FR2481711A1 - Coke dry-quenching plant - has great manoeuvrability of lifts and thus needs fewer auxiliary machines - Google Patents

Coke dry-quenching plant - has great manoeuvrability of lifts and thus needs fewer auxiliary machines Download PDF

Info

Publication number
FR2481711A1
FR2481711A1 FR8009909A FR8009909A FR2481711A1 FR 2481711 A1 FR2481711 A1 FR 2481711A1 FR 8009909 A FR8009909 A FR 8009909A FR 8009909 A FR8009909 A FR 8009909A FR 2481711 A1 FR2481711 A1 FR 2481711A1
Authority
FR
France
Prior art keywords
coke
boom
extinguishing
chambers
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR8009909A
Other languages
French (fr)
Other versions
FR2481711B1 (en
Inventor
A N Minasov
A N Suslov
A A Azimov
G N Marapulets
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
G K
Original Assignee
G K
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by G K filed Critical G K
Priority to FR8009909A priority Critical patent/FR2481711A1/en
Publication of FR2481711A1 publication Critical patent/FR2481711A1/en
Application granted granted Critical
Publication of FR2481711B1 publication Critical patent/FR2481711B1/fr
Granted legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C17/00Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports
    • B66C17/06Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes
    • B66C17/08Overhead travelling cranes comprising one or more substantially horizontal girders the ends of which are directly supported by wheels or rollers running on tracks carried by spaced supports specially adapted for particular purposes, e.g. in foundries, forges; combined with auxiliary apparatus serving particular purposes for charging treatment chambers, e.g. furnaces, kilns, ovens
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B31/00Charging devices
    • C10B31/02Charging devices for charging vertically
    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D2003/0034Means for moving, conveying, transporting the charge in the furnace or in the charging facilities
    • F27D2003/0059Means for moving, conveying, transporting the charge in the furnace or in the charging facilities comprising tracks, e.g. rails and wagon
    • F27D2003/0061Means for moving, conveying, transporting the charge in the furnace or in the charging facilities comprising tracks, e.g. rails and wagon with means for changing track
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D2003/0034Means for moving, conveying, transporting the charge in the furnace or in the charging facilities
    • F27D2003/0065Lifts, e.g. containing the bucket elevators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D3/00Charging; Discharging; Manipulation of charge
    • F27D3/12Travelling or movable supports or containers for the charge
    • F27D2003/125Charging cars, lift trolleys
    • F27D2003/127Charging cars, lift trolleys for carrying pots
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27MINDEXING SCHEME RELATING TO ASPECTS OF THE CHARGES OR FURNACES, KILNS, OVENS OR RETORTS
    • F27M2001/00Composition, conformation or state of the charge
    • F27M2001/04Carbon-containing material
    • F27M2001/045Coke

Abstract

Coke dry quenching plant has vertical quenching chambers arranged in a row each having a coke charging device in its upper part. Hoisting shafts are located opposite corresp. chambers and there are lifts each of which has a carriage for transporting a coke car up or down a hoisting shaft to or from the coke charging device. A track extends along the quenching chambers on the level of the lifts coming out of the hoisting shafts. There is a device for transferring the carriage and the lift in a horizontal direction along the track and perpendicular to it. The appts. provides a coke dry quenching plant which, due to great manoeuvrability of the lift is more efficient in operation and needs fewer auxiliary machines. There is also a decrease in coke furnace loss and a redn. in the amt. of harmful impurities discharged into atmos.

Description

La présente invention concerne l'industrie chimique du coke et a notamment pour obJet un dispositif d'extinction sèche de coke. The present invention relates to the chemical coke industry and in particular has the aim of a dry coke extinguishing device.

L'invention peut autre utilisée d'une manière particulièrement avantageuse en association avec les puissantes batteries de tours d coke modernes. The invention can also be used in a particularly advantageous manner in combination with the powerful modern coke tower batteries.

Comme on le sait, le processus technologique de la production de coke se termine par son défournement à une temp6rature de 950 d 1100 C. Afin de provenir la combustion du coke incandescent après son défournement, ainsi que pour le rendre apte au transport et au stockage, il est nécessaire de faire baisser sa température jusqu'à 250 à 100 C, c'est-à-dire "d'éteindre" le coke.  As is known, the technological process of coke production ends with its discharge at a temperature of 950 to 1100 C. In order to bring about the combustion of incandescent coke after its discharge, as well as to make it suitable for transport and storage , it is necessary to lower its temperature to 250 to 100 C, that is to say "to extinguish" the coke.

La méthode la plus avancée pour éteindre le coke est l'extinction sèche, qui permet non seulement d'obtenir du coke d'une meilleure qualit6, mais aussi d'améliorer les caractéristiques techniques et économiques des fusions au haut fourneau, d'améliorer les conditions de travail dans les fonderies ainsi que de résoudre en grande partie le problème de la protection de l'atmosphère contre les éjections polluantes. The most advanced method of quenching coke is dry quenching, which not only provides better quality coke, but also improves the technical and economic characteristics of blast furnace fusions, improves working conditions in foundries as well as largely solving the problem of protecting the atmosphere against polluting ejections.

Actuellement, toutes les batteries de fours à coke sont équipées d'installations d'extinction sèche du coke. Ces installations sont de conceptions extrêmement variées. Currently, all coke oven batteries are fitted with dry coke extinguishing systems. These installations are of extremely varied designs.

On connaît par exemple une installation d'extinction sèche de coke, comportant des chambres d'extinction disposées en une rangée parallèle au front des fours à coke
Toutes les chambres d'extinction sont situées à l'intérieur d'une earcasse métallique qui t munie, dans sa partie supérieure, de rails pour le déplacement de monte-charge.
For example, a dry coke extinguishing installation is known, comprising extinguishing chambers arranged in a row parallel to the front of the coke ovens.
All the extinguishing chambers are located inside a metal earcasse which is provided, in its upper part, with rails for moving the hoist.

Chacun des groupes de chambres d'extinction (2 à 4 chambres) est doté d'un puits élévateur. Lesdits puits élévateurs sont situés suivant la même rangée que les chambres d'extintion. Dans la partie inférieure de chaque puits se trouve un dispositif servant à retirer la benne chargée de coke incandescent du wagon à coke et à le déplacer jusqu'au centre du puits élévateur. Il est à noter que le coke rouge est amené aux chambres à l'aide de deux wagons à coke tirés par une locomotive électrique parallèlement au front des chambres d'extinction.Each of the groups of extinguishing chambers (2 to 4 chambers) is fitted with a lifting shaft. Said elevating wells are located in the same row as the extinction chambers. In the lower part of each well is a device used to remove the bucket loaded with glowing coke from the coke wagon and to move it to the center of the elevator shaft. It should be noted that the red coke is brought to the chambers using two coke wagons pulled by an electric locomotive parallel to the front of the extinguishing chambers.

Or, dans l'installation qui vient d'être décrite, la benne contenant le coke incandescent doit être déplacée sur une distance considérable le long de plusieurs chambres d'extinction avant d'être déchargée dans l'une de celles-ci
Ainsi, pour charger la quatrième chambre à partir du puits élévateur, on doit faire parcourir à la benne plus de 50 mètres. Pendant ce temps, le coke incandescent agit non seulement sur la benne mais aussi sur la carcasse de l'installation et sur le monte-charge. Il résulte de cette action thermique des pannes et une usure prématurée des équipements, des risques d'avarie, une baisse de l'efficacité de lYnstallation d'extinction sèche du coke. Le graphique de fonctionnement des machines devient plus compliqué et étendu dans le temps. Une combustion accrue du coke a lieu.Le fait de prévoir un dispositif pour retirer du wagon la benne avec le coke incandescent contribue lui aussi à diminuer le rendement de l'installation. D'autre part, la locomotive remorquant les deux wagons à coke doit spprocher d'un même puits autant de fois qu'il y a de chambres d'extinction à desservir, ce qui accroit l'action thermique subie par les structures de l'installation d'extinction.
However, in the installation which has just been described, the bucket containing the incandescent coke must be moved over a considerable distance along several extinguisher chambers before being discharged into one of them.
Thus, to load the fourth chamber from the elevator shaft, the bucket must be made to travel more than 50 meters. During this time, the glowing coke acts not only on the bucket but also on the carcass of the installation and on the freight elevator. This thermal action results from breakdowns and premature wear of the equipment, risk of damage, a decrease in the efficiency of the dry coke extinguishing installation. The machine operating graph becomes more complicated and extended over time. Increased combustion of the coke takes place. The fact of providing a device for removing from the wagon the bucket with the incandescent coke also contributes to reducing the efficiency of the installation. On the other hand, the locomotive towing the two coke wagons must approach the same well as many times as there are extinguishing chambers to be served, which increases the thermal action undergone by the structures of the fire extinguisher installation.

Les inconvénients qui viennent d'être mentionnés ont été dans une certaine mesure évités dans une autre installation d'extinction sèche de coke, qui comprend des chambres d'extinction verticales disposées suivant une rangée et ayant des trous de chargement par le haut ainsi que des puits élévateurs situés chacun en regard de la chambre correspondante. Par ailleurs, chacun des puits élévateurs, dans cette installation, est pourvu d'un monte-charge muni d'un chariot destiné à déplacer la benne avec le coke depuis le puits Jusqu'au trou de chargement de la chambre d'extinction. Le transport du coke incandescent vers les chambres est réalisé à l'aide de deux wagons déplacés par une même locomotive électrique. The disadvantages which have just been mentioned have to some extent been avoided in another dry coke extinguishing installation, which comprises vertical extinguishing chambers arranged in a row and having top loading holes as well as elevating wells each located opposite the corresponding chamber. Furthermore, each of the elevating wells, in this installation, is provided with a hoist provided with a trolley intended to move the bucket with the coke from the well To the loading hole of the extinguishing chamber. The transport of glowing coke to the chambers is carried out using two wagons moved by the same electric locomotive.

Une telle conception de l'installation d'extinction seche du coke permet de raccourcir le traJet effectué par le monte-charge avec la benne par rapport à l'installation qui a été décrite ci-dessus mais la machinerienécéssaire à la réalisation du processus devient plus compliquée. Such a design of the dry coke extinguishing installation makes it possible to shorten the journey made by the freight elevator with the bucket compared to the installation which has been described above, but the machinery necessary for carrying out the process becomes more complicated.

Ainsi, une installation d'extinction à huit chambres doit avoir huit puits élévateurs et huit monte-charge. Outre ceci, le graphique d'utilisation des machines devient plus compliqué à cause des manoeuvres à faire subir aux wagons à coke.Thus, an eight-chamber fire extinguisher system must have eight elevating shafts and eight freight elevators. Besides this, the graph of machine use becomes more complicated because of the maneuvers to be subjected to the coke wagons.

En effet la locomotive remorquant les deux wagons à coke doit accoster à deux reprises un meme puits, d'abord pour y transmettre une benne chargée de coke rouge et ensuite pour récupérer la benne vide. En récupérant la benne vide la locomotive amène au puits une autre benne chargée, celle-ci, de coke incandescent, ce qui augmente l'action thermique sur les structures de l'installation d'extinction seche du coke. Indeed, the locomotive towing the two coke wagons must dock twice on the same well, first to transmit a skip loaded with red coke and then to recover the empty skip. By recovering the empty bucket the locomotive brings to the well another bucket loaded, this one, with glowing coke, which increases the thermal action on the structures of the dry coke extinguishing installation.

L'invention vise donc une installation d'extinc- tion sèche de coke ayant une efficacité accrue et un nombre de machines auxiliaires réduit grâce à l'améliora- tion de la manoeuvrabilité du monte-charge.  The invention therefore relates to a dry coke extinguishing installation having increased efficiency and a reduced number of auxiliary machines thanks to the improvement in the maneuverability of the freight elevator.

Ce problème est résolu en ce que l'installation d'extinction sèche de coke, comprenant des chambres verticales d'extinction disposées suivant une rangée et ayant des dispositifs de chargement par le haut, des puits élévateurs situés chacun en regard de la chambre dçextinc- tion correspondante et des monte-charge munie chacun d'un chariot pour déplacer la benne avec du coke amenée en haut, depuis le puits élévateur jusqu'au dispositif de chargement de la chambre d'extinction correspondante, et inversement, est caractérisée, selon l'invention, en ce qu'elle est pourvue d'une estacade érigée le long des chambres d'extinction au niveau de la sortie des montecharge des puits élévateurs, et d'un dispositif assurant le déplacement du chariot du monte-charge dans un plan horizontal sur l'estacade et perpendieulairesent à celle-ci. This problem is solved in that the dry coke extinguishing installation, comprising vertical extinguishing chambers arranged in a row and having top loading devices, elevator shafts each situated opposite the extinguishing chamber. corresponding tion and freight elevators each provided with a trolley to move the bucket with coke brought up from the elevating shaft to the device for loading the corresponding extinguishing chamber, and vice versa, is characterized, according to l invention, in that it is provided with a boom erected along the extinguishing chambers at the exit of the hoists from the lifting shafts, and of a device ensuring the movement of the lift carriage in a plane horizontal on the boom and perpendicular to it.

Il est intéressant que le dispositif de déplacement du chariot de monte-charge dans le plan horizontal sur l'estacade et perpendiculairement à celle-ci soit réalisé sous forme d'une plate-forme dont le train de roulement prend appui sur l'estacade, et que sur cette plate-forme, perpendiculairement à l'axe longitudinal de l'estacade, soient disposés des rails assurant le déplacement du chariot de monte-charge vers le trou de chargement de la chambre d'extinction correspondante. It is advantageous that the device for moving the lift carriage in the horizontal plane on the boom and perpendicular thereto is produced in the form of a platform, the undercarriage of which rests on the boom, and that on this platform, perpendicular to the longitudinal axis of the boom, are arranged rails ensuring the movement of the lift carriage to the loading hole of the corresponding extinguishing chamber.

Il est possible que l'estacade et ladite plate forme prenant appui sur celle-ci par 1 'intermédiaire de son train de roulement soient situées d'un iêie côté des chambres d'extinction de sorte que l'axe longitudinal de l'estacade passe par les centres des puits élévateurs. It is possible that the boom and said platform bearing on it via its undercarriage are located on one side of the extinguishing chambers so that the longitudinal axis of the boom passes by the lifting well centers.

Il est possible également que ladite plate-forme soit située au-dessus des puits élévateurs et des trous de chargement des chambres d'extinction, son train de roulement prenant appui sur une estacade disposée des deux côtés des chambres d'extinction. It is also possible that said platform is located above the elevating shafts and the loading holes of the extinguishing chambers, its running gear bearing on a boom arranged on both sides of the extinguishing chambers.

Il est d'autre part utile que le dispositif de déplacement de la benne avec le coke dans le plan horizontal sur 1 'estacade et perpendiculairement à celle-ci contienne quatre paires de bogies moteurs à balancier formant le train de roulement du chariot de monte-charge, l'un desdits bogies à balancier de chacune desdites paires étant relevable et disposé perpendiculairement à l'autre. It is also useful that the device for moving the bucket with the coke in the horizontal plane on the boom and perpendicularly to it contains four pairs of motor bogies with balance forming the undercarriage of the lift truck load, one of said balance bogies of each of said pairs being liftable and arranged perpendicular to the other.

Il est utile également que le dispositif de déplacement de la benne avec le coke dans le plan horizontal sur l'estacade et perpendiculairement à celle- ci contienne quatre bogies moteurs à balancier formant le train de roulement du chariot de monte-charge, chacun desdits bogies pouvant tourner autour d'un axe vertical, et que sur le chariot de monte-charge soit monté un vérin.  It is also useful that the device for moving the bucket with the coke in the horizontal plane on the boom and perpendicular to it contains four bogies with balance wheels forming the undercarriage of the goods lift carriage, each of said bogies can rotate around a vertical axis, and that on the lift carriage is mounted a cylinder.

Un tel mode de réalisation de l'installation permet d'obtenir le déplacement de la benne avec le coke dans deux directions réciproquement perpendiculaires dans le plan horizontal de disposition des dispositifs de chargement des chambres d'extinction. Ceci permet de réduire le nombre de machines auxiliaires du fait de l'accroissement de la manoeuvrabilité des monte-charge et d'augmenter l'efficacité de fonctionnement de l'installation. Such an embodiment of the installation makes it possible to obtain the displacement of the bucket with the coke in two mutually perpendicular directions in the horizontal plane of arrangement of the devices for loading the extinguishing chambers. This makes it possible to reduce the number of auxiliary machines due to the increased maneuverability of the hoists and to increase the operating efficiency of the installation.

D'autres caractéristiques et avantages de l'invention seront mieux compris à la lecture de la description, qui va suivre, de plusieurs modes de réalisation illustrés par les dessins annexés dans lesquels
- la figure 1 représente le schéma de disposition relative de l'installation d'extinction sèche de coke, de la batterie de fours à coke et des wagons à coke;
- la figure 2 représente la même installation que la figure 1 , vue en plan;;
- la figure 3 donne une vue d'ensemble de l'instal- lation d'extinction de coke selon l'inventions
- la figure 4 représente une variante de réalisatin de l'installation selon l'invention, dans laquelle l'estacade et la plate-forme prenant appui sur elle par l'inter médiaire de son train de roulement sont disposées d'un même côté des chambres d'extinction (vue suivant la flèche A de la figure 3);
- la figure 5 est une vue fragmentaire, à plus grande échelle, de l'installation de la figure 4;;
- la figure 6 représente la même installation que la figure 5, vue suivant la flèche B9
- la figure 7 représente, selon l'invention, la plate-forme supportant le monte-charge, avec arrachement partiel à la partie superieure de la chambre d'extinction;
- la figure 8 représente la même plate-forme que la figure 7, vue suivant la flèche C;
- la figure 9 représente le monte-charge avec arrachement partiel suivant lo-- cabine, vue suivent la flèche D de la figure 8;;
- la figure 10 représente, selon l'invention, un mode de réalisation du dispositif de déplacement du chariot de monte-charge dans un plan horizontal sur l'estacade et perpendiculairement à celle-ci, avec quatre paires de bogies à balancier;
- la figure Il représente le même dispositif que la figure 10, vu du côté des chambres d'extinction;
- la figure 12 représente le même dispositif que la figure 10, vu du côté de l'estacade;
- la figure 13 représente le -même dispositif que la figure 12, vu suivant la flèche E;
- la figure 14 représente, selon l'invention, un mode de réalisation de l'installation, dans lequel le dispositif de déplacement du chariot de monte-charge est réalisé sous forme de bogies à balancier relevables et rotatifs (vue d'ensemble);;
- la figure 15 est une vue fragmentaire du dispositif de la figure 14, vu du côté des chambres d'extinction;
- la figure 16 représente un graphique de fonctionnement de l'installation.
Other characteristics and advantages of the invention will be better understood on reading the description which follows of several embodiments illustrated by the accompanying drawings in which
- Figure 1 shows the relative layout diagram of the dry coke extinguishing system, the battery of coke ovens and coke wagons;
- Figure 2 shows the same installation as Figure 1, plan view;
- Figure 3 gives an overview of the coke quenching installation according to the invention
- Figure 4 shows a variant embodiment of the installation according to the invention, in which the boom and the platform resting on it by means of its undercarriage are arranged on the same side of the extinguishing chambers (view along arrow A in Figure 3);
- Figure 5 is a fragmentary view, on a larger scale, of the installation of Figure 4 ;;
- Figure 6 shows the same installation as Figure 5, seen along arrow B9
- Figure 7 shows, according to the invention, the platform supporting the freight elevator, with partial cutaway from the upper part of the extinguishing chamber;
- Figure 8 shows the same platform as Figure 7, seen along arrow C;
- Figure 9 shows the freight elevator with partial cutaway lo-- cabin, view follow arrow D of Figure 8;
- Figure 10 shows, according to the invention, an embodiment of the device for moving the lift carriage in a horizontal plane on the boom and perpendicular thereto, with four pairs of balance bogies;
- Figure II shows the same device as Figure 10, seen from the side of the extinguishing chambers;
- Figure 12 shows the same device as Figure 10, seen from the side of the boom;
- Figure 13 shows the same device as Figure 12, seen along arrow E;
- Figure 14 shows, according to the invention, an embodiment of the installation, in which the device for moving the hoist trolley is produced in the form of bogies with lifting and rotating balance beams (overview); ;
- Figure 15 is a fragmentary view of the device of Figure 14, seen from the side of the extinguishing chambers;
- Figure 16 shows a graph of operation of the installation.

On donne ci-dessous, à titre d'exemple, la description d'une installation d'extinction sèche de coke comportant huit chambres d'extinction. A description is given below, by way of example, of a dry coke quenching installation comprising eight quenching chambers.

Comme on le voit sur les figures 1 et 2, l'installation d'extinction sèche de coke est située à proximité de batteries de fours à coke 1 et 2 parallèlement au front des fours à coke. L'installation est desservie par deux wagons à coke 3 et 4 tirés par une locomotive électrique 5. As can be seen in FIGS. 1 and 2, the dry coke extinguishing installation is located near coke oven batteries 1 and 2 parallel to the front of the coke ovens. The installation is served by two coke wagons 3 and 4 pulled by an electric locomotive 5.

Les wagons à coke 3 et 4 sont équipés de bennes amovibles 6 et 7. Les wagons à coke 3, 4 circulent sur une voie de rails 8 (figure 2) posée parallèlement au front des fours à coke dans les batteries 1 et 2 et passant au-dessous de puits élévateurs 9 de l'installation d'extinction sèche de coke.The coke wagons 3 and 4 are fitted with removable skips 6 and 7. The coke wagons 3, 4 run on a rail track 8 (Figure 2) placed parallel to the front of the coke ovens in batteries 1 and 2 and passing below elevating shafts 9 of the coke dry quenching installation.

L'installation d'extinction sèche de coke comprend des chambres d'extinction 101-n disposées en une rangée parallèle au front des fours à coke (n # 8). Dans sa partie supérieure, chacune des chambres d'extinction possède un dispositif de chargement 11 servant au chargement du coke incandescent dans la chambre d'extinction 10, tandis que dans la partie inférieure se trouve un dispositif 12 (figure 3) servant au déchargement du coke éteint sur un convoyeur 13. Les chambres d'extinction 10 sont placées dans une carcasse métallique 14 munie de passerelles 15 et d'escaliers 16.  The dry coke extinguishing installation comprises extinguishing chambers 101-n arranged in a row parallel to the front of the coke ovens (n # 8). In its upper part, each of the extinguishing chambers has a loading device 11 used for loading the incandescent coke into the extinguishing chamber 10, while in the lower part is a device 12 (FIG. 3) used for discharging the coke quenched on a conveyor 13. The quenching chambers 10 are placed in a metal carcass 14 provided with gangways 15 and stairs 16.

En regard de chaque chambre d'extinction 10, se trouvent les puits élévateurs 91 n avec des guides (non représentés) pour les déplacement de monte charge 171-m
L'installation d'extinction sèche de coke compte trois monte-charge (m=3) dont un de réserve. Chacun des montecharge 17 possède un chariot 18 servant à déplacer la benne 6 ou 7 rementée depuis le puits élévateur 9 vers le dispositif de chargement Il de la chambre d'extinction 10 et en sens inverse.
Opposite each extinguishing chamber 10, are the elevating shafts 91 n with guides (not shown) for the movement of the freight elevator 171-m
The dry coke extinguishing system has three hoists (m = 3), one of which is a reserve. Each of the lift 17 has a carriage 18 used to move the skip 6 or 7 remented from the elevating well 9 to the device 11 for loading the extinguishing chamber 10 and in the opposite direction.

Selon l'invention, le long des chambres d'extinction 10, au niveau de la sortie des monte-charge 17 des puits élévateurs 9, est prévue une estacade 19 avec des voies de rails 20 (figure 4), et il est prévu en outre un dispositif pour le déplacement du chariot 18 du montecharge 17 dasn un plan borizontal sur l'estacade 19 et perpendiculairement à celle-ci. Ceci permet de manoeuvrer les monte-charge 17 dans deux directiens réciproquement perpendiculaires dans un plan horizontal en réduisant ainsi à deux le nombre de monte-charge nécessaires pour desservir 4 ou 5 chambres d'extinction ou plus Ceci permet en fait un fonctionnement plus efficace de l'installation dans son ensemble.  According to the invention, along the extinguishing chambers 10, at the exit of the goods lift 17 from the elevating shafts 9, a boom 19 is provided with rail tracks 20 (FIG. 4), and it is provided in addition to a device for moving the carriage 18 of the load bar 17 in a horizontal plane on the boom 19 and perpendicular thereto. This makes it possible to maneuver the freight elevators 17 in two mutually perpendicular directienses in a horizontal plane thereby reducing to two the number of freight elevators necessary to serve 4 or 5 or more extinguishing chambers the installation as a whole.

La figure 4 représente un mode de réalisation de l'installation d'extinction secte de coke, suivant lequel le dispositif de déplacement du chariot 18 du monte-charge 17 dans un plan horizontal sur l'estacade et perpendiculairement à celle-ci est réalisé sous forme d'une plate-forme 21 qui prend appui par son train de roulement 22 sur l'estacade 19. Sur la plate-forme 21 sont posés, perpendiculairement à l'axe longitudinal de l'estacade 19, des rails 23 sur lesquels le chariot 18 du monte-charge 17 se déplace vers le dispositif de chargement 11 de la chambre d'extinction 10 correspondante et en sens inverse. FIG. 4 represents an embodiment of the coke sect extinction installation, according to which the device for moving the carriage 18 of the freight elevator 17 in a horizontal plane on the boom and perpendicular thereto is produced under form of a platform 21 which is supported by its undercarriage 22 on the boom 19. On the platform 21 are placed, perpendicular to the longitudinal axis of the boom 19, rails 23 on which the carriage 18 of the freight elevator 17 moves towards the loading device 11 of the corresponding extinguishing chamber 10 and in the opposite direction.

L'estacade 19 (figures 4, 5 ,6) et la plate-forme 21 qui se déplace sur elle sont situées d'un mêje côté des chambres d'extinction 10. L'axe longitudinal de l'estacade 19 passe par le centre de chacun des trous des puits élévateurs 9. Afin que le monte-charge puisse se déplacer vers le dispositif de chargement Il d'une chambre d'extinction 10, perpendiculairement à l'estacade 19, sur-la plate-forme 21, sont disposés des rails 23 , tandis que la carcasse de l'installation d'extinction sèche de coke dispose de rails 24 posés au même niveau que les rails 23. The boom 19 (Figures 4, 5, 6) and the platform 21 which moves thereon are located on the same side of the extinguishing chambers 10. The longitudinal axis of the boom 19 passes through the center of each of the holes of the elevating shafts 9. So that the lift can move towards the loading device II of an extinguishing chamber 10, perpendicular to the boom 19, on the platform 21, are arranged rails 23, while the carcass of the dry coke extinguishing installation has rails 24 placed at the same level as the rails 23.

Le monte-charge est fixé sur la plate-forme 21 à l'aide de pinces 25. Ce mode de réalisation est donc commode.The freight elevator is fixed to the platform 21 using clamps 25. This embodiment is therefore convenient.

Selon un autre mode de réalisation (figures 7, 8, 9), l'estacade 19 est montée sur la carcasse 14 des deux côtés des chambres d'extinction 10, la plate-forme 21 étant située au-dessus des puits élévateurs 9 et des chambres d'extinc tion 10. Le train de roulement 22 de la plate-forme 21 prend appui sur la voie de rails 20 posée sur l'estacade de part et d'autre des chambres d'extinction 10, tandis que les rails 23 installés sur la plate-forme 21 mettent en communication les puits élévateurs 9 avec les dispositifs de chargement Il correspondants des chambres d'extinction la
La plate-forme 21 présente une ouverture horizontale 26 à travers laquelle passent les guides et les organes de préhension du monte-charge.Tous les appareils de démarrage et de réglage des commandes du train de roulement 22 de la plate-forme 21 ayant la forme de bogies à balancier sont installés dans une cabine 27. L'alimentation en énergie électrique s'effectue par l'intermédiaire de prises de courant 28 (figure 7).
According to another embodiment (FIGS. 7, 8, 9), the boom 19 is mounted on the carcass 14 on both sides of the extinguishing chambers 10, the platform 21 being located above the elevator shafts 9 and extinction chambers 10. The undercarriage 22 of the platform 21 rests on the track of rails 20 placed on the boom on either side of the extinction chambers 10, while the rails 23 installed on the platform 21 put the elevating shafts 9 into communication with the corresponding loading devices II of the extinguishing chambers
The platform 21 has a horizontal opening 26 through which pass the guides and the gripping members of the freight elevator. All the starting and adjusting devices for the undercarriage controls 22 of the platform 21 having the form balance bogies are installed in a cabin 27. The electrical energy is supplied by means of electrical outlets 28 (FIG. 7).

Le monte-charge 17 de l'installation d'extinction sèche de coke se présente sous forme d'un chariot de grue supportant un tambour à cible 29 mfl par une commande électromécanique et des daviers 30. Le train de roulement 31 du chariot 18 du monte-charge 17 peut être réalisé sous forme de bogies à balancier. The hoist 17 of the dry coke extinguishing installation is in the form of a crane carriage supporting a target drum 29 mfl by an electromechanical control and davits 30. The undercarriage 31 of the carriage 18 of the freight elevator 17 can be produced in the form of balance bogies.

Le monte-charge 17 se déplace sur la palte-forme 21 gracie à une commande à lanterne 32 comportant une roue à fuseaux 33 et une crémaillère 34. La crémaillère 34 est fixée à une ferme 35 installée sur la plate-forme 21. La commande à lanterne 32 est située de part et d'autre du monte-charge 17 de l'installation d'extinction sèche de coke. L'alimentation électrique des commandes du montecharge 17 est réalisée par l'intermédiaire d'un cible flexible 36 suspendu à un cible 37 tendu entre des montants 38 ou 39, ou bien par l'intermédiaire d'un trolley. Des butées 40 sont prévues pour limiter le trajet du montecharge 17. The freight elevator 17 moves on the platform 21 thanks to a lantern control 32 comprising a spindle wheel 33 and a rack 34. The rack 34 is fixed to a farm 35 installed on the platform 21. The control lantern 32 is located on either side of the freight elevator 17 of the dry coke extinguishing system. The electrical supply for the controls of the load bar 17 is carried out by means of a flexible target 36 suspended from a target 37 stretched between uprights 38 or 39, or else by means of a trolley. Stops 40 are provided to limit the path of the freight elevator 17.

Le monte-charge est équipé d'un organe de préhension comprenant des guides 41 dans lesquels, au moyen de galets 42, se déplace un crochet 43. Ce dernier, au cours du transport, maintient suspendue la benne 6 ou 7 du wagon à coke. La benne 6 (7), le guide 41 et le crochet de manutention 43 sont recouverts d'une gaine 44 détournant la poussière et les gaz vers un tube de ventilation 45. The hoist is equipped with a gripping member comprising guides 41 in which, by means of rollers 42, a hook 43 moves. The latter, during transport, keeps the bucket 6 or 7 of the coke wagon suspended . The bucket 6 (7), the guide 41 and the handling hook 43 are covered with a sheath 44 diverting the dust and the gases towards a ventilation tube 45.

L'ouverture horizontale 26 pratiquée dans la plate-forme 21 est prévue pour la mise en place de ces éléments (en pointillé sur la figure 9).The horizontal opening 26 made in the platform 21 is provided for the positioning of these elements (dotted line in FIG. 9).

Ce mode de réalisation est plus intéressant parce que, dans ce cas, iI n'y a plus besoin de moindre les rails 23 disposés sur la plate-forme 21 à chacune des voies des rails 24 au-dessus des dispositifs de chargement Il des chambres d'extinction 10. This embodiment is more advantageous because, in this case, there is no longer any need for the rails 23 disposed on the platform 21 at each of the tracks of the rails 24 above the loading devices II of the chambers 10.

Dans le mode de réalisation de l'installation d'extinction sèche de coke représenté sur les figures 10, 11, 12, 13, le dispositi! de déplacement du chariot 18 du monte-charge 17 dans un plan horizontal sur l'estacade 19 et perpendiculairement à celle-ci comporte quatre paires de bogies moteurs à balanciers : quatre bogies à balancier 46 destinés à déplacer le monte-charge 17 sur les rails 20 de l'estacade 19 au-dessus des puits élévateurs 9, et quatre bogies à balancier 47 destinés à déplacer le montecharge sur des rails transversaux 48 de l'estacade et sur les rails 24 de la carcasse de l'installation d'extinction sèche de coke, les rails 48 , 24 se trouvant à un même niveau.Pour pouvar mettre les bogies à balancier alternativement sur les rails correspondants, le monte-charge est muni de vérins de levage 49. In the embodiment of the dry coke extinguishing installation shown in Figures 10, 11, 12, 13, the dispositi! of movement of the carriage 18 of the freight elevator 17 in a horizontal plane on the boom 19 and perpendicularly to the latter comprises four pairs of balance motor bogies: four balance bogies 46 intended to move the freight elevator 17 on the rails 20 of the boom 19 above the elevating shafts 9, and four balance bogies 47 intended to move the hoist on transverse rails 48 of the boom and on the rails 24 of the carcass of the dry extinguishing installation of coke, the rails 48, 24 being on the same level. To be able to put the balance bogies alternately on the corresponding rails, the hoist is provided with lifting cylinders 49.

Les trains de roues de ces bogies (figures 12 et 13) sont réciproquement perpendiculaires. Le bogie à balancier 47 servant à déplacer le monte-charge 17 vers le dispositif de chargement lide la chambre d'extinction 10 est du type relevable et, au cours du déplacement du monte-charge 17 sur l'estacade 19, occupe sa position haute extrême et passe au-dessus des rails 48 avec un certain jeu. The wheel sets of these bogies (Figures 12 and 13) are reciprocally perpendicular. The balance bogie 47 used to move the freight elevator 17 towards the loading device lides the extinguishing chamber 10 is of the liftable type and, during the movement of the freight elevator 17 on the boom 19, occupies its high position extreme and goes over the rails 48 with some play.

Le bogie à balancier 47 (figure 13) est monté de façon mobile sur un cadre remontant dans des guides 50. The balance bogie 47 (FIG. 13) is mounted movably on a frame rising in guides 50.

Le déplacement des bogies 47 se fait grâce à une commande hydraulique 51 par l'intermédiaire d'une transmission par levier et articulation, comportant des éléments 52, 53.The movement of the bogies 47 is effected by means of a hydraulic control 51 by means of a transmission by lever and articulation, comprising elements 52, 53.

L'articulation 54 de l'élément 52 est attachée au chariot 18 du monte-charge 17.The articulation 54 of the element 52 is attached to the carriage 18 of the freight elevator 17.

Les figures 14, 15 montrent encore un mode de réalisation de l'installation, selon lequel le dispositif de déplacement du chariot 18 du monte-charge 17 dans un plan horizontal sur l'estacade et perpendiculairement à celle-ci comporte quatre bogies à balancier 55. Chacun desdits bogies à balancier 55 est monté sur un axe vertical 56 dans des paliers 57, 58 fixés au chariot 18 du monte-charge 17. La rotation du chariot 18 de 900 est réalisée au moyen d'une transmission par engrenages 59, 60 de la commande électrique 61. Le relèvement du monte-charge 17 pendant la rotation des bogies 55 de 900 se fait à l'aide de vérins de levage 62 incorporés dans la carcasse du monte-charge. Figures 14, 15 also show an embodiment of the installation, according to which the device for moving the carriage 18 of the freight elevator 17 in a horizontal plane on the boom and perpendicular thereto comprises four balance bogies 55 Each of said balance bogies 55 is mounted on a vertical axis 56 in bearings 57, 58 fixed to the carriage 18 of the freight elevator 17. The rotation of the carriage 18 of 900 is achieved by means of a gear transmission 59, 60 of the electric control 61. The lifting of the freight elevator 17 during the rotation of the bogies 55 of 900 is done using lifting cylinders 62 incorporated in the carcass of the freight elevator.

En régime établi, l'installation d'extinction sèche de coke fonctionne de la façon suivante (figures 1, 2, 16). Le coke incandescent est amené à l'installation depuis les batteries 1. 2 de fours à coke dans deux wagons à coke 3, 4 attelés à la locomotive électrique 5 circulant sur la voie de rails 80 Cette dernière est posée parallèlement au front des fours à coke gt des chambres d'extinction et passe au-dessous des puits élévateurs 9. In steady state, the dry coke extinguishing system operates as follows (Figures 1, 2, 16). The incandescent coke is brought to the installation from the batteries 1. 2 of coke ovens in two coke wagons 3, 4 coupled to the electric locomotive 5 running on the rail track 80 The latter is placed parallel to the front of the ovens at coke gt of extinguishing chambers and passes below the elevating shafts 9.

Chacun des wagons à coke 3, 4 est équipé d'une benne amovible 6, 7 dans laquelle on charge le coke délivré par les fours à coke. Le convoi compos des deux wagons à coke 3s 4 et de la locomotive électrique 5 dessert en accord avec le graphique de défournement deux batteries de fours à coke 1 et 2.Each of the coke wagons 3, 4 is fitted with a removable bucket 6, 7 into which the coke delivered by the coke ovens is loaded. The convoy made up of two coke wagons 3s 4 and the electric locomotive 5 serves, in accordance with the charging diagram, two batteries of coke ovens 1 and 2.

Le graphique de fonctionnement des monte-charge 17 de l'installation d'extinction sèche de coke et des wagons 3, 4 est représenté sur la figure 16. Pour plus de clarté, on admettra ici que le début du travail coiucide avec la nécessité de charger le coke dans la promière chambre 101, par la suite les chambres sont chargées successivement dans l'ordre de croissance de leure numéros 102 à 108. The operating graph of the freight elevators 17 of the dry coke extinguishing system and of the wagons 3, 4 is shown in FIG. 16. For greater clarity, it will be assumed here that the start of the work coincides with the need to load the coke in the first room 101, thereafter the rooms are loaded successively in the order of growth of their numbers 102 to 108.

Après le chargement de la dernière (huitième) chambre, le cycle se répète. On admetra aussi que le chargament conceme toutes les chambre, c'est à dire que le travail se déroule sans chambre de réserve
Le fait de laisser des chembres de réserve et les modifications éventuelles de l'ordre successif de chargement des chambres ne changent pas le principe et la procédure de fonctionnement des monte-charge et des wagons à coke.
After loading the last (eighth) chamber, the cycle repeats. We will also admit that the chargament concerns all the rooms, that is to say that the work takes place without a reserve room
Leaving spare chembres and possible modifications to the successive order of loading of the chambers does not change the principle and the operating procedure of the hoists and coke wagons.

Au début du fonctionnement des machines, la locomotive électrique 5 amène les wagons à coke 3, 4 avec les bennes vides 6, 7 par exemple vers la batterie de fours à coke 7 où la benne 7 da wagon 4 est chargée. A ce moment, les monte-charge 171 et 172 se trouvent sur l'estacade 19 au-dessus des puits élévateurs respectivement 91 et 92 des chambres 101 et 102. At the start of the operation of the machines, the electric locomotive 5 brings the coke wagons 3, 4 with the empty skips 6, 7 for example to the battery of coke ovens 7 where the skip 7 of wagon 4 is loaded. At this time, the freight elevators 171 and 172 are located on the boom 19 above the elevating shafts 91 and 92 respectively of the chambers 101 and 102.

Après l'évacuation du coke de l'un des fours de la batterie 1, le convoi (la locomotive électrique 5 et les wagons à coke 3, 4 avec les bennes 6, 7) retourne à l'installation d'extinction sèche de coke et s'arrive juste sous les puits élévateurs des chambres 101 et 102. After the coke has been removed from one of the ovens in battery 1, the convoy (the electric locomotive 5 and the coke wagons 3, 4 with the skips 6, 7) returns to the dry coke extinguishing system and arrives just under the elevating shafts of rooms 101 and 102.

Les dimensions du convoi et des puits élévateurs sont adaptées de telle façon que les bennes 6, 7 des deux wagons à coke 3, 4 coïncident avec les ouvertures des puits élévateurs. Dans cette position, le monte-charge 171 s 'empare de la benne 7 chargée de coke et la transporte vers la chambre 101 pour l'y décharger. Pendant ce temps, le monte-charge 172 reste sur l'estacade 19 au-dessus du puits élévateur 92 de la chambre 102 en attendant l'arrivée du coke , tandis que le convoi retourne aux fours à coke et reprend de l'un des fours de la batterie 2 la benne 6 du wagon à coke 3.The dimensions of the convoy and the elevator shafts are adapted so that the buckets 6, 7 of the two coke wagons 3, 4 coincide with the openings of the elevator shafts. In this position, the freight elevator 171 takes hold of the bucket 7 loaded with coke and transports it to the chamber 101 to discharge it there. Meanwhile, the hoist 172 remains on the boom 19 above the elevator shaft 92 of the chamber 102 while waiting for the arrival of the coke, while the convoy returns to the coke ovens and resumes from one of the battery ovens 2 the bucket 6 of the coke wagon 3.

Le convoi transportant la benne chargée de coke du wagon 3 se déplace vers l'installation d'extinction sèche de coke et s'arrête de nouveau dans la zone suivant l'axe des puits élévateurs 91 et 92 des chambres 10* et 102 (comme précédemment). The convoy carrying the coke-laden skip of wagon 3 moves to the dry coke extinguishing system and stops again in the area along the axis of the elevating shafts 91 and 92 of chambers 10 * and 102 (as previously).

Dans cette position, le monte-charge 171 remet la benne vide 7 sur le wagon 4 alors que le monte-charge 172 retire la benne 6 chargée de coke du wagon 3 et la transporte vers la chambre 102. In this position, the freight elevator 171 puts the empty skip 7 back on the wagon 4 while the freight elevator 172 removes the skip 6 loaded with coke from the wagon 3 and transports it to the chamber 102.

Ceci fait, le convoi retourne à la batterie 7 de fours à coke pour charger le coke provenant du four suivant dans la benne 7 du wagon 4. This done, the convoy returns to the battery 7 of coke ovens to load the coke coming from the next oven into the bucket 7 of wagon 4.

il ressort de l'exemple de ces deux passes (figures 1, 2, 16) que le coke est pris à tour de rôle des batteries I et 2 respectivement dans les bennes 7 et 6 des wagons 4, 3 et les deux monte-charge fonctionnent eux aussi alterna vivement : l'un remonte la benne chargée de coke au haut de l'installation d'extinction sèche de coke, alors que l'autre remet la benne vide sur le wagon à coke. it emerges from the example of these two passes (FIGS. 1, 2, 16) that the coke is taken in turn from the batteries I and 2 respectively in the buckets 7 and 6 of the wagons 4, 3 and the two freight elevators they also work alternately: one puts the coke-laden skip back on top of the coke dry extinguishing system, while the other puts the empty skip back on the coke wagon.

Pour charger les chambres 103 et 104 , les deux monte-charge doivent se déplacer sur l'estacade 19 et s'arrêter dans l'axe des puits élévateurs respectivement 93 et 94. Le monte-charge 172 se déplace vers le puits 94 avec la benne vide, le monte-charge 171 arrive au puits 93 sans benne, et les deux monte-charge attendent la venue du convoi avec le coke. To load the chambers 103 and 104, the two hoists must move on the boom 19 and stop in the axis of the elevating shafts respectively 93 and 94. The hoist 172 moves towards the shaft 94 with the empty skip, the freight elevator 171 arrives at the well 93 without skip, and the two freight elevators await the arrival of the convoy with the coke.

Au cours de la troisième passe, le monte-charge 171 enlève la benne chargée 7 du wagon 4 tandis que la montecharge 172 remet la benne vide sur le wagon 3. Pendant que le chargement de la chambre 10 se poursuit, le convoi retourne à la batterie 2 et prend en charge le coke provenant du four suivant dans la benne 6 du wagon 3. During the third pass, the freight elevator 171 removes the loaded skip 7 from wagon 4 while the freight elevator 172 returns the empty skip to wagon 3. While the loading of room 10 continues, the convoy returns to the battery 2 and supports the coke coming from the next oven in the bucket 6 of wagon 3.

Ensuite le convoi retourne à l'installation d'extinction sèche de coke, réalisant ainsi la quatrième passe. Dans cette position, le monte-charge 171 remet la benne 7 sur le wagon 4 , tandis que le monte-charge 172 enlève la benne 6 du wagon 3 et la transporte vers ia chambre 104.Then the convoy returns to the dry coke extinguishing system, making the fourth pass. In this position, the freight elevator 171 puts the bucket 7 back on the wagon 4, while the freight elevator 172 removes the bucket 6 from the wagon 3 and transports it to the chamber 104.

L'ordre successid de chargement des chambres 105,6,7,8 est montré sur le graphique de la figure 16. The successive order of loading chambers 105, 6, 7, 8 is shown in the graph in FIG. 16.

Le convoi effectue une cinquième passe, une sixième. passe, etc. Après avoir chargé la chambre 107 et remis la benne 7 vide sur le wagon 4, le monte-charge 171 termine le premier cycle de chargement et retourne sur l'estacade 19 vers le dispositif de chargement Il de la chambre 10t, tandis que le monte-charge 172 , après avoir chargé la chambre 108, retourne avec la benne vide au puits 92 de la chambre 102.The convoy makes a fifth pass, a sixth. pass, etc. After loading the chamber 107 and returning the empty bucket 7 to the wagon 4, the freight elevator 171 completes the first loading cycle and returns to the boom 19 to the loading device II of the chamber 10t, while the elevator -load 172, after having loaded the chamber 108, returns with the empty bucket to the well 92 of the chamber 102.

Ici les deux monte-charge 17 attendent la première passe du convoi pour commencer le deuxième cycle de chargement des chambres avec du coke. Ce cycle est réalisé dans le même ordre successif de travail de toutes les machines que le premier cycle qui vient d'être décrit.Here the two freight elevators 17 await the first pass of the convoy to start the second cycle of loading the rooms with coke. This cycle is carried out in the same successive working order of all the machines as the first cycle which has just been described.

De cette façon , les deux monte-charge ( le montecharge 173 représenté sur les figures 1,2 est en réserve) coopérant avec les wagons à coke se déplacent sur l'esta- cade 19 et la carcasse 14 des chambres 10 d'extinction dans des directions réciproquement perpendiculaires. In this way, the two freight elevators (the freight elevator 173 shown in Figures 1,2 is in reserve) cooperating with the coke wagons move on the platform 19 and the carcass 14 of the extinguishing chambers 10 in reciprocally perpendicular directions.

Le changement de la direction du mouvement est assuré par le dispositif de déplacement du chariot 18 du monte-charge 17 dans un plan horizontal sur l'estacade 19 et perpendiculairement à celle-ci, ce dispositif pouvant être de conceptions différentes. Si ce dispositif se présente sous forme d'une plate-forme 21 prenant appui sur l'estacade 19 disposée de part et d'autre des chambres 10 d'extinction (figures 7, 8 et 9), le changement de la direction du mouvement se fait comme suit. The change in the direction of movement is ensured by the device for moving the carriage 18 of the freight elevator 17 in a horizontal plane on the boom 19 and perpendicular thereto, this device possibly being of different designs. If this device is in the form of a platform 21 bearing on the boom 19 arranged on either side of the extinguishing chambers 10 (Figures 7, 8 and 9), the change in the direction of movement is as follows.

Le monte-charge 17 se trouve sur la plate-forme 21 s'appuyant sur les rails 23, posés sur la carcasse de ladite plate-forme, par l'intermédiaire de ses bogies de roulement 31. En position de travail, le monte-charge 17 se place au-dessous de l'axe du puits élévateur 9 comme on le voir sur la figure 4, et, dans cette position attend l'arrivée du wagon d coke 3 ou 4 avec la benne 6 ou 7 remplie de coke incandescent. The freight elevator 17 is located on the platform 21 resting on the rails 23, placed on the carcass of said platform, by means of its rolling bogies 31. In the working position, the elevator load 17 is placed below the axis of the elevator shaft 9 as shown in FIG. 4, and, in this position awaits the arrival of the wagon d coke 3 or 4 with the bucket 6 or 7 filled with glowing coke .

Lorsque la benne 6 ou 7 se trouve placée dans l'axe du puits élévateur 9 de la chambre d'extinction 10 à charger, on met en jeu la commande 29 du monte-charge 17 et on pose sur la benne 6 ou 7 les crochets de manutention 43 (en position haute extrême sur la figure 7) qui saisissent la benne par ses tourillons (non représentés). Pour remonter la benne 6 ou 7, on remet en marche la commande 29 du monte-charge 17 et la benne est hissée au haut de l'installation. Les galets de guidage 42 des crochets de manutention 43 se déplacent d'abord dans les guides du puits élévateur 9 et puis dans les guides 41 du montecharge 17 en prévenant ainsi le balancement de la benne pendant le hissage. Une fois la benne arrivée en position haute extrême, la commande 29 est automatiquement mise hors d'action.  When the bucket 6 or 7 is placed in the axis of the elevator shaft 9 of the extinguishing chamber 10 to be loaded, the control 29 of the freight elevator 17 is brought into play and the hooks are placed on the bucket 6 or 7 handling 43 (in the extreme high position in FIG. 7) which grips the bucket by its pins (not shown). To reassemble the bucket 6 or 7, the control 29 of the goods lift 17 is restarted and the bucket is hoisted to the top of the installation. The guide rollers 42 of the handling hooks 43 move first in the guides of the elevating shaft 9 and then in the guides 41 of the load bar 17 thereby preventing the rocking of the bucket during the hoisting. Once the bucket has reached the extreme high position, the control 29 is automatically put out of action.

L'opération suivante consiste à transporter la benne 6 (7) avec le coke vers le dispositif de chargement 11 de la chambre d'extinction. Pour ce faire , on met en marche is commandes du train de roulement 31 et le montecharge 17 arrive au poste suivant en s'arrêtant automatiquement au-dessus de la chambre d'extinction 10 à charger (en pointillé sur la figure 7).Dans cette position on remet en marche la commande 29 du monte-charge 17, on pose la benne 6 ou 7 sur le dispositif de chargement Il et on déverse le coke incandescent dans la chambre d'extinction 10 (le processus du déchargement et la construction du dispositif de déchargemént de l'installation d'extinction sèche de coke ne font pas l'objet de la présente invention). The following operation consists in transporting the bucket 6 (7) with the coke to the loading device 11 of the extinguishing chamber. To do this, the undercarriage controls 31 are started up and the load-carrying device 17 arrives at the next station by automatically stopping above the extinguishing chamber 10 to be charged (dotted line in FIG. 7). in this position, the control 29 of the goods lift 17 is restarted, the bucket 6 or 7 is placed on the loading device II and the incandescent coke is poured into the extinguishing chamber 10 (the unloading process and the construction of the device for discharging the dry coke extinguishing system are not the subject of the present invention).

Le coke ayant été déchargé, la benne 6 ou 7 est tirée jusqu'à sa position haute extrême et le monte-charge 17 retourne en position de départ, comme montré à la figure 7. Dans cette position, on met en marche les commandes du train de roulement 22 de la plate-forme 21, celle-ci se déplaçant vers le dispositif de chargement Il de la chambre d'extinction 10 suivante & charger, où elle attend l'arrivée du wagon à coke 3 ou 4 vide. Dès que le wagon à coke 3 ou 4 vide se trouve placé dans l'axe vertical du puits élévateur 9, on met en jeu la commande 29 pour reposer la benne vide 6 ou 7 sur le wagon à coke. The coke having been discharged, the bucket 6 or 7 is pulled to its extreme high position and the freight elevator 17 returns to the starting position, as shown in FIG. 7. In this position, the controls of the undercarriage 22 of platform 21, the latter moving towards the loading device II of the next extinguishing chamber 10 & charging, where it awaits the arrival of the empty coke wagon 3 or 4. As soon as the empty coke wagon 3 or 4 is placed in the vertical axis of the elevator shaft 9, the control 29 is brought into play to rest the empty skip 6 or 7 on the coke wagon.

Une fois le benne 6 ou 7 arrivée en position basse extrême , les crochets de manutention 43 s'ouvrent automatiquement et libèrent la benne. Dans cette même position ouverte, les crochets de manutention 43 sont tirés légèrement vers le haut, après quoi le monte-charge 17 attend l'arrivée du wagon transportant une benne remplie de coke. Once the container 6 or 7 has reached the extreme low position, the handling hooks 43 open automatically and release the container. In this same open position, the handling hooks 43 are pulled slightly upwards, after which the freight elevator 17 awaits the arrival of the wagon carrying a bucket filled with coke.

Le hissage de la benne chargée se fait par la suite dans le même ordre que celui qui vient d'être décrit.The hoisting of the loaded bucket is then carried out in the same order as that which has just been described.

Si le dispositif de déplacement du chariot 18 du monte-charge 17 dans un plan horizontal sur l'estacade et perpendiculairement à celle-ci se présente sous forme d'une plate-forme 21 s'appuyant sur l'estacade 19 qui9 elle, est située d'un seul côté des chambres d'extinction 10 (figures 4, 5, 6), l'ordre de fonctionnement des machines est le suivant. Au départ, le monte-charge 17 se trouve sur la plate-forme 21 comme on le voit sur la figure 4. If the device for moving the carriage 18 of the freight elevator 17 in a horizontal plane on the boom and perpendicular thereto is in the form of a platform 21 resting on the boom 19 which is itself located on one side of the extinguishing chambers 10 (Figures 4, 5, 6), the order of operation of the machines is as follows. At the start, the freight elevator 17 is located on the platform 21 as seen in FIG. 4.

Le 'monte-charge 17 est fixé sur des rails 23 de la plate forme 21 au moyen des pinces 25. Les monte-charge 17 étant dans cette position, la plate-forme 21 peut se déplacer au-dessus des puits 9 le long de l'estacade 19. The freight elevator 17 is fixed on rails 23 of the platform 21 by means of clamps 25. The freight elevators 17 being in this position, the platform 21 can move over the wells 9 along the boom 19.

Pour monter la benne 6 ou 7 contenant du coke rouge, on arrête la plate-forme 21 dans l'axe du puits élévateur 9 correspondant et l'on bloque (on fixe sur les rails) le train de roulement 22. Le monte-charge 17 pose ses crochets de manutention 43 sur la benne à hisser, s'empare de la benne et la monte en position haute extrême. To mount the bucket 6 or 7 containing red coke, the platform 21 is stopped in the axis of the corresponding elevator shaft 9 and the undercarriage 22 is blocked (fixed on the rails). 17 places its handling hooks 43 on the hoisting bucket, grabs the bucket and mounts it in the extreme high position.

Puis on met en marche les commandes du train de roulement du monte-charge 17 et celui-ci roule sur les rails 23, 24 vers la chambre d'extinction 10 à charger. L'ordre successif de fonctionnement du monte-charge est le même que celui décrit ci-dessus et représenté sur la figure 16.Then the controls of the undercarriage of the freight elevator 17 are started and the latter travels on the rails 23, 24 towards the extinguishing chamber 10 to be loaded. The successive order of operation of the freight elevator is the same as that described above and shown in FIG. 16.

Une fois le coke déverse, le monte-charge 17 transportant la benne vide retourne à la plate-forme 21 et s'y fixe par l'intermédiaire des pinces 25. Le monte-charge 17 étant dans cette position, la plate-forme 21 se déplace vers le puits élévateur 9 suivant. La descente de la benne vide sur le wagon & coke correspondant se fait comme cela vient d'être décrit.Once the coke has been poured out, the freight elevator 17 transporting the empty bucket returns to the platform 21 and is fixed there by clamps 25. The freight elevator 17 is in this position, the platform 21 moves to the next elevator shaft 9. The descent of the empty container onto the corresponding wagon & coke is done as described above.

Les figures 10, 11, 12, 13 représentent le mode de réalisation suivant lequel le dispositif de déplacement du chariot 18 du monte-charge 17 est muni de bogies moteurs à balancier 46, 47 réciproquement perpendiculaires. Pour déplacer le monte-charge 17 sur l'estacade 19 on met en marche les commandes des bogies à balancier 46, tandis que les bogies 47 sont relevés en position haute extrême. Figures 10, 11, 12, 13 show the embodiment according to which the device for moving the carriage 18 of the freight elevator 17 is provided with balance bogies 46, 47 reciprocally perpendicular. To move the hoist 17 on the boom 19, the controls of the balance bogies 46 are started, while the bogies 47 are raised in the extreme high position.

Pour déplacer le monte-charge 17 vers la chambre d'extinction 10 perpendiculairement à l'estacade 19, on l'arrête dans l'axe de la chambre d'extinction 10 correspondante et on met en jeu les vérins de levage 49 qui relèvent le monte-charge 17 à une certaine hauteur. Puis on met en marche la commande 51 et on pose les bogies moteurs à balancier 47 sur les rails 48 en les fixant dans la carcasse du monte-charge 17. On coupe les vérins 49 et le monte-charge 17 se pose sur les rails 48. Ensuite on met en marche les commandes des bogies 47 et.le montecharge 17 se déplace vers la chambre d'extinction 10 sur les rails 48, 24. Pour faire retourner le monte-charge à l'estacade 19, on effectue ces opérations dans l'ordre inverse. To move the freight elevator 17 towards the extinguishing chamber 10 perpendicular to the boom 19, it is stopped in the axis of the corresponding extinguishing chamber 10 and the lifting cylinders 49 which raise the freight elevator 17 at a certain height. Then the control 51 is started and the balance bogies 47 are placed on the rails 48 by fixing them in the carcass of the freight elevator 17. The jacks 49 are cut and the freight elevator 17 is installed on the rails 48 Then the controls of the bogies 47 are switched on and the lift 17 moves towards the extinguishing chamber 10 on the rails 48, 24. In order to return the lift to the boom 19, these operations are carried out in reverse order.

Pour changer la direction du mouvement du montecharge équipé de mécanismes avec les bogies à balancier 55 relevables-rotatifs (figures 14, 15), on procède comme suit. On arrête le monte-charge 17 dans l'axe de la chambre d'extinction 10, on met en jeu les vérins de levage 62, on monte-charge 17 à une certaine hauteur. Puis on met en marche la commande 61 et on fait tourner le bogie moteur à balancier 55 de 900 de façon que ses roues soient disposées dans l'axe des rails 24 de la carcasse 14 des chambres d'extinction 10. Ensuite on débranche les vérins 62 et le monte-charge descend sur les rails 24. On met en marche les commandes des bogies 55 et le monte-charge 17 roule vers la chambre d'extinction 10. Pour faire retourner le monte-charge 17 à l'estacade 19, on répète ces opérations dans l'ordre inverse. To change the direction of movement of the loadlift fitted with mechanisms with the liftable-rotating balance bogies 55 (Figures 14, 15), proceed as follows. The freight elevator 17 is stopped in the axis of the extinguishing chamber 10, the lifting cylinders 62 are brought into play, the freight elevator 17 is raised to a certain height. Then the control 61 is started and the balance bogie motor 55 is turned by 900 so that its wheels are arranged in the axis of the rails 24 of the carcass 14 of the extinguishing chambers 10. Then the cylinders are disconnected 62 and the freight elevator descends on the rails 24. The bogie controls 55 are switched on and the freight elevator 17 rolls towards the extinguishing chamber 10. To return the freight elevator 17 to the boom 19, these operations are repeated in reverse order.

L'utilisation dans une cokerie de l'installation d'extinction sèche de coke qui fait l'objet de la présente invention permet de réduire le nombre de machines auxiliaires et d'accroître l'efficacité du fonctionnement de ladite installation, car l'estacade supplémentaire et le dispositif de déplacement du chariot de monte-charge dans un plan horizontal le long de l'estacade et perpendiculairement à celle-ci permettent le déplacement des montecharge dans deux directions réciproquement perpendiculaires, ce qui reduit à un minimum le traJet de ceux-ci. The use in a coking plant of the dry coke extinguishing installation which is the subject of the present invention makes it possible to reduce the number of auxiliary machines and to increase the operating efficiency of said installation, because the boom additional and the device for moving the goods lift carriage in a horizontal plane along and at right angles to the boom allow the goods to be moved in two mutually perpendicular directions, which reduces their traJet to a minimum this.

On obtient une diminution des pertes de coke et une réduction de l'action thermique exercée sur les structures métalliques des machines et l'équipement de l'installation d'extinction sèche de coke. This results in a reduction in coke losses and a reduction in the thermal action exerted on the metal structures of the machines and equipment of the dry coke quenching installation.

Les dispositifs de déplacement du chariot de monte-charge dont dispose chaque monte-charge permettent d'employer sur deux chambres vaines deux monte-charge simultanément et de desservir en même temps deux chambres d'extinction et deux wagons à coke, ce qui permet d'accrot- tre du même coup la manoeuvrabilité des wagons à coke.
D'autre part, le raccourcissement du trajet et de la durée de déplacement du monte-charge avec la benne et de la benne avec le coke incandescent au-dessus des structures de l'installation d'extinction sèche de coke (gracie au roulement des monte-charge sur l'estacade) permet d'augmenter sensiblement la durée de vie de l'installation. La haute manoeuvrabilité des machines permet aussi de réduire les éjections polluantes dans l'atmosphère.
The hoist trolley movement devices available to each hoist allow two hoists to be used simultaneously on two empty rooms and to serve two extinguishing chambers and two coke wagons at the same time, allowing '' increase the maneuverability of coke wagons at the same time.
On the other hand, the shortening of the journey and the duration of movement of the freight elevator with the bucket and of the bucket with the glowing coke above the structures of the dry coke extinguishing system (graceful to the rolling of hoist on the boom) significantly increases the service life of the installation. The high maneuverability of the machines also makes it possible to reduce polluting ejections into the atmosphere.

En réduisant le nombre de monte-charge et les frais de réparation et d'entretien de ceux-ci ainsi qu'en diminuant les pertes de coke, on obtient un effet économique considérable. En réduisant i un minimum les effets thermiques exercés sur les structures et les équipements , on arrive à accroitre la durée de vie de ceux-ci et à diminuer les dépenses de réparation. By reducing the number of hoists and their repair and maintenance costs, as well as reducing coke losses, a considerable economic effect is obtained. By reducing the thermal effects exerted on structures and equipment to a minimum, we can increase their service life and reduce repair costs.

Bien entendu, l'invention n'est nullement limitée aux modes de réalisation décrits et représentés qui n'ont été donnés qu'à titre d'exemple. En particulier, elle comprend tous les moyens constituant des équivalents techniques des moyens décrits ainsi que leurs combinaisons si celles-ci sont exécutées suivant son esprit et mises en oeuvre dans le cadre de la protection comme revendiquée. Of course, the invention is in no way limited to the embodiments described and shown which have been given only by way of example. In particular, it includes all the means constituting technical equivalents of the means described as well as their combinations if these are executed according to its spirit and implemented within the framework of protection as claimed.

Claims (6)

R E V E N D I C A T I O N SR E V E N D I C A T I O N S 1.- Installation d'extinction sèche de coke,' comprenant des chambres d'extinction verticales disposées suivant une rangée et équipées de dispositifs de chargement par le haut, des puits élévateurs situés chacun en regard de la chambre d'extinction correspondante, et des montecharge munis chacun d'un chariot pour déplacer la benne à coke, amende sur lui, depuis le puits élévateur jusqu'au dispositif de chargement de la chambre d'extinction correspondante et inversement, caractérisée en ce qu'elle est pourvue d'une estacade érigée le long des chambres d'extinction au niveau de la sortie des monte charge des puits élévateurs, et d'un dispositif-assurant le déplacement du chariot du monte-charge dans un plan horizontal sur l'extacade et perpendiculairement à celle-ci. 1.- Dry coke extinguishing installation, 'comprising vertical extinguishing chambers arranged in a row and equipped with top loading devices, lifting shafts each situated opposite the corresponding extinguishing chamber, and hoists each provided with a cart to move the coke bucket, fine on it, from the lifting shaft to the device for loading the corresponding extinguishing chamber and vice versa, characterized in that it is provided with a boom erected along the extinguishing chambers at the exit of the hoists from the elevating shafts, and a device ensuring the movement of the hoist's trolley in a horizontal plane on the jetty and perpendicular thereto. 2.- Installation selon la revendication 1, caractérisée en ce que le dispositif du d déplacement du chariot de monte-charge dans un plan horizontal sur l'estacade et perpendiculairement à celle-ci se présente sous forme d'une plate-forme prenant appui par son train de roulement sur l'estacade, et en ce que des rails posés sur cette plate-forme perpeadiculairement à l'axe longitudinal de l'estacade assurent le déplacement du chariot de monte-charge vers le trou de chargement de la chambre d'extinction correspondante a 2.- Installation according to claim 1, characterized in that the device for the movement of the lift carriage in a horizontal plane on the boom and perpendicular thereto is in the form of a platform supported by its running gear on the boom, and in that rails placed on this platform perpeadicular to the longitudinal axis of the boom ensure the movement of the lift carriage to the loading hole of the chamber d extinction corresponding to 3.- Installation selon la revendication 2, caractérisée en ee que l'estacade et la plate-forme prenant appui sur celle-ci par l'intermédiaire de son train de roulement sont situées d'un même cté des chambres d'extinction de sorte que l'axe longitudinal de l'estacade passe par le centre de chacun des trous des puits élévateurs.  3.- Installation according to claim 2, characterized in ee that the boom and the platform bearing on it via its undercarriage are located on the same side of the extinction chambers so that the longitudinal axis of the boom passes through the center of each of the holes in the elevator shafts. 4.- Installation selon l'une des revendications 1 et 2, caractérisée en ce que ladite plate-forme est située au-dessus des puits élévatours et des dispositifs de chargement des chambres d'extinction, son train de roulement prenant appui sur une estacade disposée de part et d'autre des chambres d'extinction. 4.- Installation according to one of claims 1 and 2, characterized in that said platform is located above the elevatours wells and devices for loading the extinguishing chambers, its running gear bearing on a boom arranged on either side of the extinguishing chambers. 5.- Installation selon l'une des revendications 1, à 4, caractérisée en ce que le dispositif de déplacement du chariot de monte-charge dans un plan horizontal sur l'estacade et perpendiculairement à celle-ci comprend quatre paires de bogies moteurs à balancier constituant le train de roulement du chariot de monte-charge, l'un des bogies à balancier de- chacunedesdites paires étant relevanle et disposé perpendiculairement à l'autre. 5.- Installation according to one of claims 1 to 4, characterized in that the device for moving the lift carriage in a horizontal plane on the boom and perpendicular thereto comprises four pairs of motor bogies with balance constituting the undercarriage of the goods lift carriage, one of the balance bogies of each of said pairs being lifted and arranged perpendicular to the other. 6.- Installation selon l'une des revendications 1 à 4, caractérisée en ce que le dispositif de déplacement du chariot de monte-charge dans un plan horizontal sur' l'estacade et perpendiculairement à celle-ci comprend quatre bogies moteurs à balancier constituant le train de roulement du chariot de monte-charge, chacun desdits bogies pouvant tourner autour d'un axe vertical, un vérin étant monté sur le chariot de monte-charge. 6.- Installation according to one of claims 1 to 4, characterized in that the device for moving the lift carriage in a horizontal plane on 'the boom and perpendicular thereto comprises four motor bogies with balance constituting the undercarriage of the goods lift carriage, each of said bogies being able to rotate about a vertical axis, a jack being mounted on the goods lift carriage.
FR8009909A 1980-04-30 1980-04-30 Coke dry-quenching plant - has great manoeuvrability of lifts and thus needs fewer auxiliary machines Granted FR2481711A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR8009909A FR2481711A1 (en) 1980-04-30 1980-04-30 Coke dry-quenching plant - has great manoeuvrability of lifts and thus needs fewer auxiliary machines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8009909A FR2481711A1 (en) 1980-04-30 1980-04-30 Coke dry-quenching plant - has great manoeuvrability of lifts and thus needs fewer auxiliary machines

Publications (2)

Publication Number Publication Date
FR2481711A1 true FR2481711A1 (en) 1981-11-06
FR2481711B1 FR2481711B1 (en) 1985-03-08

Family

ID=9241581

Family Applications (1)

Application Number Title Priority Date Filing Date
FR8009909A Granted FR2481711A1 (en) 1980-04-30 1980-04-30 Coke dry-quenching plant - has great manoeuvrability of lifts and thus needs fewer auxiliary machines

Country Status (1)

Country Link
FR (1) FR2481711A1 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR550431A (en) * 1921-07-13 1923-03-09 Gelsenkirchener Bergwerks Ag Gas cooling process for coke
DE2245571A1 (en) * 1972-09-16 1974-03-21 Krupp Gmbh ELEVATING CRANE
FR2420564A1 (en) * 1978-03-20 1979-10-19 Kawatetsu Chem Ind Co PROCESS FOR RECOVERING SUPERFLUUOUS GAS IN DRY EXTINGUISHING OF THE COKE AND APPARATUS THAT CAN BE USED FOR IMPLEMENTING THIS PROCESS

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR550431A (en) * 1921-07-13 1923-03-09 Gelsenkirchener Bergwerks Ag Gas cooling process for coke
DE2245571A1 (en) * 1972-09-16 1974-03-21 Krupp Gmbh ELEVATING CRANE
FR2420564A1 (en) * 1978-03-20 1979-10-19 Kawatetsu Chem Ind Co PROCESS FOR RECOVERING SUPERFLUUOUS GAS IN DRY EXTINGUISHING OF THE COKE AND APPARATUS THAT CAN BE USED FOR IMPLEMENTING THIS PROCESS
GB2018965A (en) * 1978-03-20 1979-10-24 Kawatetsu Chem Ind Co A process for recovering superfluous gas in coke dry quenching process and an apparatus therefor

Also Published As

Publication number Publication date
FR2481711B1 (en) 1985-03-08

Similar Documents

Publication Publication Date Title
US1522707A (en) Freight-handling system
EP0567475A1 (en) Automatic power-driven apparatus for storing objects, particularly motor vehicles.
CN111791787B (en) Automatic loading and unloading truck carriage
US20060182526A1 (en) Multi-trolley container crane
JP4958003B2 (en) Work equipment using transport carts
FR2481711A1 (en) Coke dry-quenching plant - has great manoeuvrability of lifts and thus needs fewer auxiliary machines
US3090502A (en) Apparatus for handling stacks of bricks
US4024023A (en) Apparatus and method for transferring hot coke to a dry coke cooler
FR2623891A1 (en) INSTALLATION FOR BRIQUETTING THE INNER WALL OF AN ENCLOSURE
US4028192A (en) Apparatus for receiving incandescent coke from respective coke ovens in a battery and for removing the coke in a closed chamber away from the battery
FR2510981A1 (en) AUTOMATIC HANDLING AND STORAGE EQUIPMENT
CN107794063B (en) Red coke transfer device and transfer method suitable for coke quenching
CN114735580A (en) Suspension type vanning device is used in copper strips production
US3370839A (en) Coil annealing apparatus
WO2020181380A1 (en) Handling device intended to transport an intervention tool for an electrolytic cell
JPS6092387A (en) Loading of red-hot coke in dry coke quencher
CN220318026U (en) Electroplating line feeding system
JPH02122014A (en) High efficient degassing apparatus
JPS6090292A (en) Coke conveying apparatus for facility for dry quenching of coke
JPH03194013A (en) Mooring facility in dam or the like and method of mooring ship
EP3357784B1 (en) Wagon and method for loading/unloading same
FR2924853A1 (en) NUCLEAR POWER PLANT COMPRISING AT LEAST ONE HIGH TEMPERATURE REACTOR.
US1555785A (en) Brick-setting apparatus
EP0477117B1 (en) Modular flexible thermic treatment device
JPS5854464Y2 (en) In-pit material handling device

Legal Events

Date Code Title Description
ST Notification of lapse