FR3023043B1 - Procede de gestion de puissance dans une installation electrique et installation electrique - Google Patents
Procede de gestion de puissance dans une installation electrique et installation electriqueInfo
- Publication number
- FR3023043B1 FR3023043B1 FR1456072A FR1456072A FR3023043B1 FR 3023043 B1 FR3023043 B1 FR 3023043B1 FR 1456072 A FR1456072 A FR 1456072A FR 1456072 A FR1456072 A FR 1456072A FR 3023043 B1 FR3023043 B1 FR 3023043B1
- Authority
- FR
- France
- Prior art keywords
- electrical installation
- power management
- installation
- electrical
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/20—Pc systems
- G05B2219/26—Pc applications
- G05B2219/2639—Energy management, use maximum of cheap power, keep peak load low
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1456072A FR3023043B1 (fr) | 2014-06-27 | 2014-06-27 | Procede de gestion de puissance dans une installation electrique et installation electrique |
EP15732600.0A EP3161775A1 (de) | 2014-06-27 | 2015-06-23 | Leistungsverwaltungsverfahren in einer elektroinstallation und elektrische installation |
CN201580033543.6A CN106663290A (zh) | 2014-06-27 | 2015-06-23 | 电气装置及其功率管理方法 |
PCT/EP2015/064123 WO2015197622A1 (fr) | 2014-06-27 | 2015-06-23 | Procédé de gestion de puissance dans une installation électrique et installation électrique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1456072A FR3023043B1 (fr) | 2014-06-27 | 2014-06-27 | Procede de gestion de puissance dans une installation electrique et installation electrique |
Publications (2)
Publication Number | Publication Date |
---|---|
FR3023043A1 FR3023043A1 (fr) | 2016-01-01 |
FR3023043B1 true FR3023043B1 (fr) | 2016-07-29 |
Family
ID=51830433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1456072A Active FR3023043B1 (fr) | 2014-06-27 | 2014-06-27 | Procede de gestion de puissance dans une installation electrique et installation electrique |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3161775A1 (de) |
CN (1) | CN106663290A (de) |
FR (1) | FR3023043B1 (de) |
WO (1) | WO2015197622A1 (de) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109870937B (zh) * | 2017-12-05 | 2022-02-11 | 佛山市顺德区美的电热电器制造有限公司 | 加热平台组合系统和加热平台组合的控制方法 |
CN110456851A (zh) * | 2019-07-11 | 2019-11-15 | 珠海优特智厨科技有限公司 | 厨房设备控制方法、装置、设备及存储介质 |
CN112555917B (zh) * | 2020-11-11 | 2023-07-25 | 深圳火王智能厨电股份有限公司 | 燃气灶的控制方法、燃气烹饪系统及计算机可读存储介质 |
CN113317688B (zh) * | 2021-06-09 | 2023-04-07 | 广东智源机器人科技有限公司 | 功率控制方法、装置、电子设备以及烹饪系统 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2008541A (en) * | 1933-02-28 | 1935-07-16 | Drury T Boyd | Electric heating device |
US8014905B2 (en) * | 2006-03-09 | 2011-09-06 | Ranco Incorporated Of Delaware | System and method for demand limiting resistive load management |
KR100994517B1 (ko) * | 2008-06-20 | 2010-11-15 | 삼인제어시스템(주) | 최대전력 통합 제어시스템 |
US8204633B2 (en) * | 2008-07-01 | 2012-06-19 | Carina Technology, Inc. | Water heater demand side management system |
CN102971928A (zh) * | 2010-06-29 | 2013-03-13 | 西门子公司 | 根据电网负载接通终端设备 |
GB2486649A (en) * | 2010-12-21 | 2012-06-27 | Responsiveload Ltd | Remotely controlled autonomous responsive load |
JP5439424B2 (ja) * | 2011-03-25 | 2014-03-12 | 株式会社東芝 | 制御装置 |
US20140074307A1 (en) * | 2011-07-13 | 2014-03-13 | Nitto Denko Corporation | On-demand power control system, on-demand power control system program, and computer-readable recording medium recording the same program |
US9450408B2 (en) * | 2011-10-07 | 2016-09-20 | Siemens Corporation | Adaptive demand response based on distributed load control |
JP5899830B2 (ja) * | 2011-11-09 | 2016-04-06 | ソニー株式会社 | 電力管理装置、電力管理方法およびデマンド通知装置 |
US8417391B1 (en) * | 2011-12-15 | 2013-04-09 | Restore Nv | Automated demand response energy management system |
EP2893605B1 (de) * | 2012-09-06 | 2019-04-24 | Auckland UniServices Limited | Lokale nachfrageseitige stromverwaltung für stromversorgungsnetzwerke |
-
2014
- 2014-06-27 FR FR1456072A patent/FR3023043B1/fr active Active
-
2015
- 2015-06-23 WO PCT/EP2015/064123 patent/WO2015197622A1/fr active Application Filing
- 2015-06-23 CN CN201580033543.6A patent/CN106663290A/zh active Pending
- 2015-06-23 EP EP15732600.0A patent/EP3161775A1/de not_active Ceased
Also Published As
Publication number | Publication date |
---|---|
CN106663290A (zh) | 2017-05-10 |
FR3023043A1 (fr) | 2016-01-01 |
EP3161775A1 (de) | 2017-05-03 |
WO2015197622A1 (fr) | 2015-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3247016A4 (de) | Stromverwaltungsvorrichtung | |
EP2988219A4 (de) | Energiesparverwaltungsverfahren und -vorrichtung für ein intelligentes endgerät | |
EP3197001A4 (de) | Stromverwaltungssystem und stromverwaltungsverfahren | |
GB201320858D0 (en) | Method of determining an islanding solution for an electrical power system | |
GB2540364B (en) | Power load management apparatus and method | |
BR302014000630S1 (pt) | Configuração aplicada em equipamento para distribuição de energia | |
FR3021835B1 (fr) | Procede et serveur de gestion de profils | |
EP2972602A4 (de) | Verwaltung von energie in stromversorgungssystemen | |
FR3023043B1 (fr) | Procede de gestion de puissance dans une installation electrique et installation electrique | |
DK3075053T3 (da) | Fremgangsmåde til computerunderstøttet konfiguration af et elektrisk strømnet | |
PT3022812T (pt) | Sistema para operação e monitorização de cabos de energia | |
EP2871750A4 (de) | Stromverwaltungssystem und stromverwaltungsverfahren | |
FR2989535B1 (fr) | Machine electrique et son procede de gestion | |
EP3007296A4 (de) | Leistungsverwaltungsverfahren und leistungsverwaltungsvorrichtung | |
EP3029802A4 (de) | Stromverwaltungssystem und stromverwaltungsverfahren | |
HK1226198A1 (zh) | 電自主套件以及管理方法 | |
GB2530354B (en) | An energy management device and an electrical installation | |
FR3036896B1 (fr) | Convertisseur de puissance et reseau electrique associe | |
FR3015074B1 (fr) | Procede de gestion d'une installation electrique et systeme de gestion d'une telle installation | |
IL249001A0 (en) | Management of devices in the electric power network | |
HK1221991A1 (zh) | 電能測量系統和方法 | |
FR3023992B1 (fr) | Circuit electrique et procede de gestion associe | |
GB201504505D0 (en) | System and method for predicting solar power generation | |
FR3012422B1 (fr) | Procede et systeme de generation de puissance auxiliaire dans un aeronef | |
SG11201601768WA (en) | System and method for efficiently using excess electrical energy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 2 |
|
PLSC | Publication of the preliminary search report |
Effective date: 20160101 |
|
PLFP | Fee payment |
Year of fee payment: 3 |
|
PLFP | Fee payment |
Year of fee payment: 4 |
|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 7 |
|
PLFP | Fee payment |
Year of fee payment: 8 |
|
PLFP | Fee payment |
Year of fee payment: 9 |
|
PLFP | Fee payment |
Year of fee payment: 10 |