FR3046479B1 - Extrapolation de la permeabilite effective d'un reseau de fractures discretes - Google Patents
Extrapolation de la permeabilite effective d'un reseau de fractures discretes Download PDFInfo
- Publication number
- FR3046479B1 FR3046479B1 FR1650015A FR1650015A FR3046479B1 FR 3046479 B1 FR3046479 B1 FR 3046479B1 FR 1650015 A FR1650015 A FR 1650015A FR 1650015 A FR1650015 A FR 1650015A FR 3046479 B1 FR3046479 B1 FR 3046479B1
- Authority
- FR
- France
- Prior art keywords
- effective permeability
- discrete
- calculating
- extrapolation
- fracture network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000035699 permeability Effects 0.000 title abstract 3
- 238000013213 extrapolation Methods 0.000 title 1
- 238000000034 method Methods 0.000 abstract 2
- 238000005070 sampling Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V20/00—Geomodelling in general
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/20—Computer models or simulations, e.g. for reservoirs under production, drill bits
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/64—Geostructures, e.g. in 3D data cubes
- G01V2210/642—Faults
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/64—Geostructures, e.g. in 3D data cubes
- G01V2210/646—Fractures
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/11—Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
- G06F17/12—Simultaneous equations, e.g. systems of linear equations
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Geophysics (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Evolutionary Computation (AREA)
- Computer Hardware Design (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Operations Research (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Procédé de calcul de la perméabilité effective d'un réseau de fractures discrètes dans un environnement souterrain. Le procédé peut comporter : l'obtention (800) d'attributs du réseau de fractures discrètes, l'échantillonnage spatial (810) de points sur les surfaces des fractures à l'intérieur d'une cellule de calcul, l'attribution (820) à chaque point échantillonné d'au moins un attribut de la fracture correspondante, le calcul (850) de valeurs de pression discrètes dans la cellule de calcul pour la localisation des points échantillonnés en résolvant des équations aux dérivées partielles d'un modèle d'écoulement, le calcul (860) de valeurs de perméabilité effective pour la cellule de calcul à partir des valeurs de pression.
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1650015A FR3046479B1 (fr) | 2016-01-04 | 2016-01-04 | Extrapolation de la permeabilite effective d'un reseau de fractures discretes |
PCT/US2016/069067 WO2017120088A1 (fr) | 2016-01-04 | 2016-12-29 | Accroissement d'échelle de perméabilité effective pour un réseau de fractures discrètes |
EP16884217.7A EP3400546B1 (fr) | 2016-01-04 | 2016-12-29 | Accroissement d'échelle de perméabilité effective pour un réseau de fractures discrètes |
US16/065,812 US11199647B2 (en) | 2016-01-04 | 2016-12-29 | Effective permeability upscaling for a discrete fracture network |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1650015 | 2016-01-04 | ||
FR1650015A FR3046479B1 (fr) | 2016-01-04 | 2016-01-04 | Extrapolation de la permeabilite effective d'un reseau de fractures discretes |
Publications (2)
Publication Number | Publication Date |
---|---|
FR3046479A1 FR3046479A1 (fr) | 2017-07-07 |
FR3046479B1 true FR3046479B1 (fr) | 2018-07-20 |
Family
ID=55486903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1650015A Active FR3046479B1 (fr) | 2016-01-04 | 2016-01-04 | Extrapolation de la permeabilite effective d'un reseau de fractures discretes |
Country Status (4)
Country | Link |
---|---|
US (1) | US11199647B2 (fr) |
EP (1) | EP3400546B1 (fr) |
FR (1) | FR3046479B1 (fr) |
WO (1) | WO2017120088A1 (fr) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11125912B2 (en) * | 2013-11-25 | 2021-09-21 | Schlumberger Technology Corporation | Geologic feature splitting |
CN110688767B (zh) * | 2019-10-09 | 2021-04-06 | 浙江大学 | 一种评价岩体裂隙网络模型精度的综合差异度的方法 |
CN111199109B (zh) * | 2020-01-10 | 2021-09-03 | 浙江大学 | 基于计盒维数与聚类分析用于划分岩体均质区的耦合方法 |
CN111339650B (zh) * | 2020-02-21 | 2023-05-26 | 北京环境特性研究所 | 正交维数缩减的电磁基函数构造方法及装置 |
US20230259662A1 (en) * | 2022-02-11 | 2023-08-17 | Landmark Graphics Corporation | Modeling a karst formation for a wellbore operation |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9618652B2 (en) * | 2011-11-04 | 2017-04-11 | Schlumberger Technology Corporation | Method of calibrating fracture geometry to microseismic events |
FR2981475B1 (fr) | 2011-10-12 | 2013-11-01 | IFP Energies Nouvelles | Methode pour construire un maillage d'un reservoir fracture avec un nombre limite de noeuds dans le milieu matrice |
WO2014116896A1 (fr) * | 2013-01-25 | 2014-07-31 | Services Petroliers Schlumberger | Test de transitoire de pression avec analyse de sensibilité |
AU2015210609B2 (en) * | 2014-02-03 | 2017-07-27 | Halliburton Energy Services, Inc. | Geomechanical and geophysical computational model for oil and gas stimulation and production |
US10788604B2 (en) * | 2014-06-25 | 2020-09-29 | Schlumberger Technology Corporation | Fracturing and reactivated fracture volumes |
KR101506321B1 (ko) * | 2014-10-24 | 2015-03-26 | 한국지질자원연구원 | 저류층 내 다상 유체 및 열 유동 특성 분석 방법 및 이를 위한 기록매체 |
US10961834B2 (en) * | 2015-11-09 | 2021-03-30 | Halliburton Energy Services, Inc. | Fracture network fluid flow simulation with junction area modeling |
FR3045868B1 (fr) * | 2015-12-17 | 2022-02-11 | Ifp Energies Now | Procede pour caracteriser et exploiter une formation souterraine comprenant un reseau de fractures |
-
2016
- 2016-01-04 FR FR1650015A patent/FR3046479B1/fr active Active
- 2016-12-29 EP EP16884217.7A patent/EP3400546B1/fr active Active
- 2016-12-29 WO PCT/US2016/069067 patent/WO2017120088A1/fr active Application Filing
- 2016-12-29 US US16/065,812 patent/US11199647B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP3400546B1 (fr) | 2023-07-19 |
EP3400546A4 (fr) | 2019-09-11 |
WO2017120088A1 (fr) | 2017-07-13 |
US20190011600A1 (en) | 2019-01-10 |
US11199647B2 (en) | 2021-12-14 |
FR3046479A1 (fr) | 2017-07-07 |
EP3400546A1 (fr) | 2018-11-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR3046479B1 (fr) | Extrapolation de la permeabilite effective d'un reseau de fractures discretes | |
BR112017025555A2 (pt) | sistema e método para monitoramento em tempo real e estimativa de desempenho de produção de sistema de poço inteligente | |
MY185589A (en) | System and method for determining drill string motions using acceleration data | |
MY186645A (en) | Fluid inflow | |
WO2016012245A3 (fr) | Système et procédé d'accès à un puits | |
MX361877B (es) | Analisis de yacimientos usando analisis de fluidos. | |
EP3176361A3 (fr) | Calcul d'une carte de fond de trou de forage dévié à l'aide de calculs de segment paramétrée | |
SA117380838B1 (ar) | نظم وطرق لحماية البئر | |
EP2848964A3 (fr) | Combinaison d'analyse de fluides de fond de trou et modélisation de systèmes de pétrole | |
GB2534279A (en) | Predicting properties of well bore treatment fluids | |
GB2536560A (en) | Creating virtual production logging tool profiles for improved history matching | |
SA519401995B1 (ar) | تنبؤ إحصائي متعدد المتغيرات بالتلوث باستخدام مستشعرات أو تدفقات بيانات | |
EP2963512A3 (fr) | Gestion de référencement de modèle et commande d'un chantier | |
GB2566649A (en) | Methods and systems for downhole telemetry employing chemical tracers in a flow stream | |
WO2015185696A3 (fr) | Procédé d'estimation de la productivité d'un puits le long d'une section d'un puits de forage | |
WO2014190261A3 (fr) | Systèmes, procédés et supports lisibles par ordinateur pour estimation de pression capillaire continue | |
GB2560665A (en) | Multiple downhole sensor digital alignment using spatial transforms | |
GB2572273A (en) | Coupled reservoir-geomechanical models using compaction tables | |
WO2018049055A3 (fr) | Surveillance de fluage de sel géomécanique de forage | |
WO2015030975A3 (fr) | Systèmes et procédés pour limiter un flux de fluide dans un puits de forage avec un dispositif d'étanchéité autonome et des structures d'arrêt de mouvement | |
IN2013CH06209A (fr) | ||
GB2570224A (en) | Managing a network of wells and surface facilities by finding a steady-state flow solution for a pipe sub-network | |
WO2019086899A3 (fr) | Procédé et système de détermination de débit dans un tuyau | |
FR3073947B1 (fr) | Procede et systeme d'estimation de position par recalage collaboratif sur amers inconnus | |
GB2556486A (en) | System and method to reduce fluid production from a well |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 2 |
|
PLSC | Publication of the preliminary search report |
Effective date: 20170707 |
|
PLFP | Fee payment |
Year of fee payment: 3 |
|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 6 |
|
PLFP | Fee payment |
Year of fee payment: 7 |
|
PLFP | Fee payment |
Year of fee payment: 8 |
|
PLFP | Fee payment |
Year of fee payment: 9 |