ES2337745T3 - PROCEDURE FOR HANDLING AND LOADING SIMULTANEOUSLY DRILLING RODS AND COVERING PIPES THROUGH TWO INDEPENDENT ROTATING PARTS. - Google Patents

PROCEDURE FOR HANDLING AND LOADING SIMULTANEOUSLY DRILLING RODS AND COVERING PIPES THROUGH TWO INDEPENDENT ROTATING PARTS. Download PDF

Info

Publication number
ES2337745T3
ES2337745T3 ES08006077T ES08006077T ES2337745T3 ES 2337745 T3 ES2337745 T3 ES 2337745T3 ES 08006077 T ES08006077 T ES 08006077T ES 08006077 T ES08006077 T ES 08006077T ES 2337745 T3 ES2337745 T3 ES 2337745T3
Authority
ES
Spain
Prior art keywords
loader
rod
rotating part
rods
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
ES08006077T
Other languages
Spanish (es)
Inventor
Patrizio Puntel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Soilmec SpA
Original Assignee
Soilmec SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Soilmec SpA filed Critical Soilmec SpA
Application granted granted Critical
Publication of ES2337745T3 publication Critical patent/ES2337745T3/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/20Driving or forcing casings or pipes into boreholes, e.g. sinking; Simultaneously drilling and casing boreholes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D11/00Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/14Racks, ramps, troughs or bins, for holding the lengths of rod singly or connected; Handling between storage place and borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/16Connecting or disconnecting pipe couplings or joints
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • E21B3/02Surface drives for rotary drilling
    • E21B3/022Top drives

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)
  • Drilling Tools (AREA)
  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
  • Drilling And Boring (AREA)

Abstract

Procedimiento para manipular y cargar simultáneamente varillas de perforación y tubos de revestimiento mediante una máquina provista de dos piezas giratorias (1 y 2), montadas deslizantemente, independientes entre sí, sobre el mástil (9) de la máquina; pudiéndose colocar a lo largo del mástil (9) la cargadora (3) que sirve para cargar unas varillas (7) y tubos de revestimiento (8), aplicándose sobre el mástil (9), en su extremo inferior, tres mordazas (4, 5 y 6), diseñadas para desatornillar/atornillar las varillas (7) y los tubos de revestimiento (8); estando caracterizado el procedimiento porque presenta las siguientes operaciones realizadas sucesivamente: a) operación de carga de las varillas/tubos de revestimiento para efectuar la perforación en la tierra hasta la profundidad necesaria, realizándose las siguientes etapas en sucesión: a1) la pieza giratoria superior (1) y la inferior (2) se colocan en posición en la parte superior del mástil (9) y la cargadora (3) se sitúa sobre el eje de perforación de la varilla (7); a2) las dos piezas giratorias (1 y 2) se bajan sobre la cargadora (3), y se hacen girar de manera que atornillen una varilla (7) a la pieza giratoria superior (1) y el tubo de revestimiento (8) correspondiente a la pieza giratoria inferior (2), respectivamente, quedando preparados en la cargadora (3) la varilla y el tubo de revestimiento; a3) se retira la cargadora (3), dejando la varilla (7) y el tubo de revestimiento (8), sobre el eje de perforación, suspendidos de las piezas giratorias (1 y 2) correspondientes; a4) las piezas giratorias (1 y 2) disponen en rotación la batería, constituida por la varilla (7) y el tubo de revestimiento (8) correspondiente, atornillados sobre la varilla subyacente (7'') y el tubo de revestimiento (8'') correspondiente, y la hacen avanzar, perforando de este modo el terreno; a5) en la parte superior se añade otra varilla (7) con el tubo de revestimiento (8) correspondiente con la ayuda de las dos mordazas superiores (4, 5), por medio de las cuales se desatornillan las piezas giratorias (1 y 2) de la varilla y del tubo de revestimiento que sobresalen del suelo, pudiendo elevarse, mientras que la mordaza inferior (6) retiene el tubo de revestimiento (7''); a6) se repite el ciclo de la etapa a2 a la etapa a5 hasta que se complete la operación de perforación; b) operación de extracción de la batería de varillas, incluida la varilla inicial provista del dispositivo de perforación, y los tubos de revestimiento que las contienen, dejándolas apoyados en la cargadora, efectuándose esta operación en las siguientes etapas, es decir: la primera etapa b1) de extracción y disposición de las varillas (7) en la cargadora, y la segunda etapa b2) de extracción y disposición de los tubos de revestimiento (8) en la cargadora; la etapa b1) de extracción y disposición de las varillas (7) en la cargadora consiste en la sucesión de las siguientes etapas: b1a) se hace que ascienda la pieza giratoria superior (1) junto con la pieza giratoria inferior (2), extrayéndose una primera varilla (7) del tubo de revestimiento (8) que, con la ayuda de las mordazas (4, 5 y 6) ha sido desconectada de las varillas subyacentes; la cargadora (3) vuelve al eje de perforación para recibir la varilla (7); b1b) la pieza giratoria superior (1) es desconectada de la varilla (7) y la cargadora (3), que la ha recibido, la conduce a la posición de descanso; b1c) se hace descender la pieza giratoria superior (1) junto con la pieza giratoria inferior (2) y, poniéndose en rotación, se atornilla sobre la siguiente varilla (7), que es mantenida fija por la mordaza intermedia (5); b1d) la pieza giratoria superior (1) asciende, junto con la pieza giratoria inferior (2), mientras que la mordaza superior de desatornillado (4) afloja la siguiente junta; b1e) se repite el ciclo de la etapa b1a a la etapa b1d hasta la extracción completa de todas las varillas, incluido el dispositivo de perforación; consistiendo la etapa b2) de extracción y disposición de los tubos de revestimiento (8) en la cargadora en la sucesión de las siguientes etapas: b2a) la pieza giratoria (1) se coloca en la parte superior y la pieza giratoria inferior (2) en el fondo, conectada al primer tubo de revestimiento (8); b2b) la cargadora (3) se alinea con el eje de perforación, y la pieza giratoria (1) agarra una varilla (7) de tal modo que la cargadora (3) pueda volver a la posición de descanso; b2c) se eleva la pieza inferior (2), revistiendo de este modo la varilla (7) con un tubo de revestimiento (8), desconectado del siguiente tubo de revestimiento (8''), que es retenido por la mordaza inferior (6); b2d) la cargadora (3) recibe la varilla (7) y el tubo de revestimiento (8) en una posición coaxial para conducirlos a la posición de descanso; b2e) se repite el ciclo de la etapa b2a a la etapa b2d hasta que todas las varillas (7) estén en la cargadora (3), revestidas con los tubos de revestimiento (8) correspondientes.Procedure for simultaneously manipulating and loading drill rods and casing tubes by means of a machine provided with two rotating parts (1 and 2), slidably mounted, independent of each other, on the mast (9) of the machine; being able to place along the mast (9) the loader (3) that serves to load some rods (7) and casing tubes (8), being applied on the mast (9), at its lower end, three jaws (4, 5 and 6), designed to unscrew / screw the rods (7) and the casing tubes (8); the procedure being characterized in that it has the following operations carried out successively: a) loading operation of the coating rods / tubes to carry out the drilling in the ground to the necessary depth, the following steps being carried out in succession: a1) the upper rotating part ( 1) and the lower one (2) are placed in position at the top of the mast (9) and the loader (3) is placed on the shaft of the rod (7); a2) the two rotating parts (1 and 2) are lowered onto the loader (3), and rotated so that they screw a rod (7) to the upper rotating part (1) and the corresponding casing tube (8) to the lower rotating part (2), respectively, the rod and the casing tube being prepared in the loader (3); a3) the loader (3) is removed, leaving the rod (7) and the casing tube (8), on the drilling axis, suspended from the corresponding rotating parts (1 and 2); a4) the rotating parts (1 and 2) have in rotation the battery, constituted by the rod (7) and the corresponding casing tube (8), screwed on the underlying rod (7 '') and the casing tube (8 '') corresponding, and move it forward, thus drilling the ground; a5) in the upper part another rod (7) is added with the corresponding casing tube (8) with the help of the two upper jaws (4, 5), by means of which the rotating parts (1 and 2 are unscrewed) ) of the rod and the lining tube protruding from the floor, being able to rise, while the lower jaw (6) retains the lining tube (7 ''); a6) the cycle from stage a2 to stage a5 is repeated until the drilling operation is completed; b) operation of removing the battery of rods, including the initial rod provided with the drilling device, and the lining tubes that contain them, leaving them supported on the loader, performing this operation in the following stages, that is: the first stage b1) extraction and arrangement of the rods (7) in the loader, and the second stage b2) extraction and arrangement of the casing tubes (8) in the loader; step b1) of extraction and arrangement of the rods (7) in the loader consists of the succession of the following stages: b1a) the upper rotating part (1) is made to rise together with the lower rotating part (2), being removed a first rod (7) of the casing tube (8) which, with the help of the jaws (4, 5 and 6) has been disconnected from the underlying rods; the loader (3) returns to the drill shaft to receive the rod (7); b1b) the upper rotating part (1) is disconnected from the rod (7) and the loader (3), which has received it, drives it to the rest position; b1c) the upper rotating part (1) is lowered together with the lower rotating part (2) and, by rotating, is screwed onto the next rod (7), which is held fixed by the intermediate jaw (5); b1d) the upper rotating part (1) rises, together with the lower rotating part (2), while the upper unscrewing jaw (4) loosen the next joint; b1e) the cycle from stage b1a to stage b1d is repeated until all rods are completely removed, including the drilling device; consisting of step b2) of extraction and arrangement of the casing tubes (8) in the loader in succession of the following stages: b2a) the rotating part (1) is placed in the upper part and the lower rotating part (2) at the bottom, connected to the first casing tube (8); b2b) the loader (3) aligns with the drill shaft, and the rotating part (1) grabs a rod (7) so that the loader (3) can return to the rest position; b2c) the lower part (2) is raised, thus coating the rod (7) with a lining tube (8), disconnected from the next lining tube (8 ''), which is retained by the lower jaw (6 ); b2d) the loader (3) receives the rod (7) and the casing tube (8) in a coaxial position to lead them to the resting position; b2e) the cycle from step b2a to step b2d is repeated until all the rods (7) are in the loader (3), coated with the corresponding casing tubes (8).

Description

Procedimiento para manipular y cargar simultáneamente varillas de perforación y tubos de revestimiento mediante dos piezas giratorias independientes.Procedure to handle and load Simultaneously drill rods and casing tubes by two independent rotating parts.

La presente invención se refiere a un procedimiento para manipular y cargar simultáneamente varillas de perforación y tubos de revestimiento mediante dos piezas giratorias independientes.The present invention relates to a procedure to simultaneously manipulate and load rods drilling and casing tubes by two rotating parts independent.

El equipo se basa en la posibilidad, debido a la capacidad para el deslizamiento en toda la longitud del mástil de las dos piezas de extremo giratorio, superior e inferior, de efectuar la maniobra de carga de una batería de perforación compuesta de varillas de perforación y tubos de revestimiento, para perforar un orificio en la tierra, y su recuperación posterior para conducir a la batería de nuevo a un estado de descanso en la cargadora automática.The team is based on the possibility, due to the ability to slide along the entire length of the mast of the two upper and lower rotating end pieces of perform the charging maneuver of a piercing battery composed of drill rods and casing tubes, for drill a hole in the ground, and its subsequent recovery to lead the battery back to a state of rest in the automatic loader

Para manipular las varillas y varillas/tubos de revestimiento en máquinas de perforación, se utiliza principalmente el equipo siguiente: cargadoras, grúas articuladas, sistemas mixtos de grúas más accesorios de agarre o piezas de extremo del torno, véase por ejemplo la patente DE 29706264.To handle the rods and rods / tubes of coating on drilling machines, it is mainly used the following equipment: loaders, articulated cranes, mixed systems of cranes plus grip accessories or winch end pieces, see for example patent DE 29706264.

El equipo compuesto de cargadoras puede ser de los tipos siguientes:The equipment composed of loaders can be of the following types:

a.to.
cargadoras de bastidor, con posibilidades de apilar las varillas o las varillas y los tubos de revestimiento sobre el mástil y con un agarrador hidráulico de manipulación que retira la varilla de la pila, la saca del bastidor y la coloca en el centro de la pila;frame loaders, with possibilities of stacking rods or rods and tubes lining on the mast and with a hydraulic grip of handling that removes the rod from the battery, takes it out of the frame and places it in the center of the pile;

b.b.
cargadoras giratorias, con posibilidad de apilar las varillas o varillas y tubos de revestimiento sobre el mástil y con un sistema para la rotación hidráulica del brazo de soporte o pescante de la cargadora que agarra la varilla del bastidor y la coloca en el centro de una pila;rotating loaders, with possibility of stacking the rods or rods and casing tubes over the mast and with a system for the hydraulic rotation of the arm of support or davit of the loader that grabs the rod of the frame and place it in the center of a stack;

c.C.
cargadoras de bastidor simplificado: en algunas máquinas para la perforación de pozos el bastidor va fijado al mástil, y la pieza giratoria, provista de un desplazamiento lateral, se mueve para recoger la varilla; la ventaja reside en el hecho de que no es necesario el manipulador, y la limitación está representada por el hecho de que las varillas solo pueden ser unas pocas, dos o tres como mucho;Simplified frame loaders: in some well drilling machines the frame is fixed to the mast, and the rotating part, provided with a displacement lateral, moves to pick up the rod; the advantage lies in the fact that the manipulator is not necessary, and the limitation is represented by the fact that the rods can only be ones few, two or three at most;

d.d.
cargadoras de bastidor de pozo: en máquinas de perforación de pozos, el bastidor está situado en la máquina básica y un brazo recoge la varilla y la alinea (cuanto mayor es el número de varillas, más complejo es el sistema).well loaders: in well drilling machines, the frame is located in the basic machine and an arm picks up the rod and aligns it (how much The greater the number of rods, the more complex the system).

Cuando se compara con la utilización de cargadoras dobles o cargadoras individuales para varillas y cargadoras individuales para tuberías o de ambos tipos de cargadoras del tipo giratorio, se obtienen notables reducciones en términos de peso y volúmenes, así como una mayor simplicidad de maniobra.When compared to the use of double loaders or individual loaders for rods and individual loaders for pipes or both types of loaders of the rotating type, noticeable reductions in terms of weight and volumes, as well as greater simplicity of maneuver.

Para los objetivos indicados anteriormente, y otros objetivos que se pondrán más claramente de manifiesto a continuación, la invención propone un procedimiento para manipular y cargar simultáneamente varillas y tubos de revestimiento por medio de dos piezas giratorias independientes según la reivindicación 1.For the objectives indicated above, and other objectives that will be more clearly revealed to Next, the invention proposes a method for handling and simultaneously load rods and casing tubes of two independent rotating parts according to claim one.

A continuación, se describirá el procedimiento según la invención haciendo referencia a los dibujos adjuntos, en los cuales:Next, the procedure will be described. according to the invention referring to the attached drawings, in which:

- la figura 1 ilustra una máquina de perforación con el equipo que pone en práctica el procedimiento según la presente invención;- Figure 1 illustrates a drilling machine with the team that implements the procedure according to the present invention;

- las figuras 2 a 5 son representaciones esquemáticas de la máquina de la figura 1, que ilustran la secuencia de perforación, con la carga simultánea de varillas y tubos de revestimiento;- Figures 2 to 5 are representations schematics of the machine of figure 1, illustrating the sequence  drilling, with simultaneous loading of rods and tubes coating;

- las figuras 6 a 9 muestran, de nuevo esquemáticamente, la secuencia de extracción de solo las varillas; y- Figures 6 to 9 show, again schematically, the extraction sequence of only the rods; Y

- las figuras 10 a 13 muestran de nuevo esquemáticamente, la secuencia de extracción de solo los tubos de revestimiento.- Figures 10 to 13 show again schematically, the extraction sequence of only the tubes of coating.

En la figura 1, se representa la máquina según la invención. Tiene esencialmente dos piezas giratorias 1 y 2 montadas deslizantemente, independientes entre sí, sobre un mástil 9.In figure 1, the machine according to the invention. It has essentially two rotating parts 1 and 2 slidably mounted, independent of each other, on a mast 9.

Junto al mástil 9 se encuentra una cargadora 3 para unas varillas 7 y unos tubos de revestimiento 8. Como puede observarse, la cargadora 3 está situada bajo las piezas giratorias 1 y 2 cuando éstas están en el extremo superior del recorrido.Next to the mast 9 is a loader 3 for rods 7 and casing tubes 8. How can you Observe, the loader 3 is located under the rotating parts 1 and 2 when they are at the upper end of the course.

En la parte inferior, fijadas sobre el mástil 9, existen tres mordazas 4, 5 y 6, que son necesarias, como se verá, para desatornillar las varillas 7 y los tubos de revestimiento 8.At the bottom, fixed on the mast 9, there are three jaws 4, 5 and 6, which are necessary, as will be seen, to unscrew the rods 7 and the casing tubes 8.

En primer lugar, se debe considerar la etapa de cargar las varillas/tubos de revestimiento a fin de efectuar la perforación en la tierra a la profundidad necesaria. Para esta primera etapa se hará referencia a las figuras 2 a 5. En primer lugar, en la figura 2 puede observarse que la pieza giratoria superior 1 y la pieza giratoria inferior 2 están en la posición superior del mástil 9, y la cargadora 3 es llevada sobre el eje de perforación de la varilla 8.First, the stage of load the coating rods / tubes in order to carry out the drilling in the ground at the necessary depth. For this first stage reference will be made to figures 2 to 5. First place, in figure 2 it can be seen that the rotating part upper 1 and lower rotating part 2 are in position upper of the mast 9, and the loader 3 is carried on the axis of rod drilling 8.

En la figura 3, se hacen descender las dos piezas giratorias 1 y 2 sobre la cargadora 3 y se hace que giren a fin de atornillar una varilla a la pieza giratoria superior 1 y el tubo de revestimiento a la pieza giratoria inferior 2, estando listos ya la varilla y el tubo de revestimiento en la cargadora 3.In figure 3, the two are lowered rotating parts 1 and 2 on the loader 3 and are made to rotate to in order to screw a rod to the upper rotating part 1 and the casing tube to the lower rotating part 2, being ready the rod and the casing tube in the loader 3.

En la figura 4, se retira la cargadora 3, dejándose la varilla 7 y el tubo de revestimiento 8 en el eje de perforación, suspendidos de las piezas giratorias correspondientes.In figure 4, the loader 3 is removed, leaving the rod 7 and the lining tube 8 on the shaft of drilling, suspended rotating parts corresponding.

En la figura 5, las piezas giratorias 1 y 2 hacen girar la batería compuesta por la varilla 7 y el tubo de revestimiento 8 correspondiente, atornillado sobre la varilla subyacente 7' y el tubo de revestimiento 8' correspondiente, haciendo que avance, perforando de ese modo la tierra.In figure 5, rotating parts 1 and 2 they rotate the battery consisting of rod 7 and the tube of corresponding coating 8, screwed onto the rod underlying 7 'and the corresponding lining tube 8', causing it to advance, thereby drilling the earth.

A medida que la batería se sumerge en la tierra, es necesario añadir sobre ella otra varilla 7 con el tubo de revestimiento 8 correspondiente de modo que, con ayuda de las mordazas 4 y 5 se desatornillan las piezas giratorias 1 y 2 de la varilla y el tubo de revestimiento que sobresalen del terreno, pudiendo subir, mientras que la mordaza 6 retiene el tubo de revestimiento 8. El ciclo comienza de nuevo desde la etapa ilustrada en la figura 2 y se repite hasta que se complete la perforación.As the battery dips into the ground, it is necessary to add another rod 7 with the tube corresponding coating 8 so that, with the help of jaws 4 and 5 unscrew the rotating parts 1 and 2 of the rod and casing tube protruding from the ground, being able to climb, while jaw 6 retains the tube of lining 8. The cycle starts again from the stage illustrated in figure 2 and repeated until the drilling.

Una vez completada la perforación, es preciso extraer la batería de varillas, incluida la varilla inicial dotada del dispositivo de perforación, y los tubos de revestimiento que las contienen, dejándolas apoyadas en la cargadora. Esta operación se realiza en dos etapas sucesivas: una primera etapa de extracción de las varillas 7 y su colocación en la cargadora y una segunda etapa de extracción de los tubos de revestimiento 8 y su colocación ordenada en la cargadora.Once the drilling is completed, it is necessary remove the battery of rods, including the initial rod provided of the drilling device, and the lining tubes that they contain, leaving them resting on the loader. This operation is performs in two successive stages: a first stage of extraction of the rods 7 and their placement in the loader and a second stage of extraction of the lining tubes 8 and their placement ordered in the loader.

En las figuras 6 a 9, se representa la primera de las dos etapas. En la figura 6, en primer lugar puede observarse que la pieza giratoria 1 ha subido junto con la pieza giratoria 2, extrayéndose una primera varilla 7 del tubo de revestimiento 8 y, con la ayuda de las mordazas 4, 5 y 6, la ha desconectado de las varillas subyacentes. La cargadora 3 vuelve a colocarse sola sobre el eje de perforación para recibir la varilla 7.In figures 6 to 9, the first is represented of the two stages. In Figure 6, you can first observe that the rotating part 1 has risen together with the rotating part 2, removing a first rod 7 from the casing tube 8 and, with the help of jaws 4, 5 and 6, you have disconnected it from the underlying rods. Loader 3 returns to stand alone on the drill shaft to receive the rod 7.

En la figura 7, la pieza giratoria 1 se ha desconectado de la varilla, y la cargadora 3, que la ha recibido, la lleva a la posición de descanso.In figure 7, the rotating part 1 has been disconnected from the rod, and the loader 3, which has received it, He takes her to the resting position.

En la figura 8, se baja la pieza giratoria 1 junto con la pieza giratoria 2 y, poniéndose en rotación, se atornilla sobre la siguiente varilla 7, que es mantenida fija por la mordaza 5.In figure 8, the rotating part 1 is lowered together with the rotating part 2 and, by rotating, screw on the next rod 7, which is held fixed by the gag 5.

La pieza giratoria 1 puede ahora subir junto con la pieza giratoria 2, mientras que la mordaza de desatornillado 4 afloja la siguiente junta, y la secuencia vuelve a la etapa representada en la figura 6, desde la cual se repite el ciclo recién descrito hasta que todas la varillas, incluido el dispositivo de perforación, hayan sido extraídos completamente.The rotating part 1 can now rise together with the rotating part 2 while the unscrewing jaw 4 loosen the next joint, and the sequence returns to the stage represented in figure 6, from which the cycle is repeated just described until all the rods, including the device of drilling, have been completely removed.

En la figura 9, el tubo de revestimiento 8 es rellenado con un refuerzo 10 y una lechada de cemento o cualquier otro elemento que se contemple en el proyecto. La pieza giratoria 1 se mantenida alta de modo que no estorbe el acceso al orificio perforado.In Figure 9, the lining tube 8 is filled with a reinforcement 10 and a cement grout or any another element that is contemplated in the project. The rotating part 1 remains high so that access to the hole is not hindered Perforated.

La pieza giratoria 2 es mantenida preferentemente en la parte de arriba a fin de reducir el obstáculo en la zona de trabajo, facilitar la operación de desatornillado, y protegerlo de cualquier daño accidental.The rotating part 2 is maintained preferably at the top to reduce the obstacle in the work area, facilitate the unscrewing operation, and Protect it from any accidental damage.

La secuencia de funcionamiento descrita en las figuras 6 a 9 puede, no obstante, efectuarse también con la pieza giratoria 2 mantenida permanentemente en la posición inferior. En este caso, el manguito para la conexión de la pieza giratoria 2 al tubo de revestimiento debe mantenerse fuera de las mordazas 4 y 5.The sequence of operation described in the Figures 6 to 9 can, however, also be done with the part swivel 2 permanently held in the lower position. In In this case, the sleeve for connecting the rotating part 2 to the casing tube must be kept out of jaws 4 and 5.

Las figuras 10 a 13 muestran de nuevo esquemáticamente la segunda fase de la operación de extracción de las varillas y los tubos de revestimiento respectivos, es decir, la fase de extracción de solo los tubos de revestimiento 8.Figures 10 to 13 show again schematically the second phase of the extraction operation of the respective rods and casing tubes, that is, the extraction phase of only the lining tubes 8.

En la figura 10, la pieza giratoria 1 está arriba y la pieza giratoria 2 está abajo, conectada al primer tubo de revestimiento 8. Las varillas 7 están todas en la cargadora 3.In figure 10, the rotating part 1 is up and the rotating part 2 is down, connected to the first tube of coating 8. The rods 7 are all in the loader 3.

En la figura 11, la cargadora 3 ha sido llevada hacia arriba alineada con la varilla de perforación, y la pieza giratoria 1 ha recogido una varilla 7 de modo que la cargadora 3 pueda regresar al estado de descanso.In figure 11, the loader 3 has been carried facing up aligned with the drill rod, and the piece swivel 1 has picked up a rod 7 so that the loader 3 I can return to the state of rest.

En la figura 12, la pieza giratoria 2 se ha movido hacia arriba, revistiendo así la varilla 7 con un tubo de revestimiento 8 que se desconecta del tubo de revestimiento posterior 8', que es retenido por la mordaza 6.In figure 12, the rotating part 2 has been moved up, thus covering the rod 7 with a tube of liner 8 that is disconnected from the liner tube posterior 8 ', which is retained by jaw 6.

En la figura 13, la cargadora 3 recibe la varilla 7 y el tubo de revestimiento 8 en una posición coaxial a fin de colocarlos en estado de descanso.In figure 13, loader 3 receives the rod 7 and the casing tube 8 in a coaxial position so of placing them in a state of rest.

La secuencia vuelve a la etapa ilustrada en la figura 10, y se repite el ciclo hasta que todas las varillas 7 están en la cargadora 3, revestidas con los tubos de revestimiento 8 correspondientes.The sequence returns to the stage illustrated in the figure 10, and the cycle is repeated until all the rods 7 are in loader 3, lined with casing tubes 8 corresponding.

Claims (3)

1. Procedimiento para manipular y cargar simultáneamente varillas de perforación y tubos de revestimiento mediante una máquina provista de dos piezas giratorias (1 y 2), montadas deslizantemente, independientes entre sí, sobre el mástil (9) de la máquina; pudiéndose colocar a lo largo del mástil (9) la cargadora (3) que sirve para cargar unas varillas (7) y tubos de revestimiento (8), aplicándose sobre el mástil (9), en su extremo inferior, tres mordazas (4, 5 y 6), diseñadas para desatornillar/atornillar las varillas (7) y los tubos de revestimiento (8); estando caracterizado el procedimiento porque presenta las siguientes operaciones realizadas sucesivamente:1. Procedure for simultaneously manipulating and loading drill rods and casing tubes by means of a machine provided with two rotating parts (1 and 2), slidably mounted, independent of each other, on the mast (9) of the machine; being able to place along the mast (9) the loader (3) that serves to load rods (7) and casing tubes (8), applying on the mast (9), at its lower end, three jaws (4, 5 and 6), designed to unscrew / screw the rods (7) and the casing tubes (8); the procedure being characterized because it presents the following operations performed successively:
a)to)
operación de carga de las varillas/tubos de revestimiento para efectuar la perforación en la tierra hasta la profundidad necesaria, realizándose las siguientes etapas en sucesión:loading operation coating rods / tubes for drilling in the land to the necessary depth, performing the following stages in succession:
a1) a1)
la pieza giratoria superior (1) y la inferior (2) se colocan en posición en la parte superior del mástil (9) y la cargadora (3) se sitúa sobre el eje de perforación de la varilla (7);the upper rotating part (1) and the lower one (2) are placed in position at the top of the mast (9) and the loader (3) is placed on the shaft of the rod (7);
a2) a2)
las dos piezas giratorias (1 y 2) se bajan sobre la cargadora (3), y se hacen girar de manera que atornillen una varilla (7) a la pieza giratoria superior (1) y el tubo de revestimiento (8) correspondiente a la pieza giratoria inferior (2), respectivamente, quedando preparados en la cargadora (3) la varilla y el tubo de revestimiento;the two rotating parts (1 and 2) are lowered on the loader (3), and are rotated so that they screw a rod (7) to the upper rotating part (1) and the casing tube (8) corresponding to the lower rotating part (2), respectively, being prepared in the loader (3) the rod and the tube of coating;
a3) a3)
se retira la cargadora (3), dejando la varilla (7) y el tubo de revestimiento (8), sobre el eje de perforación, suspendidos de las piezas giratorias (1 y 2) correspondientes;the loader (3) is removed, leaving the rod (7) and the casing tube (8), on the drill shaft, suspended from rotating parts (1 and 2) corresponding;
a4) a4)
las piezas giratorias (1 y 2) disponen en rotación la batería, constituida por la varilla (7) y el tubo de revestimiento (8) correspondiente, atornillados sobre la varilla subyacente (7') y el tubo de revestimiento (8') correspondiente, y la hacen avanzar, perforando de este modo el terreno;the rotating parts (1 and 2) have rotation the battery, consisting of the rod (7) and the tube of corresponding coating (8), screwed onto the rod underlying (7 ') and the corresponding casing tube (8'), and they move it forward, thus drilling the ground;
a5) to 5)
en la parte superior se añade otra varilla (7) con el tubo de revestimiento (8) correspondiente con la ayuda de las dos mordazas superiores (4, 5), por medio de las cuales se desatornillan las piezas giratorias (1 y 2) de la varilla y del tubo de revestimiento que sobresalen del suelo, pudiendo elevarse, mientras que la mordaza inferior (6) retiene el tubo de revestimiento (7');in the upper part another rod (7) is added with the corresponding casing tube (8) with the help of both upper jaws (4, 5), by means of which they are unscrewed the rotating parts (1 and 2) of the rod and tube lining protruding from the floor, being able to rise while that the lower jaw (6) retains the casing tube (7 ');
a6) a6)
se repite el ciclo de la etapa a2 a la etapa a5 hasta que se complete la operación de perforación;the cycle from stage a2 to stage a5 is repeated until the drilling operation is completed;
b)b)
operación de extracción de la batería de varillas, incluida la varilla inicial provista del dispositivo de perforación, y los tubos de revestimiento que las contienen, dejándolas apoyados en la cargadora, efectuándose esta operación en las siguientes etapas, es decir: la primera etapa b1) de extracción y disposición de las varillas (7) en la cargadora, y la segunda etapa b2) de extracción y disposición de los tubos de revestimiento (8) en la cargadora; la etapa b1) de extracción y disposición de las varillas (7) en la cargadora consiste en la sucesión de las siguientes etapas:battery removal operation of rods, including the initial rod provided with the device drilling, and the lining tubes that contain them, leaving them supported on the loader, carrying out this operation in the following stages, that is: the first stage b1) of extraction and arrangement of the rods (7) in the loader, and the second stage b2) removal and arrangement of the casing tubes (8) in the loader; step b1) of extraction and disposal of rods (7) in the loader consists of the succession of following stages:
b1a) b1a)
se hace que ascienda la pieza giratoria superior (1) junto con la pieza giratoria inferior (2), extrayéndose una primera varilla (7) del tubo de revestimiento (8) que, con la ayuda de las mordazas (4, 5 y 6) ha sido desconectada de las varillas subyacentes; la cargadora (3) vuelve al eje de perforación para recibir la varilla (7);the upper rotating part is raised (1) together with the lower rotating part (2), removing a first rod (7) of the casing tube (8) which, with the help of jaws (4, 5 and 6) have been disconnected from the rods underlying; the loader (3) returns to the drilling shaft to receive the rod (7);
b1b) b1b)
la pieza giratoria superior (1) es desconectada de la varilla (7) y la cargadora (3), que la ha recibido, la conduce a la posición de descanso;the upper rotating part (1) is disconnected from the rod (7) and the loader (3), which has received it, leads it to the resting position;
b1c) b1c)
se hace descender la pieza giratoria superior (1) junto con la pieza giratoria inferior (2) y, poniéndose en rotación, se atornilla sobre la siguiente varilla (7), que es mantenida fija por la mordaza intermedia (5);the upper rotating part is lowered (1) together with the lower rotating part (2) and, by rotating, it is screwed onto the next rod (7), which is held fixed by the intermediate jaw (5);
b1d) b1d)
la pieza giratoria superior (1) asciende, junto con la pieza giratoria inferior (2), mientras que la mordaza superior de desatornillado (4) afloja la siguiente junta;the upper rotating part (1) ascends, together with the lower rotating part (2), while the upper jaw of unscrewed (4) loosen the next joint;
b1e) b1e)
se repite el ciclo de la etapa b1a a la etapa b1d hasta la extracción completa de todas las varillas, incluido el dispositivo de perforación;the cycle from stage b1a to stage b1d is repeated until complete removal of all rods, including the drilling device;
consistiendo la etapa b2) de extracción y disposición de los tubos de revestimiento (8) en la cargadora en la sucesión de las siguientes etapas:consisting of stage b2) removal and arrangement of the casing tubes (8) in the loader in succession of the following stages:
b2a) b2a)
la pieza giratoria (1) se coloca en la parte superior y la pieza giratoria inferior (2) en el fondo, conectada al primer tubo de revestimiento (8);the rotating part (1) is placed in the part upper and lower rotating part (2) at the bottom, connected to the first casing tube (8);
b2b) b2b)
la cargadora (3) se alinea con el eje de perforación, y la pieza giratoria (1) agarra una varilla (7) de tal modo que la cargadora (3) pueda volver a la posición de descanso;the loader (3) aligns with the axis of drilling, and the rotating part (1) grabs a rod (7) of such so that the loader (3) can return to the position of break;
b2c) b2c)
se eleva la pieza inferior (2), revistiendo de este modo la varilla (7) con un tubo de revestimiento (8), desconectado del siguiente tubo de revestimiento (8'), que es retenido por la mordaza inferior (6);the lower part (2) is raised, covered with this rod mode (7) with a casing tube (8), disconnected of the next casing tube (8 '), which is retained by the lower jaw (6);
b2d) b2d)
la cargadora (3) recibe la varilla (7) y el tubo de revestimiento (8) en una posición coaxial para conducirlos a la posición de descanso;the loader (3) receives the rod (7) and the tube lining (8) in a coaxial position to lead them to the resting position;
b2e) b2e)
se repite el ciclo de la etapa b2a a la etapa b2d hasta que todas las varillas (7) estén en la cargadora (3), revestidas con los tubos de revestimiento (8) correspondientes.the cycle from stage b2a to stage b2d is repeated until all the rods (7) are in the loader (3), coated with casing tubes (8) corresponding.
2. Procedimiento según la reivindicación 1, caracterizado porque después de la etapa b1e), el tubo de revestimiento (8), conectado con la pieza giratoria inferior (2), se llena con un refuerzo (10) y lechada de cemento o cualquier cosa que se contemple en el proyecto.2. Method according to claim 1, characterized in that after step b1e), the casing tube (8), connected with the lower rotating part (2), is filled with a reinforcement (10) and cement grout or anything that is contemplated in the project. 3. Procedimiento según la reivindicación 1, caracterizado porque en las etapas b1a a b1e la pieza giratoria (2) se mantiene permanentemente en una posición inferior.3. Method according to claim 1, characterized in that in steps b1a to b1e the rotating part (2) is permanently maintained in a lower position.
ES08006077T 2007-04-12 2008-03-28 PROCEDURE FOR HANDLING AND LOADING SIMULTANEOUSLY DRILLING RODS AND COVERING PIPES THROUGH TWO INDEPENDENT ROTATING PARTS. Active ES2337745T3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ITTO07A0253 2007-04-12
IT000253A ITTO20070253A1 (en) 2007-04-12 2007-04-12 PROCEDURE FOR THE HANDLING AND CONTEMPORARY LOADING OF DRILL RODS AND LINING PIPES BY MEANS OF TWO INDEPENDENT ROTARY.

Publications (1)

Publication Number Publication Date
ES2337745T3 true ES2337745T3 (en) 2010-04-28

Family

ID=39691126

Family Applications (1)

Application Number Title Priority Date Filing Date
ES08006077T Active ES2337745T3 (en) 2007-04-12 2008-03-28 PROCEDURE FOR HANDLING AND LOADING SIMULTANEOUSLY DRILLING RODS AND COVERING PIPES THROUGH TWO INDEPENDENT ROTATING PARTS.

Country Status (4)

Country Link
EP (1) EP1980709B1 (en)
DE (1) DE602008000359D1 (en)
ES (1) ES2337745T3 (en)
IT (1) ITTO20070253A1 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NO333609B1 (en) 2009-02-26 2013-07-22 West Drilling Products As Method for discharging and inserting a drill string into a borehole and apparatus for use in the practice of the method of drilling
CN102400648B (en) * 2011-10-28 2013-10-23 恒天九五重工有限公司 Detachable follow-up frame and installation process thereof
US9091128B1 (en) * 2011-11-18 2015-07-28 T&T Engineering Services, Inc. Drill floor mountable automated pipe racking system
NO336850B1 (en) 2012-02-22 2015-11-16 West Drilling Products As Device at pipe handling unit as well as methods for insertion and extraction from a borehole of a pipe string
US9476267B2 (en) 2013-03-15 2016-10-25 T&T Engineering Services, Inc. System and method for raising and lowering a drill floor mountable automated pipe racking system
AU2016100200B4 (en) * 2015-06-09 2016-07-21 Southern Seawall Solutions Pty Limited Improved caisson emplacement system and method
AU2018286620A1 (en) 2015-06-09 2020-07-16 Southern Seawall Solutions Pty Limited Improved caisson and wall element system and method and apparatus for constructing shoring walls
WO2019226913A1 (en) * 2018-05-24 2019-11-28 Benthic Usa Llc Dual rotary elevating geotechnical drill
KR102156683B1 (en) * 2019-02-13 2020-09-16 강익희 A Improved Punching Machine For Straight Punching and Construction Method Thereof
IT201900003035A1 (en) * 2019-03-01 2020-09-01 Beretta Alfredo S R L ARTICULATED SUPPORT OF MAST DEVICE FOR A DRILLING AND RELATIVE DRILLING MACHINE
CN110029951A (en) * 2019-05-31 2019-07-19 贵州大学 A kind of segmentation drilling rod docking facilities
CN110566141B (en) * 2019-10-18 2024-06-11 江苏如石机械股份有限公司 Dual-purpose power tongs for drill pipe and casing

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02157388A (en) * 1988-12-07 1990-06-18 Yoshihiko Kawai Large bore drilling device
DE4126919A1 (en) * 1991-08-14 1993-02-18 Stump Bohr Gmbh METHOD AND DRILLING DEVICE FOR DRILLING HOLES IN EARTH OR ROCK, ESPECIALLY FOR THE PRODUCTION OF PRESSURE ANCHORS
NL1003072C1 (en) * 1996-05-09 1997-11-18 Visser & Smit Bouw Bv Method for inserting foundation-component in ground
EP0860582B1 (en) * 1997-02-25 2001-10-04 Hütte & Co. Bohrtechnik Gesellschaft mit beschränkter Haftung Method and apparatus for drilling with dual tube drillstring
US20030221870A1 (en) * 2002-06-01 2003-12-04 Johnson Howard E. Earth loop heat exchange methods and systems
FI121025B (en) * 2004-12-07 2010-06-15 Sandvik Mining & Constr Oy Method for pipe drilling, drilling unit and adapter
CA2650863C (en) * 2006-05-09 2012-09-04 Comacchio International S.A. Drilling machine with carousel-type drill stem and shroud tube loader

Also Published As

Publication number Publication date
EP1980709B1 (en) 2009-12-09
DE602008000359D1 (en) 2010-01-21
EP1980709A1 (en) 2008-10-15
ITTO20070253A1 (en) 2008-10-13

Similar Documents

Publication Publication Date Title
ES2337745T3 (en) PROCEDURE FOR HANDLING AND LOADING SIMULTANEOUSLY DRILLING RODS AND COVERING PIPES THROUGH TWO INDEPENDENT ROTATING PARTS.
ES2791226T3 (en) Handling vehicle for transporting, handling, loading and collecting bars and / or pipes and / or drilling tools
US3835940A (en) Earth drilling apparatus and method
CN103228860B (en) Method, excavation apparatus and associated computer program for handling drill pipe and tubular wellbore casing elements
CN113898390A (en) Mining automatic collaborative drilling and anchoring robot
EP2799661A3 (en) Automatic drill rod handling
AU769454B2 (en) Drill rod loader
US20190316427A1 (en) Drill rod handler
ES2343546T3 (en) WELL DRILLING MACHINE WITH NEW DRILLING PIPE LOADER.
ES2299609T3 (en) METHOD AND DEVICE TO AVOID SLIPPING OF PIPES.
CN108691513A (en) A kind of Operating Pressure well head plays down tube and fortune pipe automation operating system and its device
BR102015007997A2 (en) punch and applicator and method of installing
WO2016008060A1 (en) Semiautomated drill rod handling apparatus and method
CN103189591B (en) Drill pipe stopping and automatic handling equipment and related drilling machines
JP6501811B2 (en) Double tube rod desorption device
CN109322682A (en) A kind of arch trolley manipulator
ITPC20150006A1 (en) EQUIPMENT FOR HANDLING DRILLING RODS
ES2769044T3 (en) Bar loader system and procedure
EP0565502B1 (en) Pipe handling equipment and method for a rock drilling machine
JPH11173800A (en) Blasting method and blasting tube
US9523249B2 (en) Pipe rack and method for feeding and removing tubular bodies to and from a drilling installation
ES2212067T3 (en) DEVICE FOR HANDLING OF DRILLING ELEMENTS.
ES2905796T3 (en) Rotary charger unit for drill rods and pipes
CN106272371A (en) A kind of space under-deck cargoes bag clamping and placing system and method
US11448070B2 (en) Rock bolting rig and method at rock bolting rig