Prior art keywords
bucket
target
excavation
target operation
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP24885358.2A
Other languages
German (de)
French (fr)
Inventor
Natsuki Yumoto
Daisuke Noda
Yoshiki MUNEMASA
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobelco Construction Machinery Co Ltd
Original Assignee
Kobelco Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobelco Construction Machinery Co Ltd filed Critical Kobelco Construction Machinery Co Ltd
Publication of EP4782608A1 publication Critical patent/EP4782608A1/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26—Indicating devices
    • E02F9/264—Sensors and their calibration for indicating the position of the work tool
    • E02F9/265—Sensors and their calibration for indicating the position of the work tool with follow-up actions (e.g. control signals sent to actuate the work tool)
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F3/00—Dredgers; Soil-shifting machines
    • E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36—Component parts
    • E02F3/3604—Devices to connect tools to arms, booms or the like
    • E02F3/3677—Devices to connect tools to arms, booms or the like allowing movement, e.g. rotation or translation, of the tool around or along another axis as the movement implied by the boom or arms, e.g. for tilting buckets
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F3/00—Dredgers; Soil-shifting machines
    • E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36—Component parts
    • E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F3/00—Dredgers; Soil-shifting machines
    • E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36—Component parts
    • E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/431—Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like
    • E02F3/434—Control of dipper or bucket position; Control of sequence of drive operations for bucket-arms, front-end loaders, dumpers or the like providing automatic sequences of movements, e.g. automatic dumping or loading, automatic return-to-dig
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F3/00—Dredgers; Soil-shifting machines
    • E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36—Component parts
    • E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F3/00—Dredgers; Soil-shifting machines
    • E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36—Component parts
    • E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/437—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F3/00—Dredgers; Soil-shifting machines
    • E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36—Component parts
    • E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
    • E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
    • E02F3/435—Control of dipper or bucket position; Control of sequence of drive operations for dipper-arms, backhoes or the like
    • E02F3/439—Automatic repositioning of the implement, e.g. automatic dumping, auto-return
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20—Drives; Control devices
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20—Drives; Control devices
    • E02F9/2025—Particular purposes of control systems not otherwise provided for
    • E02F9/2029—Controlling the position of implements in function of its load, e.g. modifying the attitude of implements in accordance to vehicle speed
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20—Drives; Control devices
    • E02F9/2025—Particular purposes of control systems not otherwise provided for
    • E02F9/2033—Limiting the movement of frames or implements, e.g. to avoid collision between implements and the cabin
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20—Drives; Control devices
    • E02F9/2025—Particular purposes of control systems not otherwise provided for
    • E02F9/2037—Coordinating the movements of the implement and of the frame
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20—Drives; Control devices
    • E02F9/2025—Particular purposes of control systems not otherwise provided for
    • E02F9/205—Remotely operated machines, e.g. unmanned vehicles
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20—Drives; Control devices
    • E02F9/22—Hydraulic or pneumatic drives
    • E02F9/2278—Hydraulic circuits
    • E02F9/2285—Pilot-operated systems
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26—Indicating devices
    • E02F9/261—Surveying the work-site to be treated
    • E02F9/262—Surveying the work-site to be treated with follow-up actions to control the work tool, e.g. controller
    • E—FIXED CONSTRUCTIONS
    • E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02F—DREDGING; SOIL-SHIFTING
    • E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/26—Indicating devices
    • E02F9/264—Sensors and their calibration for indicating the position of the work tool

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Operation Control Of Excavators (AREA)

Abstract

A work machine target operation setting system (1) includes a machine body (10a), an inclination detector (21b), an attachment (15), and a controller (30). The controller (30) determines whether or not the machine body (10a) is in a lifted state of being lifted with respect to a ground contact surface on a basis of an inclination of the machine body (10a) detected by the inclination detector (21b). The controller (30) performs target operation change processing when a target operation change condition set in the controller (30) is satisfied. The target operation change processing is processing of changing target operation so as to reduce the inclination of the machine body (10a). The target operation change condition includes that the machine body (10a) is in the lifted state.

Description

    Technical Field
  • The present invention relates to a work machine target operation setting system that sets target operation of a work machine.
  • Background Art
  • For example, Patent Literature 1 recites a technique of creating an excavation plan (target operation) of a bucket on the basis of a soil property and topographic information.
  • When a work machine performs work according to the target operation, a machine body may be in a lifted state in which a bottom surface of the machine body is lifted from a ground contact surface of the machine body.
  • Citation List Patent Literature
  • Patent Literature 1: JP 2021-188362 A
  • Summary of Invention
  • Therefore, an object of the present invention is to provide a work machine target operation setting system enabling reduction in a degree of a lifted state of a machine body at the time when a work machine operates according to target operation.
  • A work machine target operation setting system includes a machine body, an inclination detector, an attachment, and a controller. The inclination detector detects an inclination of the machine body. The attachment is attached to the machine body. The attachment has a bucket that performs excavation work. The controller sets target operation of excavation operation of the bucket. The controller determines whether or not the machine body is in a lifted state of being lifted with respect to a ground contact surface on a basis of the inclination of the machine body detected by the inclination detector. The controller performs target operation change processing when a target operation change condition set in the controller is satisfied. The target operation change processing is processing of changing the target operation so as to reduce the inclination of the machine body. The target operation change condition includes that the machine body is in the lifted state.
  • The above-described work machine target operation setting system enables reduction in a degree of the lifted state of the machine body at the time when a work machine operates according to the target operation.
  • Brief Description of Drawings
    • FIG. 1 is a side view of a work machine 10 of a work machine target operation setting system 1.
    • FIG. 2 is a block diagram of the work machine target operation setting system 1.
    • FIG. 3 is a side view of the work machine 10 when a machine body 10a illustrated in FIG. 1 is in a front-lifted state.
    • FIG. 4 is a side view of a target path P and the like changed by the machine body 10a illustrated in FIG. 3 coming into the front-lifted state.
    • FIG. 5 is a side view of the work machine 10 when the machine body 10a illustrated in FIG. 1 is in a rear-lifted state.
    • FIG. 6 is a side view of the target path P and the like changed by the machine body 10a illustrated in FIG. 5 coming into the rear-lifted state.
    • FIG. 7 is a side view of the work machine 10 when the machine body 10a illustrated in FIG. 1 is in the front-lifted state and a bucket 15c cannot be arranged at an excavation start target bucket ground angle θs.
    • FIG. 8 is a side view of the target path P and the like in which a target excavation start position Ps illustrated in FIG. 7 is changed to a front side X1 from a position illustrated in FIG. 7.
    • FIG. 9 is a flowchart illustrating processing related to the excavation start target bucket ground angle θs and the target excavation start position Ps illustrated in FIGS. 7 and 8.
    • FIG. 10 is a view illustrating a bucket height H15c and the like stored when the machine body 10a in FIG. 1 comes into the rear-lifted state.
    • FIG. 11 is a graph illustrating a relationship between an inclination of the machine body 10a illustrated in FIG. 1 and a change amount of target operation by a controller 30 illustrated in FIG. 2.
    • FIG. 12 is a graph illustrating a relationship between work time of the work machine 10 illustrated in FIG. 1 and an integrated change amount of the target operation by the controller 30 illustrated in FIG. 2.
    • FIG. 13 is a flowchart illustrating processing of limiting the integrated change amount by an integrated change amount limit value illustrated in FIG. 11.
    • FIG. 14 is a side view of the work machine 10 in a case where an operation direction of an attachment 15 is changed when the machine body 10a illustrated in FIG. 1 comes into a lifted state.
    • FIG. 15 is a side view of the work machine 10 in a case where an element to be operated is changed in the attachment 15 illustrated in FIG. 1.
    • FIG. 16 is a side view of the work machine 10 when operation of the bucket 15c illustrated in FIG. 1 is changed to discharge operation.
    • FIG. 17 is a flowchart illustrating processing of the controller 30 illustrated in FIG. 2.
    • FIG. 18 is a flowchart illustrating processing (S50) of "handling front-lifted state in current excavation operation" illustrated in FIG. 17.
    • FIG. 19 is a flowchart illustrating processing (S70) of "handling rear-lifted state in current excavation operation" illustrated in FIG. 17.
    Description of Embodiments
  • A work machine target operation setting system 1 will be described with reference to FIGS. 1 to 19.
  • As illustrated in FIG. 1, the work machine target operation setting system 1 is a system that sets target operation of a work machine 10. The work machine target operation setting system 1 includes the work machine 10 and a controller 30.
  • The work machine 10 is a machine that performs work. The work machine 10 is, for example, a construction machine that performs construction work. For example, the work machine 10 is an excavator. The work machine 10 may be configured to be operable by automatic control. The automatic control may be automatic driving or semi-automatic driving (machine control to be described later). The work machine 10 may operate without using automatic control. The work machine 10 may be operated by a worker (operator) on board the work machine 10, or may be remotely operated by a worker (operator) at a place away from the work machine 10. Hereinafter, a case where the work machine 10 is an excavator will be mainly described. The work machine 10 includes a machine body 10a, an attachment 15, a plurality of actuators 17, a drive control unit 19 (see FIG. 2), and a plurality of attitude sensors 21.
  • The machine body 10a is a main part of the work machine 10. The machine body 10a includes a lower travelling body 11 and an upper slewing body 13. The lower travelling body 11 can travel on a traveling surface (the ground or the like). The lower travelling body 11 may include crawlers or wheels. The upper slewing body 13 is mounted on the lower travelling body 11 so as to be able to slew. A direction in which a rotation axis of slewing of the upper slewing body 13 with respect to the lower travelling body 11 extends is defined as an up-down direction Z. In the up-down direction Z, a direction from the lower travelling body 11 towards the upper slewing body 13 is defined as an upper side Z1, and a side opposite to the upper side Z1 is defined as a lower side Z2. A direction in which a rotation axis of the attachment 15 (in detail, a boom 15a) with respect to the machine body 10a extends is defined as a machine body lateral direction. A direction intersecting (e.g., orthogonal to) each of the up-down direction Z and the machine body lateral direction is defined as a front-rear direction X. In the front-rear direction X, a side on which the attachment 15 protrudes with respect to the upper slewing body 13 is defined as a front side X1, and a side opposite to the front side X1 is defined as a rear side X2. In a case where the machine body 10a is arranged on a horizontal plane, the up-down direction Z is a vertical direction.
  • The attachment 15 is a part for performing work. The attachment 15 is attached to the machine body 10a. The attachment 15 includes the boom 15a, an arm 15b, and a bucket 15c. The boom 15a is attached to the upper slewing body 13 so as to be raised and lowered with respect to the upper slewing body 13 about a rotation axis at a proximal end of the boom 15a. The arm 15b is attached to the boom 15a so as to be rotatable with respect to the boom 15a about a rotation axis at a proximal end of the arm 15b.
  • The bucket 15c performs excavation work that is work of excavating a work object. The work object is an object to be worked on by the work machine 10 (an object to be worked on by the bucket 15c). The work object is, for example, earthy, granular, chip-like, powdery, or the like. Specifically, the work object is earth and sand. The bucket 15c is a distal end attachment provided at a distal end of the attachment 15. The bucket 15c is attached to the arm 15b so as to be rotatable with respect to the arm 15b about a rotation axis at a proximal end of the bucket 15c. A direction of rotation of the bucket 15c toward the rear side X2 with respect to the arm 15b is defined as an excavation direction R1. A direction of rotation of the bucket 15c toward the front side X1 with respect to the arm 15b is defined as a discharge direction R2. An angle of the bucket 15c with respect to a reference direction is referred to as a ground angle of the bucket 15c. The above "reference direction" may be a direction along a surface of a work object to be excavated by the bucket 15c, or may be a horizontal direction. The surface of the work object is an excavation surface, for example, the ground. The ground angle of the bucket 15c is, for example, an angle of a specific surface (e.g., a bucket opening surface 15c1) of the bucket 15c with respect to the reference direction. A target value (target angle) of the ground angle of the bucket 15c is a target bucket ground angle 0 to be described later. The bucket 15c includes the bucket opening surface 15c1, a bucket distal end back surface 15c3, and a bucket distal end 15c5.
  • The bucket opening surface 15c1 is a virtual surface along an opening of the bucket 15c. Specifically, for example, the bucket opening surface 15c1 may be a virtual plane including a linearly extending left edge and a linearly extending right edge among a plurality of edges defining the opening of the bucket 15c. The bucket distal end back surface 15c3 is an outer surface of the bucket 15c extending from the bucket distal end 15c5 toward a bottom of the bucket 15c. The bucket distal end back surface 15c3 is provided at a distal end side part of the bucket 15c (a part far from a connection part to the arm 15b). The bucket distal end back surface 15c3 is located on the front side X1 of the bucket opening surface 15c1 when the bucket 15c is arranged such that the bucket opening surface 15c1 faces the upper slewing body 13. The bucket distal end back surface 15c3 has, for example, a planar shape. The bucket distal end 15c5 is a distal end of the bucket 15c (an end on a side far from the connection part to the arm 15b). The bucket distal end 15c5 may have, for example, a plurality of claw-like members (bucket teeth).
  • The bucket 15c includes a bucket specific region 15c7. The bucket specific region 15c7 is a region that is targeted to be arranged on a target path P (to be described later). In the automatic control of the work machine 10, the controller 30 to be described later may control operation of the work machine 10 so that the bucket specific region 15c7 is arranged on the target path P. In other words, in the automatic control of the work machine 10, the controller 30 may control the operation of the work machine 10 so that the bucket specific region 15c7 moves along the target path P. The bucket specific region 15c7 may be, for example, the bucket distal end 15c5. The bucket specific region 15c7 may be the proximal end of the bucket 15c (the connection part to the arm 15b).
  • The plurality of actuators 17 is a device that causes the work machine 10 to operate. The plurality of actuators 17 may include hydraulic actuators driven by hydraulic pressure or include electric actuators driven by electric power. The plurality of actuators 17 may include a motor or may include an extendable cylinder. The plurality of actuators 17 includes a cylinder that causes the attachment 15 to operate. Specifically, the plurality of actuators 17 includes a boom cylinder 17a, an arm cylinder 17b, and a bucket cylinder 17c. The boom cylinder 17a raises and lowers the boom 15a with respect to the upper slewing body 13. Each of the boom cylinder 17a, the arm cylinder 17b, and the bucket cylinder 17c is, for example, a hydraulic cylinder that expands and contracts by hydraulic pressure. The arm cylinder 17b causes the arm 15b to rotate with respect to the boom 15a. The bucket cylinder 17c causes the bucket 15c to rotate with respect to the arm 15b.
  • The drive control unit 19 (see FIG. 2) controls the operation of the actuator 17. In a case where the actuator 17 is a hydraulic type, the drive control unit 19 may include a hydraulic circuit that controls the hydraulic type actuator 17. In a case where the actuator 17 is an electric type, the drive control unit 19 may include an electric circuit that controls the electric type actuator 17.
  • Specifically, in a case where the actuator 17 is a hydraulic type, the drive control unit 19 may include a control valve. The control valve may include a plurality of direction switching valves that respectively control a direction of hydraulic oil supplied to the plurality of actuators 17. Each of the plurality of direction switching valves may include a spool and a pair of ports. Each direction switching valve may be configured such that the spool is displaced in accordance with a manipulation command input to any one of the paired ports to adjust the direction and a flow rate of the hydraulic oil supplied to the actuator 17 connected to the direction switching valve. As a result, the actuator 17 operates in accordance with the manipulation command. The manipulation command may be a command (current value) output by the controller 30. In a case where a proportional valve is interposed between the controller 30 and the port of each direction switching valve, the manipulation command may be a secondary pressure (pilot pressure) of the proportional valve. In this case, the proportional valve outputs a secondary pressure having a magnitude according to the command (current value) output from the controller 30.
  • The plurality of the attitude sensors 21 detect an attitude of the work machine 10. Some or all of the attitude sensors 21 may be mounted on the work machine 10. Some or all of the attitude sensors 21 may be arranged outside the work machine 10 (e.g., at a work site), and may not be a component of the work machine 10. The plurality of attitude sensors 21 includes a reference position sensor 21a, an inclination detector 21b, a slewing sensor 21c, a boom sensor 21d, an arm sensor 21e, and a distal end attachment sensor 21f.
  • The reference position sensor 21a detects a position and an orientation of a region to be a reference for the work machine 10 with respect to the work site. The region to be a reference for the work machine 10 may be, for example, a specific region of the upper slewing body 13, may be, for example, an attachment part (boom foot) of the boom 15a to the upper slewing body 13, or may be, for example, a slewing center of the upper slewing body 13 with respect to the lower travelling body 11. The reference position sensor 21a may perform detection by a positioning system using an electromagnetic wave (light, radio waves, etc.). For example, the positioning system may be a satellite positioning system, e.g., a global navigation satellite system (GNSS), or a system using a transmitter and a receiver (on the ground) that do not use a satellite. The positioning system may use a total station, for example. Note that, in FIG. 1, a reference sign of the reference position sensor 21a is assigned to a position of a GNSS antenna in a case where the reference position sensor 21a performs detection by a positioning system using GNSS.
  • The inclination detector 21b detects an inclination of the machine body 10a. The inclination detector 21b detects the inclination of the machine body 10a with respect to the horizontal direction. The inclination detector 21b detects an inclination of the upper slewing body 13 with respect to the horizontal direction. For example, the inclination detector 21b may be configured to detect a pitch angle of the machine body 10a with respect to the horizontal direction. The pitch angle is an inclination angle of a center axis of the machine body 10a extending in the front-rear direction X with respect to the horizontal direction. The inclination detector 21b can detect whether the machine body 10a is front-up or rear-up. "Front-up" is a state in which the machine body 10a is inclined such that the central axis of the machine body 10a extending in the front-rear direction is located higher toward the front side X1. "Rear-up" is a state in which the machine body 10a is inclined such that the central axis of the machine body 10a extending in the front-rear direction is located higher toward the rear side X2. The inclination detector 21b may be capable of detecting a roll angle of the machine body 10a or may be capable of detecting a yaw angle of the machine body 10a.
  • The inclination detector 21b may include, for example, a gyro sensor, an acceleration sensor, an inertial measurement device, or the like. The inclination detector 21b may detect the inclination of machine body 10a on the basis of information of an image detected by an imaging device. In this case, the imaging device is included in the inclination detector 21b. Similarly, each of the reference position sensor 21a, the slewing sensor 21c, the boom sensor 21d, the arm sensor 21e, and the distal end attachment sensor 21f may be configured to detect an attitude of a detection target using the information of the image detected by the imaging device. The inclination detector 21b may detect the inclination of the machine body 10a on the basis of image recognition of a two-dimensional image. The inclination detector 21b may detect the inclination of the machine body 10a on the basis of a three-dimensional image (distance image) having depth information. The inclination detector 21b may detect the inclination of the machine body 10a on the basis of the three-dimensional image and the two-dimensional image. The imaging device that detects an image may employ a passive method or an active method. Specifically, the imaging device may include a camera (monocular camera) that detects two-dimensional information. The imaging device may include a stereo camera that detects three-dimensional information. The imaging device may detect three-dimensional information of an imaging object by irradiating the imaging object with a wave such as an electromagnetic wave and detecting a reflected wave. The imaging device may include a time of flight (TOF) sensor that detects a distance on the basis of time from the irradiation of the wave to return of the reflected wave, or may include a sensor that detects a distance on the basis of a frequency of the reflected wave. The imaging device may include a device that detects the three-dimensional information using light (e.g., laser light), and may include, for example, a light detection and ranging (LiDAR). The imaging device may include a device (e.g., a millimeter wave radar) that detects the three-dimensional information by using radio waves. The inclination detector 21b may include one imaging device or may include a plurality of imaging devices. In the inclination detector 21b, only one type (one method or the like) of imaging device may be used, or a plurality of types of imaging devices may be combined.
  • The slewing sensor 21c detects a slewing angle of the upper slewing body 13 with respect to the lower travelling body 11. The slewing sensor 21c may include an angle sensor attached to a rotation shaft or a rotation support part (such as a slewing bearing) of the upper slewing body 13 with respect to the lower travelling body 11.
  • The boom sensor 21d detects an attitude of the boom 15a. The boom sensor 21d detects an angle (inclination or rotation angle) of the boom 15a with respect to the horizontal direction or the upper slewing body 13. The boom sensor 21d may include an angle sensor (e.g., a rotary encoder) attached to a rotation shaft or a rotation support part of the boom 15a with respect to the upper slewing body 13. The boom sensor 21d may include a sensor that detects an inclination of the boom 15a with respect to the horizontal direction. The boom sensor 21d may include a stroke sensor that detects a stroke of the boom cylinder 17a.
  • The arm sensor 21e detects an attitude of the arm 15b. The arm sensor 21e detects an angle of the arm 15b with respect to the horizontal direction or the boom 15a. The arm sensor 21e may include an angle sensor attached to a rotation shaft or a rotation support part of the arm 15b with respect to the boom 15a, a sensor that detects an inclination of the arm 15b with respect to the horizontal direction, or a stroke sensor that detects a stroke of the arm cylinder 17b.
  • The distal end attachment sensor 21f detects an attitude of the bucket 15c. In the example illustrated in FIG. 1, the distal end attachment sensor 21f is attached to, for example, a link member connecting the arm 15b, the bucket 15c, and the bucket cylinder 17c. The distal end attachment sensor 21f detects an angle of the bucket 15c with respect to the horizontal direction or the arm 15b. The distal end attachment sensor 21f may include an angle sensor attached to a rotation shaft or a rotation support part of the bucket 15c with respect to the arm 15b, a sensor that detects an inclination of the bucket 15c with respect to the horizontal direction, or a stroke sensor that detects a stroke of the bucket cylinder 17c.
  • The controller 30 is a computer that performs input/output of signals, calculation (processing), storage of information, and the like. For example, function of the controller 30 illustrated in FIG. 2 is implemented by a calculation unit 30a executing a program stored in a storage unit 30b or the like of the controller 30. The controller 30 and other apparatus may be connected by wireless communication or wired communication. For example, detection results by the plurality of attitude sensors 21 are input to the controller 30. For example, the controller 30 (in detail, an operation control unit 33) controls the operation of the work machine 10 (see FIG. 1). For example, the controller 30 outputs a command (signal) for causing the work machine 10 to operate to the drive control unit 19. The controller 30 may be mounted on the work machine 10 or may be arranged outside the work machine 10. The controller 30 may be dispersedly arranged in a plurality of parts (may constitute a distributed system). The controller 30 includes the calculation unit 30a that performs calculation (processing) of information and the storage unit 30b. Focusing on the function of the controller 30, the controller 30 includes a target operation setting unit 31 and the operation control unit 33.
  • The storage unit 30b stores information. The storage unit 30b stores a program. For example, the storage unit 30b stores an inclination state (specifically, a lifted state, a front-lifted state, and a rear-lifted state, which will be described later) of the machine body 10a determined by the controller 30. For example, as illustrated in FIG. 10, the storage unit 30b stores a bucket height H15c (a lifted state bucket height to be described later) when the machine body 10a is brought into the lifted state.
  • The target operation setting unit 31 sets target operation of the work machine 10 (see FIG. 1). Details of the target operation will be described in detail later.
  • The operation control unit 33 controls the operation of the work machine 10. The operation control unit 33 outputs a command to the drive control unit 19. The operation control unit 33 may output a command to the drive control unit 19 according to manipulation (e.g., lever manipulation) of the worker. The operation control unit 33 may automatically control the work machine 10 so that the work machine 10 operates according to the target operation. In this case, the operation control unit 33 automatically controls the operation of the work machine 10 on the basis of a detection value of the attitude sensor 21.
  • (Operation of Work Machine 10)
  • As described above, the work machine 10 illustrated in FIG. 1 may be manipulated by a worker in a cab 13a, may be remotely manipulated by the worker from the outside (a remote manipulation device) of the work machine 10, or may be automatically driven by the controller 30. The work machine 10 is a machine (e.g., an ICT construction machine) using information and communication technology (ICT).
  • For example, the work machine 10 may be manipulated by a worker while function of a machine guidance (MG) system is activated. Specifically, the target operation is set in the controller 30. Then, the controller 30 provides the worker with guidance on a position where work needs to be performed so that the work machine 10 can operate (work) according to the target operation. This guidance is output to, for example, an output device provided in the cab 13a of the work machine 10 or an output device provided in the remote manipulation device. Then, the worker manipulates the work machine 10 according to the guidance. As a result, the work machine 10 operates in accordance with the target operation.
  • In addition, for example, the work machine 10 may operate by a machine control (MC) system. Specifically, the target operation is set in the controller 30. Then, for example, the worker performs only lever manipulation for operating some elements (e.g., the boom 15a) of the attachment 15. At this time, the controller 30 (the operation control unit 33) automatically controls movement of the elements (e.g., the arm 15b and the bucket 15c) not manipulated by the worker so that the work machine 10 works according to the target operation. In this control, the controller 30 controls the operation of the work machine 10 on the basis of the target operation and a detection value of the attitude sensor 21. As a result, the work machine 10 operates in accordance with the target operation.
  • Furthermore, the work machine 10 may operate by automatic driving, for example. In this case, the controller 30 (the operation control unit 33) controls the operation of the work machine 10 so that the work machine 10 automatically works according to the target operation. In this automatic driving, the controller 30 automatically controls the operation of the work machine 10 on the basis of the target operation and the detection value of the attitude sensor 21. In the following, description will be made mainly of a case where the work machine 10 operates by automatic control (machine control or automatic driving).
  • (Target Operation)
  • The target operation of the work machine 10 is set in the controller 30 (in detail, the target operation setting unit 31). The target operation is operation as a target of the work machine 10. The target operation includes operation as a target of excavation operation of the bucket 15c. The target operation may include operation which is operation of the work machine 10 and is operation as a target of other operation than the excavation operation. The target operation may be set (manually) according to the manipulation of the worker. The target operation may be automatically generated by the controller 30 or may be preset in the controller 30. The target operation may be preset outside the controller 30 and input and set to the controller 30. The target operation includes the target path P and the target bucket ground angle θ.
  • The target path P is a path as a target of the bucket 15c. In detail, the target path P is a path as a target of the bucket specific region 15c7. The target path P includes a plurality of target points Pp. The target point Pp is information on a position as a target of the bucket specific region 15c7. Specifically, the "information on a position" may be three-dimensional position coordinates or two-dimensional position coordinates. The target path P is an order set of the target points Pp. The target path P is information including information on a position of each of the plurality of target points Pp and information on the order of the plurality of target points Pp. Information on time period may be added to information on the target path P. Information obtained by adding the information on time period to the information on the target path P is referred to as a target trajectory. The above "information on time period" is, for example, a time period between two points. The time period between two points is a target value of travel time of the bucket specific region 15c7 between two adjacent (sequential) target points Pp. The time period between two points is a time period until the bucket specific region 15c7 arrives from a certain target point Pp at the next target point Pp. The "information on time period" may be information on time or the like. By adjusting the above "information on time period", a target travel speed of the bucket 15c (in detail, of the bucket specific region 15c7,) is adjusted.
  • A coordinate system as a reference representing the target path P may be set in any manner as long as the coordinate system can derive an attitude of the work machine 10. An origin (position as a reference) of the coordinate system may be set at the work site. The origin of the coordinate system may be set to a specific region of the work machine 10, for example, may be set to a specific region of the upper slewing body 13. Specifically, for example, the origin of the coordinate system may be set at the attachment part (the boom foot) of the boom 15a to the upper slewing body 13, or may be set at the slewing center of the upper slewing body 13 with respect to the lower travelling body 11. The coordinate system may be, for example, a two-dimensional coordinate system such as a two-dimensional orthogonal coordinate system including a coordinate axis in the front-rear direction X and a coordinate axis in the up-down direction Z. The coordinate system may also be, for example, a three-dimensional coordinate system such as a three-dimensional orthogonal coordinate system including the coordinate axis in the front-rear direction X, the coordinate axis in the up-down direction Z, and a coordinate axis in a direction (e.g., the machine body lateral direction) orthogonal to each of the front-rear direction X and the up-down direction Z. The coordinate system may also include, for example, the coordinate axis in the front-rear direction X, the coordinate axis in the up-down direction Z, and a coordinate axis in a slewing direction of the upper slewing body 13 with respect to the lower travelling body 11. Furthermore, the coordinate system may include, for example, a coordinate axis for a bucket angle. The bucket angle may be an angle of the bucket 15c with respect to the horizontal direction, an angle with respect to the arm 15b, or an angle with respect to the upper slewing body 13. The controller 30 (in detail, the operation control unit 33 (see FIG. 2)) decides an attitude of the work machine 10 so that the bucket specific region 15c7 is arranged on the target path P. For example, when a position of the bucket specific region 15c7 and the bucket angle are decided, each attitude of the boom 15a and the arm 15b is uniquely decided, so that the controller 30 can derive target attitudes of the boom 15a and the arm 15b using the position of the bucket specific region 15c7 and the bucket angle.
  • The target path P includes a path as a target of the bucket specific region 15c7 in the excavation operation of the bucket 15c. The target path P may include a path to be a target of the bucket specific region 15c7 in operation of the work machine 10 different from the excavation operation of the bucket 15c. Hereinafter, the target path P of the excavation operation of the bucket 15c will be described. Parameters of the target path P include a target excavation start position Ps, a target excavation end position Pe, a target horizontal excavation distance Lh, and a target excavation depth Ld.
  • The target excavation start position Ps is a target position as a position where the excavation operation (in detail, one excavation operation (the same applies hereinafter)) of the bucket 15c is started. For example, the target excavation start position Ps is a target position as a position where the bucket 15c (e.g., the bucket distal end 15c5) comes into contact with the work object first in one excavation operation. For example, the target excavation start position Ps may be represented by coordinates (target excavation start coordinates) of one point in the two-dimensional coordinate system or the three-dimensional coordinate system.
  • The target excavation end position Pe is a target position as a position where the excavation operation of the bucket 15c ends. For example, the target excavation end position Pe is a target position as a position where the bucket 15c is separated from the work object in one excavation operation. For example, the target excavation end position Pe may be represented by coordinates (target excavation end coordinates) of one point in the two-dimensional coordinate system or the three-dimensional coordinate system.
  • The target horizontal excavation distance Lh is a target value of a travel distance of the bucket 15c in the horizontal direction in the excavation operation of the bucket 15c. For example, in the example illustrated in FIG. 1, the target horizontal excavation distance Lh is a target value of a travel distance of the bucket specific region 15c7 when the bucket 15c linearly excavates the work object in the horizontal direction. In addition, for example, the target horizontal excavation distance Lh may be a target value of a distance in the horizontal direction from the target excavation start position Ps to the target excavation end position Pe (not illustrated).
  • The target excavation depth Ld is a target value of a depth of excavation by the bucket 15c (an excavation distance in the vertical direction) in the excavation operation of the bucket 15c. For example, the target excavation depth Ld is a target value of a distance in the vertical direction from a height of the bucket distal end 15c5 when the bucket distal end 15c5 is arranged at the deepest position in one excavation operation to a certain reference height. The "reference height" may be, for example, a height of a bottom surface (of the lower travelling body 11) of the machine body 10a. The "reference height" may be, for example, a height of the surface of the work object at a target position (e.g., the target excavation start position Ps or the target excavation end position Pe) where the bucket 15c is to perform the excavation operation before the bucket 15c performs the excavation operation.
  • As described above, the target bucket ground angle θ is a target angle (target value) of the ground angle of the bucket 15c. In the example illustrated in FIG. 1, the target bucket ground angle θ is an angle of the bucket opening surface 15c1 with respect to the horizontal direction.
  • The excavation start target bucket ground angle θs is the target bucket ground angle θ at the target excavation start position Ps. In detail, the excavation start target bucket ground angle θs is the target bucket ground angle θ when the bucket specific region 15c7 is arranged at the target excavation start position Ps.
  • (Lifted State)
  • As illustrated in FIGS. 3 and 5, the machine body 10a may be in the lifted state during work (e.g., during the excavation work) of the work machine 10. The lifted state is a state in which the machine body 10a (in detail, the lower travelling body 11) is lifted with respect to the ground contact surface (vehicle body lifted). The lifted state includes the front-lifted state illustrated in FIG. 3 and the rear-lifted state illustrated in FIG. 5.
  • As illustrated in FIG. 3, the front-lifted state is a state in which a rear side part of the bottom surface of the machine body 10a is in contact with the ground contact surface while a front side part of the bottom surface of the machine body 10a is lifted with respect to the ground contact surface. An example of a cause of the front-lifted state of the machine body 10a is as follows. The work machine 10 attempts to move the bucket 15c to the lower side Z2 at the start or during the excavation operation. At this time, the bucket 15c pushes the work object to the lower side Z2 and receives a reaction force F toward the upper side Z1 from the work object. As a result, the front side part of the bottom surface of the machine body 10a is lifted with respect to the ground contact surface (i.e., the front-lifted state). The front-lifted state is likely to occur when the work object (e.g., the ground) excavated by the bucket 15c is hard. In addition, the front-lifted state is likely to occur when the ground angle of the bucket 15c is large (details will be described later).
  • As illustrated in FIG. 5, the rear-lifted state is a state in which the front side part of the bottom surface of the machine body 10a is in contact with the ground contact surface while the rear side part of the bottom surface of the machine body 10a is lifted with respect to the ground contact surface. An example of a cause of the rear-lifted state of the machine body 10a is as follows. In a latter half of the excavation operation, the work machine 10 causes the bucket 15c to move to the upper side Z1, i.e., lifts the bucket 15c in a state where the bucket 15c is buried in the work object. At this time, the bucket 15c pushes the work object to the upper side Z1 and receives the reaction force F toward the lower side Z2 from the work object. As a result, the rear side part of the bottom surface of the machine body 10a is lifted with respect to the ground contact surface (i.e., the rear-lifted state). The rear-lifted state is likely to occur when the work object (e.g., the ground) excavated by the bucket 15c is hard. In addition, the rear-lifted state is likely to occur, for example, when an amount of a work object located higher than the bucket distal end 15c5 is large in a latter half part of the target path P (e.g., a part closer to the upper slewing body 13 than to the center between the target excavation start position Ps and the target excavation end position Pe)(see FIG. 10).
  • (Determination of Lifted State)
  • The controller 30 illustrated in FIGS. 1 and 2 determines whether the machine body 10a is in the lifted state or not on the basis of the inclination (inclination angle) of the machine body 10a. The inclination of the machine body 10a is detected by the inclination detector 21b and acquired by the controller 30. A specific example of this determination is as described below. The controller 30 acquires an "initial inclination angle" which is an inclination angle (in detail, the pitch angle) of the machine body 10a detected by the inclination detector 21b when the machine body 10a is not in the lifted state (e.g., before work). The controller 30 acquires an "in-work inclination angle" which is an inclination angle (in detail, the pitch angle) of the machine body 10a detected by the inclination detector 21b when the work machine 10 is performing work (e.g., the excavation operation). Then, the controller 30 determines whether the machine body 10a is in the lifted state or not on the basis of a difference between the in-work inclination angle and the initial inclination angle (a change amount of the inclination angle). Specifically, the controller 30 determines whether the machine body 10a is in the lifted state or not on the basis of whether or not the change amount of the inclination angle exceeds a predetermined threshold (inclination threshold). The controller 30 determines whether the state is the front-lifted state or the rear-lifted state depending on whether the change amount of the inclination angle is a positive value or a negative value.
  • (Target Operation Change Processing)
  • When the machine body 10a is in the lifted state, the controller 30 may perform target operation change processing. An outline of the target operation change processing is as follows.
  • When a target operation change condition (to be described later) is satisfied, the controller 30 performs the target operation change processing. The target operation change processing is processing of changing the target operation so that the inclination of the machine body 10a becomes small. Specifically, the target operation change processing may include, for example, processing of changing the target path P, and may include processing of changing the excavation start target bucket ground angle θs. "The inclination of the machine body 10a becomes small" may mean that the inclination (the in-work inclination angle) of the machine body 10a detected by the inclination detector 21b becomes small, and may mean that the difference between the in-work inclination angle and the initial inclination angle (the change amount of the inclination angle) becomes small. Namely, "the inclination of the machine body 10a becomes small" means that a degree of the lifted state of the machine body 10a is reduced.
  • The target operation change condition is a condition for the controller 30 to decide to perform the target operation change processing. The target operation change condition is preset in the controller 30. The target operation change condition is set before the controller 30 performs the target operation change processing. The target operation change condition includes at least that the machine body 10a is in the lifted state. The target operation change condition may include that the machine body 10a is in the lifted state and a condition different from the condition that the machine body 10a is in the lifted state. For example, the target operation change condition may include a condition related to the lifted state bucket height (to be described later).
  • By performing the target operation change processing, the degree of the lifted state of the machine body 10a is reduced. As a result, vibration and noise when the machine body 10a is grounded from the lifted state are suppressed, and a fall of the machine body 10a is suppressed. In addition, the controller 30 automatically changes the target operation for reducing the degree of the lifted state of the machine body 10a. Therefore, it is not necessary for the worker to manually change the target operation.
  • The controller 30 can change the target operation (hereinafter, also simply referred to as "change of the target operation") in the target operation change processing at various timings and in various aspects. As the change of the target operation, the controller 30 may change the target operation for reducing a degree of the front-lifted state, or may change the target operation for reducing a degree of the rear-lifted state. The controller 30 may change target operation of the excavation operation as the change of the target operation, or may change target operation of operation other than the excavation operation. As a change of target operation of the excavation operation, the controller 30 may change target operation during current excavation operation or may change target operations of next and subsequent excavation operations. The change of the target operation of the excavation operation may include at least one of Examples A to E to be described later. Hereinafter, details of each example will be described. Note that the "current excavation operation" is operation of the bucket 15c performed according to the target operation set for the current excavation operation. The "next excavation operation" is operation of the bucket 15c performed according to the target operation set for the next excavation operation.
  • (Timing of Changing Target Operation)
  • The controller 30 may change the target operation at various timings.
  • (Change of Target Operation during Current Excavation Operation)
  • In a case where the target operation change condition is satisfied while the bucket 15c is performing the "current excavation operation", the controller 30 may change the target operation in the "current excavation operation". A specific example of this aspect is as described below. The controller 30 causes the bucket 15c to perform the excavation operation ("current excavation operation") on the basis of target operation before the change. During this excavation operation, the machine body 10a comes into the lifted state. At this time, the controller 30 changes the target operation of the "current excavation operation". Then, the controller 30 causes the bucket 15c to perform the excavation operation from the middle of the "current excavation operation" on the basis of the changed target operation.
  • (Change of Target Operation during Next and Subsequent Excavation Operations)
  • In a case where the target operation change condition is satisfied while the bucket 15c is performing the "current excavation operation", the controller 30 may change the target operation in the "next and subsequent excavation operations". The "next and subsequent excavation operations" may be only one (e.g., next) excavation operation among the next and subsequent excavation operations, or may be a plurality of excavation operations among the next and subsequent operations. A specific example of this aspect is as described below. The controller 30 causes the bucket 15c to perform the excavation operation ("current excavation operation") on the basis of target operation before the change. During this excavation operation, the machine body 10a comes into the lifted state. At this time, the controller 30 changes the target operation of the next and subsequent excavation operations. Then, the controller 30 causes the bucket 15c to perform the excavation operation on the basis of the changed target operation in the next and subsequent excavation operations.
  • (Change of Target Operation at Other Timing)
  • In a case when the target operation change condition is satisfied when the bucket 15c is not performing the excavation operation (e.g., after completion of the excavation operation and before start of the excavation operation), the controller 30 may change target operation other than the excavation operation of the bucket 15c (a specific example will be described later).
  • (Contents of Change of Target Operation)
  • As the change of the target operation of the excavation operation, the controller 30 may change the target path P (Example A) (see FIGS. 4 and 6) or may change the excavation start target bucket ground angle θs (Example B) (see FIG. 4). As the change of the target operation of the excavation operation, the controller 30 may change an operation direction (reverse operation) (Example C) (see FIG. 14), may limit the element of the attachment 15 to be operated (Example D) (see FIG. 15), or may change to discharge operation (Example E) (see FIG. 16).
  • (Example A: Change of Target Path P)
  • The controller 30 illustrated in FIG. 1 may change the target path P as the change of the target operation. The "change of the target path P" is a change of the target path P for reducing the inclination of the machine body 10a. Specifically, the change of the target path P is a change of the parameter of the target path P. As the change of the target path P, the controller 30 may change the target path P for reducing the degree of the front-lifted state (see FIG. 4), and may change the target path P for reducing the degree of the rear-lifted state (see FIG. 6).
  • (Example A1: Change of Target Path P for Reducing Degree of Front-lifted State)
  • As illustrated in FIG. 3, the cause of the machine body 10a coming into the front-lifted state may be that the reaction force F toward the upper side Z1 that the bucket 15c receives from the work object is too large due to force of the bucket 15c pushing the work object to the lower side Z2 being too large. Therefore, when a "front-lifted state handling condition" (an example of the target operation change condition) including that the machine body 10a is in the front-lifted state is satisfied, the controller 30 performs the following processing. In this case, as illustrated in FIG. 4, the controller 30 changes the target path P so that the force of the bucket 15c pushing the work object to the lower side Z2 (downward) decreases. Specifically, the controller 30 changes the target excavation depth Ld such that the force of the bucket 15c pushing the work object to the lower side Z2 decreases. Specifically, the controller 30 decreases the target excavation depth Ld. As a result, the force of the bucket 15c pushing the work object to the lower side Z2 decreases. Note that, in FIG. 4, the target path P before the change is indicated by a chain double-dashed line, and the changed target path P is indicated by a solid line.
  • (Example A2: Change of Target Path P for Reducing Degree of Rear-lifted State)
  • As illustrated in FIG. 5, the cause of the machine body 10a coming into the rear-lifted state may be that the reaction force F that the bucket 15c receives from the work object is too large due to force of the bucket 15c lifting the work object to the upper side Z1 being too large. Therefore, when a "rear-lifted state handling condition" (an example of the target operation change condition) including that the machine body 10a is in the rear-lifted state is satisfied, the controller 30 performs the following processing. In this case, as illustrated in FIG. 6, the controller 30 changes the target path P so that force of the bucket 15c pushing the work object to the upper side Z1 (upward) decreases. Specifically, the controller 30 may change the target excavation depth Ld (Example A2-1), may change the target horizontal excavation distance Lh (Example A2-2), may change the target excavation end position Pe (Example A2-3), or may perform these changes in combination. As a result, the force of the bucket 15c pushing the work object to the upper side Z1 decreases.
  • (Example A2-1)
  • The controller 30 may change the target excavation depth Ld when the rear-lifted state handling condition is satisfied. In this case, the controller 30 changes the target excavation depth Ld so as to reduce an amount of the work object (e.g., soil amount) lifted by the bucket 15c. Specifically, the controller 30 decreases the target excavation depth Ld.
  • (Example A2-2)
  • The controller 30 may change the target horizontal excavation distance Lh when the rear-lifted state handling condition is satisfied. In this case, the controller 30 changes the target horizontal excavation distance Lh so as to reduce an amount of the work object (e.g., soil amount) lifted by the bucket 15c. Specifically, the controller 30 reduces the target horizontal excavation distance Lh.
  • (Example A2-3)
  • The controller 30 may change the target excavation end position Pe when the rear-lifted state handling condition is satisfied. In this case, the controller 30 changes the target excavation end position Pe so as to reduce an amount of the work object (e.g., soil amount) lifted by the bucket 15c. Specifically, the controller 30 changes the target excavation end position Pe to the front side X1.
  • A reason for changing the target excavation end position Pe to the front side X1 is as follows. The bucket 15c excavates the work object by moving from the target excavation start position Ps to the rear side X2. Therefore, since a part of the work object excavated by the bucket 15c moves to the rear side X2 as the bucket 15c moves to the rear side X2, an amount of the work objects accumulated immediately behind the bucket 15c tends to increase (see FIG. 10). Therefore, when the bucket 15c tries to lift a large amount of the work objects accumulated immediately behind the bucket 15c, the machine body 10a is likely to be brought into the rear-lifted state. Therefore, when the rear-lifted state handling condition is satisfied, the controller 30 changes the target excavation end position Pe (the position where the bucket 15c scoops up the work object) to the front side X1. Therefore, the amount of the work objects accumulated immediately behind the bucket 15c before the bucket 15c reaches the target excavation end position Pe decreases. Namely, the amount of the earth and sand (soil amount) lifted by the bucket 15c as the work object is reduced. Therefore, the degree of the rear-lifted state of the machine body 10a is reduced. Note that as a result of the change of the target excavation end position Pe to the front side X1, the target horizontal excavation distance Lh may be shortened. As a result of the reduction in the target horizontal excavation distance Lh, the amount of the work object lifted by the bucket 15c may be reduced.
  • (Example B: Change of Excavation Start Target Bucket Ground Angle θs)
  • The controller 30 may change the excavation start target bucket ground angle θs as a change of the target operation. Here, as illustrated in FIG. 3, the cause of the machine body 10a coming into the front-lifted state may be that the ground angle (the excavation start target bucket ground angle θs) of the bucket 15c at the target excavation start position Ps is too large. In a case where the ground angle of the bucket 15c is too large at the target excavation start position Ps, force of the bucket distal end back surface 15c3 pushing the work object to the lower side Z2 increases when the bucket distal end 15c5 is inserted (penetrated) into the work object. Therefore, the reaction force F (resistance) received by the bucket 15c from the work object increases, and the bucket distal end 15c5 is less likely to be inserted into the work object. As a result, the machine body 10a comes into the front-lifted state.
  • Therefore, as illustrated in FIG. 4, the controller 30 changes the excavation start target bucket ground angle θs such that the force of the bucket 15c pushing the work object toward the lower side Z2 (downward) decreases when the front-lifted state handling condition is satisfied. In this case, the controller 30 changes the excavation start target bucket ground angle θs so that the reaction force F received by the bucket 15c decreases when the bucket distal end 15c5 is inserted into the work object. Specifically, in the example illustrated in FIG. 4, the controller 30 decreases the excavation start target bucket ground angle θs. In FIG. 4, the excavation start target bucket ground angle θs and the bucket 15c before the change are indicated by chain double-dashed lines, and the excavation start target bucket ground angle θs and the bucket 15c after the change are indicated by solid lines. When the front-lifted state handling condition is satisfied, the controller 30 may change both the target path P in the above Example A1 and the excavation start target bucket ground angle θs. Note that depending on a definition of the excavation start target bucket ground angle θs, by increasing the excavation start target bucket ground angle θs, the force of the bucket 15c pushing the work object toward the lower side Z2 (downward) may be reduced.
  • (Physical Restriction of Attitude of Attachment 15)
  • As illustrated in FIG. 7, in a case where the excavation start target bucket ground angle θs cannot be changed to a further smaller value due to the structure of the work machine 10, the controller 30 changes the target excavation start position Ps as illustrated in FIG. 8.
  • Details of a reason for changing the target excavation start position Ps are as follows. As illustrated in FIG. 7, due to the structure of the work machine 10, a possible range of the attitude of the attachment 15 is limited. Specifically, a bucket rotation angle φ, which is the angle of the bucket 15c with respect to the arm 15b, is limited in a possible range due to the structure of the work machine 10. For example, the possible range of the bucket rotation angle φ is limited from a state in which the bucket cylinder 17c contracts most (or a state close to the most contracted state) to a state in which the bucket cylinder 17c extends most (or a state close to the most extended state). Therefore, in a case where the bucket cylinder 17c is in the most contracted state or a state close thereto when the front-lifted state handling condition is satisfied, the ground angle of the bucket 15c cannot be further reduced due to the structure of the work machine 10, and thus, the excavation start target bucket ground angle θs cannot be changed to a smaller value. This is because it is necessary to shorten the bucket cylinder 17c in order to reduce the ground angle of the bucket 15c. Here, the bucket rotation angle φ in a case where the bucket distal end 15c5 is arranged at the target excavation start position Ps and the ground angle of the bucket 15c is adjusted to the excavation start target bucket ground angle θs is referred to as a "bucket rotation angle φ corresponding to the excavation start target bucket ground angle θs". For example, as illustrated in FIG. 7, when an excavation position of the work object excavated (i.e., the ground) by the bucket 15c is lower than the bottom surface of the machine body 10a, the bucket rotation angle φ corresponding to the excavation start target bucket ground angle θs tends to be an angle that cannot be taken due to the structure of the work machine 10. Therefore, the controller 30 changes the target excavation start position Ps in a case where the ground angle of the bucket 15c cannot be further decreased due to the structure of the work machine 10, i.e., in a case where the excavation start target bucket ground angle θs cannot be changed to a smaller value. Specifically, as illustrated in FIG. 8, the controller 30 changes the target excavation start position Ps to the front side X1.
  • Processing of changing the target excavation start position Ps will be described with reference to the flowchart illustrated in FIG. 9. In the following, each step (S11 to S15) will be described with reference to FIG. 9. Note that the order of steps S11 to S15 can be variously changed.
  • In step S11, as illustrated in FIG. 7, when the machine body 10a enters the front-lifted state and the front-lifted state handling condition is satisfied, the controller 30 decides an excavation start target bucket ground angle θs after the change.
  • In step S12, the controller 30 calculates a candidate value of the bucket rotation angle φ corresponding to the decided excavation start target bucket ground angle θs. The candidate value of the bucket rotation angle φ is a bucket rotation angle φ when it is assumed that the ground angle of the bucket 15c is adjusted to the decided excavation start target bucket ground angle θs without changing the target excavation start position Ps.
  • In step S13, the controller 30 determines whether the calculated candidate value of the bucket rotation angle φ is within a bucket rotation angle allowable range or not. The bucket rotation angle allowable range is an allowable range of the bucket rotation angle φ, and is set in the controller 30 in advance (before this determination). The bucket rotation angle allowable range is a range of the bucket rotation angle φ that can be taken due to the structure of the work machine 10. Note that in FIG. 9, the "bucket rotation angle allowable range" is simply referred to as an "allowable range". When the calculated candidate value of the bucket rotation angle φ is within the bucket rotation angle allowable range (in a case of YES in step S13), the controller 30 causes the processing flow to proceed to step S14. When the calculated candidate value of the bucket rotation angle φ is not within the bucket rotation angle allowable range (in a case of NO in step S13), the controller 30 causes the processing flow to proceed to step S15.
  • In step S14, the controller 30 does not perform the processing of changing the target excavation start position Ps illustrated in FIG. 7 (step S15). In this case, the controller 30 controls the operation of the bucket 15c so that the ground angle of the bucket 15c at the target excavation start position Ps becomes the excavation start target bucket ground angle θs in the next and subsequent excavation operations.
  • In step S15, as illustrated in FIG. 8, the controller 30 changes the target excavation start position Ps to the front side X1 (the back side as viewed from the machine body 10a). At this time, the controller 30 changes the target excavation start position Ps so that the ground angle of the bucket 15c becomes the excavation start target bucket ground angle θs after the change determined in step S11 and the bucket rotation angle φ falls within the bucket rotation angle allowable range. With this processing, the controller 30 can set the ground angle of the bucket 15c to the excavation start target bucket ground angle θs after the change determined in step S11. As a result, the degree of the front-lifted state (see FIG. 7) of the machine body 10a can be reduced.
  • (Change Amount of Target Operation)
  • The controller 30 may change a change amount of the target operation (a change amount in change of the target operation in the target operation change processing) according to a condition. The controller 30 may change a change amount of the target path P illustrated in FIG. 4 according to a condition. The controller 30 may change a change amount of the excavation start target bucket ground angle θs according to a condition. For example, the controller 30 may change the change amount of the target operation according to a bucket height H15c (see FIG. 10) during the excavation operation, or according to the inclination of the machine body 10a. The controller 30 may integrate the change amount of the target operation. Details of each example are as follows.
  • (Change Amount according to Bucket Height H15c)
  • As illustrated in FIG. 10, the controller 30 may change the change amount of the target operation according to the bucket height H15c (the bucket height H15c during the excavation operation) when the bucket 15c is performing the excavation operation. The bucket height H15c is a position of the bucket 15c in a height direction. The bucket height H15c may be, for example, a distance in a height direction from a reference position of the machine body 10a (e.g., the proximal end of the boom 15a, a bottom surface of the lower travelling body 11, or the like) to the bucket specific region 15c7. The "height direction" may be the vertical direction or the up-down direction Z with reference to the machine body 10a. The controller 30 may change the change amount of the target path P or may change the change amount of the excavation start target bucket ground angle θs according to the bucket height H15c during the excavation operation. Note that the controller 30 may change the change amount of the target operation according to a height of a part other than the bucket 15c in the attachment 15 during the excavation operation (e.g., a height of the distal end of the arm during the excavation operation).
  • A reason for changing the change amount of the target operation according to the bucket height H15c during the excavation operation is as follows. The reaction force F acting on the bucket 15c (see FIGS. 3 and 5) tends to be larger in a case where the bucket height H15c is large (the excavation position is located deep) than in a case where the bucket height H15c is small (the excavation position is located shallow). For example, a work object at a deep position from the surface of the work object (the ground) before excavation is often harder than a work object at a shallow position. Therefore, when the bucket 15c is inserted into the work object, the reaction force F acting on the bucket 15c (see FIG. 3) tends to be larger in a case where the bucket height H15c is large than in a case where the bucket height H15c is small. In addition, when the bucket 15c performs excavation so as to lift the work object, the amount of the work object (e.g., soil amount) lifted by the bucket 15c is larger when the bucket height H15c is large than when the bucket height H15c is small. Therefore, when the bucket 15c performs excavation so as to lift the work object, the reaction force F acting on the bucket 15c (see FIG. 5) tends to be larger in a case where the bucket height H15c is large than in a case where the bucket height H15c is small.
  • As described in the foregoing, the reaction force F acting on the bucket 15c (see FIGS. 3 and 5) tends to be larger in a case where the bucket height H15c is large than in a case where the bucket height H15c is small, so that the machine body 10a tends to be brought into the lifted state. Therefore, it is more necessary to change the target operation in a case where the bucket height H15c is large than in a case where the bucket height H15c is small.
  • On the other hand, the reaction force F acting on the bucket 15c (see FIGS. 3 and 5) tends to be smaller in a case where the bucket height H15c is small than in a case where the bucket height H15c is large. Therefore, the necessity of changing the target operation is lower in a case where the bucket height H15c is small than in a case where the bucket height H15c is large. In a case where the target operation is excessively changed such that the inclination of the machine body 10a becomes small when the bucket height H15c is small, the excavation amount of the work object by the bucket 15c decreases, and workability of the work machine 10 decreases.
  • Therefore, the controller 30 changes the change amount of the target operation according to the bucket height H15c during the excavation operation. A specific example of this processing is as described below. While the bucket 15c is performing the excavation work, the machine body 10a is brought into the lifted state. At this time, the controller 30 stores a "lifted state bucket height". The "lifted state bucket height" is a bucket height H15c when the machine body 10a comes into the lifted state.
  • After the machine body 10a comes into the lifted state and the "lifted state bucket height" is stored in the controller 30, the bucket 15c performs the excavation operation at other position (an excavation position different from the excavation position when the machine body 10a comes into the lifted state in the front-rear direction X or the slewing direction). At that time, the bucket 15c may perform the excavation operation at a position higher than the lifted state bucket height (or a height in the vicinity thereof (the same applies hereinafter)). In a case where the bucket 15c performs the excavation operation at the position higher than the lifted state bucket height, the machine body 10a is expected to be less likely to come into the lifted state than in a case where the bucket 15c performs the excavation operation at a position lower than or equal to the lifted state bucket height.
  • Therefore, the controller 30 restricts the change of the target operation when the bucket 15c performs the excavation operation at a position above a "height threshold" based on the lifted state bucket height. The "height threshold" may be the same value as the lifted state bucket height. The height threshold may be a height different from the lifted state bucket height set based on the lifted state bucket height. The height threshold may be, for example, a height in the vicinity of the lifted state bucket height. The height threshold may be, for example, a value obtained by adding a predetermined value to the lifted state bucket height or a value obtained by subtracting a predetermined value from the lifted state bucket height. The "position above" the height threshold may be a position above the height threshold in the vertical direction, or may be a position to the upper side Z1 above the height threshold with reference to the upper slewing body 13.
  • The controller 30 reduces the change amount of the target operation, i.e., restricts the change of the target operation when the bucket 15c performs the excavation operation at the position above the height threshold as compared with a change amount of the target operation when the bucket 15c performs the excavation operation at a height equal to or less than the height threshold. Specifically, for example, while the controller 30 may change the target operation when the bucket 15c performs the excavation operation at a height equal to or less than the height threshold, the controller 30 may not change the target operation when the bucket 15c performs the excavation operation at a position above the height threshold. Namely, the "restriction" of the target operation change processing may include setting the change amount of the target operation to 0 when the bucket 15c performs the excavation operation at a position above the height threshold.
  • Since the change of the target operation when the bucket 15c performs the excavation operation at the position above the height threshold is restricted, the excavation amount of the work object (e.g., soil amount) can be stably secured. In addition, the change amount of the target operation when the bucket 15c performs the excavation operation at the position equal to or less than the height threshold is preferably larger than the change amount of the target operation when the bucket 15c performs the excavation operation at the position above the height threshold. In this case, since the target operation is relatively largely changed so that the inclination of the machine body 10a becomes small, the degree of the lifted state of the machine body 10a when the bucket 15c performs the excavation operation at the position equal to or less than the height threshold is reduced.
  • (Change Amount according to Inclination of Machine Body 10a)
  • The controller 30 may change the change amount of the target operation according to the inclination (an inclination amount and an inclination angle) of the machine body 10a detected by the inclination detector 21b illustrated in FIG. 1 (see FIG. 11).
  • A reason for changing the change amount of the target operation according to the inclination of the machine body 10a is as follows. As described above, in the target operation change processing, when the controller 30 changes the target operation so that the reaction force F (see FIGS. 3 and 5) applied to the bucket 15c decreases as illustrated in FIG. 4 or FIG. 6, the excavation amount of the work object by the bucket 15c may decrease. For example, when the change amount of the target operation becomes too large, the excavation amount of the work object by the bucket 15c may become too small. On the other hand, when the change amount of the target operation is too small, the machine body 10a may be brought into the lifted state again. Therefore, the controller 30 changes the change amount of the target operation according to the inclination of the machine body 10a.
  • The controller 30 may change the change amount of the target operation according to the above-described in-work inclination angle of the machine body 10a. Specifically, the controller 30 may change the change amount of the target operation according to an absolute value of the in-work inclination angle, for example. The controller 30 may also change the change amount of the target operation according to a difference between the in-work inclination angle and the initial inclination angle (a relative value of the inclination angle, a floating amount) of the machine body 10a. The controller 30 may increase the change amount of the target operation as the inclination angle increases. The controller 30 may change the change amount of the target operation stepwise or continuously as the inclination of the machine body 10a increases (see FIG. 11). A relationship between the change amount of the target operation and the inclination of the machine body 10a may include, for example, a part represented by a linear function (i.e., a proportional relationship) (see FIG. 11).
  • (Integration of Change Amount of Target Operation)
  • The controller 30 may change the target operation a plurality of times. In this case, the controller 30 may integrate the change amounts of the target operation (see FIG. 12).
  • A specific example of integration of the change amounts of the target operation (see FIG. 12) is as follows. When the machine body 10a comes into the lifted state and the target operation change condition is satisfied, the controller 30 changes the target operation. This change is referred to as "initial change". A change amount of the target operation in the initial change is referred to as "initial change amount". The controller 30 causes the bucket 15c to perform the excavation operation with the target operation (the changed target operation) for which the "initial change" has been performed. Then, when the bucket 15c performs the excavation operation with the changed target operation, the machine body 10a may be brought into the lifted state again. In this case, the controller 30 further changes the target operation such that the inclination of the machine body 10a decreases. This change of the target operation is referred to as "additional change". A change amount of the target operation in the additional change is referred to as "additional change amount". The controller 30 may decide the additional change amount according to the bucket height H15c. The controller 30 may decide the additional change amount according to the inclination of the machine body 10a.
  • The controller 30 decides a sum of the initial change amount and the additional change amount as an integrated change amount. The controller 30 changes the target operation on the basis of the integrated change amount. The controller 30 may perform additional changes a plurality of times. In a case where the additional change is performed a plurality of times, the controller 30 decides a sum of the initial change amount and an integrated value of the additional change amounts as the integrated change amount.
  • A further specific example of the integration of the change amounts of the target operation is as follows. Here, a case where the target excavation depth Ld is changed as the change of the target operation will be described. When the bucket 15c is performing the excavation operation, the machine body 10a enters the lifted state (first time). At this time, as illustrated in FIG. 4, the controller 30 changes the target excavation depth Ld in the next or current excavation operation to be shallow by the initial change amount. Also in the subsequent excavation operation, the controller 30 changes the target excavation depth Ld to be shallow by the initial change amount. When the bucket 15c performs the excavation operation at the target excavation depth Ld changed to be shallow by the initial change amount, the machine body 10a enters the lifted state (second time) again. At this time, the controller 30 changes the target excavation depth Ld in the next or current excavation operation to be shallow by the sum of the initial change amount and the additional change amount (integrated change amount). In a case where the machine body 10a comes into the lifted state at the third time or after the third time, the controller 30 further adds the additional change amount to the integrated change amount (see FIG. 12). Note that, in this example, the description has been made of the case where the change of the target operation is the change of the target excavation depth Ld, and the change amounts of the target excavation depth Ld are integrated. However, the change of the target operation may be, for example, a change of other parameter such as a change of the target horizontal excavation distance Lh, a change of the target excavation end position Pe, a change of the excavation start target bucket ground angle θs, or the like. In this case, the change amounts of that other parameter may be integrated.
  • (Limitation of Integrated Change Amount)
  • When an integrated change amount becomes too large, the excavation amount of the work object by the bucket 15c becomes small. Therefore, the controller 30 restricts the change of the target operation so that the integrated change amount becomes equal to or less than an integrated change amount limit value (see FIG. 12). The integrated change amount limit value is set in the controller 30 in advance (before limiting the change amount of the target operation). As a result of the integrated change amount being limited to the integrated change amount limit value or less, the excavation amount of the work object by the bucket 15c is secured.
  • A specific example of the limitation of the integrated change amount will be described with reference to the flowchart illustrated in FIG. 13. In the following, steps S21 to S24 will be described with reference to FIG. 13.
  • In step S21, the controller 30 illustrated in FIG. 1 calculates a candidate value of the integrated change amount. In detail, the controller 30 calculates a candidate value of a "current change amount" when the machine body 10a comes into the lifted state. The "current change amount" is a change amount of the target operation in processing for the current excavation operation (a change amount of the target operation corresponding to a current lifted state), and is the initial change amount or the additional change amount. Then, the controller 30 calculates a sum of the previous integrated change amounts and the current change amount as a candidate value of the integrated change amount.
  • In step S22, the controller 30 determines whether or not the candidate value of the integrated change amount is equal to or more than the integrated change amount limit value. The integrated change amount limit value is set in the controller 30 in advance (before this determination). When the candidate value of the integrated change amount is equal to or more than the integrated change amount limit value (in a case of YES in step S22), the controller 30 causes the processing flow to proceed to step S23. In a case where the candidate value of the integrated change amount is less than the integrated change amount limit value (in a case of NO in step S22), the controller 30 sets the candidate value of the integrated change amount as a decided value of the integrated change amount, and causes the processing flow to proceed to step S24.
  • In step S23, in a case where the candidate value of the integrated change amount is equal to or more than the integrated change amount limit value (in a case of YES in step S22), the controller 30 corrects (sets) the decided value of the integrated change amount to be equal to or less than the integrated change amount limit value (see FIG. 12). In this case, the controller 30 may set the decided value of the integrated change amount to a value equal to or less than the integrated change amount limit value. Next, the controller 30 causes the processing flow to proceed to step S24.
  • In step S24, the controller 30 stores the decided value of the integrated change amount. Then, the controller 30 changes the target operation on the basis of the decided value of the integrated change amount.
  • (Example C: Change of Operation Direction (Reverse Operation))
  • As illustrated in FIG. 14, the controller 30 may change an operation direction of the attachment 15 as the change of the target operation. Specifically, the controller 30 may change the target operation so that reverse operation on the target path P is performed when a reverse operation execution condition (an example of the target operation change condition) to be described later is satisfied. Note that in FIG. 14, the work machine 10 before the reverse operation is performed is indicated by a chain double-dashed line, and the work machine 10 after the reverse operation is performed is indicated by a solid line.
  • A reason for changing the target operation so as to change the operation direction of the attachment 15 is as follows. A cause of the lifted state into which the machine body 10a is brought is as follows. The reaction force F (see FIGS. 3 and 5) acts on the bucket 15c from the work object when the bucket 15c performs the excavation operation along the target path P. Therefore, the controller 30 changes the operation direction of the attachment 15. Specifically, the controller 30 changes the target operation so that the reverse operation on the target path P is performed. The "reverse operation" is to move (operate) the attachment 15 in a direction (returning direction) reverse to a direction of movement of the attachment 15 in the excavation operation along the target path P. In the reverse operation, the controller 30 causes the bucket 15c to move (operate) in a direction (returning direction) reverse to the direction of movement of the bucket 15c in the excavation operation along the target path P. In the reverse operation, the controller 30 may cause the bucket 15c to move so as to follow a past trajectory of the bucket 15c in the excavation operation along the target path P. Furthermore, in the reverse operation, the controller 30 may cause the bucket 15c to move in a direction approximately reverse to the movement direction of the bucket 15c in the excavation operation along the target path P.
  • In the example illustrated in FIG. 1, in normal excavation operation, the bucket 15c performs, for example, digging down operation, horizontal excavation operation, and lifting operation. In the digging down operation, the bucket 15c digs down the work object to the lower side Z2 and to the rear side X2. In the horizontal excavation operation, the bucket 15c excavates the work object to the rear side X2. In the lifting operation, the bucket 15c lifts the work object while excavating the work object (digs up) to the upper side Z1 and to the rear side X2. In a case where the normal excavation operation is such operation, in reverse operation of the lifting operation, the bucket 15c moves to the lower side Z2 and to the front side X1. In reverse operation of the horizontal excavation operation, the bucket 15c moves to the front side X1. In reverse operation of the digging down operation, the bucket 15c moves to the front side X1 and to the upper side Z1. Although FIG. 14 illustrates a case where the reverse operation is performed when the machine body 10a is in the front-lifted state, the reverse operation may be performed when the machine body 10a is in the rear-lifted state.
  • (Reverse Operation Execution Condition)
  • As described above, the controller 30 may change the target operation so that the reverse operation on the target path P is performed when a reverse operation execution condition (an example of the target operation change condition) is satisfied. Various reverse operation execution conditions can be set. The reverse operation execution condition includes at least that the machine body 10a is in the lifted state. The reverse operation execution condition may include that the machine body 10a is in the lifted state, and that the inclination of the machine body 10a detected by the inclination detector 21b is in a specific inclined state (a specific state other than the lifted state). The "specific inclined state" is set in the controller 30 in advance (before the determination as to whether the reverse operation execution condition is satisfied or not). For example, the "specific inclined state" may be a state in which a degree of inclination of the machine body 10a has a specific extent. For example, the "specific inclined state" may be a state in which the degree of inclination of the machine body 10a exceeds a reverse operation execution inclination threshold which is a predetermined threshold. The "specific inclined state" may be a state in which the degree of inclination of the machine body 10a is increased, i.e., a state in which the inclination of the machine body 10a is deteriorated. The reverse operation execution condition may include a condition different from the above conditions.
  • (Example D: Limitation of Elements of Attachment 15 to be Operated)
  • As illustrated in FIG. 15, when an operation element limiting condition (an example of the target operation change condition) to be described later is satisfied, the controller 30 may limit the elements of the attachment 15 to be operated as the change of the target operation. The controller 30 may change the target operation so that the inclination of the machine body 10a becomes small by limiting the elements of the attachment 15 to be operated.
  • A reason for changing the target operation so as to limit the elements of the attachment 15 to be operated is as follows. For example, when all of the plurality of elements constituting the attachment 15 (the boom 15a, the arm 15b, and the bucket 15c) perform the excavation operation, the reaction force F (see FIGS. 3 and 5) acting on the bucket 15c from the work object increases, so that the machine body 10a may come into the lifted state. At this time, when only a part (e.g., only the bucket 15c) of the plurality of elements constituting the attachment 15 is caused to perform the excavation operation, the reaction force F acting on the bucket 15c from the work object tends to be small, and the degree of the lifted state of the machine body 10a tends to be reduced.
  • Therefore, the controller 30 limits the elements of the attachment 15 caused to perform the excavation operation to only some elements of the attachment 15. Specifically, the controller 30 uses only the bucket 15c as the element of the attachment 15 to be caused to perform the excavation operation. In detail, the target operation before the change includes causing the bucket 15c and an element other than the bucket 15c (one or both of the boom 15a and the arm 15b) to perform the excavation operation. Then, the controller 30 changes the target operation so that the target operation after the change includes causing only the bucket 15c among the plurality of elements constituting the attachment 15 to perform the excavation operation. Specifically, the controller 30 changes the target operation such that the target operation after the change includes rotating the bucket 15c in the excavation direction R1 with respect to the arm 15b while stopping the boom 15a and the arm 15b. Since the controller 30 limits the element of the attachment 15 to be caused to perform the excavation operation to only a part of the attachment 15 (e.g., only the bucket 15c), the reaction force F (see FIGS. 3 and 5) acting on the bucket 15c from the work object tends to be small. As a result, the lifted state of the machine body 10a is easily resolved.
  • (Operation Element Limiting Condition)
  • As described above, when the operation element limiting condition (an example of the target operation change condition) is satisfied, the controller 30 may limit the elements of the attachment 15 to be operated. Various operation element limiting conditions can be set. The operation element limiting condition includes that the machine body 10a is in the lifted state (the front-lifted state or the rear-lifted state). For example, the operation element limiting condition may include that the machine body 10a is in the lifted state, and that the inclination of the machine body 10a detected by the inclination detector 21b is in a specific inclined state (a specific state other than the lifted state). The "specific inclined state" is set in the controller 30 in advance (before the determination as to whether the operation element limiting condition is satisfied or not). The "specific inclined state" may be a state in which a degree of inclination of the machine body 10a has a specific extent. The "specific inclined state" may be a state in which the degree of inclination of the machine body 10a exceeds a predetermined threshold.
  • (Example E: Change to Discharge Operation)
  • As illustrated in FIG. 16, the controller 30 may change the target operation to cause the bucket 15c to perform the discharge operation when a discharge condition (to be described later) is satisfied. The discharge operation may include, for example, operation for adjusting the soil amount in the bucket 15c. In detail, the controller 30 may change the target operation so as to cause the bucket 15c to perform the discharge operation when the discharge condition is satisfied in a state where the bucket 15c is not performing the discharge operation.
  • A reason for changing the target operation so as to cause the bucket 15c to perform the discharge operation is as follows. In a case where the amount of the work object in the bucket 15c is too large when the work machine 10 is not performing the excavation operation, the machine body 10a may be brought into the rear-lifted state. The above "when the work machine 10 is not performing the excavation operation" is, for example, after completion of the excavation operation and before the bucket 15c discharges the work object. The above "when the work machine 10 is not performing the excavation operation" is, for example, when the bucket 15c is moving (lifting) the work object to the upper side Z1. Therefore, when the discharge condition is satisfied, the controller 30 changes the target operation so as to cause the bucket 15c to perform the discharge operation.
  • The above "discharge operation" is operation of causing at least a part of the work object in the bucket 15c to be discharged from the bucket 15c. Specifically, the discharge operation is operation including rotation of the bucket 15c to the discharge direction R2. When the controller 30 causes the bucket 15c to perform the discharge operation, the amount (e.g., soil amount) of the work object in the bucket 15c decreases. As a result, the rear-lifted state of the machine body 10a is resolved. In this discharge operation, the work object in the bucket 15c is preferably discharged from the bucket 15c until the rear-lifted state of the machine body 10a is resolved. This discharge operation may be ended in a state where the work object remains in the bucket 15c.
  • The controller 30 may cause one or both of the boom 15a and the arm 15b to operate when causing the bucket 15c to perform the discharge operation. For example, when causing the bucket 15c to perform the discharge operation, the controller 30 may cause the boom 15a to move in a direction in which a distal end of the boom 15a moves to the upper side Z1, i.e., may cause the boom 15a to perform boom raising operation. The boom raising operation is operation of the boom 15a in which the distal end of the boom 15a moves away from the ground.
  • (Discharge Condition)
  • As described above, the controller 30 may cause the bucket 15c to perform the discharge operation when the discharge condition (an example of the target operation change condition) is satisfied. Various discharge conditions can be set. The discharge condition includes that the machine body 10a is in the lifted state (in detail, the rear-lifted state). The discharge condition may include that the machine body 10a is in the rear-lifted state and that the excavation operation is not being performed.
  • (Specific Example of Change of Target Operation)
  • Each of the above examples for changing the target operation can be variously combined. Timing of changing the target operation can be variously set, and contents of changing the target operation can be variously set. Hereinafter, a specific example of the target operation change processing of the controller 30 will be described along with the flowcharts illustrated in FIGS. 17 to 19. In the following, steps S31 to S34 will be described with reference to FIG. 17.
  • In step S31, the controller 30 illustrated in FIG. 1 acquires information about the inclination of the machine body 10a detected by the inclination detector 21b.
  • In step S32, the controller 30 determines whether or not the machine body 10a is in the lifted state on the basis of the inclination acquired in step S31. In a case where the machine body 10a is not in the lifted state (in a case of NO in step S32), the controller 30 returns the processing flow to step S31 (to start). In a case where the machine body 10a is in the lifted state (in a case of YES in step S32), the controller 30 causes the processing flow to proceed to step S33.
  • In step S33, the controller 30 stores the "lifted state bucket height" which is the bucket height H15c when the machine body 10a is brought into the lifted state (see FIG. 10). In FIG. 17, the lifted state bucket height is simply described as "bucket height".
  • In step S34, the controller 30 determines whether the machine body 10a is in the front-lifted state or not on the basis of the inclination acquired in step S31. In a case where the machine body 10a is in the front-lifted state (in a case of YES in step S34), the controller 30 performs processing of handling the front-lifted state in the current excavation operation (step S50). In a case where the machine body 10a is in the rear-lifted state (in a case of NO in step S34), the controller 30 performs processing of handling the rear-lifted state in the current excavation operation (step S70).
  • As illustrated in FIG. 18, in step S50, when the machine body 10a is in the front-lifted state, the controller 30 illustrated in FIG. 1 performs the processing for handling the front-lifted state in the current excavation operation. In the following, steps S52 to S54 will be described with reference to FIG. 18.
  • In step S52, the controller 30 illustrated in FIG. 1 determines an inclination state (a degree of inclination) of the machine body 10a. Specifically, the controller 30 determines whether the inclination state of the machine body 10a in the front-lifted state is a "large inclination state" or not. In FIG. 18, the "large inclination state" is simply described as "large". A criterion for determining whether the inclination state is the large inclination state or not is set in advance in the controller 30 (before the determination as to whether the inclination state is the large inclination state or not is performed). The large inclination state may be, for example, a state in which the difference between the in-work inclination angle and the initial inclination angle (the relative value of the inclination angle) is equal to or more than a threshold, or a state in which a value of the in-work inclination angle (the absolute value of the inclination angle) is equal to or more than a threshold. When the inclination state of the machine body 10a is not the "large inclination state" (in a case of NO in step S52), the controller 30 causes the flow to proceed to step S52n. When the inclination state of the machine body 10a is the "large inclination state" (in a case of YES in step S52), the controller 30 causes the flow to proceed to step S53.
  • In step S52n, the controller 30 changes the target path P in the current excavation operation. For example, the controller 30 decreases the target excavation depth Ld (see the above example A1) (see FIG. 4). Then, the controller 30 ends the processing (step S50) for handling the front-lifted state in the current excavation operation, and causes the flow to proceed to step S61 (see FIG. 17).
  • In step S53, as illustrated in FIG. 14, the controller 30 causes the bucket 15c to perform the movement (reverse operation) in the direction reverse to the movement of the bucket 15c along the target path P in the excavation operation (see the above-described example C).
  • In step S54, the controller 30 determines whether the front-lifted state of the machine body 10a is resolved or not. The controller 30 continues the processing for the reverse operation in step S53 until the front-lifted state of the machine body 10a is resolved (until YES is obtained in step S54). When the front-lifted state of the machine body 10a is resolved (in a case of YES in step S54), the controller 30 ends the processing (step S50) for handling the front-lifted state in the current excavation operation, and causes the flow to proceed to step S61 illustrated in FIG. 17.
  • In step S61, the controller 30 determines whether or not the bucket height H15c (see FIG. 10) in the next excavation operation is larger (deeper) than the "lifted state bucket height" stored in step S33. The "bucket height H15c in the next excavation operation" here is a bucket height H15c assumed in the next excavation operation. The controller 30 can acquire the bucket height H15c assumed in the next excavation operation on the basis of the target operation of the next excavation operation. Specifically, the target operation of the next excavation operation may include the target path P or the target bucket ground angle θ. More specifically, the target operation of the next excavation operation may include, for example, at least one of the target excavation depth Ld, the excavation start target bucket ground angle θs, the target excavation end position Pe, and the target horizontal excavation distance Lh. When the bucket height H15c in the next excavation operation is larger than the lifted state bucket height (in a case of YES in step S61), the controller 30 causes the flow to proceed to step S62. When the bucket height H15c in the next excavation operation is equal to or lower (shallower) than the lifted state bucket height (in a case of NO in step S61), the controller 30 ends the processing flow for the current excavation operation (proceed to return). Then, the controller 30 starts a processing flow for the next excavation operation (return to start).
  • In step S62, the controller 30 performs processing for handling the front-lifted state in the next excavation operation. For example, as illustrated in FIG. 4, the controller 30 changes the target path P in the next excavation operation (see the above Example A). Specifically, the controller 30 decreases the target excavation depth Ld in the next excavation operation (see the above Example A1). In addition, for example, the controller 30 changes the excavation start target bucket ground angle θs in the next excavation operation (see the above Example B). Then, the controller 30 ends the processing flow for the current excavation operation and starts the processing flow for the next excavation operation.
  • As illustrated in FIG. 19, in step S70, when the machine body 10a is in the rear-lifted state (in a case of NO in step S34 in FIG. 17), the controller 30 performs the processing for handling the rear-lifted state in the current excavation operation. In the following, steps S71 to S76 illustrated in FIG. 19 will be described with reference to FIG. 19.
  • In step S71, the controller 30 illustrated in FIG. 1 determines whether or not the bucket 15c (attachment 15) is performing the excavation operation. When the bucket 15c is performing the excavation operation (in a case of YES in step S71), the controller 30 causes the flow to proceed to step S72. When the bucket 15c is not performing the excavation operation (in a case of NO in step S71), the controller 30 causes the flow to proceed to step S71n.
  • In step S71n, as illustrated in FIG. 16, the controller 30 causes the bucket 15c to perform the discharge operation (see Example E described above). In detail, when the machine body 10a is in the rear-lifted state and the bucket 15c is not performing the excavation operation, the controller 30 causes the bucket 15c to perform the discharge operation. At this time, the controller 30 may cause the boom 15a to perform the boom raising operation. Then, the controller 30 ends the processing (step S70) for handling the rear-lifted state in the current excavation operation, and causes the flow to proceed to step S81 (see FIG. 17).
  • In step S72, the controller 30 determines the inclination state of the machine body 10a. Specifically, the controller 30 determines whether the inclination state (the degree of inclination) of the machine body 10a is the "large inclination state" as in step S52 (see FIG. 18). In FIG. 19, the "large inclination state" is simply described as "large". Note that the "large inclination state" in step S52 (see FIG. 18) and the "large inclination state" in step S72 may be the same or different from each other. When the inclination state of the machine body 10a is not the "large inclination state" (in a case of NO in step S72), the controller 30 causes the flow to proceed to step S72n. When the inclination state of the machine body 10a is the "large inclination state" (in a case of YES in step S72), the controller 30 causes the flow to proceed to step S73.
  • In step S72n, the controller 30 changes the target path P in the current excavation operation. For example, as illustrated in FIG. 6, the controller 30 may decrease the target excavation depth Ld (see the above Example A2 -1), may decrease the target horizontal excavation distance Lh (see the above Example A2 -2), or may change the target excavation end position Pe to the front side X1 (see the above Example A2 -3). The controller 30 may make only one of these changes or may make a plurality of changes out of these changes. Then, the controller 30 ends the processing (step S70) for handling the rear-lifted state in the current excavation operation, and causes the flow to proceed to step S81 (see FIG. 17).
  • In step S73, when the rear-lifted state of the machine body 10a is the "large inclination state", the controller 30 causes only the bucket 15c to perform the excavation operation as illustrated in FIG. 15 (see the above Example D).
  • In step S74, the controller 30 determines whether or not the rear-lifted state of the machine body 10a is deteriorated (the inclination is increased) by causing only the bucket 15c to perform the excavation operation (by performing step S73). When the rear-lifted state of the machine body 10a deteriorates (in a case of YES in step S74), the controller 30 causes the flow to proceed to step S75. When the rear-lifted state of the machine body 10a is not deteriorated (in a case of NO in step S74), the controller 30 causes the flow to proceed to step S74n.
  • In step S74n, the controller 30 determines whether or not the excavation operation by only the bucket 15c (step S73) is completed. Specifically, the controller 30 determines whether or not the ground angle or the bucket rotation angle φ of the bucket 15c has reached a predetermined angle (an excavation operation end angle). When the excavation operation by only the bucket 15c is completed (in a case of YES in step S74n), the controller 30 ends the processing (step S70) for handling the front-lifted state in the current excavation operation, and causes the flow to proceed to step S81 (see FIG. 17). When the excavation operation by only the bucket 15c is not completed (in a case of NO in step S74n), the controller 30 causes the excavation operation by only the bucket 15c to continue (causes the flow to return to step S73).
  • In step S75, the controller 30 causes the bucket 15c to move in the direction reverse to the movement of the bucket 15c along the target path P in the excavation operation, i.e., causes the bucket 15c to perform the reverse operation on the target path P (see the above-described Example C). In detail, when the rear-lifted state is deteriorated by the excavation operation by only the bucket 15c (step S73) illustrated in FIG. 15 (in a case of YES in step S74), the controller 30 causes the bucket 15c to perform the reverse operation on the target path P as illustrated in FIG. 14. Although FIG. 14 illustrates the front-lifted state, the processing in step S75 is performed on the rear-lifted state.
  • In step S76, the controller 30 determines whether or not the rear-lifted state of the machine body 10a is resolved by the reverse operation on the target path P (step S75). When the rear-lifted state of the machine body 10a is not resolved (in a case of NO in step S76), the controller 30 continues the processing for the reverse operation on the target path P (return to step S75). When the rear-lifted state of the machine body 10a is resolved (in a case of YES in step S76), the controller 30 ends the processing for the reverse operation on the target path P. Then, the controller 30 ends the processing (step S70) for handling the front-lifted state in the current excavation operation, and causes the flow to proceed to step S81 illustrated in FIG. 17.
  • In step S81, the controller 30 determines whether the bucket height H15c in the next excavation operation (see FIG. 10) is larger (deeper) than the "lifted state bucket height" stored in step S33 (similar to step S61). The "bucket height H15c in the next excavation operation" here is a bucket height H15c assumed in the next excavation operation. The controller 30 can acquire the bucket height H15c assumed in the next excavation operation on the basis of the target operation of the next excavation operation. When the bucket height H15c in the next excavation operation is larger (deeper) than the lifted state bucket height (in a case of YES in step S81), the controller 30 causes the flow to proceed to step S82. When the bucket height H15c in the next excavation operation is equal to or smaller (shallower) than the lifted state bucket height (in a case of NO in step S81), the controller 30 ends the processing flow for the current excavation operation (proceed to return). Then, the controller 30 starts a processing flow for the next excavation operation (return to start).
  • In step S82, the controller 30 performs processing for handling the rear-lifted state in the next excavation operation. For example, as illustrated in FIG. 6, the controller 30 changes the target path P in the next excavation operation. For example, the controller 30 may decrease the target excavation depth Ld (see the above Example A2 -1), may decrease the target horizontal excavation distance Lh (see the above Example A2 -2), or may change the target excavation end position Pe to the front side X1 (see the above Example A2 -3). The controller 30 may make only one of these changes or may make a plurality of changes out of these changes. Then, the controller 30 ends the processing flow for the current excavation operation and starts the processing flow for the next excavation operation.
  • (Study)
  • In the work machine target operation setting system 1 of the present embodiment, in a case where it is determined that the machine body 10a is in the lifted state on the basis of the inclination of the machine body 10a detected by the inclination detector 21b illustrated in FIG. 1, the target operation change processing may be performed. Here, description will be made of a case where the target operation of the excavation operation is changed according to information different from the inclination of the machine body 10a. For example, consideration will be given to a case (study example) of changing the target operation of the excavation operation according to shape information of the surface (e.g., the ground surface) of the work object. In this study example, even if a shape of the work object is the same, change of an environment such as a quality of the work object (e.g., soil property) changes whether the machine body 10a is brought into the lifted state or not. In addition, a database indicating a relationship between the shape information of the surface of the work object and the target operation may be required. In this case, a processing load of the controller 30 may increase. On the other hand, in the present embodiment, in a case where it is determined that the machine body 10a is in the lifted state on the basis of the detected (actual) inclination of the machine body 10a, the target operation change processing may be performed. Therefore, it is not necessary to prepare information of a large data amount such as a database indicating the relationship between the shape information of the surface of the work object and the target operation, and it is possible to suppress an increase in the processing load of the controller 30.
  • (Effect of First Invention)
  • An effect of the work machine target operation setting system 1 illustrated in FIG. 1 is as follows. The work machine target operation setting system 1 includes the machine body 10a, the inclination detector 21b, the attachment 15, and the controller 30. The inclination detector 21b detects an inclination of the machine body 10a. The attachment 15 is attached to the machine body 10a and has the bucket 15c that performs the excavation work. The controller 30 sets target operation of the excavation operation of the bucket 15c.
  • [Configuration 1]
  • The controller 30 determines whether the machine body 10a is in the lifted state of being lifted with respect to the ground contact surface on the basis of the inclination of the machine body 10a detected by the inclination detector 21b. The controller 30 performs the target operation change processing when the target operation change condition set in the controller 30 is satisfied. The target operation change processing is processing of changing the target operation so that the inclination of the machine body 10a becomes small. The target operation change condition includes that the machine body 10a is in the lifted state.
  • In the above [Configuration 1], the controller 30 performs the target operation change processing of changing the target operation so that the inclination of the machine body 10a becomes small when the target operation change condition including that the machine body 10a is in the lifted state is satisfied. Therefore, the controller 30 can change the target operation such that the inclination of the machine body 10a decreases when the machine body 10a is brought into the lifted state. Therefore, the degree of the lifted state of the machine body 10a when the work machine 10 operates according to the target operation can be reduced.
  • (Effect of Second Invention) [Configuration 2]
  • The target operation change processing includes changing one or both of the excavation start target bucket ground angle θs that is an angle of the bucket 15c with respect to the ground at a start position of the excavation operation, and the target path P of the bucket 15c in the excavation operation.
  • The following effect can be obtained by the above [Configuration 2]. The reaction force F (see FIGS. 3 and 5) received by the bucket 15c from a work object changes depending on the angle (ground angle) of the bucket 15c with respect to the ground at the start position of the excavation operation and on a path of the bucket 15c in the excavation operation. Due to the reaction force F, the machine body 10a may come into the lifted state. Therefore, in the above [Configuration 2], change of the target operation includes changing one or both of the excavation start target bucket ground angle θs, which is an angle of the bucket 15c with respect to the ground at the start position of the excavation operation, and the target path P of the bucket 15c in the excavation operation. Specifically, the controller 30 preferably changes one or both of the excavation start target bucket ground angle θs and the target path P such that the reaction force F received by the bucket 15c from the work object when the bucket 15c is performing the excavation operation decreases. As a result, the degree of the lifted state of the machine body 10a can be reduced.
  • (Effect of Third Invention) [Configuration 3]
  • The target operation change condition includes a front-lifted state handling condition. As illustrated in FIG. 3, the front-lifted state handling condition includes that the front side part of the machine body 10a is in the front-lifted state of being lifted with respect to the ground contact surface. When the front-lifted state handling condition is satisfied, in the target operation change processing, the controller 30 changes one or both of the excavation start target bucket ground angle θs and the target excavation depth Ld of the bucket 15c in the excavation operation as illustrated in FIG. 4.
  • The following effect can be obtained by the above [Configuration 3]. The reaction force F (see FIG. 3) that the bucket 15c receives from the work object when the bucket 15c performs the excavation operation changes according to the angle of the bucket 15c with respect to the ground at the start position of the excavation operation and the excavation depth of the bucket 15c in the excavation operation. Due to the reaction force F, the machine body 10a may come into the front-lifted state. Therefore, in the above [Configuration 3], one or both of the excavation start target bucket ground angle θs and the target excavation depth Ld may be changed when the machine body 10a is in the front-lifted state. Preferably, the controller 30 changes one or both of the excavation start target bucket ground angle θs and the target excavation depth Ld such that the reaction force F received by the bucket 15c upward (e.g., the upper side Z1) from the work object decreases. As a result, the degree of the front-lifted state of the machine body 10a can be reduced.
  • (Effect of Fourth Invention) [Configuration 4]
  • The target operation change condition includes a rear-lifted state handling condition. As illustrated in FIG. 5, the rear-lifted state handling condition includes that the rear side part of the machine body 10a is in the rear-lifted state of being lifted with respect to the ground contact surface. When the rear-lifted state handling condition is satisfied, in the target operation change processing, the controller 30 changes one or more of the target horizontal excavation distance Lh, the target excavation depth Ld of the bucket 15c in the excavation operation, and the target excavation end position Pe as illustrated in FIG. 6. The target horizontal excavation distance Lh is an excavation distance of the bucket 15c in the horizontal direction in the excavation operation. The target excavation end position Pe is a position where the excavation operation ends.
  • The following effect can be obtained by the above [Configuration 4]. The reaction force F (see FIG. 5) that the bucket 15c receives from the work object when the bucket 15c is performing the excavation operation changes according to a horizontal excavation distance, an excavation depth, and an excavation end position of the bucket 15c in the excavation operation. Due to the reaction force F, the machine body 10a may come into the rear-lifted state. Therefore, in the above [Configuration 4], when the machine body 10a is in the rear-lifted state, one or more parameters of the target horizontal excavation distance Lh, the target excavation depth Ld, and the target excavation end position Pe may be changed. The controller 30 preferably changes one or more of the target horizontal excavation distance Lh, the target excavation depth Ld, and the target excavation end position Pe such that the reaction force F received by the bucket 15c downward (e.g., the lower side Z2) from the work object decreases. As a result, the degree of the rear-lifted state of the machine body 10a can be reduced.
  • (Effect of Fifth Invention) [Configuration 5]
  • As illustrated in FIG. 10, the controller 30 stores the bucket height H15c that is a position of the bucket 15c in the height direction when the machine body 10a is brought into the lifted state, i.e., the lifted state bucket height. The controller 30 restricts change of the target operation in the target operation change processing when the bucket 15c performs the excavation operation at a position above the height threshold. The height threshold is a threshold set based on the lifted state bucket height.
  • The following effect can be obtained by the above [Configuration 5]. When the bucket 15c excavates a position higher than the lifted state bucket height, a risk of the machine body 10a being brought into the lifted state is low as compared with a position equal to or lower (deep position) than the lifted state bucket height. In other words, the position higher than the lifted state bucket height is a position shallower than the lifted state bucket height, for example, a position to the upper side Z1 of the lifted state bucket height. In addition, at the excavation of a position higher than the lifted state bucket height by the bucket 15c, when the target operation is excessively changed so that the inclination of the machine body 10a becomes small, the excavation amount of the work object by the bucket 15c may be excessively reduced. Therefore, in the above [Configuration 5], when the bucket 15c performs the excavation operation at a position above the height threshold based on the lifted state bucket height, the controller 30 restricts the change of the target operation in the target operation change processing. As a result, it is possible to secure the excavation amount of the work object by the bucket 15c when the bucket 15c performs the excavation operation at a position above the height threshold.
  • (Effect of Sixth Invention)
  • As illustrated in FIG. 7, the attachment 15 includes the arm 15b to which the bucket 15c is rotatably attached. A bucket rotation angle allowable range that is an allowable range of the bucket rotation angle φ that is an angle of the bucket 15c with respect to the arm 15b is set in the controller 30.
  • [Configuration 6]
  • When the target operation change processing is performed, the controller 30 decides the excavation start target bucket ground angle θs after change (step S11 in FIG. 9). When the angle (bucket rotation angle φ) of the bucket 15c with respect to the arm 15b for arranging the bucket 15c at the decided excavation start target bucket ground angle θs is out of the bucket rotation angle allowable range, the controller 30 performs the following processing. In this case (in a case of NO in step S13 in FIG. 9), the controller 30 changes the target excavation start position Ps which is the position where the excavation operation is started.
  • In the above [Configuration 6], when the bucket rotation angle φ is out of the bucket rotation angle allowable range, the target excavation start position Ps is changed. Therefore, it is easy to set the ground angle of the bucket 15c at the start position of the excavation operation (the target excavation start position Ps) to the excavation start target bucket ground angle θs after the change in a state where the bucket rotation angle φ is within the bucket rotation angle allowable range. As a result, the degree of the front-lifted state of the machine body 10a can be reduced.
  • (Effect of Seventh Invention) [Configuration 7]
  • The controller 30 illustrated in FIG. 1 changes a change amount of the target operation according to the inclination of the machine body 10a detected by the inclination detector 21b, in the target operation change processing (see FIG. 11).
  • According to the above [Configuration 7], the controller 30 can set the change amount of the target operation to an appropriate change amount according to the inclination of the machine body 10a. As a result, the degree of the lifted state of the machine body 10a can be further reduced as compared with a case where the change amount of the target operation is too small. In addition, the excavation amount of the work object by the bucket 15c can be secured as compared with a case where the change amount of the target operation is too large.
  • (Effect of Eighth Invention) [Configuration 8]
  • In a case where the target operation change condition is satisfied when the bucket 15c is caused to perform the excavation operation with the changed target operation, the controller 30 further changes the target operation so that the inclination of the machine body 10a becomes small in the target operation change processing (see FIG. 12).
  • The following effect can be obtained by the above [Configuration 8]. In the above [Configuration 1], the controller 30 performs the target operation change processing of changing the target operation so that the inclination of the machine body 10a becomes small when the target operation change condition including that the machine body 10a is in the lifted state is satisfied. When the bucket 15c performs the excavation operation with the changed target operation, the target operation change condition including that the machine body 10a is in the lifted state may be satisfied again. In this case, in the above [Configuration 8], the controller 30 further changes the target operation (adds or integrates the change amount) such that the inclination of the machine body 10a becomes small in the target operation change processing. Therefore, when the bucket 15c performs the excavation operation with the changed target operation, the degree of the lifted state of the machine body 10a can be reduced.
  • (Effect of Ninth Invention) [Configuration 9]
  • The controller 30 restricts change of the target operation so that an integrated change amount obtained by integrating change amounts of the target operation becomes equal to or less than an integrated change amount limit value set in the controller 30 in the target operation change processing (see FIG. 12).
  • The following effect can be obtained by the above [Configuration 9]. In the above [Configuration 8], in a case where the machine body 10a is brought into the lifted state again when the bucket 15c performs the excavation operation with the changed target operation, the controller 30 further changes the target operation such that the inclination of the machine body 10a becomes small. In this case, it is assumed that the target operation is excessively changed for the purpose of reducing the inclination of the machine body 10a. Therefore, in the above [Configuration 9], the controller 30 restricts the change of the target operation such that the integrated change amount obtained by integrating the change amounts of the target operation becomes equal to or less than the integrated change amount limit value set in the controller 30. As a result, the excavation amount of the work object by the bucket 15c can be secured.
  • (Effect of Tenth Invention) [Configuration 10]
  • In a case where the target operation change condition is satisfied while the bucket 15c is performing current excavation operation, the controller 30 changes the target operation of the next and subsequent excavation operations in the target operation change processing (see steps S62 and S82 in FIG. 17).
  • In the above [Configuration 10], the degree of the lifted state of the machine body 10a in the next and subsequent excavation operations can be reduced. In a case where the target operation of the next and subsequent excavation operations is changed and the target operation of the current excavation operation is not changed, it is easy to secure the excavation amount of the work object by the bucket 15c in the current excavation operation.
  • (Effect of Eleventh Invention) [Configuration 11]
  • In a case where the target operation change condition is satisfied while the bucket 15c is performing current excavation operation, the controller 30 changes the target operation in the current excavation operation in the target operation change processing (see step S52n in FIG. 18 and step S72n in FIG. 19).
  • In the above [Configuration 11], the degree of the lifted state of the machine body 10a in the current excavation operation can be reduced.
  • (Effect of Twelfth Invention) [Configuration 12]
  • The target operation change condition includes a reverse operation execution condition. The reverse operation execution condition includes that the machine body 10a is in the lifted state, and that the inclination of the machine body 10a detected by the inclination detector 21b is in a specific inclined state set in the controller 30. As illustrated in FIG. 14, in a case where the reverse operation execution condition is satisfied, the controller 30 performs the following processing in the target operation change processing. In this case, the controller 30 changes the target operation so that the bucket 15c moves in a direction reverse to a direction of movement of the bucket 15c along the target path P of the bucket 15c (see the reverse operation of Example C described above).
  • According to the above [Configuration 12], when the bucket 15c operates in the direction reverse to the direction of the movement of the bucket 15c along the target path P, the reaction force F acting on the bucket 15c from the work object (see FIGS. 3 and 5) decreases.
    Therefore, the degree of the lifted state of the machine body 10a can be reduced.
  • (Effect of Thirteenth Invention) [Configuration 13]
  • The target operation change condition includes an operation element limiting condition. The operation element limiting condition includes that the machine body 10a is in the lifted state, and that the inclination of the machine body 10a detected by the inclination detector 21b is in a specific inclined state set in the controller 30. As illustrated in FIG. 15, in a case where the operation element limiting condition is satisfied, the controller 30 changes the target operation so as to operate only the bucket 15c among the plurality of elements constituting the attachment 15 in the target operation change processing.
  • The following effect can be obtained by the above [Configuration 13]. As compared with a case where the bucket 15c and elements other than the bucket 15c among the plurality of elements constituting the attachment 15 operate, when only the bucket 15c operates, the reaction force F acting on the bucket 15c from the work object (see FIGS. 3 and 5) decreases.
    Therefore, the degree of the lifted state of the machine body 10a can be reduced.
  • (Effect of Fourteenth Invention) [Configuration 14]
  • The target operation change condition includes a discharge condition. As illustrated in FIG. 16, the discharge condition includes that the rear side part of the machine body 10a is in the rear-lifted state of being lifted with respect to the ground contact surface, and that the excavation operation is not being performed. When the discharge condition is satisfied, the controller 30 changes the target operation so as to cause the bucket 15c to perform the discharge operation in the target operation change processing.
  • In the above [Configuration 14], when the machine body 10a is in the rear-lifted state, the work object may be discharged from the bucket 15c. In this case, a load acting on the bucket 15c due to a mass of the work object decreases. As a result, the degree of the rear-lifted state of the machine body 10a is reduced.
  • (Effect of Fifteenth Invention) [Configuration 15]
  • The controller 30 automatically controls the attachment 15 so that the excavation operation of the bucket 15c is performed according to the target operation.
  • According to the above [Configuration 15], the degree of the lifted state of the machine body 10a when the work machine 10 operates by the automatic control can be reduced.
  • (Modifications)
  • The above embodiment may be modified in various ways. For example, modifications of the above embodiment may be variously combined. For example, the number of the components in the above embodiment (including the modifications) may be changed, and some of the components do not have to be provided. For example, the components may be fixed or coupled directly or indirectly. For example, the connection of each component illustrated in FIG. 2 may be changed. For example, the arrangement of the components may be changed. For example, an inclusion relationship of the components may be variously changed. For example, a component described as a low-order component included in a certain high-order component is not required to be included in the high-order component, and may be included in another component. For example, a plurality of members or parts different from each other may be described as one member or one part. For example, one member or one part may be divided into and provided as a plurality of members or parts different from each other. For example, the order of the steps in the flowchart (see FIG. 17 and the like) may be changed, some of the steps may not be performed, and the steps in different flowcharts may be combined. For example, various parameters (e.g., various parameters of the target path P, and the like) for use in control by the controller 30 illustrated in FIG. 1 may not be the same as these various parameters, and may be parameters that can be converted into various parameters. For example, the controller 30 may perform substantially the same processing as the processing of the above embodiment (including the modifications). The various processing may be variously combined. For example, each component may have only a part of the characteristics (operating function, arrangement, shape, operation, and the like).

Claims (15)

  1. A work machine target operation setting system comprising:
    a machine body;
    an inclination detector that detects an inclination of the machine body;
    an attachment that is attached to the machine body and has a bucket that performs excavation work; and
    a controller that sets target operation of excavation operation of the bucket,
    wherein
    the controller
    determines whether or not the machine body is in a lifted state of being lifted with respect to a ground contact surface on a basis of the inclination of the machine body detected by the inclination detection device, and
    performs target operation change processing that is processing of changing the target operation so as to reduce the inclination of the machine body when a target operation change condition set in the controller is satisfied, and
    the target operation change condition includes that the machine body is in the lifted state.
  2. The work machine target operation setting system according to claim 1, wherein the target operation change processing includes changing one or both of an excavation start target bucket ground angle that is an angle of the bucket with respect to the ground at a start position of the excavation operation, and a target path of the bucket in the excavation operation.
  3. The work machine target operation setting system according to claim 2, wherein
    the target operation change condition includes a front-lifted state handling condition including that a front side part of the machine body is in a front-lifted state of being lifted with respect to the ground contact surface, and
    when the front-lifted state handling condition is satisfied, in the target operation change processing, the controller changes one or both of the excavation start target bucket ground angle and a target excavation depth of the bucket in the excavation operation.
  4. The work machine target operation setting system according to claim 2 or 3, wherein
    the target operation change condition includes a rear-lifted state handling condition including that a rear side part of the machine body is in a rear-lifted state of being lifted with respect to a ground contact surface, and
    when the rear-lifted state handling condition is satisfied, in the target operation change processing, the controller changes one or more of a target horizontal excavation distance that is an excavation distance of the bucket in a horizontal direction in the excavation operation, a target excavation depth of the bucket in the excavation operation, and a target excavation end position that is a position where the excavation operation ends.
  5. The work machine target operation setting system according to any one of claims 2 to 4, wherein
    the controller
    stores a lifted state bucket height that is a position of the bucket in a height direction when the machine body is brought into the lifted state, and
    restricts change of the target operation in the target operation change processing when the bucket performs the excavation operation at a position above a height threshold that is a threshold set based on the lifted state bucket height.
  6. The work machine target operation setting system according to any one of claims 2 to 5, wherein
    the attachment includes an arm to which the bucket is rotatably attached,
    a bucket rotation angle allowable range that is an allowable range of an angle of the bucket with respect to the arm is set in the controller, and
    when the target operation change processing is performed, the controller decides the excavation start target bucket ground angle after change, and
    when the angle of the bucket with respect to the arm for arranging the bucket at the decided excavation start target bucket ground angle is out of the bucket rotation angle allowable range, the controller changes a target excavation start position that is a position where the excavation operation is started.
  7. The work machine target operation setting system according to any one of claims 2 to 6, wherein the controller changes a change amount of the target operation according to an inclination of the machine body detected by the inclination detector in the target operation change processing.
  8. The work machine target operation setting system according to any one of claims 2 to 7, wherein in a case where the target operation change condition is satisfied when the bucket is caused to perform the excavation operation with the changed target operation, the controller further changes the target operation so that an inclination of the machine body becomes small in the target operation change processing.
  9. The work machine target operation setting system according to claim 8, wherein the controller restricts change of the target operation such that an integrated change amount obtained by integrating change amounts of the target operation becomes equal to or less than an integrated change amount limit value set in the controller in the target operation change processing.
  10. The work machine target operation setting system according to any one of claims 1 to 9, wherein in a case where the target operation change condition is satisfied while the bucket is performing current excavation operation, the controller changes the target operation of the next and subsequent excavation operations in the target operation change processing.
  11. The work machine target operation setting system according to any one of claims 1 to 10, wherein in a case where the target operation change condition is satisfied while the bucket is performing current excavation operation, the controller changes the target operation in the current excavation operation in the target operation change processing.
  12. The work machine target operation setting system according to claim 11, wherein
    the target operation change condition includes a reverse operation execution condition including that the machine body is in the lifted state, and that an inclination of the machine body detected by the inclination detector is in a specific inclined state set in the controller, and
    in a case where the reverse operation execution condition is satisfied, the controller changes the target operation so that the bucket moves in a direction reverse to a direction of movement of the bucket along a target path of the bucket in the target operation change processing.
  13. The work machine target operation setting system according to claim 11 or 12, wherein
    the target operation change condition includes an operation element limiting condition including that the machine body is in the lifted state, and that an inclination of the machine body detected by the inclination detector is in a specific inclined state set in the controller, and
    in a case where the operation element limiting condition is satisfied, the controller changes the target operation so as to operate only the bucket among a plurality of elements constituting the attachment in the target operation change processing.
  14. The work machine target operation setting system according to any one of claims 11 to 13, wherein
    the target operation change condition includes a discharge condition including that a rear side part of the machine body is in a rear-lifted state of being lifted with respect to a ground contact surface, and that the excavation operation is not being performed, and
    when the discharge condition is satisfied, the controller changes the target operation so as to cause the bucket to perform discharge operation in the target operation change processing.
  15. The work machine target operation setting system according to any one of claims 1 to 14, wherein the controller automatically controls the attachment so that the excavation operation of the bucket is performed according to the target operation.
EP24885358.2A 2023-10-30 2024-10-03 Work machine target operation setting system Pending EP4782608A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2023185654A JP2025074673A (en) 2023-10-30 2023-10-30 Work machine target operation setting system
PCT/JP2024/035445 WO2025094583A1 (en) 2023-10-30 2024-10-03 Work machine target operation setting system

Publications (1)

Publication Number Publication Date
EP4782608A1 true EP4782608A1 (en) 2026-07-29

Family

ID=95581790

Family Applications (1)

Application Number Title Priority Date Filing Date
EP24885358.2A Pending EP4782608A1 (en) 2023-10-30 2024-10-03 Work machine target operation setting system

Country Status (4)

Country Link
EP (1) EP4782608A1 (en)
JP (1) JP2025074673A (en)
CN (1) CN122070399A (en)
WO (1) WO2025094583A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2026080527A (en) * 2024-10-31 2026-05-18 株式会社小松製作所 System and method for controlling a bulldozer

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003105795A (en) * 2001-09-28 2003-04-09 Hitachi Constr Mach Co Ltd Excavator excavation control device
JP7084129B2 (en) * 2016-12-05 2022-06-14 住友重機械工業株式会社 Excavator
JP7481908B2 (en) 2020-05-29 2024-05-13 株式会社小松製作所 Drilling plan creating device, work machine, and drilling plan creating method
CN116490655B (en) * 2020-11-09 2025-10-21 国立大学法人广岛大学 Automatic operation device of construction machinery

Also Published As

Publication number Publication date
CN122070399A (en) 2026-05-19
WO2025094583A1 (en) 2025-05-08
JP2025074673A (en) 2025-05-14

Similar Documents

Publication Publication Date Title
US12686991B2 (en) Control device, loading machine, and control method to determine a target azimuth direction
US12460388B2 (en) Control device and control method for work machine
CN105518222B (en) The control method of the control device of Work machine, Work machine and Work machine
CN106029991B (en) Work vehicle control system, control method, and work vehicle
EP3988720A1 (en) Excavation system, work system, control device, control method, and non-transitory computer readable medium on which program is stored
CN107306500A (en) The control method of the control device of Work machine, Work machine and Work machine
CN105992850A (en) Work vehicle control system, control method, and work vehicle
US20230407594A1 (en) Route setting system
WO2020105262A1 (en) System and method for automatically controlling work machine including work unit
JP2024124484A (en) Operation system and control method
EP4290017B1 (en) Excavation system
WO2025094583A1 (en) Work machine target operation setting system
EP4711531A1 (en) System, program and method for setting target path
JP7379281B2 (en) Systems, methods, and work machines for controlling work machines
WO2022064813A1 (en) Work area setting system and work object detection system
WO2024202983A1 (en) Control device, control method, and work machine
US11808010B2 (en) Method and system for operating implement assemblies of machines
CN119403981A (en) Mining Path Generation System
CN112041507B (en) Blade control device and blade control method
US20220090351A1 (en) Work vehicle, control device for work vehicle, and method for specifying direction of work vehicle
EP3825473A1 (en) Blade control device for work machinery
EP4800187A1 (en) Work assistance system
JP2026042285A (en) Work System
JP2026150133A (en) Excavation Feasibility Determination System
JP2024144800A (en) Control device, control method and working machine

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20260421

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR