ES319410A1 - Improvements introduced in the construction of floor forgings (Machine-translation by Google Translate, not legally binding)
- Google Patents
Improvements introduced in the construction of floor forgings (Machine-translation by Google Translate, not legally binding)
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HIPERVIBRADOS DE CEMENTO SOC A
Original Assignee
HIPERVIBRADOS DE CEMENTO SOC A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HIPERVIBRADOS DE CEMENTO SOC AfiledCriticalHIPERVIBRADOS DE CEMENTO SOC A
Priority to ES0319410ApriorityCriticalpatent/ES319410A1/en
Publication of ES319410A1publicationCriticalpatent/ES319410A1/en
Improvements introduced in the construction of floor slabs, which are characterized by the fact that the prefabricated pieces are arranged on a support platform forming parallel rows with separation streets between them, in whose streets are longitudinally arranged the reinforcing irons that are conveniently hold at both ends and in these streets is poured the concrete mortar that fills channels or longitudinal depressions of adequate depth and section, provided on the sides of the pieces so that the reinforced joists armed and thus forged in these streets have two longitudinal anchoring ribs that are housed in the lateral channels that originally have been provided in the vaults, which increase the strength of these and the whole of the floor thus obtained. (Machine-translation by Google Translate, not legally binding)
ES0319410A1965-11-091965-11-09Improvements introduced in the construction of floor forgings (Machine-translation by Google Translate, not legally binding)
ExpiredES319410A1
(en)
Procedure for the construction of a metallic tubular element structure for the coverage or separation of two superposed floors of a building. (Machine-translation by Google Translate, not legally binding)
Prefabricated set for the forging of reticular ceilings of armed, pretensed or postensed concrete. (Machine-translation by Google Translate, not legally binding)
Prefabricated piece in armed, pretensed or postensed concrete for the construction of covers. (Machine-translation by Google Translate, not legally binding)