FR3088089B1 - Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine - Google Patents

Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine Download PDF

Info

Publication number
FR3088089B1
FR3088089B1 FR1860155A FR1860155A FR3088089B1 FR 3088089 B1 FR3088089 B1 FR 3088089B1 FR 1860155 A FR1860155 A FR 1860155A FR 1860155 A FR1860155 A FR 1860155A FR 3088089 B1 FR3088089 B1 FR 3088089B1
Authority
FR
France
Prior art keywords
terrain
optimization
tunnel
machine
tunnel boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
FR1860155A
Other languages
English (en)
Other versions
FR3088089A1 (fr
Inventor
Estelle Lorant
Philippe Marimoutou
Nicolas Janicaud
Nicolas Braud
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bouygues Travaux Publics SAS
Original Assignee
Bouygues Travaux Publics SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bouygues Travaux Publics SAS filed Critical Bouygues Travaux Publics SAS
Priority to FR1860155A priority Critical patent/FR3088089B1/fr
Priority to AU2019257539A priority patent/AU2019257539A1/en
Priority to EP19207267.6A priority patent/EP3647533A1/fr
Priority to SG10201910312PA priority patent/SG10201910312PA/en
Priority to US16/674,882 priority patent/US11448068B2/en
Publication of FR3088089A1 publication Critical patent/FR3088089A1/fr
Application granted granted Critical
Publication of FR3088089B1 publication Critical patent/FR3088089B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/108Remote control specially adapted for machines for driving tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1006Making by using boring or cutting machines with rotary cutting tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

L'invention concerne un procédé (S10) d'optimisation de caractéristiques d'un tunnelier, notamment d'un tunnelier de type à pression de boue ou VD, ledit procédé comprenant les étapes suivantes : S0 : détermination d'un modèle d'interactions terrain/machine, S11 : mesure instantanée de l'ensemble des paramètres spécifiques de forage du tunnelier, S13: détermination du groupe d'individus correspondant aux paramètres de forage mesurés à l'étape S11 à l'aide du modèle d'interactions terrain/machine, S14 : optimisation des caractéristiques du tunnelier en fonction du groupe d'individus ainsi déterminé.
FR1860155A 2018-11-05 2018-11-05 Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine Active FR3088089B1 (fr)

Priority Applications (5)

Application Number Priority Date Filing Date Title
FR1860155A FR3088089B1 (fr) 2018-11-05 2018-11-05 Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine
AU2019257539A AU2019257539A1 (en) 2018-11-05 2019-11-01 Optimization of boring by a tunnel boring machine as a function of ground/machine interactions
EP19207267.6A EP3647533A1 (fr) 2018-11-05 2019-11-05 Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine
SG10201910312PA SG10201910312PA (en) 2018-11-05 2019-11-05 Optimization of boring by a tunnel boring machine as a function of ground/machine interactions
US16/674,882 US11448068B2 (en) 2018-11-05 2019-11-05 Optimization of boring by a tunnel boring machine as a function of ground/machine interactions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1860155A FR3088089B1 (fr) 2018-11-05 2018-11-05 Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine

Publications (2)

Publication Number Publication Date
FR3088089A1 FR3088089A1 (fr) 2020-05-08
FR3088089B1 true FR3088089B1 (fr) 2022-04-08

Family

ID=66530085

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1860155A Active FR3088089B1 (fr) 2018-11-05 2018-11-05 Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine

Country Status (5)

Country Link
US (1) US11448068B2 (fr)
EP (1) EP3647533A1 (fr)
AU (1) AU2019257539A1 (fr)
FR (1) FR3088089B1 (fr)
SG (1) SG10201910312PA (fr)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295915B (zh) * 2019-07-02 2020-08-04 中国科学院武汉岩土力学研究所 一种实现三向力检测的联合破岩tbm复杂地层掘进方法
CN112796768B (zh) * 2021-03-08 2022-07-19 盾构及掘进技术国家重点实验室 一种双模隧道掘进机施工掘进参数选择方法
FR3121705B1 (fr) * 2021-04-13 2023-11-10 Vinci Construction Grands Projets Procédé de détection du risque de colmatage d’une roue de coupe d’un tunnelier

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2934896B2 (ja) 1990-03-09 1999-08-16 株式会社小松製作所 シールド工法の裏込め注入量の算出装置およびその算出方法
JP3477668B2 (ja) 1996-02-22 2003-12-10 株式会社熊谷組 ローラビット回転検出装置
JP3511163B2 (ja) 1998-03-19 2004-03-29 大成建設株式会社 トンネル掘削機及びそれを使用したトンネルの掘削方法
DE29919505U1 (de) 1999-11-05 2001-03-22 Wirth Co Kg Masch Bohr Tunnelbohrmaschine
FR2823792B1 (fr) 2001-04-24 2003-07-25 Nfm Tech Machine de creusement d'un tunnel
JP3919172B2 (ja) 2002-04-17 2007-05-23 株式会社スターロイ ディスクローラーカッター及びディスクローラーカッターモニタリングシステム
FR2874959B1 (fr) 2004-09-07 2007-04-13 Bouygues Travaux Publics Sa Procede et dispositifs pour informer en permanence le conducteur d'un tunnelier de la nature du terrain en fond de taille
US10570736B2 (en) * 2016-06-09 2020-02-25 Abb Schweiz Ag Robot automated mining
KR101967978B1 (ko) * 2017-04-18 2019-04-10 인하대학교 산학협력단 쉴드 tbm의 순굴진속도 예측 장치 및 그 방법
CN107577862B (zh) * 2017-08-30 2019-12-03 中铁工程装备集团有限公司 一种tbm在掘岩体状态实时感知系统和方法

Also Published As

Publication number Publication date
AU2019257539A1 (en) 2020-05-21
US11448068B2 (en) 2022-09-20
SG10201910312PA (en) 2020-06-29
FR3088089A1 (fr) 2020-05-08
US20200141237A1 (en) 2020-05-07
EP3647533A1 (fr) 2020-05-06

Similar Documents

Publication Publication Date Title
FR3088089B1 (fr) Optimisation du forage d'un tunnelier en fonction d'interactions terrain/machine
CN103419782B (zh) 行走纠偏装置、行走纠偏方法及工程机械
WO2015187679A8 (fr) Systèmes et procédés de mesure et de réduction de déchets de carburant de véhicule
AR110138A1 (es) Sistema y método de control para determinar automáticamente características para el óptimo desempeño de una máquina
CA2919506C (fr) Estimation et prediction de la tortuosite d'un puits de forage
MA31579B1 (fr) Procedes pour analyser electroniquement un dialogue et systemes correspondants
FR2965351B1 (fr) Procede de mesure de puissance dans une bicyclette
CN102284887A (zh) 大型铸锻件荒加工用车削刀具寿命监测仪
FR3097644B1 (fr) Procédé de détermination du profil vertical de la vitesse du vent en amont d’une éolienne équipée d’un capteur de télédétection par Laser
FR3081813B1 (fr) Adaptateur de wagon pour raccorder une caisse de wagon à un palier
FR3071051B1 (fr) Procede de compensation d'un champ magnetique, dispositif et programme d'ordinateur associes
FR3054313B1 (fr) Methode de calcul d'un itineraire pour un engin tout terrain
GB2457775B (en) Improving production by actual loss allocation
CN105956376B (zh) 一种深埋隧洞施工开挖数值模拟分析的模型范围取值方法
WO2017171557A8 (fr) Machine de forage et procédé de fonctionnement
FR3088760B1 (fr) Détermination d'un état de piste à partir de mesures embarquées de contamination de piste, système et aéronef associés
GB2592781A (en) System and method for contamination monitoring
FR3055709B1 (fr) Methode de determination d'un equipement ophtalmique progressif de compensation visuelle personnalise pour un individu
FR3063866B1 (fr) Ensemble et procede pour la culture de plantes perennes telles que des vignes, mettant en oeuvre la gestion de donnees collectees lors de l'utilisation d'un outil de coupe portatif
FR3045162B1 (fr) Systeme d'analyse spatio-temporelle des flux d'objets mobiles
FR3089335B1 (fr) Dispositif électronique, et procédé, de détermination automatique d’informations de pilotage d’un engin mobile accompagnateur d’un engin mobile leader, programme d’ordinateur associé
WO2015135359A1 (fr) Procédé de détermination des nombres d'éléments de taille à différents rayons de montage d'une tête de taille en écusson
FR3094798B1 (fr) procédé de détermination d’une vitesse d’un véhicule automobile
AR115574A1 (es) Colocación de un transportador en el fondo de un pozo para evaluar una formación terrestre
FR3096574B1 (fr) Procede de determination du port d'une orthese

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

PLSC Publication of the preliminary search report

Effective date: 20200508

PLFP Fee payment

Year of fee payment: 4

PLFP Fee payment

Year of fee payment: 5

PLFP Fee payment

Year of fee payment: 6