FR2970748A1 - Method for realizing maintenance operations i.e. replacement of heavier parts, of floating wind turbine device of off-shore wind energy production system, involves positioning floating wind turbine device on maintenance device - Google Patents

Method for realizing maintenance operations i.e. replacement of heavier parts, of floating wind turbine device of off-shore wind energy production system, involves positioning floating wind turbine device on maintenance device Download PDF

Info

Publication number
FR2970748A1
FR2970748A1 FR1150437A FR1150437A FR2970748A1 FR 2970748 A1 FR2970748 A1 FR 2970748A1 FR 1150437 A FR1150437 A FR 1150437A FR 1150437 A FR1150437 A FR 1150437A FR 2970748 A1 FR2970748 A1 FR 2970748A1
Authority
FR
France
Prior art keywords
wind turbine
float
maintenance
support
turbine device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1150437A
Other languages
French (fr)
Other versions
FR2970748B1 (en
Inventor
Cyril Bourgoin
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nass & Wind Ind
Original Assignee
Nass & Wind Ind
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nass & Wind Ind filed Critical Nass & Wind Ind
Priority to FR1150437A priority Critical patent/FR2970748B1/en
Publication of FR2970748A1 publication Critical patent/FR2970748A1/en
Application granted granted Critical
Publication of FR2970748B1 publication Critical patent/FR2970748B1/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63CLAUNCHING, HAULING-OUT, OR DRY-DOCKING OF VESSELS; LIFE-SAVING IN WATER; EQUIPMENT FOR DWELLING OR WORKING UNDER WATER; MEANS FOR SALVAGING OR SEARCHING FOR UNDERWATER OBJECTS
    • B63C1/00Dry-docking of vessels or flying-boats
    • B63C1/12Docks adapted for special vessels, e.g. submarines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B81/00Repairing or maintaining vessels
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • F03D13/25Arrangements for mounting or supporting wind motors; Masts or towers for wind motors specially adapted for offshore installation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D80/00Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
    • F03D80/50Maintenance or repair
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/10Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
    • B63B1/107Semi-submersibles; Small waterline area multiple hull vessels and the like, e.g. SWATH
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B1/00Hydrodynamic or hydrostatic features of hulls or of hydrofoils
    • B63B1/02Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement
    • B63B1/10Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls
    • B63B1/12Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls the hulls being interconnected rigidly
    • B63B2001/128Hydrodynamic or hydrostatic features of hulls or of hydrofoils deriving lift mainly from water displacement with multiple hulls the hulls being interconnected rigidly comprising underwater connectors between the hulls
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/50Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
    • B63B2021/505Methods for installation or mooring of floating offshore platforms on site
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/44Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
    • B63B2035/4433Floating structures carrying electric power plants
    • B63B2035/446Floating structures carrying electric power plants for converting wind energy into electric energy
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B39/00Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude
    • B63B39/06Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by using foils acting on ambient water
    • B63B2039/067Equipment to decrease pitch, roll, or like unwanted vessel movements; Apparatus for indicating vessel attitude to decrease vessel movements by using foils acting on ambient water effecting motion dampening by means of fixed or movable resistance bodies, e.g. by bilge keels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0091Offshore structures for wind turbines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/93Mounting on supporting structures or systems on a structure floating on a liquid surface
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F05INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
    • F05BINDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
    • F05B2240/00Components
    • F05B2240/90Mounting on supporting structures or systems
    • F05B2240/95Mounting on supporting structures or systems offshore
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/727Offshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

The method involves disconnecting a sinkable float (20) of anchor line systems (3a, 3b, 3c) and an electrical cable (40). A floating wind turbine device (1) is transferred from a production site to a maintenance device (5) by towing. The turbine device is positioned on the maintenance device, so that the turbine device is supported by the maintenance device. The maintenance device is fixed at the bottom (F) of a sub-marine. The turbine device is positioned on a lifting system (6) of the maintenance device. The turbine device is positioned above a movable immersed support (61). An independent claim is also included for a system for producing off-shore wind energy.

Description

i La présente invention concerne un procédé pour la réalisation d'opérations de maintenance sur un dispositif d'éolienne flottante appartenant à un parc de dispositifs d'éolienne flottante, et un système de production d'énergie éolienne offshore correspondant. s Il est connu des systèmes de production d'énergie éolienne offshore comprenant un parc de plusieurs dispositifs d'éolienne flottante offshore, chaque dispositif d'éolienne comportant un flotteur de type servi-submersible et au moins une éolienne montée sur ledit flotteur, un système de ligne d'ancrage pour l'ancrage du flotteur au fond sous-marin Io sur un site de production, et au moins un câble électrique pour la connexion de l'éolienne à un réseau de distribution électrique, par exemple via un câble de puissance sous-marin. Ce type de dispositif d'éolienne flottante permet l'implantation d'éoliennes sur des sites plus éloignés des côtes, avec des profondeurs ls importantes, par exemple de plus de 50 mètres, où l'implantation d'éoliennes fixes sur fondation posée sur le fond sous-marin ne peut être envisagée pour des raisons techniques ou de coûts. L'éloignement des côtes permet notamment une réduction des impacts visuels et sonores pour le rivage, et garantit en outre un vent plus fort et plus régulier, 20 permettant une meilleure production d'énergie. A ce jour, pour effectuer des opérations de maintenance sur les dispositifs d'éolienne flottante, les techniciens sont amenés à bord des dispositifs d'éolienne flottante par bateau ou par hélitreuillage. Les opérations réalisées sur les dispositifs d'éolienne ancrés sur leur site de 25 production, concernent principalement des opérations de maintenance de type légères, c'est-à-dire ne nécessitant pas le remplacement de grosses pièces. Pour des opérations de maintenance plus lourdes, notamment le remplacement de grosses pièces, les barges de type autoélévatrices, classiquement appelées systèmes « jack-up » classiquement utilisées 30 pour les éoliennes offshore fixes ne peuvent être utilisées pour des dispositifs d'éolienne flottante, en raison des profondeurs trop importantes, ainsi que des mouvements des dispositifs d'éolienne flottante. Les autres systèmes de types barge grues flottantes, classiquement appelés « bigues » ne peuvent également pas être 35 envisagés, dans le cadre d'une utilisation régulière ou ponctuelle, en raison de leurs coûts trop importants. Pour ces opérations de 2 The present invention relates to a method for carrying out maintenance operations on a floating wind turbine device belonging to a fleet of floating wind turbine devices, and a corresponding offshore wind power generation system. s Offshore wind power generation systems are known including a fleet of several offshore wind turbine devices, each wind turbine device having a servo-submersible float and at least one wind turbine mounted on said float, a system an anchor line for anchoring the float to the Io submarine bottom on a production site, and at least one electrical cable for connecting the wind turbine to an electrical distribution network, for example via a power cable submarine. This type of floating wind turbine device allows the implantation of wind turbines at sites further away from the coasts, with significant depths, for example of more than 50 meters, where the implantation of fixed wind turbines on a foundation laid on the ground. underwater background can not be considered for technical reasons or costs. The remoteness of the coasts notably makes it possible to reduce visual and sound impacts for the shore, and also guarantees a stronger and more regular wind, allowing better energy production. To date, in order to carry out maintenance operations on floating wind turbine devices, technicians are brought on board floating wind turbine devices by boat or by hoist. The operations performed on the wind turbine devices anchored on their production site mainly concern light maintenance operations, that is to say not requiring the replacement of large parts. For heavier maintenance operations, including the replacement of large parts, self-raising type barges, conventionally known as "jack-up" systems conventionally used for fixed offshore wind turbines, can not be used for floating wind turbine because of the excessive depths, as well as the movements of the floating wind turbine devices. Other barge type floating crane systems, conventionally called "bigues" can not also be envisaged, in the context of regular or punctual use, because of their excessive costs. For these 2 operations

maintenance, les dispositifs d'éolienne flottante sont remorqués vers une zone portuaire, et placés notamment en cale sèche. En raison de l'éloignement du parc et des contraintes pour le remorquage à l'intérieur des ports, notamment liées au tirant d'eau des dispositifs d'éolienne s flottante, ces opérations de transfert vers une zone portuaire sont longues, fastidieuses, onéreuses et risquées. Le but de la présente invention est de proposer une solution visant à pallier les inconvénients précités. A cet effet, la présente invention propose un procédé pour la io réalisation d'opérations de maintenance sur un dispositif d'éolienne flottante appartenant à un parc de dispositifs d'éolienne flottante, ledit dispositif d'éolienne flottante comportant - un flotteur, de préférence de type serai-submersible, et de préférence équipé d'un système de ballast, ls - au moins une éolienne montée sur ledit flotteur, comprenant des pales, un rotor, de préférence à axe de rotation horizontal, une nacelle et un mât, le mât étant assemblé audit flotteur, - un système de ligne d'ancrage pour l'ancrage du flotteur au fond sous-marin sur un site de production ; 20 - au moins un câble électrique pour la connexion de l'éolienne à un réseau de distribution électrique, par exemple via un câble de puissance sous-marin, caractérisé en ce qu'il comprend a) la déconnexion dudit flotteur du système de ligne d'ancrage et 25 du câble électrique, de préférence la déconnexion du câble électrique, puis la déconnexion du système de ligne d'ancrage, b) le transfert par remorquage du dispositif d'éolienne flottante de son site de production vers un dispositif de maintenance, disposé à proximité du parc de dispositifs d'éolienne flottante ou dans ledit parc, 30 c) le positionnement du dispositif d'éolienne sur le dispositif de maintenance, de sorte que le dispositif d'éolienne soit supporté par le dispositif de maintenance, et ainsi stabilisé pour effectuer des opérations de maintenance. Selon l'invention, un dispositif de maintenance fixé au fond est 35 prévu en mer à proximité du parc de dispositifs d'éolienne, ou au sein même du parc. Pour effectuer des opérations de maintenance sur un 3 dispositif, en particulier des opérations lourdes, celui-ci est remorqué jusqu'au dispositif de maintenance et est positionné sur ce dernier de sorte que le dispositif d'éolienne soit stable pour effectuer des opérations de maintenance en toute sécurité. s A titre d'exemple, le dispositif de maintenance est installé à côté du parc, à une distance du parc de moins de 20 miles marin, de préférence à une distance de moins de 10 miles, de sorte que le remorquage d'un dispositif d'éolienne flottante entre le site de production et le dispositif de maintenance soit effectué en moins de deux io heures, de préférence en moins d'une heure, par exemple à une vitesse de l'ordre de 4 noeuds. La présence en mer d'un tel dispositif de maintenance s'avère particulièrement intéressante pour ces sites de production classiquement installés à plus de 20 miles d'un port susceptibles d'accueillir de tels dispositifs d'éolienne, généralement à ls plus de 40 miles d'un tel port. Les opérations de maintenance peuvent ainsi être effectuées rapidement, à proximité du site de production, dans de bonnes conditions de sécurité, sans nécessiter de transfert long, fastidieux et onéreux vers une zone portuaire. 20 Après réalisation d'opérations de maintenance, le procédé selon l'invention comprend - le retrait du dispositif d'éolienne hors du dispositif de maintenance, de sorte que ledit dispositif d'éolienne flotte à nouveau, - le remorquage du dispositif d'éolienne vers son site de 25 production, - la connexion du dispositif d'éolienne à son système de ligne d'ancrage et son câble électrique. Selon une particularité, ledit dispositif de maintenance des étapes b) et c) est non flottant, fixé au fond sous-marin, garantissant ainsi une 30 parfaite stabilité au dispositif d'éolienne lors des opérations de maintenance. A titre d'exemple, le parc éolien est installé à une profondeur de plus de 50 mètres (m), et le dispositif de maintenance est installé à côté du parc à une profondeur de moins de 50111, de préférence à une 35 profondeur de moins de 30 m. 4 maintenance, floating wind turbine devices are towed to a port area and placed in drydock. Due to the remoteness of the fleet and the constraints for towing inside the ports, particularly related to the draft of floating wind turbine devices, these transfer operations to a port area are long, tedious and expensive. and risky. The object of the present invention is to propose a solution to overcome the aforementioned drawbacks. For this purpose, the present invention provides a method for carrying out maintenance operations on a floating wind turbine device belonging to a fleet of floating wind turbine devices, said floating wind turbine device comprising a float, preferably of the serai-submersible type, and preferably equipped with a ballast system, ls - at least one wind turbine mounted on said float, comprising blades, a rotor, preferably having a horizontal axis of rotation, a nacelle and a mast, the mast being assembled to said float, - an anchor line system for anchoring the float to the sea bed at a production site; At least one electrical cable for connecting the wind turbine to an electrical distribution network, for example via a submarine power cable, characterized in that it comprises: a) disconnection of said float from the line system; anchoring and electrical cable, preferably disconnecting the electrical cable, then disconnecting the anchor line system, b) towing the floating wind turbine device from its production site to a maintenance device, disposed near or in the vicinity of the fleet of floating wind turbine devices; c) positioning the wind turbine device on the maintenance device so that the wind turbine device is supported by the maintenance device, and stabilized to perform maintenance operations. According to the invention, a maintenance device fixed to the bottom is provided at sea near the wind turbine equipment park, or within the park itself. To carry out maintenance operations on a device, particularly heavy operations, it is towed to the maintenance device and is positioned on the latter so that the wind turbine device is stable for carrying out maintenance operations. safely. For example, the maintenance device is installed adjacent to the park, at a distance from the park of less than 20 nautical miles, preferably at a distance of less than 10 miles, so that the towing of a device A floating wind turbine between the production site and the maintenance device is carried out in less than two hours, preferably in less than one hour, for example at a speed of the order of 4 knots. The presence at sea of such a maintenance device is particularly interesting for those production sites conventionally installed more than 20 miles from a port likely to accommodate such wind turbine devices, generally at more than 40 miles ls from such a port. Maintenance operations can thus be carried out quickly, close to the production site, in good safety conditions, without requiring a long, tedious and expensive transfer to a port area. After carrying out maintenance operations, the method according to the invention comprises: - withdrawing the wind turbine device from the maintenance device, so that said wind turbine device floats again, - towing the wind turbine device to its production site, - the connection of the wind turbine device to its anchor line system and its electrical cable. According to a feature, said maintenance device of steps b) and c) is non-floating, fixed to the seabed, thus guaranteeing a perfect stability of the wind turbine device during maintenance operations. By way of example, the wind farm is installed at a depth of more than 50 meters (m), and the maintenance device is installed next to the park at a depth of less than 50111, preferably at a depth of less than 50 meters. from 30 m. 4

Selon un mode de réalisation, l'étape c) de positionnement comprend une opération de levage du dispositif d'éolienne au moyen d'un système de levage du dispositif de maintenance. Selon un mode de réalisation, pour cette opération de levage, l'étape c) peut comprendre le s positionnement du dispositif d'éolienne au-dessus d'un support immergé mobile, et la montée dudit support immergé mobile par des moyens de levage pour soulever le dispositif d'éolienne. Avantageusement, l'étape c) de positionnement comprend - un déballastage du flotteur, io - le positionnement du dispositif d'éolienne au-dessus dudit support mobile immergé, - un éventuel ballastage du flotteur pour poser le dispositif d'éolienne sur ledit support mobile immergé, et - la montée dudit support mobile immergé avec un déballastage ls simultané, et progressif du flotteur. Ledit support mobile immergé peut être formé d'un cadre immergé manoeuvré par des systèmes de câble, treuil et/ou vérin, ou d'un caisson ballastable/déballastable pour lever le dispositif par la poussée d' Archimède. 20 En variante, l'opération de levage est réalisée au moyen de bras venant en prise avec des éléments de structure du flotteur, disposés par exemple au-dessus du niveau de la mer Selon un autre mode de réalisation, l'étape c) de positionnement comprend 25 - un déballastage du flotteur, - le positionnement du dispositif d'éolienne au-dessus d'un support immergé, de préférence fixe, du dispositif de maintenance, - le ballastage du flotteur pour poser le dispositif d'éolienne sur ledit support immergé. 30 L'étape c) de positionnement peut comprendre l'amarrage du dispositif d'éolienne au dispositif de maintenance préalablement à l'opération de levage et/ou l'opération de ballastage pour poser le dispositif d'éolienne sur le support immergé fixe. La présente invention a également pour objet un système de 35 production d'énergie éolienne offshore, pour la mise en oeuvre du procédé tel que décrit précédemment, comprenant un parc de dispositifs d'éolienne flottante offshore, chaque dispositif d'éolienne comportant un flotteur, de préférence de type serai-submersible, et au moins une éolienne montée sur ledit flotteur, un système de ligne d'ancrage, un câble électrique pour la connexion de l'éolienne à un réseau de 5 distribution électrique, caractérisé en ce qu'il comprend en outre un dispositif de maintenance, monté fixe sur le fond sous-marin, à proximité du parc de dispositifs d'éolienne flottante ou dans ledit parc, formé d'une ou plusieurs plateformes, et muni de moyens de support aptes à supporter au moins un dispositif d'éolienne flottante déconnecté de son système de ligne d'ancrage et, de préférence, de son câble électrique, ledit dispositif de maintenance étant de préférence équipé de moyens de maintenance pour effectuer des opérations de maintenance sur les dispositifs d'éolienne flottante, en particulier des zones de stockage de pièces, une plate-forme d'héliport ou des outils de maintenance, tels qu'une grue pour le retrait et le montage de pièces importantes du dispositif d'éolienne porté par le dispositif de maintenance, ou des systèmes de manipulation pour déplacer des pièces sur le dispositif de maintenance. La plate-forme d'héliport permet notamment de disposer d'une zone d'atterrissage et de ravitaillement à proximité du parc pour les hélicoptères chargés d'effectuer l'hélitreuillage des techniciens sur les dispositifs d'éolienne flottante. Le dispositif de maintenance est de préférence en outre équipé de moyens de production d'énergie nécessaire au fonctionnement des différents équipements, présents sur le dispositif de maintenance. According to one embodiment, the positioning step c) comprises a lifting operation of the wind turbine device by means of a lifting system of the maintenance device. According to one embodiment, for this lifting operation, step c) may comprise the positioning of the wind turbine device over a mobile immersed support, and the raising of said mobile immersed support by lifting means for lift the wind turbine device. Advantageously, the positioning step c) comprises - a deballasting of the float, - the positioning of the wind turbine device above said immersed mobile support, - a possible ballasting of the float to put the wind turbine device on said mobile support immersed, and - the rise of said immersed mobile support with a deballasting ls simultaneous, and progressive float. Said immersed mobile support can be formed of a submerged frame operated by cable systems, winch and / or jack, or a ballastable / deballastable box to lift the device by buoyancy. As a variant, the lifting operation is carried out by means of arms engaging float structure elements, arranged for example above sea level. According to another embodiment, step c) of FIG. positioning comprises 25 - a deballasting of the float, - the positioning of the wind turbine device over a submerged support, preferably fixed, of the maintenance device, - the ballasting of the float to put the wind turbine device on said support immersed. Positioning step c) may include docking the wind turbine device to the maintenance device prior to the lifting operation and / or the ballasting operation to place the wind turbine device on the fixed immersed support. The present invention also relates to an offshore wind energy production system, for the implementation of the method as described above, comprising a fleet of offshore wind turbine devices, each wind turbine device comprising a float, preferably of the serai-submersible type, and at least one wind turbine mounted on said float, an anchoring line system, an electric cable for connecting the wind turbine to an electrical distribution network, characterized in that further comprises a maintenance device, mounted fixed on the seabed, near the fleet of floating wind turbine devices or in said park, formed of one or more platforms, and provided with support means able to withstand the least one floating wind turbine device disconnected from its anchoring line system and, preferably, its electrical cable, said maintenance device being preferably equal to maintenance means for performing maintenance operations on floating wind turbine devices, particularly coin storage areas, a heliport platform or maintenance tools, such as a crane for removal and mounting large parts of the wind turbine device carried by the maintenance device, or handling systems for moving parts on the maintenance device. The heliport platform notably provides a landing and refueling area near the park for the helicopters responsible for hoisting the technicians on the floating wind turbine devices. The maintenance device is preferably also equipped with energy production means necessary for the operation of the various equipment present on the maintenance device.

De préférence, le dispositif de maintenance est monté fixe sur le fond sous-marin. Selon un mode de réalisation, ledit dispositif de maintenance comprend au moins un système de levage comprenant un support immergé mobile, constituant lesdits moyens de support, apte à être déplacé par des moyens de levage entre une position basse dans laquelle au moins un dispositif d'éolienne est apte à être disposé au-dessus dudit support immergé mobile, sensiblement sans contact avec ce dernier, et une position haute dans laquelle ledit dispositif d'éolienne est apte à être porté par ledit support immergé mobile. Ledit support immergé mobile peut comprendre un cadre, lesdits moyens de levage comprenant des systèmes de câbles et/ou des systèmes de treuils et/ou des systèmes de 6 vérins, de préférence comprenant des câbles reliant ledit cadre à des systèmes de treuil et/ou de vérins, avec éventuellement un système de poulies. De préférence, lesdits moyens de levage comprennent des systèmes de vérins de type vérins traction de câbles. s Dans une variante de réalisation, ledit support immergé mobile comprend un caisson ou bouée ballastable, lesdits moyens de levage comprenant un système de pompe pour ballaster/déballaster ledit caisson. Selon un mode de réalisation, le flotteur du dispositif d'éolienne io flottante est de type serai-submersible, comprenant de préférence au moins trois colonnes. Selon un mode de réalisation, le flotteur des dispositifs d'éolienne comprend un système de ballast, ledit flotteur comprenant par exemple au moins trois colonnes externes reliées les unes aux autres par ls des éléments de liaison, lesdites colonnes formant des ballasts. Selon un autre mode de réalisation, les moyens de support comprennent un support immergé fixe sur lequel au moins un dispositif d'éolienne est apte à se poser par déballastage puis ballastage dudit flotteur. 20 Selon un autre mode de réalisation, ledit dispositif de maintenance comprend en outre une sous-station électrique à laquelle les câbles électriques des dispositifs d'éolienne sont raccordés, de préférence via un ou plusieurs câbles de puissance disposés sur le fond sous-marin, ladite sous-station électrique comprenant des moyens de 25 transformation pour transformer l'énergie électrique délivrée par les éoliennes, en particulier l'amener à une tension plus élevée, pour son transport vers le réseau de distribution. Selon un mode de réalisation, le système comprend en outre une barge de travail comportant au moins un point de fixation pour la 30 fixation de lignes d'ancrage d'un dispositif d'éolienne, lors de la déconnexion dudit dispositif d'éolienne desdites lignes d'ancrage sur le site de production, ladite barge comprenant de préférence au moins un point de fixation pour la fixation du câble électrique. L'invention sera mieux comprise, et d'autres buts, détails, 35 caractéristiques et avantages apparaîtront plus clairement au cours de la description explicative détaillée qui va suivre de modes de réalisation particuliers actuellement préférés de l'invention, en référence aux dessins schématiques annexés, sur lesquels : - la figure 1 est un schéma illustrant un système de production d'énergie éolienne comprenant plusieurs dispositifs d'éolienne flottante s et un dispositif de maintenance ; - la figure 2 est une vue schématique en perspective d'un dispositif d'éolienne flottante ; - la figure 3 est une vue schématique de côté d'un dispositif d'éolienne flottante et d'un dispositif de maintenance selon un premier io mode de réalisation ; - la figure 4 est une vue schématique de dessus du dispositif de maintenance de la figure 3 ; - les figures 5A et 5B sont des vues de côté du dispositif de maintenance, respectivement avec le système de levage en position basse ls et le système de levage en position haute ; - les figures 6A à 6D sont des vues schématiques de côté d'un dispositif d'éolienne flottante illustrant différentes opérations de l'étape de déconnexion ou débranchement électrique ; - la figure 7 est une vue schématique de dessus du dispositif 20 d'éolienne flottante illustrant l'étape de déconnexion des lignes d' amarrage ; - la figure 8 est une vue schématique de dessus du dispositif d'éolienne flottante illustrant l'étape de transfert par remorquage ; - la figure 9 est une vue schématique de dessus du dispositif 25 d'éolienne flottante illustrant le positionnement du dispositif d'éolienne sur le dispositif de maintenance et son amarrage ; - la figure 10 est une vue schématique de côté d'un dispositif d'éolienne flottante et d'un dispositif de maintenance selon un deuxième mode de réalisation ; 30 - la figure 11 est une vue schématique de dessus du dispositif de maintenance de la figure 10 ; - la figure 12 est une vue schématique de côté d'un dispositif de maintenance selon un troisième mode de réalisation ; - la figure 13 est une vue schématique de côté d'un dispositif 35 d'éolienne flottante selon un quatrième mode de réalisation ; Preferably, the maintenance device is fixedly mounted on the sea floor. According to one embodiment, said maintenance device comprises at least one lifting system comprising a mobile immersed support constituting said support means, able to be moved by lifting means between a low position in which at least one device wind turbine is adapted to be disposed above said movable immersed support, substantially without contact with the latter, and a high position in which said wind turbine device is adapted to be carried by said movable immersed support. Said mobile immersed support may comprise a frame, said lifting means comprising cable systems and / or winch systems and / or 6-jack systems, preferably comprising cables connecting said frame to winch systems and / or of jacks, possibly with a system of pulleys. Preferably, said lifting means comprise cable jack type jack systems. In an alternative embodiment, said mobile immersed support comprises a ballastable caisson or buoy, said lifting means comprising a pump system for ballasting / unpacking said caisson. According to one embodiment, the float of the floating wind turbine device is of the serai-submersible type, preferably comprising at least three columns. According to one embodiment, the float of the wind turbine devices comprises a ballast system, said float comprising for example at least three external columns connected to each other by ls of the connecting elements, said columns forming ballasts. According to another embodiment, the support means comprise a fixed immersed support on which at least one wind turbine device is able to land by deballasting then ballasting said float. According to another embodiment, said maintenance device further comprises an electrical substation to which the electrical cables of the wind turbine devices are connected, preferably via one or more power cables arranged on the seabed, said electrical substation comprising transforming means for transforming the electrical energy delivered by the wind turbines, in particular to bring it to a higher voltage, for its transport towards the distribution network. According to one embodiment, the system further comprises a work barge comprising at least one attachment point for attaching anchor lines of a wind turbine device, upon disconnection of said wind turbine device from said lines. anchoring on the production site, said barge preferably comprising at least one attachment point for fixing the electric cable. The invention will be better understood, and other objects, details, features, and advantages will become more clearly apparent from the following detailed explanatory description of particular embodiments of the present invention, with reference to the accompanying schematic drawings. , in which: FIG. 1 is a diagram illustrating a wind energy production system comprising several floating wind turbine devices and a maintenance device; - Figure 2 is a schematic perspective view of a floating wind turbine device; FIG. 3 is a schematic side view of a floating wind turbine device and a maintenance device according to a first embodiment; - Figure 4 is a schematic top view of the maintenance device of Figure 3; - Figures 5A and 5B are side views of the maintenance device, respectively with the low lift system ls and the lifting system in the high position; FIGS. 6A to 6D are schematic side views of a floating wind turbine device illustrating various operations of the disconnection or electrical disconnection step; FIG. 7 is a schematic top view of the floating wind turbine device illustrating the step of disconnecting the mooring lines; FIG. 8 is a schematic view from above of the floating wind turbine device illustrating the step of transfer by towing; FIG. 9 is a schematic view from above of the floating wind turbine device illustrating the positioning of the wind turbine device on the maintenance device and its mooring; FIG. 10 is a schematic side view of a floating wind turbine device and a maintenance device according to a second embodiment; Figure 11 is a schematic top view of the maintenance device of Figure 10; - Figure 12 is a schematic side view of a maintenance device according to a third embodiment; FIG. 13 is a schematic side view of a floating wind turbine device according to a fourth embodiment;

8 - la figure 14 est une vue schématique de dessus d'un dispositif d'éolienne flottante selon un cinquième mode de réalisation, comprenant un système de levage à bras rétractable, lesdits bras étant en position rétractée ; et, - la figure 15 est une vue analogue de celle de la figure 14, les bras étant en position déployée. En référence à la figure 1, le système de production d'énergie éolienne offshore comprend un parc de plusieurs dispositifs 1 d'éolienne flottante et un dispositif 5 de plateforme de maintenance, disposé en mer à proximité du parc. En référence à la figure 2, le dispositif 1 d'éolienne flottante comprend une éolienne 10 et une coque ou flotteur 20 de type semi-submersible. L'éolienne 10 comprend de manière connue des pales 11, un moyeu ou rotor 12 à axe de rotation horizontal, une nacelle 13 et un mât 14. L'éolienne comprend en outre une génératrice, placée dans la nacelle pour produire de l'énergie électrique à partir du mouvement de rotation des pales, des moyens de conversion électrique pour convertir l'énergie électrique produite par la génératrice en une énergie électrique ayant une fréquence donnée, et des moyens de transformation électrique pour transformer la tension entre les phases de l'énergie électrique délivrée par les moyens de conversion pour l'amener à une tension plus élevée, par exemple de l'ordre de 33 000 volts. Les moyens de conversion électrique et les moyens de transformation électrique sont disposés dans la nacelle ou le mât, ou sur le flotteur à l'intérieur d'un contenant, tel que décrit dans la demande de brevet français, déposée au nom de la demanderesse, le 27 décembre 2010, sous le n °1061260, et intitulée « Eolienne flottante offshore avec disposition particulière des moyens de conversion et/ou de transformation électrique », ledit contenant pouvant être sur un élément constitutif du flotteur au dessus de la ligne de flottaison, par exemple sur le haut d'une des colonnes ou sur un élément de liaison supérieur du flotteur, disposé dans un élément du flotteur, par exemple dans une des colonnes, ou bien être formé par l'un des éléments constitutifs du flotteur ou par une partie d'un élément constitutif du flotteur, par exemple par la partie supérieure d'une colonne. 9 Dans le présent mode de réalisation illustré, le flotteur 20 comprend trois colonnes 21a, 21b, 21c verticales externes, de forme cylindrique, disposées à espaces angulaires réguliers autour de l'axe central vertical du flotteur, et reliées entre elles par des éléments de s liaison. Le flotteur est par exemple celui décrit dans la demande de brevet français, déposée au nom de la demanderesse le 22 novembre 2010, sous le n °1059603, et intitulée « Dispositif d'éolienne offshore avec flotteur serai-submersible particulier ». Les éléments de liaison comprennent des poutres inférieures ou pontons 22 horizontaux io entièrement immergés, des poutres 23 supérieures, appelées également passerelles ou ponts, et une pièce de jonction 24 centrale. Les pontons 22 inférieurs, par exemple de section rectangulaire, relient les colonnes deux à deux en partie inférieure, en particulier au niveau de portions 211 inférieures dite de stabilisation, de section plus importante. Les poutres ls 23 supérieures, par exemple de section rectangulaire sont disposées en partie supérieure des colonnes. Chaque poutre supérieure s'étend radialement depuis l'axe central du flotteur vers l'une des colonnes. Les trois poutres 23 sont reliées au niveau de l'axe central à la pièce de jonction 24. Une pièce intermédiaire 27 verticale est assemblée à la pièce 20 de jonction 24 pour le support du mât 14 de l'éolienne. Pour une meilleure résistance structurelle et une meilleure rigidité, les colonnes 21a, 21b, 21c, les pontons 22, les poutres 23 et la pièce intermédiaire 27 sont interconnectés avec une structure en treillis comprenant des entretoises 25 primaires et des entretoises 26 secondaires. 25 En variante le flotteur comprend plus de trois colonnes extérieures, et/ou une colonne centrale sur laquelle repose le mât de l'éolienne. Tel qu'illustré schématiquement à la figure 3, les colonnes forment des ballasts. De préférence, le volume intérieur des colonnes est 30 compartimenté afin de former des compartiments de ballast séparés. Chaque ponton peut également constituer un compartiment de ballast séparé. Des systèmes de canalisation et de pompes sont prévus pour le chargement et le déchargement des eaux de ballast, ainsi que des systèmes de contrôle et de surveillance pour contrôler les systèmes de 35 canalisation. Ces systèmes sont installés sur le dispositif d'éolienne et/ou 2970748 io sur un navire, en particulier un remorqueur servant aux transferts des dispositifs d'éolienne. Le dispositif comprend également un système d'ancrage caténaire ou système de lignes d'ancrage, pour le positionnement de chaque s dispositif d'éolienne flottante sur le site de production, ledit système étant par exemple conçu pour une plage de profondeurs entre 50 et 300 m. Dans le mode de réalisation illustré, ce système d'ancrage comprend trois lignes d'ancrage 3a, 3b, 3c. Les lignes d'ancrage peuvent comprendre des chaînes et/ou des câbles souples, éventuellement équipés io de poids disposés de façon discrète le long de la ligne d'ancrage, et des ancres. Chaque ligne d'ancrage est ancrée au fond F sous marin via une ancre, et est reliée à une colonne, l'angle de déploiement de chaque ligne d'ancrage étant d'environ 120°. Le système d'ancrage caténaire doit empêcher l'éolienne flottante de s'écarter de sa position nominale en ls contrecarrant l'action combinée des efforts moyens induits par l'éolienne, des efforts constants induits par le vent agissant sur le mât et le flotteur, des efforts constants induits par le courant agissant sur le flotteur et des efforts moyens de dérive dus à la houle. D'autre part, le système d'ancrage doit autoriser, sans les contraindre, les mouvements du premier 20 ordre induits par la houle et l'éolienne, et ceci même dans les conditions extrêmes. Le dispositif d'éolienne est relié par un câble électrique, dit câble 40 ombilical ou câble dynamique, à un câble 41 de puissance sous marin destiné à acheminer l'énergie électrique produite par l'éolienne vers le 25 réseau de distribution électrique. Le câble ombilical est relié par une extrémité 40a, par exemple au niveau d'une colonne, à un câble électrique qui est relié aux moyens de transformation de l'éolienne. Les câbles dynamiques des dispositifs du parc sont reliés au fond à un ou plusieurs câbles de puissance 41. 30 Le dispositif 5 de maintenance comprend une ou plusieurs superstructures reposant sur le fond F marin servant aux opérations de maintenance. En référence aux figures 3, 4 et 5A, le dispositif 5 de maintenance comprend une première plateforme 50a dite principale 35 reposant sur le fond marin F, et deux plateformes secondaires 50b, 50c, reposant sur le fond marin, disposées à côté de la première plateforme, et ii sur lesquelles sont montés un système 6 de levage. Les deux plateformes secondaires définissent entre elles une zone de réception 56, cette zone de réception étant ouverte d'un côté pour recevoir un dispositif d'éolienne et fermée de l'autre côté par la plateforme principale 50a. s Le système de levage comprend un cadre 61 immergé, rectangulaire, disposé entre les deux plateformes secondaires, relié par ses côtés latéraux 61a à des moyens 60 de levage disposés sur les plateformes secondaires 50b, 50c. A titre d'exemple, les moyens de levage du cadre comprennent une pluralité de câbles 62 reliés aux côtés io latéraux et des systèmes de vérins hydrauliques 63a, 63b montés en partie supérieure des plateformes secondaires 50b, 50c et agissant sur lesdits câbles pour monter/descendre le cadre. Les systèmes de vérins hydrauliques sont en particulier de type vérins traction de câbles, classiquement appelés système de traction hydraulique « Strand jacks ». ls Des faisceaux de câbles sont fixés au cadre et chaque faisceau de câbles est pris entre des mâchoires, dites mobiles, montées aux extrémités de tige(s) de vérin. Pour le levage, le faisceau de câbles est serré entre les mâchoires mobiles, les mâchoires mobiles sont déplacées vers le haut par les vérins, le faisceau de câbles est pris entre des mâchoires dites fixes, 20 les mâchoires mobiles sont desserrées du faisceau de câbles, descendues par les vérins, et serrées sur le faisceau de câbles, puis les mâchoires fixes sont desserrées. Ce cycle peut être réitéré autant de fois que nécessaire pour lever le cadre à la hauteur souhaitée. Le cadre 61 est défini de sorte qu'un dispositif d'éolienne 25 flottante soit apte à reposer par son flotteur sur ledit cadre. Les moyens de levage permettent de déplacer le cadre dans une position basse illustrée à la figure 5A, dans laquelle un dispositif d'éolienne peut être positionné entre les deux plateformes secondaires, au-dessus dudit cadre, sans contact avec ce dernier, et une position haute illustrée à la figure 5B 30 dans laquelle le dispositif d'éolienne est porté par le cadre, ledit dispositif d'éolienne reposant sur le cadre par les pontons 22 et les parties 211 de stabilisation du flotteur. En variante, les moyens de levage du cadre comprennent - des systèmes de câbles poulies reliant le cadre à des systèmes 35 de treuil montés en partie supérieure des plateformes secondaires, - des vérins hydrauliques agissant directement sur le cadre, et/ou 12 Figure 14 is a schematic top view of a floating wind turbine device according to a fifth embodiment, including a retractable arm lift system, said arms being in the retracted position; and, - Figure 15 is a view similar to that of Figure 14, the arms being in the deployed position. With reference to FIG. 1, the offshore wind power generating system comprises a fleet of several floating wind turbine devices 1 and a maintenance platform device 5 placed at sea near the park. With reference to FIG. 2, the floating wind turbine device 1 comprises a wind turbine 10 and a hull or float 20 of the semi-submersible type. The wind turbine 10 comprises, in known manner, blades 11, a hub or rotor 12 with a horizontal axis of rotation, a nacelle 13 and a mast 14. The wind turbine further comprises a generator, placed in the nacelle to produce energy. electrical power from the rotational movement of the blades, electric conversion means for converting the electrical energy produced by the generator into an electrical energy having a given frequency, and electrical transformation means for transforming the voltage between the phases of the electrical energy delivered by the conversion means to bring it to a higher voltage, for example of the order of 33 000 volts. The electrical conversion means and the electrical transformation means are arranged in the nacelle or the mast, or on the float inside a container, as described in the French patent application, filed in the name of the applicant, on December 27, 2010, under No. 1061260, entitled "Offshore floating wind turbine with special provision for means for conversion and / or electrical conversion", said container being able to be on a constituent element of the float above the waterline, for example on the top of one of the columns or on an upper connecting element of the float, disposed in a float element, for example in one of the columns, or be formed by one of the components of the float or by a part of a constituent element of the float, for example by the upper part of a column. In the present illustrated embodiment, the float 20 comprises three cylindrical vertical columns 21a, 21b, 21c external, arranged at regular angular spaces around the vertical central axis of the float, and interconnected by elements of s liaison. The float is for example that described in the French patent application, filed in the name of the applicant on November 22, 2010, under No. 1059603, and entitled "Offshore wind turbine device with special serai-submersible float". The connecting members comprise fully submerged horizontal beams or horizontal pontoons 22, upper beams 23, also called bridges or bridges, and a central junction piece. The lower pontoons 22, for example of rectangular section, connect the columns two by two in the lower part, in particular at lower portions of said stabilization portion 211, of larger section. The beams ls 23 upper, for example of rectangular section are arranged in the upper part of the columns. Each upper beam extends radially from the central axis of the float to one of the columns. The three beams 23 are connected at the central axis to the junction piece 24. A vertical intermediate piece 27 is assembled to the junction piece 24 for supporting the mast 14 of the wind turbine. For better structural strength and rigidity, the columns 21a, 21b, 21c, the pontoons 22, the beams 23 and the intermediate piece 27 are interconnected with a lattice structure comprising primary struts and secondary struts 26. Alternatively, the float comprises more than three outer columns, and / or a central column on which the mast of the wind turbine rests. As schematically illustrated in Figure 3, the columns form ballasts. Preferably, the interior volume of the columns is compartmentalized to form separate ballast compartments. Each pontoon may also constitute a separate ballast compartment. Piping and pump systems are provided for the loading and unloading of ballast water, as well as control and monitoring systems for controlling the pipeline systems. These systems are installed on the wind turbine device and / or 2970748 on a vessel, particularly a tug for the transfer of wind turbine devices. The device also comprises a catenary anchoring system or anchor line system, for the positioning of each floating wind turbine device at the production site, said system being for example designed for a range of depths between 50 and 300. m. In the illustrated embodiment, this anchoring system comprises three anchor lines 3a, 3b, 3c. The anchor lines may comprise chains and / or flexible cables, optionally equipped with weights arranged discretely along the anchor line, and anchors. Each anchor line is anchored to the seabed F via an anchor, and is connected to a column, the deployment angle of each anchor line being about 120 °. The catenary anchoring system shall prevent the floating wind turbine from deviating from its nominal position by counteracting the combined action of the average forces induced by the wind turbine, constant forces induced by the wind acting on the mast and the float , constant forces induced by the current acting on the float and average drifting forces due to the swell. On the other hand, the anchoring system must allow, without constraining them, the first order movements induced by the swell and the wind turbine, even under extreme conditions. The wind turbine device is connected by an electric cable, said umbilical cable or dynamic cable, to a submarine power cable 41 for conveying electrical energy produced by the wind turbine to the electrical distribution network. The umbilical cable is connected by an end 40a, for example at the level of a column, to an electric cable which is connected to the transformation means of the wind turbine. The dynamic cables of the park devices are connected at the bottom to one or more power cables 41. The maintenance device 5 comprises one or more superstructures resting on the seabed F used for maintenance operations. With reference to FIGS. 3, 4 and 5A, the maintenance device 5 comprises a first so-called main platform 50a resting on the seabed F, and two secondary platforms 50b, 50c, resting on the seabed, arranged next to the first platform, and ii on which are mounted a lifting system 6. The two secondary platforms define between them a receiving zone 56, this reception zone being open on one side to receive a wind turbine device and closed on the other side by the main platform 50a. The lifting system comprises a rectangular immersed frame 61 placed between the two secondary platforms, connected by its lateral sides 61a to lifting means 60 arranged on the secondary platforms 50b, 50c. By way of example, the frame lifting means comprise a plurality of cables 62 connected to the lateral sides and hydraulic cylinder systems 63a, 63b mounted in the upper part of the secondary platforms 50b, 50c and acting on said cables to mount / go down the frame. Hydraulic cylinder systems are in particular of cable traction type, conventionally called "Strand jacks" hydraulic traction system. ls Cable bundles are attached to the frame and each bundle of cables is caught between jaws, said movable, mounted at the ends of rod (s) cylinder. For lifting, the cable bundle is clamped between the movable jaws, the movable jaws are moved upwards by the jacks, the cable bundle is caught between so-called fixed jaws, the movable jaws are loosened from the bundle of cables, lowered by the jacks, and tightened on the wire harness, then the fixed jaws are loosened. This cycle can be repeated as many times as necessary to raise the frame to the desired height. The frame 61 is defined so that a floating wind turbine device 25 is able to rest by its float on said frame. The lifting means make it possible to move the frame in a low position illustrated in FIG. 5A, in which a wind turbine device can be positioned between the two secondary platforms, above said frame, without contact with the latter, and a position 5B in which the wind turbine device is carried by the frame, said wind turbine device resting on the frame by the pontoons 22 and the float stabilization portions 211. In a variant, the frame lifting means comprise pulley cable systems connecting the frame to winch systems mounted in the upper part of the secondary platforms, hydraulic jacks acting directly on the frame, and / or 12

- des systèmes de pignons, crémaillère et moteurs électriques. Tel qu'illustré à la figure 4, la plateforme principale peut être reliée aux plateformes secondaires par des passerelles 51, et le côté 52 de la plateforme principale disposé en vis-à-vis des plateformes secondaires s peut être équipé de deux éléments 57 d'appui et de guidage contre lesquels deux colonnes du flotteur peuvent venir en appui et coulisser lors de la montée/descente du cadre. La plateforme principale supporte des outils de maintenance, tels qu'une grue 53, ainsi qu'une base 54 de vie pour le personnel chargé de 10 la maintenance du système de production d'électricité éolienne. Par ailleurs, la plateforme centrale peut être équipée d'une sous-station électrique 55, à laquelle est connecté le ou les câbles 41 de puissance, comprenant des moyens de transformation pour transformer l'énergie électrique délivrée par le câble de puissance et l'amener à une tension 15 plus élevée pour son transport vers le réseau de distribution via un câble sous marin 42. Le procédé de réalisation d'opérations de maintenance selon l'invention est le suivant. Dans une première étape, le câble 40 dynamique puis les lignes 20 d'ancrage sont déconnectés du dispositif d'éolienne. Les figures 6A à 6D illustrent l'étape de déconnexion du câble dynamique au moyen d'un premier remorqueur 9a. Si besoin, le tirant d'eau du dispositif 1 d'éolienne est réduit en effectuant un déballastage du flotteur, afin d'accéder à l'extrémité 40a du câble dynamique, au- 25 dessus du niveau N de la mer, tel qu'illustré à la figure 6A. Préférentiellement, l'extrémité 40a du câble dynamique est toujours située au dessus du niveau N de la mer. L'extrémité du câble dynamique connecté au flotteur est équipée d'une douille ou chaussette 81 pour permettre sa connexion à l'extrémité du câble d'un treuil 91a d'un 30 premier remorqueur 9a tel qu'illustré à la figure 6B. Le treuil 91a du remorqueur reprend la tension du câble dynamique et le câble est déconnecté du flotteur. L'extrémité 40a du câble dynamique est ramené sur le pont du remorqueur 9a, via son treuil 91a, pour permettre la mise en place d'une bouée 82 sur le câble dynamique, et l'extrémité du câble 35 dynamique équipée de la bouée spécifique 82 est alors libérée dans la 13 mer, tel qu'illustré aux figures 6C et 6D. La bouée est spécialement conçue pour maintenir une tension du câble dynamique adéquate. En référence à la figure 7, la déconnexion des lignes d'ancrage est réalisée au moyen de trois remorqueurs 9a, 9b et 9c, et d'une barge s 83 de travail comprenant trois points de fixation 83a, 83b, 83c pour la fixation des trois lignes d'ancrage. Une douille est mise en place à l'extrémité d'une première ligne d'ancrage 3a pour permettre sa connexion à l'extrémité du câble d'un treuil 91a d'un premier remorqueur 9a. La tension de la ligne d'ancrage 10 est reprise par le treuil afin de déconnecter la ligne d'ancrage du flotteur. L'extrémité de la ligne d'ancrage 3a est amenée sur le pont du remorqueur via son treuil 91a pour la connecter au câble du treuil 831 de la barge. L'extrémité de la ligne est alors déconnectée du câble du treuil du remorqueur, et ramenée sur le pont de la barge via son treuil 831 pour 15 être fixée à ladite barge en un point de fixation 83a. Lors de cette opération, un deuxième remorqueur 9b maintient la barge 83 en position. La même opération est effectuée pour la deuxième ligne d'ancrage 3b, puis pour la troisième ligne d'ancrage 3c. Au moins avant la déconnexion de la troisième ligne 3c d'ancrage, le câble du treuil du 20 troisième remorqueur 9c est connecté à une ligne 84c de remorquage qui est fixée à la troisième colonne 3c du flotteur. Le troisième remorqueur reste en position d'attente, sa ligne de remorquage non tendue, et sert à repositionner le dispositif d'éolienne si nécessaire. La barge peut présenter en outre un point de fixation 832 pour 25 fixer l'extrémité du câble 40 dynamique ou la bouée 82 précitée assemblée à ladite extrémité. En variante, la déconnexion des lignes d'ancrage peut consister à relever les ancres et rembobiner les lignes d'ancrage au moyen de treuils placés sur le flotteur. 30 Après déconnexion des lignes d'ancrage, le dispositif 1 d'éolienne est remorqué du site de production jusqu'au dispositif de maintenance. Afin de faciliter ce transfert, le dispositif peut être déballasté. Le remorquage est effectué par un remorqueur, par exemple le troisième remorqueur 9c. Les premier et deuxième remorqueurs 9a, 9b 35 sont connectés par les lignes 84a, 84b de remorquage aux deux autres 14 colonnes 21a, 21b afin d'aider au positionnement correct du dispositif lors du transfert, tel qu'illustré à la figure 8. La figure 9 illustre le positionnement du dispositif d'éolienne au-dessus du cadre en position basse au moyen des trois remorqueurs. Les s lignes de remorquage du premier remorqueur 9a et du second remorqueur 9b sont décrochées de leurs treuils respectifs, et les deux remorqueurs 9a, 9b viennent de part et d'autre du troisième remorqueur 9c pour pousser le dispositif 1 entre les deux plateformes secondaires 50b, 50c. Le flotteur est amené en appui par ses deux colonnes 21a, 21b 10 contre les deux éléments d'appui et de guidage disposés sur le côté de la plateforme principale, et est amarré au dispositif de plateforme. Le guidage de la plateforme à l'intérieur de la zone de levage peut également être aidé via l'utilisation des lignes d'amarrages. Chacune des colonnes 21a, 21b en appui contre la plateforme principale est amarrée 1s par une première ligne d'amarrage 85 à la plateforme principale 50a et par une deuxième ligne 86 d' amarrage à une plateforme secondaire 50b, 50c. La troisième colonne 21c du flotteur est amarrée par une ligne d'amarrage 87 à chacune des plateformes secondaires. Cet amarrage est réalisé au moyen de systèmes de treuil disposés sur les plateformes 20 secondaires et/ou le dispositif d'éolienne. Une fois l'amarrage effectué, la ligne 84c de remorquage du troisième remorqueur 9c est retirée. Le dispositif d'éolienne peut alors être soulevé en levant le cadre immergé via les deux systèmes 63a, 63b de vérins commandés en synchronisme. Avant de lever le cadre 61 immergé, le dispositif 25 d'éolienne peut être re-ballasté afin de le poser sur le cadre immergé en position basse, et s'assurer que le positionnement du flotteur sur le cadre immergé est correct. Des points de levage spécifiques, renforcés, peuvent être prévus sous les pontons. Le cadre immergé est alors levé par les moyens de levage. Au cours de l'opération de levage, le flotteur 30 est progressivement déballasté. Le cadre est levé dans une position haute illustrée à la figure 5B pour soulever le dispositif d'éolienne jusqu'à une position dans laquelle les vagues n'ont pas d'impact sur le flotteur, de sorte que le dispositif d'éolienne soit stable et immobile pour la réalisation des opérations de maintenance. La figure 3 illustre le système 35 de levage en cours de levage, le cadre 61 étant entre sa position basse et sa position haute. - rack and pinion systems and electric motors. As illustrated in Figure 4, the main platform can be connected to the secondary platforms by bridges 51, and the side 52 of the main platform disposed vis-à-vis secondary platforms s can be equipped with two elements 57 d support and guiding against which two columns of the float can come in support and slide during the rise / descent of the frame. The main platform supports maintenance tools, such as a crane 53, as well as a life base 54 for personnel responsible for the maintenance of the wind power generation system. Furthermore, the central platform may be equipped with an electrical substation 55, to which is connected the power cable or cables 41, including transformation means for transforming the electrical energy delivered by the power cable and the power cable. to bring to a higher voltage for its transport to the distribution network via a submarine cable 42. The method of performing maintenance operations according to the invention is as follows. In a first step, the dynamic cable 40 and the anchor lines 20 are disconnected from the wind turbine device. FIGS. 6A to 6D illustrate the step of disconnecting the dynamic cable by means of a first tug 9a. If necessary, the draft of the wind turbine device 1 is reduced by deballasting the float, in order to access the end 40a of the dynamic cable, above the level N of the sea, such as shown in Figure 6A. Preferably, the end 40a of the dynamic cable is always located above the level N of the sea. The end of the dynamic cable connected to the float is equipped with a socket or sock 81 to allow its connection to the end of the cable. a winch 91a of a first tug 9a as shown in FIG. 6B. The winch 91a of the tug takes the tension of the dynamic cable and the cable is disconnected from the float. The end 40a of the dynamic cable is brought back to the deck of the tug 9a, via its winch 91a, to allow the introduction of a buoy 82 on the dynamic cable, and the end of the dynamic cable equipped with the specific buoy. 82 is then released into the sea, as shown in Figures 6C and 6D. The buoy is specifically designed to maintain adequate dynamic cable tension. With reference to FIG. 7, the disconnection of the anchor lines is carried out by means of three tugs 9a, 9b and 9c, and a working barge 83 comprising three attachment points 83a, 83b, 83c for fixing the three anchor lines. A bushing is placed at the end of a first anchor line 3a to allow its connection to the cable end of a winch 91a of a first tug 9a. The tension of the anchor line 10 is taken up by the winch in order to disconnect the anchor line of the float. The end of the anchor line 3a is brought onto the tug deck via its winch 91a to connect it to the winch cable 831 of the barge. The end of the line is then disconnected from the winch cable of the tug, and returned to the barge deck via its winch 831 to be attached to said barge at a point of attachment 83a. During this operation, a second tug 9b keeps the barge 83 in position. The same operation is performed for the second anchor line 3b, and then for the third anchor line 3c. At least prior to the disconnection of the third anchor line 3c, the winch cable of the third tug 9c is connected to a tow line 84c which is attached to the third column 3c of the float. The third tug remains in the waiting position, its tow line is not tensioned, and is used to reposition the wind turbine device if necessary. The barge may further have an attachment point 832 for securing the end of the dynamic cable 40 or the aforementioned buoy 82 assembled at said end. Alternatively, the disconnection of the anchor lines may consist of raising the anchors and rewind the anchor lines by means of winches placed on the float. After disconnecting the anchor lines, the wind turbine device 1 is towed from the production site to the maintenance device. In order to facilitate this transfer, the device can be deballasted. Towing is performed by a tug, for example the third tug 9c. The first and second tugs 9a, 9b are connected by the tow lines 84a, 84b to the other two columns 21a, 21b to assist in the correct positioning of the device during the transfer, as shown in FIG. FIG. 9 illustrates the positioning of the wind turbine device above the frame in the lower position by means of the three tugs. The tow lines of the first tug 9a and the second tug 9b are detached from their respective winches, and the two tugs 9a, 9b come on either side of the third tug 9c to push the device 1 between the two sub-platforms 50b. , 50c. The float is brought into support by its two columns 21a, 21b against the two support and guide elements arranged on the side of the main platform, and is docked to the platform device. Guidance of the platform within the lifting area can also be assisted through the use of mooring lines. Each of the columns 21a, 21b bearing against the main platform is moored 1s by a first mooring line 85 to the main platform 50a and a second line 86 mooring to a secondary platform 50b, 50c. The third column 21c of the float is moored by a mooring line 87 to each of the secondary platforms. This mooring is achieved by means of winch systems arranged on the secondary platforms and / or the wind turbine device. Once the mooring is completed, the tow line 84c of the third tug 9c is removed. The wind turbine device can then be lifted by raising the immersed frame via the two systems 63a, 63b of synchronously controlled cylinders. Before lifting the immersed frame 61, the wind turbine device 25 can be re-ballasted in order to place it on the immersed frame in the low position, and to ensure that the positioning of the float on the immersed frame is correct. Special lifting points, reinforced, can be provided under the pontoons. The immersed frame is then raised by the lifting means. During the lifting operation, the float 30 is progressively deballasted. The frame is raised to a high position shown in Figure 5B to lift the wind turbine device to a position where the waves have no impact on the float, so that the wind turbine device is stable. and motionless for carrying out maintenance operations. Figure 3 illustrates the lifting system 35 being lifted, the frame 61 being between its low position and its high position.

15 Des opérations de maintenance peuvent alors être réalisées sur le dispositif d'éolienne, par exemple des réparations ou changements de pale, de rotor, de génératrice, de mât, de moyens de conversion, et/ou de moyens de transformation, de colonnes ou d'éléments de liaison du flotteur. Le rotor est maintenue bloqué pendant l'ensemble des opérations de déconnexion, de transfert et de positionnement sur le dispositif de maintenance. Les figures 10 et 11 illustrent un deuxième mode de réalisation dans lequel le dispositif 105 de maintenance comprend une seule plateforme 150 comportant en partie supérieure une zone de réception 156 rectangulaire, ouverte sur l'extérieur, définie entre deux portions latérales 151a, 151b de la plateforme, pour la réception d'un dispositif d'éolienne. Le système de levage 106 comprend un cadre immergé 161 installé entre les deux portions latérales 151a, 151b, et apte à être soulevé par des moyens de levage 160 installés sur les portions latérales, comme décrit précédemment. Le dispositif d'éolienne vient en appui par deux colonnes contre des éléments 157 d'appui et de guidage montés sur la plateforme, dans la zone de réception, à l'opposé de son côté ouvert. Maintenance operations can then be performed on the wind turbine device, for example repairs or changes of blade, rotor, generator, mast, conversion means, and / or transformation means, columns or of float connection elements. The rotor is kept locked during all the disconnection, transfer and positioning operations on the maintenance device. FIGS. 10 and 11 illustrate a second embodiment in which the maintenance device 105 comprises a single platform 150 comprising in the upper part a rectangular reception zone 156, open on the outside, defined between two lateral portions 151a, 151b of the platform, for receiving a wind turbine device. The lifting system 106 comprises a submerged frame 161 installed between the two lateral portions 151a, 151b, and able to be lifted by lifting means 160 installed on the side portions, as previously described. The wind turbine device is supported by two columns against support members 157 and guide mounted on the platform in the receiving zone, opposite its open side.

La plateforme est équipée comme précédemment d'une grue 153, une sous station électrique 155 et d'une station 154 pour le personnel. La figure 12 illustre un troisième mode de réalisation dans lequel le dispositif de maintenance 205 comprend une plateforme 250 comprenant une zone de réception 256 définie entre deux portions latérales 251a, 251b de la plateforme. Le système de levage 206 est formé ici d'un caisson ou bouée 261 ballastable montée coulissante par ses côtés latéraux le long de rails de guidage 264 verticaux montés sur lesdites portions latérales. La bouée est ballastée, via un système de pompe 265 monté sur la plateforme, pour être amenée dans la position basse illustrée à la figure 12. Après positionnement d'un dispositif 1 de d'éolienne au-dessus de ladite bouée ballastée, la bouée est déballastée. Le déballastage de la bouée entraîne la montée de la bouée sur laquelle repose le dispositif d'éolienne. La figure 13 illustre un autre mode de réalisation dans lequel le dispositif 305 de maintenance comprend une plateforme 350 comportant une structure immergée 359 fixe, sur laquelle un dispositif 1 d'éolienne 16 est apte à venir se poser. Le dispositif d'éolienne est déballasté de sorte que son flotteur soit disposé au dessus du niveau de la structure immergée 359, tel qu'illustré par le dispositif référencé 1b. Le dispositif d'éolienne est ensuite amené au-dessus de la structure immergée 359, s puis le dispositif d'éolienne est ballasté, de sorte que le dispositif d'éolienne repose sur la structure immergée, en venant en appui par ses pontons et ses portions de stabilisation sur la structure immergée, tel qu'illustré par le dispositif référencé 1c. Le dispositif d'éolienne est ballasté de sorte que le dispositif repose de manière stable sur la io structure immergée, cette stabilité suffisant à contrecarrer l'impact des vagues sur le flotteur. Selon un autre mode de réalisation illustré aux figures 14 et 15, le dispositif de maintenance 405 comprend un système de levage 406 comportant au moins un bras rétractable et levable, par exemple deux ls bras 461a, 461b rétractables et levables. La plateforme 450 comprend une zone 456 de réception, par exemple de forme triangulaire ou rectangulaire, définie entre deux portions 451a, 451b latérales de la plateforme, pour recevoir un dispositif 1 d'éolienne. Chaque portion latérale est équipée d'un bras 461a, 461b déplaçable, par exemple par un 20 déplacement en translation, entre une position rétractée basse dans laquelle le bras est en retrait par rapport à ladite zone de réception, tel qu'illustré à la figure 14, et une position déployée basse dans laquelle le bras est en saillie dans la zone de réception, tel qu'illustré à la figure 15. Un dispositif d'éolienne est amené dans la zone de réception, les bras 25 étant en position rétractée basse. Après amarrage du dispositif d'éolienne, chaque bras est manoeuvré en position déployée basse de manière à s'étendre entre le ponton 22 reliant deux colonnes 21a, 21c et 21b, 21c, et les poutres s'étendant depuis lesdites colonnes. Les bras en position déployée sont alors manoeuvrés dans une position déployée 30 haute, via des moyens de levage appropriés, pour soulever le dispositif d'éolienne, chaque bras venant en appui de préférence contre la face inférieure de deux poutres 23 du flotteur. Au cours du levage, le flotteur est déballasté progressivement. Des points de levage spécifiques sont avantageusement prévus sous les poutres.The platform is equipped as before with a crane 153, a sub-station 155 and a station 154 for the staff. FIG. 12 illustrates a third embodiment in which the maintenance device 205 comprises a platform 250 comprising a reception zone 256 defined between two lateral portions 251a, 251b of the platform. The lifting system 206 is here formed of a ballastable box or buoy 261 slidably mounted at its lateral sides along vertical guide rails 264 mounted on said lateral portions. The buoy is ballasted, via a pump system 265 mounted on the platform, to be brought into the lower position illustrated in Figure 12. After positioning a device 1 of a wind turbine above said ballasted buoy, the buoy is unpacked. The deballasting of the buoy causes the rise of the buoy on which the wind turbine device rests. FIG. 13 illustrates another embodiment in which the maintenance device 305 comprises a platform 350 comprising a fixed immersed structure 359, on which a wind turbine device 16 is able to come to rest. The wind turbine device is deballasted so that its float is disposed above the level of the immersed structure 359, as illustrated by the device referenced 1b. The wind turbine device is then brought over the submerged structure 359, then the wind turbine device is ballasted, so that the wind turbine device rests on the submerged structure, supported by its pontoons and its components. stabilizing portions on the immersed structure, as illustrated by the device referenced 1c. The wind turbine device is ballasted so that the device rests stably on the immersed structure, this stability sufficient to counteract the impact of the waves on the float. According to another embodiment illustrated in FIGS. 14 and 15, the maintenance device 405 comprises a lifting system 406 comprising at least one retractable and liftable arm, for example two retractable and liftable arms 461a, 461b. The platform 450 comprises a receiving zone 456, for example of triangular or rectangular shape, defined between two lateral portions 451a, 451b of the platform, for receiving a wind turbine device 1. Each lateral portion is equipped with an arm 461a, 461b displaceable, for example by a translation displacement, between a low retracted position in which the arm is recessed with respect to said receiving zone, as illustrated in FIG. 14, and a low deployed position in which the arm protrudes into the receiving zone, as illustrated in FIG. 15. A wind turbine device is brought into the receiving zone, the arms 25 being in the retracted low position. . After docking the wind turbine device, each arm is operated in low deployed position to extend between the pontoon 22 connecting two columns 21a, 21c and 21b, 21c, and the beams extending from said columns. The arms in the deployed position are then maneuvered in a high deployed position, via appropriate lifting means, to lift the wind turbine device, each arm bearing preferably against the underside of two beams 23 of the float. During lifting, the float is gradually deballasted. Specific lifting points are advantageously provided under the beams.

35 Bien que l'invention ait été décrite en liaison avec différents modes de réalisation particuliers, il est bien évident qu'elle n'y est nullement limitée et qu'elle comprend tous les équivalents techniques des moyens décrits ainsi que leurs combinaisons si celles-ci entrent dans le cadre de l'invention. Although the invention has been described in connection with various particular embodiments, it is obvious that it is in no way limited thereto and that it includes all the technical equivalents of the means described as well as their combinations if These are within the scope of the invention.

Claims (17)

REVENDICATIONS1. Procédé pour la réalisation d'opérations de maintenance sur un dispositif d'éolienne flottante appartenant à un parc de dispositifs s d'éolienne flottante, ledit dispositif (1) d'éolienne flottante comportant un flotteur (20), au moins une éolienne (10) montée sur ledit flotteur, un système de lignes d'ancrage (3a, 3b, 3c) pour l'ancrage du flotteur au fond (F) sous-marin sur un site de production, et au moins un câble (40) électrique pour la connexion de l'éolienne à un réseau de distribution Io électrique, caractérisé en ce qu'il comprend a) la déconnexion dudit flotteur (20) du système de ligne d'ancrage (3a, 3b, 3c), et du câble (40) électrique, b) le transfert par remorquage du dispositif (1) d'éolienne flottante de son site de production vers un dispositif de maintenance (5, ls 105, 205, 305, 405), c) le positionnement du dispositif d'éolienne sur le dispositif de maintenance, de sorte que le dispositif d'éolienne soit supporté par le dispositif de maintenance. REVENDICATIONS1. Method for carrying out maintenance operations on a floating wind turbine device belonging to a fleet of floating wind turbine devices, said floating wind turbine device (1) comprising a float (20), at least one wind turbine (10) ) mounted on said float, a system of anchor lines (3a, 3b, 3c) for anchoring the float at the bottom (F) underwater at a production site, and at least one electrical cable (40) for the connection of the wind turbine to an electrical distribution network Io, characterized in that it comprises a) the disconnection of said float (20) from the anchor line system (3a, 3b, 3c), and the cable (40 ) electric, (b) the towing of the floating wind turbine device (1) from its production site to a maintenance device (5, ls 105, 205, 305, 405), (c) the positioning of the wind turbine device on the maintenance device, so that the wind turbine device is supported by the hand device tenancy. 2. Procédé selon la revendication 1, caractérisé en ce que ledit 20 dispositif de maintenance des étapes b) et c) est fixé au fond (F) sous-marin. 2. Method according to claim 1, characterized in that said maintenance device of steps b) and c) is fixed to the bottom (F) underwater. 3. Procédé selon la revendication 1 ou 2, caractérisé en ce que l'étape c) de positionnement comprend une opération de levage du dispositif (1) d'éolienne au moyen d'un système de levage (6, 106, 206, 25 406) du dispositif de maintenance (5, 105, 205, 405). 3. Method according to claim 1 or 2, characterized in that the positioning step c) comprises a lifting operation of the wind turbine device (1) by means of a lifting system (6, 106, 206, 25). 406) of the maintenance device (5, 105, 205, 405). 4. Procédé selon la revendication 3, caractérisé en ce que l'étape c) comprend le positionnement du dispositif (1) d'éolienne au-dessus d'un support (61, 161, 261) immergé mobile, et la montée dudit support immergé mobile pour soulever le dispositif d'éolienne. 30 4. Method according to claim 3, characterized in that step c) comprises the positioning of the wind turbine device (1) above a mobile immersed support (61, 161, 261), and the raising of said support immersed mobile to lift the wind turbine device. 30 5. Procédé selon la revendication 3, caractérisé en ce que l'étape c) de positionnement comprend - un déballastage du flotteur (20), - le positionnement du dispositif (1) d'éolienne au-dessus dudit support mobile immergé (61, 161, 261), 35 - la montée dudit support mobile immergé avec un déballastage simultané du flotteur.19 5. Method according to claim 3, characterized in that the positioning step c) comprises - a deballasting of the float (20), - the positioning of the wind turbine device (1) above said immersed mobile support (61, 161, 261), 35 - the rise of said immersed mobile support with simultaneous deballasting of the float. 6. Procédé selon la revendication 1 ou 2, caractérisé en ce que l'étape c) de positionnement comprend - un déballastage du flotteur (20), - le positionnement du dispositif (1) d'éolienne au-dessus d'un s support immergé (359) fixe, du dispositif de maintenance, - le ballastage du flotteur pour poser le dispositif d'éolienne sur ledit support immergé. 6. Method according to claim 1 or 2, characterized in that the positioning step c) comprises - a deballasting of the float (20), - the positioning of the device (1) wind turbine over a s support immersed (359) fixed, the maintenance device, - ballasting the float to put the wind turbine device on said immersed support. 7. Système de production d'énergie éolienne offshore, pour la mise en oeuvre du procédé selon l'une des revendications 1 à 6, 10 comprenant un parc de dispositifs (1) d'éolienne flottante offshore, chaque dispositif d'éolienne comportant un flotteur (20) et au moins une éolienne (10) montée sur ledit flotteur, un système de ligne d'ancrage (3a, 3b, 3c), un câble électrique (40) pour la connexion de l'éolienne à un réseau de distribution électrique, caractérisé en ce qu'il comprend en 15 outre un dispositif (5, 105, 205, 305, 405) de maintenance muni de moyens de support (61, 161, 261, 359, 461a, 461b) aptes à supporter au moins un dispositif (1) d'éolienne flottante déconnecté de son système de ligne d'ancrage et de son câble électrique, ledit dispositif de maintenance étant équipé de moyens (53, 153) de maintenance pour 20 effectuer des opérations de maintenance sur les dispositifs d'éolienne flottante. An offshore wind energy generating system for carrying out the method according to one of claims 1 to 6, comprising a fleet of offshore wind turbine devices (1), each wind turbine device comprising a float (20) and at least one wind turbine (10) mounted on said float, an anchor line system (3a, 3b, 3c), an electric cable (40) for connecting the wind turbine to a distribution network characterized in that it further comprises a maintenance device (5, 105, 205, 305, 405) provided with support means (61, 161, 261, 359, 461a, 461b) adapted to support at least a floating wind turbine device (1) disconnected from its anchor line system and electrical cable, said maintenance device being provided with maintenance means (53, 153) for performing maintenance operations on floating wind turbine. 8. Système selon la revendication 7, caractérisé en ce que le dispositif (5, 105, 205, 305, 405) de maintenance est monté fixe sur le fond (F) sous-marin. 25 8. System according to claim 7, characterized in that the maintenance device (5, 105, 205, 305, 405) is fixedly mounted on the bottom (F) underwater. 25 9. Système selon la revendication 7 ou 8, caractérisé en ce que ledit dispositif (5, 105, 205) de maintenance comprend au moins un système de levage (6, 106, 206, 406) comprenant un support immergé mobile (61, 161, 261), constituant lesdits moyens de support, apte à être déplacé par des moyens de levage (60, 160, 265) entre une position basse 30 dans laquelle au moins un dispositif d'éolienne est apte à être disposé au-dessus dudit support immergé mobile, et une position haute dans laquelle ledit dispositif d'éolienne est apte à être porté par ledit support immergé mobile. 9. System according to claim 7 or 8, characterized in that said maintenance device (5, 105, 205) comprises at least one lifting system (6, 106, 206, 406) comprising a mobile immersed support (61, 161). , 261), constituting said support means, adapted to be moved by lifting means (60, 160, 265) between a low position 30 in which at least one wind turbine device is adapted to be disposed above said support immersed mobile, and a high position in which said wind turbine device is adapted to be carried by said movable immersed support. 10. Système selon la revendication 9, caractérisé en ce que ledit 35 support immergé mobile comprend un cadre (61, 161), lesdits moyens de20 levage comprenant des systèmes de câbles (62) et/ou des systèmes de treuils et/ou des systèmes (63a, 63b) de vérins. The system of claim 9, characterized in that said movable submerged support comprises a frame (61, 161), said hoisting means including cable systems (62) and / or hoist systems and / or systems (63a, 63b) of cylinders. 11. Système selon la revendication 10, caractérisé en ce que lesdits moyens de levage comprennent des systèmes de vérins de type s vérins traction de câbles. 11. System according to claim 10, characterized in that said lifting means comprise jack systems type s cable traction cylinders. 12. Système selon la revendication 9, caractérisé en ce que ledit support immergé mobile comprend un caisson (261) ou bouée ballastable, lesdits moyens de levage comprenant un système de pompe (265) pour ballaster/déballaster ledit caisson. io 12. System according to claim 9, characterized in that said mobile immersed support comprises a box (261) or ballastable buoy, said lifting means comprising a pump system (265) for ballast / déballaster said box. io 13. Système selon l'une des revendications 7 à 12, caractérisé en ce que le flotteur (20) du dispositif (1) d'éolienne flottante est de type serai-submersible. 13. System according to one of claims 7 to 12, characterized in that the float (20) of the device (1) floating wind turbine is of the type serai-submersible. 14. Système selon l'une des revendications 7 à 13, caractérisé en ce que le flotteur (20) des dispositifs d'éolienne comprend un système de ls ballast. 14. System according to one of claims 7 to 13, characterized in that the float (20) of the wind turbine devices comprises a ls ballast system. 15. Système selon la revendication 7 et 14, caractérisé en ce que les moyens de support comprennent un support immergé fixe (359) sur lequel au moins un dispositif (1) d'éolienne est apte à se poser par déballastage puis ballastage dudit flotteur. 20 15. System according to claim 7, characterized in that the support means comprise a fixed immersed support (359) on which at least one wind turbine device (1) is suitable for landing by deballasting then ballasting said float. 20 16. Système selon l'une des revendications 7 à 15, caractérisé en ce que ledit dispositif de maintenance (5, 105, 205, 305) comprend en outre une sous-station électrique (55) à laquelle les câbles électriques (40) des dispositifs (1) d'éolienne sont raccordés, ladite sous-station électrique comprenant des moyens de transformation pour transformer 25 l'énergie électrique délivrée par les éoliennes. 16. System according to one of claims 7 to 15, characterized in that said maintenance device (5, 105, 205, 305) further comprises an electrical substation (55) to which the electric cables (40) of the Wind turbine devices (1) are connected, said substation including transforming means for transforming the electrical energy delivered by the wind turbines. 17. Système selon l'une des revendications 7 à 16, caractérisé en ce qu'il comprend en outre une barge (83) de travail comportant au moins un point de fixation (83a, 83b, 83c) pour la fixation de lignes d'ancrage (3a, 3b, 3c) d'un dispositif (1) d'éolienne. 17. System according to one of claims 7 to 16, characterized in that it further comprises a barge (83) of work comprising at least one attachment point (83a, 83b, 83c) for fixing lines of anchoring (3a, 3b, 3c) of a wind turbine device (1).
FR1150437A 2011-01-20 2011-01-20 METHOD FOR MAKING MAINTENANCE OPERATIONS ON OFFSHORE FLOATING WINDING DEVICE AND CORRESPONDING SYSTEM Expired - Fee Related FR2970748B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1150437A FR2970748B1 (en) 2011-01-20 2011-01-20 METHOD FOR MAKING MAINTENANCE OPERATIONS ON OFFSHORE FLOATING WINDING DEVICE AND CORRESPONDING SYSTEM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1150437A FR2970748B1 (en) 2011-01-20 2011-01-20 METHOD FOR MAKING MAINTENANCE OPERATIONS ON OFFSHORE FLOATING WINDING DEVICE AND CORRESPONDING SYSTEM

Publications (2)

Publication Number Publication Date
FR2970748A1 true FR2970748A1 (en) 2012-07-27
FR2970748B1 FR2970748B1 (en) 2016-08-12

Family

ID=44454792

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1150437A Expired - Fee Related FR2970748B1 (en) 2011-01-20 2011-01-20 METHOD FOR MAKING MAINTENANCE OPERATIONS ON OFFSHORE FLOATING WINDING DEVICE AND CORRESPONDING SYSTEM

Country Status (1)

Country Link
FR (1) FR2970748B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015051998A1 (en) * 2013-10-08 2015-04-16 Linnhoff Offshore AG Floating wind power plant
JP2015155655A (en) * 2014-02-20 2015-08-27 戸田建設株式会社 Construction method for offshore wind power generation facility
DE102016118078A1 (en) * 2016-09-26 2017-12-28 Aerodyn Engineering Gmbh Floating foundation for a floating wind turbine and wind turbine with floating foundation
EP3212496A4 (en) * 2014-10-27 2018-05-23 Principle Power, Inc. Connection system for array cables of disconnectable offshore energy devices
IT202000011779A1 (en) * 2020-05-20 2021-11-20 Seawind Ocean Tech Holding B V SEMI SUBMERSIBLE FLOATING PLATFORM FOR OFFSHORE ELECTRICITY CONVERSION SYSTEMS AND METHOD FOR THE CONSTRUCTION OF SUCH PLATFORM

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080240864A1 (en) * 2007-04-02 2008-10-02 Ups Wind Management , Llc Assembly, transportation and installation of deepwater windpower plant
WO2010071433A2 (en) * 2008-12-18 2010-06-24 Single Buoy Moorings Inc. Removable offshore wind turbines with pre-installed mooring system
WO2010093259A2 (en) * 2009-02-13 2010-08-19 Vest Kran Wind Power As Offshore wind turbine
US20100293781A1 (en) * 2009-05-22 2010-11-25 Kok Seng Foo Offshore wind turbine installation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080240864A1 (en) * 2007-04-02 2008-10-02 Ups Wind Management , Llc Assembly, transportation and installation of deepwater windpower plant
WO2010071433A2 (en) * 2008-12-18 2010-06-24 Single Buoy Moorings Inc. Removable offshore wind turbines with pre-installed mooring system
WO2010093259A2 (en) * 2009-02-13 2010-08-19 Vest Kran Wind Power As Offshore wind turbine
US20100293781A1 (en) * 2009-05-22 2010-11-25 Kok Seng Foo Offshore wind turbine installation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
TOS: "Keppel bags first major newbuild contract for German offshore wind farm", 24 March 2010 (2010-03-24), XP002657686, Retrieved from the Internet <URL:http://www.tos.nl/nl/nieuws/2010/3/keppel_bags_first_major_newbuild_contract_for_german_offshore_wind_farm.2469.htm> [retrieved on 20110625] *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015051998A1 (en) * 2013-10-08 2015-04-16 Linnhoff Offshore AG Floating wind power plant
US20160245261A1 (en) * 2013-10-08 2016-08-25 Linnhoff Offshore AG Floating wind power plant
CN105980704A (en) * 2013-10-08 2016-09-28 林霍夫海洋公司 Floating wind power plant
US10677224B2 (en) 2013-10-08 2020-06-09 Cruse Offshore Gmbh Floating wind power plant
JP2015155655A (en) * 2014-02-20 2015-08-27 戸田建設株式会社 Construction method for offshore wind power generation facility
EP3212496A4 (en) * 2014-10-27 2018-05-23 Principle Power, Inc. Connection system for array cables of disconnectable offshore energy devices
CN110040212A (en) * 2014-10-27 2019-07-23 原理动力有限公司 The float connector system of marine energy converter devices and the method for installing the system
CN110040212B (en) * 2014-10-27 2021-05-25 原理动力有限公司 Floating connector system for an offshore energy converter device and method for installing the same
DE102016118078A1 (en) * 2016-09-26 2017-12-28 Aerodyn Engineering Gmbh Floating foundation for a floating wind turbine and wind turbine with floating foundation
DE102016118078B4 (en) 2016-09-26 2022-12-15 Aerodyn Consulting Singapore Pte Ltd Floating foundation for a floating wind turbine and wind turbine with a floating foundation
IT202000011779A1 (en) * 2020-05-20 2021-11-20 Seawind Ocean Tech Holding B V SEMI SUBMERSIBLE FLOATING PLATFORM FOR OFFSHORE ELECTRICITY CONVERSION SYSTEMS AND METHOD FOR THE CONSTRUCTION OF SUCH PLATFORM
WO2021234601A1 (en) * 2020-05-20 2021-11-25 Seawind Ocean Technology Holding B.V. Floating platform for supporting offshore power generation structures and method for making said platform

Also Published As

Publication number Publication date
FR2970748B1 (en) 2016-08-12

Similar Documents

Publication Publication Date Title
JP4981167B2 (en) Hydropower turbine deployment system and method
JP5727732B2 (en) Floating structure
CA2520219C (en) A vessel for transporting wind turbines, methods of moving a wind turbine, and a wind turbine for an off-shore wind farm
US7234409B2 (en) Vessel for transporting wind turbines, methods of moving a wind turbine, and a wind turbine for an off-shore wind farm
FR2887900A1 (en) Electricity generating system constructing and installing method, involves towing assembly of ballast, system and structure to site, maintaining descended structure on sea-bed and resetting cans in flotation after detaching, to be reused
JP2017516945A (en) Floating substructure for wind turbine and installation method thereof
EP3954844A2 (en) Turbine system and mooring systems
KR20210010997A (en) Wind turbine and method for installing wind turbine
GB2407114A (en) A method of installing an offshore structure
DK2818703T3 (en) SHIP FOR INSTALLING OFFSHORE WINDMILL AND PROCEDURE FOR INSTALLING OFFSHORE WINDMILL
GB2344843A (en) Gravity securing system for offshore generating equipment
CA2916763A1 (en) Platform for tidal turbines
FR2970748A1 (en) Method for realizing maintenance operations i.e. replacement of heavier parts, of floating wind turbine device of off-shore wind energy production system, involves positioning floating wind turbine device on maintenance device
JP5820953B1 (en) Wind power generator assembly method, wind power generator disassembly method, wind power generator installation method, and wind power generator work ship
JP2018203195A (en) Floating body for maritime construction
JP7495801B2 (en) Floating structure assembly device and assembly method
FR2486561A1 (en) METHOD FOR MOUNTING RELATIVELY SHALLOW, OR MEDIUM DEPTH WATER, AND FOR INSTALLING ON THE OPERATING SITE, A DRILLING AND OIL PRODUCTION PLATFORM WITH A WEIGHT BASE
US20120082530A1 (en) System and method for submerging a hydraulic turbine engine
US20220355907A1 (en) Systems and methods for a rack structure for a transport vessel adapted for use with an offshore self-elevating vessel
JP2023540064A (en) Installation method for marine structures and vessels and marine structures
SE545505C2 (en) Method for arranging a crane machine on a wind power station
WO2024054247A1 (en) Floating offshore wind turbine apparatus and installation method
WO2024121687A1 (en) Floating intervention vessel for temporarily docking on an offshore wind turbine platform and associated intervention assembly and system
CN117425594A (en) Floating manufacturing device and method for building floating structure
FR2698605A1 (en) Self-elevating work platform - has remotely controlled work machinery, cables for pulling down to sea bed, and stabilising legs

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7

PLFP Fee payment

Year of fee payment: 8

PLFP Fee payment

Year of fee payment: 10

PLFP Fee payment

Year of fee payment: 11

PLFP Fee payment

Year of fee payment: 12

ST Notification of lapse

Effective date: 20230905