Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LURUENA MARTIN VICTOR
LURUENA MOSQUETE FRANCISCO
LURUENA MOSQUETE VICTOR
Original Assignee
LURUENA MARTIN VICTOR
LURUENA MOSQUETE FRANCISCO
LURUENA MOSQUETE VICTOR
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LURUENA MARTIN VICTOR, LURUENA MOSQUETE FRANCISCO, LURUENA MOSQUETE VICTORfiledCriticalLURUENA MARTIN VICTOR
Priority to ES0236662ApriorityCriticalpatent/ES236662A1/en
Publication of ES236662A1publicationCriticalpatent/ES236662A1/en
Method of manufacturing construction elements, characterized essentially because as a first operation, we proceed to the design of the decorative cover elements corresponding to the surface seen: on the pre-established patterns and on a mechanical saw, single or multiple, they are cut to the dimensions convenient, the slats and in the precise form. It is proceeded to its devastation, sanding and polishing in the machines required for this operation, then proceeds to the formation of constituent parts of intermediate bases, intended for the superposition of the ornamental elements in the calculated arrangement, and whose piece may be shaped, material and convenient dimensions. The outer surface of the center of intermediate resistance, is impregnated by a layer of suitable thickness of any colloidal binder, and on whose mucilage are deposited in the necessary form and arrangement, the upper slats: then and during convenient time is subjected to the effect of a press suitable for fixing the decorative surface, until the complete coagulation of the colloid. On the part formed, another plate of preferably insulating material, thermal, acoustic and against moisture, fixed by glue and pressed until its solidification is fixed on its bottom, fixed later on the floor or wall, by cement, plaster or plaster, until its set (Machine-translation by Google Translate, not legally binding)
ES0236662A1957-07-191957-07-19A procedure for manufacturing construction elements. (Machine-translation by Google Translate, not legally binding)
ExpiredES236662A1
(en)
Procedure for the manufacture of a layer of a cesped, designed to be available on a surface to be encesped. (Machine-translation by Google Translate, not legally binding)
Procedure for the superficial and uniform application of fragrance and hardening retardants in construction materials. (Machine-translation by Google Translate, not legally binding)
Procedure for the manufacture of slabs of terraces constituting reasons or different drawings prescribed. (Machine-translation by Google Translate, not legally binding)