Method of acquiring a pilot charge signal by an electric vehicle Download PDF

Info

Publication number
FR3098456A1
FR3098456A1 FR1907595A FR1907595A FR3098456A1 FR 3098456 A1 FR3098456 A1 FR 3098456A1 FR 1907595 A FR1907595 A FR 1907595A FR 1907595 A FR1907595 A FR 1907595A FR 3098456 A1 FR3098456 A1 FR 3098456A1
Authority
FR
France
Prior art keywords
voltage
pulse
pilot signal
duty cycle
measurements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1907595A
Other languages
French (fr)
Other versions
FR3098456B1 (en
Inventor
Magali PONS
Jérôme Hou
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Vitesco Technologies GmbH
Original Assignee
Continental Automotive France SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Continental Automotive France SAS filed Critical Continental Automotive France SAS
Priority to FR1907595A priority Critical patent/FR3098456B1/en
Priority to PCT/EP2020/068622 priority patent/WO2021004871A1/en
Publication of FR3098456A1 publication Critical patent/FR3098456A1/en
Application granted granted Critical
Publication of FR3098456B1 publication Critical patent/FR3098456B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60LPROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
    • B60L53/00Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
    • B60L53/60Monitoring or controlling charging stations
    • B60L53/66Data transfer between charging stations and vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/14Plug-in electric vehicles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/16Information or communication technologies improving the operation of electric vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Transportation (AREA)
  • Mechanical Engineering (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

Procédé d’acquisition d’un signal pilote de charge par un véhicule électrique rechargeable, ce signal étant émis par une borne de recharge électrique, ce signal étant un signal à modulation de largeur d’impulsion. Le procédé comporte les étapes suivantes, pour chaque impulsion (9) du signal pilote de charge :- au terme d’un délai calibré (16) dont le point de départ est le front montant (10), réaliser une séquence d’acquisition comportant au moins deux mesures (17,18,19,20) de la tension du signal pilote de charge, l’intervalle de temps entre deux de ces mesures (17,18,19,20) étant égale à une durée d’intervalle prédéterminée (21) ;- sélectionner une tension de référence pour l’impulsion (9), parmi les mesures de tension (17,18,19,20) de la séquence d’acquisition. Figure pour l’abrégé : Fig. 4Method for acquiring a charging pilot signal by a rechargeable electric vehicle, this signal being emitted by an electric charging station, this signal being a pulse-width modulated signal. The method comprises the following steps, for each pulse (9) of the charge pilot signal:- at the end of a calibrated delay (16) whose starting point is the rising edge (10), carrying out an acquisition sequence comprising at least two measurements (17,18,19,20) of the voltage of the charge pilot signal, the time interval between two of these measurements (17,18,19,20) being equal to a predetermined interval duration (21); - select a reference voltage for the pulse (9), among the voltage measurements (17,18,19,20) of the acquisition sequence. Figure for abstract: Fig. 4

Description

Procédé d’acquisition d’un signal pilote de charge par un véhicule électriqueMethod for acquiring a charging pilot signal by an electric vehicle

L’invention concerne le domaine des véhicules électriques rechargeables et concerne plus particulièrement la recharge des véhicules électriques sur des bornes électriques de recharge spécifiquement prévues pour cet usage.The invention relates to the field of rechargeable electric vehicles and relates more particularly to the charging of electric vehicles on electric charging terminals specifically provided for this use.

L’expression « véhicule électrique » désigne ici aussi bien des véhicules à propulsion électrique exclusive que des véhicules hybrides. Ces véhicules comportent un accumulateur électrique, généralement un pack de batterie, qui peut être rechargé lors de la connexion du véhicule électrique à une source d’énergie électrique. Les véhicules concernés ici sont tous les véhicules dont la propulsion se fait au moins partiellement par un moteur électrique alimenté par un accumulateur d’énergie électrique qui est rechargeable.The term “electric vehicle” here refers to both exclusively electric-powered vehicles and hybrid vehicles. These vehicles include an electric accumulator, usually a battery pack, which can be recharged when connecting the electric vehicle to an electric power source. The vehicles concerned here are all vehicles whose propulsion is done at least partially by an electric motor powered by an electric energy accumulator which is rechargeable.

Le développement des véhicules électriques, et de l’infrastructure permettant leur recharge, a conduit au développement de stations de recharge selon des normes et standards techniques permettant la généralisation de ces stations de recharge sur le territoire et la possibilité de recharger différents types de véhicules sur ces stations de recharge.The development of electric vehicles, and of the infrastructure allowing their recharging, has led to the development of recharging stations according to technical norms and standards allowing the generalization of these recharging stations on the territory and the possibility of recharging different types of vehicles on these charging stations.

Les stations de recharge connues comportent au moins une borne de recharge électrique. Ces bornes de recharge électrique sont couramment dénommées EVSE (« Electric Vehicle Supply Equipment », en anglais). Ces bornes de recharge fournissent en général un courant continu et une forte puissance, permettant une recharge rapide d’un véhicule électrique.Known charging stations include at least one electric charging terminal. These electric charging stations are commonly referred to as EVSE (“Electric Vehicle Supply Equipment”). These charging stations generally provide direct current and high power, allowing rapid charging of an electric vehicle.

Ces bornes de recharge se connectent aux véhicules électriques par un connecteur standardisé qui inclut une connexion de puissance pour la recharge proprement dite des accumulateurs électriques, ainsi qu’une connexion de données permettant une communication entre la borne de recharge et le véhicule. Cette communication est nécessaire par exemple pour vérifier que la borne de recharge est disponible pour la charge ainsi que d’autres informations telles que la puissance pouvant être fournie, etc.These charging stations are connected to electric vehicles by a standardized connector which includes a power connection for the actual charging of the electric accumulators, as well as a data connection allowing communication between the charging station and the vehicle. This communication is necessary for example to check that the charging station is available for charging as well as other information such as the power that can be supplied, etc.

Les bornes de recharge connues peuvent être par exemple conformes à la norme IEC (« International Electrotechnical Commission ») IEC61851-1. Cette norme définit notamment les protocoles de communication utilisés entre un véhicule électrique et la borne de recharge à laquelle le véhicule est connecté.Known charging terminals may for example comply with the IEC standard (“International Electrotechnical Commission”) IEC61851-1. This standard notably defines the communication protocols used between an electric vehicle and the charging station to which the vehicle is connected.

La borne de recharge émet, par sa connexion de données, un signal de commande comportant les informations destinées au véhicule électrique. Ce signal est dénommé « signal pilote de charge ». Ce signal pilote de charge est un signal à modulation de largeur d’impulsion (PWM « Pulse Width Modulation », en anglais) fournissant des informations sous deux formes :
- le rapport cyclique de chaque impulsion ;
- le niveau de tension de chaque impulsion.
The charging station emits, via its data connection, a control signal comprising the information intended for the electric vehicle. This signal is referred to as the “load pilot signal”. This load pilot signal is a Pulse Width Modulation (PWM) signal providing information in two forms:
- the duty cycle of each pulse;
- the voltage level of each pulse.

Lorsqu’un véhicule électrique est connecté à une telle borne de recharge, ce véhicule doit acquérir ces deux types d’information. Autrement dit, le véhicule électrique doit déterminer, pour chaque impulsion du signal, quel est le niveau de tension ainsi que le rapport cyclique de l’impulsion, afin d’acquérir les informations provenant de la borne de recharge et codées sous forme de tension et de rapport cyclique.When an electric vehicle is connected to such a charging station, this vehicle must acquire these two types of information. In other words, the electric vehicle must determine, for each pulse of the signal, what is the voltage level as well as the duty cycle of the pulse, in order to acquire the information coming from the charging station and coded in the form of voltage and duty cycle.

Pour assurer cette acquisition, les véhicules électriques actuels sont généralement prévus pour acquérir le signal pilote de charge en l’échantillonnant à haute fréquence. Pour une fréquence du signal de 1 kHz, cet échantillonnage est par exemple réalisé à des valeurs pouvant atteindre 1 MHz. Le signal pilote de charge est échantillonné grâce à un convertisseur analogique/numérique puis est reconstitué de manière numérique de manière à pouvoir l’analyser en le débarrassant de ses irrégularités. Le rapport cyclique et le niveau de tension de chaque impulsion sont ensuite déterminés. Le signal pilote de charge est ainsi numérisé afin d’identifier le profil de chaque impulsion du signal en s’affranchissant des effets de bord et autres perturbations.To ensure this acquisition, current electric vehicles are generally designed to acquire the charging pilot signal by sampling it at high frequency. For a signal frequency of 1 kHz, this sampling is for example carried out at values which can reach 1 MHz. The charge pilot signal is sampled using an analog/digital converter and then is reconstructed digitally so that it can be analyzed by removing any irregularities. The duty cycle and voltage level of each pulse are then determined. The charge pilot signal is thus digitized in order to identify the profile of each signal pulse, freeing itself from edge effects and other disturbances.

L’échantillonnage à haute fréquence mobilise d’importantes ressources matérielles et logicielles. La plupart des véhicules électriques comportent ainsi un calculateur dédié à la communication avec la borne de recharge. Ce calculateur dédié comporte ses propres moyens de calcul tel qu’un microcontrôleur, ainsi qu’un convertisseur analogique/numérique pour l’échantillonnage.High-frequency sampling mobilizes significant hardware and software resources. Most electric vehicles thus have a dedicated computer for communication with the charging station. This dedicated computer has its own means of calculation such as a microcontroller, as well as an analog/digital converter for sampling.

L’invention a pour but d’améliorer les procédés d’acquisition d’un signal pilote de charge de manière à réduire les ressources nécessaires pour la communication entre un véhicule et une borne de recharge.The aim of the invention is to improve the methods for acquiring a charging pilot signal so as to reduce the resources necessary for communication between a vehicle and a charging station.

À cet effet, l’invention vise un procédé d’acquisition d’un signal pilote de charge par un véhicule électrique rechargeable, ce signal étant émis par une borne de recharge électrique, ce signal étant un signal à modulation de largeur d’impulsion présentant un rapport cyclique variable entre une valeur minimale et une valeur maximale constituant une première information, et présentant un niveau de tension variable constituant une deuxième information. Ce procédé comporte les étapes suivantes, pour chaque impulsion du signal pilote de charge :
- détecter un front montant du signal pilote de charge correspondant au début de l’impulsion ;
- au terme d’un délai calibré dont le point de départ est le front montant, réaliser une séquence d’acquisition comportant au moins deux mesures de la tension du signal pilote de charge, l’intervalle de temps entre deux de ces mesures étant égale à une durée d’intervalle prédéterminée ;
- détecter un front descendant du signal pilote de charge correspondant à la fin de l’impulsion ;
- déterminer le rapport cyclique de l’impulsion ;
- sélectionner une tension de référence pour l’impulsion, parmi les mesures de tension de la séquence d’acquisition.
To this end, the invention relates to a method for acquiring a charging pilot signal by a rechargeable electric vehicle, this signal being emitted by an electric charging station, this signal being a pulse-width modulated signal having a variable duty cycle between a minimum value and a maximum value constituting first information, and having a variable voltage level constituting second information. This method comprises the following steps, for each pulse of the charge pilot signal:
- detecting a rising edge of the charge pilot signal corresponding to the start of the pulse;
- at the end of a calibrated delay whose starting point is the rising edge, carry out an acquisition sequence comprising at least two measurements of the voltage of the charge pilot signal, the time interval between two of these measurements being equal at a predetermined interval duration;
- detecting a falling edge of the charge pilot signal corresponding to the end of the pulse;
- determine the duty cycle of the pulse;
- select a reference voltage for the pulse, among the voltage measurements of the acquisition sequence.

Dans un procédé selon l’invention, le besoin en ressources matérielles et logicielles est réduit de manière très significative par rapport à un échantillonnage haute fréquence. Le signal pilote de charge n’est plus échantillonné. Les informations nécessaires à la détermination du niveau de tension de chaque impulsion sont directement prises à partir d’un faible nombre de mesures.In a method according to the invention, the need for hardware and software resources is very significantly reduced compared to high-frequency sampling. The load pilot signal is no longer sampled. The information needed to determine the voltage level of each pulse is taken directly from a small number of measurements.

Selon un mode de réalisation, la séquence d’acquisition comporte entre trois et dix mesures de tension, ce qui est suffisant par exemple pour un signal à modulation de largeur d’impulsion dont la fréquence est de 1 kHz. Si l’on compare avec un échantillonnage haute fréquence (par exemple un échantillonnage à 1 MHz), ce dernier conduit à effectuer de l’ordre de 1000 mesures de tension pour chaque impulsion. Le nombre de mesures de tension selon l’invention, par exemple de 3 à 10 mesures de tension par impulsion, est dans cet exemple divisé par 100 ou plus.According to one embodiment, the acquisition sequence comprises between three and ten voltage measurements, which is sufficient for example for a pulse-width modulated signal whose frequency is 1 kHz. If we compare with a high frequency sampling (for example a sampling at 1 MHz), the latter leads to perform about 1000 voltage measurements for each pulse. The number of voltage measurements according to the invention, for example from 3 to 10 voltage measurements per pulse, is in this example divided by 100 or more.

La mise en œuvre du procédé selon l’invention nécessite de très faibles ressources matérielles et logicielles, ce qui abaisse le cout du matériel nécessaire au sein du véhicule électrique.The implementation of the method according to the invention requires very low hardware and software resources, which lowers the cost of the hardware necessary within the electric vehicle.

La réduction des ressources matérielles et logicielles nécessaires est telle que la mise en œuvre du procédé ne nécessite plus un calculateur dédié à cette fonction. Dès lors, la fonction d’acquisition du signal pilote de charge peut être attribuée à un autre calculateur déjà présent dans le véhicule, par exemple l’unité de supervision du véhicule électrique, qui gère la charge et les batteries, ou encore l’unité de contrôle moteur pour un véhicule hybride, ou toute autre unité de contrôle électronique. Ces autres unités de commande électroniques du véhicule disposent déjà généralement d’un convertisseur analogique/numérique utilisé pour d’autres fonctions et qui peut être utilisé en plus pour la mise en œuvre du procédé. Les faibles ressources nécessaires à la mise en œuvre du procédé permettent de partager les ressources d’un convertisseur analogique/numérique déjà prévu pour d’autres fonctions.The reduction in the necessary hardware and software resources is such that the implementation of the method no longer requires a computer dedicated to this function. Consequently, the charge pilot signal acquisition function can be assigned to another computer already present in the vehicle, for example the supervision unit of the electric vehicle, which manages the charge and the batteries, or even the unit engine control unit for a hybrid vehicle, or any other electronic control unit. These other electronic control units of the vehicle generally already have an analog/digital converter used for other functions and which can be used in addition for the implementation of the method. The low resources necessary for the implementation of the method make it possible to share the resources of an analog/digital converter already provided for other functions.

Ainsi, dans un mode de réalisation particulièrement avantageux, la mise en œuvre du procédé d’acquisition du signal pilote de charge ne nécessite aucune ressource matérielle propre et nécessite simplement une reprogrammation d’une autre unité de commande électronique du véhicule qui pourra mettre en œuvre le procédé sans nécessiter de dimensionnement à la hausse.Thus, in a particularly advantageous embodiment, the implementation of the method for acquiring the charge pilot signal does not require any specific hardware resource and simply requires reprogramming of another electronic control unit of the vehicle which can implement the process without requiring scaling up.

Cette importante réduction dans les ressources nécessaires pour l’acquisition du signal pilote de charge est réalisée grâce à la séquence d’acquisition dont le délai calibré positionne le début de la séquence d’acquisition et dont les durées d’intervalles prédéterminées garantissent qu’au moins une mesure de tension soit affranchie de la majeure partie des perturbations du signal qui surviennent juste après le front montant de chaque impulsion.This significant reduction in the resources necessary for the acquisition of the charge pilot signal is achieved thanks to the acquisition sequence whose calibrated delay positions the start of the acquisition sequence and whose predetermined interval durations guarantee that at least one voltage measurement is freed from most of the signal disturbances that occur just after the rising edge of each pulse.

Selon une caractéristique préférée, la première mesure de tension de la séquence d’acquisition est réalisée en cours d’impulsion, avant le front descendant de cette impulsion, et ce pour toute impulsion même celles correspondant au rapport cyclique minimal.According to a preferred characteristic, the first voltage measurement of the acquisition sequence is carried out during a pulse, before the falling edge of this pulse, and this for any pulse, even those corresponding to the minimum duty cycle.

Le procédé selon l’invention peut comporter les caractéristiques additionnelles suivantes, seules ou en combinaison :
- le délai calibré est inférieur à la durée d’impulsion qui correspond à ladite valeur minimale du rapport cyclique, la durée d’impulsion étant définie comme la durée s’écoulant entre le front montant et le front descendant de l’impulsion ;
- le délai calibré est inférieur à la durée d’impulsion qui correspond à ladite valeur minimale du rapport cyclique, diminuée du temps nécessaire à la réalisation d’une mesure de tension ;
- le délai calibré est égal à la durée de l’impulsion du signal pilote de charge qui correspond à ladite valeur minimale du rapport cyclique, diminuée de 5 à 10 µs ;
- le procédé comporte une étape d’initialiser un déclencheur matériel au moment du front montant, ce déclencheur matériel déclenchant la séquence d’acquisition une fois le délai calibré écoulé ;
- la tension du signal pilote de charge est variable parmi une pluralité de niveaux de tension prédéfinis, et l’étape de sélectionner une tension de référence pour l’impulsion est réalisée par comparaison entre les valeurs des mesures de tension de la séquence d’acquisition et lesdits niveaux de tension prédéfinis, la tension de référence choisie étant la valeur de tension qui est égale à un niveau de tension prédéfini ;
- si deux valeurs de tension sont égales à un niveau de tension prédéfini, la tension de référence choisie est la valeur de tension la plus proche du front descendant de l’impulsion ;
- l’étape de sélectionner une tension de référence pour l’impulsion est réalisée à partir d’une table d’index indiquant, en fonction du rapport cyclique de l’impulsion, la mesure de tension à choisir dans la séquence d’acquisition ;
- la table d’index indique, pour chaque rapport cyclique, la mesure de tension qui, au sein d’une séquence d’acquisition, est située le plus tard avant le front descendant ;
- la séquence d’acquisition comporte de trois à dix mesures de la tension du signal pilote de charge, et de préférence quatre mesures de la tension du signal pilote de charge.
The method according to the invention may comprise the following additional characteristics, alone or in combination:
- the calibrated delay is less than the pulse duration which corresponds to said minimum value of the duty cycle, the pulse duration being defined as the duration passing between the rising edge and the falling edge of the pulse;
- the calibrated delay is less than the pulse duration which corresponds to said minimum value of the duty cycle, reduced by the time required to perform a voltage measurement;
- the calibrated delay is equal to the duration of the pulse of the charge pilot signal which corresponds to said minimum value of the duty cycle, reduced by 5 to 10 μs;
the method comprises a step of initializing a hardware trigger at the time of the rising edge, this hardware trigger triggering the acquisition sequence once the calibrated delay has elapsed;
- the voltage of the charge pilot signal is variable among a plurality of predefined voltage levels, and the step of selecting a reference voltage for the pulse is carried out by comparison between the values of the voltage measurements of the acquisition sequence and said predefined voltage levels, the chosen reference voltage being the voltage value which is equal to a predefined voltage level;
- if two voltage values are equal to a predefined voltage level, the chosen reference voltage is the voltage value closest to the falling edge of the pulse;
- the step of selecting a reference voltage for the pulse is carried out from an index table indicating, according to the duty cycle of the pulse, the voltage measurement to be chosen in the acquisition sequence;
- the index table indicates, for each duty cycle, the voltage measurement which, within an acquisition sequence, is located the latest before the falling edge;
the acquisition sequence comprises three to ten measurements of the voltage of the charge pilot signal, and preferably four measurements of the voltage of the charge pilot signal.

L’invention se rapporte aussi à une unité de contrôle électronique qui se caractérise en ce qu’elle comprend des moyens pour mettre en œuvre toutes les étapes d’un procédé selon l’invention.The invention also relates to an electronic control unit which is characterized in that it comprises means for implementing all the steps of a method according to the invention.

D’autres caractéristiques et avantages de l’invention ressortiront de la description qui en est faite ci-après, à titre indicatif et nullement limitatif, en référence aux dessins annexés, dans lesquels :Other characteristics and advantages of the invention will emerge from the description given of it below, by way of indication and in no way limiting, with reference to the appended drawings, in which:

La figure 1 illustre schématiquement un véhicule électrique connecté à une borne de recharge ; Figure 1 schematically illustrates an electric vehicle connected to a charging station;

La figure 2 représente un exemple de signal pilote de charge ; FIG. 2 represents an example of a charge pilot signal;

La figure 3 illustre un exemple de forme réelle d’une impulsion du signal pilote de charge ; Figure 3 illustrates an example of the actual shape of a charge pilot signal pulse;

La figure 4 illustre schématiquement une séquence d’acquisition du procédé selon l’invention ; FIG. 4 schematically illustrates an acquisition sequence of the method according to the invention;

La figure 5 est similaire à la figure 4 dans une situation où le rapport cyclique est minimal ; Figure 5 is similar to Figure 4 in a situation where the duty cycle is minimal;

La figure 6 est similaire à la figure 4 dans une situation où le rapport cyclique est maximal ; Figure 6 is similar to Figure 4 in a situation where the duty cycle is maximum;

La figure 7 représente schématiquement une unité de commande électronique de véhicule électrique, adaptée à la mise en œuvre du procédé selon l’invention. FIG. 7 schematically represents an electric vehicle electronic control unit, suitable for implementing the method according to the invention.

La figure 1 est une représentation schématique illustrant un véhicule électrique 1 connecté à une borne de recharge 2 par l’intermédiaire d’un connecteur 3.Figure 1 is a schematic representation illustrating an electric vehicle 1 connected to a charging station 2 via a connector 3.

Le connecteur 3 comporte une connectique de puissance (non représentée) qui permet la charge effective des batteries du véhicule électrique, ainsi qu’une connectique 4 de données par laquelle un signal pilote de charge est transmis de la borne de recharge 2 au véhicule électrique.The connector 3 comprises a power connection (not shown) which allows the effective charging of the batteries of the electric vehicle, as well as a data connection 4 by which a charging pilot signal is transmitted from the charging station 2 to the electric vehicle.

Le signal pilote de charge émis par la borne de recharge 2 informe le véhicule électrique sur les conditions de charge, donne des directives au véhicule pour démarrer la charge, ou tout autre information utile ou nécessaire à l’opération de charge des batteries du véhicule.The charging pilot signal emitted by the charging station 2 informs the electric vehicle of the charging conditions, gives instructions to the vehicle to start charging, or any other information useful or necessary for the charging operation of the vehicle batteries.

La borne de recharge 2 émet le signal pilote de charge grâce à un circuit 5 produisant un signal à modulation de largeur d’impulsion dont chaque impulsion est caractérisée par sa largeur et également par sa hauteur. L’information contenue dans le signal pilote de charge est donc codée selon deux voies :
- par le rapport cyclique de chaque impulsion, c’est à dire par la largeur de l’impulsion ;
- par la tension de chaque impulsion, c’est à dire par la hauteur de l’impulsion.
The charging station 2 emits the charging pilot signal thanks to a circuit 5 producing a pulse-width modulated signal, each pulse of which is characterized by its width and also by its height. The information contained in the charge pilot signal is therefore encoded in two ways:
- by the duty cycle of each pulse, ie by the width of the pulse;
- by the voltage of each pulse, ie by the height of the pulse.

Un grand nombre d’informations peuvent ainsi être codées, en parallèle ou en combinaison, par la tension et le rapport cyclique de chaque impulsion, les impulsions se succédant à la fréquence du signal. Par exemple le rapport cyclique peut informer le véhicule électrique de la puissance de charge disponible tandis que le niveau de tension permet de déterminer si les conditions sont favorables pour qu’une charge puisse avoir lieu.A large amount of information can thus be coded, in parallel or in combination, by the voltage and the duty cycle of each pulse, the pulses succeeding each other at the frequency of the signal. For example, the duty cycle can inform the electric vehicle of the charging power available, while the voltage level can determine whether the conditions are favorable for charging to take place.

Pour l’acquisition du signal pilote de charge, le véhicule électrique 1 dispose d’un circuit de mesure de tension 6 et un circuit de mesure de fréquence 7. Le circuit de mesure de tension 6 permet au véhicule électrique de réaliser des mesures de tension pour déterminer le niveau de tension de chaque impulsion du signal. Le circuit de mesure de fréquence 7 permet de déterminer la fréquence du signal et le rapport cyclique de chaque impulsion.For the acquisition of the charge pilot signal, the electric vehicle 1 has a voltage measurement circuit 6 and a frequency measurement circuit 7. The voltage measurement circuit 6 allows the electric vehicle to perform voltage measurements to determine the voltage level of each signal pulse. The frequency measurement circuit 7 makes it possible to determine the frequency of the signal and the duty cycle of each pulse.

Le véhicule électrique 1 comporte également un contrôleur de charge 8 adapté à piloter la charge du véhicule et à recevoir pour cela les informations provenant des circuits 6, 7, c’est-à-dire les informations transmises par la borne de recharge 2 via le signal pilote de charge.The electric vehicle 1 also comprises a charge controller 8 adapted to control the charge of the vehicle and to receive for this the information coming from the circuits 6, 7, that is to say the information transmitted by the charging terminal 2 via the load pilot signal.

La figure 2 illustre un signal pilote de charge émis par la borne de recharge 2 et acquis par le véhicule électrique 1 grâce à ses circuits de mesures de tension 6 et de mesure de fréquence 7.FIG. 2 illustrates a charging pilot signal emitted by the charging station 2 and acquired by the electric vehicle 1 thanks to its voltage measurement 6 and frequency measurement 7 circuits.

Dans cet exemple illustratif schématique, neuf impulsions 9 du signal pilote de charge sont représentées. Dans cet exemple, toutes les impulsions ont le même rapport cyclique de 50 %. Chaque impulsion 9 démarre par un front montant 10, s’établit à une valeur de tension constante sur une largeur déterminée par le rapport cyclique, et s’achève par un front descendant 11. Dans l’exemple illustré à la figure 2, pour une fréquence du signal pilote de charge de 1 kHz, et un rapport cyclique de 50 %, la largeur d’une impulsion 9 est de 500 µs.In this schematic illustrative example, nine pulses 9 of the charge pilot signal are shown. In this example, all pulses have the same 50% duty cycle. Each pulse 9 starts with a rising edge 10, settles at a constant voltage value over a width determined by the duty cycle, and ends with a falling edge 11. In the example illustrated in FIG. 2, for a load pilot signal frequency of 1 kHz, and a duty cycle of 50%, the width of a pulse 9 is 500 μs.

Bien que dans l’exemple illustré à la figure 2 toutes les impulsions 9 ont le même rapport cyclique, ce rapport cyclique peut en réalité varier d’une impulsion à l’autre en fonction de l’information à transmettre par la borne de recharge 2. Le rapport cyclique peut prendre toute valeur entre une valeur minimale et une valeur maximale prédéfinies pour la borne de recharge. Dans le présent exemple, la plage des rapports cycliques possibles est : 3% - 98%.Although in the example illustrated in FIG. 2 all the pulses 9 have the same duty cycle, this duty cycle may in reality vary from one pulse to another depending on the information to be transmitted by the charging terminal 2 The duty cycle can take any value between a minimum value and a maximum value predefined for the charging station. In this example, the range of possible duty cycles is: 3% - 98%.

Le signal pilote de charge de la figure 2 présente également pour chaque impulsion 9 un niveau de tension qui est également porteur d’une information. Dans l’exemple de la figure 2, deux niveaux de tension sont représentés : 9 V et 6 V.The charge pilot signal of FIG. 2 also presents for each pulse 9 a voltage level which also carries information. In the example of figure 2, two voltage levels are represented: 9 V and 6 V.

Le codage de l’information grâce à la variation du rapport cyclique et du niveau de tension des impulsions 9 n’est pas le sujet de la présente description et ne sera pas décrit plus en détail ici. La norme IEC61851-1 fournit des exemples de codage d’informations grâce à ces deux paramètres. De même, tout autre protocole peut être envisagé pour mettre en œuvre ces deux paramètres et coder l’information. L’objet de la présente description est l’acquisition par le véhicule électrique des valeurs de rapport cyclique et de niveau de tension, en vue de disposer de l’information ainsi codée.The coding of the information thanks to the variation of the duty cycle and the voltage level of the pulses 9 is not the subject of the present description and will not be described in more detail here. The IEC61851-1 standard provides examples of encoding information using these two parameters. Similarly, any other protocol can be considered to implement these two parameters and encode the information. The object of the present description is the acquisition by the electric vehicle of the duty cycle and voltage level values, with a view to obtaining the information thus coded.

La figure 3 donne un exemple de forme réelle d’une impulsion 9 du signal pilote de charge, mesuré à l’oscilloscope. Les impulsions 9 ne sont bien entendu pas rectangulaires comme dans l’exemple théorique de la figure 2, mais présentent en effet des anomalies et autres phénomènes d’oscillation.Figure 3 gives an example of the real shape of a pulse 9 of the charge pilot signal, measured with an oscilloscope. The pulses 9 are of course not rectangular as in the theoretical example of FIG. 2, but indeed present anomalies and other oscillation phenomena.

Dans cet exemple de la figure 3, le rapport cyclique de l’impulsion 9 est de 16 % et le niveau de tension de cette impulsion 9 est de 8 V. Le rapport cyclique de 16 % correspond dans cet exemple à une largeur 12 de l’impulsion 9 de 160 µs. La largeur de l’impulsion est définie comme le temps qui s’écoule entre le front montant 10 et le front descendant 11.In this example of FIG. 3, the duty cycle of pulse 9 is 16% and the voltage level of this pulse 9 is 8 V. The duty cycle of 16% corresponds in this example to a width 12 of l pulse 9 of 160 µs. The pulse width is defined as the time between the rising edge 10 and the falling edge 11.

Parmi les anomalies et phénomènes d’oscillation observés pour l’impulsion 9, le plus important est un pic de tension 13 apparaissant juste après le front montant 10. La largeur 14 de ce pic de tension 13 est ici de 45 µs (pour ce rapport cyclique de 16%). Le pic de tension 13 se produit pour chacune des impulsions 9. La largeur 14 du pic de tension 13 augmente avec le rapport cyclique de l’impulsion 9.Among the anomalies and oscillation phenomena observed for pulse 9, the most important is a voltage peak 13 appearing just after the rising edge 10. The width 14 of this voltage peak 13 is here 45 μs (for this report 16% duty cycle). The voltage spike 13 occurs for each of the 9 pulses. The width 14 of the voltage spike 13 increases with the duty cycle of the 9 pulse.

L’impulsion 9 présente également une plage sensiblement constante 15 qui s’étend selon le niveau de tension propre à l’impulsion considérée, ici 8 V.Pulse 9 also has a substantially constant range 15 which extends according to the voltage level specific to the pulse considered, here 8 V.

L’acquisition de la valeur du rapport cyclique d’une impulsion 9 consiste pour le circuit de mesure de fréquence 7 à déterminer la largeur de l’impulsion 9, c’est-à-dire à mesurer la durée 12 entre le front montant 10 et le front descendant 11. La mesure de la période du signal est permise par la mesure du temps entre deux fronts montants 10 de deux impulsions 9 successives. Le circuit 7 détermine le rapport cyclique d’une impulsion en établissant le rapport de la durée de l’impulsion avec la période du signal.The acquisition of the value of the duty cycle of a pulse 9 consists for the frequency measurement circuit 7 in determining the width of the pulse 9, that is to say in measuring the duration 12 between the rising edge 10 and the falling edge 11. The measurement of the period of the signal is made possible by measuring the time between two rising edges 10 of two successive pulses 9. Circuit 7 determines the duty cycle of a pulse by establishing the ratio of the duration of the pulse with the period of the signal.

En ce qui concerne le niveau de tension de l’impulsion 9, celui-ci est mesuré par le circuit de mesure de tension 6 qui doit nécessairement mesurer la tension au niveau de la plage constante 15. Une mesure en dehors de la plage constante 15, et notamment au pic de tension 13, fausserait la mesure. Dans l’exemple de la figure 3, le pic de tension 13 culmine à une tension de 11,2 V alors que le niveau de tension de l’impulsion 9 considérée est de 8 V à la plage constante 15.With regard to the voltage level of the pulse 9, this is measured by the voltage measuring circuit 6 which must necessarily measure the voltage at the level of the constant range 15. A measurement outside the constant range 15 , and in particular at the voltage peak 13, would distort the measurement. In the example of figure 3, the voltage peak 13 peaks at a voltage of 11.2 V while the voltage level of the considered pulse 9 is 8 V at the constant range 15.

Notons que ni le rapport cyclique ni le niveau de tension d’une impulsion 9 n’est connu à l’avance par le véhicule électrique. La difficulté pour déterminer le niveau de tension d’une impulsion 9 réside dans la nécessité de réaliser au moins une mesure de tension dans la plage constante 9, et de sélectionner cette mesure comme la tension de référence pour l’impulsion. Cette tension de référence est la tension qui a été effectivement été émise par la borne de recharge pour cette impulsion.Note that neither the duty cycle nor the voltage level of a pulse 9 is known in advance by the electric vehicle. The difficulty in determining the voltage level of a pulse 9 lies in the need to make at least one voltage measurement in the constant range 9, and to select this measurement as the reference voltage for the pulse. This reference voltage is the voltage that was actually emitted by the charging station for this pulse.

La figure 4 illustre le procédé de mesure du niveau de tension d’une impulsion 9. Le véhicule électrique est tout d’abord connecté à la borne de recharge et cette dernière émet un signal pilote de charge. La figure 4 illustre schématiquement la première impulsion 9, dont le niveau de tension est de 6 V, de ce signal pilote de charge.Figure 4 illustrates the method of measuring the voltage level of a pulse 9. The electric vehicle is first connected to the charging station and the latter emits a charging pilot signal. FIG. 4 schematically illustrates the first pulse 9, the voltage level of which is 6 V, of this charge pilot signal.

Dans une première étape, le front montant 10 est détecté. Dans le présent exemple, le front montant 10 est détecté lorsqu’une tension supérieure à un certain seuil est mesurée.In a first step, the rising edge 10 is detected. In this example, the rising edge 10 is detected when a voltage above a certain threshold is measured.

À partir du front montant 10, un déclencheur est initialisé. Ce déclencheur est prévu pour déclencher une séquence d’acquisition au terme d’un délai 16 (ci-après dénommé « délai calibré ») dont le point de départ est la détection du front montant 10. Ce déclencheur est de préférence un déclencheur matériel (« hardware trigger », en anglais), c’est-à-dire une routine en langage de programmation de bas niveau qui est directement raccordée à une ligne d'entrée/sortie du microcontrôleur. Un tel déclencheur matériel est indépendant des programmes exécutés par le microcontrôleur et garantit la bonne mesure du délai calibré 16. Le déclencheur matériel comptabilise le temps s’écoulant à partir du front montant 10 et, à l’issue du délai calibré 16, la séquence d’acquisition démarre par une première mesure de la tension 17 du signal.From the rising edge 10, a trigger is initialized. This trigger is provided to trigger an acquisition sequence at the end of a delay 16 (hereinafter referred to as the "calibrated delay"), the starting point of which is the detection of the rising edge 10. This trigger is preferably a hardware trigger ( “hardware trigger”, in English), that is to say a routine in low-level programming language which is directly connected to an input/output line of the microcontroller. Such a hardware trigger is independent of the programs executed by the microcontroller and guarantees the correct measurement of the calibrated delay 16. The hardware trigger counts the time elapsed from the rising edge 10 and, at the end of the calibrated delay 16, the sequence acquisition starts with a first measurement of the voltage 17 of the signal.

Après cette première mesure de tension 17, au moins une autre mesure de la tension du signal est réalisée pour constituer la séquence d’acquisition. Dans le présent exemple, trois autres mesures de tension 18, 19, 20 sont réalisées et la séquence d’acquisition comporte ainsi quatre mesures de tension. Les mesures de tension sont réalisées à intervalles réguliers, dès lors qu’une durée d’intervalle prédéterminée 21 est écoulée depuis la mesure de tension précédente.After this first voltage measurement 17, at least one other measurement of the signal voltage is carried out to constitute the acquisition sequence. In the present example, three other voltage measurements 18, 19, 20 are carried out and the acquisition sequence thus comprises four voltage measurements. The voltage measurements are carried out at regular intervals, once a predetermined interval duration 21 has elapsed since the previous voltage measurement.

Chacune des mesures de tension 17, 18, 19, 20 est ici schématisée par un créneau. Chaque mesure de tension nécessitant un certain temps pour être réalisée (dépendant matériellement du circuit de mesure de tension utilisé), ces créneaux présentent une durée représentée par une largeur 22. Dans le présent exemple, la durée 22 est de 3,4 µs.Each of the voltage measurements 17, 18, 19, 20 is here schematized by a square wave. Each voltage measurement requiring a certain time to be carried out (materially dependent on the voltage measurement circuit used), these pulses have a duration represented by a width 22. In the present example, the duration 22 is 3.4 μs.

Dans cet exemple relatif à un signal pilote de charge d’une fréquence de 1 kHz, le délai calibré 16 est de 22,5 µs et la durée d’intervalle prédéterminée 21 est de 30 µs. Le choix du délai calibré 16, du nombre de mesures de tension de la séquence d’acquisition, et de la durée d’intervalle prédéterminée 21, est réalisé de sorte que les critères suivants soient remplis :
- la première mesure de tension 17 de la séquence d’acquisition doit être réalisée en cours d’impulsion, c’est-à-dire entre le front montant 10 et le front descendant 11 de l’impulsion, et ce quel que soit le rapport cyclique ;
- au moins une mesure de tension doit être située en dehors du pic de tension 13.
In this example relating to a load pilot signal with a frequency of 1 kHz, the calibrated delay 16 is 22.5 μs and the predetermined interval duration 21 is 30 μs. The choice of the calibrated delay 16, the number of voltage measurements of the acquisition sequence, and the predetermined interval duration 21, is made so that the following criteria are met:
- the first voltage measurement 17 of the acquisition sequence must be carried out during the pulse, that is to say between the rising edge 10 and the falling edge 11 of the pulse, and this whatever the cyclical report ;
- at least one voltage measurement must be located outside the voltage peak 13.

Dans l’exemple illustré à la figure 13, relatif à un rapport cyclique médian, la première mesure de tension 17 rempli à elle seule ces deux critères.In the example illustrated in FIG. 13, relating to a median duty cycle, the first voltage measurement 17 fulfills these two criteria on its own.

Les figures 5 et 6 sont similaires à la figure 4 mais illustrent la situation, respectivement, pour le rapport cyclique minimal et pour le rapport cyclique maximal. Quel que soit le rapport cyclique du signal pilote de charge, illustré par les trois exemples des figures 4 à 6, la configuration de la séquence d’acquisition ne change pas. Le délai calibré 16 et les durées d’intervalles 21 sont des constantes.Figures 5 and 6 are similar to Figure 4 but illustrate the situation, respectively, for the minimum duty cycle and for the maximum duty cycle. Regardless of the duty cycle of the load pilot signal, illustrated by the three examples in Figures 4 to 6, the configuration of the acquisition sequence does not change. The calibrated delay 16 and the interval durations 21 are constants.

Sur la figure 5, le rapport cyclique minimal est, selon l’exemple, de 3 %. Dans cette situation, seule la première mesure de tension 17 est réalisée au moment de l’impulsion 9, c’est-à-dire avant le front descendant 11. Les trois autres mesures de tension 18, 19, 20 renvoient une valeur nulle. La tension de référence pour l’impulsion 9, choisie pour ce cas, sera donc le résultat de la première mesure 17, soit 6 V.In Figure 5, the minimum duty cycle is, according to the example, 3%. In this situation, only the first voltage measurement 17 is carried out at the moment of the pulse 9, that is to say before the falling edge 11. The other three voltage measurements 18, 19, 20 return a zero value. The reference voltage for pulse 9, chosen for this case, will therefore be the result of the first measurement 17, i.e. 6 V.

La figure 5 illustre également la situation dans laquelle le calibrage du délai calibré est réalisé. Dans cette situation de taille minimale de la plage constante 15, le délai calibré est ajusté pour que la première mesure de tension 17 de la séquence d’acquisition soit située juste avant le front descendant, en prenant en compte le temps 22 nécessaire pour la réalisation de cette mesure 17. Dans le présent exemple, pour un rapport cyclique minimal de 3 %, le front descendant 11 se produit 30 µs après le front montant 10. Un délai calibré 16 fixé à 22,5 µs permet bien de réaliser la mesure de tension durant 3,4 µs (avec une marge) avant l’arrivée du front descendant 11. De préférence, le délai calibré 16 est égal à la durée de la durée de l’impulsion qui correspond à ladite valeur minimale du rapport cyclique (ici, 30 µs), diminuée de 5 à 10 µs.Figure 5 also illustrates the situation in which the calibration of the calibrated delay is carried out. In this situation of minimum size of the constant range 15, the calibrated delay is adjusted so that the first voltage measurement 17 of the acquisition sequence is located just before the falling edge, taking into account the time 22 necessary for the realization of this measurement 17. In the present example, for a minimum duty cycle of 3%, the falling edge 11 occurs 30 μs after the rising edge 10. A calibrated delay 16 set at 22.5 μs makes it possible to perform the measurement of voltage lasting 3.4 µs (with a margin) before the arrival of the falling edge 11. Preferably, the calibrated delay 16 is equal to the duration of the duration of the pulse which corresponds to said minimum value of the duty cycle (here , 30 µs), decreased from 5 to 10 µs.

Ce calibrage du délai calibré 16 est réalisé lors de la programmation du module électronique en charge de l’acquisition du signal pilote de charge, au sein du véhicule électrique, en connaissant les valeurs minimale et maximale définissant la plage de rapports cycliques possibles (au vu par exemple d’une norme ou d’une spécification de borne de recharge). Une fois le calibrage du délai calibré 16 effectué, la valeur du délai obtenu (dans notre exemple : 22,5 µs) est ensuite mémorisée dans le module électronique. La première mesure de tension 17 se trouvera ainsi avec certitude sur la plage constante 15 même pour une impulsion 9 correspondant au rapport cyclique minimal, qui offre la plus petite plage constante 15.This calibration of the calibrated delay 16 is carried out during the programming of the electronic module in charge of acquiring the charge pilot signal, within the electric vehicle, knowing the minimum and maximum values defining the range of possible duty cycles (in view of example of a charging station standard or specification). Once the calibration of the calibrated delay 16 has been carried out, the value of the delay obtained (in our example: 22.5 μs) is then stored in the electronic module. The first voltage measurement 17 will thus be with certainty on the constant range 15 even for a pulse 9 corresponding to the minimum duty cycle, which offers the smallest constant range 15.

La figure 6 illustre quant à elle le cas du rapport cyclique maximal du signal pilote de charge, qui est dans cet exemple de 98 %. Dans cette situation, la largeur de l’impulsion est de 980 µs. Comme schématisé sur la figure 6, le pic de tension 13 a augmenté en durée, suivant l’augmentation du rapport cyclique.FIG. 6 illustrates the case of the maximum duty cycle of the charge pilot signal, which in this example is 98%. In this situation, the pulse width is 980 µs. As shown schematically in Figure 6, the voltage peak 13 has increased in duration, following the increase in the duty cycle.

La première mesure de tension 17 est toujours située avant le front descendant 11 mais est maintenant réalisée au cours du pic de tension 13 et sa valeur est donc faussée. Dans ce cas, les deux dernières mesures de tension 19, 20 sont situées en dehors du pic de tension et avant le front descendant 11. Ces mesures de tension 19, 20 sont donc réalisées dans la plage constante 15 et leur valeur pourra être choisie comme tension de référence pour l’impulsion 9. De préférence, la mesure de tension 20 la plus tardive, c'est-à-dire la plus proche du front descendant 11, sera prise en compte, car plus la mesure de tension est éloignée du front montant 10, et donc du pic de tension 13, moins cette mesure subira de perturbations liées au pic de tension 13.The first voltage measurement 17 is always located before the falling edge 11 but is now performed during the voltage peak 13 and its value is therefore distorted. In this case, the last two voltage measurements 19, 20 are located outside the voltage peak and before the falling edge 11. These voltage measurements 19, 20 are therefore carried out in the constant range 15 and their value can be chosen as reference voltage for pulse 9. Preferably, the latest voltage measurement 20, that is to say the closest to the falling edge 11, will be taken into account, because the further the voltage measurement is from the rising edge 10, and therefore of the voltage peak 13, the less this measurement will undergo disturbances linked to the voltage peak 13.

La figure 6 illustre également la situation dans laquelle le calibrage de la durée d’intervalle prédéterminée 21 est réalisé, ainsi que le choix du nombre de mesures de tension de la séquence d’acquisition. Dans cette situation de taille maximale du pic de tension 13, le nombre de mesures de tension 18, 19, 20 en plus de la première mesure de tension, et la durée d’intervalle 21 sont ajustés pour que la dernière mesure de tension 20 de la séquence d’acquisition soit située juste avant le front descendant, en prenant en compte le temps 22 nécessaire pour la réalisation de cette mesure 20. Dans le présent exemple, pour un rapport cyclique maximal de 98 %, le front descendant 11 se produit 980 µs après le front montant 10. Un délai calibré 16 fixé à 22,5 µs et une durée d’intervalle 21 fixée à 30 µs permettent de réaliser la dernière mesure de tension à 112,5 µs, ce qui permet de réaliser cette mesure largement avant l’arrivée du front descendant 11. Dans cet exemple, on considère en effet qu’un pic de tension 13 ne durera jamais plus de 100 µs.Figure 6 also illustrates the situation in which the calibration of the predetermined interval duration 21 is carried out, as well as the choice of the number of voltage measurements of the acquisition sequence. In this situation of maximum size of the voltage peak 13, the number of voltage measurements 18, 19, 20 in addition to the first voltage measurement, and the interval duration 21 are adjusted so that the last voltage measurement 20 of the acquisition sequence is located just before the falling edge, taking into account the time 22 necessary for carrying out this measurement 20. In the present example, for a maximum duty cycle of 98%, the falling edge 11 occurs 980 μs after the rising edge 10. A calibrated delay 16 fixed at 22.5 μs and an interval duration 21 fixed at 30 μs make it possible to carry out the last voltage measurement at 112.5 μs, which makes it possible to carry out this measurement largely before the arrival of the falling edge 11. In this example, it is in fact considered that a voltage peak 13 will never last more than 100 μs.

Ce calibrage garanti qu’au moins l’une des autres mesures de tension 18, 19, 20 soit située sur la plage constante 15, en dehors du pic de tension 13 ou de toute autre perturbation de début d’impulsion.This calibration guarantees that at least one of the other voltage measurements 18, 19, 20 is located on the constant range 15, outside the voltage peak 13 or any other pulse onset disturbance.

De même que pour le délai calibré 16, le nombre de mesures de tension 17, 18, 19, 20 de la séquence d’acquisition, et la valeur de la durée d’intervalle 21 est mémorisé dans le module électronique concerné du véhicule électrique, lors de sa programmation. Au moins la dernière mesure de tension est ainsi garantie d’être sur la plage constante 15 et en dehors du pic de tension 13, même pour une impulsion 9 correspondant au rapport cyclique maximal, qui offre le pic de tension 13 le plus étendu en durée.As for the calibrated delay 16, the number of voltage measurements 17, 18, 19, 20 of the acquisition sequence, and the value of the interval duration 21 is stored in the relevant electronic module of the electric vehicle, during its programming. At least the last voltage measurement is thus guaranteed to be on the constant range 15 and outside the voltage peak 13, even for a pulse 9 corresponding to the maximum duty cycle, which offers the most extended voltage peak 13 in duration .

La figure 7 représente schématiquement une unité de contrôle / commande 23 de véhicule électrique adaptée à mettre en œuvre le procédé. Il s’agit par exemple d’un superviseur de véhicule électrique ou hybride HEVC (« Hybrid Electric Vehicle Controller », en anglais).FIG. 7 schematically represents an electric vehicle control/command unit 23 suitable for implementing the method. This is, for example, an electric or hybrid vehicle supervisor HEVC (“Hybrid Electric Vehicle Controller”).

Cette unité 23 est destinée à superviser diverses fonctions du véhicule électrique, de manière classique, et est ici de plus employée pour mettre en œuvre le procédé d’acquisition de signal pilote de charge. Aucun matériel dédié n’est ainsi nécessaire pour réaliser l’acquisition du signal pilote de charge.This unit 23 is intended to supervise various functions of the electric vehicle, in a conventional manner, and is here moreover employed to implement the charging pilot signal acquisition method. No dedicated hardware is therefore necessary to carry out the acquisition of the charge pilot signal.

Le module 23 comporte un filtre matériel 24 (« hardware filter », en anglais) relié à la connectique de signal 4 (représenté à la figure 1) et recevant donc sur son entrée 25 le signal pilote de charge.The module 23 comprises a hardware filter 24 ("hardware filter") connected to the signal connector 4 (shown in Figure 1) and therefore receiving on its input 25 the load pilot signal.

Le module 23 comporte également un microcontrôleur 23 auquel le filtre 24 est relié. Au sien du microcontrôleur 23, le filtre 24 est relié à un module chronographe 26 (« timer module », en anglais) ainsi qu’à un convertisseur analogique/numérique 27. Le module chronographe 26 reçoit du filtre 24 un signal de détection de seuil et permet ainsi de détecter les fronts montants 10 et descendants 11 du signal. Le convertisseur analogique/numérique 27 reçoit du filtre 24 la tension du signal et permet donc la réalisation des mesures de tension de la séquence d’acquisition.Module 23 also includes a microcontroller 23 to which filter 24 is connected. Within the microcontroller 23, the filter 24 is connected to a chronograph module 26 (“timer module”, in English) as well as to an analog/digital converter 27. The chronograph module 26 receives from the filter 24 a threshold detection signal and thus makes it possible to detect the rising 10 and falling 11 edges of the signal. The analog/digital converter 27 receives from the filter 24 the voltage of the signal and therefore allows the realization of the voltage measurements of the acquisition sequence.

Le module chronographe 26 met également en œuvre le déclencheur matériel 28 permettant de déterminer l’écoulement du délai calibré 16 à partir du front montant de chaque impulsion.The chronograph module 26 also implements the hardware trigger 28 making it possible to determine the flow of the calibrated delay 16 from the rising edge of each pulse.

La figure 5 schématise par un rectangle 30 l’opération de détermination du rapport cyclique du signal pilote de charge, et par un rectangle 31 les mesures de tension réalisées dans la séquence d’acquisition pour chaque impulsion du signal.FIG. 5 schematizes by a rectangle 30 the operation of determining the duty cycle of the charge pilot signal, and by a rectangle 31 the voltage measurements carried out in the acquisition sequence for each pulse of the signal.

Les deux éléments 30, 31 se rejoignent pour une opération 32 de sélection de la mesure de tension 17, 18, 19, 20 qui est choisie comme tension de référence pour une impulsion. L’opération de sélection 32 est reliée à la stratégie générale du module superviseur (schématisée par le rectangle 33) qui prendra en compte les informations communiquées par la borne de recharge 2, par l’intermédiaire du signal pilote de charge.The two elements 30, 31 come together for an operation 32 of selecting the voltage measurement 17, 18, 19, 20 which is chosen as the reference voltage for a pulse. The selection operation 32 is linked to the general strategy of the supervisor module (schematized by the rectangle 33) which will take into account the information communicated by the charging station 2, via the charging pilot signal.

L’étape de sélection 32 peut être réalisée de diverses manières.The selection step 32 can be carried out in various ways.

Par exemple, l’étape de sélection 32 peut être réalisée en analysant et comparant les mesures de tension 17, 18, 19, 20. Si le niveau de tension possible pour une impulsion correspond à une valeur qui est choisie parmi une pluralité de valeurs prédéfinie, toutes les mesures de tension nulles ou ne correspondant pas à ces valeurs prédéfinies peuvent être écartées. Seules les mesures de tension donnant une tension correspondant à un niveau de tension possible, parmi les choix dont disposait la borne de recharge, sont prises en compte. Parmi ces mesures de tension prises en compte, la plus tardive est choisie comme tension de référence pour l’impulsion considérée.For example, the selection step 32 can be performed by analyzing and comparing the voltage measurements 17, 18, 19, 20. If the possible voltage level for a pulse corresponds to a value which is chosen from among a plurality of predefined values , all voltage measurements that are zero or do not correspond to these predefined values can be discarded. Only the voltage measurements giving a voltage corresponding to a possible voltage level, among the choices available to the charging station, are taken into account. Among these voltage measurements taken into account, the latest is chosen as the reference voltage for the considered pulse.

Selon un autre mode de réalisation, le choix de la mesure de tension 17, 18, 19, 20 à prendre en compte est réalisé en fonction du rapport cyclique de l’impulsion considérée. À cette étape du procédé, ce rapport cyclique est connu du microcontrôleur grâce à l’étape 30. Le choix de la mesure de tension est réalisé à partir d’une table d’index recensant quelle est la mesure de tension à prendre en compte en fonction du rapport cyclique, la mesure de tension étant identifiée par sa position au sein de la séquence d’acquisition (première mesure 17, deuxième mesure 18, troisième mesure 19, quatrième mesure 20, dans le présent exemple).According to another embodiment, the choice of the voltage measurement 17, 18, 19, 20 to be taken into account is made according to the duty cycle of the pulse considered. At this step of the method, this duty cycle is known to the microcontroller thanks to step 30. The choice of the voltage measurement is made from an index table listing which voltage measurement to take into account in function of the duty cycle, the voltage measurement being identified by its position within the acquisition sequence (first measurement 17, second measurement 18, third measurement 19, fourth measurement 20, in the present example).

Le comportement d’une impulsion 9 est similaire pour le même rapport cyclique, en ce qui concerne l’établissement de la plage constante 15. Autrement dit, deux impulsions ayant le même rapport cyclique présenteront toutes deux une valeur constante après une même durée qui dépend de ce rapport cyclique. La table d’index indique donc, pour chaque rapport cyclique, ou pour chaque plage de rapport cyclique, la mesure de tension qui aura notamment pour caractéristique de se trouver sur la plage constante 15 de l’impulsion. La table d’index peut être élaborée lors de la programmation du microcontrôleur et mise en mémoire.The behavior of a 9 pulse is similar for the same duty cycle, with respect to the establishment of the constant range 15. In other words, two pulses with the same duty cycle will both present a constant value after the same duration which depends of this duty cycle. The index table therefore indicates, for each duty cycle, or for each range of duty cycle, the voltage measurement which will notably have the characteristic of being on the constant range 15 of the pulse. The index table can be elaborated during the programming of the microcontroller and stored in memory.

Dans le présent exemple, la première mesure de tension est réalisée après un délai (qui est le délai calibré 16) de 22,5 µs après le front montant 10, la deuxième mesure de tension 18 intervient à un délai de 52,5 µs après le front montant 10, la troisième mesure de tension 19 intervient après un délai de 82,5 µs après le front montant 10, et la quatrième mesure de tension 20 intervient après un délai de 112,5 µs après le front montant 10. La table d’index peut être, dans cet exemple :
- rapport cyclique inférieur à 6 %: la première mesure de tension 17 est choisie comme tension de référence pour l’impulsion ;
- rapport cyclique compris entre 6 % et 9 %: la deuxième mesure de tension 18 est choisie comme tension de référence pour l’impulsion ;
- rapport cyclique est compris entre 9 % et 12 %: la troisième mesure de tension 19 est choisie comme tension de référence pour l’impulsion ;
- rapport cyclique est supérieur à 12 %, la quatrième mesure de tension 20 est choisie comme tension de référence pour l’impulsion.
In the present example, the first voltage measurement is performed after a delay (which is the calibrated delay 16) of 22.5 µs after the rising edge 10, the second voltage measurement 18 occurs at a delay of 52.5 µs after the rising edge 10, the third voltage measurement 19 occurs after a delay of 82.5 µs after the rising edge 10, and the fourth voltage measurement 20 occurs after a delay of 112.5 µs after the rising edge 10. The table index can be, in this example:
- duty cycle less than 6%: the first voltage measurement 17 is chosen as the reference voltage for the pulse;
- duty cycle between 6% and 9%: the second voltage measurement 18 is chosen as reference voltage for the pulse;
- duty cycle is between 9% and 12%: the third voltage measurement 19 is chosen as reference voltage for the pulse;
- duty cycle is greater than 12%, the fourth voltage measurement 20 is chosen as the reference voltage for the pulse.

Des variantes de réalisation du procédé d’acquisition du signal pilote de charge peuvent être mise en œuvre sans sortir du cadre de l’invention. Notamment, le nombre de mesures de tension de la séquence d’acquisition, le délai calibré, et la durée d’intervalle peuvent être modifiés pour s’adapter à tout autre signal pilote de charge, avec sa fréquence et sa plage de rapport cyclique, ainsi qu’au comportement de son pic de tension, ou de toute autre perturbation de début d’impulsion.Alternative embodiments of the method for acquiring the charge pilot signal can be implemented without departing from the scope of the invention. In particular, the number of acquisition sequence voltage measurements, the calibrated delay, and the interval duration can be modified to adapt to any other load pilot signal, with its frequency and its duty cycle range, as well as the behavior of its voltage spike, or any other pulse onset disturbance.

Claims (11)

Procédé d’acquisition d’un signal pilote de charge par un véhicule électrique rechargeable, ce signal étant émis par une borne de recharge électrique, ce signal étant un signal à modulation de largeur d’impulsion présentant un rapport cyclique variable entre une valeur minimale et une valeur maximale constituant une première information, et présentant un niveau de tension variable constituant une deuxième information, ce procédé étant caractérisé en ce qu’il comporte les étapes suivantes, pour chaque impulsion (9) du signal pilote de charge :
- détecter un front montant (10) du signal pilote de charge correspondant au début de l’impulsion (9) ;
- au terme d’un délai calibré (16) dont le point de départ est le front montant (10), réaliser une séquence d’acquisition comportant au moins deux mesures (17,18,19,20) de la tension du signal pilote de charge, l’intervalle de temps entre deux de ces mesures (17,18,19,20) étant égale à une durée d’intervalle prédéterminée (21) ;
- détecter un front descendant (11) du signal pilote de charge correspondant à la fin de l’impulsion (9) ;
- déterminer le rapport cyclique de l’impulsion (9) ;
- sélectionner une tension de référence pour l’impulsion (9), parmi les mesures de tension (17,18,19,20) de la séquence d’acquisition.
Method for acquiring a charging pilot signal by a rechargeable electric vehicle, this signal being emitted by an electric charging station, this signal being a pulse-width modulated signal having a variable duty cycle between a minimum value and a maximum value constituting first information, and having a variable voltage level constituting second information, this method being characterized in that it comprises the following steps, for each pulse (9) of the charge pilot signal:
- detecting a rising edge (10) of the charge pilot signal corresponding to the start of the pulse (9);
- at the end of a calibrated delay (16) whose starting point is the rising edge (10), carry out an acquisition sequence comprising at least two measurements (17,18,19,20) of the voltage of the pilot signal load, the time interval between two of these measurements (17,18,19,20) being equal to a predetermined interval duration (21);
- detecting a falling edge (11) of the charge pilot signal corresponding to the end of the pulse (9);
- determining the duty cycle of the pulse (9);
- select a reference voltage for the pulse (9), among the voltage measurements (17,18,19,20) of the acquisition sequence.
Procédé selon la revendication 1, caractérisé en ce que le délai calibré (16) est inférieur à la durée d’impulsion qui correspond à ladite valeur minimale du rapport cyclique, la durée d’impulsion étant définie comme la durée s’écoulant entre le front montant (10) et le front descendant (11) de l’impulsion (9).Method according to Claim 1, characterized in that the calibrated delay (16) is less than the duration of the pulse which corresponds to the said minimum value of the duty cycle, the duration of the pulse being defined as the duration passing between the edge rising (10) and the falling edge (11) of the pulse (9). Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que le délai calibré (16) est inférieur à la durée d’impulsion qui correspond à ladite valeur minimale du rapport cyclique, diminuée du temps (22) nécessaire à la réalisation d’une mesure de tension.Method according to any one of the preceding claims, characterized in that the calibrated delay (16) is less than the duration of the pulse which corresponds to the said minimum value of the duty cycle, reduced by the time (22) necessary for carrying out a voltage measurement. Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que le délai calibré (16) est égal à la durée de l’impulsion du signal pilote de charge qui correspond à ladite valeur minimale du rapport cyclique, diminuée de 5 à 10 µs.Method according to any one of the preceding claims, characterized in that the calibrated delay (16) is equal to the duration of the pulse of the charge pilot signal which corresponds to the said minimum value of the duty cycle, reduced by 5 to 10 µs . Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce qu’il comporte une étape d’initialiser un déclencheur matériel (28) au moment du front montant (10), ce déclencheur matériel (28) déclenchant la séquence d’acquisition une fois le délai calibré (16) écoulé.Method according to any one of the preceding claims, characterized in that it includes a step of initializing a hardware trigger (28) at the time of the rising edge (10), this hardware trigger (28) triggering the acquisition sequence once once the calibrated delay (16) has elapsed. Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que la tension du signal pilote de charge est variable parmi une pluralité de niveaux de tension prédéfinis, et en ce que l’étape de sélectionner une tension de référence pour l’impulsion est réalisée par comparaison entre les valeurs des mesures de tension (17,18,19,20) de la séquence d’acquisition et lesdits niveaux de tension prédéfinis, la tension de référence choisie étant la valeur de tension qui est égale à un niveau de tension prédéfini.Method according to any one of the preceding claims, characterized in that the voltage of the charge pilot signal is variable among a plurality of predefined voltage levels, and in that the step of selecting a reference voltage for the pulse is carried out by comparison between the values of the voltage measurements (17,18,19,20) of the acquisition sequence and said predefined voltage levels, the chosen reference voltage being the voltage value which is equal to a voltage level preset. Procédé selon la revendication 6, caractérisé en ce que, si deux valeurs de tension sont égales à un niveau de tension prédéfini, la tension de référence choisie est la valeur de tension la plus proche du front descendant (11) de l’impulsion (9).Method according to Claim 6, characterized in that, if two voltage values are equal to a predefined voltage level, the reference voltage chosen is the voltage value closest to the falling edge (11) of the pulse (9 ). Procédé selon l'une quelconque des revendications 1 à 5, caractérisé en ce que l’étape de sélectionner une tension de référence pour l’impulsion est réalisée à partir d’une table d’index indiquant, en fonction du rapport cyclique de l’impulsion, la mesure de tension à choisir dans la séquence d’acquisition.Method according to any one of Claims 1 to 5, characterized in that the step of selecting a reference voltage for the pulse is carried out from an index table indicating, as a function of the duty cycle of the pulse, the voltage measurement to be chosen in the acquisition sequence. Procédé selon la revendication 8, caractérisé en ce que la table d’index indique, pour chaque rapport cyclique, la mesure de tension qui, au sein d’une séquence d’acquisition, est située le plus tard avant le front descendant.Method according to Claim 8, characterized in that the index table indicates, for each duty cycle, the voltage measurement which, within an acquisition sequence, is located the latest before the falling edge. Procédé selon l'une quelconque des revendications précédentes, caractérisé en ce que la séquence d’acquisition comporte de trois à dix mesures de la tension du signal pilote de charge, et de préférence quatre mesures de la tension du signal pilote de charge.Method according to any one of the preceding claims, characterized in that the acquisition sequence comprises three to ten measurements of the voltage of the charge pilot signal, and preferably four measurements of the voltage of the charge pilot signal. Unité de contrôle électronique, caractérisée en ce qu’elle comprend des moyens pour mettre en œuvre toutes les étapes d’un procédé selon l’une quelconque des revendications 1 à 10.Electronic control unit, characterized in that it comprises means for implementing all the steps of a method according to any one of Claims 1 to 10.
FR1907595A 2019-07-08 2019-07-08 Method of acquiring a pilot charge signal by an electric vehicle Active FR3098456B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR1907595A FR3098456B1 (en) 2019-07-08 2019-07-08 Method of acquiring a pilot charge signal by an electric vehicle
PCT/EP2020/068622 WO2021004871A1 (en) 2019-07-08 2020-07-02 Method for the acquisition of a charging pilot signal by an electric vehicle

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1907595 2019-07-08
FR1907595A FR3098456B1 (en) 2019-07-08 2019-07-08 Method of acquiring a pilot charge signal by an electric vehicle

Publications (2)

Publication Number Publication Date
FR3098456A1 true FR3098456A1 (en) 2021-01-15
FR3098456B1 FR3098456B1 (en) 2021-12-17

Family

ID=68654637

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1907595A Active FR3098456B1 (en) 2019-07-08 2019-07-08 Method of acquiring a pilot charge signal by an electric vehicle

Country Status (2)

Country Link
FR (1) FR3098456B1 (en)
WO (1) WO2021004871A1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011106903A1 (en) * 2010-12-16 2012-06-21 Volkswagen Aktiengesellschaft Device for enabling communication between e.g. electric car and loading station to generate guide function, has control unit to generate and abut two pulse width modulation signals at voltage outputs with respect to output resistance
WO2018224553A1 (en) * 2017-06-07 2018-12-13 Siemens Aktiengesellschaft Charge controller and charging system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102011106903A1 (en) * 2010-12-16 2012-06-21 Volkswagen Aktiengesellschaft Device for enabling communication between e.g. electric car and loading station to generate guide function, has control unit to generate and abut two pulse width modulation signals at voltage outputs with respect to output resistance
WO2018224553A1 (en) * 2017-06-07 2018-12-13 Siemens Aktiengesellschaft Charge controller and charging system

Also Published As

Publication number Publication date
FR3098456B1 (en) 2021-12-17
WO2021004871A1 (en) 2021-01-14

Similar Documents

Publication Publication Date Title
EP2087574B1 (en) Method for managing charging of a rechargeable battery
EP2410346B1 (en) Method of determining a parameter of at least one accumulator of a battery
EP2721684B1 (en) System of batteries of cells with simplified monitoring
FR3018608A1 (en) METHOD OF ESTIMATING THE HEALTH STATUS OF A BATTERY CELL
EP2122379A1 (en) Method for determining the discharge end threshold of a rechargeable battery
EP2797157A1 (en) Power battery system for determining the impedance of a module
EP3079940A1 (en) Assessing the quantity of energy in a motor vehicle battery
EP2001074B1 (en) System and method to determine the loss in capacity and energy of a battery determining the output capacity of a battery
FR3041765A1 (en) METHOD FOR ESTIMATING A HEALTH STATUS INDICATOR OF A LITHIUM BATTERY AND ASSOCIATED ESTIMATION DEVICE
EP3324197B1 (en) Method for determining the state of health of a battery cell
FR3098456A1 (en) Method of acquiring a pilot charge signal by an electric vehicle
EP3899561B1 (en) State of health of a battery
FR2944358A1 (en) Battery's e.g. lithium-ion battery, health state estimating device for electrical traction of e.g. hybrid vehicle, has samplers to calculate difference between symptomatic and effective parameters, and comparator to indicate health state
FR2946150A1 (en) SYSTEM AND METHOD FOR DETERMINING CAPACITY LOSS OF A BATTERY.
FR2979764A1 (en) METHOD AND DEVICE FOR OPTIMIZED RECHARGING OF ELECTRIC BATTERY
EP2924454A1 (en) Method for estimating and resetting of the state of charge of a battery cell
EP3028055A1 (en) Energy management in a battery
FR3035550A1 (en) METHOD FOR ELECTRICALLY CHARGING A BATTERY WITH AN INTERMITTENT ENERGY SOURCE AND CORRESPONDING CHARGE CONTROL DEVICE
EP4101047B1 (en) Method of pulse charging with variable amplitude step
FR3140221A1 (en) CHARGING CONTROL SYSTEM FOR A MOTOR VEHICLE TRACTION BATTERY, VEHICLE AND METHOD BASED ON SUCH A SYSTEM
FR2952187A1 (en) Method for detecting power imbalance between elements or cells of battery of e.g. hybrid vehicle, involves calculating average dispersion of voltage of cells of battery and comparing average dispersion with predetermined imbalance threshold
FR3045217A1 (en) CHARACTERIZATION OF AN ELECTROCHEMICAL BATTERY CELL IN AGING
FR3130039A1 (en) ESTIMATING CELLULAR BATTERY INFORMATION
FR3045218A1 (en) DETERMINATION OF PARAMETERS OF A DYNAMIC MODEL FOR AN ELECTROCHEMICAL BATTERY CELL
EP3936878A1 (en) Method for determining an ageing function of an accumulator

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20210115

PLFP Fee payment

Year of fee payment: 3

TP Transmission of property

Owner name: VITESCO TECHNOLOGIES, DE

Effective date: 20210629

CA Change of address

Effective date: 20220103

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5