FR2822868A1 - HAMMERED SLAB AND MANUFACTURING METHOD - Google Patents
HAMMERED SLAB AND MANUFACTURING METHOD Download PDFInfo
- Publication number
- FR2822868A1 FR2822868A1 FR0104183A FR0104183A FR2822868A1 FR 2822868 A1 FR2822868 A1 FR 2822868A1 FR 0104183 A FR0104183 A FR 0104183A FR 0104183 A FR0104183 A FR 0104183A FR 2822868 A1 FR2822868 A1 FR 2822868A1
- Authority
- FR
- France
- Prior art keywords
- lifting
- slab
- systems
- slab according
- mass
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/142—Means in or on the elements for connecting same to handling apparatus
- E04G21/145—Means in or on the elements for connecting same to handling apparatus specific for hollow plates
Abstract
Description
1 28228681 2822868
La présente invention concerne les dalles alvéolées en béton et plus particulièrement les dalles alvéolées comprenant une masse de béton formant une table ayant deux surfaces principales s'étendant sensiblement parallèlement l'une à l'autre, deux parois latérales sensiblement parallèles joignant lesUites surfaces principales et deux extrémités aux travers desquelles débouchent des aciers de précontrainte disposés dans ladite masse sensiblement parallèlement aux dites parois latérales. L' invention vise également un procédé The present invention relates to hollow concrete slabs and more particularly to hollow slabs comprising a mass of concrete forming a table having two main surfaces extending substantially parallel to one another, two substantially parallel side walls joining the said main surfaces and two ends through which open prestressing steels arranged in said mass substantially parallel to said side walls. The invention also relates to a method
de fabrication de telles dalles.manufacturing such slabs.
Le principal problème rencontré lors de l'utilisation de The main problem encountered when using
ces dalles alvéolées provient de leur manutention. these honeycomb slabs comes from their handling.
En effet, la manutention de ces dalles alvéolées n'est faite à ce j our qu'avec des pinces auto-serrantes prenant position dans la clef des joints longitudinaux. Cependant, de nombreux sinistres ont été provoqués par le mauvais positionnement de ces pinces ou la ropLure du béton comprimé au niveau de la mâchoire des pinces ou par l'apparition de contraintes mécanique importantes lors du déplacement de la Indeed, the handling of these honeycomb slabs is only done at this day with self-tightening pliers taking position in the key of the longitudinal joints. However, many claims have been caused by the incorrect positioning of these clamps or the breakage of the compressed concrete at the jaw of the clamps or by the appearance of significant mechanical stresses during the movement of the
dalle ainsi équipée.slab thus equipped.
Une autre possibilité de manutention est de passer une sangle sous la dalle à chaque extrémité de celle-ci. Cette méthode, plus efficace que la précédente, offre toute garantie sous réserve qu'il soit disposé un système anti-glissement sur la dalle permettant de bloquer les sangles de manière à empêcher tout glissement de celles-ci qui provoquerait la chute de ladite dalle. Cependant, cette méthode rend impossible la juxtaposition desdites dalles alvéolées à moins qu'il nTait été prévu de réaliser des encoches latérales dans les parois latérales de ladite dalle de manière à pouvoir extraire les sangles une fois la dalle juxtaposée à la dalle précédente. Une autre solution, s'il est impossible de réaliser des encoches, est de riper les dalles. Dans le premier cas, il y a lieu de reboucher les encoches directement Another handling option is to pass a strap under the slab at each end of it. This method, more effective than the previous one, offers all guarantees provided that an anti-slip system is placed on the slab allowing the straps to be blocked so as to prevent any slipping of the latter which would cause the slab to fall. However, this method makes it impossible to juxtapose said honeycomb slabs unless provision has been made to make lateral notches in the side walls of said slab so as to be able to extract the straps once the slab is juxtaposed with the previous slab. Another solution, if it is impossible to make notches, is to rip the slabs. In the first case, it is necessary to reseal the notches directly
2 28228682 2822868
sur le chantier, ce qui représente un travail coûteux et peu esthétique, dans l'autre cas, le ripage présente un risque de chute de la dalle ou alors les aciers de précontrainte dépassant des extrémités restent bloqués par les cadres de poutres supportant les dalles et neutralisent ainsi le ripage. Une dernière possibilité de manutention consiste à réaliser en usine des trous travereant la dalle au travers de ses surfaces principales. Par ces trous, on introduit l'_il on site, which represents an expensive and unattractive work, in the other case, the shifting presents a risk of falling of the slab or else the prestressing steels protruding from the ends remain blocked by the beam frames supporting the slabs and thus neutralize the shift. A final handling possibility consists in making holes in the factory crossing the slab through its main surfaces. Through these holes, we introduce the
d'une élingue bloquée par une barre généralement métallique. a sling blocked by a generally metallic bar.
Cette dernière méthode représente un travail long, fastidieux et donc coûteux et nécessite comme précédemment le reLouchage des trous sur chantier aussi difficile que le reLouchage des This last method represents a long, tedious and therefore costly work and requires, as before, the relining of holes on site as difficult as the relining of
encoches précédemment mentionné.previously mentioned notches.
La présente invention a donc pour but de remédier à ces inconvénients en proposant une dalle alvéolée en béton offrant des possibilités de manutention simples, rapides, peu coûteuses et ne nécessitant pas dTinterventions supplémentaires de percage de la dalle, de ripage ni de rebouchage et permettant une manipulation efficace et séaurisée de ladite dalle sans risque de la rompre ni de l'endommager. A cet effet et conformément à l T invention, un dalle alvéolée comprenant une masse de béton formant une table ayant deux surfaces principales s'étendant sensiblement parallèlement l T une à l T autre, deux parois latérales sensiblement parallèles joignant lesdites surfaces principales et deux extrémités aux travers desquelles déLouchent des aciers de précontrainte disposés dans ladite masse sensiblement parallèlement aux dites parois latérales, comprend également, noyées dans ladite masse, au moins deux paires de systèmes de levage, chacune des paires débouchant au travers de chacune desdites parois latérales, chacun desUits systèmes constituant ladite paire étant placé respectivement à proximité d'une desdites extrémités, lesdits systèmes étant The present invention therefore aims to remedy these drawbacks by proposing a honeycombed concrete slab offering simple, rapid, inexpensive handling possibilities and requiring no additional interventions of drilling the slab, shifting or filling and allowing a efficient and secure handling of said slab without the risk of breaking or damaging it. To this end and in accordance with the invention, a honeycomb slab comprising a mass of concrete forming a table having two main surfaces extending substantially parallel to each other, two substantially parallel side walls joining said main surfaces and two ends. through which release prestressing steels arranged in said mass substantially parallel to said side walls, also comprises, embedded in said mass, at least two pairs of lifting systems, each of the pairs emerging through each of said side walls, each of said systems constituting said pair being placed respectively near one of said ends, said systems being
3 28228683 2822868
sensiblement perpendiculaires aux dits aciers et articulés et/ou souples au moins dans leur partie non noyée dans ladite masse. Ainsi, la disposition dlun système de levage solidaire de la dalle permet d'éviter toute mise en place dTun système de levage postérieure à la réalisation de la dalle. De plus, la souplesse et/ou l T articulation dudit système de levage permet de replier le système de levage dans le joint entre deux dalles successives au moment de la réalisation dudit oint, juste avant bétonnage et ainsi de noyer lesdits systèmes de levage dans le béton de clavetage; il est donc inutile de recourir à une découpe desdits systèmes de levage après substantially perpendicular to said steels and articulated and / or flexible at least in their part not embedded in said mass. Thus, the provision of a lifting system integral with the slab makes it possible to avoid any installation of a lifting system subsequent to the production of the slab. In addition, the flexibility and / or articulation of said lifting system makes it possible to fold the lifting system into the joint between two successive slabs at the time of making said anointed, just before concreting and thus to drown said lifting systems in the keying concrete; it is therefore unnecessary to resort to cutting said lifting systems after
positionnement de la dalle.positioning of the slab.
Les systèmes de levage ainsi repliés sur l'appui des dalles augmentent de 100% 1lancrage sur appui, ce qui permet en outre de limiter le dépassement des aciers de précontrainte, voire de supprimer ce dépassement et faciliter ainsi la réalisation des poutres et autres porteurs La sortie latérale des systèmes de levage permet de juxtaposer les dalles à la pose sans aucun ripage ni The lifting systems thus folded back on the support of the slabs increase by 100% launching on the support, which also makes it possible to limit the overshoot of prestressing steels, or even to eliminate this overshoot and thus facilitate the production of beams and other carriers La lateral exit of the lifting systems allows juxtaposition of the tiles when laying without any shifting or
obligation de réaliser des enceches. obligation to make notches.
De plus, le positionnement dTextrémité des systèmes de levage permet dTéviter les moments négatifs de la table de compression pouvant entraîner la rupLure de la dalle alvéolée In addition, the end positioning of the lifting systems avoids negative moments on the compression table, which can cause the hollow slab to break.
précontrainte.prestressing.
Prétérentiellement, une dalle alvéolée selon l T invention est telle que les deux systèmes de levage disposés à proximité de la même extrémité sont reliés entre eux de facon monobloc de manière à traverser latéralement toute la largeur de la Preferably, a honeycomb slab according to the invention is such that the two lifting systems arranged near the same end are connected to one another in a single piece so as to cross laterally the entire width of the
dalle.slab.
Pour relier les systèmes de levage, on peut utiliser une chaîne métallique, un filin ou encore une barre sur lesquels sont fixés à demeure les systèmes de levage opposés par To connect the lifting systems, one can use a metal chain, a rope or a bar on which the lifting systems opposed by
rapport à la largeur de la dalle.relative to the width of the slab.
4 28228684 2822868
De cette manire, l' effort subit par les sYstAmes de levage est rAprti sur toute la 1argeur de la dalle, ce qui diminue d'autant les risques d'arrachement des systAmes de levage. Plus prAfArentiellement encore lesdits systAmes de levage d'une dalle alvAole selon l' invention sont disposs sous lesdits aciers de prAcontrainte Cette intAgraLico des systmes de levage sons les aciers de prcontrainte, dans la partie comprime de la dalle assure un parfait enrobage du bAton et permet de reprendre tous les In this way, the effort undergone by the lifting systems is spread over the entire width of the slab, which reduces the risk of lifting the lifting systems. More preferably still, said lifting systems for an alveolar slab according to the invention are provided under said prestressing steels. to resume all
efforts d'arrachement provoquAs par le levage de la dalle. lifting forces caused by lifting the slab.
De plus, les sYstAmes de levage sont ainsi parfaitement solidaires de la dalle et en sont le seul moyen de manut ent ion, ce qui en out re Avi te toute faute de positionnement et toute rupture du bton par compression ou cisaillement, puisque les dispositifs de levage sont In addition, the lifting systems are thus perfectly secured to the slab and are the only means of handling it, which in addition re Avi te any fault of positioning and any rupture of the concrete by compression or shearing, since the devices lifting are
positionnAs sous les aciers de prAcontrainte. positioned under the prestressing steels.
vantageusement, lesdits sYstmes de levage sont constitus de mAtaux, d'alliage mtalliques et/ou de matAriaux advantageously, said lifting systems consist of metals, metal alloys and / or materials
composites.composites.
Ces choix de matAriaux sont dicts par des contraintes de rAsistance mAcanique et de maniAre assurer un ancrage durable des systAmes de levage dans la dalle et ayant une These choices of materials are dictated by mechanical resistance constraints and so as to ensure a lasting anchoring of the lifting systems in the slab and having a
bonne cobAsion.good cobAsion.
23 PrAfArentiellement, lesdits systmes de levage sont en acier. De maniAre faciliter la prise des AlAments de levage, ceux-ci comportent leur extrAmitA libre un dispositif de saisie qui peut Atre un trou pour le passage d'un filin ou d'un crochet ou encore une poignAe destine coopArer avec 23 prAfArentially, said lifting systems are made of steel. In order to facilitate the lifting of the lifting AlAments, these include their free end a gripping device which can be a hole for the passage of a rope or a hook or a handle intended to cooperate with
une pince.pliers.
Plus prAfArentiellement encore, lesdits dispositifs de levage reliAs de faon monobloc sont des Alingues. Ces Even more prAfArentially, said lifting devices connected in one piece are Alingues. These
28228682822868
dispositifs représentent en effet un moyen efficace, rapide à devices represent an effective, quick way to
positionner et à se procurer.position and procure.
Dans ce cas particulier, lesdits dispositifs de saisie In this particular case, said input devices
sont des bouales fermées.are closed bouales.
L' invention concerne également un procédé de fabrication desdites dalles alvéolées comprenant une étape de positionnement des dispositifs de levage pendant le filage ou The invention also relates to a method for manufacturing said honeycomb slabs comprising a step of positioning the lifting devices during spinning or
extrusion de ladite dalle.extrusion of said slab.
D'autres caractéristiques et avantages de la présente Other features and advantages of this
invention ressortiront de la description faite ci-après, en invention will emerge from the description given below, in
référence au dessin annexé qui illustre un exemple de réalisation dépourvu de tout caractère limitatif. Sur les figures: - la figure 1 est une vue en perspective représentant un exemple de réalisation d'une dalle alvéolée objet de l' invention en cours de manutention; - la figure 2 est une vue en coupe de la dalle alvéolée représentée à la figure 1, la coupe étant réalisée selon l'axe défini par deux systèmes de levage opposés appartenant à deux paires de systèmes de levage différentes; - la figure 3 est une vue en perspective de partie de dalles alvéolées objet de l' invention, une fois celles-ci reference to the accompanying drawing which illustrates an exemplary embodiment devoid of any limiting character. In the figures: - Figure 1 is a perspective view showing an embodiment of a honeycomb slab object of the invention during handling; - Figure 2 is a sectional view of the honeycomb slab shown in Figure 1, the section being taken along the axis defined by two opposite lifting systems belonging to two pairs of different lifting systems; - Figure 3 is a perspective view of part of honeycomb slabs object of the invention, once these
positionnces sur un cadre support.positioned on a support frame.
En se rétérant aux figures, on constate que la dalle alvéclée objet de la présente invention comprend une masse de béton formant une table 1 ayant deux surfaces principal es 2 s'étendant sensiblement parallèlement lTune à l'autre, deux parois latérales 3 sensiblement parallèles joignant lesdites surfaces principales 2 et deux extrémités 4 aux travers desquelles débouchent des aciers de précontrainte 5 disposés dans ladite masse sensiblement parallèlement aux dites parois latérales 3 et comprend également, noyés dans ladite masse, au moins deux paires de systèmes de levage 6, chacune des paires déLouchant au travers de chacune desdites parois latérales 3, Referring to the figures, it can be seen that the alveolar slab which is the subject of the present invention comprises a mass of concrete forming a table 1 having two main surfaces es 2 extending substantially parallel to one another, two side walls 3 substantially parallel joining said main surfaces 2 and two ends 4 through which open prestressing steels 5 arranged in said mass substantially parallel to said side walls 3 and also comprises, embedded in said mass, at least two pairs of lifting systems 6, each of the pairs uncovering through each of said side walls 3,
6 28228686 2822868
chacun desdits systèmes 6 constituant ladite paire étant placé respectivement à proximité d'une desdites extrémités 4, lesdits systèmes 6 étant sensiblement perpendiculaires aux dits aciers 5 et articulés et/ou souples au moins dans leur partie 7 non ncyée dans ladite masse. L T articulation des systèmes 6 a en outre la double fonction de permettre le repli des système de levage 6 dans le joint 8 entre deux dalles successives (voir figure 3) et d' assurer la possibilité de each of said systems 6 constituting said pair being placed respectively near one of said ends 4, said systems 6 being substantially perpendicular to said steels 5 and articulated and / or flexible at least in their part 7 not ncyée in said mass. The articulation of the systems 6 also has the double function of allowing the lifting of the lifting systems 6 in the joint 8 between two successive slabs (see FIG. 3) and of ensuring the possibility of
réduire la course de l'engin servant à soulever ladite dalle. reduce the stroke of the machine used to lift said slab.
Sur la figure 1, chacun des systèmes de levage 6 est muni d'un dispositif de saisie 9 représenté ici sous la réalisation In FIG. 1, each of the lifting systems 6 is provided with a gripping device 9 shown here in the embodiment
d'une boucle fermée.of a closed loop.
Sur la figure 2, les systèmes de levage 6 disposés à proximité de la même extrémité 4 sont reliés entre eux de manière monobloc. Typiquement ici, on utilise une élingue constituée d'un filin métallique ou composite possédant une certaine souplesse et présentant une faible résistance à la torsion et munie à chacune de ses extrémités d'une bouale fermée 9. Typiquement cette élingue est en acier. De manière efficace, l'élingue traverse la totalité de la largeur de la In FIG. 2, the lifting systems 6 arranged near the same end 4 are connected to one another in a single piece. Typically here, a sling is used consisting of a metal or composite rope having a certain flexibility and having a low resistance to torsion and provided at each of its ends with a closed bale 9. Typically this sling is made of steel. Effectively, the sling crosses the entire width of the
dalle et débouche de chaque coté des parois latérales 3. slab and opens on each side of the side walls 3.
L'élingue est situce sous les aciers de précontrainte 5 de manière à renforcer la tenue mécanique de la dalle lors des The sling is located under the prestressing steels 5 so as to reinforce the mechanical strength of the slab during
manipulations de manutention.handling manipulations.
Sur la figure 3, les dalles sont posées sur un cadre, typiquement constitué de poutres métalliques 10, sur lequel reposent les aciers de précontrainte 5. Les systèmes de levage 6 sont alors repliés dans le joint inter-dalle 8 et seront In FIG. 3, the slabs are placed on a frame, typically made of metal beams 10, on which the prestressing steels 5 rest. The lifting systems 6 are then folded back into the inter-slab joint 8 and will be
noyés dans le béton de clavetage (étape non représentée). embedded in the keying concrete (step not shown).
Il demeure bien entendu que la présente invention n'est pas limitée à l'exemple de réalisation décrit et représenté It remains to be understood that the present invention is not limited to the embodiment described and shown
ci-dessus, mais qu'elle en englabe toutes les variantes. above, but that it encompasses all variants.
7 28228687 2822868
Claims (9)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0104183A FR2822868B1 (en) | 2001-03-28 | 2001-03-28 | HAMMERED SLAB AND MANUFACTURING METHOD |
DE60235215T DE60235215D1 (en) | 2001-03-28 | 2002-03-22 | Cavity plate and its manufacturing process |
EP02290736A EP1245756B1 (en) | 2001-03-28 | 2002-03-22 | Hollow slab and its manufacturing process |
ES02290736T ES2340143T3 (en) | 2001-03-28 | 2002-03-22 | ALVEOLAR Slab AND ITS MANUFACTURING PROCEDURE. |
AT02290736T ATE456721T1 (en) | 2001-03-28 | 2002-03-22 | CAVITY PLATE AND ITS PRODUCTION PROCESS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0104183A FR2822868B1 (en) | 2001-03-28 | 2001-03-28 | HAMMERED SLAB AND MANUFACTURING METHOD |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2822868A1 true FR2822868A1 (en) | 2002-10-04 |
FR2822868B1 FR2822868B1 (en) | 2004-04-16 |
Family
ID=8861638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR0104183A Expired - Lifetime FR2822868B1 (en) | 2001-03-28 | 2001-03-28 | HAMMERED SLAB AND MANUFACTURING METHOD |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP1245756B1 (en) |
AT (1) | ATE456721T1 (en) |
DE (1) | DE60235215D1 (en) |
ES (1) | ES2340143T3 (en) |
FR (1) | FR2822868B1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2865228B1 (en) * | 2004-01-15 | 2006-03-24 | Soprel | METHOD FOR MANUFACTURING PRECONTRATED CONCRETE SLABS EQUIPPED WITH LIFTING AND HANDLING BUCKLES AND SLABS OBTAINED FOLLOWING THE IMPLEMENTATION OF SAID METHOD |
FR2894266B1 (en) * | 2005-12-07 | 2009-08-07 | E Ronveaux Sa Sa Belge Ets | GRIPPING DEVICE FOR ALONEOLE CONCRETE SLAB |
FR2900672A1 (en) * | 2006-05-03 | 2007-11-09 | Scorim Sarl | Dwelling module for forming e.g. prefabricated single-family house, has base constituted of reinforced concrete slab, where slab has lower surface including connection beams extending from one side to another side of retaining beam |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2102948A5 (en) * | 1970-08-25 | 1972-04-07 | Jos Schwaigers Wwe Tauw | |
DE7146531U (en) * | 1971-12-10 | 1973-11-08 | Mannesmann Leichtbau Gmbh | PANEL-SHAPED COMPONENT WITH TRANSPORT AND FASTENING ANCHORS |
FR2229832A1 (en) * | 1973-05-18 | 1974-12-13 | Selam | |
DE3322646A1 (en) * | 1982-08-26 | 1984-03-08 | Gebr. Philipp GmbH, 8750 Aschaffenburg | Rope conveying anchor and method for manufacture |
-
2001
- 2001-03-28 FR FR0104183A patent/FR2822868B1/en not_active Expired - Lifetime
-
2002
- 2002-03-22 DE DE60235215T patent/DE60235215D1/en not_active Expired - Lifetime
- 2002-03-22 ES ES02290736T patent/ES2340143T3/en not_active Expired - Lifetime
- 2002-03-22 EP EP02290736A patent/EP1245756B1/en not_active Expired - Lifetime
- 2002-03-22 AT AT02290736T patent/ATE456721T1/en not_active IP Right Cessation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2102948A5 (en) * | 1970-08-25 | 1972-04-07 | Jos Schwaigers Wwe Tauw | |
DE7146531U (en) * | 1971-12-10 | 1973-11-08 | Mannesmann Leichtbau Gmbh | PANEL-SHAPED COMPONENT WITH TRANSPORT AND FASTENING ANCHORS |
FR2229832A1 (en) * | 1973-05-18 | 1974-12-13 | Selam | |
DE3322646A1 (en) * | 1982-08-26 | 1984-03-08 | Gebr. Philipp GmbH, 8750 Aschaffenburg | Rope conveying anchor and method for manufacture |
Also Published As
Publication number | Publication date |
---|---|
EP1245756B1 (en) | 2010-01-27 |
DE60235215D1 (en) | 2010-03-18 |
ATE456721T1 (en) | 2010-02-15 |
FR2822868B1 (en) | 2004-04-16 |
ES2340143T3 (en) | 2010-05-31 |
EP1245756A1 (en) | 2002-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR2739905A1 (en) | LIFTING DEVICE AND LENGTH TOOL USED IN THIS DEVICE | |
EP1996832B1 (en) | Lifting hook with chain length reducer | |
FR2614781A1 (en) | ATTACHMENT DEVICE AND TOOLS FOR ITS PLACEMENT, IN PARTICULAR TO ATTACH THE BIG TROCHANTER TO THE FEMUR | |
EP0383870A1 (en) | Anchorage piece, in particular for concrete. | |
EP2771604B1 (en) | Support device for positioning cables along submerged pipeline-type pipes | |
CH653076A5 (en) | CLAMP FOR DRILL PIPES. | |
FR2822177A1 (en) | Anchoring system for pre-stressed reinforcing cables comprises block with holes for cables running in opposite directions and thrust surface for structure | |
FR2722514A1 (en) | PROTECTIVE DEVICE FOR THE QUICK CONNECTION OF ARCADE ROPES TO LIFTING ROPES OF A WEAVING MATERIAL | |
EP3078784B1 (en) | Integrated form wall with a removable means for receiving a means for connecting to a handling appliance | |
FR2822868A1 (en) | HAMMERED SLAB AND MANUFACTURING METHOD | |
EP0846650A1 (en) | Method and device for mounting jib tension elements on tower cranes | |
EP1164106B1 (en) | Lifting ring | |
EP0786035B1 (en) | Device for anchoring the foundation of a structure in the ground | |
FR2712268A1 (en) | Handling method for thin or extruded concrete products | |
FR2765249A1 (en) | METHOD FOR LAYING A TUBE SHAFT ON A TENSIONED MEMBRAGE AND DEVICE FOR SPACING A TUBE SHAPE | |
EP3763897A1 (en) | Lifting anchor for wall with built-in formwork and wall with built-in formwork comprising said lifting anchor | |
FR2589543A1 (en) | STAPLING DEVICE FOR JOINING BELTS, JOINING METHOD USING THE SAME, AND BELT JOINED ACCORDING TO THIS METHOD | |
FR2877933A1 (en) | Lifting handle for load lifting handling, has hexagonal male part with groove that is broken up at exact value of torque needed for tightening hexagonal screw used to block shoulder ring of flange articulated to ovoid and triangular sling | |
FR3121456A1 (en) | METHOD FOR REMOVING A REINFORCEMENT FROM A STRUCTURAL CABLE AND ASSOCIATED SYSTEM | |
EP4269316A1 (en) | Lifting clamp for closed panels | |
FR2808261A1 (en) | Rapid changer for multi-grab gripper has grabs pivotably located on support and central support connectable at one end with gripper suspension, having adapter at its other end | |
FR2849008A1 (en) | Universal gripper for digger arm comprises fork with teeth fixed to arm so it interacts with bucket to grip long or awkward loads | |
WO2014002036A2 (en) | Tooling system for maintaining hand pumps for deep boreholes | |
FR2634854A1 (en) | SYSTEM FOR PROGRESSIVELY REMOVING A SERIES OF SUPPORT NECKLACES WHICH HAVE BEEN GREENLY GREEN ON AN IMMERED STRUCTURE, ALONG IT AND METHOD FOR THE OPERATION THEREOF | |
FR2470303A1 (en) | CHAIN TENSIONER DEVICE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
TP | Transmission of property |
Owner name: STRUDAL, FR Effective date: 20121106 |
|
PLFP | Fee payment |
Year of fee payment: 15 |
|
PLFP | Fee payment |
Year of fee payment: 16 |
|
PLFP | Fee payment |
Year of fee payment: 17 |
|
PLFP | Fee payment |
Year of fee payment: 18 |
|
PLFP | Fee payment |
Year of fee payment: 20 |