FR2968110A1 - Method for managing traffic on road, involves identifying equivalent traffic situation based on forecasted traffic demand, and publishing forecast of state of traffic on short term basis based on traffic data of equivalent traffic situation - Google Patents

Method for managing traffic on road, involves identifying equivalent traffic situation based on forecasted traffic demand, and publishing forecast of state of traffic on short term basis based on traffic data of equivalent traffic situation Download PDF

Info

Publication number
FR2968110A1
FR2968110A1 FR1059826A FR1059826A FR2968110A1 FR 2968110 A1 FR2968110 A1 FR 2968110A1 FR 1059826 A FR1059826 A FR 1059826A FR 1059826 A FR1059826 A FR 1059826A FR 2968110 A1 FR2968110 A1 FR 2968110A1
Authority
FR
France
Prior art keywords
traffic
situation
situations
demand
equivalent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR1059826A
Other languages
French (fr)
Other versions
FR2968110B1 (en
Inventor
Boris Demay
David Menegaux
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PHOENIX ISI INGENIERIE DES SYSTEMES D INFORMATIONS
Original Assignee
PHOENIX ISI INGENIERIE DES SYSTEMES D INFORMATIONS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PHOENIX ISI INGENIERIE DES SYSTEMES D INFORMATIONS filed Critical PHOENIX ISI INGENIERIE DES SYSTEMES D INFORMATIONS
Priority to FR1059826A priority Critical patent/FR2968110B1/en
Publication of FR2968110A1 publication Critical patent/FR2968110A1/en
Application granted granted Critical
Publication of FR2968110B1 publication Critical patent/FR2968110B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/01Detecting movement of traffic to be counted or controlled
    • G08G1/0104Measuring and analyzing of parameters relative to traffic conditions

Landscapes

  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Traffic Control Systems (AREA)

Abstract

The method involves preparing (E2) a given set of traffic data measured in traffic situations, and storing the prepared data in a historical database. A traffic demand is forecasted (E3) based on the data stored in the historical database, and an equivalent traffic situation is identified (E4) based on the forecasted traffic demand. The forecast of a state of traffic is published (E5) on a short term basis based on the set of traffic data under the equivalent traffic situation. An independent claim is also included for a system for management of road traffic, comprising a database.

Description

« Procédé de gestion de trafic d'un réseau routier et système de gestion mettant en oeuvre le procédé » La présente invention concerne un procédé de gestion de trafic d'un réseau routier. Elle concerne aussi un système de gestion mettant en oeuvre le procédé. Dans l'état de la technique on connaît des systèmes de gestion de trafic d'un réseau routier dans lesquels des capteurs d'état de trafic routier sont disposés en relation avec les routes du réseau géré. Ces capteurs remontent des informations concernant divers paramètres lo d'état du trafic et qui sont alors traités par un processeur central pour générer en fonction de règles prédéterminées des informations de gestion de trafic. Particulièrement, on connaît des systèmes de gestion de trafic routier qui génèrent des informations à destination des usagers et qui 15 sont affichées sur des panneaux d'affichage en bordure de route ou sur des portiques au-dessus de la route. Ces panneaux d'affichage permettent d'informer le conducteur, qui passe à proximité visuelle du panneau, d'avoir une estimation de la durée du trajet qui l'attend jusqu'à une destination indiquée, comme le passage à une sortie de la 20 route qu'il emprunte. Dans d'autres applications, des informations concernent par exemple la vitesse moyenne de trafic sur un axe routier, la longueur cumulée des encombrements routiers sur le réseau ou d'autres informations qui sont transmises sur un réseau de communication à 25 destination des usagers équipés de terminaux, comme un ordinateur connecté à l'Internet ou un téléphone mobile connecté à un réseau de données numériques téléphoniques. Ces informations sont destinées à inciter les usagers du réseau routier à moduler leur utilisation du réseau routier en fonction de l'état prévisionnel du trafic. 30 Dans d'autres applications, les informations prévisionnelles de trafic sont destinées à commander des moyens de fermeture ou d'ouverture temporaire de voies d'accès à un axe routier déterminé en fonction des données prévisionnelles de trafic. Ainsi, lorsqu'un axe routier atteint un certain degré de congestion, il est connu de 35 commander un feu routier pour arrêter l'entrée de véhicules supplémentaires sur l'axe en cours de congestion. Une telle commande d'un feu exige que la prévision à très court terme sur la variation du trafic ait été la plus précise possible. Or, il existe dans l'état de la technique un besoin pour un procédé de gestion de trafic routier plus efficace. The present invention relates to a traffic management method for a road network. It also relates to a management system implementing the method. In the state of the art, traffic management systems of a road network are known in which road traffic condition sensors are arranged in relation to the roads of the managed network. These sensors provide information about various traffic state parameters lo and are then processed by a central processor to generate traffic management information based on predetermined rules. In particular, road traffic management systems are known which generate information for users and which are displayed on roadside billboards or on gantries over the road. These billboards make it possible to inform the driver, who passes near the visual panel, to have an estimation of the duration of the journey that awaits him to a specified destination, such as the passage to an exit of the 20 road that he borrows. In other applications, information concerns, for example, the average speed of traffic on a road axis, the cumulative length of road congestion on the network or other information which is transmitted over a communication network for users equipped with terminals, such as a computer connected to the Internet or a mobile phone connected to a digital telephone data network. This information is intended to encourage users of the road network to modulate their use of the road network according to the projected traffic. In other applications, the traffic forecast information is intended to control means for closing or temporarily opening access routes to a determined road axis according to the forecast traffic data. Thus, when a road axis reaches a certain degree of congestion, it is known to control a traffic light to stop the entry of additional vehicles on the axis during congestion. Such a control of a fire requires that the very short-term forecast of traffic variation has been as accurate as possible. However, there exists in the state of the art a need for a more efficient road traffic management method.

C'est un but de la présente invention de proposer un procédé de gestion de trafic routier basé sur une méthode de prévision de l'évolution du trafic à très court terme. A cet effet la présente invention concerne un procédé de gestion de trafic routier caractérisé en ce qu'il comporte les étapes de : - Préparation d'un ensemble déterminé de données de trafic mesurées et mémorisation des données mesurées dans un historique de situations de trafic à enregistrer dans une base de données d'historique ; - Prévision de la demande de trafic sur la base de données d'historique ; - Identification d'une situation équivalente dans l'historique de situations de trafic passées sur la base de la demande de trafic prévue ; et - Edition d'une prévision d'un état de trafic routier à très court terme sur la base de la situation de trafic équivalente sous la forme d'un ensemble de données de trafic prévues. Selon d'autres caractéristiques du procédé : - l'étape d'identification d'une situation de trafic équivalente dans un historique de demandes de trafic passées consiste à : - déterminer une période d'identification de demande de trafic ; - déterminer au moins une situation équivalente dans un historique de situations enregistré dans la base de données d'historique de situations, sur la période d'identification de demande de trafic dans l'historique des demandes observées ; - l'étape de prévision de la demande de trafic comporte une étape de détermination d'un profil de demande nominale de trafic pour chaque type de jour établi sur une typologie calendaire prédéterminée, l'étape de détermination d'un profil de demande comportant une étape de détermination : - d'un ensemble de moyennes des débits sur l'ensemble de l'historique ; - d'un ensemble de débits pondérés pour les jours d'une typologie calendaire donnée, pour chaque jour de cette typologie sur la base de données d'historique selon une relation de la forme : <qh> = moyenne(q;, h) ; j de typologie calendaire c et hp < h < hF où h est une horodate dans la tranche horaire définie dans chaque jour de type de jour c et moyenne() est une fonction de calcul de moyennes ; - d'une médiane des débits pondérés pour chaque type de jour de la typologie déterminée selon une relation de la forme : pc,h = mediane(p;,h) ; pour chaque jour j appartenant à la classe c dans la typologie calendaire Ecalendaire, et hp < h < hF, pris comme profil de demande nominal pour le type c de jour ; - le procédé comporte une étape de sélection de la demande nominale prévue recalée par recherche de la plus petite distance entre les débits observés Q et respectivement la demande nominale prévue D, la demande nominale prévue recalée par une moyenne D, et la demande nominale prévue recalée par une médiane D2, et comme fonction de distance, on utilise une fonction de distance cumulative, comme somme des distances partielles calculées chacune comme la distance entre deux éléments de même rang, selon une norme prédéterminée ; - l'étape d'identification d'une situation équivalente dans l'historique de situations de trafic passées sur la base de la demande nominale de trafic prévue comporte une étape de : - pré échantillonnage des situations équivalentes ; puis - échantillonnage des situations équivalentes sur la base du pré échantillonnage ; - l'étape de pré échantillonnage des situations équivalentes consiste à rechercher la plus petite distance entre des situations candidates et la situation observée lors de la dernière observation qui précède la période de prévision à très court terme, sur la base de la méthode des distances cumulatives, comme somme des distances partielles calculées chacune comme la distance entre deux éléments de même rang, selon une norme prédéterminée, et appliquée à n situations Si ayant la même tranche horaire dans le jour que celle de la situation observée lors de la dernière observation qui précède la période de prévision à très court terme, prises sur l'une au moins de trois grandeurs de débit, de taux d'occupation et/ou de vitesse moyenne, et de demande nominale de trafic observées des situations rapprochées de la situation So, et préalablement soumises à un traitement statistique de centrage et de réduction ; - l'étape d'échantillonnage des situations équivalentes consiste à rechercher les plus petites distances entre des situations candidates prises parmi les situations obtenues par pré échantillonnage et la situation observée lors de la dernière observation qui précède la période de prévision à très court terme, sur la base de la méthode des distances par mensuration, prises sur l'une au moins de trois grandeurs de débit, de taux d'occupation et/ou de vitesse moyenne, et de demande nominale de trafic observées des situations rapprochées de la situation, et l'étape d'édition d'une prévision d'un état de trafic routier à très court terme sur la base de la situation de trafic équivalente sous la forme d'un ensemble de données de trafic prévues comporte une étape de construction de la prévision à très court terme à partir des mesures de trafic du jour je de l'historique qui présente la situation ayant la plus petite distance par mensuration parmi les situations identifiées à l'étape d'échantillonnage des situations équivalentes ; - le procédé comporte encore une étape pour exécuter des actions de prévision qui comprennent : - la diffusion d'information de prévision routière ; et/ou - la commande d'actionneurs de contrôle de trafic comme des feux de signalisation ; sur la base de l'édition d'une prévision d'un état de trafic routier à très court terme. La présente invention concerne aussi un système de gestion de trafic routier pour mettre en oeuvre le procédé selon l'invention caractérisé en ce qu'il comporte : - une base de données de mesures de trafic passées ; - un ensemble de capteurs de données de trafic à mesurer ; - un moyen de traitement de données de mesure de trafic ; - un moyen de calcul d'une demande de trafic à une horodate déterminée ; - un moyen d'identification d'une situation de trafic équivalente ; - un moyen de calcul d'une prévision d'un état de trafic routier à très court terme ; et - au moins un dispositif d'exploitation de données de prévision d'état de trafic à très court terme. Selon d'autres caractéristiques du système : - il comporte un module de gestion de trafic comporte des moyens pour éditer des bulletins d'information de prévision de trafic à destination de terminaux ; - les terminaux sont : - des téléphones mobiles ou des appareils du même genre, et le réseau de communication comprenant un réseau de données sur un réseau de téléphonie mobile ; et/ou - des terminaux embarqués à bord des véhicules reliés au module par un réseau de téléphonique mobile, le terminal embarqué étant adapté à un tel réseau de téléphonie mobile comme un récepteur radio-fréquences pour véhicule et le réseau de communications comportant un réseau d'informations routières de type vocal ou numérique comme le réseau RDS-TMC ; - le module de gestion de trafic est connecté à un réseau d'afficheurs d'informations routières, et comporte alors un éditeur d'informations routières adapté à communiquer avec les afficheurs ; - le module de gestion de trafic est connecté à un réseau d'actionneurs de trafic comportant notamment des feux de signalisation, des panneaux de limitation de vitesses des véhicules, des barrières d'accès à une ou plusieurs voies du réseau routier, le module de gestion de trafic comportant un moyen pour générer des signaux de commande destinés à commander les actionneurs de trafic ; - le module de gestion de trafic est connecté par des moyens de communication à des barrières de péage, de sorte que la tarification de l'accès ou de la sortie d'un véhicule dépende notamment de la prévision de trafic à très court terme généré par le système de gestion de trafic de l'invention, et le module comporte des moyens pour déterminer un message de commande de tarification à destination des automates de paiement et/ou pour affichage sur des afficheurs réservés à cet effet à chaque barrière de péage et prévus pour les usagers et/ou pour le personnel chargé de la perception des péages. It is an object of the present invention to provide a method for managing road traffic based on a method for predicting the evolution of traffic in the very short term. To this end, the present invention relates to a method for managing road traffic characterized in that it comprises the steps of: - Preparing a determined set of measured traffic data and storing the measured data in a history of traffic situations at save in a history database; - Forecast traffic demand on the historical database; - Identification of an equivalent situation in the history of past traffic situations based on the expected traffic demand; and - Editing a forecast of a very short-term road traffic condition based on the equivalent traffic situation in the form of a set of expected traffic data. According to other characteristics of the method: the step of identifying an equivalent traffic situation in a history of past traffic requests consists in: determining a traffic request identification period; - determining at least one equivalent situation in a situation history recorded in the situation history database, on the traffic request identification period in the history of the observed requests; the step of predicting the traffic request comprises a step of determining a nominal traffic demand profile for each type of day established on a predetermined calendar typology, the step of determining a demand profile comprising a determination step: - of a set of flow averages over the entire history; - a set of weighted flows for the days of a given calendar typology, for each day of this typology on the basis of historical data according to a relation of the form: <qh> = average (q, h) ; j of calendar typology c and hp <h <hF where h is a time stamp in the time slot defined in each day type day c and mean () is a mean calculation function; a median of the weighted flows for each type of day of the typology determined according to a relation of the form: pc, h = median (p, h); for each day j belonging to the class c in the calendar typology Ecalendaire, and hp <h <hF, taken as nominal demand profile for the type c of day; the method comprises a step of selecting the expected nominal demand recalculated by searching for the smallest distance between the observed flow rates Q and respectively the expected nominal demand D, the expected nominal demand recalibrated by an average D, and the expected nominal demand recalibrated by a median D2, and as a function of distance, a cumulative distance function is used, as sum of the partial distances each calculated as the distance between two elements of the same rank, according to a predetermined norm; the step of identifying an equivalent situation in the history of past traffic situations on the basis of the expected nominal traffic demand comprises a step of: pre-sampling of the equivalent situations; then - sampling of equivalent situations based on pre-sampling; - the pre-sampling stage of equivalent situations consists in finding the smallest distance between candidate situations and the situation observed during the last observation which precedes the very short-term forecast period, on the basis of the cumulative distance method as the sum of the partial distances each calculated as the distance between two elements of the same rank, according to a predetermined norm, and applied to n situations Si having the same time slot in the day as that of the situation observed during the last observation preceding the very short-term forecast period, taken on at least one of three quantities of flow, occupancy rate and / or average speed, and nominal traffic demand observed in situations close to So, and previously subjected to statistical centering and reduction processing; - the step of sampling equivalent situations consists of looking for the smallest distances between candidate situations taken from the situations obtained by pre-sampling and the situation observed during the last observation which precedes the very short-term forecast period, on the basis of the method of measurement distances taken from at least one of three quantities of flow, occupancy and / or average speed, and nominal traffic demand observed in situations close to the situation, and the step of editing a forecast of a very short-term road traffic condition based on the equivalent traffic situation in the form of a set of planned traffic data includes a step of constructing the forecast in the very short term from the traffic measurements of the day I of the history which presents the situation having the smallest distance by measurement among the situation s identified at the sampling stage of equivalent situations; the method further comprises a step for executing prediction actions which comprise: the dissemination of road forecasting information; and / or - the control of traffic control actuators as traffic lights; on the basis of the edition of a forecast of a state of very short-term road traffic. The present invention also relates to a road traffic management system for implementing the method according to the invention characterized in that it comprises: a database of past traffic measurements; a set of traffic data sensors to be measured; means for processing traffic measurement data; a means for calculating a traffic request at a given time stamp; a means of identifying an equivalent traffic situation; a means for calculating a forecast of a very short-term road traffic state; and at least one device for exploiting very short term traffic condition forecast data. According to other features of the system: - it includes a traffic management module includes means for editing traffic forecast information bulletins to terminals; the terminals are: mobile phones or similar devices, and the communication network comprising a data network over a mobile telephone network; and / or onboard terminals on vehicles connected to the module by a mobile telephone network, the onboard terminal being adapted to such a mobile telephone network as a radio-frequency receiver for a vehicle and the communications network comprising a network of mobile telephones. voice or digital traffic information such as the RDS-TMC network; - The traffic management module is connected to a network of traffic information displays, and then includes a road information editor adapted to communicate with the displays; the traffic management module is connected to a network of traffic actuators comprising, in particular, traffic lights, vehicle speed limitation panels, access barriers to one or more road network lanes, the traffic control module; traffic management comprising means for generating control signals for controlling the traffic actuators; the traffic management module is connected by means of communication to toll barriers, so that the charging of the access or the exit of a vehicle depends in particular on the forecast of very short-term traffic generated by the traffic management system of the invention, and the module comprises means for determining a pricing control message intended for payment machines and / or for displaying on displays reserved for this purpose at each tollgate and provided for for the users and / or the personnel charged with the collection of the tolls.

D'autres caractéristiques et avantages de la présente invention seront mieux compris à l'aide de la description qui va suivre et des dessins annexés dans lesquels : - la figure 1 représente un organigramme du procédé de l'invention ; - la figure 2 représente un schéma bloc d'un mode de réalisation d'un système de gestion de trafic selon l'invention. A la Figure 1, on a représenté un organigramme du procédé de l'invention. Le procédé est fondé sur une méthode de prévision à très court terme. Dans une application, la durée de prévision ou horizon de prévision est de 4 heures à compter de la dernière mesure observée. De plus, on note que le procédé de l'invention se base sur la connaissance d'un historique de situations de trafic enregistré dans une base de données de situations de trafic, et sur la mesure de la situation de trafic avant d'exécuter une prévision à très court terme. Other features and advantages of the present invention will be better understood from the following description and the appended drawings in which: FIG. 1 represents a flowchart of the method of the invention; FIG. 2 represents a block diagram of one embodiment of a traffic management system according to the invention. In Figure 1, there is shown a flowchart of the method of the invention. The process is based on a very short-term forecasting method. In one application, the forecast duration or forecast horizon is 4 hours from the last measurement observed. In addition, it is noted that the method of the invention is based on the knowledge of a history of traffic situations recorded in a database of traffic situations, and on the measurement of the traffic situation before executing a traffic situation. very short term forecast.

Dans l'invention, une horodate est une structure de données, composée d'une date d'une journée de l'année et d'une heure de la journée, qui permet ainsi de considérer des tranches horaires identiques pour chaque journée. Les situations sont ainsi comparées ou évaluées sur la base d'une même tranche horaire pour chaque jour calendaire. Ainsi, l'état de trafic à l'heure « 08:00 » sera comparé sur des jours calendaires ayant une caractéristique de trafic comparable. Une situation de trafic est caractérisée par un ensemble de mesures obtenues par l'observation du trafic routier en au moins un point de mesure sur le réseau routier. Dans un mode de réalisation du procédé de l'invention, l'ensemble comporte trois mesures qui sont : - le débit, qui informe de la répartition des véhicules dans le temps ; - le taux d'occupation, qui informe de la proportion de temps pendant lequel un point de mesure est occupé par un groupe de véhicules d'au moins un véhicule ; et - la vitesse moyenne, qui informe de la moyenne temporelle des vitesses instantanées des véhicules. Au sujet du terme de « mesure », on préfèrera le terme « grandeurs » pour désigner et distinguer les types de mesures relevées parmi le débit, le taux d'occupation et la vitesse moyenne. En pratique, une mesure collectée à une horodate donnée comporte une valeur pour une, deux ou trois grandeurs parmi celles citées (suivant le type de réseau : généralement en réseau urbain, seuls le débit Q et le taux d'occupation To sont relevés, tandis qu'en réseau interurbain, le débit Q, le taux d'occupation To et la vitesse moyenne V sont relevés). Dans un mode particulier de réalisation, les inventeurs ont pu déterminer qu'un bon compromis entre le coût d'acquisition et la qualité de la prévision était atteinte par les définitions suivantes. In the invention, a timestamp is a data structure, consisting of a date of a day of the year and a time of the day, which thus makes it possible to consider identical time slots for each day. The situations are thus compared or evaluated on the basis of the same time slot for each calendar day. Thus, the traffic status at time "08:00" will be compared on calendar days having a comparable traffic characteristic. A traffic situation is characterized by a set of measurements obtained by observing road traffic in at least one measurement point on the road network. In one embodiment of the method of the invention, the assembly comprises three measurements which are: the flow rate, which informs the distribution of the vehicles over time; - the occupancy rate, which informs of the proportion of time during which a measurement point is occupied by a group of vehicles of at least one vehicle; and - the average speed, which informs the average time of the instantaneous speeds of the vehicles. For the term "measurement", the term "magnitudes" is used to designate and distinguish the types of measurements found among flow, occupancy and average speed. In practice, a measurement collected at a given time stamp includes a value for one, two or three of the quantities mentioned (depending on the type of network: generally in an urban network, only the rate Q and the occupancy rate To are recorded, while in the interurban network, the rate Q, the occupancy rate To and the average speed V are recorded). In a particular embodiment, the inventors were able to determine that a good compromise between the acquisition cost and the quality of the forecast was achieved by the following definitions.

Le débit de trafic routier est défini par la relation : q = n / (tb - ta) dans laquelle : q est le débit à l'abscisse curviligne x ; n est le comptage du nombre de véhicules passés au point de mesure d'abscisse x entre les horodates ta et tb, définies arbitrairement par tb > ta. Le taux d'occupation i est défini au même point de mesure d'abscisse curviligne x à partir de la même horodate ta de début de mesure par la relation : i = L*p dans laquelle : L est une constante prédéterminée qui représente l'espace moyen occupé par un véhicule sur le réseau ; p est la concentration des véhicules au point de mesure d'abscisse x, entre les horodates ta et tb de mesure. La vitesse moyenne v est définie comme une moyenne arithmétique des véhicules qui sont passés au point de mesure d'abscisse curviligne x par la relation : v = somme(v; ; i IN [1,n]) / n ; OÙ : n est le nombre de véhicules passés entre les deux instants ta et tb au point de mesure d'abscisse x ; et v; est la vitesse instantanée relevée du Lerne véhicule passé au point de mesure d'abscisse x entre les horodates ta et tb. The traffic flow rate is defined by the relation: q = n / (tb - ta) in which: q is the flow rate at the curvilinear abscissa x; n is the count of the number of vehicles passed at the x-axis measurement point x between the timestamps ta and tb, arbitrarily defined by tb> ta. The occupancy rate i is defined at the same point of measurement of curvilinear abscissa x from the same time stamp of the beginning of measurement by the relation: i = L * p in which: L is a predetermined constant which represents the average space occupied by a vehicle on the network; p is the concentration of the vehicles at the x-axis measurement point x, between the time stamps ta and tb of measurement. The mean velocity v is defined as an arithmetic mean of the vehicles that have passed the point of measurement of curvilinear abscissa x by the relation: v = sum (v;; i IN [1, n]) / n; Where n is the number of vehicles passed between the two instants ta and tb at the x-axis measurement point; and V; is the instantaneous velocity taken from the vehicle Lerne passed at the x-axis measurement point x between the time-stamps ta and tb.

Dans le système de gestion de trafic mettant en oeuvre le procédé de l'invention, les capteurs de mesure des trois grandeurs de débit, de taux d'occupation et de vitesse moyenne sont constitués en fonction de l'infrastructure routière disponible. Ainsi, le système de gestion de trafic peut comporter : - des boucles inductives simples ou doubles, noyées sous la chaussée et raccordées à des processeurs de signaux inductifs pour en déduire les deux ou trois grandeurs précitées, selon le nombre de boucles déployées ; - des capteurs piézoélectriques, implantés sous la chaussée et raccordées à des processeurs de signaux piézoélectriques pour en déduire au moins l'une des trois grandeurs précitées ; - des caméras vidéos travaillant dans le spectre visible et/ou en infrarouge pour vision nocturne, implantés ou bien sur l'un des bords de la voie, ou sur un portique au-dessus de la chaussée, et raccordées à des processeurs de signaux vidéo pour en déduire les trois grandeurs précitées ; - des capteurs associés aux caisses de péage, notamment pour compter les véhicules et en déduire des vitesses moyennes sur des parcours entre deux caisses, ces données étant souvent utilisées pour tester des hypothèses de validité de reconstruction de données de trafic manquantes ; - des capteurs associés à des bases de données détenues par des opérateurs de téléphonie mobile et/ou de géolocalisation. Dans ce dernier cas, il est en effet possible de reconstituer des données partielles comprenant le comptage de véhicules équipés ou embarquant des téléphones mobiles, qui peuvent être localisés dans des cellules de téléphonie cellulaire par l'opérateur de téléphonie mobile. De même, les terminaux de géolocalisation coopérant sur les machines informatiques d'un opérateur de géolocalisation, des bases de données de mesures instantanées et de données d'historiques sont aussi disponibles chez ces opérateurs de géolocalisation. Elles permettent par des moyens connus de reconstituer une vitesse de flux de trafic, des comptages de véhicules par unité de temps, des données de vitesse moyenne et donc, par déduction, une estimation des données de débit et/ou de taux d'occupation en des points de mesure qui sont déterminés uniquement par calcul au lieu, comme c'est le cas pour les capteurs physiques précités comme des boucles inductives, de se trouver à l'abscisse curviligne de la position de la boucle inductive sur la voie. A la Figure 1, on a représenté un organigramme du procédé de gestion de trafic de la présente invention. Le procédé comporte essentiellement quatre étapes principales qui sont : - une étape E2 de mémorisation des données brutes mesurées par les capteurs de trafic dans un historique de situations de trafic à enregistrer dans une base de données d'historique et préparation de ces données (décrite par la suite) ; - une étape E3 de prévision de la demande de trafic sur la base des données de trafic mesurées et d'une typologie calendaire ; - une étape E4 d'identification d'une situation équivalente dans l'historique de situations de trafic passées sur la base de la demande de trafic prévue et de la situation en cours d'observation ; et - une étape E5 d'édition d'une prévision d'un état de trafic routier à très court terme sur la base de la situation de trafic équivalente sous la forme d'un ensemble de données de trafic prévu. La base de données prévue à l'étape E2 contient un historique de situations de trafic. Une situation de trafic contient une liste des valeurs mesurées en chaque point de mesure disposé sur le réseau géré par le procédé de l'invention. En se reportant à la Figure 2, on a représenté une partie d'un réseau routier contenant un axe 1 (ou chaussée) sur lequel circule un flot de véhicules. Les véhicules dans le procédé de gestion de l'invention ne sont pas pris en compte au niveau microscopique, mais on observe des grandeurs de mesure du flot ainsi constitué. Le réseau routier contient bien entendu plusieurs axes comme l'axe 1, chacun disposant d'un sens unique ou bien des deux sens de circulation, alors désignés respectivement par sens ascendant et sens descendant de circulation ; on compte également au moins une voie par sens de circulation existant sur un axe. On n'a pas non plus représenté d'intersection routière, ni d'échangeur ou de voie d'accès ou de sortie. Mais un point de mesure peut être placé en tout point d'un réseau routier. Un ensemble 2 de capteurs de données de trafic est disposé le long de chaque voie comme l'axe 1 du réseau routier. Selon le principe de l'invention, on détermine les capteurs 2 nécessaires à la gestion de trafic. Ces capteurs sont placés en des points de mesure déterminés. La position du point de mesure est repérée par une abscisse curviligne mesurée à compter d'un point de référence du réseau routier (non représenté). Le nombre et le type de grandeurs mesurées et donc le type de capteur prévu en chaque point de mesure dépend, ainsi qu'on l'a indiqué plus haut, du type de réseau, comme un réseau urbain ou interurbain. A la figure 2, trois points de mesure 21, 22, 23 ont été représentés et leur position est respectivement désignée par les abscisses curvilignes x,, x2, x3. Bien entendu, un nombre plus élevé de points de mesure 2 peut être utilisé. L'augmentation du nombre de points de mesure est rendue nécessaire sur un réseau routier de grande dimension présentant un maillage important avec un nombre important d'intersections ou de voies différentes. Dans l'analyse qui a été faite par les inventeurs, les grandeurs de mesure du trafic routier sont en chaque point de mesure : - Le nombre de véhicules passant entre deux horodates ta et tb ; - La vitesse instantanée des véhicules au passage au point de mesure ; et - La concentration des véhicules. Cependant, l'analyse a conduit les inventeurs à utiliser trois grandeurs d'observation dérivées des grandeurs de mesure avec lesquelles elles seront confondues dans la suite du texte et qui sont, respectivement : - le débit observé ; - la vitesse moyenne observée ; et - le taux d'occupation observé selon les calculs qui ont été décrits plus haut. In the traffic management system implementing the method of the invention, the measurement sensors of the three quantities of flow, occupancy rate and average speed are formed according to the available road infrastructure. Thus, the traffic management system may comprise: single or double inductive loops, embedded beneath the roadway and connected to inductive signal processors to deduce the two or three quantities mentioned above, depending on the number of loops deployed; piezoelectric sensors, implanted under the roadway and connected to piezoelectric signal processors to deduce at least one of the three quantities mentioned above; - video cameras working in the visible spectrum and / or infrared for night vision, implanted or on one of the edges of the track, or on a gantry above the roadway, and connected to video signal processors to deduce the three quantities mentioned above; sensors associated with the toll boxes, in particular for counting the vehicles and deriving average speeds on routes between two boxes, these data being often used to test assumptions of validity of reconstruction of missing traffic data; - sensors associated with databases held by mobile operators and / or geolocation. In the latter case, it is indeed possible to reconstruct partial data including the counting of vehicles equipped with or carrying mobile phones, which can be located in cell phone cells by the mobile operator. Similarly, geolocation terminals cooperating on the computer machines of a geolocation operator, instant measurement databases and historical data are also available from these geolocation operators. They make it possible by known means to reconstitute a traffic flow rate, vehicle counts per unit of time, average speed data and therefore, by deduction, an estimation of the flow rate and / or occupancy rate data. measuring points which are determined solely by calculation instead of, as is the case for the aforementioned physical sensors such as inductive loops, to be at the curvilinear abscissa of the position of the inductive loop on the track. In Figure 1, there is shown a flowchart of the traffic management method of the present invention. The method essentially comprises four main steps which are: a step E2 of storage of the raw data measured by the traffic sensors in a history of traffic situations to be recorded in a database of history and preparation of these data (described by the following) ; a step E3 for predicting the traffic demand on the basis of the measured traffic data and a calendar typology; a step E4 of identifying an equivalent situation in the history of past traffic situations on the basis of the expected traffic demand and the situation under observation; and a step E5 of editing a forecast of a very short-term road traffic condition on the basis of the equivalent traffic situation in the form of a set of expected traffic data. The database provided in step E2 contains a history of traffic situations. A traffic situation contains a list of measured values at each measurement point on the network managed by the method of the invention. Referring to Figure 2, there is shown a portion of a road network containing an axis 1 (or roadway) on which flows a vehicle stream. The vehicles in the management method of the invention are not taken into account at the microscopic level, but the measurement quantities of the flow thus constituted are observed. The road network contains, of course, several axes such as axis 1, each having a single direction or two directions of traffic, then designated respectively in ascending and descending direction of traffic; there is also at least one lane per direction of traffic existing on an axis. Neither was there a road intersection, interchange, access or exit lane. But a measuring point can be placed anywhere on a road network. A set 2 of traffic data sensors is disposed along each path as the axis 1 of the road network. According to the principle of the invention, the sensors 2 necessary for the management of traffic are determined. These sensors are placed at specific measuring points. The position of the measuring point is indicated by a curvilinear abscissa measured from a reference point of the road network (not shown). The number and type of quantities measured and therefore the type of sensor provided at each measurement point depends, as indicated above, on the type of network, such as an urban or interurban network. In FIG. 2, three measurement points 21, 22, 23 have been represented and their position is respectively designated by the curvilinear abscissae x ,, x2, x3. Of course, a higher number of measurement points 2 can be used. The increase in the number of measurement points is made necessary on a large road network with a large mesh with a large number of intersections or different lanes. In the analysis made by the inventors, the measurement quantities of the road traffic are at each measurement point: the number of vehicles passing between two timestamps ta and tb; - the instantaneous speed of the vehicles at the point of measurement; and - The concentration of vehicles. However, the analysis led the inventors to use three quantities of observation derived from the quantities of measurement with which they will be confused in the rest of the text and which are, respectively: the observed flow rate; - the average speed observed; and the occupancy rate observed according to the calculations which have been described above.

Lorsque l'ensemble des grandeurs d'observation à une horodate ta a été collecté sur l'ensemble des points de mesure du réseau routier, on dispose d'une situation de trafic destinée à être enregistrée dans une base de données 10 d'historique des situations de trafic, après un traitement qui sera décrit plus loin. Dans l'analyse qui a été faite par les inventeurs, une autre notion présente une grande importance : celle de confrontation entre une demande de trafic et une offre de trafic. Selon l'invention, la demande de trafic est une grandeur basée sur une moyenne de débits de véhicules. La demande nominale de trafic est constituée sur la base de l'ensemble des véhicules circulant sur le réseau routier à l'horodate d'observation ta. Elle dépend entièrement de la statistique du comportement des usagers du réseau routier, de leur nombre et de leurs intentions d'itinéraires. La demande nominale est alors la demande la plus fréquemment mesurée, à contexte fixé. Vis-à-vis de la demande de trafic, l'offre de trafic est constituée par l'état du réseau, un état qui se reflète directement dans les grandeurs d'observation. Le principe de la méthode de prévision à très court terme consiste selon l'invention à rapprocher une estimation de la demande de trafic de l'historique des situations de trafic, représentant dans le temps l'évolution des trois grandeurs de débit observé, de taux d'occupation observé et de vitesse observée. Lorsque la prévision à très court terme a été exécutée sur un horizon de prévision à très court terme, il est possible de prolonger l'historique des situations observées par une prévision de trafic représentée par la liste des valeurs des grandeurs observables sur la période allant de la dernière horodate d'observation du trafic ta à l'horodate suivante, séparée de Th l'horizon de prévision à très court terme, soit ta + Th. When all the observation quantities at a time stamp have been collected on all the measuring points of the road network, a traffic situation is available to be recorded in a database of historical records. traffic situations, after a treatment that will be described later. In the analysis made by the inventors, another notion is of great importance: that of confrontation between a demand for traffic and a supply of traffic. According to the invention, the traffic demand is a quantity based on an average of vehicle flows. The nominal traffic demand is constituted on the basis of all vehicles traveling on the road network at the observation time table ta. It depends entirely on the statistics of road users' behavior, their number and their itinerary intentions. The nominal demand is then the most frequently measured demand, with fixed context. With respect to the traffic demand, the traffic supply consists of the state of the network, a state that is directly reflected in the observation variables. The principle of the very short-term forecasting method consists, according to the invention, in comparing an estimate of the traffic demand with the history of the traffic situations, representing over time the evolution of the three observed rate observed occupation and observed speed. When the very short-term forecast has been executed over a very short-term forecast horizon, it is possible to extend the history of the situations observed by a traffic forecast represented by the list of values of the quantities observable over the period from the last traffic watch timestamp at the next timestamp, separated from Th the very short-term forecast horizon, ie ta + Th.

On note que dans le procédé de l'invention, on réalise des sélections de périodes temporelles dans l'historique des situations de trafic pour lesquelles les variables de trafic calculées selon l'invention sont tenues pour des variables explicatives du trafic. L'offre ou la demande de trafic est essentiellement un débit de véhicules sur le réseau routier en un point déterminé du réseau. L'un des aspects de l'invention a consisté à identifier une période explicative pendant laquelle les variables observées ont réellement une valeur explicative. Ce concept de période explicative est semblable à celui d'horizon de prévision, qui sera aussi utilisé et qui est la durée de validité d'une prévision de situations de trafic. It should be noted that in the method of the invention, time period selections are made in the history of the traffic situations for which the traffic variables calculated according to the invention are taken as explanatory variables of the traffic. The supply or demand of traffic is essentially a flow of vehicles on the road network at a given point in the network. One of the aspects of the invention has been to identify an explanatory period during which the observed variables really have an explanatory value. This concept of explanatory period is similar to the forecast horizon, which will also be used, which is the validity period of a forecast of traffic situations.

Dans un mode de réalisation, la période explicative Te est d'une durée de 8 heures, tandis que l'horizon de prévision Th est de 4 heures. Le principe du procédé de l'invention consiste alors à rechercher une situation de trafic passée, équivalente à la situation de trafic observée. Puis, sur la base de cette situation de trafic passée équivalente, on en déduit une prévision à très court terme par l'évolution des situations de trafic passées qui suivent la situation observée équivalente sur la période constituant l'horizon de prévision à très court terme Th. In one embodiment, the explanatory period Te is of a duration of 8 hours, while the forecast horizon Th is 4 hours. The principle of the method of the invention then consists of looking for a past traffic situation, equivalent to the traffic situation observed. Then, on the basis of this past equivalent traffic situation, a very short-term forecast is derived from the evolution of past traffic situations which follow the observed equivalent situation over the period constituting the very short-term forecast horizon. Th.

En revenant à la Figure 1, l'étape E2 exécute un traitement de préparation des données mesurées. Plusieurs étapes sont prévues séparément ou en combinaison, et qui sont : - une étape de disqualification des mesures aberrantes ; - une étape de disqualification des débuts et fins de mesures aberrantes ; - une étape de lissage des mesures ; et - une étape de reconstitution des absences de mesure. La disqualification des mesures aberrantes consiste à exécuter sur chaque mesure de trafic un test d'un critère de disqualification. Returning to FIG. 1, step E2 performs a preparation processing of the measured data. Several steps are planned separately or in combination, and which are: - a step of disqualification of outliers; - a step of disqualification of the beginnings and ends of outliers; a step of smoothing the measurements; and a step of reconstituting the absence of measurement. The disqualification of outliers consists of performing on each traffic measurement a test of a disqualification criterion.

Parmi les critères de disqualification, le procédé de l'invention, dans un mode préféré de réalisation, retient : - la disqualification des débits négatifs ou nuls ; - la disqualification des taux d'occupation strictement négatifs ; et - la disqualification des vitesses moyennes négatives, nulles ou supérieures à un seuil d'invalidité des vitesses mesurées. Dans un mode de réalisation, la vérification d'un seul des trois critères permet de disqualifier la mesure complète. La disqualification des débuts et de fins de mesures aberrantes permet de disqualifier la dernière mesure précédant et la première mesure suivant une mesure disqualifiée lors de l'étape de disqualification des mesures aberrantes. Ainsi, si la mesure A(t;, xi) est déclarée aberrante lors de l'étape de disqualification des mesures aberrantes, alors on décide de disqualifier lors de l'étape suivante de disqualification des débuts et de fins de mesures aberrantes la mesure précédente A(ti_1, xi) et la mesure suivante A(t;+1, xi), pour le point de mesure 21 (Figure 2) disposé à l'abscisse xi. La mesure considérée porte bien entendu sur l'une des trois grandeurs observées selon le procédé de l'invention : débit, taux d'occupation ou vitesse moyenne. Ainsi, une mesure disqualifiée sur au moins une de ces trois grandeurs invalide chacune des valeurs relevées sur les trois grandeurs à une horodate donnée. Dans un mode de réalisation, le procédé de l'invention lors de la préparation des données de l'étape E2 (Figure 1) comporte aussi une étape de filtrage des mesures de manière à éliminer le bruit de mesure en conservant les caractéristiques de trafic. Ainsi, le filtrage peut être réglé de manière à assurer qu'après la préparation des données, les situations de trafic enregistrées dans la base de données d'historique de trafic 10 (Figure 2) permettent de rendre compte des caractéristiques du trafic. Préférentiellement, le filtrage opéré est un lissage par calcul d'une valeur moyenne. Si donc on dispose d'une série de mesures successives dans le temps, à des horodates t;_p, ti_p+1, ---, t;, on calcule la moyenne arithmétique des mesures A(t;, xi) au point d'abscisse xi sur le réseau routier sur les p+1 valeurs précédentes, de sorte que la valeur lissée (ou filtrée) est B(t;, xi) définie par la relation : B(ti, xi) = Somme(A(t;_k, xi) ; i = [O..p]) / (p+1) On désigne cette opération sous le terme de lissage hérité pour l'opposer au cas symétrique non retenu dans le mode de réalisation décrit ici, où la valeur lissée est prise au début de la période de lissage. Dans un mode de réalisation, le procédé de l'invention lors de la préparation des données de l'étape E2 (Figure 1) comporte aussi une étape de reconstitution des mesures manquantes. Une mesure peut être manquante à cause de la défaillance d'un point de mesure ou de l'un de ses capteurs, une défaillance du réseau de communication qui relie les points de mesure à un calculateur central, ou encore une disqualification par l'une des étapes précédentes. Dans une telle situation, on réalise une interpolation linéaire entre les mesures subsistantes qui encadrent la mesure manquante. Among the disqualification criteria, the method of the invention, in a preferred embodiment, retains: the disqualification of negative or zero flow rates; - the disqualification of strictly negative occupancy rates; and - the disqualification of the negative average speeds, zero or higher than a threshold of disability of the measured speeds. In one embodiment, the verification of only one of the three criteria makes it possible to disqualify the complete measurement. The disqualification of the beginning and end of outliers disqualifies the last previous measure and the first measure following a disqualified measure during the disqualification stage of the outliers. Thus, if the measure A (t ;, xi) is declared aberrant during the disqualification step of the outliers, then it is decided to disqualify in the next step of disqualification of the beginnings and ends of outliers the previous measure. A (ti_1, xi) and the next measurement A (t; +1, xi), for the measuring point 21 (Figure 2) disposed at the abscissa xi. The measurement considered of course relates to one of the three quantities observed according to the method of the invention: flow rate, occupancy rate or average speed. Thus, a disqualified measure on at least one of these three magnitudes invalidates each of the values recorded on the three magnitudes at a given time stamp. In one embodiment, the method of the invention during the preparation of the data of step E2 (FIG. 1) also includes a step of filtering the measurements so as to eliminate the measurement noise while preserving the traffic characteristics. Thus, the filtering can be adjusted to ensure that after the data is prepared, the traffic situations recorded in the traffic history database 10 (FIG. 2) make it possible to account for the characteristics of the traffic. Preferably, the filtering performed is a smoothing by calculation of a mean value. If then we have a series of successive measurements in time, at timestamps t; _p, ti_p + 1, ---, t ;, we calculate the arithmetic mean of the measurements A (t ;, xi) at the point d the abscissa xi on the road network on the p + 1 previous values, so that the smoothed (or filtered) value is B (t ;, xi) defined by the relation: B (ti, xi) = Sum (A (t ; k, xi); i = [O..p]) / (p + 1) This operation is referred to as inherited smoothing to oppose it to the symmetrical case not retained in the embodiment described here, where the Smoothed value is taken at the beginning of the smoothing period. In one embodiment, the method of the invention during the preparation of the data of step E2 (FIG. 1) also includes a step of reconstituting the missing measurements. A measurement may be missing because of the failure of a measuring point or one of its sensors, a communication network fault that links the measuring points to a central computer, or a disqualification by one previous steps. In such a situation, a linear interpolation is made between the remaining measurements that frame the missing measurement.

Une telle mesure interpolée Mi correspond à une mesure manquante à l'horodate ti et les deux mesures subsistantes sont Ma à l'horodate ta, dernière mesure avant une période de données manquantes, et Mb à l'horodate tb, première mesure après une période de mesures manquantes. Dans un mode de réalisation, on décide d'appliquer un critère supplémentaire de période maximale admissible d'interpolation Ainterpol qui est la durée maximale pendant laquelle une reconstitution de données manquantes est envisageable. Une telle valeur de seuil doit être initialisée dans le procédé de l'invention et elle est établie à une valeur prédéterminée qui respecte notamment la capacité du procédé de réaliser une prévision à très court terme en utilisant des données interpolées. Par exemple, la période limite d'interpolation est réglée à 18 minutes, dans une prévision travaillant à très court terme sur une période de quatre heures et pour des données collectées sur une durée de 6 minutes. Typiquement, on prendra une période limite d'interpolation valant trois fois la durée de collecte d'une mesure. La condition d'interpolation est alors écrite par la relation 0 < tb - ta < Ainterpol et la relation classique d'interpolation est alors : pour tout ti 1 ta < ti < tb Mi = Ma + (ti - ta) * (Mb - Ma) / (tb - ta) pour toute grandeur de la mesure observée M dans le cadre du procédé de gestion de trafic de l'invention, comme le débit, le taux d'occupation et la vitesse moyenne, à chaque point de mesure d'abscisse curviligne x; d'horodate ti comprise entre deux horodates d'observation correctes ta et tb, respectant la condition d'interpolation. Such an interpolated measure Mi corresponds to a measurement missing from the timestamp ti and the two remaining measures are Ma at the time stamp, last measure before a period of missing data, and Mb at the time stamp tb, the first measure after a period missing measures. In one embodiment, it is decided to apply a further criterion of maximum permissible interpolation period Ainterpol which is the maximum duration during which reconstitution of missing data is possible. Such a threshold value must be initialized in the method of the invention and it is set to a predetermined value which, in particular, respects the capacity of the method to carry out a very short-term forecast using interpolated data. For example, the interpolation limit period is set to 18 minutes, in a very short-term forecast over a period of four hours and for data collected over a period of six minutes. Typically, we will take an interpolation limit period worth three times the collection time of a measurement. The interpolation condition is then written by the relation 0 <tb - ta <Ainterpol and the classical interpolation relation is then: for all ti 1 ta <ti <tb Mi = Ma + (ti - ta) * (Mb - Ma) / (tb - ta) for any magnitude of the measurement observed M in the context of the traffic management method of the invention, such as the flow rate, the occupancy rate and the average speed, at each measurement point d curvilinear abscissa x; of timestamp ti between two correct observing timestamps ta and tb, respecting the interpolation condition.

Lors d'une dernière horodate de mesure, on dispose de l'ensemble des informations nécessaires pour décrire un état de trafic nécessaire pour orienter avec précision la tendance d'évolution du trafic à très court terme. Dans ce but, la présente invention comporte une étape E3 de prévision de la demande de trafic sur la base de données d'historique. L'historique contient l'ensemble des états de trafic ou situations qui sont successivement enregistrés. During a last measurement time stamp, we have all the information necessary to describe a traffic state necessary to accurately guide the trend of traffic evolution in the very short term. For this purpose, the present invention comprises a step E3 for predicting the traffic demand on the historical data base. The history contains all the traffic reports or situations that are successively recorded.

L'étape E3 commence par une étape de détermination d'un type de journée selon une typologie calendaire prédéterminée. Dans un mode de réalisation, le critère de typologie consiste à regrouper les jours selon les critères d'activité sociale des usagers en distinguant les jours de congé, les jours de travail, les jours fériés, etc. Il est possible de fixer librement lors de l'initialisation du procédé des catégories de jours de l'année qui constituent une typologie calendaire. On désigne la typologie calendaire par Ecalendaire, de sorte que, notamment dans l'exploration de la base de données de l'historique des situations de trafic, chaque date peut être affectée à un type de jour, c'est-à-dire que l'on peut déterminer à quel type ou catégorie du calendrier le jour considéré appartient. On établit alors un profil de demande du trafic pour chaque type de jour de la typologie calendaire retenue Ecalendaire- Le profil de demande du trafic est établi de la manière suivante. On exécute le calcul des moyennes <qh> des débits sur l'ensemble de l'historique pour des horodates h comprises entre hp et hF, horodates de début de tranche horaire et de fin de tranche horaire, arbitrairement fixée dans chaque journée. Préférentiellement, hp correspondant à l'heure « 00:00 »et hF à l'heure « 24:00 » du jour j de type de jour c. Pour toutes les horodates h enregistrées du débit pour un jour j de type de jour c dans la base de données d'historique, on calcule : <qh> = moyenne(q;, h) ; j de type de jour c et hp < h < hF Chaque <qh> représente un débit moyen horaire relevé dans l'historique du point de mesure. Par exemple, q(02h00) = moyenne (gi(02h00)), i = [O..n], n étant le nombre de jours présents dans l'historique. On exécute ensuite le calcul des débits pondérés pour chaque type c de la typologie calendaire Ecalendaire, selon une relation de la forme : p;,h = q;,h / <qh> ; pour j de type de jour c et hp < h < hF Enfin, on exécute le calcul des médianes de l'ensemble des débits pondérés, pour chaque type de jour c de la typologie calendaire, selon une relation de la forme : pc,h = mediane(p;,h) ; pour chaque jour j appartenant à la classe c dans la typologie calendaire Ecalendaire, et hD < h < hF On note que les débits de l'ensemble des débits utilisé pour le calcul des médianes sont calculés indépendamment pour chaque point de mesure. Ils ne dépendent donc pas de l'abscisse. On obtient ainsi le profil de demande nominale constitué pour chaque type de jour de la typologie calendaire Ecalendaire, dans la tranche horaire quotidienne. Le profil de demande nominale pour le jour calendaire de type c est un ensemble de données {pc,h ; h hD.< h < hF}. Il y a autant de profils de demande nominaux qu'il y a de types c dans la typologie calendaire Ecalendaire- La fonction mediane() utilisée pour définir les médianes des débits pondérés permet de sélectionner le terme pc,h, qui partage en deux moitiés égales l'ensemble des valeurs {(p;,h) ; hD < h < hF} après qu'il ait été ordonné en valeurs croissantes ou décroissantes. Dans le procédé de l'invention, pour l'étape E3 de prévision de la demande du trafic sur la base de données d'historique, on exécute ensuite une étape d'identification de la demande nominale optimale. De l'étape précédente, on dispose de la liste des profils de demande nominale pour chaque type de jour c de la typologie calendaire. L'étape suivante, dans un mode de réalisation du procédé de l'invention, est, pour un jour observé jo, de déterminer un profil de demande nominale optimal. Pour obtenir un tel profil de demande optimal, l'invention consiste à calculer les débits pondérés pour toute horodate h comprise entre hD et ho, respectivement horodate de la tranche horaire de début de journée, et horodate de la dernière tranche horaire observée, selon la relation : p;o,h = q;o,h / <qh> pour le jour de la dernière observation L'ensemble des débits pondérés {p;o,h ; h IN [hD, ho» constitue le profil de débit du jour observé jo. Le profil de demande nominale optimal est ensuite identifié en comparant l'ensemble des profils de demande nominale établis pour chaque type de jour, que l'on a noté : {{pc,h , h hD-< h < hF} , c dans Ecalendaire} au profil de débit du jour observé jo. Step E3 begins with a step of determining a type of day according to a predetermined calendar typology. In one embodiment, the typology criterion consists in grouping the days according to the criteria of social activity of the users by distinguishing the days off, the days of work, the holidays, etc. It is possible to set freely during the initialization of the process categories of days of the year that constitute a calendar typology. The calendar typology is designated by Ecalendaire, so that, especially in the exploration of the history database of traffic situations, each date can be assigned to a type of day, that is to say that the type or category of the calendar on which the day is considered can be determined. A traffic request profile is then established for each type of day of the selected calendar typology Ecalendaire- The traffic request profile is established as follows. The averages <qh> of the flows are computed over the entire history for time stamps h between hp and hF, time stamps at the start of the time slot and at the end of the time slot, arbitrarily fixed in each day. Preferably, hp corresponding to the time "00:00" and hF to the hour "24:00" of the day j of day type c. For all time stamps h recorded for a day d of day type c in the history database, calculate: <qh> = average (q; h); j of day type c and hp <h <hF Each <qh> represents an average hourly flow recorded in the history of the measuring point. For example, q (02h00) = average (gi (02h00)), i = [O..n], where n is the number of days in the history. We then perform the calculation of the weighted flows for each type c of the Ecalendaire calendar typology, according to a relation of the form: p;, h = q;, h / <qh>; for day type day c and hp <h <hF Finally, we calculate the medians of the set of weighted flows, for each type of day c of the calendar typology, according to a relation of the form: pc, h = median (p, h); for each day j belonging to the class c in the calendar typology Ecalendaire, and hD <h <hF It is noted that the flows of all flows used for the calculation of the medians are calculated independently for each measurement point. They do not depend on the abscissa. This gives the nominal demand profile for each type of day of the Ecalendaire calendar typology in the daily time slot. The nominal demand profile for the type c calendar day is a set of data {pc, h; h hd. <h <hf}. There are as many nominal demand profiles as there are types c in the calendar typology Ecalendaire- The median function () used to define the medians of the weighted flows allows to select the term pc, h, which divides into two halves equal to the set of values {(p;, h); hD <h <hF} after it has been ordered in increasing or decreasing values. In the method of the invention, for the step E3 for predicting the traffic demand on the history data base, a step of identifying the optimal nominal demand is then carried out. From the previous step, we have the list of nominal demand profiles for each type of day c of the calendar typology. The next step, in one embodiment of the method of the invention, is, for a day observed jo, to determine an optimal nominal demand profile. To obtain such an optimal demand profile, the invention consists in calculating the weighted flows for any time stamp h between hD and ho, respectively the time stamp of the start of day time slot, and the time stamp of the last observed time slot, according to the relation: p; o, h = q; o, h / <qh> for the day of the last observation The set of weighted flows {p; o, h; h IN [hD, ho] is the flow profile of the observed day jo. The optimal nominal demand profile is then identified by comparing the set of nominal demand profiles established for each type of day, which is noted: {{pc, h, h hD- <h <hF}, c in Ecalendary} to the debit profile of the observed day jo.

L'étape E3 d'identification d'une demande de trafic comporte ensuite une étape de prévision de la demande nominale proprement dite. Cette opération consiste à établir une demande nominale prévue à partir du profil de demande nominale optimal obtenue lors de l'étape précédente, dans l'étape E3. On appelle la demande de trafic prévue une liste dh, valable sur une durée comprenant les horodates comptées à partir de l'horodate de début de prévision, c'est-à-dire en exploitation du procédé l'horodate ho de la dernière situation observée et chargée dans l'historique de la base de données 10, et sur la période de prévision à très court terme ayant une durée ou horizon de prévision Ts de quatre heures dans un mode préféré de réalisation. Dans un mode de réalisation, le terme courant dh de la demande prévue d est donné par la relation : dh-pi,h*<qh> où : h est l'horodate courante du terme calculé dans la période de prévision à très court terme Ts ; pi,h est le h-ième terme du profil de demande nominale optimal sélectionné à l'étape précédente ; et <qh> est la moyenne des débits sur une tranche horaire prédéfinie, pour les horodates h comprises entre hp et hF, de début et de fin de tranche horaire. Dans un mode de réalisation, la demande de trafic prévue est ensuite traitée pour s'adapter aux données de l'historique. Préférentiellement, le traitement est une opération de recalage de la prévision de demande nominale en fonction du débit observé sur la période explicative. L'opération de recalage permet d'exécuter une mise à l'échelle de la demande. Selon l'invention, on peut choisir deux types de recalage : - par moyennes ; - par médianes. Dans cette étape de recalage de la demande prévue, on exécute les opérations successives suivantes - calcul des écarts des débits observés deux à deux ; - calcul des écarts des demandes prévues deux à deux ; - calcul du rapport des écarts des demandes aux écarts des débits ; Fmoyenne - calcul de la divergence du rapport des écarts par moyenne et par médiane Fmédiane, respectivement par calcul des moyennes des rapports des écarts et des médianes des rapports des écarts ; - calcul permettant la mise à l'échelle de la demande prévue selon les divergences obtenues précédemment, soit dh,1 pour la moyenne Fmoyenne et dh,2 pour la médiane Fmédiane, selon une relation de la forme dh,1 = dh / Fmoyenne et dh,2 = dh / Fmédiane, pour toutes les horodates h, dans la tranche horaire en cours avant l'horodate ho de la dernière observation de trafic avant la période de prévision ; - calcul d'un décalage p entre les débits observés et la demande mise à l'échelle dans chacun des cas de recadrage par moyenne p1 ou par médiane p2, selon les relations respectives : p1 = somme(qh - dh,1 ; hp < h < ho) et p2 = somme(gh - dh,2 ; hp < h < ho) ; - calcul d'ajustement du volume de la demande nominale prévue et recalée selon les deux méthodes de moyenne et de médiane, selon les relations respectives Dh, 1 = dh, 1 + p1 et Dh, 2 = dh, 2 + p2, pour les horodates h comprises entre hp < h < ho ; - sélection de la demande nominale prévue recalée par recherche de la plus petite distance entre les débits observés Q et respectivement la demande nominale prévue D, la demande nominale prévue recalée par la moyenne D1 et la demande nominale prévue recalée par la médiane D2. La demande nominale prévue est donc l'une des trois demandes nominales D, D1, et D2 issues de l'étape de recalage. Comme fonction de distance, on peut utiliser toute norme convenable. Dans un mode de réalisation, le procédé de gestion de trafic utilise une fonction de distance cumulative. Une fonction de distance cumulative est la somme des distances partielles, dont les termes sont, dans un mode de réalisation, pondérés par des coefficients déterminés par étalonnage sur un historique d'essai. Une distance partielle est calculée comme la distance entre deux éléments de même rang, dans deux ensembles de données, dont on cherche à calculer la distance cumulative. Dans le cas de la sélection de recalage de la demande nominale prévue, les trois ensembles de données de mêmes tailles sont la demande nominale prévue avant recalage D, la demande nominale prévue recalée par la moyenne D1 et la demande nominale prévue recalée par la médiane D2, qui sont comparés par la distance cumulative à l'ensemble de données des débits Q. Chacun des termes des trois ensembles de données est décrit par dh, d,,h, d2,h, sur la période [hp..ho] de la dernière tranche horaire. The step E3 of identifying a traffic request then comprises a step of forecasting the actual nominal request. This operation consists in establishing a nominal demand forecast from the optimal nominal demand profile obtained in the previous step, in step E3. The expected traffic demand is called a dh list, valid for a period including the timestamps counted from the forecast start date, that is to say, when operating the method the horodate ho of the last observed situation. and loaded into the history of the database 10, and the very short-term forecast period having a duration or forecast horizon Ts of four hours in a preferred embodiment. In one embodiment, the current term dh of the expected demand d is given by the relation: dh-pi, h * <qh> where: h is the current timestamp of the calculated term in the very short-term forecast period Ts; pi, h is the h-th term of the optimal nominal demand profile selected in the previous step; and <qh> is the average of the flows on a predefined time slot, for the timestamps h between hp and hF, of start and end of time slot. In one embodiment, the expected traffic request is then processed to fit the history data. Preferably, the processing is a recalibration operation of the nominal demand forecast as a function of the flow rate observed over the explanatory period. The resetting operation is used to scale the request. According to the invention, two types of registration may be selected: by means; - by medians. In this step of resetting the planned demand, the following successive operations are executed: calculation of the differences of the flow rates observed two by two; - calculation of the deviations of expected requests two by two; - calculation of the ratio of the deviations of the requests to the deviations of the flows; Fmoyenne - calculating the divergence of the ratio of deviations by mean and median Fmédiane, respectively by calculating the averages of the ratios of the gaps and the medians of the reports of the deviations; calculation allowing the scaling of the expected demand according to the divergences obtained previously, ie dh, 1 for the mean F average and dh, 2 for the median Fmedian, according to a relation of the form dh, 1 = dh / F average and dh, 2 = dh / Fmédiane, for all time stamps h, in the current time slot before the horodate ho of the last traffic observation before the forecast period; calculating an offset p between the observed flow rates and the scaled demand in each of the p1 or median p2 cropping cases, according to the respective relations: p1 = sum (qh - dh, 1; hp < h <ho) and p2 = sum (gh - dh, 2; hp <h <ho); calculation of the adjustment of the volume of nominal demand forecast and recalculated according to the two mean and median methods, according to the respective relations Dh, 1 = dh, 1 + p1 and Dh, 2 = dh, 2 + p2, for the horodates h between hp <h <ho; selecting the expected nominal demand adjusted by searching for the smallest distance between the observed flow rates Q and the expected nominal demand D, the expected nominal demand adjusted by the average D1 and the expected nominal demand adjusted by the median D2. The expected nominal demand is therefore one of the three nominal requests D, D1, and D2 resulting from the registration step. As a function of distance, any suitable standard can be used. In one embodiment, the traffic management method uses a cumulative distance function. A cumulative distance function is the sum of the partial distances, the terms of which, in one embodiment, are weighted by coefficients determined by calibration on a test history. A partial distance is calculated as the distance between two elements of the same rank in two sets of data whose cumulative distance is to be calculated. In the case of the selection selection of the expected nominal demand, the three sets of data of the same size are the expected nominal demand before registration D, the expected nominal demand recaled by the average D1 and the expected nominal demand recaled by the median D2. , which are compared by the cumulative distance to the data set of the flow rates Q. Each of the terms of the three sets of data is described by dh, d ,, h, d2, h, over the period [hp..ho] of the last time slot.

Dans la suite du procédé de gestion de trafic routier selon l'invention, l'étape d'identification E4 d'une situation équivalente dans l'historique de situations de trafic passées sur la base de la demande de trafic prévue comporte une étape de : - pré échantillonnage des situations équivalentes ; - échantillonnage des situations équivalentes sur la base du pré échantillonnage. L'étape d'identification E4 d'une situation équivalente dans l'historique de situations de trafic, réellement observées et enregistrées dans la base de données d'historique 10 (Figure 2), présente l'avantage d'une très grande rapidité d'identification et d'obtenir une très faible divergence entre les deux situations rapprochées. L'étape de pré échantillonnage, qui est la première étape composant l'étape d'identification E4 d'une situation équivalente, comporte une étape de sélection d'un échantillon de situations candidates à l'équivalence, puis une étape de sélection de l'échantillon des meilleures équivalences. L'étape de sélection d'un échantillon de situations candidates à l'équivalence consiste à rechercher la plus petite distance entre des situations candidates et la situation observée lors de la dernière observation qui précède la période de prévision à très court terme. On note qu'on utilise la même période explicative, c'est-à-dire pour l'ensemble des tranches horaires h des jours j retenus, telles que : ho - Te 5 h 5 ho, pour les trois grandeurs de débit Q, de taux d'occupation To et de vitesse moyenne V, et telles que ho 5 h 5 ho + Th, pour la demande D. In the following road traffic management method according to the invention, the identification step E4 of an equivalent situation in the history of past traffic situations on the basis of the expected traffic demand comprises a step of: - pre-sampling of equivalent situations; - sampling of equivalent situations on the basis of pre-sampling. The identification step E4 of an equivalent situation in the history of traffic situations, actually observed and recorded in the historical database 10 (FIG. 2), has the advantage of a very high speed of detection. identification and to obtain a very small divergence between the two close situations. The pre-sampling step, which is the first step comprising the identification step E4 of an equivalent situation, comprises a step of selecting a sample of candidate situations for equivalence, then a step of selecting the sample of the best equivalences. The step of selecting a sample of candidate situations for equivalence consists in finding the smallest distance between candidate situations and the situation observed during the last observation preceding the very short-term forecast period. Note that we use the same explanatory period, that is to say for all time slots h days retained, such as: ho - Te 5 h 5 ho, for the three quantities of flow Q, occupancy rate To and average speed V, and such that ho 5 h 5 ho + Th, for the request D.

Préférentiellement, on utilise la méthode précitée des distances cumulatives comme somme des distances partielles calculées chacune comme la distance entre deux éléments de même rang, selon une norme prédéterminée. On considère deux situations de trafic prises comme ensembles de données de même taille, respectivement So pour la dernière situation observée à l'horodate ho, et les situations observées précédentes dans l'historique au nombre de n, soit Si. Chaque situation est définie, ainsi qu'il a été décrit, pour trois grandeurs de trafic observées de débit, de taux d'occupation et de vitesse moyenne. Les n situations Si retenues dans l'analyse sont celles qui ont la même tranche horaire dans le jour que celle de So. Dans un mode de réalisation, les trois grandeurs observées des situations rapprochées de la situation So sont soumises à un traitement statistique classique de centrage et de réduction, qui rend les données indépendantes de l'unité et de l'échelle, et enfin de donner aux grandeurs traitées une même moyenne et une dispersion similaire, de sorte que les grandeurs deviennent comparables. Ces opérations exigent donc le calcul d'une moyenne et d'un écart-type pour chaque grandeur observée de débit, de taux d'occupation et de vitesse moyenne. La distance cumulée est alors effectuée sur les trois grandeurs observées centrées-réduites de débit, de taux d'occupation et de vitesse moyenne et sur la demande prévue centrée-réduite. Or, les situations Si sont prises sur la même tranche horaire qui est d'une durée Te tandis que la demande prévue centrée-réduite est prise sur l'horizon de prévision Th qui est différent. Les distances cumulatives sont ramenées à la même dimension temporelle en utilisant le fait que les grandeurs observées sont mesurées pendant une durée prédéterminée z ; de sorte que les distances cumulées de chacune des situations Si à la situation So sont ramenées à une moyenne prise sur le même nombre de données. En désignant par M l'une des trois grandeurs observées dans la situation Si ou So, et par N la demande prévue, et en désignant par M' la valeur correspondante centrée-réduite ou N' la demande prévue centrée-réduite, on peut écrire les distances cumulatives prises en compte par : dM;= (z / Te) * Somme (lMh, ; - M'h, ;l ; ho - Te < h < ho) dN;= (z / Th) * Somme (INh, - N'h, il ; ho < h < ho + Th) L'étape de sélection de l'échantillon des meilleures équivalences est ensuite exécutée pour sélectionner parmi les distances dM; et dN; calculées à l'étape précédente les distances les plus faibles. On constitue alors un ensemble ordonné D des distances dM; et dN;, triées dans l'ordre croissant. Puis, on sélectionne les Np premiers éléments de D, ensemble de pré-échantillonnage des situations observées équivalentes à la situation So, avec Np un nombre prédéterminé sélectionné lors de l'étape E, d'initialisation du procédé. Preferably, the aforementioned cumulative distance method is used as the sum of the partial distances each calculated as the distance between two elements of the same rank, according to a predetermined standard. We consider two traffic situations taken as data sets of the same size, respectively So for the last situation observed at the horodate ho, and the previous observed situations in the history with the number of n, ie Si. Each situation is defined, as has been described, for three observed traffic quantities of flow, occupancy rate and average speed. The n situations If retained in the analysis are those which have the same time slot in the day as that of So. In one embodiment, the three observed magnitudes of the situations approximated to the So situation are subjected to a conventional statistical centering and reduction treatment, which makes the data independent of the unit and the scale, and finally to give the quantities treated the same average and a similar dispersion, so that the quantities become comparable. These operations therefore require the calculation of an average and a standard deviation for each observed quantity of flow, occupancy and average speed. The cumulative distance is then performed on the three observed centric-reduced rates of flow, occupancy and average speed and on the projected centric-reduced demand. Now, if situations are taken on the same time slot that is of a duration Te while the expected centric-reduced demand is taken on the forecast horizon Th which is different. The cumulative distances are returned to the same time dimension using the fact that the observed magnitudes are measured for a predetermined time z; so that the cumulative distances of each of the situations Si to the situation So are averaged over the same number of data. By designating by M one of the three quantities observed in the Si or So situation, and by N the expected demand, and denoting by M 'the corresponding centered-reduced value or N' the planned centric-reduced demand, one can write cumulative distances taken into account by: dM; = (z / Te) * Sum (lMh,; - M'h,; l; ho - Te <h <ho) dN; = (z / Th) * Sum (INh , - Ho, he; ho <h <ho + Th) The step of selecting the sample of the best equivalences is then performed to select among the distances dM; and dN; calculated in the previous step the smallest distances. We then constitute an ordered set D of distances dM; and dN; sorted in ascending order. Then, we select the first Np elements of D, pre-sampling set observed situations equivalent to the situation So, with Np a predetermined number selected in step E, initialization of the process.

On génère ainsi un ensemble Rp des références de Np situations équivalentes à So. On exécute ensuite une étape d'échantillonnage final des situations équivalentes parmi les références Rp des Np situations équivalentes à So dernière situation observée et cet ensemble étant obtenu lors de l'étape précédente des distances cumulatives. Lors de cette étape, on recherche la situation offrant la meilleure équivalence par rapport à la dernière situation observée So à l'aide d'une fonction de distance par mensuration, distance de meilleure précision que la fonction de distance utilisée pour le calcul de l'ensemble Rp des Np références des meilleures situations équivalentes à So. Dans un mode particulier de réalisation, on utilise une fonction de distance par mensurations et on exécute à cette fin les étapes de : - calcul de distances par mensurations ; - sélection de la meilleure équivalence. We thus generate a set Rp of the references of Np situations equivalent to So. We then perform a final sampling step of the equivalent situations among the references Rp Np situations equivalent to So last situation observed and this set being obtained in the previous step cumulative distances. During this step, we look for the situation offering the best equivalence with respect to the last observed situation So using a distance function by measurement, distance of better precision than the distance function used for the calculation of the together Rp of the Np references of the best situations equivalent to So. In a particular embodiment, a distance function is used by measurements and the following steps are performed for this purpose: - calculation of distances by measurements; - selection of the best equivalence.

La distance par mensurations utilisée dans l'étape d'échantillonnage finale des situations équivalentes est limitée à l'ensemble Rp des Np références des meilleures situations équivalentes à So, qui est plus petit que l'ensemble D des situations de même tranche horaire pour lesquelles la distance cumulative est moins consommatrice de calculs. Il en ressort que l'échantillonnage final des situations équivalentes à la situation So observée présente l'avantage d'être relativement rapide en réduisant le nombre des situations équivalentes candidates. Pour chacune des quatre grandeurs de débit observé, de taux d'occupation observé, de vitesse moyenne observée, et de demande prévue, on réalise un calcul de distances par mensuration, qui revient pour chacune des quatre grandeurs, à mesurer la différence entre la situation lors de la période observée, qui sert avant la prévision, avec les situations comparables retenues. Pour les débits, la distance par mensurations partielle sera donnée par n différences sommées pour chacune des n situations à comparer, ces différences d(q;) étant exprimées par : d(qi) = n/Te * (Somme(I6gh,ohservée - 6qh, il ; ho - Te < h < ho)) Les trois autres différences sont exprimées par des relations de même genre et sont notées d(to;), d(v;) et d(d;), respectivement pour le taux d'occupation, la vitesse moyenne et la demande. Le principe de la distance par mensurations consiste, pour chaque situation S'; retenue à l'étape précédente dans l'ensemble Ep, à calculer pour chaque grandeur de débit, de taux d'occupation, de vitesse moyenne et de demande les différences deux à deux des listes de ces grandeurs. Ainsi sur le débit, on calcule une matrice triangulaire dont le terme courant a;,; est : a;; _ {q; - q; pour h; < h;, OU 0 pour h; 5 h; ; ho - Te 5 h 5 ho} Ces différences deux à deux sont donc calculées pour n matrices associées au débit q des n situations S'; retenues lors de l'étape de calcul des distances cumulatives. Les mêmes calculs sont effectués pour le taux d'occupation To, la vitesse moyenne V et la demande D. On obtient ainsi quatre matrices de mensuration pour les situations comparées appartenant à l'ensemble Rp des Np situations S'; retenues lors de l'étape des distances cumulatives. On exécute ensuite le même calcul sur la situation observée So et on obtient quatre matrices de mensuration des quatre grandeurs observées de débit Q, de taux d'occupation To, de vitesse moyenne V et de demande D, dont le terme courant pour le débit qo sera bi,j défini par : b;,i = {gio - q;o pour hi < h;, OU 0 pour h; 5 hi ; ho - Te 5 h 5 ho} Dans une autre étape, on calcule l'écart de profil entre la dernière situation observée So et la situation comparée S'; parmi les n situations retenus Ep. Cette étape permet de caractériser les différences de formes des représentations graphiques des historiques des quatre grandeurs de débit Q, de taux d'occupation To, de vitesse moyenne V et de demande D. L'écart de profil est caractérisé par une valeur obtenue à l'aide d'une fonction arithmétique telle que : - si le profil de la grandeur évaluée de la situation comparée S'; et le profil de la grandeur évaluée pour la situation observée So sont identiques, la valeur est 1 ; - si les deux profils comparés sont différents, la valeur est d'autant supérieure à 1 que l'écart entre les profils est important. Dans un mode de réalisation, cette fonction arithmétique est obtenue par le rapport des médianes de l'ensemble des valeurs observées et de l'ensemble des valeurs comparées, respectivement medianeo et medianeo. On aura la relation de définition de l'écart de profil (p : 4)= medianeo / medianeo ou la relation inverse de manière à obtenir un résultat supérieur ou égal à 1 caractérisant l'écart. Les écarts de profil sont donc calculés pour chacune des quatre grandeurs de débit Q, de taux d'occupation To, de vitesse moyenne V et de demande D et sont notées 4)Q, 4)T0, 4)V et YI). Dans une étape suivante, on calcule ensuite la moyenne arithmétique des écarts de mensuration en faisant la somme des écarts entre les mensurations sur les quatre grandeurs considérées pour les situations comparées S'; de Rp et pour les situations observées So : mQ = ri/Te * (Somme(Ibhi,h; -ah;, ; ho - Te 5 h; < hi 5 ho» Ces moyennes sont calculées pour les quatre grandeurs de débit Q, de taux d'occupation To, de vitesse moyenne V et de demande D. Dans une étape suivante, on calcule la distance par mensurations pour chacune des quatre grandeurs de débit Q, de taux d'occupation To, de vitesse moyenne V et de demande D. La relation de définition de la distance par mensuration pour le débit est : dMq;=~q*mq/Go; 1 5i5Np La distance par mensurations entre les situations comparées S'i de l'ensemble Rp des situations équivalentes retenues à l'étape précédente de sélection des Np situations équivalentes de la situation observée So est calculée sous forme des valeurs : d mi = AQ*d MQ + ATo*d MTo + Av*d Mv + Ad*d Md Dans laquelle relation les coefficients Ad, ATo, Av et Ad sont choisis par étalonnage du procédé de prévision à très court terme sur des données d'essai, et dans laquelle les dMX correspondent aux distances par mensuration pour le débit q, le taux d'occupation T, la vitesse moyenne V et la demande D. Dans un mode de réalisation, les trois premiers coefficients de pondération de la distance cumulative sont égaux à l'unité, et le dernier vaut la somme des trois premiers, de manière à obtenir une pondération égale entre les valeurs correspondant à la base explicative (Q, To et V) et la valeur correspondant à la base expliquée (D). Enfin dans une étape finale, on détermine la meilleure situation équivalente en recherchant la plus faible des Np distances par mensuration : io est l'équivalence telle que dM;o = min(dM; ; 1 5 i 5 Np). A la Figure 1, on a encore représenté une étape d'édition (E5) d'une prévision d'un état de trafic routier à très court terme sur la base de la situation de trafic équivalente sous la forme d'un ensemble de données de trafic prévues. Dans cette étape E5, la prévision à très court terme est construite à partir des mesures du jour je de l'historique qui présente la situation ayant la meilleure équivalence avec la situation observée au dernier jour d'observation avant la période de prévision. Ainsi la prévision comporte les mesures sur les trois grandeurs retenues pour caractériser une situation de trafic : le débit, le taux d'occupation et la vitesse moyenne des véhicules devant chaque point de mesure 2; d'abscisse curviligne x;. En désignant par m l'une quelconque de ces trois grandeurs, la prévision au jour jo à partir de l'horodate ho sur l'horizon Th est déterminée à partir de la même horodate de début de tranche horaire sur la même durée Th au jour je : mp, h = m e, h ; pour ho < h < ho + Th et pour tous les x; Dans une étape E6, enfin, on exécute des actions de prévision qui comprennent : - la diffusion d'information de prévision routière ; et - la commande d'actionneurs de contrôle de trafic comme des feux de signalisation ; qui seront décrits plus loin à l'aide de la Figure 2. The distance by measurements used in the final sampling stage of the equivalent situations is limited to the set Rp of the Np references of the best situations equivalent to So, which is smaller than the set D of the situations of the same time slot for which the cumulative distance is less computationally intensive. It emerges that the final sampling of the situations equivalent to the situation So observed has the advantage of being relatively fast by reducing the number of candidate equivalent situations. For each of the four observed flow rates, the observed occupancy rate, the observed average speed, and the expected demand, a measurement distance calculation is performed for each of the four variables to measure the difference between the situation. during the observed period, which is used before the forecast, with the comparable situations retained. For flow rates, the distance by partial measurements will be given by n summed differences for each of the n situations to be compared, these differences d (q;) being expressed by: d (qi) = n / Te * (Sum (I6gh, ohserved - The three other differences are expressed by relations of the same kind and are denoted d (to), d (v) and d (d) respectively for the rate. occupation, average speed and demand. The principle of distance by measurements consists, for each situation S '; retained in the previous step in the set Ep, to calculate for each magnitude of flow rate, occupancy rate, average speed and demand differences two by two lists of these quantities. Thus on the flow, one calculates a triangular matrix whose current term a;,; is: a ;; _ {q; - q; for h; <h ;, OR 0 for h; 5 h; ; These two-by-two differences are thus computed for n matrices associated with the rate q of n situations S '; retained during the step of calculating cumulative distances. The same calculations are made for the occupancy rate To, the average speed V and the request D. Thus, four measurement matrices are obtained for the compared situations belonging to the set Rp of the Np situations S '; retained during the cumulative distances step. The same calculation is then performed on the observed situation So and four measurement matrices are obtained from the four observed quantities of flow rate Q, occupancy rate To, average speed V and demand D, whose current term for the flow qo will be bi, j defined by: b;, i = {gio - q; o for hi <h ;, OR 0 for h; 5 hi; In another step, we calculate the profile difference between the last observed situation So and the compared situation S '; Among the n selected situations Ep. This step makes it possible to characterize the differences of shapes of the graphical representations of the histories of the four quantities of flow Q, of occupation rate To, of average speed V and of demand D. The difference of profile is characterized by a value obtained using an arithmetic function such that: - if the profile of the evaluated magnitude of the compared situation S '; and the profile of the magnitude evaluated for the observed situation So are identical, the value is 1; if the two compared profiles are different, the value is greater than 1 as the difference between the profiles is important. In one embodiment, this arithmetic function is obtained by the ratio of the medians of the set of observed values and the set of compared values, medianeo and medianeo, respectively. We will have the relation of definition of the difference of profile (p: 4) = medianeo / medianeo or the inverse relation so as to obtain a result superior or equal to 1 characterizing the difference. The profile deviations are thus calculated for each of the four flow variables Q, occupancy rate To, average speed V and demand D and are denoted 4) Q, 4) T0, 4) V and YI). In a next step, the arithmetic mean of the measurement differences is then calculated by summing the differences between the measurements on the four quantities considered for the compared situations S '; of Rp and for the observed situations So: mQ = ri / Te * (Sum (Ibhi, h; -ah ;,; ho - Te 5 h; <hi 5 ho) These averages are calculated for the four quantities of flow Q, occupancy rate To, average speed V and demand D. In a next step, the distance is calculated by measurements for each of the four flow variables Q, occupancy rate To, average speed V and demand. D. The relation of definition of the distance by measurement for the flow is: dMq; = ~ q * mq / Go; 1 5i5Np The distance by measurements between the situations compared If of the set Rp of the equivalent situations retained at previous step of selection of the Np equivalent situations of the observed situation So is computed in the form of the values: d mi = AQ * d MQ + ATo * d MTo + Av * d Mv + Ad * d Md In which relation the coefficients Ad, ATo, Av and Ad are selected by calibration of the very short-term forecasting method on test data, and in which dMX are the cadastral distances for the flow rate q, the occupancy rate T, the average speed V and the demand D. In one embodiment, the first three coefficients of weighting of the cumulative distance are equal to unity. , and the last is worth the sum of the first three, so as to obtain an equal weighting between the values corresponding to the explanatory base (Q, To and V) and the value corresponding to the explained basis (D). Finally, in a final step, the best equivalent situation is determined by looking for the lowest of the Np distances by measurement: io is the equivalence such that dM; o = min (dM;; 1 5 i 5 Np). In Figure 1, there is also shown an editing step (E5) of a forecast of a very short-term road traffic condition on the basis of the equivalent traffic situation in the form of a data set. planned traffic. In this step E5, the very short-term forecast is constructed from the historical I-day measurements that present the situation with the best equivalence with the situation observed on the last day of observation before the forecast period. Thus, the forecast includes measurements on the three quantities selected to characterize a traffic situation: the flow rate, the occupancy rate and the average speed of the vehicles in front of each measurement point 2; x curvilinear abscissa. By designating any of these three magnitudes by m, the prediction on the day jo from the horodate ho on the horizon Th is determined from the same time stamp at the beginning of the time slot for the same duration Th at the day I: mp, h = me, h; for ho <h <ho + Th and for all x; Finally, in a step E6, forecasting actions are performed that include: - the dissemination of road forecasting information; and control of traffic control actuators such as traffic lights; which will be described later using Figure 2.

Le procédé de l'invention comporte par ailleurs, dans un mode de réalisation, le test E7 d'une condition pour exécuter un bouclage, c'est-à-dire pour produire une nouvelle prévision à très court terme, par exemple en relançant sur la demande d'un opérateur les calculs E2 à E5 à une nouvelle horodate ho et le cas échéant pour un échantillonnage prédéterminé des abscisses curvilignes x; sur le réseau routier 1, sur lesquelles la prévision est réalisée. Dans un autre mode de réalisation, le bouclage est exécuté périodiquement par exemple à une heure prédéterminée de chaque jour. Le bouclage est déterminé par un test à l'étape E7. Le test peut être remplacé par une boucle infinie qui permet de renouveler la prévision pour chaque nouvelle mesure et pour chaque point de mesure du réseau routier. On note que lors d'une étape E1 de début de procédé, on exécute les initialisations des paramètres constants utilisés dans le procédé qui a été décrit ci-dessus, comme l'horizon de prévision Th ou le nombre de situations à échantillonner Np. Ces paramètres peuvent être initialisés par une interface utilisateur, sur un logiciel exécuté sur une machine informatique mettant en oeuvre le procédé de l'invention, par un opérateur humain, ou par un processus adaptatif pour atteindre une contrainte comme, par exemple, un temps de calcul ou une résolution de prévision, permettant de régler la précision et/ou la fiabilité de la prévision. A la figure 2, on a représenté un schéma bloc d'un mode de réalisation d'un système de gestion de trafic selon l'invention. Le réseau routier 1 et le groupe de capteurs 2 ont déjà été décrits avec la base de données d'historiques des situations de trafic 10. Un réseau de communication 3 permet de collecter les données de mesure des capteurs 2. Il est connecté à un module 4 de préparation des données à enregistrer dans la base de données des historiques de situations de trafic 10. Le module 4 fonctionne selon l'enseignement de l'étape E2 du procédé décrit ci-dessus. On note que le module 4 de préparation des données peut être partiellement distribué sur le réseau de communications 3 et/ou sur les divers capteurs 2 disposés à diverses abscisses curvilignes sur le réseau routier 1. The method of the invention furthermore comprises, in one embodiment, the E7 test of a condition for executing a loopback, that is to say for producing a new forecast in the very short term, for example by relaunching on the request of an operator the calculations E2 to E5 to a new horodate ho and if necessary for a predetermined sampling curvilinear abscissa x; on the road network 1, on which the forecast is made. In another embodiment, the loopback is executed periodically for example at a predetermined time of each day. The loopback is determined by a test in step E7. The test can be replaced by an infinite loop which allows the forecast to be renewed for each new measurement and for each measuring point of the road network. It should be noted that during a process start step E1, the initialization of the constant parameters used in the process described above, such as the prediction horizon Th or the number of situations to be sampled Np, are executed. These parameters can be initialized by a user interface, on a software run on a computer machine implementing the method of the invention, by a human operator, or by an adaptive process to achieve a constraint such as, for example, a time of calculation or prediction resolution, to adjust the accuracy and / or reliability of the forecast. In Figure 2, there is shown a block diagram of an embodiment of a traffic management system according to the invention. The road network 1 and the sensor group 2 have already been described with the traffic situation history database 10. A communication network 3 makes it possible to collect the measurement data from the sensors 2. It is connected to a module 4 of preparation of the data to be recorded in the database of traffic situation histories 10. The module 4 operates according to the teaching of step E2 of the method described above. Note that the data preparation module 4 can be partially distributed on the communications network 3 and / or on the various sensors 2 arranged at various curvilinear abscissae on the road network 1.

Le système de l'invention comporte ensuite un module 5 de prévision d'une demande de trafic qui met en oeuvre l'enseignement de l'étape E3 du procédé de l'invention. Le module 5 est implémenté sur un ordinateur disposé en un point du réseau de communications ou sur une liaison propre avec le module 4 de préparation de données. Les modules 4 et 5 ainsi que la base de données 10 peuvent être implémentés sur un seul et même ordinateur ou sur un réseau local connecté au réseau de communication 3. Le module 6 est un module d'identification d'une situation de trafic équivalente qui met en oeuvre l'étape E4 du procédé décrit ci-dessus. Le module 6 est implémenté de la même manière que les modules précités. Il prend ses données sources de la base de données 10, ainsi que du module 5 de prévision de demande de trafic. Un module 7 d'édition d'une prévision de trafic met en oeuvre l'étape E5 du procédé décrit ci-dessus. Le module 7 est implémenté de la même manière que les modules précités. Il prend ses données sources de la base de données 10, ainsi que des modules 5 de prévision de demande de trafic et 6 d'identification d'une situation de trafic équivalente. Un module 8 de gestion de trafic exécute ensuite des actions prises sur la base de la prévision de trafic éditée par le module 7. Le module 8 comporte, dans un mode de réalisation, des moyens pour éditer des bulletins d'information de prévision de trafic à destination de terminaux. Ces terminaux d'information de trafic lui sont connectés par l'intermédiaire d'un réseau de communication qui dépend des terminaux mis en oeuvre. The system of the invention then comprises a module 5 for predicting a traffic request which implements the teaching of step E3 of the method of the invention. The module 5 is implemented on a computer arranged at a point of the communications network or on its own link with the data preparation module 4. The modules 4 and 5 as well as the database 10 can be implemented on a single computer or on a local area network connected to the communication network 3. The module 6 is an identification module of an equivalent traffic situation which implements step E4 of the process described above. Module 6 is implemented in the same way as the aforementioned modules. It takes its source data from the database 10, as well as the module 5 traffic demand forecast. A module 7 for editing a traffic forecast implements step E5 of the method described above. The module 7 is implemented in the same way as the aforementioned modules. It takes its source data from the database 10, as well as modules 5 for traffic demand forecasting and 6 for identifying an equivalent traffic situation. A traffic management module 8 then executes actions taken on the basis of the traffic forecast edited by the module 7. The module 8 comprises, in one embodiment, means for editing traffic forecast information bulletins. to terminals. These traffic information terminals are connected to it via a communication network which depends on the terminals used.

Dans un mode de réalisation, les terminaux sont des téléphones mobiles ou des appareils du même genre, et le réseau de communication est un réseau de données sur le réseau de téléphonie mobile. Dans un mode de réalisation, les terminaux sont des terminaux embarqués à bord des véhicules qui prévoient de s'engager sur le réseau routier 1. Le réseau de communication qui les relie au module 8 est alors un réseau de téléphonie mobile, le terminal embarqué étant adapté à un tel réseau de téléphonie mobile. Dans un autre mode de réalisation, le terminal embarqué est un récepteur radio-fréquences pour véhicule et le réseau de communication peut alors être un réseau d'informations routières de type vocal ou numérique comme le réseau RDS-TMC. Dans un autre mode de réalisation, le module 8 de gestion de trafic est connecté à un réseau d'afficheurs d'informations routières, comme l'afficheur 9 représenté à la Figure 2, et disposés à des abscisses déterminées sur le réseau routier 1. Le module 8 de gestion de trafic comporte alors un éditeur d'informations routières adapté à communiquer avec les afficheurs 9. Dans un autre mode de réalisation, le module 8 de gestion de trafic est connecté par des moyens connus à un réseau d'actionneurs de trafic comportant notamment des feux de signalisation, des panneaux de limitation de vitesses des véhicules, des barrières d'accès à une ou plusieurs voies du réseau routier. Dans ce mode de réalisation, le module 8 de gestion de trafic comporte un moyen pour générer des signaux de commande destinés à commander les actionneurs de trafic. Dans un autre mode de réalisation, le module 8 de gestion de trafic est connecté par des moyens de communication à des barrières de péage, de sorte que la tarification de l'accès ou de la sortie d'un véhicule dépende notamment de la prévision de trafic à très court terme généré par le système de gestion de trafic de l'invention. Dans ce but, le module 8 comporte des moyens pour déterminer un message de commande de tarification à destination des automates de paiement et/ou pour affichage sur des afficheurs réservés à cet effet à chaque barrière de péage et prévus pour les usagers et/ou pour le personnel chargé de la perception des péages. D'autres applications sont possibles dans le cadre de l'invention. De même, les méthodes de calcul indiquées ont été utilisées dans des modes de réalisation du procédé de gestion de trafic selon les buts qui ont été définis. Elles sont modifiables par l'homme de métier mettant en oeuvre l'enseignement de l'invention sans sortir de la portée revendiquée. D'autres caractéristiques de l'invention présentent une importance qui est soulignée ici. In one embodiment, the terminals are mobile phones or similar devices, and the communication network is a data network on the mobile network. In one embodiment, the terminals are onboard terminals on vehicles that plan to enter the road network 1. The communication network connecting them to the module 8 is then a mobile telephone network, the onboard terminal being adapted to such a mobile phone network. In another embodiment, the on-board terminal is a radio-frequency receiver for a vehicle and the communication network can then be a voice or digital type of traffic information network such as the RDS-TMC network. In another embodiment, the traffic management module 8 is connected to a network of traffic information displays, such as the display 9 shown in FIG. 2, and arranged at given abscissae on the road network 1. The traffic management module 8 then comprises a traffic information editor adapted to communicate with the displays 9. In another embodiment, the traffic management module 8 is connected by known means to a network of actuators traffic including, but not limited to, traffic lights, vehicle speed limitation signs, access barriers to one or more road lanes. In this embodiment, the traffic management module 8 includes means for generating control signals for controlling the traffic actuators. In another embodiment, the traffic management module 8 is connected by means of communication to toll barriers, so that the charging of the access or the exit of a vehicle depends in particular on the forecast of very short-term traffic generated by the traffic management system of the invention. For this purpose, the module 8 comprises means for determining a tariff control message intended for payment machines and / or for display on displays reserved for this purpose at each toll gate and intended for users and / or for staff responsible for collecting tolls. Other applications are possible within the scope of the invention. Likewise, the calculation methods indicated have been used in embodiments of the traffic management method according to the goals that have been defined. They are modifiable by those skilled in the art implementing the teaching of the invention without departing from the scope claimed. Other features of the invention have an importance that is emphasized here.

L'étape (E2) de préparation d'un ensemble de données comporte au moins une des étapes suivantes : - disqualification des données de mesure aberrantes ; - disqualification de la dernière mesure précédant une donnée de mesure aberrante ; - disqualification de la première mesure succédant à une donnée de mesure aberrante ; - lissage des données de mesure par calcul d'une moyenne sur une durée déterminée de lissage des données de mesure ; - reconstitution des données de mesure absentes par interpolation des variables absentes à partir des variables de mesure encadrantes. L'étape de prévision (E3) de la demande de trafic sur la base des données de trafic mesurées comporte au moins une des étapes suivantes : - détermination d'un type de journée selon une typologie calendaire prédéterminée ; - détermination d'un profil de demande nominale de trafic pour chaque type de journée ; - pour un jour observé, détermination du profil de demande nominale optimal ; - prévision d'une demande nominale sur une période de prévision sur la base du profil de demande nominal optimal ; - recalage de la prévision de demande nominale. L'étape d'édition (E5) d'une prévision d'un état de trafic routier comporte une étape de calcul d'une situation de prévision sur la base de la situation équivalente sur la base d'au moins une situation historique comptée à partir de l'horodate de la situation équivalente prise dans une durée de prévision déterminée. L'étape de disqualification des données de mesure aberrantes comporte le test d'au moins un critère pourtant sur : - des débits négatifs ou nuls ; - des taux d'occupation strictement négatifs ; et - des vitesses moyennes négatives, nulles ou supérieures à un seuil d'invalidité des vitesses mesurées pour disqualifier la mesure (A(t;, x;)) à l'horodate (t;) et au point de mesure d'abscisse (x;). The step (E2) of preparing a set of data comprises at least one of the following steps: disqualification of the aberrant measurement data; - disqualification of the last measure preceding an outlier measurement data; - disqualification of the first measurement following an aberrant measurement data; smoothing the measurement data by calculating an average over a determined period of smoothing of the measurement data; - reconstitution of the missing measurement data by interpolation of the missing variables from the accompanying measurement variables. The forecasting step (E3) of the traffic request based on the measured traffic data comprises at least one of the following steps: determining a type of day according to a predetermined calendar typology; - determination of a nominal traffic demand profile for each type of day; - for an observed day, determination of the optimal nominal demand profile; - forecast nominal demand over a forecast period based on the optimal nominal demand profile; - adjustment of the nominal demand forecast. The editing step (E5) of a forecast of a road traffic state includes a step of calculating a forecast situation on the basis of the equivalent situation on the basis of at least one historical situation counted at from the timestamp of the equivalent situation taken within a given forecast period. The disqualification step of the aberrant measurement data involves testing at least one criterion, however, on: negative or zero flow rates; - strictly negative occupancy rates; and negative mean velocities, zero or greater than a threshold of disability of the measured velocities for disqualifying the measurement (A (t ;, x;)) at the time stamp (t;) and at the abscissa measuring point ( x;).

Particulièrement dans ce dernier cas, la vérification d'un seul des critères disqualifie la mesure (A(ti, xi». L'étape de reconstitution des données manquantes est précédée d'une étape de test d'une condition d'interpolation de sorte que la période entre la dernière mesure précédant une période de données manquantes et la première mesure succédant à la dite période de données manquantes soit inférieure à une période prédéterminée d'interpolation selon une relation de la forme : 0 < tb - ta < Ainterpol L'étape d'identification du profil de demande nominale optimal comporte la comparaison de l'ensemble des profils de demande nominale établis pour chaque type de jour noté : {{pc,h ; h hD.< h < hF} ; c dans Ecalendaire} au profil de débit du jour observé jo calculé à partir des débits pondérés {pio,h ; hp,< h < ho} avec la relation : pj0,h - gj0,h <qh> où <qh> est la moyenne des débits observés sur la période hp < h < ho de la dernière partie observée dans le dernier jour observé avant la période de prévision à très court terme. Especially in the latter case, the verification of only one of the criteria disqualifies the measurement (A (ti, xi). The step of reconstituting the missing data is preceded by a step of testing an interpolation condition of that the period between the last measurement preceding a period of missing data and the first measurement following said period of missing data is less than a predetermined period of interpolation according to a relation of the form: 0 <tb - ta <Ainterpol L The optimum nominal demand profile identification step involves comparing the set of nominal demand profiles established for each type of day noted: {{pc, h; h hd. <h <hF}; c in Ecalendar} flow profile of the observed day, calculated from the weighted flow rates {pio, h; hp, <h <ho} with the relation: pj0, h - gj0, h <qh> where <qh> is the mean of the flows observed on the period hp <h <ho of the last part to observe on the last day observed before the very short-term forecast period.

L'étape d'identification du profil de demande nominale optimal comporte une étape de calcul du terme courant dh d'une demande prévue d, donné par la relation : dh-pi,h*<qh> où h est l'horodate courant du terme calculé dans la période de prévision à très court terme Ts ; PHI est le h-ième terme du profil de demande nominale optimal sélectionné à l'étape précédente ; et <qh> est la moyenne des débits sur une tranche horaire prédéfinie, pour les horodates h compris entre hp et hF de début et de fin de tranche horaire. L'étape d'identification du profil de demande nominale optimal comporte une étape de traitement pour s'adapter aux données de l'historique. The step of identifying the optimal nominal demand profile comprises a step of calculating the current term dh of an expected demand d, given by the relation: dh-pi, h * <qh> where h is the current time stamp of the term calculated in the very short-term forecast period Ts; PHI is the h-th term of the optimal nominal demand profile selected in the previous step; and <qh> is the average of the flows on a predefined time slot, for the timestamps h between hp and hF of beginning and end of time slot. The optimal nominal demand profile identification step includes a processing step to fit the historical data.

Particulièrement, l'étape de traitement pour l'identification du profil de demande est une opération de recalage de la prévision de demande nominale en fonction du débit observé sur la période explicative. Particulièrement, le recalage est exécuté par moyennes et/ou par médianes. In particular, the processing step for the identification of the demand profile is a resetting operation of the nominal demand forecast as a function of the flow rate observed over the explanatory period. In particular, the registration is performed by averages and / or medians.

L'étape de recalage de la demande prévue comporte les opérations successives suivantes - calcul des écarts des débits observés deux à deux ; - calcul des écarts des demandes prévues deux à deux ; - calcul du rapport des écarts des demandes aux écarts des débits ; Fmoyennecalcul de la divergence du rapport des écarts par moyenne et par médiane Fmédiane, respectivement par calcul des moyennes des rapports des écarts et des médianes des rapports des écarts ; - calcul permettant la mise à l'échelle de la demande prévue selon les divergences obtenues précédemment, soit dh,1 pour la moyenne Fmoyenne et dh,2 pour la médiane Fmédiane, selon une relation de la forme dh,1 = dh / Fmoyenne et dh,2 = dh / Fmédiane, pour toutes les horodates h, dans la tranche horaire en cours avant l'horodate h0 de la dernière observation de trafic avant la période de prévision ; - calcul d'un décalage p entre les débits observés et la demande mise à l'échelle dans chacun des cas de recadrage par moyenne p1 ou par médiane p2, selon les relations respectives : p1 = somme(qh - dh,1 ; hp < h < ho) et p2 = somme(qh - dh,2 ; hp < h < ho) ; - calcul d'ajustement du volume de la demande nominale prévue et recalée selon les deux méthodes de moyenne et de médiane selon les relations respectives Dh, 1 = dh, 1 + p1 et Dh, 2 = dh, 2 + p2, pour les horodates h comprises entre hp < h < ho. L'étape de sélection de l'échantillon des meilleures équivalences consiste à constituer un ensemble ordonné D des distances dMi et dNi, triées dans l'ordre croissant ; puis, à sélectionne les Np premiers éléments de D, ensemble de pré-échantillonnage des situations observées équivalentes à la situation So, avec Np un nombre prédéterminé sélectionné lors de l'étape E1 d'initialisation du procédé et à générer ainsi un ensemble Rp des références de Np situations équivalentes à So. The step of resetting the planned demand comprises the following successive operations - calculating the differences in flow rates observed two by two; - calculation of the deviations of expected requests two by two; - calculation of the ratio of the deviations of the requests to the deviations of the flows; Fmoyennecalculating the divergence of the ratio of deviations by mean and median Fmédiane, respectively by calculating the averages of the ratios of the deviations and the medians of the reports of the deviations; calculation allowing the scaling of the expected demand according to the divergences obtained previously, ie dh, 1 for the mean F average and dh, 2 for the median Fmedian, according to a relation of the form dh, 1 = dh / F average and dh, 2 = dh / Fmédiane, for all time stamps h, in the current time slot before the horodate h0 of the last traffic observation before the forecast period; calculating an offset p between the observed flow rates and the scaled demand in each of the p1 or median p2 cropping cases, according to the respective relations: p1 = sum (qh - dh, 1; hp < h <ho) and p2 = sum (qh - dh, 2; hp <h <ho); - calculation of adjustment of the volume of nominal demand forecast and recalculated according to the two mean and median methods according to the respective relations Dh, 1 = dh, 1 + p1 and Dh, 2 = dh, 2 + p2, for the time stamps h between hp <h <ho. The step of selecting the sample of the best equivalences consists in constituting an ordered set D of the distances dMi and dNi, sorted in ascending order; then, to select the Np first elements of D, set of pre-sampling observed situations equivalent to the situation So, with Np a predetermined number selected during the initialization step E1 of the method and thus to generate a set Rp of the references of Np situations equivalent to So.

On exécute ensuite une étape d'échantillonnage final des situations équivalentes à la dernière situation observée So à l'aide d'une fonction de distance de meilleure précision que la fonction de distance utilisée pour le calcul de l'ensemble Rp des Np références des meilleures situations équivalentes à So. On utilise une fonction de distance par mensuration et on exécute à cette fin les étapes de : - calcul de distances par mensuration ; - sélection de la meilleure mensuration. Then a final sampling step of the situations equivalent to the last observed situation So is carried out using a distance function of better accuracy than the distance function used for the calculation of the set Rp of the Np references of the best situations equivalent to So. A distance function is used by measurement and the following steps are performed for this purpose: - calculation of distances by measurement; - selection of the best measurement.

L'étape de calcul de distances par mensuration comporte les étapes suivantes : - Calcul de la moyenne des distances par mensuration ; - Evaluation de la distance par mensuration. Le procédé de l'invention comporte aussi une étape de test (E7) d'une condition pour exécuter un bouclage, exécuté périodiquement par exemple à une heure prédéterminée de chaque jour, ou par commande d'un opérateur. Il peut alors comporter, de plus, une étape (E1) de début de procédé, pour exécuter les initialisations des paramètres constants utilisés au moyen d'une interface utilisateur, sur un logiciel exécuté sur une machine informatique mettant en oeuvre le procédé de l'invention, par un opérateur humain, ou d'un processus adaptatif pour atteindre une contrainte comme un temps de calcul ou une résolution de prévision, permettant de régler la précision et/ou la fiabilité de la prévision. Le système de l'invention comporte un réseau de communication (3) pour collecter les données de mesure des capteurs (2) de situations de trafic à des horodates déterminées, connecté à un module (4) de préparation des données à enregistrer dans la base de données des historiques de situations de trafic (10). Dans un mode de réalisation, il comporte un module (5) de prévision d'une demande de trafic. Il comporte un module (6) d'identification d'une situation de trafic équivalente, qui prend ses données sources de la base de données (10), ainsi que du module (5) de prévision de demande de trafic. The step of calculating distances by measurement comprises the following steps: - Calculation of the average of the distances by measurement; - Evaluation of the distance by measurement. The method of the invention also comprises a test step (E7) of a condition for performing a loopback, periodically executed for example at a predetermined time of each day, or by operator control. It can then comprise, in addition, a step (E1) of the beginning of the method, to execute the initialization of the constant parameters used by means of a user interface, on a software executed on a computer machine implementing the method of the invention, by a human operator, or an adaptive process to achieve a constraint such as a computation time or a prediction resolution, for adjusting the accuracy and / or reliability of the prediction. The system of the invention comprises a communication network (3) for collecting the measurement data of the traffic situation sensors (2) at specific time stamps connected to a module (4) for preparing the data to be recorded in the database. traffic history data (10). In one embodiment, it comprises a module (5) for predicting a traffic request. It comprises a module (6) for identifying an equivalent traffic situation, which takes its source data from the database (10), as well as the module (5) for predicting traffic demand.

Il comporte un module (7) d'édition d'une prévision de trafic, qui prend ses données sources de la base de données (10), ainsi que des modules (5) de prévision de demande de trafic et (6) d'identification d'une situation de trafic équivalente. It comprises a module (7) for editing a traffic forecast, which takes its source data from the database (10), as well as modules (5) for forecasting traffic demand and (6) for identification of an equivalent traffic situation.

Il comporte enfin un module (8) de gestion de trafic, qui exécute ensuite des actions prises sur la base de la prévision de trafic éditée par le module (7). It finally comprises a traffic management module (8), which then performs actions taken on the basis of the traffic forecast published by the module (7).

Claims (14)

REVENDICATIONS1. Procédé de gestion de trafic routier, caractérisé en ce qu'il comporte les étapes de : - Préparation (E2) d'un ensemble déterminé de données de trafic mesurées et mémorisation des données mesurées dans un historique de situations de trafic à enregistrer dans une base de données d'historique (10) ; - Prévision (E3) de la demande de trafic sur la base de données d'historique (10) ; - Identification (E4) d'une situation équivalente dans l'historique de situations de trafic passées sur la base de la demande de trafic prévue ; et - Edition (E5) d'une prévision d'un état de trafic routier à très court terme sur la base de la situation de trafic équivalente sous la forme d'un ensemble de données de trafic prévues. REVENDICATIONS1. A method for managing road traffic, characterized in that it comprises the steps of: - Preparing (E2) a determined set of measured traffic data and storing the measured data in a history of traffic situations to be recorded in a base historical data (10); - Prediction (E3) of the traffic request on the history database (10); - Identification (E4) of an equivalent situation in the history of past traffic situations on the basis of the expected traffic demand; and - Editing (E5) a forecast of a very short-term road traffic condition based on the equivalent traffic situation in the form of a set of expected traffic data. 2. Procédé selon la revendication 1, caractérisé en ce que l'étape d'identification (E4) d'une situation de trafic équivalente dans un historique de demandes de trafic passées consiste à : - déterminer une période d'identification de demande de trafic ; - déterminer au moins une situation équivalente dans un historique de situations enregistré dans la base de données d'historique de situations, sur la période d'identification de demande de trafic dans l'historique des demandes observées. 2. Method according to claim 1, characterized in that the step of identifying (E4) an equivalent traffic situation in a history of past traffic requests consists in: determining a traffic request identification period ; determining at least one equivalent situation in a situation history recorded in the situation history database, the traffic request identification period in the history of the observed requests. 3. Procédé selon la revendication 1, caractérisé en ce que l'étape (E3) de prévision de la demande de trafic comporte une étape de détermination d'un profil de demande nominale de trafic pour chaque type de jour établi sur une typologie calendaire prédéterminée, l'étape de détermination d'un profil de demande comportant une étape de détermination : - d'un ensemble de moyennes des débits sur l'ensemble de l'historique ; - d'un ensemble de débits pondérés pour les jours d'une typologie calendaire donnée, pour chaque jour de cette typologie sur la base de données d'historique selon une relation de la forme : <qh> = moyenne(q;, h) ; j de typologie calendaire c et hp < h < hFoù h est une horodate dans la tranche horaire définie dans chaque jour de type de jour c et moyenne() est une fonction de calcul de moyennes ; - d'une médiane des débits pondérés pour chaque type de jour de la typologie déterminée selon une relation de la forme : pc,h = mediane(p;,h) ; pour chaque jour j appartenant à la classe c dans la typologie calendaire Ecalendaire, et hp < h < hF, pris comme profil de demande nominal pour le type c de jour. 3. Method according to claim 1, characterized in that the step (E3) for predicting the traffic demand includes a step of determining a nominal traffic demand profile for each type of day established on a predetermined calendar typology. the step of determining a demand profile comprising a step of determining: a set of averages of the flows over the entire history; - a set of weighted flows for the days of a given calendar typology, for each day of this typology on the basis of historical data according to a relation of the form: <qh> = average (q, h) ; j of calendar typology c and hp <h <hFor h is a time stamp in the time slot defined in each day type day c and mean () is a mean calculation function; a median of the weighted flows for each type of day of the typology determined according to a relation of the form: pc, h = median (p, h); for each day j belonging to the class c in the calendar typology Ecalendaire, and hp <h <hF, taken as nominal demand profile for the type c of day. 4. Procédé selon la revendication 3, caractérisé en ce qu'il comporte une étape de sélection de la demande nominale prévue recalée par recherche de la plus petite distance entre les débits observés Q et respectivement la demande nominale prévue D, la demande nominale prévue recalée par une moyenne D, et la demande nominale prévue recalée par une médiane D2, et en ce que comme fonction de distance, on utilise une fonction de distance cumulative, comme somme des distances partielles calculées chacune comme la distance entre deux éléments de même rang, selon une norme prédéterminée. 4. Method according to claim 3, characterized in that it comprises a step of selecting the expected nominal demand recaled by searching for the smallest distance between the observed flow rates Q and respectively the expected nominal demand D, the expected nominal demand recalibrated by a mean D, and the expected nominal demand recaled by a median D2, and that as a function of distance, a cumulative distance function is used, as sum of the partial distances each calculated as the distance between two elements of the same rank, according to a predetermined standard. 5. Procédé selon la revendication 4, caractérisé en ce que l'étape d'identification (E4) d'une situation équivalente dans l'historique de situations de trafic passées sur la base de la demande nominale de trafic prévue comporte une étape de : - pré échantillonnage des situations équivalentes ; puis - échantillonnage des situations équivalentes sur la base du pré échantillonnage. 5. Method according to claim 4, characterized in that the step of identifying (E4) an equivalent situation in the history of past traffic situations on the basis of the expected nominal traffic demand comprises a step of: - pre-sampling of equivalent situations; then - sampling of equivalent situations based on pre-sampling. 6. Procédé selon la revendication 5, caractérisé en ce que l'étape de pré échantillonnage des situations équivalentes consiste à rechercher la plus petite distance entre des situations candidates et la situation observée (So) lors de la dernière observation qui précède la période de prévision à très court terme, sur la base de la méthode des distances cumulatives, comme somme des distances partielles calculées chacune comme la distance entre deux éléments de même rang, selon une norme prédéterminée, et appliquée à n situations Si ayant la même tranche horaire dans le jour que celle de la situation observée (So) lors de la dernière observation qui précède la période de prévision à très court terme, prises sur l'une au moins de troisgrandeurs de débit, de taux d'occupation et/ou de vitesse moyenne, et de demande nominale de trafic observées des situations rapprochées de la situation So, et préalablement soumises à un traitement statistique de centrage et de réduction. 6. Method according to claim 5, characterized in that the step of pre-sampling the equivalent situations consists in finding the smallest distance between candidate situations and the observed situation (So) during the last observation preceding the forecasting period. in the very short term, on the basis of the cumulative distance method, as the sum of the partial distances each calculated as the distance between two elements of the same rank, according to a predetermined norm, and applied to n situations Si having the same time slot in the as observed at the last observation preceding the very short-term forecast period, taken from at least one of three flow, occupancy and / or average speed and nominal traffic demand observed from situations close to the So situation, and previously subjected to a statistical treatment of a hundred rabies and reduction. 7. Procédé selon la revendication 6, caractérisé en ce que l'étape d'échantillonnage des situations équivalentes consiste à rechercher les plus petites distances entre des situations candidates prises parmi les situations obtenues par pré échantillonnage et la situation observée (So) lors de la dernière observation qui précède la période de prévision à très court terme, sur la base de la méthode des distances par mensuration, prises sur l'une au moins de trois grandeurs de débit, de taux d'occupation et/ou de vitesse moyenne, et de demande nominale de trafic observées des situations rapprochées de la situation (So) et en ce que l'étape d'édition (E5) d'une prévision d'un état de trafic routier à très court terme sur la base de la situation de trafic équivalente sous la forme d'un ensemble de données de trafic prévues comporte une étape de construction de la prévision à très court terme à partir des mesures de trafic du jour je de l'historique qui présente la situation ayant la plus petite distance par mensuration parmi les situations identifiées à l'étape d'échantillonnage des situations équivalentes. 7. Method according to claim 6, characterized in that the step of sampling the equivalent situations consists of looking for the smallest distances between candidate situations taken from the situations obtained by pre-sampling and the observed situation (So) during the last observation preceding the very short-term forecast period, based on the measurement distance method, taken on at least one of three quantities of flow, occupancy and / or average speed, and of nominal traffic demand observed in situations close to the situation (So) and in that the editing step (E5) of a forecast of a very short-term road traffic situation on the basis of the situation of equivalent traffic in the form of a set of planned traffic data involves a very short-term forecasting construction step from the day I traffic measurements of the history that feel the situation with the smallest distance measurement from the situations identified in the sampling stage equivalent situations. 8. Procédé selon la revendication 1, caractérisé en ce qu'il comporte une étape (E6) pour exécuter des actions de prévision qui comprennent : - la diffusion d'information de prévision routière ; et/ou - la commande d'actionneurs de contrôle de trafic comme des feux de signalisation ; sur la base de l'édition (E5) d'une prévision d'un état de trafic routier à très court terme. 8. The method of claim 1, characterized in that it comprises a step (E6) for performing prediction actions which comprise: - the dissemination of road forecast information; and / or - the control of traffic control actuators as traffic lights; on the basis of the edition (E5) of a forecast of a very short-term road traffic situation. 9. Système de gestion de trafic routier pour mettre en oeuvre le procédé selon l'une des revendications précédentes, caractérisé en ce qu'il comporte : - une base de données (10) de mesures de trafic passées ; - un ensemble (2) de capteurs de données de trafic à mesurer ;- un moyen de traitement (4) de données de mesure de trafic ; - un moyen de calcul d'une demande de trafic (5) à une horodate déterminée ; - un moyen d'identification (6) d'une situation de trafic équivalente ; - un moyen de calcul (7) d'une prévision d'un état de trafic routier à très court terme ; et - au moins un dispositif d'exploitation (9) de données de prévision d'état de trafic à très court terme. 9. Road traffic management system for implementing the method according to one of the preceding claims, characterized in that it comprises: - a database (10) of past traffic measurements; a set (2) of traffic data sensors to be measured; a means for processing (4) traffic measurement data; means for calculating a traffic request (5) at a given time stamp; - a means of identification (6) of an equivalent traffic situation; - a calculation means (7) of a forecast of a very short-term road traffic situation; and at least one operating device (9) for very short-term traffic condition forecast data. 10. Système selon la revendication précédente, caractérisé en ce qu'il comporte un module (8) de gestion de trafic comporte des moyens pour éditer des bulletins d'information de prévision de trafic à destination de terminaux. 10. System according to the preceding claim, characterized in that it comprises a module (8) for traffic management comprises means for editing traffic forecast information bulletins to terminals. 11. Système selon la revendication précédente, caractérisé en ce que les terminaux sont : - des téléphones mobiles ou des appareils du même genre, et le réseau de communication comprenant un réseau de données sur un réseau de téléphonie mobile ; et/ou - des terminaux embarqués à bord des véhicules reliés au module (8) par un réseau de téléphonique mobile, le terminal embarqué étant adapté à un tel réseau de téléphonie mobile comme un récepteur radio-fréquences pour véhicule et le réseau de communications comportant un réseau d'informations routières de type vocal ou numérique comme le réseau RDS-TMC. 11. System according to the preceding claim, characterized in that the terminals are: - mobile phones or similar devices, and the communication network comprising a data network on a mobile network; and / or - onboard terminals on vehicles connected to the module (8) by a mobile telephone network, the onboard terminal being adapted to such a mobile telephone network as a radio-frequency receiver for a vehicle and the communications network comprising a network of voice or digital traffic information such as the RDS-TMC network. 12. Système selon la revendication 10, caractérisé en ce que le module (8) de gestion de trafic est connecté à un réseau d'afficheurs d'informations routières, et comporte alors un éditeur d'informations routières adapté à communiquer avec les afficheurs. 12. System according to claim 10, characterized in that the module (8) for traffic management is connected to a network of traffic information displays, and then comprises a road information editor adapted to communicate with the displays. 13. Système selon la revendication 10, caractérisé en ce que le module (8) de gestion de trafic est connecté à un réseau d'actionneurs de trafic comportant notamment des feux de signalisation, des panneaux de limitation de vitesses des véhicules, des barrières d'accès à une ou plusieurs voies du réseau routier, le module (8) de gestion de trafic comportant un moyen pour générer des signaux de commande destinés à commander les actionneurs de trafic. 13. System according to claim 10, characterized in that the module (8) for traffic management is connected to a network of traffic actuators comprising in particular traffic lights, vehicle speed limit panels, road barriers and traffic barriers. access to one or more roads of the road network, the traffic management module (8) comprising means for generating control signals for controlling the traffic actuators. 14. Système selon la revendication 13, caractérisé en ce que le module (8) de gestion de trafic est connecté par des moyens de communication à des barrières de péage, de sorte que la tarification de l'accès ou de la sortie d'un véhicule dépende notamment de la prévision de trafic à très court terme généré par le système de gestion de trafic de l'invention, et en ce que le module (8) comporte des moyens pour déterminer un message de commande de tarification à destination des automates de paiement et/ou pour affichage sur des afficheurs réservés à cet effet à chaque barrière de péage et prévus pour les usagers et/ou pour le personnel chargé de la perception des péages. 14. System according to claim 13, characterized in that the traffic management module (8) is connected by communication means to toll barriers, so that the charging of the access or the exit of a vehicle depends in particular on the forecast of very short-term traffic generated by the traffic management system of the invention, and in that the module (8) comprises means for determining a charging control message intended for the PLCs of the invention. payment and / or for display on displays reserved for this purpose at each tollgate and provided for the users and / or for the personnel charged with the collection of tolls.
FR1059826A 2010-11-29 2010-11-29 METHOD FOR MANAGING THE TRAFFIC OF A ROAD NETWORK AND MANAGEMENT SYSTEM IMPLEMENTING THE METHOD Active FR2968110B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR1059826A FR2968110B1 (en) 2010-11-29 2010-11-29 METHOD FOR MANAGING THE TRAFFIC OF A ROAD NETWORK AND MANAGEMENT SYSTEM IMPLEMENTING THE METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1059826A FR2968110B1 (en) 2010-11-29 2010-11-29 METHOD FOR MANAGING THE TRAFFIC OF A ROAD NETWORK AND MANAGEMENT SYSTEM IMPLEMENTING THE METHOD

Publications (2)

Publication Number Publication Date
FR2968110A1 true FR2968110A1 (en) 2012-06-01
FR2968110B1 FR2968110B1 (en) 2012-11-16

Family

ID=44210364

Family Applications (1)

Application Number Title Priority Date Filing Date
FR1059826A Active FR2968110B1 (en) 2010-11-29 2010-11-29 METHOD FOR MANAGING THE TRAFFIC OF A ROAD NETWORK AND MANAGEMENT SYSTEM IMPLEMENTING THE METHOD

Country Status (1)

Country Link
FR (1) FR2968110B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3129239A1 (en) 2021-11-16 2023-05-19 Phoenix Isi Ingenierie Des Systemes D'informations Method for estimating the short-term evolution of a mobility network

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1503355A1 (en) * 2003-07-30 2005-02-02 Pioneer Corporation A device, system and a method for processing statistic traffic information
US20050206534A1 (en) * 2004-02-27 2005-09-22 Hitachi, Ltd. Traffic information prediction apparatus
EP1986170A2 (en) * 2007-04-26 2008-10-29 Aisin AW Co., Ltd. Traffic situation determination system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1503355A1 (en) * 2003-07-30 2005-02-02 Pioneer Corporation A device, system and a method for processing statistic traffic information
US20050206534A1 (en) * 2004-02-27 2005-09-22 Hitachi, Ltd. Traffic information prediction apparatus
EP1986170A2 (en) * 2007-04-26 2008-10-29 Aisin AW Co., Ltd. Traffic situation determination system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3129239A1 (en) 2021-11-16 2023-05-19 Phoenix Isi Ingenierie Des Systemes D'informations Method for estimating the short-term evolution of a mobility network

Also Published As

Publication number Publication date
FR2968110B1 (en) 2012-11-16

Similar Documents

Publication Publication Date Title
US9958280B2 (en) Assessing inter-modal passenger travel options
CN100535957C (en) Traffic information system
EP2989623A1 (en) Method and device for dynamic management of urban mobility
US9293040B2 (en) Data quality assessment and real-time evaluation of GPS probe data
US20100286899A1 (en) Combining Road and Vehicle Traffic Information
US20080071465A1 (en) Determining road traffic conditions using data from multiple data sources
US20150339595A1 (en) Method and system for balancing rental fleet of movable asset
CN109961164A (en) Passenger flow forecast method and device
CN110400462B (en) Track traffic passenger flow monitoring and early warning method and system based on fuzzy theory
EP4026110A1 (en) Method for predicting at least one profile of the speed of a vehicle on a road network
EP4075408A1 (en) Method for determining the amount of pollutant emissions emitted by a vehicle on a section of a road network
Wang et al. Digital roadway interactive visualization and evaluation network applications to WSDOT operational data usage.
EP3936824A1 (en) Method for characterising a path travelled by a user
WO2019092146A1 (en) Device and method for processing heterogeneous data to determine inflows in time and space
Duchrow et al. Towards electric mobility data mining
Sun et al. Big data mobile services for New York City taxi riders and drivers
FR2968110A1 (en) Method for managing traffic on road, involves identifying equivalent traffic situation based on forecasted traffic demand, and publishing forecast of state of traffic on short term basis based on traffic data of equivalent traffic situation
Weng et al. Freeway travel speed calculation model based on ETC transaction data
WO2013190233A1 (en) Method for estimating a journey time of a vehicle on a road network
Bauer et al. Modelling travel time uncertainty in urban networks based on floating taxi data
WO2020039061A1 (en) Method and system for quasi real time prediction of at least one indicator of operation of a passenger transport network
Latinopoulos et al. Trust in IoT-enabled mobility services: Predictive analytics and the impact of prediction errors on the quality of service in bike sharing
Han et al. Bike sharing data analytics for silicon valley in USA
Beitel Methods for investigating bicycle traffic flow parameters and facility performance in urban environments
EP4239289A1 (en) Method for determining at least one route between an original geographical area and a target geographical area

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 6

PLFP Fee payment

Year of fee payment: 7

PLFP Fee payment

Year of fee payment: 8

PLFP Fee payment

Year of fee payment: 10

RN Application for restoration

Effective date: 20190903

FC Decision of inpi director general to approve request for restoration

Effective date: 20200109

PLFP Fee payment

Year of fee payment: 11

PLFP Fee payment

Year of fee payment: 12

PLFP Fee payment

Year of fee payment: 13