Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sante DoriofiledCriticalSante Dorio
Priority to IT8185638ApriorityCriticalpatent/IT1208081B/en
Publication of IT8185638A0publicationCriticalpatent/IT8185638A0/en
Application grantedgrantedCritical
Publication of IT1208081BpublicationCriticalpatent/IT1208081B/en
PROCEDURE FOR THE ASSEMBLY AND DISMANTLING OF FORMWORK FOR SLABS FOR CONCRETE CONSTRUCTION WORKS, AS WELL AS FORMWORK FOR SLABS FOR THE IMPLEMENTATION OF THE PROCEDURE.
REINFORCEMENT FOR CONSTRUCTION IN REINFORCED CONGLOMERATE, SUCH AS REINFORCED CONCRETE, PARTICULARLY FOR BUILDING, AND CONSTRUCTION METHOD USING SUCH REINFORCEMENT.