ES2564526T3 - Barrier border node and procedure to establish a connection between barrier border nodes - Google Patents

Barrier border node and procedure to establish a connection between barrier border nodes

Info

Publication number
ES2564526T3
ES2564526T3 ES09812652.7T ES09812652T ES2564526T3 ES 2564526 T3 ES2564526 T3 ES 2564526T3 ES 09812652 T ES09812652 T ES 09812652T ES 2564526 T3 ES2564526 T3 ES 2564526T3
Authority
ES
Spain
Prior art keywords
block
information
subnet
connection
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
ES09812652.7T
Other languages
Spanish (es)
Inventor
Gang Xie
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Application granted granted Critical
Publication of ES2564526T3 publication Critical patent/ES2564526T3/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/60Router architectures
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/02Topology update or discovery
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L45/00Routing or path finding of packets in data switching networks
    • H04L45/62Wavelength based
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/70Admission control; Resource allocation
    • H04L47/78Architectures of resource allocation
    • H04L47/783Distributed allocation of resources, e.g. bandwidth brokers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0073Provisions for forwarding or routing, e.g. lookup tables

Abstract

Nodo frontera de un bloque que comprende un controlador de conexión (20), un administrador de recursos de enlace (21) y un controlador del recorrido (22), teniendo el nodo frontera de bloque información del bloque sobre la conversión de longitud de onda, caracterizado porque, el controlador de conexión (20) está configurado para enviar una solicitud para consultar la información del bloque al administrador (21) de recursos de enlace tras recibir un mensaje de solicitud de conexión, consultar y verificar la información del bloque de un punto de entrada de la subred de un terminal local, consultar la información del bloque de un punto de salida de la subred de un nodo frontera de salida una vez ha pasado la verificación y enviar una solicitud de consulta del recorrido al controlador de recorrido utilizando la información del bloque del punto de entrada de la subred del terminal local y la información del bloque del punto de salida de la subred del nodo frontera de salida como parámetros de consulta; el administrador (21) de recursos de enlace está configurado para alimentar la información del bloque del punto de entrada de la subred del terminal local de nuevo al controlador de conexión (20) en respuesta a la solicitud para consultar la información del bloque del controlador de conexión (20); y el controlador de recorrido (22) está configurado para proporcionar una información de recorrido para establecer una conexión en respuesta a la solicitud de consulta del recorrido; en el que la información del bloque del punto de entrada de la subred comprende la intercambiabilidad entre el punto de entrada de la subred y otros puntos de la subred del terminal local en un dominio de recorrido, y la información del bloque del punto de salida de la subred comprende la intercambiabilidad entre el punto de salida de la subred y otros puntos de la subred del nodo frontera de salida en el dominio de recorrido.Border node of a block comprising a connection controller (20), a link resource manager (21) and a route controller (22), the block border node having block information about wavelength conversion, characterized in that, the connection controller (20) is configured to send a request to consult the block information to the link resource manager (21) after receiving a connection request message, query and verify the information of the block of a point input of the subnet of a local terminal, check the information of the block of an exit point of the subnet of an exit border node once the verification has passed and send a request to consult the route to the route controller using the information of the block of the entry point of the subnet of the local terminal and the information of the block of the exit point of the subnet of the exit border node as query parameters; the link resource manager (21) is configured to feed the block information from the local terminal subnet entry point back to the connection controller (20) in response to the request to query the block controller information from connection (20); and the route controller (22) is configured to provide a route information to establish a connection in response to the request for route consultation; wherein the subnet entry point block information comprises the interchangeability between the subnet entry point and other subnet points of the local terminal in a travel domain, and the information of the exit point block of The subnet comprises the interchangeability between the subnet exit point and other subnet points of the exit border node in the path domain.

Description

55

1010

15fifteen

20twenty

2525

3030

3535

4040

45Four. Five

50fifty

5555

6060

6565

DESCRIPCIONDESCRIPTION

Nodo frontera de barrera y procedimiento para establecer una conexion entre nodos frontera de barrera Sector tecnicoBarrier border node and procedure to establish a connection between barrier border nodes Technical sector

La presente invencion se refiere a una tecnologla de red optica inteligente y, mas particularmente, a un nodo frontera de bloque de una red optica inteligente y a un procedimiento para establecer una conexion entre nodos de frontera de bloque.The present invention relates to an intelligent optical network technology and, more particularly, to a block border node of an intelligent optical network and a method for establishing a connection between block border nodes.

Antecedentes de la tecnicaBackground of the technique

Con la aplicacion en masa de la tecnologla de redes opticas inteligentes, se ha desarrollado la construccion y el desarrollo de una red de transporte a partir de la tecnologla de transporte con un hardware unico a una tecnologla de transporte completa que integra la tecnologla de gestion de la red, la tecnologla de control y la tecnologla del hardware. Con la ayuda de un plano de control de la red optica inteligente, se mejora la fiabilidad de la red y los nuevos servicios de ancho de banda, tales como la red optica virtual privada (OVPN) y el ancho de banda bajo demanda (BoD), pueden ser proporcionados tambien rapidamente, ofreciendo as! una eficiencia mejorada y un coste reducido del funcionamiento y mantenimiento de la red.With the mass application of the technology of intelligent optical networks, the construction and development of a transport network has been developed from the transport technology with a unique hardware to a complete transport technology that integrates the management technology of the network, the control technology and the hardware technology. With the help of an intelligent optical network control plane, the reliability of the network and new bandwidth services, such as private virtual optical network (OVPN) and bandwidth on demand (BoD) are improved , can also be provided quickly, offering as! an improved efficiency and a reduced cost of the operation and maintenance of the network.

No obstante, dado que los tipos de servicios son cada vez mas variados, la proporcion de ancho de banda, especialmente consumida por los servicios de paquetes es cada vez mas elevada, y la granularidad del servicio es cada vez mas grande tambien. Un dispositivo de jerarquia digital sincrona (SDH) o de red optica sincrona (SONET) que esta disenado originalmente para soporte de voz no ha satisfecho el desarrollo de aplicaciones futuras, y de este modo, la red optica inteligente tiene una tendencia imparable a evolucionar de una red SDH a una red de transporte optica.However, given that the types of services are increasingly varied, the proportion of bandwidth, especially consumed by package services, is increasingly high, and the granularity of the service is getting bigger as well. A synchronous digital hierarchy (SDH) or synchronous optical network (SONET) device that is originally designed for voice support has not satisfied the development of future applications, and thus, the intelligent optical network has an unstoppable tendency to evolve from an SDH network to an optical transport network.

La transmision de servicios con una gran granularidad desafla la capacidad de preparacion de servicios de un nodo de multiplexacion por division de longitud de onda (WDM). Recientemente, se ha obtenido un gran avance en la tecnologla de multiplexacion optica reconfigurable de extraccion e insercion (ROADM) y la tecnologla basada en sistemas microelectromecanicos (MEMS), tales como un conmutador selectivo por longitud de onda (WSS), soluciona el problema de la reconfigurabilidad de una longitud de onda optica de tal manera que la conversion flexible ascendente y descendente y la penetracion de la longitud de onda optica pueden ser implementadas hasta cierto punto. Ademas, la ROADM no requiere utilizar la conversion optica-electrica-optica (OEO) durante la transmision de una senal de una red a otra, de manera que se puede eliminar el coste de la conversion optica- electrica-optica. Muchos fabricantes de esta industria han dado a conocer un sistema WDM con propiedades reconfigurables de la capa optica. Ademas, en vista de las ventajas de la OTN sobre el sistema por division de la longitud de onda en terminos de una definicion del nodo y de la gestion integral, la OTN empieza a aparecer en dispositivos de transmision comerciales. En consecuencia, se introducen requisitos de control dinamico de la longitud de onda o de la sublongitud de onda, como con una red optica con conmutacion automatica (ASON) para un multiplexor de extraccion e insercion (ADM) del SDH/SONET.The transmission of services with a great granularity challenges the service preparation capacity of a wavelength division multiplexing node (WDM). Recently, great progress has been made in reconfigurable optical extraction and insertion multiplexing technology (ROADM) and microelectromechanical systems (MEMS) based technology, such as a selective wavelength switch (WSS), solves the problem of reconfigurability of an optical wavelength such that flexible upward and downward conversion and optical wavelength penetration can be implemented to some extent. In addition, ROADM does not require the use of optical-electrical-optical conversion (OEO) during the transmission of a signal from one network to another, so that the cost of optical-electrical-optical conversion can be eliminated. Many manufacturers in this industry have unveiled a WDM system with reconfigurable properties of the optical layer. Furthermore, in view of the advantages of the OTN over the system by division of the wavelength in terms of a definition of the node and of the integral management, the OTN begins to appear in commercial transmission devices. Consequently, dynamic wavelength or wavelength control requirements are introduced, as with an optical network with automatic switching (ASON) for an SDH / SONET extraction and insertion multiplexer (ADM).

No obstante, debido a que la ROADM no requiere el uso de la conversion OEO, unicamente se puede volver a asignar la direccion de la longitud de onda y no se puede llevar a cabo la conversion de la longitud de onda, de manera que no esta totalmente sin bloqueo en la conversion de la longitud de onda. Aunque se puede introducir un dispositivo de conversion OEO en la ROADM para implementar la conversion de la longitud de onda, no se puede implementar la conversion de longitud de onda totalmente sin bloqueo debido a limitaciones de coste y a la capacidad de conversion de los dispositivos OEO.However, because ROADM does not require the use of OEO conversion, only the wavelength address can be reassigned and the wavelength conversion cannot be performed, so it is not totally without blocking in the wavelength conversion. Although an OEO conversion device can be introduced into the ROADM to implement the wavelength conversion, the wavelength conversion cannot be fully implemented without blocking due to cost limitations and the conversion capability of the OEO devices.

Actualmente, existen dos procedimientos de procesamiento para la informacion del bloque descrita anteriormente. El primer procedimiento es notificar a cada nodo de la informacion del bloque empleando informacion del recorrido de la inundacion y llevando a cabo un calculo del recorrido teniendo en cuenta la informacion del bloque a efectos de asegurar que el recorrido calculado es intercambiable en cada nodo. El Indice de exitos de establecimiento de una conexion entre recorridos que son calculados por este procedimiento es elevado, pero es necesario anadir una gran inundacion de informacion. El segundo procedimiento es no desbordar la inundacion de informacion del bloque y no reservar recursos especificos durante el reenvio de la senalizacion cuando se establece la conexion, sino ofrecer una gama de recursos disponibles y finalmente seleccionar los recursos a utilizar segun la gama anteriormente ofrecida a un nodo objetivo. Este procedimiento no necesita anadir una inundacion de informacion adicional, pero el Indice de exitos en el establecimiento de la conexion entre los recorridos calculados es bajo.Currently, there are two processing procedures for the block information described above. The first procedure is to notify each node of the block information using flood path information and carrying out a route calculation taking into account the block information in order to ensure that the calculated route is interchangeable in each node. The success rate of establishing a connection between routes that are calculated by this procedure is high, but it is necessary to add a large flood of information. The second procedure is not to overflow the flood of information of the block and not to reserve specific resources during the signaling forwarding when the connection is established, but to offer a range of available resources and finally select the resources to be used according to the range previously offered to a target node This procedure does not need to add a flood of additional information, but the success rate in establishing the connection between the calculated routes is low.

El documento US 2007/160039 A1 da a conocer un procedimiento para identificar la accesibilidad del nodo, un procedimiento para identificar si un enlace es un enlace externo, un procedimiento para calcular un recorrido y un procedimiento para difundir la informacion de la direccion del nodo. En el procedimiento de difusion de la informacion de la direccion del nodo, cuando se inicia la red, cada nodo de la red optica con conmutacion automatica lleva a cabo un proceso de incorporacion de la direccion del nodo y un proceso de difusion de la direccion agregada y obtiene y almacena las direcciones agregadas respectivamente. Por tanto, cualquier nodo de la red puede decidir siDocument US 2007/160039 A1 discloses a procedure to identify the accessibility of the node, a procedure to identify if a link is an external link, a procedure to calculate a route and a procedure to disseminate the node address information. In the process of dissemination of the node address information, when the network is started, each node of the optical network with automatic switching performs a process of incorporating the node address and a process of diffusion of the aggregate address and get and store the aggregate addresses respectively. Therefore, any node in the network can decide whether

55

1010

15fifteen

20twenty

2525

3030

3535

4040

45Four. Five

50fifty

5555

6060

6565

el nodo y otro nodo de la red son accesibles entre si, y puede, ademas, calcular el recorrido entre el par de nodos origen y destino.the node and another node of the network are accessible to each other, and can also calculate the path between the pair of origin and destination nodes.

El documento EP 1460808 A2 da a conocer un procedimiento y un sistema para implementar una tecnica de primera trayectoria mas corta en base a restricciones de interdominio (“IrD-CSPF”) para soportar un recorrido jerarquico en redes OTN de multidominio interconectadas. El documento US 6801496 B1 da a conocer un esquema de direcciones de red para reducir la cabecera del protocolo en una red optica, un procedimiento para hacer funcionar una red y una arquitectura de red que implementa el procedimiento. El documento EP 1936911 A1 da a conocer un procedimiento y un dispositivo para establecer un servicio de conexion de red en una red optica de intercambio automatico.EP 1460808 A2 discloses a procedure and a system to implement a shorter first-path technique based on inter-domain restrictions ("IrD-CSPF") to support a hierarchical path in interconnected multidomain OTN networks. US 6801496 B1 discloses a network address scheme to reduce the protocol header in an optical network, a procedure for operating a network and a network architecture that implements the procedure. EP 1936911 A1 discloses a procedure and a device for establishing a network connection service in an optical automatic exchange network.

En el documento no patentado PROYECTO DE RECOMENDACION ITU-T G 7715/Y 1706: “Arquitectura y requisitos para el recorrido en la red optica con conmutacion automatica", PROYECTO DE ESTUDIO ITU-T DURANTE EL PERIODO 2001-2004, UNION INTERNACIONAL DE TELECOMUNICACIONES, GINEBRA, CH, 21 de mayo de 2002 (2002-05-21), paginas 1 a 32, XP002461480, da a conocer una recomendacion que especifica los requisitos y la arquitectura para las funciones de recorrido utilizadas para el establecimiento de conexiones conmutadas (SC) y de conexiones blandas permanentes (SPC) dentro de la estructura de red de la red optica con conmutacion automatica (ASON).In the non-patented document ITU-T RECOMMENDATION PROJECT G 7715 / Y 1706: "Architecture and requirements for the route in the optical network with automatic switching", ITU-T STUDY PROJECT DURING THE PERIOD 2001-2004, INTERNATIONAL TELECOMMUNICATIONS UNION , GENEVA, CH, May 21, 2002 (2002-05-21), pages 1 to 32, XP002461480, discloses a recommendation that specifies the requirements and architecture for the route functions used for establishing switched connections ( SC) and permanent soft connections (SPC) within the network structure of the automatic switching optical network (ASON).

En el documento no patentado de TOMONORI TAKEDA y otros: “Diversos esquemas de configuration de trayectorias en redes opticas multidominio", COMUNICACIONES, REDES Y SISTEMAS DE BANDA ANCHA, 2008. BROADNETS 2008. 5a CONFERENCIA INTERNACIONAL, IEEE, PISCATAWAY, NJ, U.S.A., 8 de septiembre de 2008 (2008-09-08), paginas 523 a 530, XP03141479, se da a conocer un nuevo esquema para la configuracion de diversos recorridos en redes de multidominio para vencer las deficiencias de los esquemas existentes. El esquema propuesto es capaz de encontrar diversos recorridos a suficiente nivel, aun manteniendo su simplicidad. Posteriormente, este documento presenta la aplicabilidad del esquema propuesto conjuntamente con los esquemas existentes considerando diversos aspectos, incluyendo la cuantificacion de la capacidad de encontrar diversos recorridos.In the non-patented document of TOMONORI TAKEDA and others: "Various trajectory configuration schemes in multi-domain optical networks", COMMUNICATIONS, NETWORKS AND WIDE BAND SYSTEMS, 2008. BROADNETS 2008. 5th INTERNATIONAL CONFERENCE, IEEE, PISCATAWAY, NJ, USA, September 8, 2008 (2008-09-08), pages 523 to 530, XP03141479, a new scheme for the configuration of various routes in multi-domain networks to overcome the deficiencies of existing schemes is announced. capable of finding several routes at a sufficient level, while maintaining its simplicity.Then, this document presents the applicability of the proposed scheme together with the existing schemes considering various aspects, including the quantification of the ability to find different routes.

Caracterlsticas de la inventionCharacteristics of the invention

La presente invencion da a conocer un nodo frontera de bloque y un procedimiento para el establecimiento de una conexion entre nodos frontera de bloque a efectos de reducir de manera eficiente la inundation de mensajes de information del bloque con la premisa de asegurar el Indice de exitos de establecimiento de la conexion mediante el procesamiento independiente de la informacion del bloque de un punto de la subred frontera de un nodo frontera en un dominio de recorrido y la informacion del bloque de un punto de la subred en el dominio de recorrido.The present invention discloses a block boundary node and a procedure for establishing a connection between block boundary nodes in order to efficiently reduce the establishment of information messages from the block with the premise of ensuring the Success Index of establishment of the connection by independent processing of the block information of a point of the border subnet of a border node in a travel domain and the information of the block of a point of the subnet in the travel domain.

Las caracterlsticas del nodo frontera de bloque y el procedimiento segun la presente invencion se definen en las reivindicaciones independientes, y las caracterlsticas preferentes segun la presente invencion se definen en las reivindicaciones dependientes.The characteristics of the block border node and the method according to the present invention are defined in the independent claims, and the preferred features according to the present invention are defined in the dependent claims.

El esquema tecnico de la presente invencion se describira a continuation.The technical scheme of the present invention will be described below.

La presente invencion da a conocer un nodo frontera de bloque que comprende un controlador de conexion, un administrador de recursos de enlace y un controlador de recorrido, en que:The present invention discloses a block border node comprising a connection controller, a link resource manager and a route controller, in which:

El controlador de conexion esta configurado para enviar una solicitud de consulta de informacion del bloque al administrador de recursos de enlace tras recibir un mensaje de solicitud de conexion y verificar la informacion del bloque consultado al terminal local, consultar la informacion del bloque de un nodo frontera de salida tras pasar la verification y enviar una solicitud de consulta del recorrido al controlador de recorrido utilizando la informacion del bloque del terminal local y la informacion del bloque del nodo frontera de salida como parametros de consulta.The connection controller is configured to send a request for information on the block to the link resource manager after receiving a connection request message and verify the information of the block consulted to the local terminal, consult the information of the block of a border node of exit after passing the verification and sending a request for a route query to the route controller using the information of the local terminal block and the information of the exit border node block as query parameters.

El administrador de recursos de enlace esta configurado para alimentar la informacion del bloque del terminal local de nuevo al controlador de conexion en respuesta a la solicitud de consulta de informacion del bloque del controlador de conexion.The link resource manager is configured to feed the information from the local terminal block back to the connection controller in response to the request for information on the connection controller block.

El controlador de recorrido esta configurado para proporcionar la informacion del recorrido para establecer una conexion en respuesta a la solicitud de consulta del recorrido.The travel controller is configured to provide the travel information to establish a connection in response to the request for travel consultation.

Preferentemente, el controlador de conexion esta configurado, ademas, para actualizar la informacion del bloque almacenada en el terminal local tras recibir un mensaje de actualization de la informacion del bloque del terminal local.Preferably, the connection controller is also configured to update the information of the block stored in the local terminal after receiving an update message of the information of the local terminal block.

Preferentemente, el controlador de conexion esta configurado, ademas, para recibir un mensaje de actualizacion de la informacion del bloque de un nodo frontera distal y a continuacion actualizar la informacion del bloque del nodo frontera de salida almacenada en el terminal local segun el mensaje de actualizacion de la informacion del bloquePreferably, the connection controller is further configured to receive an update message of the block information of a distal boundary node and then update the information of the output boundary node block stored in the local terminal according to the update message of block information

55

1010

15fifteen

20twenty

2525

3030

3535

4040

45Four. Five

50fifty

5555

6060

6565

del nodo frontera distal.of the distal border node.

La presente invencion da a conocer un procedimiento para establecer una conexion entre bloques de nodos frontera que comprende las siguientes etapas:The present invention discloses a procedure for establishing a connection between boundary node blocks comprising the following steps:

A. Un nodo frontera de entrada consulta y verifica la informacion del bloque de un punto de entrada de la subred en una subred de entrada tras la recepcion de un mensaje de solicitud de establecimiento de conexion y envia la solicitud de consulta de informacion del bloque a un nodo frontera de salida tras una verificacion con exito;A. An entry border node consults and verifies the block information of an entry point of the subnet in an input subnet upon receipt of a connection establishment request message and sends the request for information about the block to an exit border node after a successful verification;

B. un nodo frontera de salida consulta y verifica la informacion del bloque de un punto de salida de la subred, en una subred de salida tras la recepcion de una solicitud de consulta de informacion del bloque y envia la informacion del bloque del punto de salida de la subred al nodo frontera de entrada tras una verificacion con exito;B. an exit border node consults and verifies the block information of an exit point of the subnet, in an exit subnet after receiving a request for information on the block information and sends the information of the block of the exit point from the subnet to the entry boundary node after a successful verification;

C. el nodo frontera de entrada consulta el recorrido utilizando la informacion del bloque del punto de entrada en la subred y del punto de salida de la subred como parametros de consulta, y envia un mensaje de solicitud de conexion al nodo frontera de salida cuando la consulta del recorrido tiene exito; yC. the entry border node consults the route using the information of the block of the entry point in the subnet and the exit point of the subnet as query parameters, and sends a connection request message to the exit border node when the travel consultation is successful; Y

D. el nodo frontera de entrada recibe un mensaje de confirmacion de la conexion devuelto por el nodo frontera de salida, completando asi el establecimiento de la conexion.D. the entry border node receives a confirmation message of the connection returned by the exit border node, thus completing the connection establishment.

Preferentemente, en la etapa A, el nodo frontera de entrada verifica el mensaje de solicitud de establecimiento de la conexion tras recibir el mensaje de solicitud de establecimiento de la conexion, consulta y verifica la informacion del bloque del punto de entrada de la subred en la subred de entrada si pasa la verificacion, y devuelve una respuesta de fallo de la solicitud de conexion si no pasa la verificacion, y el procedimiento finaliza.Preferably, in step A, the entry border node verifies the connection establishment request message after receiving the connection establishment request message, consults and verifies the information of the subnet entry point block in the input subnet if the verification passes, and returns a failure response from the connection request if the verification does not pass, and the procedure ends.

Preferentemente, en la etapa C, el nodo frontera de salida inicia la monitorizacion de la informacion del bloque tras recibir el mensaje de solicitud de conexion; y en la etapa D, el nodo frontera de entrada inicia la monitorizacion de la informacion del bloque tras la recepcion del mensaje de confirmacion de la conexion.Preferably, in step C, the exit border node starts monitoring the block information after receiving the connection request message; and in step D, the entry boundary node starts monitoring the block information upon receipt of the connection confirmation message.

Preferentemente, una vez se ha establecido la conexion, el nodo frontera de entrada actualiza la informacion del bloque del punto de entrada de la subred del terminal local almacenada localmente cuando se detectan cambios en la informacion del bloque del punto de entrada de la subred del terminal local.Preferably, once the connection is established, the entry border node updates the information of the locally stored subnet entry point block locally when changes in the information of the subnet entry point of the terminal subnet are detected. local.

Preferentemente, una vez se ha establecido la conexion, el nodo frontera de salida envia un mensaje de actualizacion de la informacion del bloque al nodo frontera de entrada cuando se detectan cambios en la informacion del bloque del punto de salida de la subred del terminal local, y el nodo frontera de entrada actualiza la informacion del bloque del punto de salida de la subred del nodo frontera de salida almacenada localmente segun el mensaje de actualizacion de la informacion del bloque.Preferably, once the connection has been established, the exit border node sends an update message of the block information to the entry border node when changes in the block information of the exit point of the subnet of the local terminal are detected, and the input border node updates the block information of the output point of the subnet of the output border node stored locally according to the update information of the block information.

Preferentemente, el nodo frontera de entrada recibe una solicitud de liberacion de la conexion y a continuacion finaliza la monitorizacion de la informacion del bloque del terminal local y envia la solicitud de liberacion de la conexion al nodo frontera de salida y el nodo frontera de salida finaliza la monitorizacion de la informacion del bloque del terminal local tras la recepcion de la solicitud de liberacion de la conexion y envia un mensaje de confirmacion de la liberacion de la conexion al nodo frontera de entrada tras procesar la solicitud de liberacion de la conexion.Preferably, the entry border node receives a request for connection release and then the monitoring of the information of the local terminal block is completed and sends the request for connection release to the exit border node and the exit border node terminates the monitoring of the information of the local terminal block upon receipt of the connection release request and sends a confirmation message of the connection release to the entry border node after processing the connection release request.

En comparacion con la tecnica anterior, la presente invencion procesa independientemente la informacion del bloque de un punto de la subred frontera de un nodo frontera en un dominio de recorrido y bloquea la informacion de un punto de la subred en el dominio de recorrido a efectos de reducir de manera eficiente los mensajes de inundacion de la informacion del bloque con la premisa de asegurar el indice de exitos de establecimiento de la conexion. En comparacion con el primer procedimiento segun la tecnica anterior, la presente invencion puede reducir de manera eficiente los mensajes de inundacion no validos y mantener el mismo indice de exitos de establecimiento de la conexion, mientras que si se compara con el segundo procedimiento segun la tecnica anterior, la presente invencion puede mejorar el indice de exitos de establecimiento de la conexion de manera significativa.In comparison with the prior art, the present invention independently processes the block information of a point of the border subnet of a border node in a travel domain and blocks the information of a point of the subnet in the travel domain for the purpose of Efficiently reduce the flood messages of the block information with the premise of ensuring the success rate of connection establishment. Compared to the first procedure according to the prior art, the present invention can efficiently reduce invalid flood messages and maintain the same rate of connection establishment successes, while compared to the second procedure according to the technique. above, the present invention can improve the success rate of connection establishment significantly.

Breve descripcion de los dibujosBrief description of the drawings

La figura 1 es un diagrama de bloques de un nodo frontera de bloque segun la presente invencion;Figure 1 is a block diagram of a block boundary node according to the present invention;

la figura 2 es un diagrama de flujo de un procedimiento para el establecimiento de una conexion entre nodos frontera del bloque segun la presente invencion;Figure 2 is a flow chart of a procedure for establishing a connection between boundary nodes of the block according to the present invention;

la figura 3 es un diagrama esquematico de una topologia de red segun una realizacion de la presente invencion;Figure 3 is a schematic diagram of a network topology according to an embodiment of the present invention;

la figura 4 es un diagrama de flujo en el que un nodo frontera establece una conexion en el caso de encontrar resistencia segun una realizacion de la presente invencion;Figure 4 is a flowchart in which a boundary node establishes a connection in the case of finding resistance according to an embodiment of the present invention;

55

1010

15fifteen

20twenty

2525

3030

3535

4040

45Four. Five

50fifty

5555

6060

6565

la figura 5 es un diagrama de flujo en el que el nodo frontera de bloque libera una conexion segun una realization de la presente invention;Fig. 5 is a flow chart in which the block boundary node releases a connection according to an embodiment of the present invention;

la figura 6 es un diagrama de flujo de la actualization de la information del bloque local cuando existen cambios en la informacion del bloque del nodo A segun una realizacion de la presente invencion; yFigure 6 is a flow chart of the update of the information of the local block when there are changes in the information of the block of node A according to an embodiment of the present invention; Y

la figura 7 es un diagrama de flujo de la actualizacion de la informacion del bloque almacenada en el nodo A cuando existen cambios en la informacion del bloque del nodo C segun una realizacion de la presente invencion.Figure 7 is a flow chart of the update of the information of the block stored in node A when there are changes in the information of the block of node C according to an embodiment of the present invention.

Realizaciones preferentes de la invencionPreferred embodiments of the invention

La presente invencion procesa por separado la informacion del bloque de un punto de la subred frontera de un nodo frontera en un dominio de recorrido y bloquea la informacion de un punto de la subred en el dominio de recorrido a efectos de reducir de manera eficiente los mensajes de inundation de la informacion del bloque con la premisa de asegurar el Indice de exitos de establecimiento de la conexion.The present invention separately processes the information of the block of a point of the border subnet of a border node in a travel domain and blocks the information of a point of the subnet in the travel domain in order to efficiently reduce the messages of inundation of the information of the block with the premise of ensuring the Index of successful establishment of the connection.

Al ser similar a la informacion del bloque del punto de la subred en el dominio de recorrido, la informacion del bloque del punto frontera de la subred del nodo frontera de la presente invencion, utiliza el mismo modelo de datos que la informacion del bloque del punto de la subred en el dominio de recorrido. No obstante, a diferencia de la informacion del bloque del punto de la subred del dominio de recorrido, la informacion del bloque del punto frontera de la subred del nodo frontera se utiliza en el calculo del recorrido unicamente cuando el punto frontera de la subred del nodo frontera esta especificado como un punto de entrada o salida de la subred para la conexion, y la informacion del bloque del punto frontera de la subred del nodo frontera no es valida para otras conexiones. Ademas, una vez se ha establecido la conexion, la informacion del bloque del punto de entrada o de salida de la subred del nodo frontera esta asociado unicamente con la conexion que utiliza el punto de la subred.Being similar to the information of the subnet point block in the travel domain, the information of the border point block of the subnet of the border node of the present invention uses the same data model as the information of the point block of the subnet in the travel domain. However, unlike the information of the block of the subnet point of the route domain, the information of the border point block of the subnet of the border node is used in the calculation of the route only when the border point of the subnet of the node border is specified as an entry or exit point of the subnet for the connection, and the information on the border point block of the subnet of the border node is not valid for other connections. In addition, once the connection has been established, the information of the block of the entry or exit point of the subnet of the border node is associated only with the connection that uses the point of the subnet.

La implementation especifica de la presente invencion se describira a continuation conjuntamente con los dibujos adjuntos.The specific implementation of the present invention will be described below in conjunction with the accompanying drawings.

Un nodo frontera de una red optica inteligente comprende principalmente un controlador de conexion (CC), un controlador del recorrido (RC) y un administrador de recursos de enlace (LRM), cuyas funciones se describiran a continuacion.A boundary node of an intelligent optical network mainly comprises a connection controller (CC), a route controller (RC) and a link resource manager (LRM), whose functions will be described below.

El controlador de conexion es responsable de coordinar el administrador de recursos de enlace, el controlador del recorrido y el controlador de conexion entre pares y subordinados para gestionar y monitorizar el establecimiento y la liberation de la conexion y para modificar los parametros de conexion de la conexion existente.The connection controller is responsible for coordinating the link resource manager, the route controller and the peer-to-peer connection controller to manage and monitor the establishment and release of the connection and to modify the connection connection parameters existing.

El controlador del recorrido es responsable de proporcionar la informacion del recorrido para establecer la configuration de la conexion, que puede ser de extremo a extremo (por ejemplo, recorrido origen) o informacion salto a salto, en respuesta a una solicitud del controlador de conexion y respondiendo a una solicitud de informacion de topologla (un punto de la subred y su resumen) del administrador de red.The route controller is responsible for providing the route information to establish the connection configuration, which may be end-to-end (for example, origin route) or jump-to-jump information, in response to a request from the connection controller and responding to a request for topology information (a subnet point and its summary) from the network administrator.

El administrador de recursos de enlace es responsable de gestionar un enlace de reserva de puntos de la subred (SNPP), incluyendo la asignacion y desasignacion de una conexion de enlace de un punto de la subred, y proporcionando informacion de la topologla y la situation. Debido a que el enlace de la reserva de puntos de la subred (SNPP) puede ser publico o privado, el administrador de recursos del enlace tambien puede ser publico o estar asociado con una cierta red privada virtual (VPN).The link resource manager is responsible for managing a subnet point reservation link (SNPP), including the assignment and deallocation of a link connection of a subnet point, and providing information on the topology and the situation. Because the subnet point reservation (SNPP) link can be public or private, the link resource manager can also be public or associated with a certain virtual private network (VPN).

Haciendo referencia a la figura 1, que es un diagrama de bloques de un nodo frontera de bloque segun la presente invencion, comprende un controlador de conexion, un administrador de recursos de enlace y un controlador del recorrido, en el que,Referring to Figure 1, which is a block diagram of a block border node according to the present invention, it comprises a connection controller, a link resource manager and a route controller, in which,

El controlador de conexion -20- esta configurado para enviar una solicitud de consulta de informacion del bloque al administrador -21- de recursos del enlace tras recibir un mensaje de solicitud de conexion y verificar la informacion del bloque consultada del terminal local, consultar la informacion del bloque de un nodo frontera de salida una vez se pasa la verification y enviar una solicitud de consulta del recorrido al controlador de recorrido -22- utilizando la informacion del bloque del terminal local y la informacion del bloque del nodo frontera de salida como parametros de consulta.The connection controller -20- is configured to send a request for information on the block to the link resource manager -21- after receiving a connection request message and verify the information of the block consulted from the local terminal, check the information of the block of an exit border node once the verification is passed and send a request for query of the route to the route controller -22- using the information of the block of the local terminal and the information of the block of the exit border node as parameters of query.

El controlador de conexion -20- esta configurado, ademas, para actualizar la informacion del bloque almacenada en la terminal local tras recibir un mensaje de actualizacion de la informacion del bloque y de actualizar la informacion del bloque del nodo frontera de salida almacenada en la terminal local segun un mensaje de actualizacion de la informacion del bloque de un nodo frontera distal tras recibir el mensaje de actualizacion de la informacion del bloque del nodo frontera distal.The connection controller -20- is also configured to update the information of the block stored in the local terminal after receiving a message of updating the information of the block and updating the information of the block of the output border node stored in the terminal local according to an information update message of the block of a distal border node after receiving the information update message of the block of the distal border node.

El administrador -21- de recursos de enlace esta configurado para alimentar la informacion del bloque del terminalThe link resource manager -21- is configured to feed the terminal block information

55

1010

15fifteen

20twenty

2525

3030

3535

4040

45Four. Five

50fifty

5555

6060

6565

local de nuevo al controlador de conexion -20- en respuesta a la solicitud de consulta de la informacion del bloque del controlador de conexion -20-.local back to the connection controller -20- in response to the request for consultation of the information of the connection controller block -20-.

El controlador de recorrido -22- esta configurado para proporcionar la informacion del recorrido para establecer la conexion en respuesta a la solicitud de consulta del recorrido.The travel controller -22- is configured to provide the travel information to establish the connection in response to the request for travel consultation.

Haciendo referencia a la figura 2, que es un diagrama de flujo de un procedimiento para establecer una conexion entre los nodos frontera del bloque segun la presente invencion. El proceso de implementacion principal del procedimiento se describira a continuacion.Referring to Figure 2, which is a flow chart of a procedure for establishing a connection between the boundary nodes of the block according to the present invention. The main process implementation process will be described below.

Etapa 10, el controlador de conexion de un nodo frontera de entrada verifica un mensaje de solicitud de establecimiento de la conexion tras recibirla.Step 10, the connection controller of an input boundary node verifies a connection establishment request message upon receipt.

Etapa 11, tras una verification con exito, el controlador de conexion del nodo frontera de entrada consulta la informacion del bloque de un punto de entrada de la subred en una subred de entrada de un administrador de recursos de enlace local y verifica la informacion.Step 11, after a successful verification, the connection controller of the entry border node consults the block information of an entry point of the subnet in an input subnet of a local link resource manager and verifies the information.

Etapa 12, tras una verificacion con exito, el controlador de conexion del nodo frontera de entrada envia un mensaje de solicitud de consulta de la informacion del bloque al controlador de conexion de un nodo frontera de salida.Step 12, after a successful verification, the connection controller of the input border node sends a request message of the block information to the connection controller of an output border node.

Etapa 13, el controlador de conexion del nodo frontera de salida consulta la informacion del bloque de un punto de salida de la subred en una subred de salida del administrador de recursos de enlace local y la verifica tras recibir el mensaje de solicitud de consulta de la informacion del bloque.Step 13, the connection controller of the exit border node consults the block information of an exit point of the subnet in an output subnet of the local link resource manager and verifies it after receiving the request query message from the block information.

Etapa 14, tras una verificacion con exito, el controlador de conexion del nodo frontera de salida envia una respuesta a la consulta de la informacion del bloque que contiene la informacion verificada del bloque del punto de salida de la subred en la subred de salida al controlador de conexion del nodo frontera de entrada.Step 14, after a successful verification, the connection controller of the exit border node sends a response to the query of the information of the block containing the verified information of the block of the exit point of the subnet in the output subnet to the controller of connection of the entry border node.

Etapa 15, el controlador de conexion del nodo frontera de entrada envia una solicitud de consulta del recorrido a un controlador local del recorrido, siendo los parametros de la consulta la informacion del bloque del punto de entrada de la subred y la informacion del bloque del punto de salida de la subred.Step 15, the connection controller of the entry border node sends a request for route inquiry to a local route controller, the parameters of the query being the information of the block of the entry point of the subnet and the information of the point block Subnet output.

Etapa 16, tras una consulta con exito del recorrido, el controlador de conexion del nodo frontera de entrada envia un mensaje de solicitud de conexion en flujo descendente para continuar el procedimiento de procesamiento del establecimiento de la conexion.Step 16, after a successful consultation of the route, the connection controller of the incoming border node sends a downflow connection request message to continue the process of establishing the connection establishment.

Etapa 17, el controlador de conexion del nodo frontera de salida notifica al administrador de recursos de enlace local que inicie la monitorizacion de la informacion del bloque tras recibir y procesar el mensaje de solicitud de conexion, y a continuacion envia un mensaje de confirmation de la conexion al nodo frontera de entrada.Step 17, the connection controller of the exit border node notifies the local link resource manager to start monitoring the block information after receiving and processing the connection request message, and then sends a connection confirmation message to the border entry node.

Etapa 18, el controlador de conexion del nodo frontera de entrada inicia la monitorizacion de la informacion del bloque tras recibir el mensaje de confirmacion de la conexion devuelto por el flujo descendente y se completa el establecimiento de la conexion.Step 18, the connection controller of the input boundary node starts monitoring the block information after receiving the confirmation message of the connection returned by the downstream flow and the connection establishment is completed.

Una vez establecida la conexion, cuando un administrador de recursos de enlace del nodo frontera de entrada detecta cambios en la informacion del bloque del punto de entrada de la subred del terminal local, notificara al controlador de conexion local, que actualizara la informacion del bloque del punto de entrada de la subred del terminal local almacenada localmente; cuando un administrador de recursos de enlace del nodo frontera de salida detecta cambios en la informacion del bloque del punto de salida de la subred del terminal local, notificara al controlador de conexion local, y al controlador de conexion del nodo frontera de salida enviara un mensaje de actualization de la informacion del bloque al controlador de conexion del nodo frontera de entrada, que actualiza la informacion del bloque del punto de salida de la subred del nodo frontera de salida almacenada localmente segun el mensaje de actualizacion de la informacion del bloque.Once the connection is established, when a link resource manager of the entry border node detects changes in the information of the entry point block of the local terminal subnet, it will notify the local connection controller, which will update the information of the block of the entry point of the subnet of the locally stored local terminal; when a link resource manager of the exit border node detects changes in the information of the exit point block of the local terminal subnet, it will notify the local connection controller, and the connection controller of the exit border node will send a message of updating the information of the block to the connection controller of the input border node, which updates the information of the output point block of the subnet of the output border node stored locally according to the information update message of the block.

Una vez establecida la conexion, cuando el controlador de conexion del nodo frontera de entrada recibe un mensaje de liberation de la conexion, verificara el mensaje de liberation de la conexion, notificara al administrador de recursos de enlace local para finalizar la monitorizacion de la informacion del bloque si pasa la verificacion, y enviara una solicitud de liberacion de la conexion al controlador de conexion del nodo frontera de salida, que notificara al administrador de recursos de enlace local para que finalice la monitorizacion de la informacion del bloque tras recibir la solicitud de liberacion de la conexion y enviar un mensaje de confirmacion de la liberacion de la conexion al controlador de conexion del nodo frontera de entrada tras el procesamiento de la solicitud de liberacion de la conexion.Once the connection is established, when the connection controller of the incoming border node receives a connection release message, it will verify the connection release message, notify the local link resource manager to complete the monitoring of the information of the connection. block if the verification passes, and will send a connection release request to the connection controller of the exit border node, which will notify the local link resource manager to complete the monitoring of the block information after receiving the release request of the connection and send a message confirming the release of the connection to the connection controller of the entry border node after processing the connection release request.

La implementacion especifica de la presente invencion se describira con mas detalle a continuacion mediante de una realization especifica.The specific implementation of the present invention will be described in more detail below by means of a specific realization.

55

1010

15fifteen

20twenty

2525

3030

3535

4040

45Four. Five

50fifty

5555

6060

6565

Haciendo referenda a la figura 3, que es un diagrama esquematico de una topologla de red segun la realization de la presente invention. La figura representa un dominio de recorrido, en el que tanto el nodo A como el nodo C son nodos frontera, y el nodo B es un nodo intermedio. La direction del establecimiento de la conexion es A^B^C.Referring to Figure 3, which is a schematic diagram of a network topology according to the realization of the present invention. The figure represents a path domain, in which both node A and node C are border nodes, and node B is an intermediate node. The direction of connection establishment is A ^ B ^ C.

La figura 4 es un diagrama de flujo en el que un nodo frontera establece una conexion en el caso de un bloque segun una realizacion de la presente invencion que comprende las siguientes etapas.Fig. 4 is a flow chart in which a boundary node establishes a connection in the case of a block according to an embodiment of the present invention comprising the following steps.

Etapa 301, un controlador de conexion del nodo A recibe un mensaje de solicitud de conexion.Step 301, a connection controller from node A receives a connection request message.

Etapa 302, el controlador de conexion del nodo A verifica el mensaje de solicitud de conexion, es decir, principalmente verifica si las condiciones de solicitud de conexion son correctas, y lleva a cabo la etapa 303 si falla la verificacion, en cualquier otro caso se lleva a cabo la etapa 304.Step 302, the connection controller of node A verifies the connection request message, that is, mainly verifies if the connection request conditions are correct, and performs step 303 if the verification fails, in any other case carries out step 304.

Etapa 303, el controlador de conexion del nodo A devuelve una respuesta de fallo de la solicitud de conexion y el procedimiento finaliza.Step 303, the connection controller of node A returns a failure response of the connection request and the procedure ends.

Etapa 304, el controlador de conexion del nodo A consulta la information del bloque del punto de entrada de la subred, es decir, la intercambiabilidad entre el punto de entrada de la subred y los otros puntos de la subred del nodo A en un dominio de recorrido, desde un administrador de recursos de enlace del nodo A, y lleva a cabo la etapa 303 cuando falla la consulta, es decir, cuando no existe ningun punto de entrada de la subred o no existen ningunos otros puntos en la subred en el dominio de recorrido que sean intercambiables con el punto de entrada de la subred, en cualquier otro caso se lleva a cabo la etapa 305.Step 304, the connection controller of node A consults the information of the block of the entry point of the subnet, that is, the interchangeability between the entry point of the subnet and the other points of the subnet of node A in a domain of route, from a link resource manager of node A, and performs step 303 when the query fails, that is, when there is no entry point of the subnet or there are no other points in the subnet in the domain that are interchangeable with the point of entry of the subnet, in any other case stage 305 is carried out.

Etapa 305, el controlador de conexion del nodo A envia un mensaje de solicitud de consulta de la informacion del bloque al nodo C para consultar la informacion del bloque de un punto de salida de la subred del nodo C.Step 305, the connection controller of node A sends a request for querying the information of the block to node C to query the block information of an exit point of the subnet of node C.

Etapa 306, el controlador de conexion del nodo C recibe y verifica el mensaje de solicitud de consulta de la informacion del bloque, es decir, verifica principalmente si las condiciones de solicitud de consulta son correctas, y lleva a cabo la etapa 307 si falla la verification, en caso contrario se lleva a cabo la etapa 309.Step 306, the connection controller of node C receives and verifies the query request message of the block information, that is, it mainly verifies if the query request conditions are correct, and performs step 307 if the verification, otherwise step 309 is carried out.

Etapa 307, el controlador de conexion del nodo C envia una respuesta de fallo de la solicitud de consulta de la informacion del bloque al controlador de conexion del nodo A.Step 307, the connection controller of node C sends a failure response of the request for consultation of the block information to the connection controller of node A.

Etapa 308, el controlador de conexion del nodo A lleva a cabo la etapa 303 tras recibir la respuesta de fallo de la solicitud de consulta de la informacion del bloque.Step 308, the connection controller of node A carries out step 303 after receiving the failure response of the request for consultation of the block information.

Etapa 309, el controlador de conexion del nodo C consulta la informacion del bloque del punto de salida de la subred desde un administrador de recursos de enlace del nodo C y lleva a cabo la etapa 307 si falla la consulta, en cualquier otro caso lleva a cabo la etapa 310.Step 309, the connection controller of node C consults the information of the block of the exit point of the subnet from a link resource manager of node C and carries out step 307 if the query fails, in any other case it leads to perform step 310.

Etapa 310, el controlador de conexion del nodo C cumplimenta la informacion del bloque del punto de salida de la subred en respuesta a la consulta de la informacion del bloque y la devuelve al controlador de conexion del nodo A.Step 310, the connection controller of node C completes the information of the block of the exit point of the subnet in response to the query of the block information and returns it to the connection controller of node A.

Etapa 311, tras recibir la respuesta a la consulta de la informacion del bloque, el nodo A consulta la informacion del recorrido desde el controlador de recorrido utilizando la informacion del bloque del punto de entrada de la subred del nodo A y la informacion del bloque del punto de salida de la subred del nodo C como condiciones de consulta, y lleva a cabo la etapa 303 cuando falla la consulta, en cualquier otro caso lleva a cabo la etapa 312.Step 311, after receiving the response to the block information query, node A consults the travel information from the route controller using the information of the block of the entry point of the subnet of node A and the information of the block of the exit point of the subnet of node C as query conditions, and carries out step 303 when the query fails, in any other case it carries out step 312.

Etapa 312, el controlador de conexion del nodo A envia un mensaje de solicitud de conexion al siguiente nodo de salto B, que recibe y procesa el mensaje de solicitud de conexion y reenvia el mensaje de solicitud de conexion al siguiente nodo de salto C.Step 312, the connection controller of node A sends a connection request message to the next hop node B, which receives and processes the connection request message and forwards the connection request message to the next jump node C.

Etapa 313, el controlador de conexion del nodo C notifica al administrador de recursos de enlace del nodo C para que inicie la monitorizacion de la informacion del bloque tras recibir y procesar el mensaje de solicitud de conexion y a continuation envia un mensaje de respuesta de la conexion al nodo B, que recibe y procesa el mensaje de respuesta a la conexion y reenvia el mensaje de respuesta a la conexion al nodo A.Step 313, the connection controller of node C notifies the link resource manager of node C to initiate the block information monitoring after receiving and processing the connection request message and then sends a connection response message to node B, which receives and processes the response message to the connection and forwards the response message to the connection to node A.

Etapa 314, el controlador de conexion del nodo A notifica al administrador de recursos de enlace del nodo A para que inicie la monitorizacion de la informacion del bloque tras recibir y procesar el mensaje de respuesta de la conexion.Step 314, the connection controller of node A notifies the link resource manager of node A to initiate monitoring of the block information after receiving and processing the connection response message.

Etapa 315, el nodo A envia un mensaje de confirmation de la conexion, y finaliza el procedimiento.Step 315, node A sends a connection confirmation message, and ends the procedure.

Haciendo referencia a la figura 5, que es un diagrama de flujo en el que un nodo frontera de bloque libera una conexion segun una realizacion de la presente invencion que comprende las siguientes etapas.Referring to Figure 5, which is a flow chart in which a block boundary node releases a connection according to an embodiment of the present invention comprising the following steps.

55

1010

15fifteen

20twenty

2525

3030

3535

4040

45Four. Five

50fifty

5555

6060

Etapa 401, el controlador de conexion del nodo A recibe un mensaje de liberation de la conexion.Step 401, the connection controller of node A receives a connection release message.

Etapa 402, el controlador de conexion del nodo A verifica el mensaje de liberacion de la conexion, es decir, principalmente verifica si las condiciones de liberacion de la conexion son correctas, y lleva a cabo la etapa 403 si falla la verification, en cualquier otro caso se lleva a cabo la etapa 404.Step 402, the connection controller of node A verifies the connection release message, that is, mainly verifies if the connection release conditions are correct, and performs step 403 if verification fails, in any other case stage 404 is carried out.

Etapa 403, el controlador de conexion del nodo A devuelve una respuesta del fallo de la liberacion de la conexion y finaliza el procedimiento.Step 403, the connection controller of node A returns a response of the connection release failure and ends the procedure.

Etapa 404, el controlador de conexion del nodo A notifica al administrador de recursos de enlace del nodo A que finalice la monitorizacion de la informacion del bloque.Step 404, the connection controller of node A notifies the link resource manager of node A to complete the monitoring of the block information.

Etapa 405, el controlador de conexion del nodo A envia un mensaje de solicitud de liberacion de la conexion al siguiente nodo de salto B, que recibe y procesa el mensaje de solicitud de liberacion de la conexion y reenvia el mensaje de solicitud de liberacion de la conexion al siguiente nodo de salto C.Step 405, the connection controller of node A sends a connection release request message to the next jump node B, which receives and processes the connection release request message and forwards the request for release of the connection connection to the next jump node C.

Etapa 406, el controlador de conexion del nodo C notifica al administrador de recursos de enlace del nodo C que finalice la monitorizacion de la information del bloque tras recibir el mensaje de solicitud de liberacion de la conexion y envia un mensaje de respuesta de la liberacion de la conexion al nodo B tras procesar el mensaje de solicitud de liberacion de la conexion y el nodo B recibe y procesa el mensaje de respuesta a la liberacion de la conexion y reenvia el mensaje de respuesta a la liberacion de la conexion al nodo A.Step 406, the connection controller of node C notifies the link resource manager of node C to complete the monitoring of the block information after receiving the connection release request message and sends a response message of the release of the connection to node B after processing the connection release request message and node B receives and processes the connection response response message and resends the connection response message to the connection to node A.

Etapa 407, el controlador de conexion del nodo A recibe y procesa un mensaje de confirmation de la liberacion de la conexion y a continuation envia el mensaje de confirmacion de la liberacion de la conexion, y el procedimiento finaliza.Step 407, the connection controller of node A receives and processes a confirmation message of the connection release and then sends the confirmation message of the connection release, and the procedure ends.

Haciendo referencia a la figura 6, es un diagrama de flujo de la actualization de la informacion del bloque del terminal local cuando existen cambios en la informacion del bloque del nodo A segun una realization de la presente invention que comprende las siguientes etapas.Referring to Figure 6, it is a flowchart of the update of the local terminal block information when there are changes in the information of the node A block according to an embodiment of the present invention comprising the following steps.

Etapa 501, el administrador de recursos de enlace del nodo A notifica al controlador de conexion del nodo A de la actualizacion de la informacion del bloque del punto de entrada de la subred del nodo A cuando detecta cambios en la informacion del bloque del punto de entrada de la subred del terminal local, por ejemplo, cuando existen fallos de conexion entre un cierto punto de salida de la subred y el punto de entrada de la subred.Step 501, the link resource manager of node A notifies the connection controller of node A of the information update of the entry point block of the subnet of node A when it detects changes in the information of the entry point block of the subnet of the local terminal, for example, when there are connection failures between a certain point of exit of the subnet and the point of entry of the subnet.

Etapa 502, el controlador de conexion del nodo A actualiza la informacion del bloque del punto de entrada de la subred del nodo A almacenada localmente tras recibir un mensaje de actualizacion de la informacion del bloque del punto de entrada de la subred del nodo A, y el procedimiento finaliza.Step 502, the connection controller of node A updates the information of the entry point block of the subnet of node A stored locally after receiving an update message of the information of the block of the entry point of the subnet of node A, and The procedure ends.

Haciendo referencia a la figura 7, es un diagrama de flujo de la actualizacion de la informacion del bloque almacenada en el nodo A cuando existen cambios en la informacion del bloque del nodo C segun una realizacion de la presente invencion que comprende las siguientes etapas.Referring to Figure 7, it is a flow chart of the update of the information of the block stored in node A when there are changes in the information of the block of node C according to an embodiment of the present invention comprising the following steps.

Etapa 601, el administrador de recursos de enlace del nodo C notifica al controlador de conexion del nodo C de la actualizacion de la informacion del bloque de un punto de entrada de la subred del nodo C cuando se detectan cambios en la informacion del bloque del punto de entrada de la subred del terminal local.Step 601, the link resource manager of node C notifies the connection controller of node C of the update of the block information of an entry point of the subnet of node C when changes in the information of the point block are detected input of the subnet of the local terminal.

Etapa 602, el controlador de conexion del nodo C envia un mensaje de actualizacion de la informacion del bloque de un punto de salida de la subred del nodo C al nodo A.Step 602, the connection controller of node C sends an update message of the block information from an exit point of the subnet of node C to node A.

Etapa 603, el controlador de conexion del nodo A actualiza la informacion del bloque del punto de salida de la subred del nodo C almacenada localmente tras recibir el mensaje de actualizacion de la informacion del bloque del punto de salida de la subred del nodo C, y finaliza el procedimiento.Step 603, the connection controller of node A updates the information of the exit point block of the subnet of node C stored locally after receiving the update message of the information of the block of the exit point of the subnet of node C, and The procedure ends.

Es evidente que los expertos en la tecnica pueden realizar diversas modificaciones y variaciones en la presente invencion sin desviarse del espiritu y del alcance de la presente invencion. Asi, si dichas modificaciones y variaciones de la presente invencion se encuentran dentro del alcance de las reivindicaciones de la presente invencion y de tecnologia equivalente de la misma, entonces se pretende que la presente invencion tambien incluya dichas modificaciones y variaciones.It is clear that those skilled in the art can make various modifications and variations in the present invention without departing from the spirit and scope of the present invention. Thus, if said modifications and variations of the present invention are within the scope of the claims of the present invention and of equivalent technology thereof, then it is intended that the present invention also include said modifications and variations.

Claims (8)

55 1010 15fifteen 20twenty 2525 3030 3535 4040 45Four. Five 50fifty 5555 6060 6565 REIVINDICACIONES 1. Nodo frontera de un bloque que comprende un controlador de conexion (20), un administrador de recursos de enlace (21) y un controlador del recorrido (22), teniendo el nodo frontera de bloque informacion del bloque sobre la conversion de longitud de onda, caracterizado porque,1. Border node of a block comprising a connection controller (20), a link resource manager (21) and a route controller (22), the block border node having block information about the length conversion of wave, characterized because, el controlador de conexion (20) esta configurado para enviar una solicitud para consultar la informacion del bloque al administrador (21) de recursos de enlace tras recibir un mensaje de solicitud de conexion, consultar y verificar la informacion del bloque de un punto de entrada de la subred de un terminal local, consultar la informacion del bloque de un punto de salida de la subred de un nodo frontera de salida una vez ha pasado la verification y enviar una solicitud de consulta del recorrido al controlador de recorrido utilizando la informacion del bloque del punto de entrada de la subred del terminal local y la informacion del bloque del punto de salida de la subred del nodo frontera de salida como parametros de consulta;The connection controller (20) is configured to send a request to consult the block information to the link resource manager (21) after receiving a connection request message, to consult and verify the block information of an entry point of the subnet of a local terminal, check the information of the block of an exit point of the subnet of an exit boundary node once the verification has passed and send a request to consult the route to the route controller using the information of the block of the entry point of the subnet of the local terminal and the information of the block of the exit point of the subnet of the exit border node as query parameters; el administrador (21) de recursos de enlace esta configurado para alimentar la informacion del bloque del punto de entrada de la subred del terminal local de nuevo al controlador de conexion (20) en respuesta a la solicitud para consultar la informacion del bloque del controlador de conexion (20); yThe link resource manager (21) is configured to feed the subnet entry point block of the local terminal back to the connection controller (20) in response to the request to query the information from the controller block of connection (20); Y el controlador de recorrido (22) esta configurado para proporcionar una informacion de recorrido para establecer una conexion en respuesta a la solicitud de consulta del recorrido;the route controller (22) is configured to provide a route information to establish a connection in response to the request for route consultation; en el que la informacion del bloque del punto de entrada de la subred comprende la intercambiabilidad entre el punto de entrada de la subred y otros puntos de la subred del terminal local en un dominio de recorrido, y la informacion del bloque del punto de salida de la subred comprende la intercambiabilidad entre el punto de salida de la subred y otros puntos de la subred del nodo frontera de salida en el dominio de recorrido.wherein the information of the subnet entry point block comprises the interchangeability between the subnet entry point and other subnet points of the local terminal in a travel domain, and the information of the exit point block of The subnet comprises the interchangeability between the subnet exit point and other subnet points of the exit border node in the path domain. 2. Nodo frontera de un bloque, segun la reivindicacion 1, en el que el controlador de conexion (20) esta configurado, ademas, para actualizar la informacion del bloque almacenada en el terminal local tras recibir un mensaje de actualizacion de la informacion del bloque del terminal local.2. Border node of a block, according to claim 1, wherein the connection controller (20) is also configured to update the information of the block stored in the local terminal after receiving a message updating the information of the block from the local terminal. 3. Nodo frontera de un bloque, segun la reivindicacion 1, en el que el controlador de conexion (20) esta configurado, ademas, para recibir un mensaje de actualization de la informacion del bloque de un nodo frontera remoto y a continuation actualizar la informacion del bloque del nodo frontera de salida almacenada en el terminal local segun el mensaje de actualizacion de la informacion del bloque del nodo frontera remoto.3. The boundary node of a block, according to claim 1, wherein the connection controller (20) is further configured to receive a message of updating the information of the block of a remote boundary node and then updating the information of the block of the output border node stored in the local terminal according to the update message of the information of the block of the remote border node. 4. Procedimiento para establecer una conexion entre los nodos frontera del bloque, teniendo cada nodo frontera de bloque una informacion del bloque sobre la conversion de longitud de onda, caracterizado porque, el procedimiento comprende las siguientes etapas:4. Procedure for establishing a connection between the boundary nodes of the block, each block boundary node having a block information on the wavelength conversion, characterized in that the procedure comprises the following steps: A. Un nodo frontera de entrada consulta y verifica la informacion del bloque de un punto de entrada de la subred del nodo frontera de entrada tras recibir un mensaje de solicitud de configuration de la conexion (11), y envia una solicitud para consultar la informacion del bloque a un nodo frontera de salida cuando la verificacion tiene exito (12);A. An entry border node consults and verifies the block information of an entry point in the subnet of the entry border node after receiving a connection configuration request message (11), and sends a request to query the information from the block to an exit border node when the verification is successful (12); B. Un nodo frontera de salida consulta y verifica la informacion del bloque de un punto de salida de la subred del nodo frontera de salida tras recibir la solicitud de consulta de la informacion del bloque (13), y enviar la informacion del bloque del punto de salida de la subred al nodo frontera de entrada cuando la verificacion tiene exito (14);B. An exit border node consults and verifies the block information of an exit point of the subnet of the exit border node after receiving the request for information on the block information (13), and sends the information of the point block from the subnet to the border entry node when the verification is successful (14); C. El nodo frontera de entrada consulta utilizando la informacion del bloque del punto de entrada de la subred del nodo frontera de entrada y el punto de salida de la subred del nodo frontera de salida como parametros de consultaC. The entry border node queries using the block information of the entry point of the subnet of the entry border node and the exit point of the subnet of the output border node as query parameters (15) , y el envio de un mensaje de solicitud de conexion al nodo frontera de salida al consultar el recorrido con exito(15), and the sending of a connection request message to the exit border node when consulting the route successfully (16) ; y(16); Y D. El nodo frontera de entrada recibe un mensaje de confirmation de la conexion devuelto por el nodo frontera de salida, completando asi el establecimiento de la conexion (18);D. The entry border node receives a confirmation message of the connection returned by the exit border node, thus completing the establishment of the connection (18); en el que la informacion del bloque del punto de entrada de la subred comprende la intercambiabilidad entre el punto de entrada de la subred y otros puntos de la subred del nodo frontera de entrada en un dominio de recorrido, y la informacion del bloque del punto de salida de la subred comprende la intercambiabilidad entre el punto de salida de la subred y otros puntos de la subred del nodo frontera de salida en el dominio de recorrido.wherein the information of the subnet entry point block comprises the interchangeability between the subnet entry point and other subnet points of the entry boundary node in a travel domain, and the information of the point block of Subnet output comprises the interchangeability between the subnet exit point and other subnet points of the exit border node in the path domain. 5. Procedimiento, segun la reivindicacion 4, en el que en la etapa A, el nodo frontera de entrada verifica el mensaje de solicitud de configuracion de la conexion tras recibir el mensaje de solicitud de configuracion de la conexion, consulta y verifica la informacion del bloque del punto de entrada de la subred si ha pasado la verificacion y devuelve una respuesta de fallo de la solicitud de conexion si no ha pasado la verificacion, y finaliza el procedimiento.5. The method according to claim 4, wherein in step A, the entry border node verifies the connection configuration request message after receiving the connection configuration request message, consults and verifies the information of the connection block of the subnet entry point if the verification has passed and returns a failure response from the connection request if the verification has not passed, and the procedure is completed. 6. Procedimiento, segun la reivindicacion 4, en el que6. Procedure according to claim 4, wherein en la etapa C, el nodo frontera de salida inicia la monitorizacion de la informacion del bloque tras recibir el mensaje de solicitud de conexion; yin step C, the exit border node starts monitoring the block information after receiving the connection request message; Y 5 en la etapa D, el nodo frontera de entrada inicia la monitorizacion de la informacion del bloque tras recibir un mensaje de confirmation de la conexion.5 in step D, the entry boundary node starts monitoring the block information after receiving a confirmation message from the connection. 7. Procedimiento, segun la reivindicacion 6, que comprende, ademas, una vez se ha establecido la conexion, la actualization por parte del nodo frontera de entrada de la informacion del bloque del punto de entrada de la subred7. Procedure, according to claim 6, further comprising, once the connection has been established, the update by the input boundary node of the information of the block of the entry point of the subnet 10 almacenada en la terminal local cuando se monitorizan cambios en la informacion del bloque del punto de entrada de la subred del terminal local.10 stored in the local terminal when changes in the information of the block of the entry point of the subnet of the local terminal are monitored. 8. Procedimiento, segun la reivindicacion 6, que comprende, ademas: una vez se ha establecido la conexion, el envio por parte del nodo frontera de salida de un mensaje de actualizacion de la informacion del bloque al nodo8. The method, according to claim 6, further comprising: once the connection has been established, the sending by the exit border node of an update message of the block information to the node 15 frontera de entrada cuando se monitorizan cambios en la informacion del bloque del punto de salida de la subred del terminal local, y la actualizacion del nodo frontera de entrada de la informacion del bloque del punto de salida de la subred del nodo frontera de salida almacenada en el terminal local segun el mensaje de actualizacion de la informacion del bloque.15 entry boundary when changes in the information of the exit point block of the subnet of the local terminal are monitored, and the update of the entry boundary node of the information of the exit point block of the subnet of the stored exit boundary node in the local terminal according to the update message of the block information. 20 9. Procedimiento, segun la reivindicacion 6, que comprende, ademas: la reception por parte del nodo frontera de20 9. Procedure according to claim 6, further comprising: reception by the border node of entrada de una solicitud de liberation de la conexion y, a continuation, finalizar la monitorizacion de la informacion del bloque del terminal local y enviar la solicitud de liberacion de la conexion al nodo frontera de salida; yentry of a connection release request and then complete the monitoring of the local terminal block information and send the connection release request to the exit border node; Y la finalization por parte del nodo frontera de salida de la monitorizacion de la informacion del bloque del terminal 25 local tras recibir la solicitud de liberacion de la conexion y el envio de un mensaje de confirmacion de la liberacion de la conexion al nodo frontera de entrada tras procesar la solicitud de liberacion de la conexion.the finalization by the exit border node of the monitoring of the information of the block of the local terminal 25 after receiving the request for the release of the connection and the sending of a message confirming the release of the connection to the entry border node after process the connection release request.
ES09812652.7T 2008-09-12 2009-09-07 Barrier border node and procedure to establish a connection between barrier border nodes Active ES2564526T3 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN200810211958XA CN101360349B (en) 2008-09-12 2008-09-12 Resistant boundary node and establishing method for connection between resistant boundary nodes
CN200810211958 2008-09-12
PCT/CN2009/073795 WO2010028586A1 (en) 2008-09-12 2009-09-07 Barrier boundary node and method for establishing connection between barrier bound ary nodes

Publications (1)

Publication Number Publication Date
ES2564526T3 true ES2564526T3 (en) 2016-03-23

Family

ID=40332661

Family Applications (1)

Application Number Title Priority Date Filing Date
ES09812652.7T Active ES2564526T3 (en) 2008-09-12 2009-09-07 Barrier border node and procedure to establish a connection between barrier border nodes

Country Status (5)

Country Link
US (1) US8832282B2 (en)
EP (1) EP2328307B1 (en)
CN (1) CN101360349B (en)
ES (1) ES2564526T3 (en)
WO (1) WO2010028586A1 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101360349B (en) * 2008-09-12 2011-01-19 中兴通讯股份有限公司 Resistant boundary node and establishing method for connection between resistant boundary nodes
CN102801602B (en) * 2011-05-26 2017-09-22 中兴通讯股份有限公司 A kind of method and device for realizing inner link flooding
WO2014186986A1 (en) * 2013-05-24 2014-11-27 华为技术有限公司 Stream forwarding method, device and system
US10476545B2 (en) * 2015-09-25 2019-11-12 Intel Corporation Communication between integrated circuit packages using a millimeter-wave wireless radio fabric
CN112583622B (en) * 2019-09-30 2023-09-26 中兴通讯股份有限公司 Method and system for reporting fault event information
CN117472049B (en) * 2023-10-25 2024-05-07 山东大学 Control method and system for movement device, storage medium and movement device

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6801496B1 (en) * 1999-01-15 2004-10-05 Cisco Technology, Inc. Network addressing scheme for reducing protocol overhead in an optical network
US7215644B2 (en) 2003-03-19 2007-05-08 Alcatel Lucent Inter-domain constraint-based shortest path first technique for supporting hierarchical routing in interconnected multi-domain optical transport networks
CN1277375C (en) * 2003-07-31 2006-09-27 华为技术有限公司 Switching method between permanent connection and exchage connection in optical network
CN100417117C (en) * 2005-06-15 2008-09-03 华为技术有限公司 Method for recognizing node accessibility in automatically switched optical network
CN101133601B (en) * 2005-08-15 2011-03-02 中兴通讯股份有限公司 Complex control node in automatic exchanging transmission network and control method thereof
CN1859369B (en) * 2005-10-09 2010-07-14 华为技术有限公司 Method and device for realizing network connection service establishment
CN100531050C (en) * 2006-04-21 2009-08-19 中兴通讯股份有限公司 Adaptive optical transmission network connecting performance optimization method and equipment
CN101360349B (en) * 2008-09-12 2011-01-19 中兴通讯股份有限公司 Resistant boundary node and establishing method for connection between resistant boundary nodes

Also Published As

Publication number Publication date
EP2328307A1 (en) 2011-06-01
EP2328307B1 (en) 2016-01-06
EP2328307A4 (en) 2014-05-07
WO2010028586A1 (en) 2010-03-18
CN101360349B (en) 2011-01-19
CN101360349A (en) 2009-02-04
US8832282B2 (en) 2014-09-09
US20110173336A1 (en) 2011-07-14

Similar Documents

Publication Publication Date Title
ES2564526T3 (en) Barrier border node and procedure to establish a connection between barrier border nodes
ES2340719T3 (en) METHOD AND DEVICE FOR RECOVERING A NETWORK IN SHARED MESH.
ES2348362T3 (en) METHOD AND SYSTEM OF RECOVERY OF SERVICES AFTER PRODUCING A FAILURE.
US6856627B2 (en) Method for routing information over a network
US7428212B2 (en) Best effort technique for virtual path restoration
US7180852B1 (en) Method for selecting a restoration path in a mesh network
US7852863B2 (en) System and methods for connections using automatically switched optical network control planes
ES2338814T3 (en) METHOD AND APPLIANCE FOR MANAGING AND TRANSMITING FINE GRANULARITY SERVICES.
ES2381748T3 (en) Method and equipment for fault recovery in an adaptive burst optical ring and a fault management method
JP4920308B2 (en) Path setting method, node device, and monitoring control device
US20100091647A1 (en) Method for Restoration and Normalization in a Mesh Network
ES2395939T3 (en) Method to make an association in an automatic switching optical network
JP2006527543A (en) Optical network topology database and optical network operations
Xin et al. On an IP-centric optical control plane
JP2003018200A (en) Communication network, node device and path-setting method
EP1146682A2 (en) Two stage, hybrid logical ring protection with rapid path restoration over mesh networks
US20030043427A1 (en) Method of fast circuit recovery using local restoration
Shami et al. Performance evaluation of two GMPLS-based distributed control and management protocols for dynamic lightpath provisioning in future IP networks
US7706383B2 (en) Minimum contention distributed wavelength assignment in optical transport networks
WO2010037305A1 (en) Method, node device and ring network for notifying re-routing
Shami et al. On the merits of flooding/parallel probing-based signaling algorithms for fast automatic setup and tear-down of paths in IP/MPLS-over-optical-networks I
Zheng et al. An automatic switched optical network testbed based on GMPLS in Tsinghua University
Yu Signaling and Control of Dynamically Switched Optical Networks
Lin et al. IP-based restoration algorithm for optical networks
Boyle et al. Network Hierarchy and Multilayer Survivability