FR3092379A1 - Tube assembly process in a nuclear power plant - Google Patents

Tube assembly process in a nuclear power plant Download PDF

Info

Publication number
FR3092379A1
FR3092379A1 FR1900947A FR1900947A FR3092379A1 FR 3092379 A1 FR3092379 A1 FR 3092379A1 FR 1900947 A FR1900947 A FR 1900947A FR 1900947 A FR1900947 A FR 1900947A FR 3092379 A1 FR3092379 A1 FR 3092379A1
Authority
FR
France
Prior art keywords
tube
longitudinal
fixing
tubes
longitudinal end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1900947A
Other languages
French (fr)
Other versions
FR3092379B1 (en
Inventor
Laurence VALETTE
Gérald LINDINGRE
Benjamin SENEQUIER CROZET
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Areva NP SAS
Original Assignee
Framatome SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Framatome SA filed Critical Framatome SA
Priority to FR1900947A priority Critical patent/FR3092379B1/en
Priority to PCT/EP2020/052146 priority patent/WO2020157120A1/en
Publication of FR3092379A1 publication Critical patent/FR3092379A1/en
Application granted granted Critical
Publication of FR3092379B1 publication Critical patent/FR3092379B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L13/00Non-disconnectible pipe-joints, e.g. soldered, adhesive or caulked joints
    • F16L13/14Non-disconnectible pipe-joints, e.g. soldered, adhesive or caulked joints made by plastically deforming the material of the pipe, e.g. by flanging, rolling
    • F16L13/146Non-disconnectible pipe-joints, e.g. soldered, adhesive or caulked joints made by plastically deforming the material of the pipe, e.g. by flanging, rolling by an axially moveable sleeve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L2201/00Special arrangements for pipe couplings
    • F16L2201/10Indicators for correct coupling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L2201/00Special arrangements for pipe couplings
    • F16L2201/40Special arrangements for pipe couplings for special environments
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/1608Devices for covering leaks in pipes or hoses, e.g. hose-menders by replacement of the damaged part of the pipe
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Automatic Assembly (AREA)

Abstract

Procédé de montage de tubes dans une centrale nucléaire Le procédé comprend les étapes suivantes :- obtention d’un raccord (1) comprenant un corps tubulaire (3) définissant intérieurement un passage (5) longitudinal de circulation de fluide et présentant des première et seconde extrémités (7, 9) longitudinales, et des fixations permanentes (11, 13) prévues pour fixer de manière non démontable les première et secondes extrémités longitudinales (7, 9) aux tubes ;- fixation d’un premier tube (15, 51, 63) à la première extrémité longitudinale (7);- fixation d’un second tube (17, 53, 57) à la seconde extrémité longitudinale (9), le premier tube (15, 51, 63) étant en communication fluidique avec le second tube (17, 53, 57) à travers le passage longitudinal (5) du corps tubulaire (3) du raccord (1). Figure pour l'abrégé : figure 6Method for mounting tubes in a nuclear power station The method comprises the following steps: - obtaining a fitting (1) comprising a tubular body (3) internally defining a longitudinal passage (5) for the circulation of fluid and having first and second longitudinal ends (7, 9), and permanent fixings (11, 13) provided to fix in a non-removable manner the first and second longitudinal ends (7, 9) to the tubes; - fixing of a first tube (15, 51, 63) at the first longitudinal end (7); - fixing of a second tube (17, 53, 57) at the second longitudinal end (9), the first tube (15, 51, 63) being in fluid communication with the second tube (17, 53, 57) through the longitudinal passage (5) of the tubular body (3) of the connector (1). Figure for abstract: figure 6

Description

Procédé de montage de tubes dans une centrale nucléaireMethod of mounting tubes in a nuclear power plant

L’invention concerne en général le montage de tubes dans une centrale nucléaire.The invention generally relates to the assembly of tubes in a nuclear power station.

Les tubes, dans une centrale nucléaire, sont généralement raccordés les uns aux autres par des soudures. Une telle méthode de raccordement présente de nombreux inconvénients.The tubes in a nuclear power plant are generally connected to each other by welds. Such a connection method has many drawbacks.

Les entreprises intervenant pour réaliser de telles opérations doivent être qualifiées pour intervenir dans des installations nucléaires.The companies intervening to carry out such operations must be qualified to intervene in nuclear installations.

Les soudeurs doivent posséder des diplômes professionnels, qui sont renouvelés périodiquement. Les modes opératoires de soudage doivent également être qualifiés, de telle sorte que les opérations de soudage sont onéreuses.Welders must possess professional diplomas, which are periodically renewed. The welding procedures must also be qualified, so that the welding operations are expensive.

Il est difficile dans certains cas de trouver suffisamment de soudeurs qualifiés pour réaliser les opérations dans le délai requis.It is difficult in some cases to find enough qualified welders to carry out the operations within the required time.

Les soudages sont typiquement réalisés à l’aide de machines orbitales TIG, dont la maintenance est coûteuse.Welding is typically carried out using orbital TIG machines, which are expensive to maintain.

Le temps nécessaire pour réaliser une soudure, et les contrôles destructifs et non destructifs permettant de garantir la qualité de cette soudure, est important.The time required to make a weld, and the destructive and non-destructive testing to guarantee the quality of this weld, is important.

L’outillage de soudure est encombrant, et dans certains cas l’accessibilité à la zone où doit être effectuée la soudure ne peut pas être garantie.Welding tools are bulky, and in some cases accessibility to the area where the welding is to be carried out cannot be guaranteed.

Les contrôles gammamétriques, effectuées par des tirs radio, sont longs, et sont généralement sur le chemin critique des opérations de maintenance.Gammametric checks, carried out by radio shots, are long, and are generally on the critical path of maintenance operations.

Quand l’opération de soudure est effectuée en milieu ionisant, sur des installations déjà en service, le temps nécessaire pour effectuer l’opération de soudure et les contrôles impacte la dose intégrée par le personnel d’intervention.When the welding operation is carried out in an ionizing environment, on installations already in service, the time required to carry out the welding operation and the checks impacts the dose integrated by the intervention personnel.

Dans ce contexte, l’invention vise à proposer un procédé de montage de tubes dans une centrale nucléaire qui ne présente pas les défauts ci-dessus.In this context, the invention aims to provide a method for mounting tubes in a nuclear power plant which does not have the above defects.

A cette fin, l’invention porte sur un procédé de montage de tubes dans une centrale nucléaire, le procédé comprenant les étapes suivantes :To this end, the invention relates to a method for mounting tubes in a nuclear power plant, the method comprising the following steps:

- obtention d’un raccord comprenant un corps tubulaire définissant intérieurement un passage longitudinal de circulation de fluide et présentant des première et seconde extrémités longitudinales, et des fixations permanentes prévues pour fixer de manière non démontable les première et secondes extrémités longitudinales aux tubes ;
- fixation d’un premier tube à la première extrémité longitudinale de manière non démontable avec l’une des fixations permanentes;
- fixation d’un second tube à la seconde extrémité longitudinale de manière non démontable avec l’autre fixation permanente, le premier tube étant en communication fluidique avec le second tube à travers le passage longitudinal du corps tubulaire du raccord.
- Obtaining a connector comprising a tubular body internally defining a longitudinal fluid circulation passage and having first and second longitudinal ends, and permanent fasteners provided for fixing the first and second longitudinal ends to the tubes in a non-removable manner;
- Fixing a first tube to the first longitudinal end in a non-removable manner with one of the permanent fixings;
- Attachment of a second tube to the second longitudinal end in a non-removable manner with the other permanent attachment, the first tube being in fluid communication with the second tube through the longitudinal passage of the tubular body of the fitting.

L’utilisation de raccords avec des fixations permanentes aux tubes permet d’accélérer considérablement le montage des tubes. Le fait que les fixations soient permanentes permet de garantir un haut niveau de qualité dans les fixations. Ce niveau de qualité est très supérieur à celui obtenu avec des raccords démontables.The use of fittings with permanent attachments to the tubes allows the assembly of the tubes to be considerably speeded up. The fact that the fixings are permanent ensures a high level of quality in the fixings. This level of quality is much higher than that obtained with removable fittings.

Le raccord peut être mis en place avec un outil peu encombrant.The fitting can be put in place with a space-saving tool.

Le procédé de montage peut également présenter une ou plusieurs des caractéristiques ci-dessous, considérées individuellement ou selon toutes les combinaisons techniquement possibles :The assembly process may also have one or more of the characteristics below, considered individually or in all technically possible combinations:

- les étapes de fixation des premier et/ou second tubes aux première et/ou seconde extrémités longitudinales du corps sont effectuées à froid ;- the steps of fixing the first and/or second tubes to the first and/or second longitudinal ends of the body are carried out cold;

- les fixations permanentes fixent les première et/ou seconde extrémités longitudinales du corps aux premier et/ou second tubes par sertissage ;- The permanent fasteners secure the first and/or second longitudinal ends of the body to the first and/or second tubes by crimping;

- les première et secondes extrémités longitudinales sont configurées pour recevoir intérieurement, avant sertissage, les premier et second tubes, les fixations permanentes comprenant des bagues montées autour des première et secondes extrémités longitudinales, l’étape de fixation du premier ou second tube à la première ou seconde extrémité longitudinale comprenant les sous-étapes suivantes :
- engagement du premier ou second tube dans la première ou seconde extrémité longitudinale ;
- déplacement de la bague longitudinalement le long de la première ou seconde extrémité longitudinale vers une partie centrale du corps située longitudinalement entre les première et seconde extrémités, ce déplacement provoquant le sertissage du premier ou second tube à la première ou seconde extrémité longitudinale;
- the first and second longitudinal ends are configured to receive internally, before crimping, the first and second tubes, the permanent fixings comprising rings mounted around the first and second longitudinal ends, the step of fixing the first or second tube to the first or second longitudinal end comprising the following sub-steps:
- Engagement of the first or second tube in the first or second longitudinal end;
- Displacement of the ring longitudinally along the first or second longitudinal end towards a central part of the body located longitudinally between the first and second ends, this displacement causing the crimping of the first or second tube at the first or second longitudinal end;

- à la sous-étape de déplacement, la bague est déplacée longitudinalement jusqu’à une butée, l’étape de fixation du premier ou second tube à la première ou seconde extrémité longitudinale comprenant une sous-étape de contrôle dimensionnel de déplacement au cours de laquelle l’écartement longitudinal entre la bague et la butée est contrôlé avec une cale d’épaisseur inférieure à 5/100 mm ;- in the displacement sub-step, the ring is moved longitudinally to a stop, the step of fixing the first or second tube to the first or second longitudinal end comprising a sub-step of dimensional control of displacement during which the longitudinal spacing between the ring and the stop is checked with a shim of thickness less than 5/100 mm;

- à la sous-étape d’engagement, le premier ou second tube est engagé dans la première ou seconde extrémité longitudinale longitudinalement jusqu’à une butée interne et après déplacement de la bague, l’étape de fixation du premier ou second tube à la première ou seconde extrémité longitudinale comprenant une sous-étape de contrôle dimensionnel d’engagement comportant les opérations suivantes :
- avant engagement du premier ou second tube dans la première ou seconde extrémité longitudinale, création d’un repère visuel sur premier ou second tube
- après engagement du premier ou second tube dans la première ou seconde extrémité longitudinale jusqu’à la butée interne, mesure de l’écartement longitudinal entre la bague et le repère visuel;
- in the engagement sub-step, the first or second tube is engaged in the first or second longitudinal end longitudinally up to an internal stop and after displacement of the ring, the step of fixing the first or second tube to the first or second longitudinal end comprising a dimensional engagement control sub-step comprising the following operations:
- before engagement of the first or second tube in the first or second longitudinal end, creation of a visual cue on the first or second tube
- After engagement of the first or second tube in the first or second longitudinal end to the internal stop, measurement of the longitudinal distance between the ring and the visual marker;

- le procédé comprend une étape de fixation d’un premier tube à une structure d’un réacteur nucléaire, le second tube étant déjà fixé à la structure du réacteur nucléaire au moment de l’étape de fixation du premier tube à la structure du réacteur nucléaire, le procédé comportant une étape de déformation élastique du second tube au cours de laquelle une extrémité libre du second tube est écartée d’un emplacement prévu pour le raccord après montage, effectuée avant l’étape de fixation du second tube à la seconde extrémité du corps du raccord;- the method comprises a step of fixing a first tube to a structure of a nuclear reactor, the second tube being already fixed to the structure of the nuclear reactor at the time of the step of fixing the first tube to the structure of the reactor nuclear, the method comprising a step of elastic deformation of the second tube during which a free end of the second tube is moved away from a location provided for the connection after assembly, carried out before the step of fixing the second tube to the second end fitting body;

- le procédé comprend une étape de fixation d’un premier tube à une structure d’un réacteur nucléaire, le second tube étant déjà fixé à la structure du réacteur nucléaire au moment de l’étape de fixation du premier tube à la structure du réacteur nucléaire, le procédé comportant une étape de déplacement du second tube au cours de laquelle une extrémité libre du second tube est écartée d’un emplacement prévu pour le raccord après montage, effectuée avant l’étape de fixation du second tube à la seconde extrémité du corps du raccord;- the method comprises a step of fixing a first tube to a structure of a nuclear reactor, the second tube being already fixed to the structure of the nuclear reactor at the time of the step of fixing the first tube to the structure of the reactor nuclear, the method comprising a step of moving the second tube during which a free end of the second tube is moved away from a location provided for the connector after assembly, carried out before the step of fixing the second tube to the second end of the fitting body;

- l’étape de déplacement du second tube comprend les sous-étapes suivantes :- the step of moving the second tube includes the following sub-steps:

- démontage d’un accessoire auquel le second tube est raccordé à l’opposé du premier tube ;
- déplacement du second tube dans le sens d’un écartement de l’extrémité libre par rapport audit emplacement prévu pour le raccord une fois monté.
- disassembly of an accessory to which the second tube is connected opposite the first tube;
- Displacement of the second tube in the direction of a spacing of the free end relative to said location provided for the connection once mounted.

D’autres caractéristiques et avantages de l’invention ressortiront de la description détaillée qui en est donnée ci-dessous, à titre indicatif et nullement limitatif, en référence aux figures annexées, parmi lesquelles :Other characteristics and advantages of the invention will emerge from the detailed description given below, by way of indication and in no way limiting, with reference to the appended figures, among which:

[Fig 2] les figures 1 et 2 montrent la constitution du raccord utilisé dans le procédé de l’invention, respectivement avant fixation des tubes et après fixation des tubes ; [Fig 2] Figures 1 and 2 show the construction of the connector used in the method of the invention, respectively before fixing the tubes and after fixing the tubes;

[Fig 4] les figures 3 et 4 illustrent des contrôles dimensionnels qui sont effectués dans l’invention pour garantir la qualité du raccordement des tubes; [Fig 4] Figures 3 and 4 illustrate dimensional checks which are carried out in the invention to guarantee the quality of the connection of the tubes;

[Fig 6] [Fig 7] les figures 5 à 7 montrent différentes étapes du procédé de montage de l’invention, dans un cas où le procédé est appliqué au remplacement d’une soudure d’un conduit déjà existant ; [Fig 6] [Fig 7] Figures 5 to 7 show different stages of the assembly method of the invention, in a case where the method is applied to the replacement of a weld of an already existing conduit;

[Fig 9] [Fig 10] les figures 8 à 10 illustrent différentes étapes du procédé de l’invention, dans le cas du montage d’un tronçon de tuyauterie entre deux points fixes, pour une première variante de réalisation de l’invention ; [Fig 9] [Fig 10] Figures 8 to 10 illustrate different steps of the method of the invention, in the case of mounting a pipe section between two fixed points, for a first embodiment of the invention;

[Fig 12] [Fig 13] [Fig 14] les figures 11 à 14 illustrent, comme les figures 8 à 10, différentes étapes du procédé de l’invention, appliqué au montage d’un tronçon de tuyauterie entre deux points fixes, pour une autre variante de réalisation de l’invention. [Fig 12] [Fig 13] [Fig 14] Figures 11 to 14 illustrate, like Figures 8 to 10, different steps of the method of the invention, applied to the assembly of a pipe section between two fixed points, for another alternative embodiment of the invention.

Le procédé de l’invention porte sur le montage de tubes dans une centrale nucléaire.The method of the invention relates to the assembly of tubes in a nuclear power station.

Ces tubes sont typiquement de section modérée. Ils présentent généralement un diamètre extérieur compris entre 6 et 25 mm pour les tubes métriques, et entre ¼ de pouce et un pouce pour les tubes impériaux.These tubes are typically of moderate section. They generally have an outside diameter between 6 and 25 mm for metric tubes, and between ¼ inch and one inch for imperial tubes.

Ces tubes sont des tubes métalliques, typiquement en acier.These tubes are metal tubes, typically steel.

Ces tubes font partie de toutes sortes de circuits. Ils sont prévus pour la circulation de liquide ou de gaz, de fluides radioactifs ou non radioactifs.These tubes are part of all kinds of circuits. They are designed for the circulation of liquid or gas, radioactive or non-radioactive fluids.

Ils sont intégrés par exemple dans des circuits de fourniture d’utilité, dans des circuits d’échantillonnage, dans des circuits de mesure, ou dans tout autre type de circuit.They are integrated for example in utility supply circuits, in sampling circuits, in measurement circuits, or in any other type of circuit.

Le procédé est appliqué à des circuits déjà existants, lors d’opérations de maintenance. Dans ce cas, il vise par exemple à remplacer une soudure défectueuse par un raccord. Les tubes raccordés par le raccord sont les tubes d’origine, et ne sont pas remplacés.The process is applied to already existing circuits, during maintenance operations. In this case, it aims for example to replace a defective weld with a fitting. The tubes connected by the connector are the original tubes, and are not replaced.

En variante, le procédé vise à remplacer une portion de la tuyauterie existante. Les tubes d’origine sont retirés, et sont remplacés par des tubes neufs, qui sont raccordés les uns aux autres par les raccords qui seront décrits plus bas.Alternatively, the method aims to replace a portion of the existing piping. The original tubes are removed, and are replaced by new tubes, which are connected to each other by the fittings which will be described below.

Le procédé de l’invention vise également le montage de tubes neufs, lors de la création de la tuyauterie en travaux neufs.The process of the invention is also aimed at the assembly of new tubes, during the creation of the piping in new works.

Dans tous les cas, le procédé de montage de tubes de l’invention comprend les étapes suivantes :In all cases, the method for mounting tubes of the invention comprises the following steps:

- obtention d’un raccord 1 comprenant un corps tubulaire 3 définissant intérieurement un passage longitudinal 5 de circulation de fluide et présentant des première et seconde extrémités longitudinales 7, 9, et des fixations permanentes 11, 13 prévues pour fixer de manière non démontable les première et seconde extrémités longitudinales 7, 9 aux tubes (figure 1) ;- Obtaining a connector 1 comprising a tubular body 3 internally defining a longitudinal passage 5 for the circulation of fluid and having first and second longitudinal ends 7, 9, and permanent fasteners 11, 13 provided for non-removably fastening the first and second longitudinal ends 7, 9 to the tubes (Figure 1);

- fixation d’un premier tube 15 à la première extrémité longitudinale 7 de manière non démontable avec l’une des fixations permanentes 11, 13 (figure 2) ;- Fixing a first tube 15 to the first longitudinal end 7 in a non-removable manner with one of the permanent fasteners 11, 13 (Figure 2);

- fixation d’un second tube 17 à la seconde extrémité longitudinale 9, de manière non démontable, avec l’autre fixation permanente 11, 13, le premier tube 15 étant alors en communication fluidique avec le second tube 17 à travers le passage longitudinal 5 du corps tubulaire 3 du raccord 1 (figure 2).- attachment of a second tube 17 to the second longitudinal end 9, in a non-removable manner, with the other permanent attachment 11, 13, the first tube 15 then being in fluid communication with the second tube 17 through the longitudinal passage 5 of the tubular body 3 of the fitting 1 (FIG. 2).

Avantageusement, les étapes de fixation des premier et/ou second tubes 15, 17 aux premières et/ou secondes extrémités 7, 9 longitudinales du corps 3 sont effectuées à froid.Advantageously, the steps of fixing the first and/or second tubes 15, 17 to the first and/or second longitudinal ends 7, 9 of the body 3 are carried out cold.

En d’autres termes, aucun procédé thermique n’est utilisé pour raccorder les première et seconde extrémités longitudinales aux premier et second tubes. La fixation est exclusivement mécanique.In other words, no thermal process is used to connect the first and second longitudinal ends to the first and second tubes. The fixing is exclusively mechanical.

De préférence, les fixations permanentes 11, 13 fixent les première et/ou seconde extrémités longitudinales 7, 9 du corps 3 aux premier et/ou second tubes 15, 17 par sertissage.Preferably, the permanent fixings 11, 13 fix the first and/or second longitudinal ends 7, 9 of the body 3 to the first and/or second tubes 15, 17 by crimping.

Le sertissage est une opération mécanique consistant à fixer deux pièces l’une à l’autre par déformation desdites pièces.Crimping is a mechanical operation consisting of fixing two parts to each other by deforming said parts.

Comme illustré sur les figures 1 et 2, les première et seconde extrémités longitudinales 7, 9 sont configurées pour recevoir intérieurement, avant sertissage, les premier et second tubes 15, 17.As illustrated in Figures 1 and 2, the first and second longitudinal ends 7, 9 are configured to receive internally, before crimping, the first and second tubes 15, 17.

Le corps 3 comporte une partie centrale 19, située longitudinalement entre les première et seconde extrémités 7, 9, et raccordant les première et seconde extrémités 7, 9 l’une à l’autre (figure 1).The body 3 comprises a central part 19, located longitudinally between the first and second ends 7, 9, and connecting the first and second ends 7, 9 to each other (figure 1).

Le passage longitudinal 5 s’étend sur toute la longueur du corps 3.The longitudinal passage 5 extends over the entire length of the body 3.

Il traverse les première et seconde extrémités longitudinales 7, 9 et la partie centrale 19.It crosses the first and second longitudinal ends 7, 9 and the central part 19.

Ce passage 5 présente au niveau des première et seconde extrémités 7, 9 des premier et second tronçons 21, 23.This passage 5 has at the first and second ends 7, 9 first and second sections 21, 23.

Ces premier et second tronçons 21, 23, avant sertissage, présentent une section interne légèrement plus grande que la section externe des premier et second tubes 15, 17.These first and second sections 21, 23, before crimping, have an internal section slightly larger than the external section of the first and second tubes 15, 17.

Les premier et second tronçons 21, 23 sont raccordés l’un à l’autre par un tronçon intermédiaire 25 du passage 5, de section interne plus faible que les premier et second tronçons 21, 23. Des premier et second épaulements 27, 29 sont ainsi ménagés entre le tronçon intermédiaire 25 et respectivement les premier et second tronçons 21, 23.The first and second sections 21, 23 are connected to each other by an intermediate section 25 of the passage 5, of smaller internal section than the first and second sections 21, 23. First and second shoulders 27, 29 are thus provided between the intermediate section 25 and respectively the first and second sections 21, 23.

Ces épaulements 27, 29 constituent des butées pour les premier et second tubes 15, 17.These shoulders 27, 29 constitute abutments for the first and second tubes 15, 17.

La surface interne des première et seconde extrémités 7, 9 porte des reliefs 31, permettant le sertissage des première et seconde extrémités 7, 9 sur les premier et second tubes 15, 17.The internal surface of the first and second ends 7, 9 carries reliefs 31, allowing the crimping of the first and second ends 7, 9 on the first and second tubes 15, 17.

Ces reliefs sont de tout type adapté. Dans l’exemple représenté, ce sont des nervures circonférentielles.These reliefs are of any suitable type. In the example shown, these are circumferential ribs.

Les fixations permanentes 11, 13 comportent chacune une bague 33. Les bagues 33 sont montées autour des première et seconde extrémités longitudinales 7, 9.The permanent fasteners 11, 13 each include a ring 33. The rings 33 are mounted around the first and second longitudinal ends 7, 9.

Chaque bague 33 délimite intérieurement un passage interne 35 de section décroissante. La section interne du passage 35 décroît longitudinalement, à partir d’une extrémité de la bague 33 tournée vers la partie centrale 19 du corps, vers l’extrémité de la bague 33 tournée à l’opposé de la partie centrale 19.Each ring 33 internally delimits an internal passage 35 of decreasing section. The internal section of the passage 35 decreases longitudinally, from one end of the ring 33 facing the central part 19 of the body, towards the end of the ring 33 facing away from the central part 19.

L’étape de fixation du premier ou second tube 15, 17 à la première ou seconde extrémité longitudinale 7, 9 comprend alors les étapes suivantes :The step of fixing the first or second tube 15, 17 to the first or second longitudinal end 7, 9 then comprises the following steps:

- engagement du premier ou second tube 15, 17 dans la première ou seconde extrémité longitudinale 7, 9 ;- Engagement of the first or second tube 15, 17 in the first or second longitudinal end 7, 9;

- déplacement de la bague 33 longitudinalement le long de la première ou seconde extrémité longitudinale 7, 9 vers la partie centrale 19 du corps 3.- displacement of the ring 33 longitudinally along the first or second longitudinal end 7, 9 towards the central part 19 of the body 3.

Ce déplacement provoque le sertissage du premier ou second tube 15, 17 avec la première ou seconde extrémité longitudinale 7, 9.This displacement causes the crimping of the first or second tube 15, 17 with the first or second longitudinal end 7, 9.

A la sous-étape d’engagement, le premier ou second tube 15, 17 est engagé dans la première ou seconde extrémité longitudinale 7, 9 longitudinalement jusqu’à une butée interne.At the engagement sub-step, the first or second tube 15, 17 is engaged in the first or second longitudinal end 7, 9 longitudinally up to an internal stop.

Cette butée interne correspond ici au premier ou second épaulement 27, 29.This internal stop here corresponds to the first or second shoulder 27, 29.

Du fait de la forme convergente du passage interne de la bague 33, le déplacement longitudinal de la bague 33 provoque l’écrasement de la première ou seconde extrémité 7, 9 sur le premier ou second tube 15, 17. La surface interne de la bague 33 vient porter sur la surface externe de la première ou seconde extrémité 7, 9, forçant la première ou seconde extrémité 7, 9 à se déformer.Due to the convergent shape of the internal passage of the ring 33, the longitudinal displacement of the ring 33 causes the crushing of the first or second end 7, 9 on the first or second tube 15, 17. The internal surface of the ring 33 comes to bear on the outer surface of the first or second end 7, 9, forcing the first or second end 7, 9 to deform.

De ce fait, les reliefs internes 31 des première et seconde extrémités 7, 9 viennent s’enfoncer dans la surface externe du premier ou second tube 15, 17. Réciproquement, le matériau constituant les premier ou second tubes 15, 17 vient remplir les creux entre les reliefs 31.As a result, the internal reliefs 31 of the first and second ends 7, 9 sink into the outer surface of the first or second tube 15, 17. Conversely, the material constituting the first or second tubes 15, 17 fills the hollows between the reliefs 31.

A la sous-étape de déplacement, chaque bague 33 est déplacée longitudinalement jusqu’à une butée 37. Typiquement, cette butée est ménagée sur la partie centrale 19 du corps. La partie centrale comporte ainsi deux butées 37, une pour chacune des deux bagues 33.At the displacement sub-step, each ring 33 is moved longitudinally as far as an abutment 37. Typically, this abutment is provided on the central part 19 of the body. The central part thus comprises two stops 37, one for each of the two rings 33.

L’état du raccord à l’issue des étapes de fixation est illustré sur la figure 2. Les bagues 33 sont en butée contre les butées 37. Les première et seconde extrémités longitudinales 7, 9 du corps 3 sont serties avec les premier et second tubes 15, 17. Les reliefs 31 ont pénétré dans la surface externe des premier et second tubes 15, 17. La matière constituant les tubes a rempli les espaces entre les reliefs 31.The state of the connection at the end of the fixing steps is illustrated in FIG. 2. The rings 33 are in abutment against the stops 37. The first and second longitudinal ends 7, 9 of the body 3 are crimped with the first and second tubes 15, 17. The reliefs 31 have penetrated the outer surface of the first and second tubes 15, 17. The material constituting the tubes has filled the spaces between the reliefs 31.

Les premier et second tubes 15, 17 sont ainsi solidement maintenus en butée contre les épaulements 27, 29.The first and second tubes 15, 17 are thus firmly held in abutment against the shoulders 27, 29.

Typiquement, le déplacement des bagues 33 est effectué en utilisant une presse hydraulique, équipée d’inserts adaptés à la forme des bagues et des tubes.Typically, the displacement of the rings 33 is carried out using a hydraulic press, equipped with inserts adapted to the shape of the rings and the tubes.

Avantageusement, l’étape de fixation du premier ou second tube 15, 17 à la première ou seconde extrémité longitudinale 7, 9 comprend une sous-étape de contrôle dimensionnel de déplacement de la bague 33.Advantageously, the step of fixing the first or second tube 15, 17 to the first or second longitudinal end 7, 9 includes a sub-step of dimensional control of the movement of the ring 33.

Au cours de cette sous-étape, l’écartement longitudinal entre la bague 33 et la butée 37 correspondante est contrôlé avec une cale d’une épaisseur inférieure à 5/100 de mm, de préférence inférieure à 3/100 de mm et valant par exemple 2/100 de mm.During this sub-step, the longitudinal spacing between the ring 33 and the corresponding stop 37 is checked with a shim with a thickness of less than 5/100 of a mm, preferably less than 3/100 of a mm and equal to example 2/100 mm.

Cette cale est représentée sur la figure 4.This wedge is shown in Figure 4.

La sous-étape de contrôle dimensionnel est effectuée par un opérateur, qui essaie de glisser la cale 39 entre la butée 37 et la bague 33 correspondante. Si l’opérateur parvient à glisser la cale entre la bague et la butée, on considère que le déplacement de la bague n’a pas été complet et que la fixation n’est pas satisfaisante.The dimensional control sub-step is carried out by an operator, who tries to slide the wedge 39 between the stop 37 and the corresponding ring 33. If the operator manages to slip the shim between the ring and the stop, it is considered that the movement of the ring has not been complete and that the fixing is not satisfactory.

Au contraire, si la cale ne peut pas être glissée entre la bague 33 et la butée 37, alors on considère que le déplacement longitudinal de la bague a été complet et que le test est satisfaisant.On the contrary, if the wedge cannot be slid between the ring 33 and the abutment 37, then it is considered that the longitudinal displacement of the ring has been complete and that the test is satisfactory.

De préférence, l’étape de fixation comporte également une sous-étape de contrôle dimensionnel d’engagement du premier ou second tube 15, 17.Preferably, the fixing step also includes a sub-step of dimensional control of engagement of the first or second tube 15, 17.

Comme illustré sur les figures 3 et 4, cette sous-étape comprend les opérations suivantes :As illustrated in Figures 3 and 4, this sub-step includes the following operations:

- avant engagement du premier ou second tube 15, 17 dans la première ou seconde extrémité longitudinale 7, 9, création d’un repère visuel 41 sur le premier ou second tube 15, 17 ;- before engagement of the first or second tube 15, 17 in the first or second longitudinal end 7, 9, creation of a visual cue 41 on the first or second tube 15, 17;

- après engagement du premier ou second tube 15, 17 dans la première ou seconde extrémité longitudinale 7, 9 jusqu’à la butée interne et après déplacement de la bague 33, mesure de l’écartement longitudinal entre la bague 33 et le repère visuel 41.- after engagement of the first or second tube 15, 17 in the first or second longitudinal end 7, 9 up to the internal stop and after displacement of the ring 33, measurement of the longitudinal distance between the ring 33 and the visual marker 41 .

De préférence, un second repère visuel 43 est également créé pour le premier ou second tube 15, 17, avant engagement de ce tube dans l’extrémité longitudinale correspondante (figure 3).Preferably, a second visual cue 43 is also created for the first or second tube 15, 17, before engagement of this tube in the corresponding longitudinal end (FIG. 3).

Le repère visuel 43 est interposé longitudinalement entre le repère visuel 41 et l’extrémité libre du premier ou second tube 15, 17 inséré dans le corps 3.The visual marker 43 is interposed longitudinally between the visual marker 41 and the free end of the first or second tube 15, 17 inserted into the body 3.

Par exemple, le repère visuel 41 est une marque circulaire, s’étendant sur toute la périphérie du premier ou second tube 15, 17. Le repère visuel 43 est de préférence du même type.For example, the visual marker 41 is a circular mark, extending over the entire periphery of the first or second tube 15, 17. The visual marker 43 is preferably of the same type.

Typiquement, quand le tube 15, 17 est engagé dans la première ou seconde extrémité longitudinale 7, 9, et avant déplacement de la bague 33, les deux marques 41, 43 doivent être invisibles. Ceci garantit que le tube est engagé jusqu’à la butée 27, 29.Typically, when the tube 15, 17 is engaged in the first or second longitudinal end 7, 9, and before displacement of the ring 33, the two marks 41, 43 must be invisible. This ensures that the tube is engaged up to the stop 27, 29.

Après déplacement de la bague 33, le repère visuel 41 est visible. Cette situation est illustrée sur la figure 4.After displacement of the ring 33, the visual cue 41 is visible. This situation is illustrated in Figure 4.

En revanche, le repère visuel 43 ne doit pas être visible.On the other hand, the visual cue 43 must not be visible.

La non-visibilité du repère visuel 43 est une première vérification qualitative, permettant de s’assurer que le tube 15, 17 est resté en butée pendant le déplacement de la bague 33.The non-visibility of the visual marker 43 is a first qualitative check, making it possible to ensure that the tube 15, 17 has remained in abutment during the movement of the ring 33.

L’écartement longitudinal entre la bague 33 et le repère visuel 41 est mesuré à l’aide d’une cale 45, représentée sur la figure 7. La cale 45 est placée contre la bague 33. Plus précisément, elle est placée contre l’extrémité de la bague 33 située à l’opposé de la partie centrale 19 du corps.The longitudinal distance between the ring 33 and the visual marker 41 is measured using a wedge 45, shown in Figure 7. The wedge 45 is placed against the ring 33. More specifically, it is placed against the end of the ring 33 located opposite the central part 19 of the body.

Le repère visuel 41 doit être masqué par la cale 45 pour que le contrôle soit positif. Ceci garantit que le déplacement de la bague 33 a été complet, et que le tube 15 , 17 est resté en butée pendant le déplacement de la bague 33. Si le repère visuel 41 est visible, on considère que le contrôle est négatif, et que la fixation du tube n’est pas satisfaisante.The visual cue 41 must be masked by the wedge 45 for the control to be positive. This guarantees that the movement of the ring 33 has been complete, and that the tube 15, 17 has remained in abutment during the movement of the ring 33. If the visual marker 41 is visible, it is considered that the control is negative, and that the fixing of the tube is not satisfactory.

Les positions longitudinales des repères visuels 41 et 43 sont choisies en fonction des dimensions du corps tubulaire 3 et des bagues 33.The longitudinal positions of the visual markers 41 and 43 are chosen according to the dimensions of the tubular body 3 and the rings 33.

On a décrit ci-dessus la fixation au premier tube 15 à la première extrémité 7, ou la fixation au second tube 17 à la seconde extrémité 9. Les premier et second tubes 15, 17 peuvent l’un et l’autre être fixés comme décrit ci-dessus.The attachment to the first tube 15 at the first end 7, or the attachment to the second tube 17 at the second end 9 has been described above. The first and second tubes 15, 17 can both be attached as described above.

Un premier exemple de mise en œuvre du procédé de montage de l’invention va maintenant être décrit, en référence aux figures 5 à 7.A first example of implementation of the mounting method of the invention will now be described, with reference to Figures 5 to 7.

Cette mise en œuvre correspond typiquement à un cas d’intervention sur une tuyauterie existante 47 de la centrale nucléaire. Elle vise à remplacer par exemple une soudure défectueuse 49 par le raccord 1 décrit plus haut.This implementation typically corresponds to a case of intervention on existing piping 47 of the nuclear power plant. It aims to replace, for example, a defective weld 49 with the connection 1 described above.

Le procédé comporte alors une étape préliminaire de coupe de la tuyauterie 47, au niveau de la soudure 49 à éliminer. Par exemple, une coupe est effectuée de chaque côté de la soudure 49, la soudure 49 étant ensuite évacuée.The method then includes a preliminary step of cutting the pipe 47, at the level of the weld 49 to be eliminated. For example, a cut is made on each side of the weld 49, the weld 49 then being evacuated.

La coupe est par exemple effectuée à l’aide d’un coupe-tube, de manière à assurer un bon état de surface sur les extrémités libres des tubes restants 51, 53.The cut is for example made using a pipe cutter, so as to ensure a good surface finish on the free ends of the remaining tubes 51, 53.

Les extrémités libres des tubes restants 51, 53, situés de part et d’autre de la soudure 49 qui a été éliminée, sont ensuite ébavurées, à l’aide d’un outil de type « taille-crayon ».The free ends of the remaining tubes 51, 53, located on either side of the weld 49 which has been eliminated, are then deburred, using a “pencil sharpener” type tool.

On vérifie ensuite visuellement la propreté et l’absence de rayure sur les extrémités des tubes restant.We then visually check the cleanliness and the absence of scratches on the ends of the remaining tubes.

Les repères visuels 41, et de préférence les repères visuels 43, sont ensuite réalisés sur les tubes 51, 53.The visual marks 41, and preferably the visual marks 43, are then made on the tubes 51, 53.

Le raccord 1 est ensuite mis en place entre les tubes 51 et 53, le tube 51 étant engagé dans la première extrémité longitudinale 7 du raccord et le tube 53 dans la seconde extrémité longitudinale 9 du raccord.The connector 1 is then placed between the tubes 51 and 53, the tube 51 being engaged in the first longitudinal end 7 of the connector and the tube 53 in the second longitudinal end 9 of the connector.

Comme illustré sur la figure 6, à ce stade, les bagues 33 sont situées à distance de la partie centrale 19 du corps 3. Les tubes 51 et 53 sont en butée contre les butées 27, 29.As illustrated in Figure 6, at this stage, the rings 33 are located at a distance from the central part 19 of the body 3. The tubes 51 and 53 are in abutment against the stops 27, 29.

On contrôle à ce stade qu’aucun des repères visuels 41, 43 n’est visible.It is checked at this stage that none of the visual markers 41, 43 is visible.

Le tube 51 est ensuite fixé à la première extrémité longitudinale 7, et le tube 53 à la seconde extrémité longitudinale 9.The tube 51 is then fixed to the first longitudinal end 7, and the tube 53 to the second longitudinal end 9.

Cette opération est effectuée par déplacement des bagues longitudinales 33 vers la partie centrale 19 du corps.This operation is performed by moving the longitudinal rings 33 towards the central part 19 of the body.

Ce mouvement se termine quand les bagues 33 arrivent en butée contre les butées 37.This movement ends when the rings 33 come into abutment against the stops 37.

On effectue ensuite les contrôles dimensionnels de déplacement et d’engagement, comme décrit plus haut.The dimensional displacement and engagement checks are then carried out, as described above.

Un second exemple de mise en œuvre de l’invention va maintenant être décrit, en référence aux figures 8 à 10.A second example of implementation of the invention will now be described, with reference to Figures 8 to 10.

Cet exemple correspond à un cas où une portion de tuyauterie existante est remplacée par une tuyauterie neuve. Les différents tubes constituant la tuyauterie neuve sont raccordés les uns aux autres à l’aide de raccords 1 du type décrit ci-dessus.This example corresponds to a case where a portion of existing piping is replaced by new piping. The various tubes constituting the new piping are connected to each other using connectors 1 of the type described above.

La portion de tuyauterie est montée entre deux points fixes 55, 57.The pipe portion is mounted between two fixed points 55, 57.

Cet exemple de mise en œuvre s’applique également en travaux neufs, lors de l’installation d’une portion de tuyauterie entre deux points fixes.This example of implementation also applies to new works, when installing a section of piping between two fixed points.

Le point fixe 55 est par exemple un robinet d’isolement, ou un raccord existant, ou même une portion de tuyauterie déjà installée.The fixed point 55 is for example an isolation valve, or an existing connection, or even a portion of piping already installed.

Dans l’exemple représenté sur les figures, le point fixe 57 est un tube.In the example shown in the figures, the fixed point 57 is a tube.

Le procédé comporte alors une étape de fixation d’un tube initial 59 à la structure 60 du réacteur. Le tube 59 est également raccordé au premier point fixe 55.The method then includes a step of fixing an initial tube 59 to the structure 60 of the reactor. The tube 59 is also connected to the first fixed point 55.

Puis, un ou plusieurs autres tubes intermédiaires 61 sont éventuellement fixés à la structure 60.Then, one or more other intermediate tubes 61 are possibly fixed to the structure 60.

Les tubes intermédiaires 61 sont raccordés au tube initial 59, et sont raccordés entre eux, par des raccords 1 du type décrit ci-dessus.The intermediate tubes 61 are connected to the initial tube 59, and are connected together by connectors 1 of the type described above.

La structure 60 du réacteur est typiquement une structure de génie civil, un plancher, un mur ou toute autre structure.The structure 60 of the reactor is typically a civil engineering structure, a floor, a wall or any other structure.

Le montage du dernier tube 63 pose un problème particulier, du fait que celui-ci doit être raccordé par des raccords 1 du type ci-dessus, entre un tube 59 ou 61 déjà en place et le tube 57 qui est un point fixe. Le raccordement final au tube 57 est particulièrement délicat s’il n’existe pas un degré de liberté entre le dernier tube 63 et le tube 57.The assembly of the last tube 63 poses a particular problem, because it must be connected by connectors 1 of the above type, between a tube 59 or 61 already in place and the tube 57 which is a fixed point. The final connection to tube 57 is particularly delicate if there is not a degree of freedom between the last tube 63 and tube 57.

En d’autres termes, il existe une difficulté particulière du fait que le procédé comprend une étape de fixation du tube 63 (premier tube) à la structure 60 du réacteur nucléaire, alors que le tube 57 (second tube) est déjà fixé à la structure 60 du réacteur nucléaire au moment de la fixation du tube 63 à la structure 60 du réacteur nucléaire.In other words, there is a particular difficulty due to the fact that the method comprises a step of fixing the tube 63 (first tube) to the structure 60 of the nuclear reactor, whereas the tube 57 (second tube) is already fixed to the structure 60 of the nuclear reactor at the time of attachment of the tube 63 to the structure 60 of the nuclear reactor.

Dans ce cas, le procédé comprend avantageusement une étape de déplacement du second tube 57, au cours de laquelle une extrémité libre 65 du second tube 57 est écartée d’un emplacement prévu pour le raccord 1 après montage.In this case, the method advantageously comprises a step of moving the second tube 57, during which a free end 65 of the second tube 57 is moved away from a location provided for the connector 1 after assembly.

Cette étape est effectuée avant l’étape de fixation du second tube 57 à la seconde extrémité 9 du raccord 1.This step is carried out before the step of fixing the second tube 57 to the second end 9 of the connector 1.

Plus précisément, comme visible sur la figure 9, le second tube 57 est déformé élastiquement de manière à écarter l’extrémité libre 65 de l’emplacement du futur raccord. Si nécessaire, des fixations du tube 57 à la structure 60 du réacteur sont démontées pour permettre la déformation élastique du second tube 57.More specifically, as shown in Figure 9, the second tube 57 is elastically deformed so as to separate the free end 65 from the location of the future connection. If necessary, attachments of the tube 57 to the structure 60 of the reactor are dismantled to allow the elastic deformation of the second tube 57.

L’étape de fixation du premier tube 63 à la structure 60 du réacteur nucléaire est effectuée après l’étape de déformation, comme illustré sur la figure 10.The step of fixing the first tube 63 to the structure 60 of the nuclear reactor is carried out after the deformation step, as illustrated in figure 10.

Enfin, le raccord 1 est mis en place entre le premier tube 63 et le second tube 57, et les tubes 63 et 57 sont engagés dans les première et seconde extrémités 7, 9 du corps 3 du raccord 1. On réalise ensuite la fixation des tubes 63 et 57 au raccord 1. Ceci est réalisé en déplaçant les bagues 33, comme décrit plus haut.Finally, the connector 1 is placed between the first tube 63 and the second tube 57, and the tubes 63 and 57 are engaged in the first and second ends 7, 9 of the body 3 of the connector 1. The fixing of the tubes 63 and 57 to fitting 1. This is achieved by moving the rings 33, as described above.

On effectue ensuite les contrôles dimensionnels de déplacement et d’engagement comme décrit plus haut.The dimensional displacement and engagement checks are then carried out as described above.

Un troisième exemple de mise en œuvre du procédé de l’invention va maintenant être décrit, en référence aux figures 11 à 14.A third example of implementation of the method of the invention will now be described, with reference to Figures 11 to 14.

Comme sur les figures 8 à 10, cet exemple correspond à un cas de montage d’un tronçon de tuyauterie entre deux points fixes 55, 57.As in FIGS. 8 to 10, this example corresponds to a case of assembly of a pipe section between two fixed points 55, 57.

La tuyauterie neuve vient remplacer une tuyauterie déjà existante, au cours d’une opération de maintenance. En variante, la tuyauterie neuve est mise en place au cours de travaux neufs, lors de la création de la tuyauterie.The new piping replaces an already existing piping, during a maintenance operation. As a variant, the new piping is put in place during new works, during the creation of the piping.

Comme précédemment, le second point fixe 57 est un tube (le second tube). Le procédé comporte une étape de fixation d’un tube initial 59 à la structure 60 du réacteur, le tube 59 étant également raccordé au premier point fixe 55.As before, the second fixed point 57 is a tube (the second tube). The method includes a step of fixing an initial tube 59 to the structure 60 of the reactor, the tube 59 also being connected to the first fixed point 55.

Comme précédemment, le procédé comprend éventuellement une étape de fixation d’un ou plusieurs tubes intermédiaires 61 à la structure 60, et de raccordement du ou des tubes intermédiaires 61 entre eux et au tube initial 59 par des raccords 1 du type décrit ci-dessus.As before, the method optionally comprises a step of fixing one or more intermediate tubes 61 to the structure 60, and connecting the intermediate tube(s) 61 to each other and to the initial tube 59 by fittings 1 of the type described above. .

Comme précédemment, le montage du dernier tube 63 (le premier tube), destiné à être raccordé au second tube 57 pose un problème particulier du fait que le premier tube 63 doit être inséré entre le tube 59 ou 61 précédent, déjà existant, et le second tube 57, qui constitue un point fixe.As before, the assembly of the last tube 63 (the first tube), intended to be connected to the second tube 57 poses a particular problem because the first tube 63 must be inserted between the previous tube 59 or 61, already existing, and the second tube 57, which constitutes a fixed point.

En d’autres termes, le procédé comprend une étape de fixation du premier tube 63 à la structure 60, alors que le second tube 57 est quant à lui déjà fixé à ladite structure 60 au moment de l’étape de fixation du premier tube 63.In other words, the method comprises a step of fixing the first tube 63 to the structure 60, while the second tube 57 is itself already fixed to said structure 60 at the time of the step of fixing the first tube 63 .

Dans ce cas, le procédé comporte avantageusement une étape de déplacement du second tube 57 au cours de laquelle l’extrémité libre 65 du second tube 57 est écartée de l’emplacement prévu pour le raccord 1 après montage.In this case, the method advantageously includes a step of moving the second tube 57 during which the free end 65 of the second tube 57 is moved away from the location provided for the connector 1 after assembly.

Cette opération est effectuée avant l’étape de fixation du second tube 57 à la seconde extrémité 9 du corps 3 du raccord 1.This operation is carried out before the step of fixing the second tube 57 to the second end 9 of the body 3 of the connector 1.

Pour ce faire, l’étape de déplacement du second tube 57 comprend les sous-étapes suivantes :To do this, the step of moving the second tube 57 comprises the following sub-steps:

- démontage d’un accessoire 67 auquel le second tube 57 est raccordé à l’opposé du tube 63 ;- disassembly of an accessory 67 to which the second tube 57 is connected opposite the tube 63;

- déplacement du second tube 57 dans le sens d’un écartement de l’extrémité libre 65 par rapport audit emplacement prévu pour le raccord 1 une fois monté.- displacement of the second tube 57 in the direction of a spacing of the free end 65 with respect to said location provided for the connector 1 once mounted.

Le démontage de l’accessoire 67 est illustré sur la figure 12. L’accessoire 67 correspond par exemple à un robinet d’isolement, ou à un autre raccord ou à tout autre organe démontable adapté. Le fait de démonter l’accessoire 67 crée un espace permettant de déplacer le second tube 57, comme illustré sur la figure 12.The dismantling of the accessory 67 is illustrated in figure 12. The accessory 67 corresponds for example to an isolation valve, or to another fitting or to any other suitable removable component. Removing the accessory 67 creates a space to move the second tube 57, as shown in figure 12.

Il devient possible, après démontage de l’accessoire 67 et déplacement du second tube 57, de fixer le premier tube 63 à la structure du réacteur 60, et de raccorder le premier tube 63 au tube précédent, qui est le tube intermédiaire 61 dans l’exemple représenté, par un raccord 1 du type décrit ci-dessus.It becomes possible, after removing the accessory 67 and moving the second tube 57, to fix the first tube 63 to the structure of the reactor 60, and to connect the first tube 63 to the previous tube, which is the intermediate tube 61 in the example shown, by a connector 1 of the type described above.

Cette situation est illustrée sur la figure 13.This situation is illustrated in Figure 13.

Il devient également possible de disposer un raccord 1 du type décrit ci-dessus entre le premier tube 63 et le second tube 57 déporté du côté de l’accessoire 67.It also becomes possible to arrange a connector 1 of the type described above between the first tube 63 and the second tube 57 offset on the side of the accessory 67.

La fixation du premier tube 63 à la première extrémité 7 du corps 3 et la fixation du second tube 63 à la seconde extrémité 9 du corps 3 intervient ensuite.The fixing of the first tube 63 to the first end 7 of the body 3 and the fixing of the second tube 63 to the second end 9 of the body 3 then takes place.

Comme décrit plus haut, ceci est effectué en déplaçant les bagues 33 longitudinalement jusqu’aux butées 37.As described above, this is done by moving the rings 33 longitudinally up to the stops 37.

On effectue ensuite les contrôles dimensionnels de déplacement et d’engagement, comme décrit plus haut.The dimensional displacement and engagement checks are then carried out, as described above.

L’invention a été décrite avec un raccord comprenant deux extrémités, prévues pour recevoir et fixer deux tubes. Elle peut être mise en œuvre avec un raccord comprenant plus de deux extrémités destinées à recevoir un tube, par exemple trois extrémités (raccord en T) ou quatre extrémités (raccords en croix).The invention has been described with a connector comprising two ends, designed to receive and fix two tubes. It can be implemented with a connector comprising more than two ends intended to receive a tube, for example three ends (T connector) or four ends (cross connectors).

L’invention a été décrite avec des fixations par sertissage. Dans une variante non préférée, un autre type de fixation permanente est utilisé.The invention has been described with crimp fasteners. In a non-preferred variant, another type of permanent attachment is used.

Claims (9)

Procédé de montage de tubes dans une centrale nucléaire, le procédé comprenant les étapes suivantes :
- obtention d’un raccord (1) comprenant un corps tubulaire (3) définissant intérieurement un passage (5) longitudinal de circulation de fluide et présentant des première et seconde extrémités (7, 9) longitudinales, et des fixations permanentes (11, 13) prévues pour fixer de manière non démontable les première et secondes extrémités longitudinales (7, 9) aux tubes ;
- fixation d’un premier tube (15, 51, 63) à la première extrémité longitudinale (7) de manière non démontable avec l’une des fixations permanentes (11, 13) ;
- fixation d’un second tube (17, 53, 57) à la seconde extrémité longitudinale (9) de manière non démontable avec l’autre fixation permanente (11, 13) , le premier tube (15, 51, 63) étant en communication fluidique avec le second tube (17, 53, 57) à travers le passage longitudinal (5) du corps tubulaire (3) du raccord (1).
A method of mounting tubes in a nuclear power plant, the method comprising the following steps:
- obtaining a connector (1) comprising a tubular body (3) internally defining a longitudinal fluid circulation passage (5) and having first and second longitudinal ends (7, 9), and permanent fasteners (11, 13 ) provided for fixing in a non-removable manner the first and second longitudinal ends (7, 9) to the tubes;
- Fixing a first tube (15, 51, 63) to the first longitudinal end (7) in a non-removable manner with one of the permanent fasteners (11, 13);
- attachment of a second tube (17, 53, 57) to the second longitudinal end (9) in a non-removable manner with the other permanent attachment (11, 13), the first tube (15, 51, 63) being in fluid communication with the second tube (17, 53, 57) through the longitudinal passage (5) of the tubular body (3) of the fitting (1).
Procédé de montage selon la revendication 1, dans lequel les étapes de fixation des premier et/ou second tubes (15, 51, 63 ; 17, 53, 57) aux première et/ou seconde extrémités (7, 9) longitudinales du corps (3) sont effectuées à froid.Assembly method according to claim 1, in which the steps of fixing the first and/or second tubes (15, 51, 63; 17, 53, 57) to the first and/or second longitudinal ends (7, 9) of the body ( 3) are carried out cold. Procédé de montage selon la revendication 1 ou 2, dans lequel les fixations permanentes (11, 13) fixent les première et/ou seconde extrémités (7, 9) longitudinales du corps (31) aux premier et/ou second tubes (15, 51, 63 ; 17, 53, 57) par sertissage.Mounting method according to Claim 1 or 2, in which the permanent fixings (11, 13) fix the first and/or second longitudinal ends (7, 9) of the body (31) to the first and/or second tubes (15, 51 , 63; 17, 53, 57) by crimping. Procédé de montage selon la revendication 3, dans lequel les première et secondes extrémités longitudinales (7, 9) sont configurées pour recevoir intérieurement, avant sertissage, les premier et second tubes (15, 51, 63 ; 17, 53, 57), les fixations permanentes comprenant des bagues (33) montées autour des première et secondes extrémités longitudinales (7, 9), l’étape de fixation du premier ou second tube (15, 51, 63 ; 17, 53, 57) à la première ou seconde extrémité longitudinale (7, 9) comprenant les sous-étapes suivantes :
- engagement du premier ou second tube (15, 51, 63 ; 17, 53, 57) dans la première ou seconde extrémité longitudinale (7, 9) ;
- déplacement de la bague (33) longitudinalement le long de la première ou seconde extrémité longitudinale (7, 9) vers une partie centrale (19) du corps (3) située longitudinalement entre les première et seconde extrémités (7, 9), ce déplacement provoquant le sertissage du premier ou second tube (15, 51, 63 ; 17, 53, 57) à la première ou seconde extrémité longitudinale (7, 9).
Assembly method according to claim 3, in which the first and second longitudinal ends (7, 9) are configured to receive internally, before crimping, the first and second tubes (15, 51, 63; 17, 53, 57), the permanent fixtures comprising rings (33) fitted around the first and second longitudinal ends (7, 9), the step of securing the first or second tube (15, 51, 63; 17, 53, 57) to the first or second longitudinal end (7, 9) comprising the following sub-steps:
- engagement of the first or second tube (15, 51, 63; 17, 53, 57) in the first or second longitudinal end (7, 9);
- displacement of the ring (33) longitudinally along the first or second longitudinal end (7, 9) towards a central part (19) of the body (3) located longitudinally between the first and second ends (7, 9), this movement causing crimping of the first or second tube (15, 51, 63; 17, 53, 57) at the first or second longitudinal end (7, 9).
Procédé de montage selon la revendication 4, dans lequel, à la sous-étape de déplacement, la bague (33) est déplacée longitudinalement jusqu’à une butée (37), l’étape de fixation du premier ou second tube (15, 51, 63 ; 17, 53, 57) à la première ou seconde extrémité longitudinale (7, 9) comprenant une sous-étape de contrôle dimensionnel de déplacement au cours de laquelle l’écartement longitudinal entre la bague (33) et la butée (37) est contrôlé avec une cale (39) d’épaisseur inférieure à 5/100 mm.Mounting method according to Claim 4, in which, in the moving sub-step, the ring (33) is moved longitudinally to an abutment (37), the step of fixing the first or second tube (15, 51 , 63; 17, 53, 57) at the first or second longitudinal end (7, 9) comprising a dimensional displacement control sub-step during which the longitudinal spacing between the ring (33) and the abutment (37 ) is checked with a wedge (39) less than 5/100 mm thick. Procédé de montage selon la revendication 4 ou 5, dans lequel, à la sous-étape d’engagement, le premier ou second tube (15, 51, 63 ; 17, 53, 57) est engagé dans la première ou seconde extrémité longitudinale (7, 9) longitudinalement jusqu’à une butée interne (27, 29), l’étape de fixation du premier ou second tube (15, 51, 63 ; 17, 53, 57) à la première ou seconde extrémité longitudinale (7, 9) comprenant une sous-étape de contrôle dimensionnel d’engagement comportant les opérations suivantes :
- avant engagement du premier ou second tube (15, 51, 63 ; 17, 53, 57) dans la première ou seconde extrémité longitudinale (7, 9), création d’un repère visuel (41) sur premier ou second tube (15, 51, 63 ; 17, 53, 57)
- après engagement du premier ou second tube (15, 51, 63 ; 17, 53, 57) dans la première ou seconde extrémité longitudinale (7, 9) jusqu’à la butée interne (27, 29), et après déplacement de la bague (33), mesure de l’écartement longitudinal entre la bague (33) et le repère visuel (41).
A mounting method according to claim 4 or 5, wherein, in the engagement sub-step, the first or second tube (15, 51, 63; 17, 53, 57) is engaged in the first or second longitudinal end ( 7, 9) longitudinally up to an internal stop (27, 29), the step of fixing the first or second tube (15, 51, 63; 17, 53, 57) to the first or second longitudinal end (7, 9) comprising a dimensional engagement control sub-step comprising the following operations:
- before engagement of the first or second tube (15, 51, 63; 17, 53, 57) in the first or second longitudinal end (7, 9), creation of a visual marker (41) on the first or second tube (15 , 51, 63; 17, 53, 57)
- after engagement of the first or second tube (15, 51, 63; 17, 53, 57) in the first or second longitudinal end (7, 9) as far as the internal stop (27, 29), and after displacement of the ring (33), measurement of the longitudinal distance between the ring (33) and the visual marker (41).
Procédé de montage selon l’une quelconque des revendications 1 à 6, dans lequel le procédé comprend une étape de fixation d’un premier tube (51) à une structure (60) d’un réacteur nucléaire, le second tube (57) étant déjà fixé à la structure (60) du réacteur nucléaire au moment de l’étape de fixation du premier tube (51) à la structure (60) du réacteur nucléaire, le procédé comportant une étape de déformation élastique du second tube (57) au cours de laquelle une extrémité libre (65) du second tube (57) est écartée d’un emplacement prévu pour le raccord (1) après montage, effectuée avant l’étape de fixation du second tube (57) à la seconde extrémité (9) du corps (3) du raccord (1).Mounting method according to any one of claims 1 to 6, in which the method comprises a step of attaching a first tube (51) to a structure (60) of a nuclear reactor, the second tube (57) being already fixed to the structure (60) of the nuclear reactor at the time of the step of fixing the first tube (51) to the structure (60) of the nuclear reactor, the method comprising a step of elastic deformation of the second tube (57) at the during which a free end (65) of the second tube (57) is separated from a location provided for the connector (1) after assembly, carried out before the step of fixing the second tube (57) to the second end (9 ) of the body (3) of the fitting (1). Procédé de montage selon l’une quelconque des revendications 1 à 6, dans lequel le procédé comprend une étape de fixation d’un premier tube (63) à une structure (60) d’un réacteur nucléaire, le second tube (57) étant déjà fixé à la structure (60) du réacteur nucléaire au moment de l’étape de fixation du premier tube (63) à la structure (60) du réacteur nucléaire, le procédé comportant une étape de déplacement du second tube (57) au cours de laquelle une extrémité libre (65) du second tube (57) est écartée d’un emplacement prévu pour le raccord (1) après montage, effectuée avant l’étape de fixation du second tube (57) à la seconde extrémité (9) du corps (3) du raccord (1).Mounting method according to any one of claims 1 to 6, in which the method comprises a step of attaching a first tube (63) to a structure (60) of a nuclear reactor, the second tube (57) being already fixed to the structure (60) of the nuclear reactor at the time of the step of fixing the first tube (63) to the structure (60) of the nuclear reactor, the method comprising a step of moving the second tube (57) during from which a free end (65) of the second tube (57) is separated from a location provided for the connector (1) after assembly, carried out before the step of fixing the second tube (57) to the second end (9) of the body (3) of the fitting (1). Procédé de montage selon la revendication 8, dans lequel l’étape de déplacement du second tube (57) comprend les sous-étapes suivantes :
- démontage d’un accessoire (67) auquel le second tube (57) est raccordé à l’opposé du premier tube (63) ;
- déplacement du second tube (57) dans le sens d’un écartement de l’extrémité libre (65) par rapport audit emplacement prévu pour le raccord (1) une fois monté.
A mounting method according to claim 8, wherein the step of moving the second tube (57) comprises the following substeps:
- disassembly of an accessory (67) to which the second tube (57) is connected opposite the first tube (63);
- Displacement of the second tube (57) in the direction of a spacing of the free end (65) relative to said location provided for the connector (1) once mounted.
FR1900947A 2019-01-31 2019-01-31 Tube assembly process in a nuclear power plant Active FR3092379B1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR1900947A FR3092379B1 (en) 2019-01-31 2019-01-31 Tube assembly process in a nuclear power plant
PCT/EP2020/052146 WO2020157120A1 (en) 2019-01-31 2020-01-29 Method for installing tubes in a nuclear power plant

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR1900947 2019-01-31
FR1900947A FR3092379B1 (en) 2019-01-31 2019-01-31 Tube assembly process in a nuclear power plant

Publications (2)

Publication Number Publication Date
FR3092379A1 true FR3092379A1 (en) 2020-08-07
FR3092379B1 FR3092379B1 (en) 2021-07-09

Family

ID=67810655

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1900947A Active FR3092379B1 (en) 2019-01-31 2019-01-31 Tube assembly process in a nuclear power plant

Country Status (2)

Country Link
FR (1) FR3092379B1 (en)
WO (1) WO2020157120A1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4762266A (en) * 1984-04-03 1988-08-09 Deutsche Gesellschaft Fur Wiederaufarbeitung Von Kernbrennstoffen Mbh Method for performing remotely-manipulated work on a conduit of a nuclear facility
WO1995021712A1 (en) * 1994-02-15 1995-08-17 Mcdonnell Douglas Corporation High pressure mechanical seal
CH695026A5 (en) * 2002-03-24 2005-11-15 Sk Tec Sa Pipe connection device for producing pressure-tight pipe connections has a socket-shaped main unit to rotate symmetrically with the ends of pieces of piping
US20080309067A1 (en) * 2007-06-14 2008-12-18 Fazakerly William B Repair pipe fittings
US20130119659A1 (en) * 2010-07-26 2013-05-16 Swagelok Company Single axis push to connect conduit fitting
EP2921755A1 (en) * 2014-03-19 2015-09-23 Eugen Riexinger GmbH & Co. KG Plasticconnectingssystems Connector for creating a press connection between two pipes
US20170321825A1 (en) * 2016-05-03 2017-11-09 Danco, Inc. Quick connect tubing insertion reference markings

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4762266A (en) * 1984-04-03 1988-08-09 Deutsche Gesellschaft Fur Wiederaufarbeitung Von Kernbrennstoffen Mbh Method for performing remotely-manipulated work on a conduit of a nuclear facility
WO1995021712A1 (en) * 1994-02-15 1995-08-17 Mcdonnell Douglas Corporation High pressure mechanical seal
CH695026A5 (en) * 2002-03-24 2005-11-15 Sk Tec Sa Pipe connection device for producing pressure-tight pipe connections has a socket-shaped main unit to rotate symmetrically with the ends of pieces of piping
US20080309067A1 (en) * 2007-06-14 2008-12-18 Fazakerly William B Repair pipe fittings
US20130119659A1 (en) * 2010-07-26 2013-05-16 Swagelok Company Single axis push to connect conduit fitting
EP2921755A1 (en) * 2014-03-19 2015-09-23 Eugen Riexinger GmbH & Co. KG Plasticconnectingssystems Connector for creating a press connection between two pipes
US20170321825A1 (en) * 2016-05-03 2017-11-09 Danco, Inc. Quick connect tubing insertion reference markings

Also Published As

Publication number Publication date
FR3092379B1 (en) 2021-07-09
WO2020157120A1 (en) 2020-08-06

Similar Documents

Publication Publication Date Title
EP1121553B1 (en) Integral threaded assembly of two metal tubes
EP2440795B1 (en) Family of fixation devices with variable taper
WO2008148993A2 (en) Method for assembling a part of a metal material and a part of a composite material using a fastener
FR2929352A1 (en) METHOD FOR ASSEMBLING BETWEEN A PIECE OF METALLIC MATERIAL AND A COMPOSITE MATERIAL PART
FR3092379A1 (en) Tube assembly process in a nuclear power plant
FR2722326A1 (en) METHOD FOR REPLACING A CROSS-TUBE OF THE BOTTOM OF A NUCLEAR REACTOR COOLED WITH PRESSURIZED WATER
EP0196971B1 (en) Repairing method by way of a steam generator tube
EP0751531B1 (en) Connecting element for an apparatus for measuring at least one physical parameter within a nuclear reactor core
EP3204679B1 (en) Coupling to be crimped onto at least one pipe, set of pipes including such a coupling, and method for assembling a pipe with such a coupling
EP0428433A1 (en) Device for fixation of upper spider guide plate in a nuclear reactor vessel
EP1932160B1 (en) Method for repairing guide rails of an assembly radially maintaining a support plate of a pressurized water nuclear reactor core
EP3724414B1 (en) Device and method for anchoring equipment to a civil engineering structure
EP3987214A1 (en) Apparatus for conducting a hydraulic proof test
FR3055565A1 (en) SUSPENSION IN VIS-A-VIS FOR THE REPAIR OF TIGHTENING HOLES
FR2589535A1 (en) Screw-fastening device for nuclear fuel assembly and method for repairing the assembly using such a device
BE496089A (en)
EP1160027A1 (en) Expansion plier
FR2929540A1 (en) Making flange junction formed from crown-shaped flange body, by cutting body into metal plate, and producing common and single hole in plate and then cutting along same path to obtain holes and external or internal peripheral edges
FR2743131A1 (en) PIPE COMPRISING A MALE PART PROVIDED WITH A RIB, AND METHOD FOR FORMING THE SAME
FR3105555A1 (en) Method of repairing an envelope, in particular a pressurizer
WO2023274775A1 (en) Cannula for inspecting a wall close to a plug, kit comprising same and methods employing same
EP4364168A1 (en) Cannula for inspecting a wall close to a plug, kit comprising same and methods employing same
FR2864327A1 (en) Sealing system for instrumentation column passing through cover of pressure chamber especially of nuclear reactor has graphite seal crush limiter in form of thrust ring
EP4073406A1 (en) Holding device for a non-return valve flap and method for positioning same
FR3102945A1 (en) Method of repairing an assembly comprising at least one bolt and assembly thus repaired

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20200807

PLFP Fee payment

Year of fee payment: 3

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6