FR3120087A1 - Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation - Google Patents

Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation Download PDF

Info

Publication number
FR3120087A1
FR3120087A1 FR2101678A FR2101678A FR3120087A1 FR 3120087 A1 FR3120087 A1 FR 3120087A1 FR 2101678 A FR2101678 A FR 2101678A FR 2101678 A FR2101678 A FR 2101678A FR 3120087 A1 FR3120087 A1 FR 3120087A1
Authority
FR
France
Prior art keywords
technique
underground formation
exploitation
formation
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
FR2101678A
Other languages
French (fr)
Inventor
Dan Bossie Codreanu
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IFP Energies Nouvelles IFPEN
Original Assignee
IFP Energies Nouvelles IFPEN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IFP Energies Nouvelles IFPEN filed Critical IFP Energies Nouvelles IFPEN
Priority to FR2101678A priority Critical patent/FR3120087A1/en
Priority to PCT/EP2022/053700 priority patent/WO2022175279A1/en
Publication of FR3120087A1 publication Critical patent/FR3120087A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/20Computer models or simulations, e.g. for reservoirs under production, drill bits

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

La présente invention concerne un procédé de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine, parmi une liste prédéfinie de techniques d’exploitation possibles, caractérisé en ce qu’il comprend la mise en œuvre par des moyens de traitements de données (21) d’un équipement client (2), d’étapes de : Obtention d’une valeur d’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine ; Calcul, pour chaque technique d’exploitation de ladite liste prédéfinie, d’un score d’adéquation de cette technique d’exploitation avec ladite formation souterraine en fonction de la valeur obtenue de l’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine ; Estimation, pour chaque technique d’exploitation de ladite liste prédéfinie, d’une valeur au cours du temps d’au moins un paramètre dynamique descriptif de l’exploitation de ladite formation souterraine lorsque cette technique d’exploitation est mise en œuvre ; Calcul, pour chaque technique d’exploitation de ladite liste prédéfinie, d’un score global de cette technique d’exploitation en fonction des scores d’adéquation, des valeurs dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine, et d’au moins une ontologie caractérisant lesdites techniques d’exploitation ; Sélection d’au moins ladite technique d’exploitation de ladite formation souterraine présentant le score global maximum. Figure pour l’abrégé : Fig. 2The present invention relates to a method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation, from among a predefined list of possible exploitation techniques, characterized in that it comprises the implementation by data processing means (21) of a client equipment (2), of steps of: Obtaining a value of at least one static parameter descriptive of physical properties of said underground formation; Calculation, for each mining technique of said predefined list, of an adequacy score of this mining technique with said underground formation as a function of the value obtained from at least one static parameter descriptive of the physical properties of said underground formation; Estimation, for each mining technique of said predefined list, of a value over time of at least one dynamic parameter descriptive of the mining of said underground formation when this mining technique is implemented; Calculation, for each mining technique of said predefined list, of an overall score for this mining technique as a function of the adequacy scores, of the values of said dynamic parameter descriptive of the mining of said underground formation, and of at least one ontology characterizing said exploitation techniques; Selection of at least said mining technique of said underground formation having the maximum overall score. Figure for the abstract: Fig. 2

Description

Procédé de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraineMethod for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation

DOMAINE TECHNIQUE GENERALGENERAL TECHNICAL AREA

La présente invention concerne le domaine de l’exploitation d’hydrocarbures contenus dans une formation souterraine, plus particulièrement un procédé de sélection d’une technique d’exploitation de ladite formation souterraineThe present invention relates to the field of the exploitation of hydrocarbons contained in an underground formation, more particularly a method for selecting a technique for exploiting said underground formation.

ETAT DE L’ARTSTATE OF THE ART

Les champs pétroliers sont habituellement exploités durant trois phases successives. Phase I : déplétion naturelle / Phase II : waterflood (injection d’eau) / Phase III : IOR ou EOR (en français : “récupération tertiaire”).Oil fields are usually exploited in three successive phases. Phase I: natural depletion / Phase II: waterflood (water injection) / Phase III: IOR or EOR (in French: “tertiary recovery”).

La phase I dite de récupération primaire, consiste à extraire, via un puits dit de production, le pétrole présent dans le réservoir par l’effet de surpression régnant naturellement au sein du réservoir. Il s’agit ainsi d’une « déplétion naturelle ». Cette récupération primaire ne permet d’accéder qu’à une faible quantité du pétrole contenu dans le réservoir, de l’ordre de 10 à 15% tout au plus.Phase I, called primary recovery, consists in extracting, via a so-called production well, the oil present in the reservoir by the effect of overpressure naturally prevailing within the reservoir. This is therefore a “natural depletion”. This primary recovery only allows access to a small quantity of the oil contained in the reservoir, around 10 to 15% at most.

Pour permettre de poursuivre l’extraction quand la pression du réservoir devient insuffisante pour déplacer le pétrole encore en place, en phase II dite de récupération secondaire, on injecte un fluide (ré-injection de l'eau produite diluée ou non, injection d'eau de mer ou de rivière, par exemple) au sein du réservoir, en vue d'exercer au sein du réservoir une surpression propre à entraîner le pétrole vers le ou les puits de production. Une technique usuelle dans ce cadre est l'injection d'eau (désignée également par le terme anglais « waterflooding »), dans laquelle de grands volumes d'eau sont injectés sous pression dans le réservoir via des puits injecteurs. L'eau injectée entraîne une partie du pétrole qu'elle rencontre et le pousse vers un ou plusieurs puits producteurs. Les méthodes secondaires de production telles que l’injection d'eau ne permettent toutefois d’extraire qu’une partie relativement faible des hydrocarbures en place (typiquement de l’ordre de 30%). Ce balayage partiel est dû notamment au piégeage de l’huile par les forces capillaires, aux différences de viscosité et de densité existant entre le fluide injecté et les hydrocarbures en place, ainsi qu’à des hétérogénéités à des échelles micro- ou macroscopiques (échelle des pores et aussi échelle du réservoir).To allow the extraction to continue when the pressure in the reservoir becomes insufficient to move the oil still in place, in phase II called secondary recovery, a fluid is injected (re-injection of the water produced, diluted or not, injection of sea or river water, for example) within the reservoir, with a view to exerting within the reservoir an overpressure capable of driving the oil towards the production well or wells. A common technique in this context is water injection (also referred to by the English term “waterflooding”), in which large volumes of water are injected under pressure into the reservoir via injection wells. The injected water drags some of the oil it encounters and pushes it towards one or more producing wells. Secondary production methods such as water injection, however, only extract a relatively small part of the hydrocarbons in place (typically around 30%). This partial sweeping is due in particular to the trapping of the oil by capillary forces, to the differences in viscosity and density existing between the injected fluid and the hydrocarbons in place, as well as to heterogeneities at micro- or macroscopic scales (scale pores and also reservoir scale).

Pour essayer de récupérer le reste du pétrole, qui demeure dans les formations souterraines à l’issue de la mise en œuvre des méthodes primaires et secondaires de production, la phase III dite de récupération tertiaire (connue sous l’acronyme « EOR », correspondant à «Enhanced Oil Recovery»), propose un ensemble de techniques impliquant l’injection de produits ayant pour vocation de physiquement améliorer la récupération. Parmi ces produits, on peut citer des additifs tels que des tensio-actifs ou d’autres surfactants, des polymères tels que le polyacrylamide hydrolysé, du gaz tel que du CO2, etc.To try to recover the rest of the oil, which remains in the underground formations after the implementation of the primary and secondary production methods, the so-called tertiary recovery phase III (known by the acronym "EOR", corresponding to " Enhanced Oil Recovery "), offers a set of techniques involving the injection of products intended to physically improve recovery. Among these products, mention may be made of additives such as surfactants or other surfactants, polymers such as hydrolyzed polyacrylamide, gas such as CO 2 , etc.

La difficulté consiste néanmoins à choisir la stratégie optimale d’EOR parmi toutes celles possibles pour une formation souterraine donnée.The difficulty nevertheless consists in choosing the optimal EOR strategy among all those possible for a given subterranean formation.

On se base aujourd’hui généralement sur un processus dit de "screening" (ou balayage en français) qui consiste en une analyse multi-critères pour déterminer une stratégie optimale d'EOR. Toutefois, ces méthodes sont souvent limitées car elles reposent sur des modèles analytiques ou simplifiées (modèles numériques approchés, dits aussi "modèles proxy"), visant à approximer un taux de récupération additionnel. De plus, un tel processus ignore les effets dus à l’incertitude introduite par d’autres facteurs tels que la performance dans une géologie et un milieu hétérogène incertains, l’accessibilité, le risque d’injecter dans des zones ayant été bien balayées par la phase II, des problèmes d’injectivité, le prix du baril et son évolution etc., dus à un manque de données. Si on consulte un schéma de développement habituellement utilisé, on s’aperçoit que de nombreuses réponses risquent d’arriver trop tard, ou bien que certains problèmes ne soient explorés qu’après des efforts coûteux, par manque d’anticipation, en ignorant des expertises ou des informations, considérées comme initialement « floues ».Today, we generally rely on a process called "screening" which consists of a multi-criteria analysis to determine an optimal EOR strategy. However, these methods are often limited because they are based on analytical or simplified models (approximate numerical models, also called "proxy models"), aimed at approximating an additional recovery rate. Moreover, such a process ignores the effects due to the uncertainty introduced by other factors such as performance in an uncertain geology and heterogeneous environment, accessibility, the risk of injecting in areas that have been well swept by phase II, problems of injectivity, the price of the barrel and its evolution etc., due to a lack of data. If we consult a development plan usually used, we realize that many answers are likely to arrive too late, or that certain problems are only explored after costly efforts, for lack of anticipation, ignoring expertise or information, considered initially "fuzzy".

Ainsi, il serait souhaitable de disposer d’un nouvel outil plus performant et plus universel de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine.Thus, it would be desirable to have a new, more efficient and more universal selection tool, for at least one underground formation comprising hydrocarbons, of a technique for exploiting said underground formation.

PRESENTATION DE L’INVENTIONPRESENTATION OF THE INVENTION

Ainsi, la présente invention concerne selon un premier aspect un procédé de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine, parmi une liste prédéfinie de techniques d’exploitation possibles, caractérisé en ce qu’il comprend la mise en œuvre par des moyens de traitements de données d’un équipement client, d’étapes de :Thus, the present invention relates, according to a first aspect, to a method of selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation, from among a predefined list of possible exploitation techniques, characterized in what it includes the implementation by means of data processing of customer equipment, of steps of:

  1. Obtention d’une valeur d’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine à partir de mesures fournies depuis au moins un capteur ;Obtaining a value of at least one static parameter descriptive of physical properties of said underground formation from measurements supplied from at least one sensor;
  2. Calcul, pour chaque technique d’exploitation de ladite liste prédéfinie, d’un score d’adéquation de cette technique d’exploitation avec ladite formation souterraine en fonction de la valeur obtenue de l’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine ;Calculation, for each mining technique of said predefined list, of an adequacy score of this mining technique with said underground formation as a function of the value obtained from at least one static parameter descriptive of the physical properties of said underground formation;
  3. Estimation, pour chaque technique d’exploitation de ladite liste prédéfinie, d’une valeur au cours du temps d’au moins un paramètre dynamique descriptif de l’exploitation de ladite formation souterraine lorsque cette technique d’exploitation est mise en œuvre ;Estimation, for each mining technique of said predefined list, of a value over time of at least one dynamic parameter descriptive of the mining of said underground formation when this mining technique is implemented;
  4. Calcul, pour chaque technique d’exploitation de ladite liste prédéfinie, d’un score global de cette technique d’exploitation en fonction des scores d’adéquation, des valeurs dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine, et d’au moins une ontologie caractérisant la mise en œuvre desdites techniques d’exploitationCalculation, for each mining technique of said predefined list, of an overall score for this mining technique as a function of the adequacy scores, of the values of said dynamic parameter descriptive of the mining of said underground formation, and of at least one ontology characterizing the implementation of said exploitation techniques
  5. Sélection d’au moins ladite technique d’exploitation de ladite formation souterraine présentant le score global maximum.Selection of at least said mining technique of said underground formation having the maximum overall score.

Selon des caractéristiques avantageuses et non-limitatives :According to advantageous and non-limiting characteristics:

Ladite liste prédéfinie de techniques d’exploitation possibles comprend au moins une technique d’injection de CO2 miscible, une technique d’injection de polymère, et une technique d’injection de surfactant.Said predefined list of possible operating techniques includes at least one miscible CO2 injection technique, one polymer injection technique, and one surfactant injection technique.

Ledit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine est un taux de récupération desdits hydrocarbures de ladite formation.Said dynamic parameter descriptive of the exploitation of said underground formation is a recovery rate of said hydrocarbons from said formation.

L’étape (c) comprend, pour chaque technique d’exploitation de ladite liste prédéfinie, la construction en fonction de la valeur obtenue de l’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine d’une courbe linéaire par morceaux représentant au cours du temps le taux de récupération desdits hydrocarbures de ladite formation lorsque cette technique d’exploitation est mise en œuvre.Step (c) comprises, for each technique of exploitation of said predefined list, the construction according to the value obtained of the at least one static parameter descriptive of physical properties of said underground formation of a linear curve by pieces representing over time the rate of recovery of said hydrocarbons from said formation when this exploitation technique is implemented.

Ledit paramètre statistique descriptif de propriétés physiques de ladite formation souterraine est choisi parmi une profondeur, une température, une porosité, une perméabilité, une hétérogénéité, une saturation résiduelle en hydrocarbures, une épaisseur de zone d’hydrocarbures, une viscosité d’hydrocarbures, un taux d’argile, une salinité, de ladite formation souterraine.Said statistical parameter descriptive of physical properties of said underground formation is chosen from among depth, temperature, porosity, permeability, heterogeneity, residual hydrocarbon saturation, hydrocarbon zone thickness, hydrocarbon viscosity, clay rate, salinity, of said underground formation.

L’étape (e) comprend l’exploitation desdits hydrocarbures de ladite formation en mettant en œuvre des infrastructures relatives à ladite technique d’exploitation sélectionnée.Step (e) comprises the exploitation of said hydrocarbons of said formation by implementing infrastructures relating to said selected exploitation technique.

Ledit problème de sélection d’une technique d’exploitation en un système hiérarchique est préalablement décomposé par Analyse Hiérarchique des Processus, AHP, au moyen de ladite ontologie ; l’étape (d) comprenant l’agrégation, pour calculer le score global d’une technique d’exploitation, des scores d’adéquation et des valeurs dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine conformément audit système hiérarchique en utilisant une méthode d’aide à la décision multicritères, telle que Technique for Order of Preference by Similarity to Ideal Solution, TOPSIS.Said problem of selecting an exploitation technique in a hierarchical system is previously decomposed by Hierarchical Process Analysis, AHP, by means of said ontology; step (d) comprising aggregating, to calculate the overall score of a mining technique, the suitability scores and the values of said dynamic parameter descriptive of the mining of said subterranean formation in accordance with said hierarchical system using a multi-criteria decision-making method, such as Technique for Order of Preference by Similarity to Ideal Solution, TOPSIS.

Ledit système hiérarchique comprend une pluralité de facteurs, et éventuellement des sous-facteurs desdits facteurs, du problème de sélection d’une technique d’exploitation dont au moins un facteur de propriétés physiques de ladite formation souterraine et un facteur d’exploitation de ladite formation souterraine, l’étape (d) comprenant la construction d’au moins une matrice de jugement comparant deux à deux entre eux les facteurs ou les sous-facteurs d’un facteur, puis le calcul à partir de la ou les matrices de jugement de pondérations à appliquer à chaque score d’adéquation et chaque paramètre dynamique descriptif de l’exploitation de ladite formation souterraine.Said hierarchical system comprises a plurality of factors, and optionally sub-factors of said factors, of the problem of selecting an exploitation technique including at least one factor of physical properties of said underground formation and an exploitation factor of said formation subterranean, step (d) comprising the construction of at least one judgment matrix comparing two by two the factors or the sub-factors of a factor, then the calculation from the judgment matrix or matrices of weightings to be applied to each suitability score and each dynamic parameter descriptive of the exploitation of said underground formation.

Le procédé comprend une étape préalable (a0) de construction de ladite ontologie caractérisant lesdites techniques d’exploitation par des moyens de traitement d’un serveur connecté audit équipement client.The method comprises a preliminary step (a0) of building said ontology characterizing said operating techniques by processing means of a server connected to said client equipment.

Le procédé est également un procédé de sélection d’au moins une formation souterraine parmi un ensemble prédéfini de formations souterraines comportant des hydrocarbures, comprenant la mise en œuvre des étapes (a) à (c) pour chaque formation souterraine dudit ensemble prédéfini, l’étape (d) comprenant le calcul, pour chaque couple d’une formation souterraine dudit ensemble prédéfini et d’une technique d’exploitation de ladite liste prédéfinie, d’un score global de ce couple en fonction des scores d’adéquation, des valeurs dudit paramètre dynamique descriptif de l’exploitation de chaque formation souterraine, et d’au moins une ontologie caractérisant lesdites techniques d’exploitation ; et l’étape (e) comprenant la sélection d’au moins ledit couple présentant le score global maximum.The method is also a method for selecting at least one underground formation from among a predefined set of underground formations comprising hydrocarbons, comprising the implementation of steps (a) to (c) for each underground formation of said predefined set, the step (d) comprising the calculation, for each pair of an underground formation of said predefined set and of a technique for exploiting said predefined list, of an overall score for this pair as a function of the suitability scores, of the values said dynamic parameter descriptive of the exploitation of each underground formation, and of at least one ontology characterizing said exploitation techniques; and step (e) comprising selecting at least said pair having the maximum overall score.

Selon un deuxième et un troisième aspects, l’invention concerne un produit programme d’ordinateur comprenant des instructions de code pour l’exécution d’un procédé selon le premier aspect de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine ; et un moyen de stockage lisible par un équipement informatique sur lequel un produit programme d’ordinateur comprend des instructions de code pour l’exécution d’un procédé selon le premier aspect de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine.According to a second and a third aspect, the invention relates to a computer program product comprising code instructions for the execution of a method according to the first selection aspect, for at least one underground formation comprising hydrocarbons, of a technique for exploiting said underground formation; and computer-equipment readable storage means on which a computer program product includes code instructions for performing a method according to the first selection aspect, for at least one subterranean formation comprising hydrocarbons, of a technique for exploiting said underground formation.

PRESENTATION DES FIGURESPRESENTATION OF FIGURES

D’autres caractéristiques, buts et avantages de l’invention ressortiront de la description qui suit, qui est purement illustrative et non limitative, et qui doit être lue en regard des dessins annexés sur lesquels :Other characteristics, objects and advantages of the invention will emerge from the description which follows, which is purely illustrative and not limiting, and which must be read in conjunction with the appended drawings in which:

la représente une architecture pour la mise en œuvre du procédé selon l’invention ; the represents an architecture for the implementation of the method according to the invention;

la illustre les étapes d’un mode de réalisation préféré d’un procédé de sélection d’une technique d’exploitation d’une formation souterraine comportant des hydrocarbures selon l’invention ; the illustrates the steps of a preferred embodiment of a method for selecting a technique for exploiting an underground formation comprising hydrocarbons according to the invention;

la représente un mode de réalisation préféré de l’étape (b) d’un procédé de sélection d’une technique d’exploitation d’une formation souterraine comportant des hydrocarbures selon l’invention ; the represents a preferred embodiment of step (b) of a method for selecting a technique for exploiting an underground formation comprising hydrocarbons according to the invention;

la représente un mode de réalisation préféré de l’étape (c) d’un procédé de sélection d’une technique d’exploitation d’une formation souterraine comportant des hydrocarbures selon l’invention ; the represents a preferred embodiment of step (c) of a method for selecting a technique for exploiting an underground formation comprising hydrocarbons according to the invention;

la représente un exemple de courbe continue par morceau d’un paramètre dynamique descriptif de l’exploitation de ladite formation souterraine lorsqu’une technique d’exploitation est mise en œuvre ; the represents an example of a continuous curve per piece of a dynamic parameter descriptive of the exploitation of said underground formation when an exploitation technique is implemented;

la représente un mode de réalisation préféré d’une première partie de l’étape (d) d’un procédé de sélection d’une technique d’exploitation d’une formation souterraine comportant des hydrocarbures selon l’invention ; the represents a preferred embodiment of a first part of step (d) of a method for selecting a technique for exploiting an underground formation comprising hydrocarbons according to the invention;

la représente un mode de réalisation préféré d’une deuxième partie de l’étape (d) d’un procédé de sélection d’une technique d’exploitation d’une formation souterraine comportant des hydrocarbures selon l’invention ; the represents a preferred embodiment of a second part of step (d) of a method for selecting a technique for exploiting an underground formation comprising hydrocarbons according to the invention;

la représente un mode de réalisation préféré d’une étape préalable (a0) d’un procédé de sélection d’une technique d’exploitation d’une formation souterraine comportant des hydrocarbures selon l’invention. the represents a preferred embodiment of a preliminary step (a0) of a method for selecting a technique for exploiting an underground formation comprising hydrocarbons according to the invention.

DESCRIPTION DETAILLEEDETAILED DESCRIPTION

Principe de l’inventionPrinciple of the invention

En référence à la , l’invention propose un procédé de sélection, pour au moins une formation souterraine F1 comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine, parmi une liste prédéfinie de techniques d’exploitation possibles.With reference to the , the invention proposes a method for selecting, for at least one underground formation F1 comprising hydrocarbons, a technique for exploiting said underground formation, from among a predefined list of possible exploitation techniques.

De manière préférée, on a même un ensemble prédéfini de formations souterraines F1, F2, F3 comportant des hydrocarbures, et le procédé est également un procédé de sélection d’au moins une formation souterraine F1, F2, F3 parmi ledit ensemble prédéfini de formations souterraines F1, F2, F3 comportant des hydrocarbures.Preferably, there is even a predefined set of underground formations F1, F2, F3 comprising hydrocarbons, and the method is also a method for selecting at least one underground formation F1, F2, F3 from among said predefined set of underground formations F1, F2, F3 containing hydrocarbons.

De manière résumée, on comprendra que le présent procédé est un procédé de sélection d’une formation souterraine F1, F2, F3 comportant des hydrocarbures et/ou d’une technique d’exploitation de ladite formation souterraine F1, F2, F3.In summary, it will be understood that the present method is a method for selecting an underground formation F1, F2, F3 comprising hydrocarbons and/or a technique for exploiting said underground formation F1, F2, F3.

Dans la suite de la présente description, on prendra l’exemple d’une seule formation souterraine F1, et on expliquera ensuite comment étendre au cas d’un ensemble prédéfini de formations souterraines F1, F2, F3.In the rest of this description, we will take the example of a single underground formation F1, and we will then explain how to extend to the case of a predefined set of underground formations F1, F2, F3.

Comme expliqué, on suppose que ladite formation souterraine F1 a subi une phase préalable d’exploitation desdits hydrocarbures de ladite formation conformément à une technique d’injection d’eau (Phase II – elle-même après une phase d’exploitation par déplétion naturelle – Phase I), et l’objectif est ultimement d’exploiter encore lesdits hydrocarbures de ladite formation en mettant en œuvre des infrastructures relatives à ladite technique d’exploitation sélectionnée.As explained, it is assumed that said underground formation F1 has undergone a prior phase of exploitation of said hydrocarbons from said formation in accordance with a water injection technique (Phase II – itself after an exploitation phase by natural depletion – Phase I), and the ultimate objective is to further exploit said hydrocarbons from said formation by implementing infrastructures relating to said selected exploitation technique.

De manière préférée, ladite liste prédéfinie de techniques d’exploitation possibles comprend les techniques dites d’EOR, i.e. au moins une technique d’injection de CO2 miscible, une technique d’injection de polymère, et une technique d’injection de surfactant. Le présent procédé ne propose en soi aucune nouvelle technique d’exploitation et l’homme du métier pourra utiliser toute technique EOR connue.Preferably, said predefined list of possible exploitation techniques includes so-called EOR techniques, i.e. at least one miscible CO2 injection technique, one polymer injection technique, and one surfactant injection technique. The present method does not in itself propose any new exploitation technique and those skilled in the art may use any known EOR technique.

Il peut naturellement y avoir plusieurs techniques de chaque type, par exemple plusieurs techniques d’injection de polymère, différant par le polymère et/ou les modalités d’injection. De manière générale on supposera qu’on a K techniques d’exploitation candidates dans la liste prédéfinie.There can of course be several techniques of each type, for example several polymer injection techniques, differing by the polymer and/or the injection methods. In general, we will assume that we have K candidate exploitation techniques in the predefined list.

L’invention peut être résumée à la mise en œuvre d’une méthodologie qui s’articule autour de plusieurs étapes cognitives, permettant la quantification de critères de choix de telle ou telle technique d’exploitation.The invention can be summed up as the implementation of a methodology which revolves around several cognitive steps, allowing the quantification of criteria for choosing a particular exploitation technique.

La sortie principale est un score attribué aux techniques par rapport à différents « facteurs de décision », préalablement hiérarchisés. Le nombre de facteurs considérés peut varier de un à plusieurs dizaines, selon que l’on souhaite une évaluation focalisée ou au contraire intégrée.The main output is a score assigned to the techniques in relation to various "decision factors", previously prioritized. The number of factors considered can vary from one to several dozen, depending on whether a focused or, on the contrary, integrated assessment is desired.

Comme le représente la , on suppose qu’on a au moins une formation souterraine F1, F2, F3 comportant des hydrocarbures, équipée d’au moins un capteur 10 pour l’acquisition de données relatives à ladite formation souterraine F1.As represented by , it is assumed that there is at least one underground formation F1, F2, F3 comprising hydrocarbons, equipped with at least one sensor 10 for acquiring data relating to said underground formation F1.

Le procédé est mis en œuvre grâce à un système décisionnel, couplé à cette ou ces formation souterraine F1, F2, F3 (et plus précisément les capteurs 10).The method is implemented using a decision-making system, coupled to this or these underground formation(s) F1, F2, F3 (and more precisely the sensors 10).

Le système se compose essentiellement d’au moins un équipement client 2 comprenant des moyens de traitement de données 21 tels qu’un processeur, des moyens de stockage de données 22 tel qu’une mémoire (par exemple un disque dur) stockant une base de données de référence sur laquelle on reviendra plus loin. L’équipement 2 est typiquement un poste de travail, en particulier pourvu d’une interface d’entrée et de sortie pour restituer les résultats du procédé (et le cas échéant définir la technique d’exploitation de ladite formation souterraine à implémenter). L’équipement client 2 est connecté directement ou indirectement aux capteurs 10, par exemple par un réseau du type internet.The system essentially consists of at least one client equipment 2 comprising data processing means 21 such as a processor, data storage means 22 such as a memory (for example a hard disk) storing a database reference data to which we will return later. The equipment 2 is typically a workstation, in particular provided with an input and output interface to restore the results of the process (and if necessary define the technique of exploitation of said underground formation to be implemented). The client equipment 2 is connected directly or indirectly to the sensors 10, for example by a network of the Internet type.

En complément, le système décisionnel comprend en outre avantageusement un serveur 1 lui-même connecté audit équipement client 2, à nouveau par un réseau du type internet. Comme l’on verra plus loin, le serveur 1 comprend également des moyens de traitement de données 11 tels qu’un processeur et des moyens de stockage de données 12, et permet la construction d’une ontologie caractérisant lesdites techniques d’exploitation.In addition, the decision-making system also advantageously comprises a server 1 itself connected to said client equipment 2, again by a network of the Internet type. As will be seen later, the server 1 also comprises data processing means 11 such as a processor and data storage means 12, and allows the construction of an ontology characterizing said exploitation techniques.

ProcédéProcess

En référence à la , le présent procédé est mis en œuvre par les moyens de traitement de données 21 de l’équipement client 2 et commence par une étape (a) (appelée « scraping ») d’obtention d’une valeur d’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine, et de manière préférée une pluralité (on supposera qu’on a N paramètres statiques considérés).With reference to the , the present method is implemented by the data processing means 21 of the client equipment 2 and begins with a step (a) (called "scraping") for obtaining a value of at least one static parameter description of physical properties of said underground formation, and preferably a plurality (it will be assumed that there are N static parameters considered).

Par paramètre statique descriptif de propriétés physiques de ladite formation souterraine, on entend des grandeurs physiques appelées « données réservoir » qui sont sensiblement invariantes dans le temps et permettent de caractériser de manière unique ?la nature d’une formation souterraine et les comparer entre elles.By static parameter descriptive of physical properties of said underground formation, we mean physical quantities called "reservoir data" which are substantially invariant over time and make it possible to characterize in a unique way the nature of an underground formation and to compare them with each other.

De manière non limitative, chaque paramètre statique descriptif de propriétés physiques de ladite formation souterraine est choisi parmi une profondeur, une largeur, une température, une porosité, une perméabilité, une hétérogénéité, une saturation résiduelle en hydrocarbures, une épaisseur de zone d’hydrocarbures, une viscosité d’hydrocarbures, un taux d’argile, une lithologie (grés, carbonates, etc), une salinité, de ladite formation souterraine, etc.In a non-limiting manner, each static parameter descriptive of physical properties of said underground formation is chosen from among a depth, a width, a temperature, a porosity, a permeability, a heterogeneity, a residual hydrocarbon saturation, a thickness of the hydrocarbon zone , hydrocarbon viscosity, clay content, lithology (sandstone, carbonates, etc.), salinity, of said underground formation, etc.

Chaque paramètre est obtenu à partir de mesures fournies au moyen dudit au moins un capteur 10, en en particulier la valeur du paramètre peut être directement être mesurée par le capteur 10 (c’est le cas de la profondeur par exemple) ou bien calculée à partir de mesures réalisées par le capteur 10 (c’est le cas de la saturation résiduelle par exemple).Each parameter is obtained from measurements provided by means of said at least one sensor 10, in particular the value of the parameter can be directly measured by the sensor 10 (this is the case of the depth for example) or else calculated at from measurements made by the sensor 10 (this is the case of the residual saturation for example).

Si les mesures sont légèrement variables dans le temps, on peut prendre une valeur moyenne à partir d’une série temporelle (ce qui est le cas de la température notamment).If the measurements are slightly variable over time, an average value can be taken from a time series (which is the case for temperature in particular).

De manière pratique, on a généralement une base de données de valeurs de paramètres statiques descriptifs de propriétés physiques dudit ensemble de formations souterraines stockée par les moyens de stockage de données 22, complétée au fur et à mesure à partir des mesures fournies depuis le ou les capteurs 10, et l’étape (a) consiste à extraire les N valeurs d’intérêt de ladite base.In practice, there is generally a database of values of static parameters descriptive of physical properties of said set of underground formations stored by the data storage means 22, supplemented gradually from the measurements provided from the sensors 10, and step (a) consists in extracting the N values of interest from said base.

Dans une étape (b), illustrée plus en détail par la , on calcule, pour chaque technique d’exploitation de ladite liste prédéfinie, un score d’adéquation de cette technique d’exploitation avec ladite formation souterraine en fonction de la valeur obtenue de l’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine.In a step (b), illustrated in more detail by the , a score of adequacy of this mining technique with said underground formation is calculated, for each mining technique of said predefined list, as a function of the value obtained from the at least one static parameter describing the physical properties of said underground formation.

A noter que l’étape (b) n’oblige pas à utiliser chaque paramètre statique obtenu à l’étape (a), certains peuvent être mis de côté et utilisés seulement pour les étapes (c) ou (d).Note that step (b) does not require the use of every static parameter obtained in step (a), some can be set aside and used only for steps (c) or (d).

L’étape (b) comprend typiquement d’une comparaison de chaque valeur d’un paramètre statique considéré avec au moins une valeur seuil (préférentiellement deux : un seuil bas et un seuil haut) associée à chaque technique d’exploitation, puis la pondération des résultats de toutes les comparaisons de sorte à obtenir ledit score d’adéquation. Chaque seuil est ainsi un « critère d’applicabilité » de ladite technique d’exploitation.Step (b) typically comprises a comparison of each value of a static parameter considered with at least one threshold value (preferably two: a low threshold and a high threshold) associated with each exploitation technique, then the weighting of the results of all the comparisons so as to obtain said adequacy score. Each threshold is thus an “applicability criterion” of said exploitation technique.

Lesdites valeurs seuils sont avantageusement celles observée dans plusieurs cas existants d’exploitations EOR ayant ou non été fructueux, et peuvent également être renseignés dans des bases de données dédiées (une par technique d’exploitation possible), également stockées par les moyens de stockage 22. L’homme du métier pourra en outre prendre des critères d’applicabilité de la littérature (voir par exemple les documents : Taber, J. J., Martin, F. D., and Seright, R. S. 1997a.EOR Screening Criteria Revisited—Part 1: Introduction to Screening Criteria and Enhanced Recovery Field Projects ”,SPE Res Eval & Eng 12 (3): 189–198. SPE-35385-PA; Taber, J.J., Martin, F.D., Seright, R.S., 1996. “EOR screening criteria revisited. Proceedings of the SPE/DOE Tenth Symposium on Improved Oil Recovery”, April 21–24, 1996, held at Tulsa, Oklahoma, U.S.A. (SPE 35385); Kang PS, Jong-Se Lim JS, and Chun Huh C., “Screening Criteria and Considerations of Offshore Enhanced Oil Recovery” MDPI – Energy; et Akanji L., Sandrea R. “A Neuro-Fuzzy Approach to Screening Reservoir Candidates for EOR”, Advances in Petroleum Exploration and Development Vol. 12, No. 1, 2016, pp. 1-14 DOI:10.3968/8743).Said threshold values are advantageously those observed in several existing cases of EOR operations having or have not been successful, and can also be entered in dedicated databases (one per possible operating technique), also stored by the storage means 22 Those skilled in the art may also take applicability criteria from the literature (see for example the documents: Taber, JJ, Martin, FD, and Seright, RS 1997a. EOR Screening Criteria Revisited—Part 1: Introduction to Screening Criteria and Enhanced Recovery Field Projects ", SPE Res Eval & Eng 12 (3): 189–198. SPE-35385-PA; Taber, JJ, Martin, FD, Seright, RS, 1996. " EOR screening criteria revisited . Proceedings of the SPE/DOE Tenth Symposium on Improved Oil Recovery”, April 21–24, 1996, held at Tulsa, Oklahoma, USA (SPE 35385); Kang PS, Jong-Se Lim JS, and Chun Huh C., “ Screening Criteria and Considerations of Offshore Enhanced Oil Recovery ” MDPI – Energy; and Akanji L., Sa ndrea R. “ A Neuro-Fuzzy Approach to Screening Reservoir Candidates for EOR ”, Advances in Petroleum Exploration and Development Vol. 12, No. 1, 2016, p. 1-14 DOI:10.3968/8743).

Dans l’exemple de la , les RPi avec 1≤i≤N sont les valeurs des N paramètres statiques descriptifs de propriétés physiques de ladite formation souterraine. On voit que sur une boucle on teste chaque paramètre (i allant de 1 à N), en comparant sa valeur avec les deux valeurs de seuils CRmin et CRmax. On comprend ici qu’on a autant de seuils (et donc de comparaison) que de techniques d’exploitation possibles. Plus précisément, on a en pratique des seuils CRmin j et CRmax j avec 1≤j≤K, où K est le nombre de techniques d’exploitation de ladite liste prédéfinie.In the example of the , the RPi with 1≤i≤N are the values of the N static parameters descriptive of physical properties of said underground formation. We see that on a loop we test each parameter (i ranging from 1 to N), by comparing its value with the two threshold values CRmin and CRmax. We understand here that we have as many thresholds (and therefore comparisons) as there are possible exploitation techniques. More precisely, there are in practice thresholds CRmin j and CRmax j with 1≤j≤K, where K is the number of techniques for using said predefined list.

Si, pour une technique, la valeur du paramètre statique RPise trouve entre ces valeurs min. et max, la possibilité d’application est indiquée par un score élémentaire Side 1, sinon 0 (i.e. Siest à valeurs binaires).If, for a technique, the value of the static parameter RP i is between these min. and max, the possibility of application is indicated by an elementary score S i of 1, otherwise 0 (ie S i has binary values).

Le score d’adéquation de cette technique d’exploitation est alors calculé comme la combinaison linéaire des scores élémentaires Sipar des poids Wi(entre 0 et 1), avec la formule ∑i(Si*Wi). Comme expliqué avant, on a un score d’adéquation par technique d’exploitation.The adequacy score of this exploitation technique is then calculated as the linear combination of the elementary scores S i by weights W i (between 0 and 1), with the formula ∑ i (S i *W i ). As explained before, we have an adequacy score by exploitation technique.

A noter que les poids Wi sont des « facteurs de confiance » traduisant la certitude en la valeur du paramètre statique descriptif de propriétés physiques de ladite formation souterraine correspondant (un paramètre manquant de base statistique solide est considéré comme incertain). Ils sont ainsi propres aux paramètres statiques et donc communs à toutes les techniques d’exploitation (contrairement aux seuils et donc aux scores élémentaires). Ces facteurs de confiance peuvent être prédéterminés (et stockés à nouveau dans une base), mais également calculés à la volée en analysant la base des valeurs des paramètres statiques, voire être directement saisis par l’utilisateur (d’où le « input » dans la ). Par défaut la valeur des poids Wi peut être mise à 1 (certitude maximale), et on peut ne pas les utiliser (i.e. directement sommer les scores élémentaires Si).It should be noted that the weights Wi are “confidence factors” translating the certainty into the value of the static parameter descriptive of the physical properties of said corresponding underground formation (a parameter lacking a solid statistical basis is considered to be uncertain). They are thus specific to static parameters and therefore common to all exploitation techniques (unlike thresholds and therefore elementary scores). These confidence factors can be predetermined (and stored again in a database), but also calculated on the fly by analyzing the database of static parameter values, or even be directly entered by the user (hence the "input" in the ). By default, the value of the weights Wi can be set to 1 (maximum certainty), and they can not be used (ie directly sum the elementary scores Si).

Chaque score d’adéquation peut au final être normalisé, pour arriver à une valeur entre 0 et 1.Each fit score can ultimately be normalized, to arrive at a value between 0 and 1.

Afin qu’une éligibilité de la technique EOR soit validée, le score d’adéquation de la technique doit éventuellement être supérieur à un plancher tel que 0.5. De plus les scores correspondants peuvent (le cas échéant pour les techniques éligibles), être classés et donc à-priori offrir un critère au décideur pour choisir les méthodes pour lesquelles une étude plus approfondie aura lieu.In order for an eligibility of the EOR technique to be validated, the adequacy score of the technique must possibly be higher than a floor such as 0.5. In addition, the corresponding scores can (if necessary for the eligible techniques) be classified and therefore a priori offer a criterion to the decision maker to choose the methods for which a more in-depth study will take place.

A noter qu’on ne sera pas limité au mode de réalisation de la (comparaison avec des seuils), et on pourra par exemple avoir une évaluation des critères en maximisant les distances avec des valeurs de référence, ou encore le calcul d’un polynôme dont les coefficients sont prédéterminés.Note that we will not be limited to the embodiment of the (comparison with thresholds), and it is possible for example to have an evaluation of the criteria by maximizing the distances with reference values, or even the calculation of a polynomial whose coefficients are predetermined.

Dans une étape (c), on estime, pour chaque technique d’exploitation de ladite liste prédéfinie, une valeur au cours du temps d’au moins un paramètre dynamique descriptif de l’exploitation de ladite formation souterraine lorsque cette technique d’exploitation est mise en œuvre.In a step (c), for each mining technique of said predefined list, a value over time of at least one dynamic parameter descriptive of the mining of said underground formation is estimated when this mining technique is Implementation.

En d’autres termes, un critère additionnel cette fois dynamique peut être utilisé, afin de mieux caractériser les choix et l’évaluation finale des techniques d’extraction candidates. En effet, la technique EOR à choisir doit non seulement être en adéquation avec la nature de la formation souterraine, mais également s’avérer pertinente sur la durée.In other words, an additional criterion this time dynamic can be used, in order to better characterize the choices and the final evaluation of the candidate extraction techniques. Indeed, the EOR technique to be chosen must not only be in line with the nature of the underground formation, but also prove to be relevant over time.

Ledit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine est à ce titre préférentiellement un taux de récupération desdits hydrocarbures de ladite formation (en fonction du temps). On peut en complément utiliser d’autres paramètres dynamiques, notamment un temps de percée (temps auxquels sont détectées au niveau des puits producteurs les premières traces du fluide injecté, tel que eau, traceurs, etc.).Said dynamic parameter descriptive of the exploitation of said underground formation is therefore preferably a rate of recovery of said hydrocarbons from said formation (as a function of time). In addition, other dynamic parameters can be used, in particular a breakthrough time (time at which the first traces of the injected fluid, such as water, tracers, etc., are detected at the level of the producing wells).

On comprend que la où les paramètres statiques sont des paramètres « exogènes » à l’exploitation de la formation souterraine, c’est-à-dire propres à la formation, et subis, par opposition aux paramètres dynamiques qui sont « endogènes », i.e. dont la valeur est une conséquence de l’exploitation. Ainsi la valeur de paramètres statiques « exogènes » est une « cause » de l’état de l’exploitation, i.e. influant sur la valeur du ou des paramètres endogènes, d’où l’idée du présent procédé de venir raffiner le résultat de l’étape (b) avec le ou les paramètres dynamiques.It is understood that where the static parameters are “exogenous” parameters to the exploitation of the underground formation, that is to say specific to the formation, and undergone, as opposed to the dynamic parameters which are “endogenous”, i.e. whose value is a consequence of exploitation. Thus the value of "exogenous" static parameters is a "cause" of the state of the operation, i.e. influencing the value of the endogenous parameter(s), hence the idea of the present process to refine the result of the step (b) with the dynamic parameter(s).

Les relations permettant une estimation de la valeur du paramètre dynamique sont typiquement des régressions multiples (surface de réponse) obtenues à partir d’une série de simulations, dont les données d’entrée couvrent une large statistique des propriétés réservoir ainsi que des conditions d’injection de ces produits dans des applications champ. Les régressions sont exprimées en termes de critères de similitude, estimées ou calculées, à partir des valeurs des paramètres statiques descriptifs de propriétés physiques de ladite formation souterraine. Un exemple de procédure de calcul est schématisé dans la .The relations allowing an estimation of the value of the dynamic parameter are typically multiple regressions (response surface) obtained from a series of simulations, the input data of which cover a large statistic of the reservoir properties as well as the operating conditions. injection of these products in field applications. The regressions are expressed in terms of similarity criteria, estimated or calculated, from the values of the static parameters descriptive of physical properties of said underground formation. An example of the calculation procedure is schematized in the .

Comme l’on voit, on utilise à nouveaux lesdites valeurs des paramètres statiques descriptifs de propriétés physiques de ladite formation souterraine, notamment extraites depuis la base de données ad hoc.As can be seen, said values of the static parameters descriptive of physical properties of said underground formation are used again, in particular extracted from the ad hoc database.

Cette fois, on travaille avantageusement sur des « nombres adimensionnels » notés DM dérivés des valeurs des paramètres statiques descriptifs de propriétés physiques de ladite formation souterraine.This time, work is advantageously done on “dimensionless numbers” denoted DM derived from the values of the static parameters descriptive of physical properties of said underground formation.

De manière générale, les paramètres dynamiques peuvent être ainsi issus d'une surface de réponse (régression) donnée par l’équation : paramètre = a1*(DM1) + a2*(DM2) +…. an*(DMn). Le nombre de « Nombres adimensionnels » dépend de la technique d’exploitation. Et ce sont les coefficients a1, a2, anqui sont obtenus par régression suite à une série de simulations (à noter qu’ils peuvent être prédéfinis dans le cadre du présent procédé, mais on va montrer comment les calculer).In general, the dynamic parameters can thus be derived from a response surface (regression) given by the equation: parameter = a 1 *(DM 1 ) + a 2 *(DM 2 ) +…. a n *(DM n ). The number of “dimensionless numbers” depends on the mining technique. And it is the coefficients a 1 , a 2 , a n which are obtained by regression following a series of simulations (note that they can be predefined within the framework of the present method, but we will show how to calculate them).

De manière connue, un nombre adimensionnel, ou critère de similitude permet de comparer des échelles, ou d’appliquer des résultats de la surface de réponse (ex. taux de récupération) à une formation souterraine qui possède un nombre adimensionnel similaire.In a known way, an adimensional number, or criterion of similarity, makes it possible to compare scales, or to apply results of the response surface (ex. recovery rate) to an underground formation which has a similar adimensional number.

L’homme du métier pourra se référer aux documentsThe person skilled in the art may refer to the documents

- Wood, Derek: “A Screening Model for CO2 Flooding and Storage in Dipping Gulf Coast Reservoirs Based on Dimensionless Groups” The University of Texas at Austin, M.S. thesis, 2006,- Wood, Derek: “ A Screening Model for CO2 Flooding and Storage in Dipping Gulf Coast Reservoirs Based on Dimensionless Groups ” The University of Texas at Austin, MS thesis, 2006,

- Chang, H. L., Zhang, Z. Q., Wang, Q. M. et al. 2006. «Advances in Polymer Flooding and Alkaline/Surfactant/Polymer Processes as Developed and Applied in the People’s Republic of China ». J Pet Technol 58 (2): 84–89. SPE-89175-MS- Chang, HL, Zhang, ZQ, Wang, QM et al. 2006. " Advances in Polymer Flooding and Alkaline/Surfactant/Polymer Processes as Developed and Applied in the People's Republic of China" . J Pet Technol 58 (2): 84–89. SPE-89175-MS

- et Rai, K, Russell, T.J., Lake, L.W., Delshad, M., «Oil-Recovery Predictions for Surfactant Polymer Flooding», SPE ATCE, New Orleans, Louisiana USA, 4-7 October 2009, SPE 124001.- and Rai, K, Russell, TJ, Lake, LW, Delshad, M., “ Oil-Recovery Predictions for Surfactant Polymer Flooding ”, SPE ATCE, New Orleans, Louisiana USA, 4-7 October 2009, SPE 124001.

Avantageusement les nombres adimensionnels sont générés (dimensional analysis ou inspectional analysis of process équations) pour chaque technique d’exploitation et pour chaque formation souterraine.Advantageously, dimensionless numbers are generated (dimensional analysis or inspectional analysis of process equations) for each mining technique and for each underground formation.

Chaque nombre adimensionnel est construit à partir d’une une combinaison de paramètres statiques. Par exemple le nombre adimensionnel dit « Aspect Ratio » est donné par la formule L/A(Kz/Kx)1/2) où L=longueur A=largeur Kz = perméabilité verticale et Kx = perméabilité horizontale de la formation, le nombre adimensionnel « ratio de pendage » est donné par la formule L/H*tan(α), où α est le pendage, et le « temps adimensionnel » sur lequel on reviendra plus loin. A noter que certains paramètres statiques peuvent être directement des nombres adimensionnels (comme la saturation).Each dimensionless number is constructed from a combination of static parameters. For example, the dimensionless number called "Aspect Ratio" is given by the formula L/A(Kz/Kx) 1/2 ) where L=length A=width Kz = vertical permeability and Kx = horizontal permeability of the formation, the dimensionless number “dip ratio” is given by the formula L/H*tan(α), where α is the dip, and the “dimensionless time” to which we will return later. Note that some static parameters can be dimensionless numbers directly (like saturation).

On suppose qu’on dispose d’une part de nombres adimensionnels « de référence » pour une pluralité de formations souterraines connues (ces nombres adimensionnels de référence peuvent également être prédéterminés) et d’autre part de nombres adimensionnels « candidats » pour la formation souterraine sur laquelle on met en œuvre le présent procédé. Pour les nombres adimensionnels de référence, on peut calculer des valeurs min, max, moyennes, et normaliser toutes les valeurs (la normalisation est typiquement calculée en soustrayant de la valeur du nombre adimensionnel la différence entre la valeur min. et max. de la base et divisant le tout par la moitié de la différence entre la valeur min. et max. de la base).It is assumed that one has on the one hand "reference" dimensionless numbers for a plurality of known underground formations (these reference dimensionless numbers can also be predetermined) and on the other hand "candidate" dimensionless numbers for the underground formation on which the present method is implemented. For dimensionless reference numbers, one can calculate min, max, average values, and normalize all values (normalization is typically calculated by subtracting from the value of the dimensionless number the difference between the min. and max. value of the base and dividing the whole by half of the difference between the min and max value of the base).

Partant de là, on peut faire des simulations de réservoir (avantageusement jusqu’à plus de 600 simulations) au moyen d'un simulateur de réservoir sur la base des valeurs de référence, en supposant qu’on connaisse ou qu’on puisse modéliser les évolutions associées dans le temps du paramètre dynamique (par exemple on connait des taux de récupération « de référence »). L’idée est d’estimer sur la base de toutes les valeurs de référence les coefficients a1, a2, anévoqués avant qui permettent de lier correctement les nombres adimensionnels de référence et les paramètres statiques de référence.From there, one can make reservoir simulations (advantageously up to more than 600 simulations) by means of a reservoir simulator on the basis of the reference values, assuming that one knows or can model the associated changes over time of the dynamic parameter (for example, “reference” recovery rates are known). The idea is to estimate on the basis of all the reference values the coefficients a 1 , a 2 , a n mentioned before which make it possible to correctly link the dimensionless reference numbers and the static reference parameters.

Si le calcul des valeurs « candidates » de DM est impossible à cause du manque de données réservoir (les paramètres statiques), la possibilité est offerte de soit choisir dans une base de données la valeur du nombre adimensionnel (entre un min et un max), soit de laisser l’utilisateur le saisir.If the calculation of the "candidate" values of DM is impossible due to the lack of reservoir data (the static parameters), the possibility is offered of either choosing from a database the value of the dimensionless number (between a min and a max) , or let the user enter it.

De manière préférée, l’étape (c) comprend alors (toujours pour chaque technique d’exploitation de ladite liste prédéfinie) la construction d’une courbe linéaire par morceaux représentant au cours du temps la valeur dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine lorsque cette technique d’exploitation est mise en œuvre. Ladite courbe peut être définie en fonction des coefficients a1, a2, anévoqués avant et des nombres adimensionnels candidats, il suffit que l’on ait? des paramètres adimensionnels soit fonction du temps, et notamment soit un temps adimensionnel, voir plus bas.Preferably, step (c) then comprises (always for each exploitation technique of said predefined list) the construction of a linear curve by pieces representing over time the value of said dynamic parameter descriptive of the exploitation of said underground formation when this mining technique is implemented. Said curve can be defined according to the coefficients a 1 , a 2 , a n mentioned before and the candidate dimensionless numbers, it suffices that we have? dimensionless parameters either as a function of time, and in particular either a dimensionless time, see below.

Par exemple, dans le cas où le paramètre dynamique est un taux de récupération,une courbe de récupération linéaire par morceaux est générée, voir .For example, in case the dynamic parameter is a recovery rate, a piecewise linear recovery curve is generated, see .

La génération de cette courbe nécessite avantageusement 4 points pour chaque réservoir, à partir des coefficients estimés. Ces points sont préférentiellement :The generation of this curve advantageously requires 4 points for each reservoir, from the estimated coefficients. These points are preferentially:

  • le point de coordonnées (tD0; 0) où tD0est le temps de percée du fluide à injecter dans ladite technique d’exploitation (CO2, polymère ou surfactant), on comprend que la récupération est nulle tant que l’on n’a pas commencé à injecter.the coordinate point (t D0 ; 0) where t D0 is the breakthrough time of the fluid to be injected into said exploitation technique (CO2, polymer or surfactant), it is understood that the recovery is nil as long as one does not has not started injecting.
  • les points de coordonnées (tD1; RD1), (tD2; RD2) et (tD3; RD3), où les temps tD1, tD2et tD 3sont des temps adimensionnels arbitraires tels que 0.8, 1 et 1.2, et RD1, RD2et RD3sont les taux de récupération estimés correspondants.the coordinate points (t D1 ; R D1 ), (t D2 ; R D2 ) and (t D3 ; R D3 ), where the times t D1 , t D2 and t D 3 are arbitrary dimensionless times such that 0.8, 1 and 1.2, and RD 1 , RD 2 and RD 3 are the corresponding estimated recovery rates.

Entre ces points la récupération est considérée comme linéaire (approximations obtenues à partir des courbes générées par simulation lors de l’établissement des régressions multiples).Between these points the recovery is considered to be linear (approximations obtained from the curves generated by simulation during the establishment of the multiple regressions).

Le temps adimensionnel ici s’entend par rapport à un temps pour atteindre « 1 HCPV », c’est-à-dire une injection d’un volume de fluide égal à 100% du volume du réservoir (HCPV signifie « hydrocarbon pore volume »). Cela explique pourquoi on peut avoir des temps adimensionnels supérieurs à 1, i.e. on a injecté plus d’1 HCPV de fluide EOR.The dimensionless time here is understood in relation to a time to reach "1 HCPV", i.e. an injection of a volume of fluid equal to 100% of the volume of the reservoir (HCPV means "hydrocarbon pore volume" ). This explains why we can have dimensionless times greater than 1, i.e. we injected more than 1 HCPV of EOR fluid.

Cette approche est considérée comme réaliste dans la mesure ou la plupart des projets industriels dépassent rarement 1 HCPV.This approach is considered realistic since most industrial projects rarely exceed 1 HCPV.

A partir de là, dans une étape (d) principale, sur laquelle se base essentiellement la prise de décision finale, on calcule, toujours pour chaque technique d’exploitation de ladite liste prédéfinie, un score global de cette technique d’exploitation en fonction des scores d’adéquation, des valeurs dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine, et d’au moins une ontologie caractérisant lesdites techniques d’exploitation.From there, in a main step (d), on which the final decision-making is essentially based, an overall score of this exploitation technique is calculated, still for each exploitation technique of said predefined list, according to suitability scores, values of said dynamic parameter descriptive of the exploitation of said underground formation, and of at least one ontology characterizing said exploitation techniques.

De manière générale, l’étape (d) se fait préférentiellement en deux sous-étapes (d1) et (d2) : dans l’étape (d1), représentée par la , ledit problème de sélection d’une technique d’exploitation est préalablement décomposé en un système hiérarchique par Analyse Hiérarchique des Processus, AHP, au moyen de ladite ontologie, de scores à calculer, des score finaux élémentaires, et dans l’étape (d2), représentée par la , on a l’agrégation, pour calculer le score global d’une technique d’exploitation, des scores finaux élémentaires en utilisant une méthode d’aide à la décision multicritères, telle que la méthode TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution).In general, step (d) is preferably carried out in two sub-steps (d1) and (d2): in step (d1), represented by the , said problem of selecting an exploitation technique is previously decomposed into a hierarchical system by Hierarchical Process Analysis, AHP, by means of said ontology, of scores to be calculated, of elementary final scores, and in step (d2 ), represented by the , we have the aggregation, to calculate the overall score of an exploitation technique, of the elementary final scores using a multi-criteria decision-making aid method, such as the TOPSIS method (Technique for Order of Preference by Similarity to IdealSolution).

On va commencer par définir cette notion d’ontologie caractérisant lesdites techniques d’exploitation. Par « ontologie », on entend l’ensemble structuré des termes et concepts représentant le sens d’un champ d'informations, en l’espèce celui desdites techniques d’exploitation..We will begin by defining this notion of ontology characterizing said exploitation techniques. By “ontology”, we mean the structured set of terms and concepts representing the meaning of a field of information, in this case that of said exploitation techniques.

Plus précisément, il s’agit de pouvoir représenter la connaissance préalable sur l’exploitation des réservoirs par une desdites techniques EOR par une cartographie ontologique.More precisely, it is a question of being able to represent the preliminary knowledge on the exploitation of the reservoirs by one of the said EOR techniques by an ontological cartography.

Ainsi, l’ontologie liste et définit en particulier une pluralité de facteurs, et éventuellement des sous-facteurs desdits facteurs, du problème de sélection d’une technique d’exploitation.Thus, the ontology lists and defines in particular a plurality of factors, and possibly sub-factors of said factors, of the problem of selecting an exploitation technique.

Avantageusement, on a au moins un facteur de propriétés physiques de ladite formation souterraine et un facteur d’exploitation de ladite formation souterraine (correspondant directement aux paramètres statiques et dynamiques), mais on peut en avoir davantage comme représenté sur la (avec leurs sous-facteurs) :Advantageously, there is at least one factor of physical properties of said underground formation and one factor of exploitation of said underground formation (corresponding directly to the static and dynamic parameters), but more can be had as represented on the (with their sub-factors):

  • facteur économique
    • réserves géologiques
    • temps de retour sur investissement
    • couts
    • prix des hydrocarbures
    • dépréciation
    economic factor
    • geological reserves
    • payback time
    • costs
    • hydrocarbon prices
    • depreciation
  • facteur d’exploitation (production dynamics)
    • performances de production
    • performances d’injection
    • ratio de production d’eau (water cut)
    • prix des hydrocarbures
    • maintien de la pression
    operating factor (production dynamics)
    • production performance
    • injection performance
    • water production ratio (water cut)
    • hydrocarbon prices
    • maintaining pressure
  • facteur de propriétés physiques (formation.fluid properties)
    • les différents paramètres statiques
    physical properties factor (formation.fluid properties)
    • the different static parameters
  • facteur de simulation numérique
    • taux de production d’hydrocarbures
    • récupération d’hydrocarbures
    • performances de production d’eau
    • performances de pression
    numerical simulation factor
    • hydrocarbon production rate
    • hydrocarbon recovery
    • water production performance
    • pressure performance
  • facteur de risque
    • analogie géologique de formation souterraine
    • stabilité du prix des hydrocarbures
    • dégâts structurels sur la formation
    • fréquence de renouvellement des infrastructures
    • incertitude sur les données d’entrée de simulation
    risk factor
    • underground formation geological analogy
    • hydrocarbon price stability
    • structural damage on formation
    • frequency of infrastructure renewal
    • uncertainty on simulation input data
  • facteur « flou » (fuzzy)
    • disponibilité de l’injection de fluide
    • HSE
    • Législation et réglementation
    • Acceptation publique
    • Impact sur l’emploi
    fuzzy factor
    • availability of fluid injection
    • HSE
    • Legislation and regulations
    • Public acceptance
    • Impact on employment

L’invention ne sera bien entendu pas limitée à cette liste de facteurs et sous-facteurs. A noter que l’utilisateur peut avoir la capacité d’éditer ces facteurs/sous-facteurs.The invention will of course not be limited to this list of factors and sub-factors. Note that the user may have the ability to edit these factors/sub-factors.

La méthode AHP (analyse hiérarchique des processus) est une technique structurée pour organiser et analyser des décisions complexes, basée sur les mathématiques et la psychologie.The AHP (Hierarchical Process Analysis) method is a structured technique for organizing and analyzing complex decisions, based on mathematics and psychology.

Elle a notamment des applications en prise de décision, et s’avère particulièrement adaptée dans le cadre du présent procédé, une fois que l’on dispose des divers scores d’adéquation, et valeurs dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine.It has in particular applications in decision-making, and proves to be particularly suitable in the context of the present method, once one has the various adequacy scores, and values of said dynamic parameter descriptive of the exploitation of said formation. underground.

Plutôt que de prescrire une décision « exacte », AHP aide à trouver celle convenant le mieux à la compréhension du problème. Elle fournit un cadrage complet et rationnel de structuration d'une prise de décision, de représentation et d'évaluation des éléments, afin de les relier aux objectifs et d'évaluer les solutions de rechange.Rather than prescribing an “exact” decision, AHP helps find the one that best fits the understanding of the problem. It provides a comprehensive and rational framework for structuring decision-making, representation and evaluation of the elements, in order to relate them to the objectives and to evaluate the alternatives.

AHP commence par décomposer la problématique devant aboutir à une décision en une hiérarchie de sous-problèmes de plus en plus facilement restreints pour pouvoir être analysés de façon indépendante, ce qui est possible grâce à l’ontologie en se basant sur lesdits facteurs ou sous-facteurs. Les éléments de la hiérarchie peuvent se rapporter à un aspect de la décision, à un problème matériel ou immatériel, soigneusement mesuré ou estimé, bien ou mal compris, tout en se rapportant à une prise de décision. Une fois que la hiérarchie est construite, ses différents éléments peuvent être évalués systématiquement en les comparant les uns aux autres, deux à la fois, en ce qui concerne leur impact sur un élément au-dessus d'eux dans la hiérarchie.AHP starts by decomposing the problem leading to a decision into a hierarchy of sub-problems that are more and more easily restricted in order to be able to be analyzed independently, which is possible thanks to the ontology based on the said factors or sub-problems. factors. The elements of the hierarchy can relate to an aspect of the decision, to a material or immaterial problem, carefully measured or estimated, well or badly understood, while relating to a decision-making. Once the hierarchy is constructed, its various elements can be systematically evaluated by comparing them to each other, two at a time, with respect to their impact on an element above them in the hierarchy.

Ainsi, dans la première sous-étape (d1), le problème de sélection d’une technique d’exploitation est repris et retravaillé conformément à l’ontologie en utilisant AHP.Thus, in the first sub-step (d1), the problem of selecting an exploitation technique is resumed and reworked according to the ontology using AHP.

A ce titre, ledit système hiérarchique comprend comme expliqué une pluralité desdits facteurs, et éventuellement des sous-facteurs desdits facteurs, du problème de sélection d’une technique d’exploitation, et l’étape (d1) comprend la construction d’au moins une matrice de jugement comparant deux à deux entre eux les facteurs ou les sous-facteurs d’un facteur, puis le calcul à partir de la ou les matrices de jugement de pondération à appliquer à chaque score d’adéquation et chaque paramètre dynamique descriptif de l’exploitation de ladite formation souterraine, de sorte à obtenir desdits scores finaux élémentaires.As such, said hierarchical system comprises as explained a plurality of said factors, and possibly sub-factors of said factors, of the problem of selecting an exploitation technique, and step (d1) comprises the construction of at least a judgment matrix comparing two by two the factors or sub-factors of a factor, then the calculation from the weighting judgment matrix(es) to be applied to each suitability score and each dynamic parameter descriptive of the exploitation of said underground formation, so as to obtain said elementary final scores.

L’idée est d’évaluer les différents éléments hiérarchiques en ce qui concerne leur impact sur les facteurs supérieurs dans la hiérarchie.The idea is to evaluate the different hierarchical elements with regard to their impact on the factors higher in the hierarchy.

Comme l’on voit sur la , l’étape (d1) commence par une formulation des buts du processus de décision, en particulier : “Quelle est la meilleure technique d’exploitation de ladite liste prédéfinie à sélectionner pour ladite formation souterraine, toutes considérations confondues ?”.As we see on the , step (d1) begins with a formulation of the goals of the decision-making process, in particular: “What is the best exploitation technique from said predefined list to be selected for said underground formation, all considerations combined?”.

Le jugement de la pertinence de tel ou tel facteur se fait en remplissant une “matrice de jugement” (dite table de Saaty), selon un système de notation directement issu de la méthode d’analyse AHP. Cette notation est un système allant de 1 à 9. La signification de cette notation est la suivante :The judgment of the relevance of such and such a factor is made by filling in a “judgment matrix” (known as the Saaty table), according to a scoring system directly derived from the AHP analysis method. This notation is a system ranging from 1 to 9. The meaning of this notation is as follows:

  • 1 : Les deux activités (facteurs ou sous-facteurs) contribuent également à l’objectif donné.1: Both activities (factors or sub-factors) contribute equally to the given objective.
  • 3 : Une activité est légèrement favorisée par rapport à l’autre basé sur le jugement et l’expérience3: One activity is slightly favored over the other based on judgment and experience
  • 5 : Une activité est fortement favorisée par rapport à l’autre basé sur le jugement et l’expérience5: One activity is strongly favored over the other based on judgment and experience
  • 7 : Une activité est très fortement favorisée par rapport à l’autre (démontré par quelques cas d’application)7: One activity is very strongly favored over the other (demonstrated by a few application cases)
  • 9 : Une activité évidemment favorisée par rapport à l’autre (démontré par de nombreux cas d’application)9: One activity obviously favored over the other (demonstrated by numerous application cases)
  • 2,4,6,8 : Valeurs intermédiaires2,4,6,8: Intermediate values
  • 1/2, 1/3, ¼, etc. : L’inverse des affirmations précédentes1/2, 1/3, ¼, etc. : The inverse of the previous statements

La « matrice de jugement » compare deux à deux les facteurs/sous-facteurs entre eux en formant toutes les combinaisons possibles (c’est une matrice carrée). Ensuite des coefficients de pondération des différents facteurs/sous-facteurs peuvent être obtenus à partir de cette matrice.The “judgment matrix” compares the factors/sub-factors in pairs by forming all the possible combinations (it is a square matrix). Then weighting coefficients of the different factors/sub-factors can be obtained from this matrix.

Par exemple, supposons qu’on ne prend que les 6 facteurs suivantsFor example, suppose we take only the following 6 factors

A1 – Facteur économiqueA1 – Economic factor

A2 - Facteur de propriétés physiquesA2 - Physical properties factor

A3 - facteur d’exploitationA3 - operating factor

A4 – Facteur de simulationA4 – Simulation factor

A5 – Facteur de risquesA5 – Risk factor

A6 - Facteur flouA6 - Fuzziness Factor

On peut par exemple obtenir la matrice suivante : A1 A2 A3 A4 A5 A6 A1 1 3 2 5 4 7 A2 0,33333333 1 1 2 2 4 A3 0,5 1 1 4 5 6 A4 0,2 0,5 0,25 1 3 4 A5 0,25 0,5 0,2 0,33333333 1 4 A6 0,14285714 0,25 0,16666667 0,25 0,25 1 We can for example obtain the following matrix: A1 A2 A3 A4 AT 5 A6 A1 1 3 2 5 4 7 A2 0.33333333 1 1 2 2 4 A3 0.5 1 1 4 5 6 A4 0.2 0.5 0.25 1 3 4 AT 5 0.25 0.5 0.2 0.33333333 1 4 A6 0.14285714 0.25 0.16666667 0.25 0.25 1

Naturellement, chaque élément diagonal vaut 1, et par exemple la notation A1/A6 vaut 7 car il est évident que le facteur économique est très fortement favorisé par rapport au facteur flou. A l’opposé, on considère que les facteurs de propriétés physiques et d’exploitation contribuent à parts égales à l’objectif donné d’où la notation A2/A3 qui vaut 1.Naturally, each diagonal element is worth 1, and for example the notation A1/A6 is worth 7 because it is obvious that the economic factor is very strongly favored compared to the fuzzy factor. On the other hand, it is considered that the factors of physical properties and exploitation contribute in equal parts to the given objective, hence the rating A2/A3 which is worth 1.

On répète que cette matrice et les valeurs de ces cases peuvent, une fois que le choix des facteurs et sous-facteurs est terminé, être déduites de l’ontologie de manière connue pour l’homme du métier.Il a été montré qu'on peut définir dans le cadre de l’AHP une échelle d’évaluation qui mesure l’importance ou la différence d’un élément sur un autre.It is repeated that this matrix and the values of these boxes can, once the choice of the factors and sub-factors has been completed, be deduced from the ontology in a manner known to those skilled in the art. may define as part of the AHP a rating scale that measures the importance or difference of one item over another.

Les premiers calculs de la méthode AHP vont porter sur le calcul du vecteur des coefficients de jugement à partir des valeurs de la matrice de jugement, c’est à dire les poids relatifs de chaque facteur (dans la méthode AHP, on parle également de « vecteur de priorités »). La formule appliquée est la suivante :The first calculations of the AHP method will concern the calculation of the vector of judgment coefficients from the values of the judgment matrix, i.e. the relative weights of each factor (in the AHP method, we also speak of " vector of priorities”). The formula applied is as follows:

Coefficient de jugement (Poids du facteur) = somme des lignes normalisées / nombre de facteurJudgment coefficient (Factor weight) = sum of normalized lines / number of factors

Avec la même formule, le vecteur des coefficients de jugement des sous-facteurs est calculé pour chaque facteur. Ce vecteur est ensuite pondéré par le poids du facteur, et ainsi de suite récursivement. On obtient ainsi les poids de chaque facteur et des sous-facteurs qui interviendront dans la pondération des vecteurs des coefficients de jugement des alternatives calculées avec la même formule mathématique.With the same formula, the vector of the judgment coefficients of the sub-factors is calculated for each factor. This vector is then weighted by the weight of the factor, and so on recursively. We thus obtain the weights of each factor and of the sub-factors which will intervene in the weighting of the vectors of the judgment coefficients of the alternatives calculated with the same mathematical formula.

Une option dans les résultats de sortie est proposée pour évaluer la cohérence des données. Ce test permet de contrôler la saisie des valeurs dans les tableaux de comparaison. En effet si le facteur A1 est par exemple évalué 2 fois plus important que le facteur A2, et A2 est jugé 3 fois plus important que A3, et A3 4 fois plus important que A1, alors le test permettra de dire qu’il y a une incohérence dans les données. On la mesure avec 2 paramètres : l’indice de cohérence (IC) et le ratio de cohérence (RC).An option in the output results is provided to assess data consistency. This test is used to check the entry of values in the comparison tables. Indeed if the factor A1 is for example evaluated 2 times more important than the factor A2, and A2 is considered 3 times more important than A3, and A3 4 times more important than A1, then the test will make it possible to say that there is an inconsistency in the data. It is measured with 2 parameters: the coherence index (CI) and the coherence ratio (CR).

Pour obtenir la cohérence moyenne on multiplie d’abord la matrice de comparaison avec son vecteur des coefficients qui nous donne ainsi un nouveau vecteur, qui devrait être un vecteur des composantes principales (eigenvalues) si la cohérence était parfaite, i.e. être proportionnel au vecteur des coefficients. Ainsi, si l’on divise le vecteur produit obtenu par le coefficient du vecteur de l’élément de la même ligne, la moyenne de ce vecteur normé donne la cohérence moyenne, qui correspond à la valeur propre λ.To obtain the average consistency, we first multiply the comparison matrix with its vector of coefficients which thus gives us a new vector, which should be a vector of principal components (eigenvalues) if the consistency were perfect, i.e. be proportional to the vector of coefficients. Thus, if we divide the product vector obtained by the coefficient of the vector of the element of the same line, the average of this normalized vector gives the average consistency, which corresponds to the eigenvalue λ.

La formule de calcul pour l’indice de cohérence est la suivante : IC = (cohérence moyenne) - nombre d’éléments / (nombre d’éléments -1), où le nombre d’éléments est le nombre de colonnes ou de lignes de la matrice.The calculation formula for the consistency index is: CI = (mean consistency) - number of items / (number of items -1), where number of items is the number of columns or rows of the matrix.

La formule pour le calcul du ratio de cohérence est donnée par : RC = Indice de cohérence / cohérence aléatoire. On note que les cohérences aléatoires dépendent uniquement du nombre d’éléments et sont connues, et on a par exemple 1.12 si N=6 comme dans notre exemple.The formula for calculating the coherence ratio is given by: RC = Coherence index / random coherence. We note that the random coherences depend only on the number of elements and are known, and we have for example 1.12 if N=6 as in our example.

Si le ratio de cohérence est inférieur ou égal à 0.1 alors l’évaluation est jugée cohérente.If the coherence ratio is less than or equal to 0.1 then the evaluation is considered coherent.

Si on reprend l’exemple précédent, la matrice normalisée est : A1 A2 A3 A4 A5 A6 A1 0,41216879 0,48 0,433213 0,39735099 0,26229508 0,26923077 A2 0,1373896 0,16 0,2166065 0,1589404 0,13114754 0,15384615 A3 0,2060844 0,16 0,2166065 0,31788079 0,32786885 0,23076923 A4 0,08243376 0,08 0,05415162 0,0794702 0,19672131 0,15384615 A5 0,1030422 0,08 0,0433213 0,02649007 0,06557377 0,15384615 A6 0,05888126 0,04 0,03610108 0,01986755 0,01639344 0,03846154 If we take the previous example, the normalized matrix is: A1 A2 A3 A4 AT 5 A6 A1 0.41216879 0.48 0.433213 0.39735099 0.26229508 0.26923077 A2 0.1373896 0.16 0.2166065 0.1589404 0.13114754 0.15384615 A3 0.2060844 0.16 0.2166065 0.31788079 0.32786885 0.23076923 A4 0.08243376 0.08 0.05415162 0.0794702 0.19672131 0.15384615 AT 5 0.1030422 0.08 0.0433213 0.02649007 0.06557377 0.15384615 A6 0.05888126 0.04 0.03610108 0.01986755 0.01639344 0.03846154

Le vecteur des coefficients de jugement est alors : 0,37570977 0,15965503 0,24320163 0,10777051 0,07871225 0,03495081 The vector of judgment coefficients is then: 0.37570977 0.15965503 0.24320163 0.10777051 0.07871225 0.03495081

Le produit de la matrice et du vecteur est alors 2,43943534 1,04086201 1,62505969 0,69948038 0,47683428 0,21569169 The product of the matrix and the vector is then 2.43943534 1.04086201 1.62505969 0.69948038 0.47683428 0.21569169

Et on obtient la cohérence moyenne 6.40232613.And we get the average consistency 6.40232613.

Enfin, IC= 8.05% et RC=7.18%<0.1 de sorte que la cohérence est acceptable.Finally, IC= 8.05% and RC=7.18%<0.1 so the consistency is acceptable.

Sans rentrer dans le détail, on peut faire exactement le même travail à l’échelle des sous-facteurs d’un facteur et obtenir un « sous-secteur » de coefficients de jugement, qui peut être multiplié par le coefficient de jugement du facteur dont ils sont les sous-facteurs (par exemple 0.16 pour les sous-facteurs du facteur de propriétés physiques).Without going into detail, we can do exactly the same work on the scale of the sub-factors of a factor and obtain a "sub-sector" of judgment coefficients, which can be multiplied by the judgment coefficient of the factor whose they are the sub-factors (for example 0.16 for the sub-factors of the physical properties factor).

Jusque-là, on n’utilise en pratique que l’ontologie (et pas les valeurs de scores/paramètres obtenus aux étapes (b) et (c)), de sorte qu’à moins que l’utilisateur modifie la liste de facteurs/sous-facteurs, la ou les matrices de jugement peuvent être pré-calculées. Cependant, les étapes (b) et (c) peuvent influencer également, de manière indépendantes, l’analyse.Until then, we only use the ontology in practice (and not the values of scores/parameters obtained in steps (b) and (c)), so that unless the user modifies the list of factors /sub-factors, the judgment matrix(es) can be pre-computed. However, steps (b) and (c) can also independently influence the analysis.

On va à présent prendre en compte ces matrices de jugement pour pondérer chaque score d’adéquation et chaque paramètre dynamique descriptif de l’exploitation de ladite formation souterraine.We will now take into account these judgment matrices to weight each adequacy score and each dynamic parameter descriptive of the exploitation of said underground formation.

Il est en effet possible de juger plus précisément les différents sous-facteurs selon une grille de pertinence propre (notant par exemple de 1 à 5 chaque sous-facteur en ce qui concerne son impact vis-à-vis de la technique d’exploitation concernée), associée à chaque technique d’exploitation et permettant de les comparer, et fonction d’un ou plusieurs paramètres. A nouveau, on peut avoir un ou plusieurs seuils en particulier également définis dans des bases de données dédiées.It is indeed possible to judge the various sub-factors more precisely according to a grid of specific relevance (noting for example from 1 to 5 each sub-factor with regard to its impact with respect to the exploitation technique concerned ), associated with each mining technique and allowing them to be compared, and depending on one or more parameters. Again, one or more particular thresholds can also be defined in dedicated databases.

Un score « élémentaire » (car propre à un facteur, et pas encore global) est obtenu en faisant la somme des produits entre le coefficient de jugement du facteur, le coefficient de jugement de chaque sous-facteur, et la note assignée pour chaque sous-facteur.An "elementary" score (because it is specific to a factor, and not yet global) is obtained by summing the products between the factor's judgment coefficient, the judgment coefficient of each sub-factor, and the score assigned for each sub-factor. -factor.

Ainsi, par exemple si on prend le facteur propriétés physiques et ses 10 sous-facteur, les trois exemples de techniques d’exploitation prises en comptes “reçoivent” un score élémentaire égal de 3.2683. En détail, on a : Facteur coefficient Sous-facteur coefficient CO2 polymère surfactant A2
Propriétés physiques
0,16 Profondeur 0,017 2 2 2
Température 0,262 4 4 4 Porosité 0,16 3 3 3 Perméabilité 0,089 3 3 3 Saturation résiduelle 0,061 3 3 3 Hétérogénéité 0,149 2 2 2 Epaisseur 0,0001 3 3 3 densité API 0,016 3 3 3 Viscosité 0,037 2 2 2 taux d'argile 0,05 4 4 4 Salinité 0,159 4 4 4 Score 3,2683 3,2683 3,2683
Thus, for example, if we take the physical properties factor and its 10 sub-factors, the three examples of exploitation techniques taken into account “receive” an equal elementary score of 3.2683. In detail, we have: Factor coefficient Subfactor coefficient CO2 polymer surfactant A2
Physical properties
0.16 Depth 0.017 2 2 2
Temperature 0.262 4 4 4 Porosity 0.16 3 3 3 Permeability 0.089 3 3 3 Residual saturation 0.061 3 3 3 Heterogeneity 0.149 2 2 2 Thickness 0.0001 3 3 3 API density 0.016 3 3 3 Viscosity 0.037 2 2 2 clay rate 0.05 4 4 4 Salinity 0.159 4 4 4 Score 3.2683 3.2683 3.2683

On retrouve la valeur 0.16 évoquée avant. Les coefficients des sous-facteurs sont obtenus par la matrice de jugement propre, et pour chaque technique on a une grille de scores. A noter qu’on pourrait récursivement procéder de la sorte avec des éventuels « sous-sous-facteurs ».We find the value 0.16 mentioned before. The coefficients of the sub-factors are obtained by the own judgment matrix, and for each technique there is a score grid. Note that we could recursively proceed in this way with possible “sub-sub-factors”.

On peut ainsi obtenir, pour chaque facteur et pour chaque technique de ladite liste prédéfinie de techniques d’exploitation ledit score élémentaire, et les mettre sous la forme d’une matrice « globale » telle que : A1 A2 A3 A4 A4 A6 CO2 2,846 3,26 2,56 2,792 3,7 3,429 Polymère 2,923 3,26 3,16 3,125 3,45 3,19 Surfactant 2,436 3,26 3,24 3,792 3,6 2,71 It is thus possible to obtain, for each factor and for each technique of said predefined list of exploitation techniques, said elementary score, and put them in the form of a “global” matrix such as: A1 A2 A3 A4 A4 A6 CO2 2,846 3.26 2.56 2,792 3.7 3,429 Polymer 2,923 3.26 3.16 3.125 3.45 3.19 Surfactant 2,436 3.26 3.24 3,792 3.6 2.71

La deuxième partie (étape d2) de la décision finale consiste à agréger lesdits scores élémentaires « mono-facteurs » en un score global « multi-facteurs ».The second part (step d2) of the final decision consists in aggregating said “single-factor” elementary scores into an overall “multi-factor” score.

Elle utilise la technique de préférence par comparaison à une solution idéale (TOPSIS - “Technique for Order of Preference by Similarity to Ideal Solution”) qui est une analyse multicritères de décision. Cette méthode compare un ensemble de solutions en identifiant des pondérations pour chaque critère (i.e. chaque facteur), la normalisation de scores pour chaque critère, et en calculant la distance géométrique entre chaque alternative et l'alternative idéale, qui est le meilleur score de chaque critère.It uses the technique of preference by comparison with an ideal solution (TOPSIS - “Technique for Order of Preference by Similarity to Ideal Solution”) which is a multi-criteria decision analysis. This method compares a set of solutions by identifying weights for each criterion (i.e. each factor), normalizing scores for each criterion, and calculating the geometric distance between each alternative and the ideal alternative, which is the best score for each criterion.

Une hypothèse forte de la méthode TOPSIS est que les critères sont assignés de façon monotone croissante ou décroissante. L’avantage de cette méthode est qu’elle permet des compromis entre les critères, où un mauvais résultat à un critère peut être minimisé par un bon résultat dans un autre critère. Cela donne une forme plus réaliste de la modélisation que les méthodes non compensatoires, qui incluent ou excluent des solutions alternatives.A strong assumption of the TOPSIS method is that the criteria are assigned monotonically increasing or decreasing. The advantage of this method is that it allows compromises between criteria, where a bad result in one criterion can be minimized by a good result in another criterion. This gives a more realistic form of modeling than non-compensatory methods, which include or exclude alternative solutions.

La méthode TOPSIS peut être directement mise en œuvre sur la matrice globale présentée ci-avant, mais alternativement l’étape (d2) est préférentiellement conforme à la , et comprend elle-même avantageusement une analyse AHP comparant les techniques d’exploitation de la liste deux à deux sur la base des scores élémentaires.The TOPSIS method can be directly implemented on the global matrix presented above, but alternatively step (d2) is preferably in accordance with the , and itself advantageously comprises an AHP analysis comparing the techniques for using the list two by two on the basis of the elementary scores.

En d’autres termes, on reconstruit pour chaque facteur une nouvelle matrice de jugement, de sorte à obtenir pour chaque technique et chaque facteur un coefficient de jugement (ou plutôt un vecteur de coefficients de jugement pour chaque facteur, lesquels on peut agréger en une matrice globale), de la même manière qu’à l’étape précédente. Pour chaque matrice de jugement, les notations 1/9 à 9 sont attribuées sur la base d’une comparaison des scores élémentaires des différentes techniques pour le facteur associé à la matrice.In other words, a new judgment matrix is reconstructed for each factor, so as to obtain for each technique and each factor a judgment coefficient (or rather a vector of judgment coefficients for each factor, which can be aggregated into a global matrix), in the same way as in the previous step. For each judgment matrix, ratings 1/9 to 9 are assigned based on a comparison of the elementary scores of the different techniques for the factor associated with the matrix.

Par exemple, on voit que pour le facteur A2 de propriétés physiques de la formation on a le même score de 3.26 pour les trois techniques. La matrice de jugement de ce facteur n’a par conséquent que des 1 (et ainsi le vecteur de coefficients de jugement a toutes des valeurs également à 0.333). Si on prend par contre le facteur A6 flou, les scores sont bien plus disparates (3.429, 3.19 et 2.71) de sorte qu’on aura une matrice dans laquelle les notations CO2/polymère et polymère/surfactant valent 2 car le premier a un score légèrement supérieur au deuxième pour ce facteur, et la notation CO2/surfactant vaut 3 car la technique CO2 a un score largement supérieur à la technique surfactant pour ce facteur, d’où une matrice de jugement : CO2 Polymère Surfactant CO2 1 2 3 Polymère 0,5 1 2 Surfactant 0,3333333 0,5 1 For example, we see that for the factor A2 of physical properties of the formation we have the same score of 3.26 for the three techniques. The judgment matrix of this factor therefore has only 1s (and thus the vector of judgment coefficients all have values also at 0.333). If, on the other hand, we take the fuzzy factor A6, the scores are much more disparate (3.429, 3.19 and 2.71) so that we will have a matrix in which the notations CO2/polymer and polymer/surfactant are worth 2 because the first has a score slightly higher than the second for this factor, and the CO2/surfactant rating is worth 3 because the CO2 technique has a much higher score than the surfactant technique for this factor, hence a judgment matrix: CO2 Polymer Surfactant CO2 1 2 3 Polymer 0.5 1 2 Surfactant 0.3333333 0.5 1

Le vecteur des coefficients de jugement est alors : 0,54 0,3 0,16 The vector of judgment coefficients is then: 0.54 0.3 0.16

On peut alors constituer à partir de tous les vecteurs de coefficients de jugement une nouvelle matrice globale et la normaliser.It is then possible to constitute from all the vectors of judgment coefficients a new global matrix and to normalize it.

Ainsi, dans l’exemple de 6 facteurs en colonnes et 3 techniques en lignes (on comprend qu’elle est juste basculée par rapport à la matrice globale de la fin de l’étape (d1)), on a les valeurs suivantes : A1 A2 A3 A4 A4 A6 CO2 0,47029356 0,57735027 0,25073566 0,25073566 0,84623284 0,84623284 Polymère 0,84623284 0,57735027 0,47029356 0,47029356 0,25073566 0,47029356 Surfactant 0,25073566 0,57735027 0,84623284 0,84623284 0,47029356 0,25073566 Thus, in the example of 6 factors in columns and 3 techniques in rows (we understand that it is just tilted in relation to the global matrix at the end of step (d1)), we have the following values: A1 A2 A3 A4 A4 A6 CO2 0.47029356 0.57735027 0.25073566 0.25073566 0.84623284 0.84623284 Polymer 0.84623284 0.57735027 0.47029356 0.47029356 0.25073566 0.47029356 Surfactant 0.25073566 0.57735027 0.84623284 0.84623284 0.47029356 0.25073566

L’idée est alors de multiplier chaque valeur de la matrice normalisée par le coefficient de jugement du facteur correspondant tel qu’obtenu à l’étape (d1) (par exemple 0.16 pour le facteur A2 de propriété physiques), de sorte à obtenir une matrice dite « pondérée normalisée » : A1 A2 A3 A4 A4 A6 CO2 0,17871155 0,09237604 0,06017656 0,02758092 0,06769863 0,02538699 Polymère 0,32156848 0,09237604 0,11287045 0,05173229 0,02005885 0,01410881 Surfactant 0,09527955 0,09237604 0,20309588 0,09308561 0,03762348 0,00752207 The idea is then to multiply each value of the normalized matrix by the judgment coefficient of the corresponding factor as obtained in step (d1) (for example 0.16 for the factor A2 of physical properties), so as to obtain a so-called “weighted normalized” matrix: A1 A2 A3 A4 A4 A6 CO2 0.17871155 0.09237604 0.06017656 0.02758092 0.06769863 0.02538699 Polymer 0.32156848 0.09237604 0.11287045 0.05173229 0.02005885 0.01410881 Surfactant 0.09527955 0.09237604 0.20309588 0.09308561 0.03762348 0.00752207

La décision se sert alors des valeurs maximales et minimales de la matrice pondérée normalisée (ou bien de la simple matrice globale, si on ne souhaite pas faire la deuxième AHP) conformément au principe de TOPSIS. On peut alors, pour chaque technique, calculer les distances euclidiennes Sj +et Sj -aux solutions extrêmes (idéale et non idéale), avec les formules Sj += [∑i(Vi j-Vi +)²]0.5et Sj -= [∑i(Vi j-Vi -)²]0.5, ainsi que l’index de performance, Pj= Sj -/ (Sj ++ Sj -) en tant que score global. En effet, plus le PI est haut, plus grande est la performance de la méthode. Dans notre exemple, on obtient les scores globaux suivants : Si+ Si- Pi Rang CO2 0,21246819 0,0976688 0,31792148 3 polymère 0,11070767 0,23367694 0,67853479 1 surfactant 0,22897847 0,15819245 0,40858558 2 The decision then makes use of the maximum and minimum values of the normalized weighted matrix (or else of the simple global matrix, if one does not wish to make the second AHP) in accordance with the principle of TOPSIS. We can then, for each technique, calculate the Euclidean distances SI +and SI -to extreme solutions (ideal and non-ideal), with formulas SI += [∑I(VI I-VI +)²]0.5and SI -= [∑I(VI I-VI -)²]0.5, as well as the performance index, PI= SI -/ (SI ++ SI -) as an overall score. Indeed, the higher the PI, the greater the performance of the method. In our example, we obtain the following overall scores: If+ Whether- Pi Rank CO2 0.21246819 0.0976688 0.31792148 3 polymer 0.11070767 0.23367694 0.67853479 1 surfactant 0.22897847 0.15819245 0.40858558 2

De sorte que l’on peut sélectionner la deuxième technique d’exploitation.So that we can select the second exploitation technique.

A ce titre, le procédé se termine par une étape de sélection d’au moins ladite technique d’exploitation de ladite formation souterraine présentant le score global maximum.As such, the method ends with a step of selecting at least said technique for exploiting said underground formation having the maximum overall score.

Alors, l’étape (e) comprend avantageusement l’exploitation desdits hydrocarbures de ladite formation en mettant en œuvre des infrastructures relatives à ladite technique d’exploitation sélectionnée, de manière connue de l’homme du métier.Then, step (e) advantageously comprises the exploitation of said hydrocarbons of said formation by implementing infrastructures relating to said selected exploitation technique, in a manner known to those skilled in the art.

Multi-formations souterrainesUnderground multi-formations

De manière préférée, on a comme expliqué un ensemble prédéfini de formations souterraines comportant des hydrocarbures, et on peut faire une double sélection.Preferably, as explained, there is a predefined set of underground formations comprising hydrocarbons, and a double selection can be made.

Le procédé devient également un procédé de sélection d’au moins une formation souterraine parmi un ensemble prédéfini de formations souterraines comportant des hydrocarbures, i.e. un procédé de sélection d’au moins un couple d’une formation souterraine parmi un ensemble prédéfini de formations souterraines comportant des hydrocarbures et d’une technique d’exploitation de ladite formation souterraine (parmi la liste prédéfinie).The method also becomes a method for selecting at least one underground formation from a predefined set of underground formations comprising hydrocarbons, i.e. a method for selecting at least a couple of underground formations from a predefined set of underground formations comprising hydrocarbons and a technique for exploiting said underground formation (from the predefined list).

L’idée est de mettre en œuvre les étapes (a) à (c) pour chaque formation souterraine dudit ensemble prédéfini, et ainsi l’étape (d) peut comprendre le calcul, pour chaque couple d’une formation souterraine dudit ensemble prédéfini et d’une technique d’exploitation de ladite liste prédéfinie, d’un score global de ce couple en fonction des scores d’adéquation, des valeurs dudit paramètre dynamique descriptif de l’exploitation de chaque formation souterraine, et d’au moins une ontologie caractérisant lesdites techniques d’exploitation.The idea is to implement steps (a) to (c) for each underground formation of said predefined set, and thus step (d) can include the calculation, for each couple of an underground formation of said predefined set and of a technique for exploiting said predefined list, of an overall score of this pair as a function of the adequacy scores, of the values of said dynamic parameter descriptive of the exploitation of each underground formation, and of at least one ontology characterizing said exploitation techniques.

Enfin l’étape (e) comprend la sélection d’au moins ledit couple présentant le score global maximum.Finally, step (e) comprises the selection of at least said pair having the maximum overall score.

A noter que dans ce mode de réalisation il est possible que ladite liste prédéfinie ne contienne qu’une technique d’exploitation EOR (ce qui n’aurait aucun sens s’il n’y avait qu’une formation souterraine), le but est ainsi de sélectionner la meilleure formation où appliquer cette technique.Note that in this embodiment it is possible that said predefined list only contains an EOR mining technique (which would make no sense if there was only one underground formation), the goal is thus to select the best formation where to apply this technique.

Construction de l’ontologieConstruction of the ontology

De manière préférée, le procédé comprend une étape préalable (a0) de construction de ladite ontologie caractérisant lesdites techniques d’exploitation par des moyens de traitement 11 du serveur 1 connecté audit équipement client 2 (et sa transmission à l’équipement client 2 pour mise en œuvre du procédé).Preferably, the method comprises a preliminary step (a0) of building said ontology characterizing said exploitation techniques by processing means 11 of the server 1 connected to said client equipment 2 (and its transmission to the client equipment 2 for implementation of the process).

Cette étape de construction peut être très antérieure au procédé de sélection en lui-même.This construction step can be much earlier than the selection process itself.

On répète que par « ontologie », on entend l’ensemble structuré des termes et concepts représentant le sens d’un champ d'informations, en l’espèce celui desdites techniques d’exploitation.We repeat that by “ontology”, we mean the structured set of terms and concepts representing the meaning of a field of information, in this case that of said exploitation techniques.

Cette étape (a0) peut être mise en œuvre de n’importe quelle façon connue de l’homme du métier, mais avantageusement, en référence à la ,la construction de l’ontologie implique de :This step (a0) can be implemented in any way known to those skilled in the art, but advantageously, with reference to the , the construction of the ontology involves:

  • charger un « modèle » méthodologique préétabli concernant les aspects EOR à partir d’une liste de tâches pertinentes (ex. laboratoire, simulation, installations de surface, optimisation, incertitudes, etc.) avec le glossaire respectif de concepts et de “langage opérationnel”. En cela l’opération peut être assimilée à un “diagramme d’influence” au sens large ; ouload a pre-established methodological “model” regarding EOR aspects from a list of relevant tasks (e.g. laboratory, simulation, surface facilities, optimization, uncertainties, etc.) with the respective glossary of concepts and “operational language” . In this, the operation can be assimilated to an “influence diagram” in the broad sense; Where
  • charger un glossaire général de concepts et de “langage opérationnel”.load a general glossary of concepts and “operational language”.

Produit programme d’ordinateurcomputer program product

Selon un deuxième et un troisième aspect, l’invention concerne un produit programme d’ordinateur comprenant des instructions de code pour l’exécution d’un procédé selon le premier aspect de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine, lorsque ledit programme est exécuté sur un ordinateur ; et un moyen de stockage lisible par un équipement informatique sur lequel on trouve ce produit programme d’ordinateur.According to a second and a third aspect, the invention relates to a computer program product comprising code instructions for the execution of a method according to the first selection aspect, for at least one underground formation comprising hydrocarbons, of a technique for exploiting said subterranean formation, when said program is executed on a computer; and a storage medium readable by computer equipment on which this computer program product is located.

Claims (12)

Procédé de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine, parmi une liste prédéfinie de techniques d’exploitation possibles, caractérisé en ce qu’il comprend la mise en œuvre par des moyens de traitements de données (21) d’un équipement client (2), d’étapes de :
  1. Obtention d’une valeur d’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine à partir de mesures fournies depuis au moins un capteur (10) ;
  2. Calcul, pour chaque technique d’exploitation de ladite liste prédéfinie, d’un score d’adéquation de cette technique d’exploitation avec ladite formation souterraine en fonction de la valeur obtenue de l’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine ;
  3. Estimation, pour chaque technique d’exploitation de ladite liste prédéfinie, d’une valeur au cours du temps d’au moins un paramètre dynamique descriptif de l’exploitation de ladite formation souterraine lorsque cette technique d’exploitation est mise en œuvre ;
  4. Calcul, pour chaque technique d’exploitation de ladite liste prédéfinie, d’un score global de cette technique d’exploitation en fonction desdits scores d’adéquation, des valeurs dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine, et d’au moins une ontologie caractérisant la mise en œuvre desdites techniques d’exploitation ;
  5. Sélection d’au moins ladite technique d’exploitation de ladite formation souterraine présentant le score global maximum.
Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation, from among a predefined list of possible exploitation techniques, characterized in that it comprises the implementation by data processing means (21) of a client equipment (2), steps of:
  1. Obtaining a value of at least one static parameter descriptive of physical properties of said underground formation from measurements supplied from at least one sensor (10);
  2. Calculation, for each mining technique of said predefined list, of an adequacy score of this mining technique with said underground formation as a function of the value obtained from at least one static parameter descriptive of the physical properties of said underground formation;
  3. Estimation, for each exploitation technique of said predefined list, of a value over time of at least one dynamic parameter descriptive of the exploitation of said underground formation when this exploitation technique is implemented;
  4. Calculation, for each mining technique of said predefined list, of an overall score for this mining technique as a function of said adequacy scores, of the values of said dynamic parameter descriptive of the mining of said underground formation, and of at least one ontology characterizing the implementation of said exploitation techniques;
  5. Selection of at least said mining technique of said underground formation having the maximum overall score.
Procédé selon la revendication 1, dans lequel ladite liste prédéfinie de techniques d’exploitation possibles comprend au moins une technique d’injection de CO2 miscible, une technique d’injection de polymère, et une technique d’injection de surfactant.A method according to claim 1, wherein said predefined list of possible operating techniques includes at least one miscible CO2 injection technique, one polymer injection technique, and one surfactant injection technique. Procédé selon l’une des revendications 1 et 2, dans lequel ledit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine est un taux de récupération desdits hydrocarbures de ladite formation.Method according to one of Claims 1 and 2, in which the said dynamic parameter descriptive of the exploitation of the said underground formation is a rate of recovery of the said hydrocarbons from the said formation. Procédé selon la revendication 3, dans lequel l’étape (c) comprend, pour chaque technique d’exploitation de ladite liste prédéfinie, la construction en fonction de la valeur obtenue de l’au moins un paramètre statique descriptif de propriétés physiques de ladite formation souterraine d’une courbe linéaire par morceaux représentant au cours du temps le taux de récupération desdits hydrocarbures de ladite formation lorsque cette technique d’exploitation est mise en œuvre.Method according to claim 3, in which step (c) comprises, for each exploitation technique of said predefined list, the construction according to the value obtained of at least one static parameter describing physical properties of said formation underground of a piecewise linear curve representing over time the rate of recovery of said hydrocarbons from said formation when this mining technique is implemented. Procédé selon l’une des revendications 1 à 4, dans lequel ledit paramètre statistique descriptif de propriétés physiques de ladite formation souterraine est choisi parmi une profondeur, une température, une porosité, une perméabilité, une hétérogénéité, une saturation résiduelle en hydrocarbures, une épaisseur de zone d’hydrocarbures, une viscosité d’hydrocarbures, un taux d’argile, une lithologie, une salinité, de ladite formation souterraine.Method according to one of Claims 1 to 4, in which the said statistical parameter descriptive of the physical properties of the said underground formation is chosen from among a depth, a temperature, a porosity, a permeability, a heterogeneity, a residual saturation in hydrocarbons, a thickness hydrocarbon zone, hydrocarbon viscosity, clay content, lithology, salinity, of said underground formation. Procédé selon l’une des revendications 1 à 5, dans lequel l’étape (e) comprend l’exploitation desdits hydrocarbures de ladite formation en mettant en œuvre des infrastructures relatives à ladite technique d’exploitation sélectionnée.Process according to one of Claims 1 to 5, in which step (e) comprises the exploitation of said hydrocarbons from said formation by implementing infrastructures relating to said selected exploitation technique. Procédé selon l’une des revendications 1 à 6, dans lequel ledit problème de sélection d’une technique d’exploitation en un système hiérarchique est préalablement décomposé par Analyse Hiérarchique des Processus, AHP, au moyen de ladite ontologie ; l’étape (d) comprenant l’agrégation, pour calculer le score global d’une technique d’exploitation, des scores d’adéquation et des valeurs dudit paramètre dynamique descriptif de l’exploitation de ladite formation souterraine conformément audit système hiérarchique en utilisant une méthode d’aide à la décision multicritères, telle que Technique for Order of Preference by Similarity to Ideal Solution, TOPSIS.Method according to one of claims 1 to 6, in which said problem of selecting an exploitation technique in a hierarchical system is previously decomposed by Hierarchical Process Analysis, AHP, by means of said ontology; step (d) comprising aggregating, to calculate the overall score of a mining technique, the suitability scores and the values of said dynamic parameter descriptive of the mining of said subterranean formation in accordance with said hierarchical system using a multi-criteria decision-making method, such as Technique for Order of Preference by Similarity to Ideal Solution, TOPSIS. Procédé selon la revendication 7, dans lequel ledit système hiérarchique comprend une pluralité de facteurs, et éventuellement des sous-facteurs desdits facteurs, du problème de sélection d’une technique d’exploitation dont au moins un facteur de propriétés physiques de ladite formation souterraine et un facteur d’exploitation de ladite formation souterraine, l’étape (d) comprenant la construction d’au moins une matrice de jugement comparant deux à deux entre eux les facteurs ou les sous-facteurs d’un facteur, puis le calcul à partir de la ou les matrices de jugement de pondérations à appliquer à chaque score d’adéquation et chaque paramètre dynamique descriptif de l’exploitation de ladite formation souterraine.A method according to claim 7, wherein said hierarchical system comprises a plurality of factors, and optionally sub-factors of said factors, of the mining technique selection problem including at least one factor of physical properties of said subterranean formation and an exploitation factor of said underground formation, step (d) comprising the construction of at least one judgment matrix comparing two by two the factors or the sub-factors of a factor, then the calculation from of the weighting judgment matrix(es) to be applied to each adequacy score and each dynamic parameter descriptive of the exploitation of said underground formation. Procédé selon l’une des revendication 1 à 8, comprenant une étape préalable (a0) de construction de ladite ontologie caractérisant lesdites techniques d’exploitation par des moyens de traitement (11) d’un serveur (1) connecté audit équipement client (2).Method according to one of Claims 1 to 8, comprising a preliminary step (a0) of constructing said ontology characterizing said exploitation techniques by processing means (11) of a server (1) connected to said client equipment (2 ). Procédé selon l’une des revendication 1 à 9, également de sélection d’au moins une formation souterraine parmi un ensemble prédéfini de formations souterraines comportant des hydrocarbures, comprenant la mise en œuvre des étapes (a) à (c) pour chaque formation souterraine dudit ensemble prédéfini, l’étape (d) comprenant le calcul, pour chaque couple d’une formation souterraine dudit ensemble prédéfini et d’une technique d’exploitation de ladite liste prédéfinie, d’un score global de ce couple en fonction des scores d’adéquation, des valeurs dudit paramètre dynamique descriptif de l’exploitation de chaque formation souterraine, et d’au moins une ontologie caractérisant lesdites techniques d’exploitation ; et l’étape (e) comprenant la sélection d’au moins ledit couple présentant le score global maximum.Method according to one of Claims 1 to 9, also for selecting at least one underground formation from among a predefined set of underground formations comprising hydrocarbons, comprising the implementation of steps (a) to (c) for each underground formation of said predefined set, step (d) comprising the calculation, for each pair of an underground formation of said predefined set and of a technique for exploiting said predefined list, of an overall score for this pair as a function of the scores of adequacy, of the values of said dynamic parameter descriptive of the exploitation of each underground formation, and of at least one ontology characterizing said exploitation techniques; and step (e) comprising selecting at least said pair having the maximum overall score. Produit programme d’ordinateur comprenant des instructions de code pour l’exécution d’un procédé selon l’une des revendications 1 à 10 de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine, lorsque ledit programme est exécuté sur un ordinateur.Computer program product comprising code instructions for executing a method according to one of Claims 1 to 10 for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said formation underground, when said program is executed on a computer. Moyen de stockage lisible par un équipement informatique sur lequel un produit programme d’ordinateur comprend des instructions de code pour l’exécution d’un procédé selon l’une des revendications 1 à 10 de sélection, pour au moins une formation souterraine comportant des hydrocarbures, d’une technique d’exploitation de ladite formation souterraine.Storage means readable by computer equipment on which a computer program product comprises code instructions for the execution of a method according to one of Claims 1 to 10 of selection, for at least one underground formation comprising hydrocarbons , of a technique for exploiting said underground formation.
FR2101678A 2021-02-22 2021-02-22 Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation Pending FR3120087A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR2101678A FR3120087A1 (en) 2021-02-22 2021-02-22 Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation
PCT/EP2022/053700 WO2022175279A1 (en) 2021-02-22 2022-02-15 Method for selecting, for at least one subterranean formation comprising hydrocarbons, a technique for mining the subterranean formation

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR2101678A FR3120087A1 (en) 2021-02-22 2021-02-22 Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation
FR2101678 2021-02-22

Publications (1)

Publication Number Publication Date
FR3120087A1 true FR3120087A1 (en) 2022-08-26

Family

ID=75278245

Family Applications (1)

Application Number Title Priority Date Filing Date
FR2101678A Pending FR3120087A1 (en) 2021-02-22 2021-02-22 Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation

Country Status (2)

Country Link
FR (1) FR3120087A1 (en)
WO (1) WO2022175279A1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100300682A1 (en) * 2009-05-27 2010-12-02 Ganesh Thakur Computer-implemented systems and methods for screening and predicting the performance of enhanced oil recovery and improved oil recovery methods

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100300682A1 (en) * 2009-05-27 2010-12-02 Ganesh Thakur Computer-implemented systems and methods for screening and predicting the performance of enhanced oil recovery and improved oil recovery methods

Non-Patent Citations (10)

* Cited by examiner, † Cited by third party
Title
AKANJI L.SANDREA R.: "A Neuro-Fuzzy Approach to Screening Reservoir Candidates for EOR", ADVANCES IN PETROLEUM EXPLORATION AND DEVELOPMENT, vol. 12, no. 1, 2016, pages 1 - 14
CHANG, H. L.ZHANG, Z. Q.WANG, Q. M. ET AL.: "Advances in Polymer Flooding and Alkaline/Surfactant/Polymer Processes as Developed and Applied in the People's Republic of China", J PET TECHNOL, vol. 58, no. 2, 2006, pages 84 - 89
CRAIG SMALLEY P ET AL: "EOR Screening Including Technical, Operational, Environmental and Economic Factors Reveals Practical EOR Potential Offshore on the Norwegian Continental Shelf", SPE-200376-MS, 30 August 2020 (2020-08-30), XP055860474, Retrieved from the Internet <URL:https://onepetro.org/SPEIOR/proceedings-pdf/20IOR/1-20IOR/D011S012R003/2367933/spe-200376-ms.pdf> [retrieved on 20211111] *
KANG PSJONG-SE LIM JSCHUN HUH C.: "Screening Criteria and Considérations of Offshore Enhanced Oil Recovery", MDPI - ENERGY
RAI, KRUSSELL, T.J.LAKE, L.W.DELSHAD, M.: "Oil-Recovery Prédictions for Surfactant Polymer Flooding", SPE ATCE, 4 October 2009 (2009-10-04)
SMALLEY P C ET AL: "Screening for EOR and Estimating Potential Incremental Oil Recovery on the Norwegian Continental Shelf", SPE-190230-MS, 14 April 2018 (2018-04-14), XP055860476, Retrieved from the Internet <URL:https://onepetro.org/speior/proceedings-pdf/18ior/4-18ior/d041s017r005/1232257/spe-190230-ms.pdf> [retrieved on 20211111] *
TABER, J. J.MARTIN, F. D.SERIGHT, R. S.: "EOR Screening Criteria Revisited-Part 1: ''Introduction to Screening Criteria and Enhanced Recovery Field Projects''", SPE RES EVAL & ENG, vol. 12, no. 3, 1997, pages 189 - 198
TABER, J.J.MARTIN, F.D.SERIGHT, R.S., EOR SCREENING CRITERIA REVISITED. PRO-CEEDINGS OF THE SPE/DOE TENTH SYMPOSIUM ON IMPROVED OIL RECOVERY, 1996
WOOD, DEREK: "M.S. thesis", 2006, THE UNIVERSITY OF TEXAS AT AUSTIN, article "A Screening Modelfor C02 Flooding and Storage in Dipping Gulf Coast Reservoirs Based on Dimensionless Groups"
ZHANG NA ET AL: "Development of a hybrid scoring system for EOR screening by combining conventional screening guidelines and random forest algorithm", FUEL, IPC SIENCE AND TECHNOLOGY PRESS , GUILDFORD, GB, vol. 256, 7 August 2019 (2019-08-07), XP085782422, ISSN: 0016-2361, [retrieved on 20190807], DOI: 10.1016/J.FUEL.2019.115915 *

Also Published As

Publication number Publication date
WO2022175279A1 (en) 2022-08-25

Similar Documents

Publication Publication Date Title
EP2253797B1 (en) Method of exploitation of a porous medium by modelling of fluid flows
CA2638227C (en) Method for evaluating a flow sheet for an underground deposit taking uncertainties into account
FR3062672B1 (en) METHOD FOR OPERATING A HYDROCARBON STORAGE BY INJECTING A GAS IN THE FORM OF FOAM
FR3062873A1 (en) AUTOMATION OF THE HIGHER SCALE OF RELATIVE PERMEABILITY AND CAPILLARY PRESSURE IN MULTIPLE POROSITY SYSTEMS
CA2789537C (en) Method for exploiting an oil deposit based on a position selection technique of the wells to be drilled
FR2855631A1 (en) METHOD FOR OPTIMIZING THE PRODUCTION OF AN OIL DEPOSIT IN THE PRESENCE OF UNCERTAINTIES
FR2823877A1 (en) Production, from dynamic data, of timely geological model of physical property characteristic of structure of underground layer being examined, includes parametrizing fine mesh model to obtain distribution of property
EP2963235B1 (en) Method for exploiting an oil deposit based on a technique for positioning wells to be drilled
CA2821099C (en) Production process for a geological reservoir based on a stock reservoir by calculating an analytical conditional distribution law of uncertain parameters of the model
EP2628893A1 (en) Method for exploiting a deposit using a technique for selecting the positions of drilling wells
EP2650471B1 (en) Method for selecting positions of wells to be drilled for exploiting an oil field
FR3045098A1 (en) METHOD OF OPERATING A SEDIMENT BASIN USING ORGANIC CARBON CONTENT CARDS AND HYDROGEN INDEX
WO2010061135A1 (en) Estimation of lithological properties of a geological zone
EP2770162B1 (en) Method for exploiting a geological reservoir by means of a wedge model of the reservoir that is consistent with the flow properties
FR3120087A1 (en) Method for selecting, for at least one underground formation comprising hydrocarbons, a technique for exploiting said underground formation
EP2873989A1 (en) Method for building a grid representing the distribution of a physical property of a subsurface formation by conditional multi-point statistical simulation
EP3763913A1 (en) Method for operating a hydrocarbon reservoir by injecting a gas in foam form
FR3029664A1 (en) DEFINITION OF NON-LINEAR PETROFACIES FOR A RESERVOIR SIMULATION MODEL
CA2711926A1 (en) Method, software and computer system for making a 3d geological mode
WO2012120241A1 (en) Computer estimation method, and method for oil exploration and development using such a method
EP3192964A1 (en) Method for producing hydrocarbons comprising a productivity index of wells under thermal effect
FR2996038A1 (en) Method for exploiting sedimentary basin crossed by well for petroleum exploration, involves generating heat flow map of basin by interpolation of heat flow at base of basin for each geological time, and exploiting basin by heat flow maps
FR2923052A1 (en) Hydrocarbon field e.g. underground hydrocarbon tank, exploitation optimizing method for producing oil deposit, involves defining development pattern of field from parameters, and utilizing pattern to optimize exploitation of field
WO2021063804A1 (en) Method for determining a trajectory of a well in an oil reservoir
CA3185043A1 (en) Method for determining an electrofacies interpretation of measurements carried out in a well

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20220826

PLFP Fee payment

Year of fee payment: 3