of a network of hoses and/or tubing and/or electrical cables between the components of an internal combustion engine of the motor vehicle.

Etat de la techniqueState of the art

Les véhicules automobiles sont équipés de plusieurs réseaux de tubes s’entendant entre différents composants et permettant la circulation d’eau, d’air, d’huile ou encore le passage de conducteurs électriques.Motor vehicles are equipped with several networks of tubes connecting different components and allowing the circulation of water, air, oil or even the passage of electrical conductors.

La détermination d’un schéma de routage de ces réseaux est assez complexe car elle nécessite de tenir compte de contraintes géométriques assez marquées, en particulier concernant l’espace disponible. Cette méthode combinatoire est actuellement mise en œuvre manuellement, par le concepteur du véhicule automobile.Determining a routing scheme for these networks is quite complex because it requires taking into account quite marked geometric constraints, in particular concerning the available space. This combinatorial method is currently implemented manually by the designer of the motor vehicle.

Elle ne garantit donc pas que les schémas de routage de ces réseaux soient optimaux. Par ailleurs, du fait de son caractère manuel, elle est assez longue à mettre en œuvre. Enfin, un changement d’agencement d’un composant ou d’un tube nécessite de repenser l’ensemble du schéma de routage du réseau concerné.It therefore does not guarantee that the routing schemes of these networks are optimal. Furthermore, due to its manual nature, it takes quite a long time to implement. Finally, a change in the layout of a component or a tube requires rethinking the entire routing diagram of the network concerned.

Présentation de l'inventionPresentation of the invention

Afin de remédier aux inconvénients précités, la présente invention propose d’améliorer la détermination des réseaux de tubes dans un véhicule automobile.In order to remedy the aforementioned drawbacks, the present invention proposes to improve the determination of the networks of tubes in a motor vehicle.

Plus particulièrement, on propose selon l’invention un procédé de détermination d’un réseau de tubes dans un espace de référence d’un véhicule automobile qui comprend une pluralité de composants, ledit réseau de tubes comprenant une pluralité de tubes principaux s’étendant entre deux composants, le procédé comportant les étapes suivantes mises en œuvre par un calculateur :
- pour chaque composant, détermination d’une représentation tridimensionnelle et d’une posture du composant concerné dans l’espace de référence,
- chaque tube principal s’étendant depuis un premier port de raccordement d’un premier composant jusqu’à un deuxième port de raccordement d’un deuxième composant, détermination, pour chacun du premier port de raccordement et du deuxième port de raccordement, d’une donnée de posture, et
- détermination d’un chemin pour chaque tube principal par calcul d’une trajectoire optimale s’étendant entre le premier port de raccordement et le deuxième port de raccordement et tenant compte de contraintes basées sur la représentation tridimensionnelle et la posture de chaque composant, de la donnée de posture du premier port de raccordement et de la donnée de posture du deuxième port de raccordement.
More particularly, according to the invention, a method is proposed for determining a network of tubes in a reference space of a motor vehicle which comprises a plurality of components, said network of tubes comprising a plurality of main tubes extending between two components, the process comprising the following steps implemented by a computer:
- for each component, determination of a three-dimensional representation and a posture of the component concerned in the reference space,
- each main tube extending from a first connection port of a first component to a second connection port of a second component, determination, for each of the first connection port and the second connection port, of posture data, and
- determination of a path for each main tube by calculating an optimal trajectory extending between the first connection port and the second connection port and taking into account constraints based on the three-dimensional representation and the posture of each component, the posture data of the first connection port and the posture data of the second connection port.

Ainsi, d’après la présente invention, la trajectoire de chacun des tubes est déterminée en tenant compte de l’ensemble des données caractérisant l’espace de référence et des composants qu’il contient. Cela permet alors d’optimiser le schéma de routage du réseau de tubes en respectant les contraintes géométriques associées aux différents composants et à l’espace de référence.Thus, according to the present invention, the trajectory of each of the tubes is determined by taking into account all the data characterizing the reference space and the components it contains. This then makes it possible to optimize the routing diagram of the tube network while respecting the geometric constraints associated with the different components and the reference space.

D’autres caractéristiques avantageuses et non limitatives du procédé conforme à l’invention, prises individuellement ou selon toutes les combinaisons techniquement possibles, sont les suivantes :
- le calcul de la trajectoire optimale comprend des étapes de détermination d’une pluralité de trajectoires s’étendant entre le premier port de raccordement et le deuxième port de raccordement, et calcul de la trajectoire optimale par détermination de la trajectoire la plus courte permettant le contournement d’au moins un composant présent entre le premier port de raccordement et le deuxième port de raccordement ;
Other advantageous and non-limiting characteristics of the process according to the invention, taken individually or in all technically possible combinations, are as follows:
- calculating the optimal trajectory comprises steps of determining a plurality of trajectories extending between the first connection port and the second connection port, and calculating the optimal trajectory by determining the shortest trajectory allowing the bypassing at least one component present between the first connection port and the second connection port;

- le deuxième port de raccordement étant localisé en retrait d’une surface générale du deuxième composant, vers l’intérieur dudit deuxième composant, il est prévu des étapes de tracé d’un segment entre le premier port de raccordement et le deuxième port de raccordement, sélection d’une portion d’une droite passant par le segment et correspondant à la traversée du deuxième composant, détermination d’une plus petite distance entre le deuxième port de raccordement et l’extrémité de la portion du segment qui est la plus éloignée du premier port de raccordement, et calcul de la trajectoire optimale par comparaison du rapport entre ladite distance et la longueur de la portion du segment à une valeur prédéterminée ;
- the second connection port being located set back from a general surface of the second component, towards the inside of said second component, steps are provided for drawing a segment between the first connection port and the second connection port , selection of a portion of a straight line passing through the segment and corresponding to the crossing of the second component, determination of a smallest distance between the second connection port and the end of the portion of the segment which is furthest away of the first connection port, and calculation of the optimal trajectory by comparison of the ratio between said distance and the length of the portion of the segment at a predetermined value;

- le réseau de tubes comprend également une pluralité de tubes secondaires, au moins un tube secondaire s’étendant entre un composant et un desdits tubes principaux, le procédé comprenant une étape de détermination de la position optimale de branchement du tube secondaire sur le tube principal par minimisation de la longueur du tube secondaire ;
- the network of tubes also comprises a plurality of secondary tubes, at least one secondary tube extending between a component and one of said main tubes, the method comprising a step of determining the optimal position for connecting the secondary tube to the main tube by minimizing the length of the secondary tube;

- l’étape de détermination de la position optimale de branchement comprend la minimisation d’une abscisse curviligne du tube secondaire ;
- the step of determining the optimal connection position comprises the minimization of a curvilinear abscissa of the secondary tube;

- l’étape de détermination de la position de branchement optimale comprend des étapes de discrétisation du tube principal en une pluralité de sous-portions, détermination, pour chaque sous-portion discrétisée, d’une position de branchement associée, détermination de la position de branchement optimale par sélection de la position de branchement déterminée minimisant la longueur du tube secondaire parmi les positions de branchement déterminées pour chaque sous-portion discrétisée ;
- the step of determining the optimal branching position comprises steps of discretizing the main tube into a plurality of sub-portions, determining, for each discretized sub-portion, an associated branching position, determining the position of optimal connection by selection of the determined connection position minimizing the length of the secondary tube among the connection positions determined for each discretized sub-portion;

- le tube principal se présentant sous la forme d’une ligne brisée reliant le premier port de raccordement au deuxième port de raccordement, la ligne brisée comprenant au moins un sommet, il est prévu une étape de lissage de ladite ligne brisée ;
- the main tube being in the form of a broken line connecting the first connection port to the second connection port, the broken line comprising at least one vertex, a step is provided for smoothing said broken line;

- l’étape de lissage comprend l’ajustement de chaque sommet de la ligne brisée par déplacement du sommet concerné dans une sphère de rayon prédéterminé ;
- the smoothing step includes adjusting each vertex of the broken line by moving the vertex concerned in a sphere of predetermined radius;

- l’étape de lissage comprend la minimisation d’une fonction de coût de manière à minimiser la longueur du réseau de tubes, empêcher les superpositions entre tubes et composants et empêcher les superpositions entre les tubes ;
- the smoothing step includes the minimization of a cost function so as to minimize the length of the network of tubes, prevent superpositions between tubes and components and prevent superpositions between the tubes;

- il est prévu une étape de conversion de la ligne brisée lissée en tubes tridimensionnels.- a step of converting the smoothed broken line into three-dimensional tubes is provided.

Bien entendu, les différentes caractéristiques, variantes et formes de réalisation de l'invention peuvent être associées les unes avec les autres selon diverses combinaisons dans la mesure où elles ne sont pas incompatibles ou exclusives les unes des autres.Of course, the different characteristics, variants and embodiments of the invention can be associated with each other in various combinations as long as they are not incompatible or exclusive of each other.

Description détaillée de l'inventionDetailed description of the invention

La description qui va suivre en regard des dessins annexés, donnés à titre d’exemples non limitatifs, fera bien comprendre en quoi consiste l’invention et comment elle peut être réalisée.The description which follows with reference to the appended drawings, given as non-limiting examples, will make it clear what the invention consists of and how it can be carried out.

Sur les dessins annexés :On the attached drawings:

représente de manière schématique un réseau de durites conforme à la présente invention ; schematically represents a network of hoses according to the present invention;

représente de manière schématique un premier exemple de trajectoire d’une durite s’étendant entre un premier port de raccordement et un deuxième port de raccordement ; schematically represents a first example of the trajectory of a hose extending between a first connection port and a second connection port;

représente de manière schématique un deuxième exemple de trajectoire d’une durite s’étendant entre un premier port de raccordement et un deuxième port de raccordement ; schematically represents a second example of the trajectory of a hose extending between a first connection port and a second connection port;

représente de manière schématique un exemple de raccordement d’une durite secondaire présente dans la ; schematically represents an example of connection of a secondary hose present in the ;

illustre un exemple de ligne brisée représentant une partie du réseau de durites conforme à l’invention ; illustrates an example of a broken line representing part of the network of hoses according to the invention;

représente, sous forme de logigramme, un exemple de procédé de détermination d’un réseau de durites conforme à l’invention. represents, in flowchart form, an example of a method for determining a network of hoses according to the invention.

Un véhicule automobile comporte classiquement un châssis qui supporte de nombreux équipements, parmi lesquels un moteur à combustion interne.A motor vehicle conventionally comprises a chassis which supports numerous pieces of equipment, including an internal combustion engine.

Les différents équipements comportent eux-mêmes différents composants.The different pieces of equipment themselves have different components.

En prenant l’exemple du moteur à combustion interne, de manière classique, il comporte une pluralité de composants qui sont logés dans un compartiment moteur délimité entre le châssis et le capot du véhicule. Parmi ces composants, on trouve par exemple (et de manière non exhaustive) un carter d’huile, une pompe à eau, un ventilateur, un démarreur, etc.Taking the example of the internal combustion engine, in a conventional manner, it comprises a plurality of components which are housed in an engine compartment delimited between the chassis and the hood of the vehicle. Among these components, we find for example (and not exhaustively) an oil pan, a water pump, a fan, a starter, etc.

Certains des éléments et composants du véhicule automobile, en particulier dans le moteur à combustion interne, sont reliés entre eux par des tubes afin de permettre la circulation de liquide de refroidissement, la circulation d’air, la circulation de lubrifiant ou encore le passage de conducteurs électriques.Some of the elements and components of the motor vehicle, in particular in the internal combustion engine, are connected together by tubes in order to allow the circulation of coolant, the circulation of air, the circulation of lubricant or even the passage of electrical conductors.

Dans cette description, on entend par « tube » un tuyau permettant la circulation d’air, de liquide de refroidissement, de lubrifiant ou le passage de câbles électriques entre deux composants.In this description, “tube” means a pipe allowing the circulation of air, coolant, lubricant or the passage of electrical cables between two components.

On s’intéressera ici plus particulièrement au réseau de durites (permettant la circulation d’un fluide), mais l’invention pourrait s’appliquer à tous les réseaux.We will be more particularly interested here in the network of hoses (allowing the circulation of a fluid), but the invention could be applied to all networks.

Dans un véhicule automobile, les durites doivent être agencées dans un espace contraint de manière à occuper un minimum d’espace tout en assurant un fonctionnement optimal des éléments du véhicule automobile.In a motor vehicle, the hoses must be arranged in a constrained space so as to occupy a minimum of space while ensuring optimal operation of the elements of the motor vehicle.

La présente invention vise donc à agencer un réseau de durites qui soit optimal. Dans cette description, on considèrera qu’un réseau de durites est formé de différentes portions de durites s’étendant entre les différents composants du véhicule automobile.The present invention therefore aims to arrange a network of hoses which is optimal. In this description, we will consider that a network of hoses is formed of different portions of hoses extending between the different components of the motor vehicle.

La représente de manière schématique un réseau 1A de durites compris dans un espace de référence 1 d’un véhicule automobile. Cet espace de référence 1 définit l’enveloppe englobante contenant différents composants 2, 3, 4, 5, 6, 7 et le réseau 1A de durites. Ce réseau 1A de durites comprend une pluralité de durites 10, 20, 30 raccordant les différents composants 2, 3, 4, 5, 6, 7 entre eux (pour permettre par exemple la circulation d’eau, la circulation d’air et la circulation d’huile).There schematically represents a network 1A of hoses included in a reference space 1 of a motor vehicle. This reference space 1 defines the encompassing envelope containing different components 2, 3, 4, 5, 6, 7 and the network 1A of hoses. This network 1A of hoses comprises a plurality of hoses 10, 20, 30 connecting the different components 2, 3, 4, 5, 6, 7 to each other (to allow for example the circulation of water, the circulation of air and the oil circulation).

A titre d’illustration, l’espace de référence 1 est formé par exemple par le compartiment moteur. Les durites 10, 20, 30 du réseau 1A de durites sont également prévues pour être contenues dans cet espace de référence 1.For illustration purposes, reference space 1 is formed for example by the engine compartment. The hoses 10, 20, 30 of the network 1A of hoses are also intended to be contained in this reference space 1.

Comme cela est visible sur la , le réseau 1A de durites comprend différents types de durites 10, 20, 30.As can be seen on the , the 1A network of hoses includes different types of hoses 10, 20, 30.

Tout d’abord, il comprend une pluralité de durites principales 10. Les durites principales 10 forment une portion principale du réseau 1A de durites.First of all, it comprises a plurality of main hoses 10. The main hoses 10 form a main portion of the network 1A of hoses.

Chaque durite principale 10 s’étend entre deux composants 2, 3, 4. Plus particulièrement, chaque durite principale 10 s’étend entre un premier port de raccordement 2A, 2B, 3A, 3B, 4A, 4B formé sur un premier composant 2, 3, 4 et un deuxième port de raccordement 2A, 2B, 3A, 3B, 4A, 4B formé sur un deuxième composant 2, 3, 4.Each main hose 10 extends between two components 2, 3, 4. More particularly, each main hose 10 extends between a first connection port 2A, 2B, 3A, 3B, 4A, 4B formed on a first component 2, 3, 4 and a second connection port 2A, 2B, 3A, 3B, 4A, 4B formed on a second component 2, 3, 4.

Les durites principales 10 présentent généralement les diamètres les plus élevés (parmi la pluralité de durites).The main hoses 10 generally have the largest diameters (among the plurality of hoses).

Il est ensuite prévu une pluralité de durites secondaires 20. Les durites secondaires 20 forment une portion secondaire du réseau 1A de durites.A plurality of secondary hoses 20 are then provided. The secondary hoses 20 form a secondary portion of the network 1A of hoses.

Chaque durite secondaire 20 s’étend soit entre deux composants 5, 6, soit entre un composant 5, 6 et une durite principale 10. Dans ce dernier cas, une jonction 15 permet de raccorder la durite secondaire 20 à la durite principale 10. En d’autres termes, chaque jonction 15 correspond à un embranchement du réseau 1A en T, au niveau duquel une durite secondaire 20 est branchée sur une durite principale 10 de plus grande section.Each secondary hose 20 extends either between two components 5, 6, or between a component 5, 6 and a main hose 10. In the latter case, a junction 15 makes it possible to connect the secondary hose 20 to the main hose 10. in other words, each junction 15 corresponds to a T-shaped branch of the network 1A, at which a secondary hose 20 is connected to a main hose 10 of larger section.

Dans l’exemple de la , le réseau 1A de durites comprend de surcroît une pluralité de durites tertiaires 30. Les durites tertiaires 30 forment une portion tertiaire du réseau 1A de durites.In the example of the , the network 1A of hoses further comprises a plurality of tertiary hoses 30. The tertiary hoses 30 form a tertiary portion of the network 1A of hoses.

Ici, chaque durite tertiaire 30 s’étend entre un composant 7 et une durite secondaire 30. Une jonction 25 en T permet alors de raccorder la durite tertiaire 30 à la durite secondaire 20. En d’autres termes, chaque jonction 25 correspond à un embranchement du réseau 1A de durites au niveau duquel une durite tertiaire 30 est branchée sur une durite secondaire 20 de plus grande section.Here, each tertiary hose 30 extends between a component 7 and a secondary hose 30. A T-shaped junction 25 then makes it possible to connect the tertiary hose 30 to the secondary hose 20. In other words, each junction 25 corresponds to a branch of the network 1A of hoses at which a tertiary hose 30 is connected to a secondary hose 20 of larger section.

Bien entendu, une durite tertiaire pourrait également s’étendre entre deux composants.Of course, a tertiary hose could also extend between two components.

De manière générale, le réseau de durites comprend une pluralité de portions de durites en cascade (principale, secondaire, etc). Bien entendu, la présente invention n’est pas limitée à la structure présentée sur la . Ainsi, le réseau de durites pourrait comprendre uniquement la portion principale, ou uniquement les portions principale et secondaire ou encore comprendre plus de trois portions de durites.Generally speaking, the hose network comprises a plurality of cascading hose portions (main, secondary, etc.). Of course, the present invention is not limited to the structure presented on the . Thus, the network of hoses could include only the main portion, or only the main and secondary portions or even include more than three portions of hoses.

Le procédé selon l’invention décrit ci-après vise à déterminer la trajectoire optimale de chaque durite 10, 20, 30 du réseau 1A dans l’espace de référence 1.The method according to the invention described below aims to determine the optimal trajectory of each hose 10, 20, 30 of the network 1A in the reference space 1.

Cette détermination est ici réalisée à l’aide d’une unité de traitement informatique, ci-après appelée calculateur.This determination is made here using a computer processing unit, hereinafter called a calculator.

Ce calculateur comporte classiquement un processeur, une mémoire et différentes interfaces d'entrée et de sortie.This calculator conventionally comprises a processor, a memory and different input and output interfaces.

Grâce à ses interfaces d'entrée, le calculateur est adapté à recevoir différentes données, typiquement des données concernant la représentation tridimensionnelle et la posture des composants, des données de posture de chaque port de raccordement, etc.Thanks to its input interfaces, the computer is adapted to receive different data, typically data concerning the three-dimensional representation and the posture of the components, posture data of each connection port, etc.

Dans cette description, on entend par « posture » d’un composant, le positionnement de ce composant, dans l’espace de référence 1, dans une position spatiale prédéfinie, et selon une orientation prédéterminée. La donnée de posture de chaque port de raccordement correspond alors à la position spatiale et à l’orientation prédéfinie pour le raccordement de la durite au niveau du port de raccordement. L’orientation prédéfinie pour le raccordement de la durite correspond en pratique aux tangentes de départ et d’arrivée au niveau des ports de raccordement de la durite concernée.In this description, the term “posture” of a component means the positioning of this component, in reference space 1, in a predefined spatial position, and in a predetermined orientation. The posture data of each connection port then corresponds to the spatial position and the predefined orientation for the connection of the hose at the connection port. The predefined orientation for the connection of the hose corresponds in practice to the departure and arrival tangents at the connection ports of the hose concerned.

Grâce à ses interfaces de sortie, le calculateur est adapté à transmettre des données concernant la trajectoire optimale déterminée de chaque durite 10, 20, 30 du réseau 1A.Thanks to its output interfaces, the computer is adapted to transmit data concerning the determined optimal trajectory of each hose 10, 20, 30 of the network 1A.

Grâce à sa mémoire, le calculateur mémorise une application informatique, constituée de programmes d’ordinateur comprenant des instructions dont l’exécution par le processeur permet la mise en œuvre par le calculateur du procédé décrit ci-après.Thanks to its memory, the computer stores a computer application, made up of computer programs comprising instructions whose execution by the processor allows the computer to implement the process described below.

De manière générale, le procédé conforme à l’invention vise à permettre de déterminer les trajectoires optimales des durites 10, 20, 30 dans le réseau 1A de durites. Cette détermination tient compte de la géométrie de l’espace de référence 1, d’une représentation tridimensionnelle (c’est-à-dire la forme et les dimensions) et de la posture de chaque composant 2, 3, 4, 5, 6, 7, C1, C2, C3, C4, C5 compris dans l’espace de référence 1, et de données de posture de raccordement des durites sur ces composant 2, 3, 4, 5, 6, 7, C1, C2, C3, C4, C5. Le procédé selon l’invention permet alors d’optimiser le trajet de chaque durite du réseau 1A dans l’espace de référence.Generally speaking, the method according to the invention aims to make it possible to determine the optimal trajectories of the hoses 10, 20, 30 in the network 1A of hoses. This determination takes into account the geometry of the reference space 1, a three-dimensional representation (i.e. the shape and dimensions) and the posture of each component 2, 3, 4, 5, 6 , 7, C1, C2, C3, C4, C5 included in reference space 1, and data on the connection posture of the hoses on these components 2, 3, 4, 5, 6, 7, C1, C2, C3 , C4, C5. The method according to the invention then makes it possible to optimize the path of each hose of the 1A network in the reference space.

Sur la , on a représenté en détail les différentes étapes du procédé de détermination du réseau 1A de durites dans l’espace de référence 1. On peut maintenant décrire plus en détail ce procédé.On the , we have represented in detail the different stages of the process for determining the network 1A of hoses in the reference space 1. We can now describe this process in more detail.

On suppose à ce stade que la géométrie de l’espace de référence 1 dans lequel doit être intégré le réseau 1A est connue et enregistrée dans la mémoire du calculateur.It is assumed at this stage that the geometry of the reference space 1 in which the network 1A must be integrated is known and recorded in the computer memory.

Comme le montre la , le procédé commence à l’étape E2. Lors de cette étape, le calculateur détermine la représentation tridimensionnelle et la posture de chaque composant 2, 3, 4, C1, C2, C3, C4, C5 compris dans l’espace de référence 1.As shown in the , the process begins at step E2. During this step, the calculator determines the three-dimensional representation and the posture of each component 2, 3, 4, C1, C2, C3, C4, C5 included in the reference space 1.

Lors de cette étape, le calculateur détermine également, pour chaque port de raccordement P1, P2, P3 sur chaque composant C1, C2, C3, C4, C5, une donnée de posture associée. Pour chaque port de raccordement P1, P2, cette donnée de posture comprend la position, dans l’espace de référence 1, de l’entrée du port de raccordement P1, P2, P3. Elle comprend également une donnée d’orientation concernant le raccordement d’une durite 10, 20, 30 sur ce port de raccordement P1, P2, P3. Cette donnée d’orientation est par exemple représentée par un vecteur illustrant une direction de raccordement de la durite sur ce port de raccordement. En d’autres termes, ce vecteur indique la tangente de raccordement à respecter au niveau de chaque port de raccordement P1, P2, P3.During this step, the computer also determines, for each connection port P1, P2, P3 on each component C1, C2, C3, C4, C5, associated posture data. For each connection port P1, P2, this posture data includes the position, in reference space 1, of the entrance to the connection port P1, P2, P3. It also includes orientation data concerning the connection of a hose 10, 20, 30 to this connection port P1, P2, P3. This orientation data is for example represented by a vector illustrating a connection direction of the hose on this connection port. In other words, this vector indicates the connection tangent to be respected at each connection port P1, P2, P3.

Enfin, le calculateur détermine également un schéma de routage du réseau 1A de durites. Ce schéma de routage répertorie l’ensemble des raccordements à effectuer au moyen de durites entre les composants identifiés. Le schéma de routage indique également le type de chaque durite, à savoir durite principale 10, durite secondaire 20, etc.Finally, the calculator also determines a routing diagram for the 1A network of hoses. This routing diagram lists all the connections to be made using hoses between the identified components. The routing diagram also indicates the type of each hose, i.e. main hose 10, secondary hose 20, etc.

En pratique, toutes les informations dont dispose le calculateur à l’étape E2 sont par exemple transmises au calculateur sous la forme d’un tableau qui répertorie l’ensemble de ces données.In practice, all the information available to the computer in step E2 is for example transmitted to the computer in the form of a table which lists all of this data.

Typiquement, ce tableau indique que le port 2B du composant 2 doit être connecté au port 3A du composant 3 au moyen d’une durite principale.Typically, this table indicates that port 2B of component 2 should be connected to port 3A of component 3 using a main hose.

Le calculateur met en œuvre ensuite des étapes de détermination du réseau 1A de durites, c’est-à-dire de détermination, pour chaque durite 10, 20, 30, de la trajectoire optimale pour raccorder un premier port de raccordement P1 à un deuxième port de raccordement P2.The computer then implements steps for determining the network 1A of hoses, that is to say determining, for each hose 10, 20, 30, the optimal trajectory for connecting a first connection port P1 to a second connection port P2.

Pour cela, à l’étape E4, le calculateur décompose le réseau 1A de durites selon une hiérarchie de construction prédéfinie. Ainsi, comme cela est visible dans la suite, selon cette décomposition, la construction du réseau 1A de durites commence par la détermination des trajectoires des durites principales 10 de plus grand diamètre. Puis, le calculateur procède à la détermination des trajectoires des durites secondaires 20 et enfin à celle des trajectoires des durites tertiaires 30. Dans cette étape E4, le calculateur définit, en quelque sorte, le plan de construction du réseau 1A de durites. Cette hiérarchie de construction est en pratique possible à mettre en œuvre ici car les étapes de tracé du réseau 1A de durites décrites ci-après sont mises en œuvre de manière numérique par le calculateur.To do this, in step E4, the calculator breaks down the network 1A of hoses according to a predefined construction hierarchy. Thus, as is visible in the following, according to this decomposition, the construction of the network 1A of hoses begins by determining the trajectories of the main hoses 10 of largest diameter. Then, the computer proceeds to determine the trajectories of the secondary hoses 20 and finally that of the trajectories of the tertiary hoses 30. In this step E4, the computer defines, as it were, the construction plan of the network 1A of hoses. This construction hierarchy is in practice possible to implement here because the steps for tracing the network 1A of hoses described below are implemented digitally by the computer.

Le procédé se poursuit à l’étape E6 lors de laquelle le calculateur détermine, selon la décomposition définie à l’étape E4, un tracé représentant la trajectoire optimale de chaque durite principale 10 entre un premier port de raccordement P1 et un deuxième port de raccordement P2. Il est à noter que, dans un premier temps, le tracé du réseau 1A de durites s’effectue sous la forme de lignes brisées TBentre les ports de raccordement P1, P2 (un exemple d’une telle ligne brisée est représenté sur la ). Dans cette description, on entend par « ligne brisée », une succession de segments qui se succèdent en formant des angles variables entre eux. Une ligne brisée comprend donc des portions de segments et des sommets.The process continues in step E6 during which the computer determines, according to the decomposition defined in step E4, a plot representing the optimal trajectory of each main hose 10 between a first connection port P1 and a second connection port P2. It should be noted that, initially, the layout of the network 1A of hoses is carried out in the form of broken lines T B between the connection ports P1, P2 (an example of such a broken line is shown on the ). In this description, the term “broken line” means a succession of segments which follow one another, forming variable angles between them. A broken line therefore includes portions of segments and vertices.

En pratique, plusieurs configurations doivent être considérées dans cette étape pour déterminer le tracé de la trajectoire optimale de chaque durite principale 10 entre le premier port de raccordement P1 d’un premier composant C1 et le deuxième port de raccordement P2 d’un deuxième composant C2.In practice, several configurations must be considered in this step to determine the route of the optimal trajectory of each main hose 10 between the first connection port P1 of a first component C1 and the second connection port P2 of a second component C2 .

Dans une première configuration (non représentée), l’espace entre le premier port de raccordement P1 du premier composant C1 et le deuxième port de raccordement P2 du deuxième composant C2 est libre, c’est-à-dire que le segment [P1P2] ne présente aucune intersection avec aucun autre élément (composant ou autre durite) de l’espace de référence 1. Dans ce cas, la trajectoire optimale de la durite concernée est représentée (et tracée) par le segment [P1P2].In a first configuration (not shown), the space between the first connection port P1 of the first component C1 and the second connection port P2 of the second component C2 is free, that is to say that the segment [P1P2] does not present any intersection with any other element (component or other hose) of reference space 1. In this case, the optimal trajectory of the hose concerned is represented (and traced) by the segment [P1P2].

Dans une deuxième configuration, représentée sur la , un ou plusieurs éléments de l’espace de référence 1, ici les composants C3, C4, sont interposés entre les composants C1, C2 à raccorder par la durite principale 10. Le segment [P1P2] présente donc au moins une intersection avec l’un de ces éléments.In a second configuration, shown on the , one or more elements of the reference space 1, here the components C3, C4, are interposed between the components C1, C2 to be connected by the main hose 10. The segment [P1P2] therefore has at least one intersection with the one of these elements.

Ici aussi, la trajectoire repose en partie sur le tracé du segment [P1P2]. Cependant, les portions de ce segment traversant ici les composants C3, C4 sont remplacées par des portions modifiées contournant les composants C3, C4 ( ). En d’autres termes, ces portions modifiées longent les composants C3, C4, ici par l’extérieur des composants.Here too, the trajectory is partly based on the route of the segment [P1P2]. However, the portions of this segment crossing here the components C3, C4 are replaced by modified portions bypassing the components C3, C4 ( ). In other words, these modified portions run along the components C3, C4, here from the outside of the components.

En pratique, le calculateur met en œuvre ce contournement des composants en faisant en sorte que chaque portion modifiée soit la plus courte possible. Il détermine alors une pluralité de trajectoires permettant le contournement des composant C3, C4. Parmi cette pluralité de trajectoires, le calculateur sélectionne la trajectoire la plus courte permettant le contournement des composants tout en les longeant.In practice, the calculator implements this bypass of the components by ensuring that each modified portion is as short as possible. It then determines a plurality of trajectories allowing the bypass of components C3, C4. Among this plurality of trajectories, the computer selects the shortest trajectory allowing the components to be bypassed while following them.

Cela est par exemple mis en œuvre par l’intermédiaire d’un algorithme de Djikstra en considérant que la surface du composant traversé est décomposée en une pluralité de portions (la pluralité de trajectoires introduites ci-dessus) permettant son contournement (en le longeant). Plus de détails sur l’algorithme de Djikstra peuvent être trouvés dans l’article de Dijkstra, E.W., «A note on two problems in connexion with graphs», Numer. Math. 1, 269–271 (1959).This is for example implemented via a Djikstra algorithm by considering that the surface of the component crossed is decomposed into a plurality of portions (the plurality of trajectories introduced above) allowing its bypass (by following it) . More details on Djikstra's algorithm can be found in the article by Dijkstra, EW, “ A note on two problems in connection with graphs ”, Numer. Math. 1, 269–271 (1959).

Ainsi, dans cette configuration, comme représenté sur la , la trajectoire de chaque durite principale 10 entre le premier port de raccordement P1 du premier composant C1 et le deuxième port de raccordement P2 du deuxième composant C2 est obtenue en combinant des portions s’étendant selon le segment [P1P2] et des portions longeant les composants C3, C4.Thus, in this configuration, as shown in the , the trajectory of each main hose 10 between the first connection port P1 of the first component C1 and the second connection port P2 of the second component C2 is obtained by combining portions extending along the segment [P1P2] and portions running along the components C3, C4.

Dans une troisième configuration, représentée sur la , l’un des ports de raccordement, ici le deuxième port de raccordement P2 du deuxième composant C2, n’est pas disposé sur la surface générale de ce deuxième composant C2 mais en retrait. Ceci est possible lorsque la surface générale du composant n’est pas très détaillée et n’illustre pas nécessairement tous les reliefs de ce composant. Ici, le deuxième port de raccordement P2 du deuxième composant C2 est disposé à l’intérieur du deuxième composant C2 par rapport à la surface générale de ce dernier. En d’autres termes ici, le port de raccordement C2 est localisé dans un renfoncement formé dans le deuxième composant C2.In a third configuration, shown on the , one of the connection ports, here the second connection port P2 of the second component C2, is not arranged on the general surface of this second component C2 but set back. This is possible when the general surface of the component is not very detailed and does not necessarily illustrate all the reliefs of this component. Here, the second connection port P2 of the second component C2 is arranged inside the second component C2 relative to the general surface of the latter. In other words here, the connection port C2 is located in a recess formed in the second component C2.

La détermination de la trajectoire optimale de chaque durite principale 10 se base ici aussi sur le segment [P1P2] défini entre le premier port de raccordement P1 du premier composant C1 et le deuxième port de raccordement P2 du deuxième composant C2.The determination of the optimal trajectory of each main hose 10 is also based here on the segment [P1P2] defined between the first connection port P1 of the first component C1 and the second connection port P2 of the second component C2.

Le contournement du composant C3 se fait de la même façon que sur la . En revanche, le contournement du composant C2 se fait de manière différente.Bypassing component C3 is done in the same way as on the . On the other hand, bypassing component C2 is done in a different way.

En pratique, le calculateur définit deux distances par rapport au segment [P1P2].In practice, the calculator defines two distances relative to the segment [P1P2].

D’une part, il définit la distance totale D de traversée du deuxième composant C2. Cette distance totale D correspond à la portion d’une droite passant par les points P1 et P2, qui est contenue dans le deuxième composant C2. En d’autres termes, d’après les notations utilisées sur la , la distance totale D correspond à la longueur du segment [AB], le point A appartenant à la surface générale du deuxième composant C2 la plus proche du premier port de raccordement P1 du premier composant C1 et le point B étant positionné dans le prolongement de la surface générale du deuxième composant C2 la plus éloignée du premier port de raccordement P1 du premier composant C1. Par construction, les points A et B sont alignés avec le segment [P1P2].On the one hand, it defines the total crossing distance D of the second component C2. This total distance D corresponds to the portion of a straight line passing through the points P1 and P2, which is contained in the second component C2. In other words, according to the notations used on the , the total distance D corresponds to the length of the segment [AB], the point A belonging to the general surface of the second component C2 closest to the first connection port P1 of the first component C1 and the point B being positioned in the extension of the general surface of the second component C2 furthest from the first connection port P1 of the first component C1. By construction, points A and B are aligned with the segment [P1P2].

D’autre part, le calculateur définit également une autre distance d, s’étendant entre le deuxième port de raccordement P2 du deuxième composant C2 et le point B.On the other hand, the calculator also defines another distance d, extending between the second connection port P2 of the second component C2 and point B.

Afin de déterminer la trajectoire optimale de la durite principale 10 dans cette configuration, le calculateur détermine le rapport entre l’autre distance d et la distance totale D. Ce rapport d/D est ensuite comparé à une valeur prédéterminée. Cette valeur prédéterminée est par exemple inférieure à 30%. De préférence, cette valeur prédéterminée est comprise entre 10 et 30%.In order to determine the optimal trajectory of the main hose 10 in this configuration, the computer determines the ratio between the other distance d and the total distance D. This ratio d/D is then compared to a predetermined value. This predetermined value is for example less than 30%. Preferably, this predetermined value is between 10 and 30%.

Si le rapport d/D est inférieur à la valeur prédéterminée, cela signifie que le deuxième port de raccordement P2 du deuxième composant C2 est plus proche du point B. Comme représentée sur la , la trajectoire optimale de la durite principale 10 passe alors par le point B (et contourne le deuxième composant C2 comme décrit dans la deuxième configuration ci-dessus).If the ratio d/D is less than the predetermined value, this means that the second connection port P2 of the second component C2 is closer to point B. As shown in the , the optimal trajectory of the main hose 10 then passes through point B (and bypasses the second component C2 as described in the second configuration above).

Dans le cas où le rapport d/D est supérieur à la valeur prédéterminée, le deuxième port de raccordement P2 du deuxième composant est donc considéré comme devant être connecté via le point A. La trajectoire optimale de la durite principale 10 suit le segment [P1P2], en émergeant du deuxième composant C2 directement par le point A.In the case where the ratio d/D is greater than the predetermined value, the second connection port P2 of the second component is therefore considered to be connected via point A. The optimal trajectory of the main hose 10 follows the segment [P1P2 ], emerging from the second component C2 directly through point A.

Finalement, dans cette troisième configuration, la trajectoire optimale correspond à celle qui permet de « faire sortir » la durite principale 10 du deuxième composant C2 avec une portion de cette durite principale 10 qui traverse le composant la plus courte possible.Finally, in this third configuration, the optimal trajectory corresponds to that which allows the main hose 10 to “exit” the second component C2 with a portion of this main hose 10 which passes through the component as short as possible.

A l’issue de l’étape E6, le calculateur a donc déterminé, sous forme de lignes brisées TB, le tracé des trajectoires des durites principales 10 répertoriées dans le schéma de routage obtenu à l’étape E2. Un exemple d’une telle ligne brisée TBs’étendant entre le premier port de raccordement P1 et le deuxième port de raccordement P2 est représenté sur la .At the end of step E6, the computer has therefore determined, in the form of broken lines T B , the layout of the trajectories of the main hoses 10 listed in the routing diagram obtained in step E2. An example of such a broken line T B extending between the first connection port P1 and the second connection port P2 is shown on the .

Selon le plan de construction établi à l’étape E4, le calculateur détermine ensuite un tracé représentant la trajectoire optimale de chaque durite secondaire 20 (étape E8).According to the construction plan established in step E4, the calculator then determines a path representing the optimal trajectory of each secondary hose 20 (step E8).

Pour les durites secondaires s’étendant entre deux ports de raccordement appartement respectivement à deux composants, les trois configurations décrites pour les durites principales 10 s’appliquent de la même manière.For the secondary hoses extending between two flat connection ports respectively with two components, the three configurations described for the main hoses 10 apply in the same way.

Pour les durites secondaires 20 s’étendant entre un port de raccordement P3 présent sur un composant C5 et une durite principale 10 ( ), les trois configurations décrites précédemment s’appliquent, en assimilant la jonction à un port de raccordement. Toutefois, le calculateur doit déterminer la position de la jonction sur la durite principale 10. En d’autres termes, le calculateur doit déterminer à quel niveau de la durite principale 10 est effectué le raccordement.For the secondary hoses 20 extending between a connection port P3 present on a component C5 and a main hose 10 ( ), the three configurations described above apply, assimilating the junction to a connection port. However, the computer must determine the position of the junction on the main hose 10. In other words, the computer must determine at which level of the main hose 10 the connection is made.

De manière générale, le raccordement peut être effectué à tout endroit de la durite principale 10 concernée.Generally speaking, the connection can be made at any location on the main hose 10 concerned.

De manière préférentielle, le calculateur détermine la position de branchement optimale sur la durite principale 10 par minimisation de la longueur de la durite secondaire 20 entre un port de raccordement P3 sur un composant C5 et la jonction sur la durite principale 10 ( ). En d’autres termes, la trajectoire optimale de la durite secondaire 20 entre le port de raccordement P3 et la jonction sur la durite principale 10 est la trajectoire qui minimise la longueur de la durite secondaire 20.Preferably, the calculator determines the optimal connection position on the main hose 10 by minimizing the length of the secondary hose 20 between a connection port P3 on a component C5 and the junction on the main hose 10 ( ). In other words, the optimal trajectory of the secondary hose 20 between the connection port P3 and the junction on the main hose 10 is the trajectory which minimizes the length of the secondary hose 20.

Selon un premier mode de réalisation, le calculateur minimise la longueur de la durite secondaire 20 en en minimisant l’abscisse curviligne. Pour cela, le calculateur met par exemple en œuvre un algorithme génétique permettant de tester une pluralité de configurations possibles pour le branchement de la durite secondaire 20 et d’obtenir une configuration qui s’approche de la configuration optimale (une infinité de possibilités de branchement étant envisageable dans ce cas).According to a first embodiment, the calculator minimizes the length of the secondary hose 20 by minimizing its curvilinear abscissa. For this, the calculator implements for example a genetic algorithm making it possible to test a plurality of possible configurations for the connection of the secondary hose 20 and to obtain a configuration which approaches the optimal configuration (an infinity of connection possibilities being possible in this case).

De manière plus concrète, le calculateur peut mettre en œuvre cet algorithme pendant un intervalle de temps limité (par exemple quelques minutes) et sélectionne la trajectoire de la durite secondaire 20 présentant l’abscisse curviligne minimale parmi toutes celles déterminées pendant cet intervalle de temps limité.More concretely, the computer can implement this algorithm for a limited time interval (for example a few minutes) and selects the trajectory of the secondary hose 20 having the minimum curvilinear abscissa among all those determined during this limited time interval. .

En variante, le calculateur peut tester un nombre limité de configurations de branchement pour la durite secondaire 20 et sélectionner la trajectoire de la durite secondaire 20 présentant l’abscisse curviligne minimale parmi toutes celles déterminées. Le calculateur teste par exemple quelques milliers de configurations de branchement pour la durite secondaire 20.Alternatively, the computer can test a limited number of connection configurations for the secondary hose 20 and select the trajectory of the secondary hose 20 having the minimum curvilinear abscissa among all those determined. For example, the calculator tests several thousand connection configurations for secondary hose 20.

Selon un deuxième mode de réalisation, représenté sur la , le calculateur définit un nombre discret de possibilités de positionnement de la jonction J1, J2, J3, J4 de branchement de la durite secondaire 20 sur la durite principale 10. En d’autres termes, le calculateur effectue une discrétisation de la durite principale 10 en un nombre fini de portions. Ce nombre fini est par exemple inférieur à 10.According to a second embodiment, shown on the , the computer defines a discrete number of positioning possibilities of the junction J1, J2, J3, J4 for connecting the secondary hose 20 to the main hose 10. In other words, the computer carries out a discretization of the main hose 10 in a finite number of portions. This finite number is for example less than 10.

Sur la , il est prévu quatre portions et donc quatre jonctions J1, J2, J3, J4 possibles pour raccorder la durite secondaire 20 sur la durite principale 10.On the , four portions are provided and therefore four possible junctions J1, J2, J3, J4 to connect the secondary hose 20 to the main hose 10.

La trajectoire optimale de la durite secondaire 20 est donc celle, parmi le nombre fini de jonctions possibles, permettant de minimiser la longueur de la durite secondaire 20.The optimal trajectory of the secondary hose 20 is therefore that, among the finite number of possible junctions, making it possible to minimize the length of the secondary hose 20.

Par exemple, dans le cas de la , le calculateur détermine la trajectoire optimale de la durite secondaire 20 parmi les quatre trajectoires 20A, 20B ; 20C ; 20D possibles correspondant aux quatre jonctions J1, J2, J3, J4 considérées, en sélectionnant celle qui minimise la longueur de la durite secondaire.For example, in the case of the , the computer determines the optimal trajectory of the secondary hose 20 among the four trajectories 20A, 20B; 20C; 20D possible corresponding to the four junctions J1, J2, J3, J4 considered, by selecting the one which minimizes the length of the secondary hose.

Finalement, à l’issue de l’étape E8, le calculateur a donc déterminé, sous forme de lignes brisées, le tracé des trajectoires des durites secondaires répertoriées dans le schéma de routage obtenu à l’étape E2.Finally, at the end of step E8, the computer therefore determined, in the form of broken lines, the layout of the trajectories of the secondary hoses listed in the routing diagram obtained in step E2.

Selon le plan de construction établi à l’étape E4, le calculateur détermine ensuite un tracé représentant la trajectoire optimale de chaque durite tertiaire 30 (étape E10). Ce tracé s’effectue de la même manière que ce qui a été décrit à l’étape E8 pour les durites secondaires 20 et n’est pas décrit à nouveau ici.According to the construction plan established in step E4, the calculator then determines a route representing the optimal trajectory of each tertiary hose 30 (step E10). This tracing is carried out in the same way as what was described in step E8 for the secondary hoses 20 and is not described again here.

De manière générale, le tracé des durites, autres que les durites principales, s’effectue selon les méthodes décrites précédemment pour les durites secondaires.Generally speaking, the routing of hoses, other than the main hoses, is carried out according to the methods described previously for secondary hoses.

Finalement, à la suite de la mise en œuvre des étapes E2 à E10, le calculateur dispose d’une représentation du réseau 1A de durites sous forme de lignes brisées TB.Finally, following the implementation of steps E2 to E10, the computer has a representation of the network 1A of hoses in the form of broken lines T B.

Comme le montre la , le procédé se poursuit à l’étape E12. Cette étape vise à lisser les lignes brisées TBformant le réseau 1A de durites. Plus concrètement, cette étape vise à ajuster les rayons de courbure des durites (en introduisant notamment des coudes courbés dans le tracé sous forme de lignes brisées de chaque durite) afin notamment de permettre d’éloigner les durites des composants (car jusqu’ici, la trajectoire optimale des durites longe, voir se confond, avec la surface des composants ; ce qui n’est pas compatible avec la fabrication concrète du réseau 1A de durites, les durites présentant un certain diamètre et une représentation tridimensionnelle).As shown in the , the process continues in step E12. This step aims to smooth the broken lines T B forming the network 1A of hoses. More concretely, this step aims to adjust the radii of curvature of the hoses (in particular by introducing curved elbows into the layout in the form of broken lines of each hose) in particular to allow the hoses to be moved away from the components (because until now, the optimal trajectory of the hoses runs along, or even merges, with the surface of the components, which is not compatible with the concrete manufacture of the network 1A of hoses, the hoses having a certain diameter and a three-dimensional representation).

Cette étape de lissage comprend alors l’ajustement de chaque sommet de la ligne brisée TBpar déplacement du sommet concerné dans une sphère S de rayon prédéterminé ( ). Le rayon de cette sphère S est ici de l’ordre de quelques centimètres, par exemple inférieur à 10 centimètres. En d’autres termes, le calculateur ajuste la position de chaque sommet de la ligne brisée TBen lui imposant un léger déplacement autour de sa position initiale.This smoothing step then comprises the adjustment of each vertex of the broken line T B by moving the vertex concerned in a sphere S of predetermined radius ( ). The radius of this sphere S is here of the order of a few centimeters, for example less than 10 centimeters. In other words, the calculator adjusts the position of each vertex of the broken line T B by imposing a slight movement around its initial position.

En pratique, cet ajustement (et donc ce déplacement de la position initiale de chaque sommet de la ligne brisée TB) est mis en œuvre par minimisation d’une fonction de coût. Cette fonction de coût est par exemple la longueur curviligne de conduite. Dans ce cas, l’optimisation de la fonction de coût vise à lisser la conduite autour d’une configuration initiale formée de lignes brisées.In practice, this adjustment (and therefore this displacement of the initial position of each vertex of the broken line T B ) is implemented by minimization of a cost function. This cost function is for example the curvilinear length of the pipe. In this case, the optimization of the cost function aims to smooth the pipe around an initial configuration formed of broken lines.

Cette minimisation de la fonction de coût est notamment réalisée en imposant certaines contraintes de réalisation. Ainsi, le calculateur impose notamment de minimiser également la longueur totale du réseau 1A de durites, d’empêcher les superpositions entres les composants et les durites (car ce n’est pas réalisable lors de la fabrication tridimensionnelle du réseau 1A de durites) ou encore d’empêcher les superpositions entre les durites entre elles (là aussi non réalisable lors de la fabrication tridimensionnelle).This minimization of the cost function is notably achieved by imposing certain implementation constraints. Thus, the calculator requires in particular to also minimize the total length of the network 1A of hoses, to prevent superpositions between the components and the hoses (because this is not achievable during the three-dimensional manufacture of the network 1A of hoses) or even to prevent overlapping between the hoses (also not possible during three-dimensional manufacturing).

En plus, le calculateur peut également imposer de respecter les données d’orientation (c’est-à-dire les tangentes de départ et d’arrivée au niveau du raccordement des durites) au niveau des ports de raccordement.In addition, the calculator can also require respecting the orientation data (i.e. the departure and arrival tangents at the connection of the hoses) at the connection ports.

Afin que le tracé lissé (noté TLsur la ) ne présente pas trop de différences avec le tracé obtenu en lignes brisées TB, le calculateur peut également imposer, lors de la minimisation de la fonction de coût, que la somme des carrés des distances entre les positions initiales et finales des sommets des lignes brisées soit inférieure à une valeur seuil. Cette valeur de seuil est par exemple comprise entre 1.10-6et 1.10-3.So that the smoothed path (noted T L on the ) does not present too many differences with the plot obtained in broken lines T B , the calculator can also impose, when minimizing the cost function, that the sum of the squares of the distances between the initial and final positions of the vertices of the lines broken is less than a threshold value. This threshold value is for example between 1.10 -6 and 1.10 -3 .

Ainsi, à l’issue de l’étape E12, le calculateur dispose d’un tracé du réseau 1A de durites sous forme de lignes brisées lissées TL, avec des rayons de courbure au niveau des sommets des lignes brisées initiales (un exemple d’une ligne brisée lissée TL est représenté sur la ).Thus, at the end of step E12, the computer has a layout of the network 1A of hoses in the form of smoothed broken lines T L , with radii of curvature at the level of the vertices of the initial broken lines (an example of 'a smoothed broken line TL is shown on the ).

En pratique, le calculateur peut mettre en œuvre plusieurs étapes d’ajustement successives, par exemple en commençant par imposer des contraintes portant sur la longueur totale du réseau de durites et sur les non-superpositions, puis en imposant le respecter des données d’orientation au niveau des ports de raccordement.In practice, the calculator can implement several successive adjustment steps, for example by starting by imposing constraints relating to the total length of the hose network and on non-overlaps, then by requiring compliance with the orientation data at the connection ports.

Puis, à l’étape E14, le calculateur transforme les lignes brisées lissées TLen durites tridimensionnelles. En pratique, le calculateur ajoute une donnée de diamètre à chaque ligne brisée lissée TLde manière à obtenir une représentation tridimensionnelle du réseau 1A de durites. Cette étape est par exemple ici mise en œuvre par extrusion.Then, in step E14, the computer transforms the smoothed broken lines T L into three-dimensional hoses. In practice, the calculator adds diameter data to each smoothed broken line T L so as to obtain a three-dimensional representation of the network 1A of hoses. This step is for example implemented here by extrusion.

A l’étape E16, le calculateur transmet les instructions de fabrication du réseau 1A de durites selon la représentation tridimensionnelle déterminée à l’étape E14.In step E16, the computer transmits the instructions for manufacturing the network 1A of hoses according to the three-dimensional representation determined in step E14.

Ce réseau 1A de durites est ensuite fabriqué avec les composants que relient les durites dans l’espace de référence 1, avant d’être installés dans le véhicule automobile (étape E18).This network 1A of hoses is then manufactured with the components that connect the hoses in reference space 1, before being installed in the motor vehicle (step E18).

Ainsi, de manière avantageuse selon l’invention, le tracé du réseau de durites est déterminé par portions, de manière à optimiser chacune des longueurs des durites. Cette détermination successive pour chaque type de durite permet une correction rapide du tracé en cas de modifications d’agencement.Thus, advantageously according to the invention, the route of the network of hoses is determined in portions, so as to optimize each of the lengths of the hoses. This successive determination for each type of hose allows rapid correction of the layout in the event of layout modifications.

De plus, la trajectoire de chacune des durites est déterminée en tenant compte de l’ensemble des données caractérisant l’espace de référence, permettant ainsi d’optimiser le schéma de routage du réseau de durites en respectant les contraintes géométriques.In addition, the trajectory of each of the hoses is determined taking into account all the data characterizing the reference space, thus making it possible to optimize the routing scheme of the hose network while respecting geometric constraints.

Claims (10)

Procédé de détermination d’un réseau (1A) de tubes dans un espace de référence (1) d’un véhicule automobile qui comprend une pluralité de composants (2, 3, 4, 5, 6, 7, C1, C2, C3, C4, C5), ledit réseau (1A) de tubes comprenant une pluralité de tubes principaux (10) s’étendant entre deux composants (2, 3, 4, C1, C2, C3, C4), le procédé comportant les étapes suivantes mises en œuvre par un calculateur :
- pour chaque composant (2, 3, 4, C1, C2, C3, C4), détermination d’une représentation tridimensionnelle et d’une posture du composant (2, 3, 4, C1, C2, C3, C4) concerné dans l’espace de référence (1),
- chaque tube principal (10) s’étendant depuis un premier port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P1) d’un premier composant (2, 3, 4, C1, C2, C3, C4) jusqu’à un deuxième port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P2) d’un deuxième composant (2, 3, 4, C1, C2, C3, C4), détermination, pour chacun du premier port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P1) et du deuxième port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P2), d’une donnée de posture, et
- détermination d’un chemin pour chaque tube principal (10) par calcul d’une trajectoire optimale s’étendant entre le premier port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P1) et le deuxième port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P2) et tenant compte de contraintes basées sur la représentation tridimensionnelle et la posture de chaque composant (2, 3, 4, C1, C2, C3, C4), de la donnée de posture du premier port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P1) et de la donnée de posture du deuxième port de raccordement (2A, 2B, 3A, 3B, 4A, 4B, P2).
Method for determining a network (1A) of tubes in a reference space (1) of a motor vehicle which comprises a plurality of components (2, 3, 4, 5, 6, 7, C1, C2, C3, C4, C5), said network (1A) of tubes comprising a plurality of main tubes (10) extending between two components (2, 3, 4, C1, C2, C3, C4), the method comprising the following steps implemented by a calculator:
- for each component (2, 3, 4, C1, C2, C3, C4), determination of a three-dimensional representation and a posture of the component (2, 3, 4, C1, C2, C3, C4) concerned in the reference space (1),
- each main tube (10) extending from a first connection port (2A, 2B, 3A, 3B, 4A, 4B, P1) of a first component (2, 3, 4, C1, C2, C3, C4 ) to a second connection port (2A, 2B, 3A, 3B, 4A, 4B, P2) of a second component (2, 3, 4, C1, C2, C3, C4), determination, for each of first connection port (2A, 2B, 3A, 3B, 4A, 4B, P1) and the second connection port (2A, 2B, 3A, 3B, 4A, 4B, P2), posture data, and
- determination of a path for each main tube (10) by calculating an optimal trajectory extending between the first connection port (2A, 2B, 3A, 3B, 4A, 4B, P1) and the second connection port (2A, 2B, 3A, 3B, 4A, 4B, P2) and taking into account constraints based on the three-dimensional representation and the posture of each component (2, 3, 4, C1, C2, C3, C4), of the data posture data of the first connection port (2A, 2B, 3A, 3B, 4A, 4B, P1) and the posture data of the second connection port (2A, 2B, 3A, 3B, 4A, 4B, P2).
Procédé selon la revendication 1, dans lequel le calcul de la trajectoire optimale comprend des étapes de :
- détermination d’une pluralité de trajectoires s’étendant entre le premier port de raccordement (P1) et le deuxième port de raccordement (P2), et
- calcul de la trajectoire optimale par détermination de la trajectoire la plus courte permettant le contournement d’au moins un composant (C3, C4) présent entre le premier port de raccordement (P1) et le deuxième port de raccordement (P2).
Method according to claim 1, in which the calculation of the optimal trajectory comprises steps of:
- determination of a plurality of trajectories extending between the first connection port (P1) and the second connection port (P2), and
- calculation of the optimal trajectory by determining the shortest trajectory allowing the bypass of at least one component (C3, C4) present between the first connection port (P1) and the second connection port (P2).
Procédé selon la revendication 1 ou 2, dans lequel, le deuxième port de raccordement (P2) étant localisé en retrait d’une surface générale du deuxième composant (C2), vers l’intérieur dudit deuxième composant (C2), il est prévu des étapes de :
- tracé d’un segment entre le premier port de raccordement (P1) et le deuxième port de raccordement (P2),
- sélection d’une portion (AB) d’une droite passant par le segment et correspondant à la traversée du deuxième composant (C2),
- détermination d’une plus petite distance (d) entre le deuxième port de raccordement (P2) et l’extrémité de la portion (AB) du segment qui est la plus éloignée du premier port de raccordement (P1), et
- calcul de la trajectoire optimale par comparaison du rapport entre ladite distance (d) et la longueur (D) de la portion du segment à une valeur prédéterminée.
Method according to claim 1 or 2, in which, the second connection port (P2) being located set back from a general surface of the second component (C2), towards the interior of said second component (C2), there are provided steps of:
- drawing of a segment between the first connection port (P1) and the second connection port (P2),
- selection of a portion (AB) of a straight line passing through the segment and corresponding to the crossing of the second component (C2),
- determination of a smallest distance (d) between the second connection port (P2) and the end of the portion (AB) of the segment which is furthest from the first connection port (P1), and
- calculation of the optimal trajectory by comparison of the ratio between said distance (d) and the length (D) of the portion of the segment at a predetermined value.
Procédé selon l’une quelconque des revendications 1 à 3, dans lequel le réseau (1A) de tubes comprend également une pluralité de tubes secondaires (20), au moins un tube secondaire (20) s’étendant entre un composant (5, 6, C5) et un desdits tubes principaux (10), le procédé comprenant une étape de détermination de la position optimale de branchement du tube secondaire (20) sur le tube principal (10) par minimisation de la longueur du tube secondaire (20).Method according to any one of claims 1 to 3, in which the network (1A) of tubes also comprises a plurality of secondary tubes (20), at least one secondary tube (20) extending between a component (5, 6 , C5) and one of said main tubes (10), the method comprising a step of determining the optimal position for connecting the secondary tube (20) to the main tube (10) by minimizing the length of the secondary tube (20). Procédé selon la revendication 4, dans lequel l’étape de détermination de la position optimale de branchement comprend la minimisation d’une abscisse curviligne du tube secondaire (20).Method according to claim 4, in which the step of determining the optimal connection position comprises the minimization of a curvilinear abscissa of the secondary tube (20). Procédé selon la revendication 4, dans lequel l’étape de détermination de la position de branchement optimale comprend des étapes de :
- discrétisation du tube principal (10) en une pluralité de sous-portions,
- détermination, pour chaque sous-portion discrétisée, d’une position de branchement associée,
- détermination de la position de branchement optimale par sélection de la position de branchement déterminée minimisant la longueur du tube secondaire (20) parmi les positions de branchement déterminées pour chaque sous-portion discrétisée.
Method according to claim 4, in which the step of determining the optimal connection position comprises steps of:
- discretization of the main tube (10) into a plurality of sub-portions,
- determination, for each discretized sub-portion, of an associated branching position,
- determination of the optimal connection position by selection of the determined connection position minimizing the length of the secondary tube (20) among the connection positions determined for each discretized sub-portion.
Procédé selon l’une quelconque des revendications 1 à 6, dans lequel, le tube principal (10) se présentant sous la forme d’une ligne brisée (TB) reliant le premier port de raccordement (P1) au deuxième port de raccordement (P2), la ligne brisée (TB) comprenant au moins un sommet, il est prévu une étape de lissage de ladite ligne brisée (TB).Method according to any one of claims 1 to 6, in which the main tube (10) is in the form of a broken line ( TB ) connecting the first connection port (P1) to the second connection port ( P2), the broken line ( TB ) comprising at least one vertex, a step is provided for smoothing said broken line ( TB ). Procédé selon la revendication 7, dans lequel l’étape de lissage comprend l’ajustement de chaque sommet de la ligne brisée (TB) par déplacement du sommet concerné dans une sphère (S) de rayon prédéterminé.Method according to claim 7, in which the smoothing step comprises adjusting each vertex of the broken line ( TB ) by moving the vertex concerned in a sphere (S) of predetermined radius. Procédé selon la revendication 7, dans lequel l’étape de lissage comprend la minimisation d’une fonction de coût de manière à minimiser la longueur du réseau (1A) de tubes, empêcher les superpositions entre tubes (10, 20, 30) et composants (2, 3, 4, 5, 6, 7, C1, C2, C3, C4, C5) et empêcher les superpositions entre les tubes (10, 20, 30).Method according to claim 7, in which the smoothing step comprises minimizing a cost function so as to minimize the length of the network (1A) of tubes, prevent superpositions between tubes (10, 20, 30) and components (2, 3, 4, 5, 6, 7, C1, C2, C3, C4, C5) and prevent overlapping between the tubes (10, 20, 30). Procédé selon l’une quelconque des revendications 7 à 9, dans lequel il est prévu une étape de conversion de la ligne brisée lissée (TL) en tubes tridimensionnels.Method according to any one of claims 7 to 9, in which there is provided a step of converting the smoothed broken line (T L ) into three-dimensional tubes.
FR2212120A 2022-11-21 2022-11-21 Method for determining a network of tubes in a reference space of a motor vehicle Pending FR3142270A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR2212120A FR3142270A1 (en) 2022-11-21 2022-11-21 Method for determining a network of tubes in a reference space of a motor vehicle
PCT/EP2023/082440 WO2024110408A1 (en) 2022-11-21 2023-11-20 Method for determining a network of tubes in a reference space of a motor vehicle

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR2212120A FR3142270A1 (en) 2022-11-21 2022-11-21 Method for determining a network of tubes in a reference space of a motor vehicle
FR2212120 2022-11-21

Publications (1)

Publication Number Publication Date
FR3142270A1 true FR3142270A1 (en) 2024-05-24

Family

ID=85018875

Family Applications (1)

Application Number Title Priority Date Filing Date
FR2212120A Pending FR3142270A1 (en) 2022-11-21 2022-11-21 Method for determining a network of tubes in a reference space of a motor vehicle

Country Status (2)

Country Link
FR (1) FR3142270A1 (en)
WO (1) WO2024110408A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1388694A (en) * 1962-09-13 1965-02-12 Badger Co Method and program apparatus for a computer producing linear significant indications
FR2835941B1 (en) * 2001-09-29 2006-05-05 Boeing Co CONSTRAINTS-BASED METHOD FOR DESIGNING A PATH FOR TRANSPORT ELEMENTS AND DEVICE FOR IMPLEMENTING THE METHOD
EP1850252A1 (en) * 2006-04-28 2007-10-31 Caterpillar Inc. Automatic hose and harness routing method and system
US20090248609A1 (en) * 2008-02-21 2009-10-01 Kabushiki Kaisha Toshiba Optimum route searching apparatus, method and program
US8706452B2 (en) * 2008-06-26 2014-04-22 Siemens Product Lifecycle Management Software Inc. System and method for collision-free CAD design of pipe and tube paths
US20160012179A1 (en) * 2013-03-04 2016-01-14 Renault S.A. S. Method for managing data relative to motor vehicles with a view to the subsequent graphic generation of electrical diagrams of electrical systems

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2939489B1 (en) * 2008-12-08 2011-01-14 Eads Europ Aeronautic Defence OPTIMIZATION METHOD FOR ROUTING TUBES TO A STRUCTURE SUPPORTING SMALL DEFORMATIONS

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1388694A (en) * 1962-09-13 1965-02-12 Badger Co Method and program apparatus for a computer producing linear significant indications
FR2835941B1 (en) * 2001-09-29 2006-05-05 Boeing Co CONSTRAINTS-BASED METHOD FOR DESIGNING A PATH FOR TRANSPORT ELEMENTS AND DEVICE FOR IMPLEMENTING THE METHOD
EP1850252A1 (en) * 2006-04-28 2007-10-31 Caterpillar Inc. Automatic hose and harness routing method and system
US20090248609A1 (en) * 2008-02-21 2009-10-01 Kabushiki Kaisha Toshiba Optimum route searching apparatus, method and program
US8706452B2 (en) * 2008-06-26 2014-04-22 Siemens Product Lifecycle Management Software Inc. System and method for collision-free CAD design of pipe and tube paths
US20160012179A1 (en) * 2013-03-04 2016-01-14 Renault S.A. S. Method for managing data relative to motor vehicles with a view to the subsequent graphic generation of electrical diagrams of electrical systems

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DIJKSTRA, E.W.: "A note on two problems in connexion with graphs", NUMER. MATH., vol. 1, 1959, pages 269 - 271, XP055336619, DOI: 10.1007/BF01386390

Also Published As

Publication number Publication date
WO2024110408A1 (en) 2024-05-30

Similar Documents

Publication Publication Date Title
CA2648901C (en) Selection method for an arrangement of turbine engine distributor sectors
FR2835941A1 (en) CONSTRAINTS-BASED METHOD FOR DESIGNING A PATH FOR TRANSPORT ELEMENTS AND DEVICE FOR CARRYING OUT THE METHOD
CA2587070A1 (en) Automatic optimization process for a natural gas transportation network
EP1848965A1 (en) Method and device for determining a rout with points of interest
FR2646726A1 (en) COMPUTER ASSISTED DESIGN AND MANUFACTURING APPARATUS
EP1217474A1 (en) Method for producing an optimized neural network module for simulating the flow mode of a multiphased vein of fluids
FR2789771A1 (en) METHOD FOR THE GENERATION OF A HORIZONTAL PATH TO AVOID HAZARDOUS AREAS FOR AN AIRCRAFT
FR3056527A1 (en) CLEANING DEVICE FOR PROJECTING AT LEAST ONE FLUID TO A CLEANING SURFACE OF A MOTOR VEHICLE
FR3142270A1 (en) Method for determining a network of tubes in a reference space of a motor vehicle
WO2003058170A1 (en) Method and device for determining the minimal cost path between two points in a road network
EP2075527B1 (en) Method for measuring by scanning the throat cross-sections of a turbomachine nozzle sector
US20050090975A1 (en) Method for determiming boutes and rekated navigation system
FR2763775A1 (en) METHOD OF VISUALIZING PATHS WITHIN A GRAPHIC REPRESENTATION OF A NETWORK
FR3096286A1 (en) Method of generating a compatibility index between two ends of two tubes, tube provided with a compatibility indicator
FR3023634A1 (en) COMPUTERIZED SYSTEM FOR DESIGNING THE THREE-DIMENSIONAL ROUTING OF ELECTRIC CABLES IN AN ELECTRICAL SYSTEM, AND CORRESPONDING DESIGN PROCESS
FR3002805A1 (en) METHOD OF PROCESSING A DATA SET FOR USE THEN FOR THE GRAPHICAL GENERATION OF AN ELECTRICAL SCHEME OF AN ELECTRICAL SYSTEM
WO2010066711A9 (en) Method for optimising the routing of pipes on a structure with small deformations
EP3947058A1 (en) System for cleaning at least two sensors/transmitters for a motor vehicle
FR2815406A1 (en) Evaluation of the curvature of an approaching road section from digital map data in which the base map data are used as the basis for an interpolation routine so that curve curvature can be accurately determined
WO2006042689A1 (en) Method of establishing a sinuosity index for a digital mapping system
EP1473627A2 (en) Verfahren zur Modellierung von referenziellen Daten und seine Verwendung zur Ortung von referenziellen Daten in einem Informationssystem
EP1058898B1 (en) Computer-based tool for studying electrical architectures designed to be installed inside a motor vehicle
FR2709849A1 (en) Navigation process using a vectorized terrain map.
FR2755525A1 (en) METHOD FOR CONSTITUTING A SIMULATION MODEL OF HYDRAULIC OR ELECTRIC CIRCUITS
FR3109126A1 (en) Method and device for automatically determining the trajectory of an autonomous vehicle

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20240524