Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
VILA-CORO BARRACHINA JOSE MARIA
Original Assignee
VILA-CORO BARRACHINA JOSE MARIA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by VILA-CORO BARRACHINA JOSE MARIAfiledCriticalVILA-CORO BARRACHINA JOSE MARIA
Priority to ES469453ApriorityCriticalpatent/ES469453A1/en
Publication of ES469453A1publicationCriticalpatent/ES469453A1/en
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
Abstract
This invention refers to a new formwork system for the construction of floor slabs,said formwork system being premounted in the form of self-supporting plates of variable dimensions, with the inclusion, at the time of the premounting of the formwork, of the steel bar reinforcement of the slabs, and moveable -thanks to their rigidity- from the place of their premounting to their place of use in the construction of the slabs.
ES469453A1978-05-041978-05-04Improvements made to the formwork for the construction of floor slabs.
ExpiredES469453A1
(en)