FR2485593A1 - Part prefabricated building roof construction - in which top panels are fitted with insulation material filled cases with wrapped spacer insulators - Google Patents

Part prefabricated building roof construction - in which top panels are fitted with insulation material filled cases with wrapped spacer insulators Download PDF

Info

Publication number
FR2485593A1
FR2485593A1 FR8014430A FR8014430A FR2485593A1 FR 2485593 A1 FR2485593 A1 FR 2485593A1 FR 8014430 A FR8014430 A FR 8014430A FR 8014430 A FR8014430 A FR 8014430A FR 2485593 A1 FR2485593 A1 FR 2485593A1
Authority
FR
France
Prior art keywords
plate
conveyor belt
box
conveyor
roof element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
FR8014430A
Other languages
French (fr)
Inventor
Lars Sandberg
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Abetong AB
Original Assignee
Abetong AB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Abetong AB filed Critical Abetong AB
Priority to FR8014430A priority Critical patent/FR2485593A1/en
Publication of FR2485593A1 publication Critical patent/FR2485593A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/20Roofs consisting of self-supporting slabs, e.g. able to be loaded
    • E04B7/22Roofs consisting of self-supporting slabs, e.g. able to be loaded the slabs having insulating properties, e.g. laminated with layers of insulating material

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The method is for the manufacture of roof components comprising a flat plate, against the underside of which is fixed one or several box-shaped casings. A lower plate involves insulation components, and the upper plate, together with the casing or casings, forms the support skeleton for the roof component with the requisite degree of rigidity. The manufacturing process involves the top plate (1) being placed base side upwards on a transport track (13), and on it casings (4) are fixed with the intermediary of distance pieces (3). The casings are filled with insulation material. Between or on the casings insulator spacers are fitted, provided with a surrounding sheet. The under plate (8) is then placed on the casings (4).

Description

La présente invention concerne un procédé de fabrication d'éléments de toit qui,-en position d'utilisation, comportent une plaque supérieure essentiellement plane avec au moins, fixé à
la partie inférieure, un caisson analogue à un coffret qui est dis -posé de façon a absorber des contraintes essentiellement de traction,
ces éléments de toit comportant en outre des éléments isolantsracou- verts par un plateau inférieur, la plaque supérieure constituant avec le ou les caisson(s) la chassies porteur de l'élément de toit, ce qui donne a celui-ci sa résistance principale, le procédé comportant des phases successives de travail indiquées ci-après.
The present invention relates to a method of manufacturing roof elements which, in the position of use, comprise an essentially flat upper plate with at least, fixed to
the lower part, a box similar to a box which is arranged so as to absorb essentially tensile stresses,
these roof elements further comprising insulating elements covered by a lower plate, the upper plate constituting with the box (es) the ducts carrying the roof element, which gives it its main resistance, the process comprising successive stages of work indicated below.

L'invention concerne également un dispositif pour la mise en oeuvre du procédé de l'invention. The invention also relates to a device for implementing the method of the invention.

Quand un bâtimant doit être muni d'une couverture qui constitue le toit extérieur et; l'intérieur, le plafond dans une ou plusieurs pièces du bâtiment, le montage sur place est un procédé utilisé depuis longtemps. Le toit est alors monté directement sur la charpente a partir de ase constituants. En général, pour un tel toit constitué sur place, on dépose d'abord sur la charpente des éléments porteurs comea---- par exemple des planches ou un lambrissage, et ceux-ci sont ensuite munis d'un revêtement étanche comme du carton bitumé, des tuiles, de la tole ou autres matériaux.C'est seulement quand cette partie du travail est terminée que le batiment ese a l'abri sous son toit contre les précipitations. Dans le cas où
le toit délimite des chambres avec dispositif intérieur, la toit comporte comme travail de finition un plafond et comporte, habituel lament une protection isolante entre la revêtement du toit et le plafond.
When a building must be provided with a covering which constitutes the external roof and; inside, the ceiling in one or more rooms of the building, on-site mounting is a process that has been used for a long time. The roof is then mounted directly on the frame from ase constituents. In general, for such a roof made up on the spot, firstly load bearing elements comea ---- for example boards or paneling, and these are then provided with a waterproof coating like cardboard asphalt, tiles, sheet metal or other materials. It is only when this part of the work is finished that the building is sheltered under its roof against precipitation. In the case where
the roof delimits rooms with interior device, the roof comprises as finishing work a ceiling and comprises, usually lament an insulating protection between the coating of the roof and the ceiling.

En particulier pour rationaliser le travail de mon- tage et réduire le temps qui s'écoule avant que le bâtiment soit hors d'eau, on est passé dans une certaine mesure de la construction sur place au montage d'éléments dle toit préfabriqués sur la charpente, qui comprennent la totalité ou une partie des composants cités tels. In particular to streamline the assembly work and reduce the time that elapses before the building is out of the water, we have gone to some extent from on-site construction to the assembly of prefabricated roof elements on the framework, which include all or part of the components mentioned above.

que la partie portante, le revêtement extérieur, l'isolation et le revêtement intérieur. L'invention concerns la fabrication de ces
éléments de toit, et cette fabrication doit s'adapter évidement dans
une large mesure au montage de l'élément a fabriquer. Dans le cas
présent, l'invention concerne un élément de toit qui, a l'état posé, comporte une plaque supérieure essentiellement plane dont le côté inférieur est relié a des caissons en forme de coffret et a des entrez toises ainsi qu'a une protection isolante recouverta d'un lambrissage.
than the load-bearing part, the external covering, the insulation and the internal covering. The invention relates to the manufacture of these
roof elements, and this manufacturing must obviously fit in
a large measure to the assembly of the element to be manufactured. In the case
present, the invention relates to a roof element which, in the installed state, comprises a substantially planar upper plate whose lower side is connected to boxes in the form of a box and to entry rods as well as to an insulating protection covered with paneling.

La plaque et les caissons forment la partie essentiellement porteuse de l'élément de toit, et le lambrissage est destiné V former le toit.The plate and the boxes form the essentially load-bearing part of the roof element, and the paneling is intended to form the roof.

Le revêtement extérieur peut constituer une partie du lambrissage, mais il est déposé de préférence sur la surface- supérieure qui est constituée par les plaques des éléments de toit necessaire-s mis en place sur la charpente.The exterior covering may constitute part of the paneling, but it is preferably deposited on the upper surface which is constituted by the plates of the necessary roof elements placed on the frame.

Un tel élément de toit peut etre fabriqué selon les règles du métier, a savoir que l'on dépose d'abord la plaque et on fixe ensuite successivement d la partie inférieure les-composants appropriés jusqutau lambrissage terminé. Cela correspond auxprocédés de la construction sur place et l'on a les éléments sous la sain pour les utiliser. Mais un tel procédé n'est pas économique et mène à des frais de fabrication élevés, de sorte que les gains réalisés au moyen de la construction par éléments sont amoindris ou même éli- minés.Le fait de mettre par contre la plaque en position inversée et d'y rapporter les composants sur le coté tourné vers le haut serait avantageux, mais il s'ensuivrait certaines difficultés du fait qu'un élément de ce type ne pourrait pas être maniplué dans cette position inversée au cours dlun levage ou pendant un trains port, parce que la construction de l'élément de toit ne permet d'absorber les contraintes de flexion que dans la position correcte tournéa vers le haut.Au cours de la misa en oeuvre d'un Procédé de fabrication rationnel, celui-ci doit donc tenir compte non seulement de moyens economiques pour le transport, la maipulation, la mise en place et la fixation des composants, mais également d'une méthode de manipulation appropriée pour l'ensemble de l'élément de toit. Such a roof element can be manufactured according to the rules of the trade, namely that the plate is first removed and then the successive components are attached successively to the finished paneling. This corresponds to the on-site construction processes and we have the elements under the sane to use them. However, such a process is not economical and leads to high manufacturing costs, so that the gains made by means of construction by elements are reduced or even eliminated. The fact of placing the plate on the other hand in the inverted position and bringing the components back on the upward side would be advantageous, but some difficulties would ensue from the fact that an element of this type could not be manipulated in this inverted position during lifting or during a train wearing, because the construction of the roof element makes it possible to absorb the bending stresses only in the correct position turned upwards. During the implementation of a rational manufacturing process, this must therefore take into account not only economical means for transport, handling, positioning and fixing of the components, but also an appropriate handling method for the entire roof element.

L'invention a pour but un procédé et un dispositif de fabrication d'un élément de toit du type indiqué au début, ce procédé et ce dispositif comportant des moyens permettant d'obtenir une fabrication rationnelle, compte tenu des exigences de qualité précédentes. The object of the invention is to provide a method and a device for manufacturing a roof element of the type indicated at the start, this method and this device comprising means allowing rational production to be obtained, taking account of the preceding quality requirements.

Le procédé de l'invention est caractérisé en ce que la plaque est déposée en position de montage avec son côté inférieur
tourné vers le haut sur une bande transporteuse, en ce que la plaque
est munie du caisson ou des caissons qui sont placés de préférence
sur des entretoises, et d'éléments isolants serrés dans le- ou les
caissons, en ce que les éléments isolants sont placés entre les
caissons et/ou en dehors d'eux, en ce que les éléments isolants sont munis d'une couche de recouvrement, en ce que le plateau, se trouvant en dessous en position d'utilisation, est placé et fixé contre le
caisson ou les caissons, en ce que l'élément de toit qui est alors
monté est amené de sa position sur la bande transporteuse à une
position levée en dehors de la bande et en ce qu'il est tourné en position correcte avec la plaque supérieure placée vers le haut, et en ce que l'élément de toit est enlevé de l'emplacement de montage
par levage, en le saisissant de préférence par la plaque plane.
The method of the invention is characterized in that the plate is placed in the mounting position with its lower side
turned upwards on a conveyor belt, in that the plate
is fitted with the box or boxes which are preferably placed
on spacers, and insulating elements clamped in the- or
boxes, in that the insulating elements are placed between the
boxes and / or outside them, in that the insulating elements are provided with a covering layer, in that the plate, being below in the position of use, is placed and fixed against the
box or boxes, in that the roof element which is then
mounted is brought from its position on the conveyor belt to a
raised position outside the strip and in that it is turned into the correct position with the upper plate placed upwards, and in that the roof element is removed from the mounting location
by lifting, preferably gripping it by the flat plate.

Le dispositif de l'invention est caractérisé en ce
qu'il comporte une bande transporteuse pour-faire avancer les ébauches
d'élément pendant leur fabrication, en ce que la plaque est en posi
tion retournée par rapport a la position d'utilisation, pour le mon
tage des composants sur la plaque, et en ce qu'à la fin de la bande
transporteuse, un dispositif de retournement remet l'élément de toit
terminé en position correcte en vue de son évacuation.
The device of the invention is characterized in that
that it includes a conveyor belt for advancing the blanks
element during their manufacture, in that the plate is in posi
tion returned in relation to the position of use, for the mon
components on the plate, and in that at the end of the strip
conveyor, a turning device returns the roof element
finished in the correct position for evacuation.

D'autres caractéristiques et avantages de l'inven
tion seront mieux compris & la- lecture de la description qui va
suivre d'un exemple de réalisation et en se reportant aux dessins
annexés sur lesquels :
- la figure 1 représente en vue de dessus le dis
positif constitué d'une chaîne de fabrication; les @ les figures 2, 3 et 4 représentent une vue latté.
Other characteristics and advantages of the invention
tion will be better understood & reading the description that goes
follow an example of an embodiment and referring to the drawings
annexed on which:
- Figure 1 shows a top view of the dis
positive consisting of a production line; the @ Figures 2, 3 and 4 show a block view.

rale d'une partie du dispositif dans différentes positions d'utilise
sation;
- les figures 5 à 9 représentent l'élément fabriqué
dans différentes phases de sa fabrication.
part of the device in different positions of use
station;
- Figures 5 to 9 show the manufactured element
in different stages of its manufacture.

On décrira d'abord l'élément en se reportant a la figure 9. Sur cette figure, ainsi que sur les figures 5 d 8, l'élément est représenté en état de fabrication, dans lequel il est
retourné par rapport a la position d'utilisation. Sur les figures 5
a 9, l'élément est donc représenté avec son côté extérieur vers le
bas, alors que le lambrissage intérieur sur la figure 9 est tourné
vers le haut.
The element will first be described with reference to FIG. 9. In this figure, as well as in FIGS. 5 d 8, the element is shown in the state of manufacture, in which it is
returned relative to the position of use. In Figures 5
at 9, the element is therefore represented with its outer side towards the
bottom, while the interior paneling in Figure 9 is rotated
to the top.

L'élément comporte, comme partie porteuse essentielle, qui constitue la charpente de l'élément, une plaque 1 qui est réalisée de préférence en bois, tel que le contre-plaque ou le panneau de particules, ainsi que deux caissons entôle 4 en forme de coffret, fixés a la plaque. Du point de vue contrainte, l'élément peut etre considéré comme une poutre en canal dans laquelle la plaque' 1 est l'âme et les caissons 4 len ailes. Pour maintenir faible l'épaisseur de t81e des calissons, ceux-ci sont soumises a des contraintestde traction mais non a des contraintes de pression. The element comprises, as an essential load-bearing part, which constitutes the frame of the element, a plate 1 which is preferably made of wood, such as the counter-plate or the particle board, as well as two interlocking boxes 4 in the form of cabinet, fixed to the plate. From the constrained point of view, the element can be considered as a channel beam in which the plate '1 is the core and the boxes 4 have wings. To keep the thickness of the calissons small, they are subjected to tensile stresses but not to pressure constraints.

L'élément ne doit donc pas être soulevé avec la plaque suspendue en dessous. Pour des raisons de fabrication, la plaque 1 est constituée de deux plaques en bois, qui sont reliées l'une à l'autre a l'aide dune barrette de liaison 2. La plaque 1 comporte deux paires d'entre- toises3 qui portent les caissons 4. Ceux-ci ont une section droite de forme trapézoîdale et leurs faces sont munies de deux brides 5 par lesquelles elles sont fixées aux entretoises 3. Les caissons en tôle sont munis de fourches qui sont fixées à des barrettes transversales 6 (voir figure I). Après la fixation des caissons par leurs brides suer les barrettes 3 et 6, ils constituent chacun un espace clos.Cet espace est rempli totalement ou partiellement par une couche isolante 7 qui est fixée la plaque 1. Un plateau 8 est fixé aux caissons 4 et il se compose d'une plaque en tôle, de préférence une tle cannelée en trapèzes. Dans l'espace entre la plaque 1 et le plateau 8 se trouvent, en dehors des caissons 4, les couches isolantes 9, 10 et 11. Ces couches sont entourées d'une feuille de matiere plastique 12 qui englobe le matériau isolant pouvant se composer de laine de verre ou de roche. La feuille de matière. plastique s'étend également autour de l'isolement sur les faces frontales de l'élément.Comme le montre la partie gauche de la figure 1-, chacun des panneaux de bois qui forme la plaque 1 a des dimensions d'environ 120 x 240 cm et de préférence, les plaques sont utilisées en grandeur normale avec ces dimensions. Comme un élément se compose de deux panneaux qui sont assemblés dans le sens de la longueur, ltélément terminé prend une largeur de 240 cm. La longueur de l'été ment varie suivant l'écartement entre ses appuis et elle peut être par exemple de 12 m. Cela signifie que les panneaux de matériau peuvent être assemblés dans le sens de la longueur. Les entretoises -3 peuvent recouvrir les joints, ce qui permet d'obtenir un support mutuel des panneaux qui peuvent être munis également de planchas de liaison fixées, recouvrant les joints.Cela n'est toutefois pas représenté d'une façon spéciale sur les dessins, pour des raisons de place, les panneaux sont représenté. relativement courts. De leur c8té, les caissons 4 sont réalisés de préférence dans les mêmes longueurs que ltélément terminé. Des dimensions sont données ici uniquement a titre d'exemple et le procédé s'utilise également avec d'autres formats.The element must therefore not be lifted with the plate hanging below. For manufacturing reasons, the plate 1 consists of two wooden plates, which are connected to each other by means of a connecting bar 2. The plate 1 comprises two pairs of spacers3 which carry the boxes 4. These have a cross section of trapezoidal shape and their faces are provided with two flanges 5 by which they are fixed to the spacers 3. The sheet metal boxes are provided with forks which are fixed to transverse bars 6 (see figure I). After fixing the boxes by their flanges on the bars 3 and 6, they each constitute a closed space. This space is completely or partially filled with an insulating layer 7 which is fixed to the plate 1. A plate 8 is fixed to the boxes 4 and it consists of a sheet metal plate, preferably a fluted trapezoidal sheet. In the space between the plate 1 and the plate 8 are located, outside the boxes 4, the insulating layers 9, 10 and 11. These layers are surrounded by a sheet of plastic material 12 which includes the insulating material which may be composed glass or rock wool. The material sheet. plastic also extends around the insulation on the front faces of the element. As shown on the left side of figure 1-, each of the wooden panels which forms the plate 1 has dimensions of approximately 120 x 240 cm and preferably, the plates are used in normal size with these dimensions. As an element consists of two panels which are assembled lengthwise, the finished element takes a width of 240 cm. The length of the summer varies according to the distance between its supports and it can be, for example, 12 m. This means that the material panels can be assembled lengthwise. The spacers -3 can cover the joints, which allows mutual support of the panels which can also be provided with fixed connecting planchas, covering the joints. This is not however shown in a special way in the drawings. , for reasons of space, the panels are shown. relatively short. On their side, the boxes 4 are preferably made in the same lengths as the finished element. Dimensions are given here only by way of example and the method is also used with other formats.

Le dispositif ou la chaîne de fabrication de lélé- ment comprend une première bande transportause 13 avec un premier poste de travail 14, un deuxième poste 15 et un troisième poste 16. The device or the production line of the element comprises a first conveyor belt 13 with a first work station 14, a second station 15 and a third station 16.

La bande est constituée d'un certain nombra de rouleaux 17 sur lesquels les plaques 1 peuvent avancer pendant la fabrication. antre le premier et le deuxième poste de travail 14, 15, on a disposé des machines pour le clouage at le collage. En dessous de la passerelle et dans l'espace entre deux rouleaux 17 se trouvent deux dispositifs de clouage qui appartiennent à la machine a clouer et grâce auxquels des clous peuvent être enfoncés au travers de la plaque 1 dans les entretoises 3. Pour maintenir celle-ci pendant la phase de travail, une passerelle 18 porte des galets de pression.Des machines è clouer de ce type sont déjê connues et peuvent être réalisées sur le marché.The strip consists of a certain number of rollers 17 on which the plates 1 can advance during manufacture. Between the first and second work stations 14, 15, machines have been placed for nailing and gluing. Below the gangway and in the space between two rollers 17 are two nailing devices which belong to the nailing machine and by means of which nails can be driven through the plate 1 in the spacers 3. To maintain this Ci during the working phase, a gangway 18 carries pressure rollers. Nailing machines of this type are already known and can be produced on the market.

Une machine è coller est placée entre les postes de travail 15 et 16 et elle présente la forme d'une deuxième passerelle 41 aven des dis positifs de nettoyage et d'alimentation en colle, cette passerelle s'étendant au-dessus de la bande 13. Le dispositif de nettoyage se compose d'un aspirateur de poussière et de deux orifices qui ddbou- chent au-dessus des entretoises 3 et qui sont suivis d'embouchures au travers desquelles la colle peut être projetée sur la surface supérieure des entretoises 3.A gluing machine is placed between the work stations 15 and 16 and it has the shape of a second gateway 41 with cleaning and glue supply devices, this gateway extending above the strip 13 The cleaning device consists of a dust vacuum cleaner and two orifices which open above the spacers 3 and which are followed by mouths through which the adhesive can be sprayed onto the upper surface of the spacers 3.

Au poste 16, les rouleaux de transport 17 sont complétés par des rouleaux 19 qui sont placés perpendiculairement aux rouleaux 17. Ce-s rouleaux sont portés par un cadre déplaçable verticalement, de sorte que les cOtés supérieurs des rouleaux peuvent être amenés entre une position un peu au-dessus des sommets des rouleaux 17 et une position un peu en dessous des sommets des rou- leaux 17. Par inversion des cadres, la bande transporteuse peut être utilisée également pour le transport dans le sans transversal (de gauche a droite sur le dessin) quand les rouleaux 19 90nt souleves, ou pour le transport dans le sens longitudinal de la bande convoyeuse (de haut en bas sur le dessin) quand les rouleaux 19 sont abaissés. At station 16, the transport rollers 17 are completed by rollers 19 which are placed perpendicular to the rollers 17. These rollers are carried by a vertically movable frame, so that the upper sides of the rollers can be brought between a position one slightly above the tops of the rollers 17 and a position slightly below the tops of the rollers 17. By reversing the frames, the conveyor belt can also be used for transport in the transverse without (from left to right on the drawing) when the rollers 19 are lifted, or for transport in the longitudinal direction of the conveyor belt (from top to bottom in the drawing) when the rollers 19 are lowered.

Du coté de la bande 13, on a placé une deuxième bande convoyeuse 20 qui est a peu près deux fois plus large que la bande 13. La bande 20 présente un premier poste de travail 21 qui se trouve juste en face du poste 16 et possède en outre deux autres postes de travail 22 et 23 à la suite. Des rouleaux de transport 24 sont disposés pour le transport le long de la banda, et au poste de travail 21 il existe en outre des rouleaux 25 qui correspondent aux rouleaux 19 de la bande 13 et qui sont disposés, comme on l'a déjà décrit, sur un cadre mobile verticalement en vue du passage entra le transport dans le sens longitudinal et; le transport dans le sens transversal.A cOté du poste de travail 22, il existe une alimanta- tion 26 pour les panneaux-qui doivent former les panneaux 8 La bande 20 est entourée de deux passerelles de travail 42 qui pré- sentent la hauteur de travail appropriée pour le montage du panneaux
Au poste 23 sur le côté de la bande 20, qui se trouve en face de la banda 13, il existe un dispositif de retournement 27 qui ressort des figures 2 d 4.
On the side of the band 13, a second conveyor belt 20 has been placed which is approximately twice as wide as the band 13. The band 20 has a first work station 21 which is located just opposite the station 16 and has in addition two other work stations 22 and 23 in a row. Transport rollers 24 are arranged for transport along the band, and at the work station 21 there are further rollers 25 which correspond to the rollers 19 of the strip 13 and which are arranged, as already described , on a vertically movable frame for the passage entered the transport in the longitudinal direction and; transport in the transverse direction. Next to the workstation 22, there is a power supply 26 for the panels - which must form the panels 8 The strip 20 is surrounded by two working walkways 42 which present the height of suitable work for mounting the panels
At station 23 on the side of the strip 20, which is opposite the band 13, there is a turning device 27 which emerges from FIGS. 2 d 4.

Entre les postes 16, 21 des bandes 13, 20 il existe un passage 28. Les bandes 13 et 20 sont soulevées S une hauteur de travail commode au-dessus du plancher qui forme le passage 28. Au milieu du passage, il existe trois piliers 29 qaa, portent chacun une consola 30 pivotant autour d'un axe. Chacune des consoles 30 porte des rouleaux 31 dont les axes sont placés an travers par rapport au sens longitudinal des consoles. Les sommets des rouleaux 31 se trouvent a la même hauteur que les sommets des rouleaux 19 et 25 quand ceux-ci sont en position soulevée dans laquelle i se trouvent. Between the posts 16, 21 of the bands 13, 20 there is a passage 28. The bands 13 and 20 are raised to a convenient working height above the floor which forms the passage 28. In the middle of the passage, there are three pillars 29 qaa, each carry a console 30 pivoting around an axis. Each of the brackets 30 carries rollers 31 whose axes are placed through with respect to the longitudinal direction of the brackets. The tops of the rollers 31 are at the same height as the tops of the rollers 19 and 25 when the latter are in the raised position in which i are located.

dans le même plan. Les consoles 30 sont dans une position transversale (représentée en trait continu) dans laquelle elles s'étendent transversalement au-dessus du passage 28 et relient les deux bandes 13 et 20. Comme tous les rouleaux placés transversalement 19, 31 et 25 se trouvent sur le même niveau, il en résulte une voie de transport ininterrompue, placée en travers du sens longitudinal des bandes 13 et 20, entre les postes 16 et 21. Dans l'autre position d'inclinaison (représentée en ligne interrompue sur la figure 1) elles sont placées principalement le long du passage et libèrent un passage de piéton le long des bandes 13 et 20 sur les deux cOtés des consoles.in the same shot. The brackets 30 are in a transverse position (shown in solid lines) in which they extend transversely above the passage 28 and connect the two strips 13 and 20. Like all the rollers placed transversely 19, 31 and 25 are located on the same level, this results in an uninterrupted transport path, placed across the longitudinal direction of the strips 13 and 20, between the stations 16 and 21. In the other tilting position (shown in broken line in Figure 1) they are placed mainly along the passage and release a pedestrian passage along the strips 13 and 20 on both sides of the consoles.

Le dispositif de fabrication comporte de plus un poste de travail 32 pour la finition des caissons entOle 4, et un chariot roulant 33 pour le transport des caissons du poste 32 au poste 16. En outre, il existe une alimentation 34 pour les éléments de toit terminés, avec un chariot roulant 35 pour l'évacuation .  The manufacturing device further comprises a work station 32 for finishing the entOle boxes 4, and a rolling cart 33 for transporting the boxes from station 32 to station 16. In addition, there is a supply 34 for the roof elements finished, with a rolling cart 35 for evacuation.

partir du dispositif de retournement 27.from the turning device 27.

Le dispositif de retournement 27 représenté sur les figures 2 à 4 comporte deux axes horizontaux 36 et 37 parallèles l'un a l'autre, deux bras 38, 39 partant de chacun d'eux. La totalité des quatre bras porte une butée 40. Les axes 36 et 37 sont entraînés par moteur et peuvent être actionnés de façon que les bras 38 puissent passer d'une position horizontale (représentée sur les figures 1 et 4), dans laquelle ils se trouvent au-dessus de la bande 20 au poste 23 et ou ils sont abaissés en dessous des rouleaux 24, et une position relevée-que montre la figure 3. Les bras 39 peuvent pivoter entre une position dressée (re.présentée sur la figure 2) et une position abaissée (voir figure 1) ou ils sont placés horizontalement, en s'écartant de la bande 20.Quand les deux bras -sont verticaux (voir figure 3) la distance entre eux est un peu plus grande qua la hauteur d'un élément de toit termine, comme il ressort de la figure 3. The turning device 27 shown in FIGS. 2 to 4 comprises two horizontal axes 36 and 37 parallel to each other, two arms 38, 39 starting from each of them. The whole of the four arms carries a stop 40. The axes 36 and 37 are driven by a motor and can be actuated so that the arms 38 can pass from a horizontal position (represented in FIGS. 1 and 4), in which they are are located above the band 20 at station 23 and or they are lowered below the rollers 24, and a raised position - as shown in Figure 3. The arms 39 can pivot between an upright position (shown in Figure 2 ) and a lowered position (see figure 1) or they are placed horizontally, moving away from the strip 20. When the two arms - are vertical (see figure 3) the distance between them is a little greater than the height d 'a roof element ends, as shown in Figure 3.

Au cours de la fabrication d'éléments de toit, on dépose d'abord sur la bande 13 du poste 14 un panneau du type qui forme la plaque 1 dans l'élément terminé. A ce poste de travail, les entretoises 3 sont placées dans une position déterminée. Les entretoises et/ou les panneaux de bois sont de préférence munis auparavant de colle. Le panneau avance alors en passant en dessous de-la passerelle 18, 9 ce moment les entretoises 3 sont poussées contre~le.panneau et les clous sont enfoncés la partie inférieure. During the manufacture of roof elements, a panel of the type which forms the plate 1 in the finished element is first deposited on the strip 13 of the station 14. At this work station, the spacers 3 are placed in a determined position. The spacers and / or the wooden panels are preferably provided with glue beforehand. The panel then advances by passing below the gateway 18, 9 this moment the spacers 3 are pushed against ~ le.panneau and the nails are driven the lower part.

Dès qui le panneau a dépassé la machine avec la passerelle 18, il se trouve au poste 15. A ce poste, les barrettes frontales 6 sont mises en place et clouées sur le panneau. Le panneau est ensuite
enduit de colle dans la machine avec la passerelle 41, et il est amené- simultanément au poste de travail 16.
As soon as the panel has passed the machine with the gangway 18, it is at station 15. At this station, the front bars 6 are put in place and nailed to the panel. The panel is then
coated with glue in the machine with the gangway 41, and it is brought simultaneously to the work station 16.

Quand le panneau avec les barrettes a été amené au poste de travail 16, on dépose la couche isolante 7, après quoi un caisson terminé 4 est amené du poste 32 au poste-16 -l'aide du chariot routant 33 pour le raccorder par sesbrides 5 aux-entretoises 3 en même temps que les brides frontales ou barrettes -6-. Les- brides sont fixées au moyen d'un certain nombre de clous, de préférence -a l'aide d'un pistolet clous. Avec la liaison par colle, qui a été réalisée par collage dans la machine 18, on réalise une zone collée et clouée qui réalise une très bonne liaison entre le caisson et les barrettes. When the panel with the bars has been brought to the work station 16, the insulating layer 7 is deposited, after which a finished box 4 is brought from the station 32 to the station-16 with the aid of the routing trolley 33 to connect it by its flanges 5 at the spacers 3 at the same time as the front flanges or bars -6-. The flanges are fixed by means of a number of nails, preferably using a nail gun. With the bonding by glue, which was carried out by gluing in the machine 18, a bonded and nailed area is produced which makes a very good bond between the box and the bars.

Pendant le passage le long des postes de travail 14, 15 et 16, le panneau était accessible des deux cOtés du convoyeur relativement étroit 13. Les consoles se trouvaient donc dans leur position représentée en pointillé, de sorte que l'accessibilité autour de la bande était totale.-Quand les caissons ont été rapportés, les consoles pivotent dans leur position représentée en ligne continue, perpendiculairement au passage 28. En même temps, le cadre avec les rouleaux 19 et le cadre avec les rouleaux 25- sont -soulevés, après quoi l'élément de toit partiellement terminé est placé sur le convoyeur 20 a son bord arrière ( droite sur la figure 1).Si un élément au poste 16 a été façonné jusqu'd l'état indiqué, cet élément est placé sur la bande transporteuse 20, de sorte que les deux éléments sont placés l'un a cOté de l'autre. Les éléments sont reliés l'un a l'autre, ce qui se réalise de préférence a l'aide d'une barrette, de la barrette 2 représentée sur la figure 9. During the passage along the work stations 14, 15 and 16, the panel was accessible from both sides of the relatively narrow conveyor 13. The consoles were therefore in their position shown in dotted lines, so that the accessibility around the strip was complete. When the boxes have been brought back, the brackets pivot in their position shown in a continuous line, perpendicular to the passage 28. At the same time, the frame with the rollers 19 and the frame with the rollers 25 are lifted, after where the partially completed roof element is placed on the conveyor 20 at its rear edge (right in Figure 1). If an element at station 16 has been shaped to the indicated state, this element is placed on the belt conveyor 20, so that the two elements are placed one beside the other. The elements are connected to each other, which is preferably carried out using a bar, the bar 2 shown in FIG. 9.

Pour achever l'ébauche d'éléments de toit, celleci est munie d'un isolant par dépôt de matériau isolant entre les caissons 4 de la plaque 1, et l'on utilise de préférence pour cela de la laine de scorie sous la forme de blocs 9, 10 et 11 et on utilise ensuite une feuille de matière plastique. La feuille est enroulée autour des blocs et elle est fixée tout autour de ceux-ci par des bandes collantes. La feuille de matière plastique agit dans l'élément terminé comme blocage de la diffusion. Après la mise en place de la feuille, on a donc rapporté contre la plaque 1, dont le cOté inférieur est déposé librement conformément,a la figure 9, "un ensemble" complet qui se compose de matériaux isolants et d'éléments porteurs formés par les caissons 4. To complete the draft of roof elements, this is provided with an insulator by depositing insulating material between the boxes 4 of the plate 1, and preferably used for this is slag wool in the form of blocks 9, 10 and 11 and then a plastic sheet is used. The sheet is wrapped around the blocks and is fixed all around them by adhesive strips. The plastic sheet acts in the finished element to block the diffusion. After the sheet has been put in place, it is therefore reported against the plate 1, the lower side of which is freely deposited in accordance with, in FIG. 9, "a complete set" which is made up of insulating materials and load-bearing elements formed by the boxes 4.

Après achèvement de ce travail au poste 21, l'ébauche d'éléments est amenée au poste 22 où les rouleaux 25 sont abaissés avant que l'ébauche soit évacuée du poste 21 sur les rouveaux 24. Au poste 22, les panneaux 8 sont sortis de 19alimentation 26 et déposés sur l'ébaucha d'éléments. Les panneaux8 qui, ainsi qu'on l'a indiqué, se composent de préférence de tales cannelées, sont fixés aux caissons 4 a l'aide de vis autoforeuseset autotaraudeuses. L'élé- ment de toit est alors virtuellement terminé. Tant qu'il se trouvait sur la bande transporteuse relativemant plane, la manipulation pouvait s'effectuer sans difficulté dans la position retournée des figures. After completion of this work at station 21, the element blank is brought to station 22 where the rollers 25 are lowered before the blank is removed from station 21 on the feeders 24. At station 22, the panels 8 are taken out of feed 26 and deposited on the blank of elements. The panels8 which, as has been indicated, preferably consist of grooved tabs, are fixed to the boxes 4 using self-drilling and self-tapping screws. The roof element is then virtually finished. As long as it was on the relatively flat conveyor belt, the manipulation could be carried out without difficulty in the inverted position of the figures.

Mais quand l'élément doit être retiré du convoyeur 20 an vue d'un traitement ultérieur, il est nécessaire de la retourner dans le cas ù on doit le manipuler avec des dispositifs de levage habituels. En effet c'est seulement dans cette position qu'il peut supporter les contraintes de flexion qui peuvent se produire par exemple au levage à l'aida de deux anneaux. Ce retournement est réalisé n l'aide du dispositif de levage 27 au posta 23. Les bras amenés en position de départ entre les rouleaux 24 sont tournés vers le haut et ils soulèvent ainsi l'élément. En même temps, les bras 39 sont orientés en position verticale.Pendant le mouvement de levage, l'élément repose sur les butées 40 des bras inclinés 38. Dans la position verticale (voir figure 3) l'élément est donc saisi par les paires de bras 39, 40 et il se trouve en position verticale. Après cette phase de travail, les bras 39 commencent un mouvement de rabattement, comme le montre la figure 4, et l'èlément, soutenu par les butées 40 des bras 39, suit le mouvement, lesdites butées facilitant également le basculement de l'élément. Quand les bras 39 Ont pris une position horizontale, l'élément a été retourné et il peut être alors soulevé à l'aida d'un chariot roulant.But when the element has to be removed from the conveyor 20 for further processing, it is necessary to return it in the event that it has to be handled with conventional lifting devices. In fact, it is only in this position that it can withstand the bending stresses which can occur, for example when lifting with the aid of two rings. This reversal is carried out using the lifting device 27 at the post 23. The arms brought into the starting position between the rollers 24 are turned upwards and they thus lift the element. At the same time, the arms 39 are oriented in a vertical position. During the lifting movement, the element rests on the stops 40 of the inclined arms 38. In the vertical position (see FIG. 3) the element is therefore grasped by the pairs of arms 39, 40 and it is in a vertical position. After this working phase, the arms 39 begin a folding movement, as shown in FIG. 4, and the element, supported by the stops 40 of the arms 39, follows the movement, said stops also facilitating the tilting of the element . When the arms 39 have taken a horizontal position, the element has been turned over and it can then be lifted using a rolling cart.

Comme il ressort de ce qui précéda, le procédé comporte donc un certain nombra de dispositions qui constituent une chaîne permettant une fabrication rationnelle. Le dispositif ou la chaîne de fabrication pour la mise en oeuvre du procédé est muni de moyens qui permettent une réalisation rationnelle des différentes phases de travail.  As is clear from the above, the process therefore includes a certain number of provisions which constitute a chain allowing rational production. The device or the production line for implementing the process is provided with means which allow a rational realization of the different work phases.

Rien entendu diverses modifications peuvent être apportées par l'homme de l'art aux dispositifs ou procédés qui viennent d'être décrits uniquement a titre d'exemples non limitatifs sans sortir du cadre de l'invention.  Nothing understood by various modifications can be made by those skilled in the art to the devices or methods which have just been described only by way of nonlimiting examples without departing from the scope of the invention.

Claims (7)

R E V E N D I C A T I O N S-R E V E N D I C A T I O N S- 1. Procédé de fabrication d'éléments de toit qui comportent en position d'utilisation une plaque supérieure (1) essentiellement plane avec au moins un caisson (4) en forme de coffret qui est fixé la partie inférieure de la plaque et qui est conçu pour supporter essentiellement des contraintes de traction, l'élément de toit comportant en outre des éléments isolants (3, 7, 9 - 11) recouverts d'un panneau inférieur 8, la plaque supérieure constituant avec la ou les caissons 4 la charpente porteuse de l'élément de toit, ce qui donne a celui-ci sa solidité principale, caractérisé en ce que la plaque (1) est déposée en position de montage avec son cOté inférieur tourné vers le haut sur une bande transporteuse (13), en ce que la.plaque (1) est munie du caisson ou des caissons (4) qui sont placés de préférence sur des entretoises (3), et d'éléments isolants (7) serrés dans le ou les caissons-(4) et/ou en dehors d'eux, en ce que les éléments isolants (9, 11) sont munis d'une couche (12) de recouvrement, en ce que le plateau (8), se trouvant en dessous- en position d'utilisation, est placé et fixé contre le caisson ou les calissons, en Ce que l'élément de rois qui est alors monté est amené de sa position sur la bande transporteuse (20) a une position levée en dehors de la bande et en ce qu'il est tourné en position correcte avec la plaque supérieure (1) placee vers b haut, et en ce que l'élément de toit est enlevé de l'emplacement de montage par levage, en le saisissant de préférence par la plaque plane (1).1. A method of manufacturing roof elements which comprise in the position of use an upper plate (1) essentially planar with at least one box (4) in the form of a box which is fixed to the lower part of the plate and which is designed to essentially support tensile stresses, the roof element further comprising insulating elements (3, 7, 9 - 11) covered with a lower panel 8, the upper plate constituting with the box or boxes 4 the load-bearing structure of the roof element, which gives it its main solidity, characterized in that the plate (1) is placed in the mounting position with its lower side turned upwards on a conveyor belt (13), that la.plaque (1) is provided with the box or boxes (4) which are preferably placed on spacers (3), and insulating elements (7) clamped in the box (es) (4) and / or apart from them, in that the insulating elements (9, 11) are provided with a layer (12) of rec openly, in that the plate (8), being below- in the position of use, is placed and fixed against the box or the calissons, in that the element of kings which is then mounted is brought from its position on the conveyor belt (20) has a raised position outside the belt and in that it is turned into the correct position with the upper plate (1) placed upwards, and in that the roof element is removed from the mounting location by lifting, preferably gripping it by the flat plate (1). 2. Procédé selon la revendication 1, dans lequel on utilise comme.caisson au moins un caisson en tôle (4), caractérisé en ce que le caisson en tôle est prétraité a un poste de finition séparé (32) et en ce qu'il est fourni a la bande convoyeuse (13) en vue du raccordement a la plaque (1) a état au moins a peu près fini.2. Method according to claim 1, in which at least one sheet metal box (4) is used as a casing, characterized in that the sheet metal box is pretreated at a separate finishing station (32) and in that it is supplied to the conveyor belt (13) for connection to the plate (1) in at least roughly finished condition. 3. Procédé selon l'une quelconque des revendications 1 ou 2, caractérisé'en ce que l'élément de toit est assemblé avec plusieurs sections d'ébauche jointives qui sont assemblées successivement a partir d'une plaque plane (1) et au moins un caisson (4) et qui sont assemblés de façon a apporter d'abord une section d'une premiere portion (13) de bande convoyeuse à une autre portion (20) de bande convoyeuse, après quoi une autre section est mise en ordre sur la première portion (13) de -bande convoyeuse et elle est placée sur la deuxième partie de bande convoyeuse a côté de la première section, de façon jointive, après quoi les deux sections sont terminées sur la deuxième portion de bande (20) pour former un élément de toit complet.3. Method according to any one of claims 1 or 2, characterized in that the roof element is assembled with several contiguous blank sections which are assembled successively from a flat plate (1) and at least a box (4) and which are assembled so as to first bring a section of a first portion (13) of conveyor belt to another portion (20) of conveyor belt, after which another section is put in order on the first portion (13) of conveyor belt and it is placed on the second portion of conveyor belt next to the first section, contiguously, after which the two sections are terminated on the second portion of belt (20) to form a complete roof element. 4. Procédé selon la revendication 3, caractérisé en ce que la première portion (13) de convoyeur est placée dans une certaine direction, en vue de l'avance de la section d'ébauche, entre différents postes de travail (14, 15, 16), alors que la section d'élément1 pendant le déplacemant vers la deuxième portion de convoyeur (20), qui est placée parallèlement à la première portion, est amenée dans le sens transversal par rapport au premier sens de convoyage.4. Method according to claim 3, characterized in that the first portion (13) of conveyor is placed in a certain direction, in view of the advance of the blank section, between different work stations (14, 15, 16), while the section of element 1 during the displacement towards the second conveyor portion (20), which is placed parallel to the first portion, is brought in the transverse direction relative to the first conveying direction. 5. Dispositif de mise en oeuvre du procédé selon l'une quelconque des revendications 1 a 4 pour la fabrication d'éléments de toit qui, en position d'utilisation, comportent une plaque supérieure (1) essentiellement plane avec au moins un caisson (4) en forme de coffret qui est fixé a la partie inférieure de la plaque et qui est conçu pour supporter essentiellement des contraintes de traction, l'élément dé toit comportant en outre des éléments isolants (3, 7, 9 - 11) recouverts d'un panneau inférieur (8), la plaque supérieure constituant avec la ou les caissons 4 la charpente porteuse de l'élément de toit, ce qui donne a celui-ci sa solidité principale, caractérisé en ce qu'il comporte une bande transporteuse (13, 20) pour faire avancer les ébauches d'éléments pendant leur fabrication, en ce que la plaque (1) est en position retrournée par rapport a la position d'utilisation, pour le montage des composants (4, 3, 7, 9 -ll)sur la plaque, et en ce qu'a la fin de la bande transporteuse, un dispositif de retournement (27) remet l'élément de toit terminé en position correcte en vue de son évacuation.5. Device for implementing the method according to any one of claims 1 to 4 for the manufacture of roof elements which, in the use position, comprise an upper plate (1) essentially planar with at least one box ( 4) in the form of a box which is fixed to the lower part of the plate and which is designed to essentially withstand tensile stresses, the roof element further comprising insulating elements (3, 7, 9 - 11) covered with 'A lower panel (8), the upper plate constituting with the box or boxes 4 the supporting structure of the roof element, which gives it its main solidity, characterized in that it comprises a conveyor belt ( 13, 20) for advancing the blanks of elements during their manufacture, in that the plate (1) is in the inverted position relative to the position of use, for mounting the components (4, 3, 7, 9 -ll) on the plate, and in that at the end of the conveyor belt, a turning device (27) returns the finished roof element to the correct position for its evacuation. 6. Dispositif selon la revendication 5, dans lequel des sections de l'élément des toit sont réalisées successivement et sont réunies en un élément de toit complet, caractérisé en ce que la bande convoyeuse (13, 20) est subdivisée en une première partie (13) et en une deuxième partie parallèle, les deux parties étant reliées b laide d'une partie transversale (29, 313 par rapport auxdites parties de convoyeur, de sorte que les sections en question sont réalisées sur la première portion (13) de convoyeur et sont amenées dans le sens transversal à l'autre élément de bande convoyeuse (20) en vue du raccordement è au moins une section réalisée auparavent, lesdites sections étant entraînées après l'assemblage sur la deuxième portion de convoyeur (20), la première portion (13) présentant principalement une largeur qui correspond à la largeur d'une section, alors que la deuxième portion (20) de convoyeur a une largeur qui correspond principalement a la largeur de l'élément de toit complet composé de plusieurs sections jointives.6. Device according to claim 5, in which sections of the roof element are produced successively and are combined into a complete roof element, characterized in that the conveyor belt (13, 20) is subdivided into a first part ( 13) and in a second parallel part, the two parts being connected by means of a transverse part (29, 313 relative to said conveyor parts, so that the sections in question are produced on the first conveyor portion (13) and are brought in the transverse direction to the other conveyor belt element (20) for connection to at least one section made beforehand, said sections being driven after assembly on the second conveyor portion (20), the first portion (13) having mainly a width which corresponds to the width of a section, while the second portion (20) of conveyor has a width which mainly corresponds to the width of the complete roof element com posed of several contiguous sections. 7. Dispositif selon la revendication 6, caractérisé en ce que la bande transporte use (29, 31) dirigée transversalement par rapport aux deux autres bandes convoyeuses se compose d'un certain nombre de consoles (30) suspendues à des axes sensiblement verticaux, lesdites consoles, en position d'utilisation, étant orientées dans une position transversale par rapport ê la première et a la deuxième portion de convoyeur (13, 20) pour relier lesdites portions, et lesdites consoles étant conçues de façon qu'elles puisa sent être orientées dans une position sensiblement parallèle à la première et V la deuxième portion de convoyeur quand un transport transversal n'est pas prévu, pour assurer une libre accessibilité aux deux cOtés de la première et de la deuxième portion de bande convoyeuse. 7. Device according to claim 6, characterized in that the conveyor belt uses (29, 31) directed transversely with respect to the other two conveyor belts consists of a number of consoles (30) suspended from substantially vertical axes, said consoles, in the position of use, being oriented in a transverse position relative to the first and to the second portion of conveyor (13, 20) for connecting said portions, and said consoles being designed so that they can be oriented in a position substantially parallel to the first and V the second portion of the conveyor when a transverse transport is not provided, to ensure free accessibility to both sides of the first and of the second portion of the conveyor belt.
FR8014430A 1980-06-27 1980-06-27 Part prefabricated building roof construction - in which top panels are fitted with insulation material filled cases with wrapped spacer insulators Withdrawn FR2485593A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR8014430A FR2485593A1 (en) 1980-06-27 1980-06-27 Part prefabricated building roof construction - in which top panels are fitted with insulation material filled cases with wrapped spacer insulators

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8014430A FR2485593A1 (en) 1980-06-27 1980-06-27 Part prefabricated building roof construction - in which top panels are fitted with insulation material filled cases with wrapped spacer insulators

Publications (1)

Publication Number Publication Date
FR2485593A1 true FR2485593A1 (en) 1981-12-31

Family

ID=9243629

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8014430A Withdrawn FR2485593A1 (en) 1980-06-27 1980-06-27 Part prefabricated building roof construction - in which top panels are fitted with insulation material filled cases with wrapped spacer insulators

Country Status (1)

Country Link
FR (1) FR2485593A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2080844A1 (en) * 2008-01-15 2009-07-22 DART spol. s r.o. Beam and panel provided with this beam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2080844A1 (en) * 2008-01-15 2009-07-22 DART spol. s r.o. Beam and panel provided with this beam

Similar Documents

Publication Publication Date Title
EP0160613B1 (en) Manufacturing method and apparatus for grooved slats
FR2657944A1 (en) COMPOSITE PLATE INSULATION MATERIAL WITH V-NOTCHES
CH617739A5 (en) Prefabricated construction panel and method for manufacturing it
FR2705984A1 (en) Method and apparatus for manufacturing an insulating assembly.
FR2550057A1 (en) DEVICE FOR MANUFACTURING BLOCKS OF WAFFLE
FR2523895A1 (en) APPARATUS FOR DIVIDING AERIAL CONCRETE BLOCKS
FR2842848A1 (en) Ceiling shuttering panel supporting system has groups of secondary supports for panels mounted on primary supports and connected by bars
FR2485593A1 (en) Part prefabricated building roof construction - in which top panels are fitted with insulation material filled cases with wrapped spacer insulators
FR2989614A1 (en) CHAIN AND METHOD FOR MANUFACTURING PREFABRICATED PANELS FOR THE CONSTRUCTION OF BUILDINGS
EP2791448A2 (en) Process for manufacturing a gas-filled multiple glazing unit
EP0018286A1 (en) Method and device for producing concrete products
FR3119110A1 (en) Wooden box making machine for house construction and related manufacturing method
EP0298792B1 (en) Device for the application of a protective sheet to an alveolar plate
FR2467142A1 (en) MACHINE FOR COVERING BOXES WITH FLANKS OF SHEET MATERIAL
EP1382424A1 (en) Method for manufacturing boards made of hydraulic binder with tapered edges, production line and apparatus for manufacturing such boards
EP1118559B1 (en) Structure of an autonomous and self-supporting assembly, in particular a belt conveyor
EP1285111B1 (en) Method for forming and packaging insulation felts and device therefor
EP0322646A1 (en) Longitudinal wood veneer slicer
FR2624781A1 (en) Method for manufacturing shaped wooden elements, device for implementing this method and shaped elements thus obtained
FR2640582A1 (en) METHOD FOR CLAMPING MOUNTED BOX ELEMENTS AND INSTALLATION FOR CARRYING OUT SAID METHOD
EP0203868B1 (en) Construction element for the building industry, method of assembly and installation to carry out this method
FR2707913A1 (en) Machine for manufacturing wooden articles such as the pallets for transporting goods, for example
FR2816236A1 (en) MACHINE FOR PRODUCING WOOD SUB-ASSEMBLIES FOR THE COMPOSITION OF A PALLETS HANDLING OR TRANSPORTING GOODS, BY ASSEMBLING PREFABRICATED BASIC COMPONENTS
FR2523090A1 (en) Thermal insulation for container - has semi rigid plates fixed against the container inner walls
EP2246279B1 (en) Facility for stacking products with brackets that can move in the three directions of the space

Legal Events

Date Code Title Description
RE Withdrawal of published application