EP4328601B1 - Energiespeichersystem und verfahren zum betrieb davon - Google Patents
Energiespeichersystem und verfahren zum betrieb davonInfo
- Publication number
- EP4328601B1 EP4328601B1 EP22919063.2A EP22919063A EP4328601B1 EP 4328601 B1 EP4328601 B1 EP 4328601B1 EP 22919063 A EP22919063 A EP 22919063A EP 4328601 B1 EP4328601 B1 EP 4328601B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- measurement data
- conversion device
- communication conversion
- failure flag
- memory
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/396—Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
-
- H02J7/80—
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/36—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
- G01R31/371—Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC] with remote indication, e.g. on external chargers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
- H02J3/32—Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q9/00—Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
- H01M2010/4271—Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01M—PROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
- H01M10/00—Secondary cells; Manufacture thereof
- H01M10/42—Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
- H01M10/425—Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
- H01M2010/4278—Systems for data transfer from batteries, e.g. transfer of battery parameters to a controller, data transferred between battery controller and main controller
-
- H02J7/52—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Definitions
- the present invention relates to an energy storage system and a method of operating the same, and more particularly, to an energy storage system capable of preventing data loss due to data transmission failure by dualizing data securement, and a method of operating the same.
- a secondary battery capable of charging/discharging is commonly applied not only to a portable device, but also to an electric vehicle or hybrid vehicle driven by an electrical source, an energy storage system (ESS) or an uninterruptible power supply (UPS) that use a medium-sized or large-sized battery for home or industrial use, etc.
- ESS energy storage system
- UPS uninterruptible power supply
- the energy storage system is an apparatus for improving the efficiency of power use by storing generated electricity in a storage device such as a battery and supplying it when power is needed.
- a storage device such as a battery
- Such an energy storage system stores electricity generated through renewable energy such as solar and wind power or electricity transmitted from a power plant in the battery, and allows the stored power to be used at a time when power consumption is relatively high.
- the secondary battery may not necessarily be the case if it is implemented as the battery for a portable terminal, etc., but a battery applied to an electric vehicle or an energy storage source as described above is generally used in a form in which a plurality of unit secondary battery cells are assembled to increase suitability for a high-capacity environment.
- a secondary battery pack having a multi-module structure in which a plurality of secondary batteries are connected in series/parallel, etc. is commonly used.
- a unit rack for power storage is composed of a plurality of secondary battery packs, and each secondary battery pack includes a plurality of secondary battery cells or secondary battery modules.
- a section is composed of a plurality of banks, and the bank has a structure including a plurality of racks.
- the energy storage system is configured to additionally include a battery management system (BMS) that performs functions such as power supply control for the load of each battery unit, electrical characteristic value measurement such as the current or voltage, charge/discharge control, voltage equalization control, state of charge (SOC) estimation, etc.
- BMS battery management system
- BMSs battery system controllers
- PBMS pack battery management system
- RBMS rack battery management system
- BBMS bank battery management system
- BSC battery system controller
- the BMSs of the energy storage system are composed of the BBMS, the RBMS, the PBMS, etc.
- the RBMS transmits measurement data such as rack current and cell voltage to a module log receiver, that is, server, in a TCP communication method through the CAN to Ethernet Converter (CANETHEW) device, that is, a communication conversion device.
- the server stores the corresponding measurement data, and the measurement data stored in the server is analyzed when an unexpected failure occurs.
- CANETHEW CAN to Ethernet Converter
- loss of the measurement data may be caused. Therefore, a dualization method of measurement data is needed so that the measurement data is not lost.
- the present invention provides an energy storage system capable of dual management of measurement data and a method of operating the same.
- the present invention provides an energy storage system capable of preventing loss of measurement data by storing the measurement data in a communication conversion device and analyzing the stored measurement data when collection of measurement data by a server is impossible, and a method of operating the same.
- the invention relates to an energy storage system according to claim 1.
- the energy storage system after the invention may comprise one or more features from dependent claims 2 to 7, in any technically feasible combination.
- the invention also relates to a method according to claim 8 of operating an energy storage system.
- the rack BMS generates measurement data of the battery rack and transmits the measurement data to the server through the communication conversion device.
- the rack BMS transmits the failure flag together with the measurement data, and the failure flag is activated when the server does not receive the measurement data through the communication conversion device. If the failure flag is activated, the communication conversion device stores the measurement data in the memory, and the external controller may read the measurement data stored in the memory to store in the server and analyze the measurement data.
- the communication conversion device stores the measurement data that could not be transmitted to the server and analyzes the stored measurement data using the external controller, and thus it is possible to manage the measurement data in a dual way, thereby preventing the loss of the measurement data.
- FIG. 1 is a block diagram for describing a configuration of an energy storage system according to the embodiment of the present invention.
- FIGS. 2 and 3 are block diagrams for describing configurations of a rack BMS and a communication conversion device constituting the energy storage system according to an embodiment of the present invention.
- the energy storage system includes a rack BMS 100 that outputs measurement data and a failure flag of a battery rack 1000 including a plurality of battery cells, a communication conversion device 2000 that receives the measurement data and the failure flag from the rack BMS 100, subjects the measurement data to communication conversion and outputs the measurement data, and stores the measurement data according to activation of the failure flag, and a server 3000 that receives the measurement data from the communication conversion device 2000.
- the present invention may further include an external controller 4000 that reads the measurement data stored in the communication conversion device.
- the communication conversion device 2000 stores the measurement data at the time when the failure flag is activated depending on whether or not the failure flag is activated, and the external controller 4000 reads the stored measurement data and analyzes the measurement data.
- the communication conversion device 2000 stores the measurement data according to the activation of the failure flag, and the stored measurement data may be measurement data that has not been subjected to communication conversion or measurement data that has been subjected to communication conversion. Therefore, dual management of measurement data is possible and thus loss of the measurement data can be prevented.
- the energy storage system according to an embodiment of the present invention will be described in more detail for each configuration as follows.
- the battery rack 1000 includes a plurality of battery cells connected in series, parallel or series-parallel, and a rack BMS 100 that manages charging and discharging of the corresponding battery rack, respectively.
- a plurality of battery cells may constitute one battery pack
- a plurality of battery packs may constitute one battery rack 1000
- a pack BMS may be provided in each battery pack.
- a plurality of battery racks 1000 may be provided in the energy storage system. That is, the energy storage system may include a plurality of battery racks 1000, and the rack BMS 100 may be provided in each of the plurality of battery racks.
- the rack BMS 100 protects cells from overcharging, overdischarging, overcurrent, overheating, etc.
- the measurement data of the rack BMS 100 is be transmitted to the server 3000 through the communication conversion device 2000.
- the rack BMS 100 transmits a failure flag together with the measurement data to the communication conversion device 2000.
- the configuration of this rack BMS 100 is illustrated in FIG. 2 .
- the rack BMS 100 may include a measurement unit 110 for measuring a state of the battery rack 1000, a communication unit 120 for receiving and outputting data with the outside, and a control unit 130 for controlling and managing the rack BMS 100.
- a balancing unit 140 for balancing the battery rack 1000 may be further included.
- the measurement unit 110 is provided to measure the state of the battery rack 1000 and, for example, measures the voltage, current, etc. of the battery rack 1000.
- the measurement unit 110 may measure the voltage and current of at least one of the battery pack and the battery cell as well as the battery rack. That is, the measurement unit 110 may measure the voltage, current, etc. of at least one of a battery rack, a battery pack, or a battery cell.
- the measurement unit 110 may include a plurality of sensors, for example, at least one voltage sensor and at least one current sensor.
- the voltage sensor may measure the voltage of at least one of the battery rack, the battery pack, or the battery cell.
- the voltage of the battery rack may be measured using the voltage sensor, and a stabilized voltage after a predetermined time from the battery rack, that is, the open circuit voltage (OCV) may be measured.
- the current sensor may measure the current of the battery rack.
- the current sensor may include, for example, a Hall current transformer (Hall CT) that measures the current using a Hall element and outputs a signal corresponding to the measured current.
- the measurement unit 110 may further include a temperature sensor (not illustrated) for measuring the temperature of the battery rack or ambient temperature.
- the temperature sensor may measure the temperature of one area or a plurality of areas of the battery rack or battery pack, and at least one temperature sensor may be provided for this purpose.
- the communication unit 120 performs data input/output between the rack BMS 100 and the communication conversion device 2000.
- the rack BMS 100 and the communication conversion device 2000 may be connected through controller area network (CAN) communication to perform data input/output. That is, the rack BMS 100 and the communication conversion device 2000 may input and output data of CAN communication method.
- the communication unit 120 under the control of the control unit 130, receives measurement data from the measurement unit 110 and transfers the measurement data to the communication conversion device 2000.
- a buffer unit for temporarily storing data may be provided at the front end of the communication unit 120. That is, the buffer unit, under the control of the control unit 130, may temporarily store data output from the measurement unit 110 and then transfer the data to the communication conversion device 2000 through the communication unit 120.
- the buffer unit stores next measurement data when previous measurement data is output to the communication conversion device 2000. That is, in the buffer unit, the previous measurement data may be overwritten with the next measurement data.
- the communication unit 120 may transmit the failure flag according to an embodiment of the present invention. That is, the communication unit 120 may transmit the failure flag to the communication conversion device 2000 together with measurement data such as, for example, the rack voltage and cell current of the battery rack 1000. In this case, the communication unit 120 receives a measurement data reception completion signal output from the server 2000, and activates and outputs the failure flag when the reception completion signal is not received for a predetermined time or longer.
- the measurement data is transmitted from the rack BMS 100 to the server 3000 through the communication conversion device 2000
- the server 3000 outputs a measurement data reception completion signal when the measurement data is received
- the rack BMS 100 activates the failure flag when the reception completion signal is not received for a predetermined time and transmits the failure flag to the communication conversion device 2000.
- the reception completion signal from the server 3000 may be received by the communication unit 120 of the rack BMS 100 from the server 3000, or may be received by the communication unit 120 of the rack BMS 100 through the communication conversion device 2000. That is, in order to receive the reception completion signal, the communication unit 120 of the rack BMS 100 may be connected to the server 3000 or the communication conversion device 2000.
- the control unit 130 controls and manages the components constituting the rack BMS 100. That is, the control unit 130 controls the measurement unit 110 to cause the measurement unit 110 to measure the voltage, current, temperature, etc. of at least one of the battery rack, the battery pack, and the battery cell, cause the data measured therefrom to be transmitted to the communication conversion device 2000 through the communication unit 120.
- the measurement unit 110 may continuously measure the state of the battery rack 1000 and the control unit 130 may cause data output from the measurement unit 110 to be periodically transferred to the communication conversion device 2000.
- the control unit 130 may transfer the corresponding data only when the current data is changed or outside a set range after comparing the previous data measured by the measurement unit 110 with the current data.
- control unit 130 controls the balancing unit 140 to balance at least one selected battery cell. Meanwhile, the control unit 130 may activate the failure flag according to whether or not the reception completion signal from the server 3000 is received. That is, the control unit 130 may control the communication unit 120 to output the failure flag through the communication unit 120, and may activate the failure flag and output the failure flag through the communication unit 120 when the reception completion signal from the server 3000 is not received.
- the balancing unit 140 may charge or discharge all of the plurality of battery cells constituting the battery rack 1000 to balance the overall state of charge of the plurality of battery racks 1000. That is, in the plurality of battery racks 1000, the state of charge of at least one of the plurality of battery racks may be high or low. All battery cells constituting the battery rack may be charged or discharged by performing balancing through the balancing unit 140 under the control of the control unit 130 of the rack BMS 100. In this case, for the battery rack 1000 having a relatively high state of charge, all battery cells thereof may be discharged, and for the battery rack 1000 having a relatively low state of charge, all battery cells thereof may be charged.
- the balancing unit 140 may be configured by connecting a switch and a load resistor in series between both ends of each battery cell. Accordingly, the switch may be turned on and off according to a control signal of the control unit 130 to discharge the voltage charged in the battery cell through the load resistor. In addition, in order to balance the state of charge of each battery cell constituting the battery rack 1000 under the control of the control unit 130, the balancing unit 140 may discharge cells having a relatively high state of charge and charge cells having a relatively low state of charge.
- the measurement unit 110 may measure the voltage and current of a plurality of battery cells constituting the battery rack 1000 and the control unit 130 may discharge the cells having a high state of charge and charge the cells having a low state of charge according to the measurement result of the measurement unit 110.
- the communication conversion device 2000 performs communication of measurement data between the rack BMS 100 and the server 3000.
- the communication conversion device 2000 is connected to the rack BMS 100 through controller area network (CAN) communication, and connected to the server 3000 through transmission control protocol (TCP) communication.
- CAN controller area network
- TCP transmission control protocol
- the communication conversion device 2000 converts the CAN communication into the TCP communication and transmits the measurement data from the rack BMS 100 to the server 3000. That is, the communication conversion device 2000 receives measurement data of CAN frame format from the rack BMS 100, converts the measurement data into measurement data of TCP packet format), and then transmits the measurement data of TCP packet format to the server 3000.
- the communication conversion device 2000 receives the failure flag according to the present invention, and stores the measurement data received from the rack BMS 100 according to activation of the failure flag. That is, when the failure flag received from the rack BMS 100 is activated, the communication conversion device 2000 stores the corresponding measurement data. Of course, the communication conversion device 2000 may activate the failure flag. When the communication conversion device 2000 fails to receive the reception confirmation signal from the server 3000, a failure flag may be activated. The configuration of such a communication conversion device 2000 is illustrated in FIG. 3 .
- the communication conversion device 3000 of the energy storage system may include a first communication unit 210 for receiving the measurement data and the failure flag of the battery rack 1000 through the rack BMS 100, a control unit 220 for receiving the measurement data through the first communication unit 210, subjects the measurement data to communication conversion for transmit the measurement data to the server 3000, and determines whether or not the failure flag is activated, a memory 230 that stores the measurement data when the failure flag is activated, and a second communication unit 240 for transmitting measurement data that has been subjected to communication conversion through the control unit 220 to the server 3000.
- the first communication unit 210 includes a CAN communication module to receive the measurement data from the rack BMS 100 in real time, and transmits the received measurement data to the control unit 220. That is, the first communication unit 210 is connected to the communication unit 110 of the rack BMS 100 and receives the measurement data of the battery rack 1000 from the communication unit 110 of the rack BMS 100 over the CAN frame format. In addition, the first communication unit 210 receives the failure flag from the rack BMS 100 together with the measurement data and transmits the failure flag to the control unit 220.
- the control unit 220 subjects the measurement data transmitted in real time from the rack BMS 100 through the first communication unit 210 to communication conversion. That is, the control unit 220 includes a communication conversion unit to convert the measurement data of the CAN frame format to the measurement data of the TCP packet format, and transfers the TCP-converted measurement data to the second communication unit 240. In addition, the control unit 220 determines whether or not the failure flag received together with the measurement data through the first communication unit 210 is activated, and stores the measurement data. That is, when the server 3000 cannot receive the measurement data due to communication line failure, fire, etc., the failure flag is activated. The control unit 220 may store measurement data at the time when the failure flag is activated in the memory 230.
- the measurement data to be stored in the memory 230 may be measurement data that has not been subjected to communication conversion, or measurement data that has been subjected to communication conversion.
- the data form of the measurement data stored in the memory 230 may be determined according to a communication method with an external controller 4000 to be described later. That is, when the external controller 4000 communicates over the CAN frame format, unconverted measurement data is stored in the memory 230. When the external controller 4000 communicates over the TCP packet format, converted measurement data may be stored in the memory 230. In an embodiment of the present invention, the external controller 4000 communicates over the CAN frame format, and thus unconverted measurement data of CAN frame format may be stored in the memory 230.
- the measurement data may be sequentially stored in the five memories 230 whenever the failure flag is activated. That is, the control unit 220 may sequentially store the measurement data in the five memories 230 by incrementing the index whenever the failure flag is activated. In addition, if the failure flag is activated even after the measurement data is stored in the five memories 230, the control unit 220 may sequentially overwrite the measurement data in the memories from the first memory to the fifth memory.
- the Memory 230 stores the measurement data when the failure flag is activated. That is, when it is impossible to collect data in the server 3000 due to a failure of communication line, a fire caused by a system fault, etc., the reception confirmation signal is not generated from the server 3000, the rack BMS 100 that has not received the reception confirmation signal activates and outputs the failure flag, and when it is determined that the failure flag is activated, the measurement data may be stored in the memory 230 by the control unit 220.
- the memories 230 may be provided as first to fifth memories, and measurement data may be sequentially stored in the first to fifth memories according to the number of activations of the failure flag.
- the memory 230 may include a secure digital card (SD card), a flash memory, a USB memory, an external hard disk, etc. That is, the memory 230 may be configured within the communication conversion device 2000 or may be configured outside the communication conversion device 2000.
- SD card secure digital card
- the second communication unit 240 transmits the measurement data that has been subjected to communication conversion by the control unit 220 to the server 3000 through an external communication network. That is, the second communication unit 240 transmits the measurement data, which is converted into measurement data of the TCP packet format through the control unit 220, to the server 3000.
- the second communication unit 240 may be connected to the server 3000 in a wireless or wired manner.
- a buffer unit for temporarily storing data (not illustrated) may be provided at the front end of the second communication unit 240. That is, the buffer unit, under the control of the control unit 230, may temporarily store TCP-converted measurement data and then transfer the data to the server 3000 through the second communication unit 240.
- the buffer unit stores next measurement data when previous measurement data is output to the server 3000. That is, in the buffer unit, the previous measurement data may be overwritten with the next measurement data.
- the buffer unit since the buffer unit temporarily stores the measurement data, when the failure flag is activated, the measurement data temporarily stored in the buffer unit may be stored in the memory 230. That is, the buffer unit may store the previous measurement data until the next measurement data is received.
- the previous measurement data stored in the buffer unit may be stored in the memory 230 without being overwritten with the next measurement data under the control of the control unit 220.
- the control unit 220 may store the measurement data, which is temporarily stored in the buffer unit, in the memory 230 according to the activated failure flag.
- the measurement data temporarily stored in the buffer unit may be stored in the memory 230, and the measurement data may be sequentially stored in the plurality of memories 230 by incrementing an index value of the memory 230.
- the server 3000 is connected to the communication conversion device 2000 to receive the measurement data from the communication conversion device 2000, and stores the received measurement data.
- the server 3000 may be connected to the communication conversion device 2000 in the TCP packet format. That is, the server 3000 may receive and store measurement data of the TCP packet format.
- the server 3000 generates and outputs the reception confirmation signal when the measurement data is received.
- the reception confirmation signal may be transmitted from the server 3000 to the rack BMS 100, or may be transmitted to the rack BMS 100 through the communication conversion device 2000. That is, the reception confirmation signal is transmitted to the rack BMS 100, the rack BMS 100 activates the failure flag depending on whether or not the server 3000 has received the measurement data.
- the server 3000 and the rack BMS 100 may be connected to transmit the reception confirmation signal, and the reception confirmation signal of the server 3000 may be transmitted to the rack BMS 100 through the communication conversion device 2000.
- the reception confirmation signal is transferred to the communication conversion device 2000.
- the failure flag may be activated by the communication conversion device 2000.
- the external controller 4000 may be provided to check and analyze measurement data, which is not received by server 3000, when measurement data is not received by server 3000. That is, the external controller 4000 may be connected to the communication conversion device 2000 and read the measurement data stored in the communication conversion device 2000. In this case, the external controller 4000 requests a read command to the communication conversion device 2000 together with a memory index, and the communication conversion device 2000 may transmit measurement data stored in the memory having the corresponding index to the server 3000 according to a command of the external controller 4000. The read command and the memory index of the external controller 4000 may be transmitted to the communication conversion device 2000 over the CAN frame format.
- the external controller 4000 requests the read command and the memory index to the control unit 220 of the communication conversion device 2000 in a CAN communication method, and the control unit 220 transfers the measurement data stored in the memory 230 of the corresponding index to the external controller 4000. That is, the communication conversion device 2000 may transmit measurement data that the server 3000 has not received to the server 3000 according to a command of the external controller 4000.
- the external controller 4000 may include a manager terminal connected to the communication conversion device 2000 in a wireless or wired manner.
- the manager terminal may include at least one selected from a computer, a laptop computer, a mobile phone, a personal digital assistant (PDA), and a smart phone.
- the energy storage system includes the battery rack 1000 including the rack BMS 100, the communication conversion device 2000, and the server 3000, and the measurement data of the battery rack 1000 measured by the rack BMS 100 is transmitted to the server 3000 through the communication conversion device 2000.
- the rack BMS 100 transmits the failure flag together with the measurement data to the communication conversion device 2000
- the communication conversion device 2000 includes the memory 230 and stores the measurement data in the memory 230 when the failure flag is activated. That is, if the server 3000 fails to receive measurement data due to communication failure, fire, etc., it does not generate the reception confirmation signal.
- the rack BMS 100 fails to check the reception confirmation signal for a predetermined time, the rack BMS 100 activates the failure flag and transmits it to the communication conversion device 2000, and the communication conversion device 2000 stores the measurement data in the memory 230 according to the activation of the failure flag.
- the memory 230 is composed of two or more memories, and the communication conversion device 2000 increments the index by one whenever the failure flag is activated, and stores the measurement data in the memory 230 having the corresponding index. When all the measurement data is stored in the plurality of memories 230, the index is reset to 1 again, and the measurement data stored in the the memory 230 is overwritten with the newly received measurement data.
- the memory 230 is composed of five memories, and whenever the failure flag is activated, the index is incremented to sequentially store measurement data from the first memory to the fifth memory.
- the index is incremented to five and the measurement data is stored up to the fifth memory, the index is reset and the measurement data stored in the memories is sequentially overwritten from the first memory to the fifth memory. That is, when the activated failure flag is received, measurement data is stored in the order from the first memory to the fifth memory. If the failure flag is activated even after the measurement data is stored up to the fifth memory, the measurement data input is overwritten over the stored measurement data in the order of from the first memory to the fifth memory.
- the communication conversion device 2000 receives the read command together with the index value from the external controller 4000 over CAN communication, reads the measurement data of the memory 230 corresponding to the received index value, and transmits it to the server 3000. Therefore, in the present invention, since the communication conversion device 2000 stores the measurement data that could not be transmitted to the server 3000 and the stored measurement data is read using the external controller 4000, dual management of measurement data is possible, thereby capable of preventing loss of measurement data.
- FIG. 4 is a flowchart illustrating a method of operating the energy storage system according to an embodiment of the present invention.
- the method of operating the energy storage system may include a process of receiving the measurement data and the failure flag of the battery rack (S110), a process of determining whether the failure flag is activated (S120), a process of storing the measurement data in a memory when the failure flag is activated (S130), a process of storing the measurement data in memory by incrementing an index whenever the failure flag is activated (S140, S150), a process of overwriting the measurement data into a memory by resetting an index when a failure flag exceeding a predetermined index is activated (S160), a process of inputting the read command together with the index value from the external controller (S170), and a process of analyzing the measurement data of the memory corresponding to the index value or storing the measurement data in the server (S180).
- the method of operating the energy storage system according to the embodiment of the present invention will be described in more detail for each process as follows.
- the rack BMS 100 measures a state of the battery rack 1000 such as the voltage, current, and temperature to generate measurement data and transmits them to the communication conversion device 2000. That is, the measurement unit 110 measures the voltage, current, temperature, etc. of at least one of the battery rack, the battery pack, and the battery cell, and the measurement data generated therefrom is transmitted to the communication conversion device 2000 through the communication unit 120. In addition, the rack BMS 100 transmits the failure flag together with the measurement data to the communication conversion device 2000. That is, the rack BMS 100 may activate the failure flag depending on whether or not the reception completion signal from the server 3000 is received. When the reception completion signal from the server 3000 is not received, the rack BMS 100 may activate the failure flag and transmit the failure flag to the communication conversion device 2000.
- the communication conversion device 2000 receiving the battery rack measurement data and the failure flag subjects the measurement data to communication conversion and transmits the measurement data to the server 3000. That is, the communication conversion device 2000 receives the measurement data of the CAN frame format from the rack BMS 100, converts the data into the measurement data of the TCP packet format, and transmits it to the server 300. In addition, the communication conversion device 2000 determines whether the failure flag is activated. That is, if the measurement data is received, the server 3000 may generate the reception confirmation signal and transmit it to the rack BMS 100. The rack BMS 100 may activate the failure flag when not receiving the reception confirmation signal for a predetermined time, and the communication conversion device 2000 may determine whether the failure flag received from the rack BMS 100 is activated.
- the communication conversion device 2000 stores the measurement data in the memory 230.
- the memory 230 may be provided inside or outside the communication conversion device 2000, and may be provided as two or more memories.
- a buffer unit for temporarily storing the measurement data before transmission to the server 3000 may be provided in the communication conversion device 2000.
- the buffer unit stores next measurement data when previous measurement data is output to the server 3000. That is, in the buffer unit, the previous measurement data may be overwritten with the next measurement data.
- the buffer unit since the buffer unit temporarily stores the measurement data, when the failure flag is activated, the measurement data temporarily stored in the buffer unit may be stored in the memory 230. That is, the buffer unit may store the previous measurement data until the next measurement data is received.
- the previous measurement data stored in the buffer unit may be stored in the memory 230 without being overwritten with the next measurement data under the control of the control unit 220.
- the control unit 220 may store the measurement data, which is temporarily stored in the buffer unit, in the memory 230 according to the activated failure flag.
- the measurement data temporarily stored in the buffer unit may be stored in the memory 230, and the measurement data may be sequentially stored in the plurality of memories 230 by incrementing the index value of the memory 230.
- the memory 230 is composed of two or more memories, and the communication conversion device 2000 increments the index by one whenever the failure flag is activated, and stores the measurement data in the memory 230 having the corresponding index.
- the memory 230 is composed of five memories, and whenever the failure flag is activated, the index is incremented and the measurement data is sequentially stored from the first memory to the fifth memory. That is, when the activated failure flag is received, the measurement data is stored in the order from the first memory to the fifth memory.
- S160 When a failure flag exceeding a predetermined index is activated the index is reset and the measurement data is overwritten into the memory. That is, when all the measurement data is stored in the plurality of memories 230, the index is reset to one again, and the measurement data stored in the memory 230 is overwritten with the newly received measurement data.
- the memory 230 is composed of five memories, and whenever the failure flag is activated, the index is incremented and the measurement data is sequentially stored from the first memory to the fifth memory and when the index is incremented to five and the measurement data is stored up to the fifth memory, the index is reset and the the measurement data is sequentially overwritten from the first memory to the fifth memory.
- the measurement data is stored in the order from the first memory to the fifth memory. If the failure flag is activated even after the measurement data is stored up to the fifth memory, the measurement data input is overwritten in the order from the first memory to the fifth memory.
- the read command together with the index value are input from the external controller 4000.
- the external controller 4000 may be provided to check and analyze the measurement data not received by the server 3000 when the measurement data is not received by the server 3000. That is, the external controller 4000 may be connected to the communication conversion device 2000 and read the measurement data stored in the communication conversion device 2000. In this case, the external controller 4000 requests read command to the communication conversion device 2000 together with the memory index.
- the memory measurement data corresponding to the index value is analyzed or stored in the server.
- the communication conversion device 2000 may transmit the measurement data stored in the memory having the corresponding index to the server 3000.
- the external controller 4000 requests the read command and the memory index to the control unit 220 of the communication conversion device 2000, and the control unit 220 transfers the measurement data stored in the memory 230 having the corresponding index to the external controller 4000. That is, the communication conversion device 2000 may transmit measurement data not received by the server 3000 to the server 3000 according to the command of the external controller 4000.
Landscapes
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Power Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- General Chemical & Material Sciences (AREA)
- Computer Networks & Wireless Communication (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Secondary Cells (AREA)
Claims (11)
- Energiespeichersystem, umfassend:ein Rack-BMS (100), welches dazu eingerichtet ist, Messdaten und eine Fehlerkennzeichnung eines Batterie-Racks (1000) auszugeben, welches eine Mehrzahl von Batteriezellen umfasst;eine Kommunikationsumwandlungsvorrichtung (2000), welche dazu eingerichtet ist, die Messdaten und die Fehlerkennzeichnung von dem Rack-BMS (100) zu empfangen, die Messdaten einer Kommunikationsumwandlung auszusetzen und die Messdaten auszugeben; undeinen Server (3000), welcher dazu eingerichtet ist, die Messdaten von der Kommunikationsumwandlungsvorrichtung (2000) zu empfangen,dadurch gekennzeichnet, dass der Server (3000) dazu eingerichtet ist, ein Empfangsbestätigungssignal an das Rack-BMS (100) oder die Kommunikationsumwandlungsvorrichtung (2000) zu übertragen, wenn die Messdaten empfangen werden, wobei das Rack-BMS (100) oder die Kommunikationsumwandlungsvorrichtung (2000) die Fehlerkennzeichnung aktiviert, wenn das Empfangsbestätigungssignal nicht empfangen wird, unddie Kommunikationsumwandlungsvorrichtung (2000) dazu eingerichtet ist, zu bestimmen, ob die Fehlerkennzeichnung aktiviert ist, und die Messdaten gemäß einer Aktivierung der Fehlerkennzeichnung zu speichern.
- System nach Anspruch 1, wobei
die Kommunikationsumwandlungsvorrichtung (2000) dazu eingerichtet ist, Messdaten in einem CAN-Frame-Format von dem Rack-BMS (100) zu empfangen, die Messdaten in Messdaten in einem TCP-Packet-Format umzuwandeln und sie dann an den Server (3000) zu übertragen. - System nach Anspruch 2, wobei
die Kommunikationsumwandlungsvorrichtung (2000) dazu eingerichtet ist, eine Mehrzahl von Speichern (230) zum Speichern der Messdaten zu umfassen. - System nach Anspruch 3, wobei
die Kommunikationsumwandlungsvorrichtung (2000) dazu eingerichtet ist, einen Index zu inkrementieren, wann immer die Fehlerkennzeichnung aktiviert ist, und sequenziell die Messdaten in der Mehrzahl von Speichern (230) zu speichern. - System nach Anspruch 4, wobei,
wenn die Fehlerkennzeichnung aktiviert ist, selbst nachdem alle Messdaten in der Mehrzahl von Speichern (230) gespeichert worden sind, die Kommunikationsumwandlungsvorrichtung (2000) dazu eingerichtet ist, den Index zurückzusetzen und sequenziell die Messdaten in die Mehrzahl von Speichern (230) zu überschreiben. - System nach einem der Ansprüche 1 bis 5, ferner umfassend:
eine externe Steuereinrichtung (4000), welche dazu eingerichtet ist, die in der Kommunikationsumwandlungsvorrichtung (2000) gespeicherten Messdaten zu lesen. - System nach Anspruch 6, wobei
die externe Steuereinrichtung (4000) dazu eingerichtet ist, die in dem entsprechenden Speicher (230) gespeicherten Messdaten durch ein Eingeben eines Indexwerts und eines Lesebefehls in die Kommunikationsumwandlungsvorrichtung (2000) zu lesen. - Verfahren zum Betreiben eines Energiespeichersystems nach einem der Ansprüche 1 bis 7, umfassend:Ausgeben von Messdaten und einer Fehlerkennzeichnung eines Batterie-Racks (1000) durch das Rack-BMS (100);Empfangen, durch die Kommunikationsumwandlungsvorrichtung (2000), der Messdaten und der Fehlerkennzeichnung, Aussetzen der Messdaten einer Kommunikationsumwandlung und Ausgeben der Messdaten;Empfangen der Messdaten durch den Server und, wenn die Messdaten empfangen werden, Übertragen, durch den Server (3000), eines Empfangsbestätigungssignals an das Rack-BMS (100) oder an die Kommunikationsumwandlungsvorrichtung (2000);wenn das Empfangsbestätigungssignal nicht empfangen wird, Aktivieren der Fehlerkennzeichnung durch das Rack-BMS (100) oder die Kommunikationsumwandlungsvorrichtung (2000);Bestimmen, durch die Kommunikationsumwandlungsvorrichtung (2000), ob die Fehlerkennzeichnung aktiviert ist;Speichern der Messdaten in einem Speicher (230), wenn die Fehlerkennzeichnung aktiviert ist.
- Verfahren nach Anspruch 8, wobei die Messdaten durch ein Inkrementieren eines Indexes, wann immer die Fehlerkennzeichnung aktiviert ist, in dem Speicher (230) gespeichert werden.
- Verfahren nach Anspruch 9, wobei die Messdaten durch ein Zurücksetzen des Indexes, wenn eine Fehlerkennzeichnung aktiviert ist, welche einen vorbestimmten Index überschreitet, in den Speicher (230) überschrieben werden.
- Verfahren nach Anspruch 10, ferner umfassend:einen Prozess eines Eingebens eines Lesebefehls zusammen mit einem Indexwert von einer externen Steuereinrichtung (4000); undeinen Prozess eines Analysierens der Messdaten des Speichers (230), welche dem Indexwert entsprechen, oder eines Speicherns der Messdaten in dem Server (3000).
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020220000989A KR102913571B1 (ko) | 2022-01-04 | 2022-01-04 | 전력 저장 장치 및 그 운용 방법 |
| PCT/KR2022/020852 WO2023132526A1 (ko) | 2022-01-04 | 2022-12-20 | 전력 저장 장치 및 그 운용 방법 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| EP4328601A1 EP4328601A1 (de) | 2024-02-28 |
| EP4328601A4 EP4328601A4 (de) | 2024-10-16 |
| EP4328601B1 true EP4328601B1 (de) | 2025-10-22 |
Family
ID=87073985
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP22919063.2A Active EP4328601B1 (de) | 2022-01-04 | 2022-12-20 | Energiespeichersystem und verfahren zum betrieb davon |
Country Status (7)
| Country | Link |
|---|---|
| US (1) | US20240258589A1 (de) |
| EP (1) | EP4328601B1 (de) |
| JP (1) | JP7657977B2 (de) |
| KR (1) | KR102913571B1 (de) |
| CN (1) | CN117501138A (de) |
| PL (1) | PL4328601T3 (de) |
| WO (1) | WO2023132526A1 (de) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20250027025A (ko) * | 2023-08-18 | 2025-02-25 | 삼성에스디아이 주식회사 | Ess의 레이어간 통신 방법, 시스템 및 상기 방법을 실행시키기 위하여 기록매체에 저장된 컴퓨터 프로그램 |
| KR102764623B1 (ko) * | 2024-04-30 | 2025-02-07 | 주식회사 빅토리지 | 에너지관리시스템 운영 장치 및 방법 |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9060213B2 (en) * | 2011-05-24 | 2015-06-16 | Spireon, Inc. | Battery monitoring system |
| KR101540086B1 (ko) * | 2012-01-19 | 2015-07-28 | 주식회사 엘지화학 | 멀티 bms 기동 시스템 및 방법 |
| KR101726930B1 (ko) | 2014-12-08 | 2017-04-13 | 주식회사 엘지화학 | 배터리 관리 시스템 간의 통신 시스템 및 통신을 위한 연결 방법 |
| KR101792818B1 (ko) | 2015-03-26 | 2017-11-01 | 주식회사 엘지화학 | 전력 저장 장치 |
| JP6432490B2 (ja) * | 2015-11-20 | 2018-12-05 | トヨタ自動車株式会社 | 車載制御装置、及び、車載記録システム |
| KR102078347B1 (ko) * | 2015-11-26 | 2020-02-17 | 주식회사 엘지화학 | 데이터 무결성 검증 및 복구 기능을 가진 배터리 관리 시스템 |
| JP7562940B2 (ja) | 2019-05-30 | 2024-10-08 | 株式会社Gsユアサ | 船舶用蓄電素子監視システム、船舶用蓄電設備及び船舶用蓄電素子監視方法 |
| KR102373347B1 (ko) * | 2019-10-22 | 2022-03-11 | 서창전기통신 주식회사 | 통합 환경 모니터링 및 제어 장치가 구비된 에너지저장시스템 및 운용방법 |
| JP2021086816A (ja) | 2019-11-29 | 2021-06-03 | パナソニックIpマネジメント株式会社 | 電池情報管理装置、電池情報管理方法、および電池情報管理システム |
| WO2021220306A1 (en) * | 2020-04-30 | 2021-11-04 | Tvs Motor Company Limited | Wireless communication in a battery pack |
-
2022
- 2022-01-04 KR KR1020220000989A patent/KR102913571B1/ko active Active
- 2022-12-20 EP EP22919063.2A patent/EP4328601B1/de active Active
- 2022-12-20 JP JP2023572634A patent/JP7657977B2/ja active Active
- 2022-12-20 WO PCT/KR2022/020852 patent/WO2023132526A1/ko not_active Ceased
- 2022-12-20 CN CN202280037985.8A patent/CN117501138A/zh active Pending
- 2022-12-20 PL PL22919063.2T patent/PL4328601T3/pl unknown
- 2022-12-20 US US18/564,422 patent/US20240258589A1/en active Pending
Also Published As
| Publication number | Publication date |
|---|---|
| JP2024519144A (ja) | 2024-05-08 |
| CN117501138A (zh) | 2024-02-02 |
| EP4328601A4 (de) | 2024-10-16 |
| PL4328601T3 (pl) | 2026-02-02 |
| KR20230105515A (ko) | 2023-07-11 |
| EP4328601A1 (de) | 2024-02-28 |
| WO2023132526A1 (ko) | 2023-07-13 |
| JP7657977B2 (ja) | 2025-04-07 |
| KR102913571B1 (ko) | 2026-01-19 |
| US20240258589A1 (en) | 2024-08-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11070067B2 (en) | Battery management unit and battery pack including same | |
| US9088052B2 (en) | Battery multi-series system and communication method thereof | |
| US9395417B2 (en) | Battery pack, apparatus including battery pack, and method of managing battery pack | |
| US8232768B2 (en) | System and method for balancing battery cells | |
| EP2639923B1 (de) | Batteriesystem | |
| EP3974850B1 (de) | Vorrichtung und verfahren zur diagnose eines parallelbatterierelais | |
| EP4328601B1 (de) | Energiespeichersystem und verfahren zum betrieb davon | |
| US11808816B2 (en) | System for obtaining battery state information | |
| KR20220129735A (ko) | 모듈식 배터리 관리 시스템 | |
| CN107797011A (zh) | 储能bms的均衡策略模拟测试方法及装置 | |
| CN105958140A (zh) | 锂离子动力电池保护装置及方法 | |
| US20150185291A1 (en) | Switched capacitor battery unit monitoring system | |
| EP3840102B1 (de) | System und verfahren zur bms-erkennung | |
| US20240243595A1 (en) | Battery Management Apparatus and Operating Method Thereof | |
| KR20210022470A (ko) | 배터리 관리 시스템 및 배터리 관리 방법 | |
| KR102376635B1 (ko) | 전기차 재사용 배터리를 활용한 무정전 전원 장치 | |
| US20250149663A1 (en) | Battery Management Apparatus and Operating Method Thereof | |
| KR20190142152A (ko) | 시스템 bms 포함하는 에너지 저장 시스템 | |
| KR102814753B1 (ko) | 배터리 및 그것의 동작 방법 | |
| AU2024203695B2 (en) | Battery soc evaluation method, apparatus, device and medium | |
| TWI822428B (zh) | 電池分散式管理系統及其電池履歷裝置 | |
| CN111048853A (zh) | 一种电芯系统 | |
| EP4600677A1 (de) | Batteriepackverwaltungsvorrichtung und betriebsverfahren dafür | |
| KR20220080471A (ko) | 배터리 관리 시스템을 내장한 대용량 배터리 장치 | |
| KR20230000824A (ko) | 배터리 충전 장치 및 배터리 충전 시스템 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
| 17P | Request for examination filed |
Effective date: 20231122 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| A4 | Supplementary search report drawn up and despatched |
Effective date: 20240912 |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04Q 9/00 20060101ALI20240906BHEP Ipc: H02J 3/32 20060101ALI20240906BHEP Ipc: G01R 31/371 20190101ALI20240906BHEP Ipc: G01R 31/396 20190101AFI20240906BHEP |
|
| DAV | Request for validation of the european patent (deleted) | ||
| DAX | Request for extension of the european patent (deleted) | ||
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Free format text: PREVIOUS MAIN CLASS: G01R0031396000 Ipc: H02J0007000000 Ref document number: 602022023698 Country of ref document: DE |
|
| GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
| RIC1 | Information provided on ipc code assigned before grant |
Ipc: H04Q 9/00 20060101ALI20250605BHEP Ipc: H02J 7/00 20060101AFI20250605BHEP |
|
| INTG | Intention to grant announced |
Effective date: 20250616 |
|
| P01 | Opt-out of the competence of the unified patent court (upc) registered |
Free format text: CASE NUMBER: APP_31599/2025 Effective date: 20250701 |
|
| GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
| GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
| AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
| REG | Reference to a national code |
Ref country code: CH Ref legal event code: F10 Free format text: ST27 STATUS EVENT CODE: U-0-0-F10-F00 (AS PROVIDED BY THE NATIONAL OFFICE) Effective date: 20251022 Ref country code: GB Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602022023698 Country of ref document: DE |
|
| REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
| REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20260113 Year of fee payment: 4 |
|
| PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20251229 Year of fee payment: 4 |