ES8304248A1 - Railway track reconditioning train. - Google Patents

Railway track reconditioning train.

Info

Publication number
ES8304248A1
ES8304248A1 ES511424A ES511424A ES8304248A1 ES 8304248 A1 ES8304248 A1 ES 8304248A1 ES 511424 A ES511424 A ES 511424A ES 511424 A ES511424 A ES 511424A ES 8304248 A1 ES8304248 A1 ES 8304248A1
Authority
ES
Spain
Prior art keywords
car
track
frame
excavator
train
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
ES511424A
Other languages
Spanish (es)
Other versions
ES511424A0 (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCHEUCHZER FILS AUGUSTE
Original Assignee
SCHEUCHZER FILS AUGUSTE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCHEUCHZER FILS AUGUSTE filed Critical SCHEUCHZER FILS AUGUSTE
Publication of ES8304248A1 publication Critical patent/ES8304248A1/en
Publication of ES511424A0 publication Critical patent/ES511424A0/en
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/02Removing or re-contouring ballast
    • E01B2203/024Inclined chain
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/03Displacing or storing ballast
    • E01B2203/034Displacing or storing ballast using storing containers
    • E01B2203/038Displacing or storing ballast using storing containers detachable from the vehicle
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/08Levelling ballast or ground beneath
    • E01B2203/083Ploughs
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/08Levelling ballast or ground beneath
    • E01B2203/086Rotating brooms
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/12Tamping devices
    • E01B2203/127Tamping devices vibrating the track surface
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/14Way of locomotion or support
    • E01B2203/141Way of locomotion or support on the track to be treated

Abstract

1. Train for renewing a railway track, which comprises a working car (3) consisting of a frame-car with an empty frame of a length (L) in excess of the length (l) of one track span, said car having two trucks, the rear truck (5) being on the new track and the front truck (4) on the old track and, ahead of said frame-car, a set of cars provided with equipments for loading the excavation and, at the rear of said frame-car, transport cars for transporting the track spans, the sand and the ballast, guide rails installed on said transport cars and said rame-car, two gantries (9) adapted to roll on said guide rails installed on said transport cars and said frame-car, said gantries supporting hoisting means for lifting a track span and means for handling buckets (11) for transporting the sand and ballast, and a rolling truck (10) movable on said guide rails ahead of said two gantries and from which at least one vertically adjustable excavator (12) is suspended, said excavator covering either the full width of the excavation or only a reduced width and being movable laterally or adapted to pivot for excavating the ballast, characterized in that said train is adapted to perform also the draining of the railway track and comprises for this purpose an adjustable digging device (16, 20) mounted at the rear of said excavator (12), and consisting preferably of an endless chain (14) associated with helical transverse fins (15, 15'), said digging device being provided with hydraulic cylinders (28, 29) for moving same in the vertical and longitudinal plane, said digging device being so designed that it can dig to a depth greater than the excavator and covers the full excavation width.
ES511424A 1982-02-09 1982-04-14 IMPROVEMENTS IN A TRAIN FOR THE RENOVATION OF A RAILWAY. Granted ES511424A0 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP82200150A EP0085790B1 (en) 1982-02-09 1982-02-09 Railway track reconditioning train

Publications (2)

Publication Number Publication Date
ES8304248A1 true ES8304248A1 (en) 1983-02-16
ES511424A0 ES511424A0 (en) 1983-02-16

Family

ID=8189460

Family Applications (1)

Application Number Title Priority Date Filing Date
ES511424A Granted ES511424A0 (en) 1982-02-09 1982-04-14 IMPROVEMENTS IN A TRAIN FOR THE RENOVATION OF A RAILWAY.

Country Status (6)

Country Link
EP (1) EP0085790B1 (en)
AT (1) ATE15088T1 (en)
CA (1) CA1201937A (en)
DD (1) DD209006A5 (en)
DE (1) DE3265499D1 (en)
ES (1) ES511424A0 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5664498A (en) * 1995-10-31 1997-09-09 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal machgine

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1209585B (en) * 1961-02-23 1966-01-27 Mannix Co Ltd Device for clearing out ballast under a track
CH583822A5 (en) * 1974-07-11 1977-01-14 Scheuchzer Auguste Les Fils De
US4102066A (en) * 1977-05-11 1978-07-25 Christoff James W Scarifying apparatus and method for railroad bed ballast removal
CH620005A5 (en) * 1978-04-19 1980-10-31 Scheuchzer Auguste Les Fils D
EP0028668B1 (en) * 1979-11-08 1984-04-18 Les Fils D'auguste Scheuchzer S.A. Train for stabilising a railway track

Also Published As

Publication number Publication date
DE3265499D1 (en) 1985-09-26
DD209006A5 (en) 1984-04-18
EP0085790A1 (en) 1983-08-17
ATE15088T1 (en) 1985-09-15
ES511424A0 (en) 1983-02-16
EP0085790B1 (en) 1985-08-21
CA1201937A (en) 1986-03-18

Similar Documents

Publication Publication Date Title
US4160418A (en) Mobile apparatus for continuous track renewal
US4357874A (en) Mobile arrangement and method for improving a track bed
ES479737A1 (en) Train for the renewal of a railway track.
US4211170A (en) Mobile apparatus for the continuous replacement of an old track by a new track
AU639636B2 (en) A loading vehicle for receiving, moving along and discharging bulk material
US4542697A (en) Train for laying a new railroad track
GB1423285A (en) On-track ballast cleaning machine
ATE119112T1 (en) SPECIAL CAR FOR COLLECTING OR DISTRIBUTING RAILWAY BOGIES OR THE LIKE FOR THE RAIL TRANSPORT OF HEAVY-DUTY ROAD VEHICLES.
CA2212997C (en) A track maintenance machine for excavating ballast bed material
US6006894A (en) Low vein mobile bridge carrier hydraulic haulage system
US4681205A (en) Displaceable inclined hoist
DE3265499D1 (en) Railway track reconditioning train
DE3570099D1 (en) Train for the renewal of tracks provided with supporting and guiding means for its advance
US2696791A (en) Equipment for the laying ahead of railroad tracks by means of completely assembled sections
EP0768426A1 (en) Railway truck assembly
US4400897A (en) Method and railway train for draining a railway track
JP2539151B2 (en) Excavation method for bottom floor in tunnel
US4319416A (en) Method for draining a railway track and a railway train for use in said method
US4316416A (en) Mobile apparatus for replacing old track ties by new track ties
JP2873818B1 (en) Continuous belt conveyor support mechanism in tunnel excavation
US2873866A (en) Material handling apparatus
EP1348057A1 (en) Ballast removal method and apparatus
PL173312B1 (en) Machine for treating the railway track ballast aggregate
PL129474B1 (en) Mobile machine for track work
US3548750A (en) Mobile mechanized track layer