ES2116136B1 - COMBINATION IMPROVEMENT PROCEDURE BETWEEN A GAS TURBINE AND A VAPOR CYCLE WITH ANOTHER NON-FOSSIL SOURCE OF PRIMARY ENERGY. - Google Patents
COMBINATION IMPROVEMENT PROCEDURE BETWEEN A GAS TURBINE AND A VAPOR CYCLE WITH ANOTHER NON-FOSSIL SOURCE OF PRIMARY ENERGY.Info
- Publication number
- ES2116136B1 ES2116136B1 ES9300930A ES9300930A ES2116136B1 ES 2116136 B1 ES2116136 B1 ES 2116136B1 ES 9300930 A ES9300930 A ES 9300930A ES 9300930 A ES9300930 A ES 9300930A ES 2116136 B1 ES2116136 B1 ES 2116136B1
- Authority
- ES
- Spain
- Prior art keywords
- gas turbine
- vapor
- steam
- another non
- primary energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
Abstract
PROCEDIMIENTO DE MEJORA DE LA COMBINACION ENTRE UNA TURBINA DE GAS Y UN CICLO DE VAPOR CON OTRA FUENTE NO FOSIL DE ENERGIA PRIMARIA, CONSISTENTE EN APROVECHAR PARTE DEL CALOR RESIDUAL DE LOS GASES DE ESCAPE DE LA TURBINA DE GAS PARA REALIZAR UN RECALENTAMIENTO A PRESION INTERMEDIA DEL FLUJO PRINCIPAL DEL CIELO DE VAPOR. CON OBJETO DE OPTIMIZAR EL PROCESO, ES CONVENIENTE EN CIERTOS CASOS COMPLEMENTAR LA ABSORCION DE ENERGIA DE LOS GASES DE ESCAPE VAPORIZANDO FLUIDO DE TRABAJO A LA PRESION INTERMEDIA, QUE PUEDE SER AGUA, SI EL CICLO DE VAPOR ES UNO CONVENCIONAL DE VAPOR DE AGUA, O UN FLUIDO MENOS VOLATIL QUE EL AGUA, DE TAL FORMA QUE EL CICLO DE VAPOR OPERE CON VAPOR MEZCLA EN LA ZONA DE BAJA PRESION Y CON VAPOR DE AGUA PRACTICAMENTE EN LA ZONA DE ALTA PRESION.COMBINATION IMPROVEMENT PROCEDURE BETWEEN A GAS TURBINE AND A VAPOR CYCLE WITH ANOTHER NON-FOSSIL SOURCE OF PRIMARY ENERGY, CONSISTING OF TAKING ADVANTAGE OF THE RESIDUAL HEAT OF THE GAS TURBINE EXHAUST GASES TO PERFORM AN INTERMEDIATE PRESSURE OVERHEAT MAIN FLOW OF THE STEAM HEAVEN. IN ORDER TO OPTIMIZE THE PROCESS, IT IS SUITABLE IN CERTAIN CASES TO COMPLEMENT THE ENERGY ABSORPTION OF EXHAUST GAS BY VAPORIZING WORKING FLUID AT INTERMEDIATE PRESSURE, WHICH MAY BE A CONVENTIONAL VAPOR VAPOR OF STEAM A FLUID LESS VOLATILE THAN WATER, SO THAT THE STEAM CYCLE OPERATES WITH STEAM MIXING IN THE LOW PRESSURE ZONE AND WITH WATER VAPOR PRACTICALLY IN THE HIGH PRESSURE ZONE.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES9300930A ES2116136B1 (en) | 1993-05-03 | 1993-05-03 | COMBINATION IMPROVEMENT PROCEDURE BETWEEN A GAS TURBINE AND A VAPOR CYCLE WITH ANOTHER NON-FOSSIL SOURCE OF PRIMARY ENERGY. |
EP94907572A EP0664377A1 (en) | 1993-05-03 | 1994-02-18 | Method for improving the combination between un gas turbine and a steam cycle with an another non fossile source of primary energy |
PCT/ES1994/000017 WO1994025739A1 (en) | 1993-05-03 | 1994-02-18 | Method for improving the combination between un gas turbine and a steam cycle with an another non fossile source of primary energy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ES9300930A ES2116136B1 (en) | 1993-05-03 | 1993-05-03 | COMBINATION IMPROVEMENT PROCEDURE BETWEEN A GAS TURBINE AND A VAPOR CYCLE WITH ANOTHER NON-FOSSIL SOURCE OF PRIMARY ENERGY. |
Publications (2)
Publication Number | Publication Date |
---|---|
ES2116136A1 ES2116136A1 (en) | 1998-07-01 |
ES2116136B1 true ES2116136B1 (en) | 1998-12-16 |
Family
ID=8281672
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES9300930A Expired - Fee Related ES2116136B1 (en) | 1993-05-03 | 1993-05-03 | COMBINATION IMPROVEMENT PROCEDURE BETWEEN A GAS TURBINE AND A VAPOR CYCLE WITH ANOTHER NON-FOSSIL SOURCE OF PRIMARY ENERGY. |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0664377A1 (en) |
ES (1) | ES2116136B1 (en) |
WO (1) | WO1994025739A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19538670A1 (en) * | 1995-10-17 | 1997-04-24 | Siemens Ag | Process for generating energy and power plant for carrying out the process |
WO2010057279A1 (en) * | 2008-11-24 | 2010-05-27 | Ribeiro Sergio Vieira Guerreir | High efficiency waste to energy power plants combining municipal solid waste and natural gas |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2005135A6 (en) * | 1987-04-08 | 1989-03-01 | Carnot Sa | Power cycle working with a mixture of substances. |
NL8701573A (en) * | 1987-07-03 | 1989-02-01 | Prometheus Energy Systems | METHOD AND APPARATUS FOR GENERATING ELECTRICAL AND / OR MECHANICAL ENERGY FROM AT LEAST A LOW-VALUE FUEL. |
ES2006059A6 (en) * | 1988-01-21 | 1989-04-01 | Sener Ing & Sist | System for the production of water vapour with high pressure and temperature levels. |
DE4101064A1 (en) * | 1991-01-16 | 1992-07-23 | Radebeul Energie Umwelt | Operating combined steam and gas turbine power plant - uses waste heat boiler without extra firing behind gas turbine, whose steam is added to steam turbine |
DE4103228A1 (en) * | 1991-02-02 | 1992-08-06 | Radebeul Energie Umwelt | Super heating in combined steam and gas turbine power station plant - uses available heat of combined steam and gas turbine sets to give increased efficiency in old plant |
DE4117191C2 (en) * | 1991-05-25 | 1994-11-24 | Saarbergwerke Ag | Combined gas-steam power plant to generate energy |
-
1993
- 1993-05-03 ES ES9300930A patent/ES2116136B1/en not_active Expired - Fee Related
-
1994
- 1994-02-18 WO PCT/ES1994/000017 patent/WO1994025739A1/en not_active Application Discontinuation
- 1994-02-18 EP EP94907572A patent/EP0664377A1/en not_active Withdrawn
Also Published As
Publication number | Publication date |
---|---|
ES2116136A1 (en) | 1998-07-01 |
WO1994025739A1 (en) | 1994-11-10 |
EP0664377A1 (en) | 1995-07-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CO4410232A1 (en) | PARTIAL OXIDATION PROCESS WITH ENERGY PRODUCTION | |
BR8203563A (en) | PROCESS AND APPLIANCE FOR COMPRESSING GAS AND INSTALLATION | |
ES2045825T5 (en) | REFORM WITH STEAM. | |
KR950703116A (en) | METHOD AND APPARATUS FOR INCREASING EFFICIENCY AND PRODUCTIVITY IN A POWER GENERATION CYCLE | |
ES2141195T3 (en) | THERMOELECTRIC POWER PLANT COMBINED WITH COMBUSTION GAS AND WATER STEAM TURBINE. | |
ES2121608T3 (en) | PERFECTED FACILITY PRODUCER OF COMBINED CYCLES ENERGY SUPPLIED BY LIQUEFIED NATURAL GAS. | |
ES2107915T3 (en) | PROCEDURE FOR THE OPERATION OF A GAS AND STEAM TURBINE INSTALLATION, AS WELL AS AN INSTALLATION THAT WORKS ACCORDING TO SUCH PROCEDURE. | |
BR7706937A (en) | PROCESS TO REDUCE WATER VAPOR CONCENTRATION IN A MIXTURE OF THE SAME WITH A SECOND GAS FOR LESS THAN THE MAXIMUM LIMIT CONCENTRATION OF THE SAME SECOND GAS, AND APPLIANCE FOR THE SAME | |
BR9905893A (en) | Apparatus for adding nitrogen and moisture derived from low pressure steam from combustible gas used to drive a gas turbine and for adding low pressure steam and nitrogen to combustible gas used to drive a gas turbine system, and, process for increase the energy output of a gas turbine system. | |
ES2116136B1 (en) | COMBINATION IMPROVEMENT PROCEDURE BETWEEN A GAS TURBINE AND A VAPOR CYCLE WITH ANOTHER NON-FOSSIL SOURCE OF PRIMARY ENERGY. | |
ES2172903T3 (en) | INSTALLATION OF GAS AND VAPOR TURBINES AND PROCEDURE FOR COOLING THE GAS TURBINE COOLANT OF AN INSTALLATION OF THIS TYPE. | |
Harasgama | Combustor exit temperature distortion effects on heat transfer and aerodynamics within a rotating turbine blade passage | |
SE8200341L (en) | FOR USE IN A HIGH PRESSURE ENVIRONMENT DETAILED GAMMETER METER | |
US3802186A (en) | Generation of power using a rankine-cycle engine with tetrachloroethylene as the working fluid | |
CN105318752A (en) | End face double-sealing spiral plate type high-temperature flue gas reboiler | |
JPS5611993A (en) | Gasification of liquefied natural gas | |
JPS55123306A (en) | Vaporization of liquefied natural gas and its energy recovering method | |
BR9812786A (en) | More efficient thermal machines | |
JPS57195179A (en) | Working fluid for rankine cycle | |
Blanco | Heat pump concepts for industrial use of waste heat | |
KR880001721Y1 (en) | Heating machine for drying chamber of sizing machine | |
Bezmenov | The process of expansion of a high-pressure gas in a tank | |
JPS5647608A (en) | Energy saving type generator | |
Eskesen et al. | A comparison of the performance of steam turbine cycles using gas contaminated geothermal steam | |
JPS5572838A (en) | High-pressure gas generator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
EC2A | Search report published |
Date of ref document: 19980701 Kind code of ref document: A1 Effective date: 19980701 |
|
FD1A | Patent lapsed |
Effective date: 20040601 |