EP4265861A1 - Concrete void form and method of modular construction therewith - Google Patents
Concrete void form and method of modular construction therewith Download PDFInfo
- Publication number
- EP4265861A1 EP4265861A1 EP23166955.7A EP23166955A EP4265861A1 EP 4265861 A1 EP4265861 A1 EP 4265861A1 EP 23166955 A EP23166955 A EP 23166955A EP 4265861 A1 EP4265861 A1 EP 4265861A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- concrete
- void form
- concrete void
- sheet
- side faces
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011800 void material Substances 0.000 title claims abstract description 99
- 238000010276 construction Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 76
- 239000010959 steel Substances 0.000 claims abstract description 76
- 239000002131 composite material Substances 0.000 claims description 7
- 238000003466 welding Methods 0.000 claims description 5
- 238000009428 plumbing Methods 0.000 claims description 4
- 238000009408 flooring Methods 0.000 claims description 2
- 238000009413 insulation Methods 0.000 claims description 2
- 230000008901 benefit Effects 0.000 description 3
- 230000001934 delay Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/348—Structures composed of units comprising at least considerable parts of two sides of a room, e.g. box-like or cell-like units closed or in skeleton form
- E04B1/34815—Elements not integrated in a skeleton
- E04B1/3483—Elements not integrated in a skeleton the supporting structure consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/161—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/84—Walls made by casting, pouring, or tamping in situ
- E04B2/86—Walls made by casting, pouring, or tamping in situ made in permanent forms
Definitions
- the present specification relates generally to modular construction and more specifically to a sacrificial concrete void form and method of modular construction therewith.
- Modular construction is becoming increasing popular, due in large part to advantages over traditional construction including time-savings, fewer weather-based delays, a reduced need for on-site storage of materials, lower labor costs, and lower waste volume.
- modular construction invariably reduces the amount of time required for the construction of a given structure, a substantial amount of time is still involved at the on-site assembly stage.
- structures built from pre-constructed modules require a concrete superstructure for structural, seismic, high wind, sound and fire rating requirements. The construction of that superstructure necessarily involves concrete forming.
- a concrete void form comprising a steel frame having a top face, a bottom face, and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking.
- a method of modular construction comprising constructing at least one concrete void form, the at least one concrete void form comprising a steel frame having a top face, bottom face and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking; installing the at least one concrete void form at a construction site; and pouring concrete over or adjacent to the at least one concrete void form.
- a concrete void form 100 is provided to enable structures to be built from pre-constructed modules to create the permanent formwork for a concrete superstructure. Accordingly, concrete void form 100 may obviate and/or reduce the need for conventional concrete forming, form stripping, reshoring, and/or tarping in the construction of a building and facilitate modular construction. Accordingly, concrete void form 100 may reduce construction delays associated with inter alia curing times for concrete and reduce an amount of time required to complete a given construction project. Consequently, concrete void form 100 may be especially beneficial after natural disasters like tornadoes, hurricanes, earthquakes, tsunamis, or pandemics or after manmade disasters like war, where hospitals and housing must be constructed quickly.
- Concrete void form 100 may also reduce costs associated with a given construction project by reducing labour costs and material costs and by contributing to the faster completion of revenue-generating properties. Further, concrete void form 100 may reduce waste associated with traditional concrete forming, form stripping and/or reshoring. Concrete void form 100 may be constructed off-site and may be subject to permit requirements distinct from those applied to the erection of structures on-site, thereby enabling the advancement of a given project while awaiting issuance of one or more permits, again saving time and costs necessarily associated with that time.
- concrete void form 100 comprises a steel frame 110 having a top face, a bottom face, and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking 120.
- Steel frame 110 can also be seen in FIG. 3 .
- Steel frame 110 may comprise at least two steel tubes and two steel beams.
- at least one sheet of corrugated steel decking 120 comprises at least one of 16-gauge composite steel decking and 20-gauge corrugated steel decking.
- a set of requirements for a given project and/or a location of concrete void form 100 within a larger structure may inform a choice of gauge of at least one sheet of corrugated steel decking 120.
- At least one sheet of corrugated steel decking 120 may comprise at least four sheets of corrugated steel decking, one sheet for each of three of the four side faces and the top face. At least one sheet of corrugated steel decking 120 may be fastened to steel frame 110 by way of one or more of screwing, shooting and welding. A size and shape of each of steel frame 110 and sheet of corrugated steel decking 120 may vary.
- Steel frame 110 may be L-shaped or may be rectangular, as shown in FIGs. 1 - 3 .
- At least one concrete void form 100 may further comprise at least one bent steel plate 160, as shown in FIG. 4 . At least one bent steel plate 160 may form part of and be installed within steel frame 110. Where concrete void form 100 and steel frame 110 are to include one or more interior columns, the one or more interior columns may be shaped, constructed and installed into steel frame 110 with at least one bent steel plate 160.
- concrete void form 100 further comprises at least one of rebar mat 130 and tied rebar (not shown), affixed to concrete void form 100 parallel to a surface of at least one sheet of corrugated steel decking 120.
- a size and shape of rebar mat 130 may vary.
- a size and shape of rebar mat 130 corresponds to a size and shape of at least one sheet of corrugated steel decking 120, as shown in FIGs. 1 and 2 .
- Rebar mat 130 may comprise at least four rebar mats.
- the at least four rebar mats are disposed along at least the top face and three of the four side faces of steel frame 110.
- Rebar mat 130 may be configured to a set of specifications for a project in which concrete void form 100 will be used.
- a high-rise building within a seismic region will need more and larger rebar mat 130 than a low-rise building in a location with fewer seismic requirements.
- a concrete column or pier may have different rebar mat 130 and tied stirrups then a shear wall or other structural element.
- concrete void form 100 further comprises at least one cast-in-place concrete wall 140 in front of the at least one sheet of corrugated steel decking covering at least one of the four side faces.
- a size and thickness of at least one cast-in-place concrete wall 140 may vary.
- a set of requirements for a given project may inform a choice of size and thickness of at least one cast-in-place concrete wall 140.
- at least one cast-in-place concrete wall 140 comprises at least two cast-in-place concrete walls.
- concrete void form 100 further comprises a cast-in-place concrete top layer 150 above the top face and at least one sheet of corrugated steel decking 120.
- a size and thickness of cast-in-place concrete top layer 150 may vary.
- a set of requirements for a given project may inform a choice of size and thickness of cast-in-place concrete top layer 150.
- a method of modular construction comprising: constructing at least one concrete void form, the at least one concrete void form comprising a steel frame having a top face, bottom face and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking; installing the at least one concrete void form at a construction site; and pouring concrete over or adjacent to the at least one concrete void form.
- the at least one sheet of corrugated steel decking comprises at least one of 16-gauge composite steel decking and 20-gauge composite steel decking.
- the at least one sheet of corrugated steel decking, and the steel frame are engineered to withstand the pressure of poured concrete.
- the at least one concrete void form further comprises at least one bent steel plate.
- the step of constructing the at least one concrete void form may comprise at least one of welding and bolting together at least two steel tubes and at least two steel beams.
- One or more of a size, orientation, and thickness of the at least two steel tubes and the at least two steel beams may be selected based on one or more of a set of specifications for a project within which the at least one concrete void form will be installed and a specific location within a building where the at least one concrete void form will be installed.
- the at least two steel beams form a top rail and a bottom rail of the at least one concrete void form and the at least two steel tubes are welded in and form upright and horizontal components of the at least one concrete void form, creating a modular box shape.
- a set of dimensions and components of at least one concrete void form may vary depending on a set of specifications for a project employing the at least one concrete void form.
- the at least one concrete void form may comprise a plurality of concrete void forms.
- the plurality of concrete void forms may comprise concrete void forms of different shapes.
- the plurality of concrete void forms is connected by at least one of welding and bolting.
- the plurality of concrete void forms is bolted together using structural bolts and jumper plates.
- a set of specifications of the structural bolts may vary.
- the structural bolts may be selected based on a set of specifications for a given project.
- the method of modular construction further comprises connecting the plurality of concrete void forms with threaded rod ties.
- the threaded rod ties may be specifically designed for use in a particular position along the plurality of concrete void forms.
- the threaded rod ties may be spaced 48" apart.
- the threaded rod ties are constructed of 3 ⁇ 4" threaded rod. Connecting the plurality of concrete void forms with threaded rod ties may prevent shifting, separation and/or bowing of the plurality of concrete void forms before, during and/or after concrete pouring.
- the threaded rod ties may also support the live load of cast-in-place concrete poured over the plurality of concrete void forms.
- the method of modular construction further comprises affixing at least one of rebar mat and tied rebar to at least one of the four side faces and the top face, parallel to the at least one sheet of corrugated steel decking.
- At least one rebar mat may be affixed to at least one of the four side faces and the top face, parallel to the at least one sheet of corrugated steel decking, by at least one of welding and tying at least one rebar mat to the steel frame.
- the method of modular construction further comprises installing at least one additional concrete void form adjacent to the at least one concrete void form; and pouring concrete over or adjacent to the at least one additional concrete void form.
- the method of modular construction may further comprise installing at least one upper concrete void form on top of the concrete and the at least one concrete void form.
- the step of installing at least one upper concrete void form on top of the concrete and the at least one concrete void form may be completed before the concrete cures, thereby potentially expediting construction. Once cured, the poured concrete may act as a strong structural frame for the stacked concrete void forms.
- the method of modular construction may further comprise finishing an interior of the at least one concrete void form with at least one of steel studs, insulation, doors and trim, electrical, plumbing, HVAC, drywall, millwork, flooring, lighting and plumbing fixtures, finishes and furnishings, and thereby potentially expediting construction and reducing an amount of time between beginning construction and having a move-in ready, fully operational apartment, office, hospital or other building.
- the method of modular construction may further comprise transporting the concrete void form to the construction site.
- the step of constructing at least one concrete void form may be completed off-site, thereby making available the benefits of a manufacturing and mass production facility to create concrete superstructures of all kinds. Consequently, construction of the at least one concrete void form may not be subject to delays associated with inclement weather; workers can perform the work in a sheltered, safe, comfortable, and controlled environment; and the at least one concrete void form is protected from precipitation during construction. Completing construction of the at least one concrete void form off-site may reduce a quantity of material and personnel required at a given construction site, thereby reducing the environmental impact, costs and other challenges associated with same.
- the step of constructing at least one concrete void form is completed in an at least one of a temperature-controlled environment and a humidity-controlled environment. Construction of the at least one concrete void form in at least one of a temperature-controlled environment and a humidity-controlled environment.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
- The present specification relates generally to modular construction and more specifically to a sacrificial concrete void form and method of modular construction therewith.
- Modular construction is becoming increasing popular, due in large part to advantages over traditional construction including time-savings, fewer weather-based delays, a reduced need for on-site storage of materials, lower labor costs, and lower waste volume. Although modular construction invariably reduces the amount of time required for the construction of a given structure, a substantial amount of time is still involved at the on-site assembly stage. Often, structures built from pre-constructed modules require a concrete superstructure for structural, seismic, high wind, sound and fire rating requirements. The construction of that superstructure necessarily involves concrete forming.
- Currently, there are a number of solutions for conventional concrete forming, especially in midrise and high-rise construction, but these solutions fail to meet the needs of the industry because they require concrete forming, form stripping and/or reshoring. These solutions are therefore expensive, wasteful and time consuming, as well as being very dangerous for workers and the general public in the area of the construction site. These solutions are also ineffective in circumstances where poured concrete superstructures are required in a timely manner, for example after natural disasters like tornadoes, hurricanes, earthquakes, tsunamis, or pandemics or after manmade disasters like war, where hospitals and housing must be constructed quickly.
- The benefit and value of modular construction today is therefore curbed by the need for a concrete superstructure and the protracted, tedious manner in which this concrete superstructure is provided.
- Accordingly, there remains a need for improvements in the art.
- In an embodiment of the present invention, there is provided a concrete void form comprising a steel frame having a top face, a bottom face, and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking.
- According to another embodiment, there is provided a method of modular construction comprising constructing at least one concrete void form, the at least one concrete void form comprising a steel frame having a top face, bottom face and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking; installing the at least one concrete void form at a construction site; and pouring concrete over or adjacent to the at least one concrete void form.
- Other aspects and features according to the present application will become apparent to those ordinarily skilled in the art upon review of the following description of embodiments of the invention in conjunction with the accompanying figures.
- The principles of the invention may better be understood with reference to the accompanying figures provided by way of illustration of an exemplary embodiment, or embodiments, incorporating principles and aspects of the present invention, and in which:
-
FIG. 1 is a perspective view of a concrete void form, according to an embodiment; -
FIG. 2 is an exploded view of the concrete void form ofFIG. 1 ; -
FIG. 3 is a perspective view of a concrete void form, according to an embodiment, in which the corrugated steel decking is not shown; and -
FIG. 4 is a perspective view of a concrete void form, according to another embodiment, in which the corrugated steel decking is not shown. - The description that follows, and the embodiments described therein, are provided by way of illustration of an example, or examples, of particular embodiments of the principles of the present invention. These examples are provided for the purposes of explanation, and not of limitation, of those principles and of the invention. In the description, like parts are marked throughout the specification and the drawings with the same respective reference numerals. The drawings are not necessarily to scale and, in some instances, proportions may have been exaggerated in order to more clearly depict certain features of the invention.
- According to an embodiment, a
concrete void form 100 is provided to enable structures to be built from pre-constructed modules to create the permanent formwork for a concrete superstructure. Accordingly,concrete void form 100 may obviate and/or reduce the need for conventional concrete forming, form stripping, reshoring, and/or tarping in the construction of a building and facilitate modular construction. Accordingly,concrete void form 100 may reduce construction delays associated with inter alia curing times for concrete and reduce an amount of time required to complete a given construction project. Consequently,concrete void form 100 may be especially beneficial after natural disasters like tornadoes, hurricanes, earthquakes, tsunamis, or pandemics or after manmade disasters like war, where hospitals and housing must be constructed quickly.Concrete void form 100 may also reduce costs associated with a given construction project by reducing labour costs and material costs and by contributing to the faster completion of revenue-generating properties. Further,concrete void form 100 may reduce waste associated with traditional concrete forming, form stripping and/or reshoring.Concrete void form 100 may be constructed off-site and may be subject to permit requirements distinct from those applied to the erection of structures on-site, thereby enabling the advancement of a given project while awaiting issuance of one or more permits, again saving time and costs necessarily associated with that time. - As shown in
FIG. 2 ,concrete void form 100 comprises asteel frame 110 having a top face, a bottom face, and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet ofcorrugated steel decking 120.Steel frame 110 can also be seen inFIG. 3 .Steel frame 110 may comprise at least two steel tubes and two steel beams. According to an embodiment, at least one sheet ofcorrugated steel decking 120 comprises at least one of 16-gauge composite steel decking and 20-gauge corrugated steel decking. A set of requirements for a given project and/or a location ofconcrete void form 100 within a larger structure may inform a choice of gauge of at least one sheet ofcorrugated steel decking 120. At least one sheet ofcorrugated steel decking 120 may comprise at least four sheets of corrugated steel decking, one sheet for each of three of the four side faces and the top face. At least one sheet ofcorrugated steel decking 120 may be fastened tosteel frame 110 by way of one or more of screwing, shooting and welding. A size and shape of each ofsteel frame 110 and sheet ofcorrugated steel decking 120 may vary.Steel frame 110 may be L-shaped or may be rectangular, as shown inFIGs. 1 - 3 . At least oneconcrete void form 100 may further comprise at least onebent steel plate 160, as shown inFIG. 4 . At least onebent steel plate 160 may form part of and be installed withinsteel frame 110. Whereconcrete void form 100 andsteel frame 110 are to include one or more interior columns, the one or more interior columns may be shaped, constructed and installed intosteel frame 110 with at least onebent steel plate 160. - According to an embodiment, as shown in
FIGs. 1 and2 ,concrete void form 100 further comprises at least one ofrebar mat 130 and tied rebar (not shown), affixed toconcrete void form 100 parallel to a surface of at least one sheet ofcorrugated steel decking 120. A size and shape ofrebar mat 130 may vary. According to an embodiment, a size and shape ofrebar mat 130 corresponds to a size and shape of at least one sheet ofcorrugated steel decking 120, as shown inFIGs. 1 and2 . Rebarmat 130 may comprise at least four rebar mats. According to an embodiment, the at least four rebar mats are disposed along at least the top face and three of the four side faces ofsteel frame 110. Rebarmat 130 may be configured to a set of specifications for a project in whichconcrete void form 100 will be used. By way of example only, a high-rise building within a seismic region will need more andlarger rebar mat 130 than a low-rise building in a location with fewer seismic requirements. By way of further example, a concrete column or pier may havedifferent rebar mat 130 and tied stirrups then a shear wall or other structural element. - According to an embodiment, as shown in
FIGs. 1 and2 ,concrete void form 100 further comprises at least one cast-in-place concrete wall 140 in front of the at least one sheet of corrugated steel decking covering at least one of the four side faces. A size and thickness of at least one cast-in-place concrete wall 140 may vary. A set of requirements for a given project may inform a choice of size and thickness of at least one cast-in-place concrete wall 140. According to an embodiment, at least one cast-in-place concrete wall 140 comprises at least two cast-in-place concrete walls. - According to an embodiment, as shown in
FIGs. 1 and2 ,concrete void form 100 further comprises a cast-in-placeconcrete top layer 150 above the top face and at least one sheet ofcorrugated steel decking 120. A size and thickness of cast-in-place concretetop layer 150 may vary. A set of requirements for a given project may inform a choice of size and thickness of cast-in-place concretetop layer 150. - According to an embodiment, there is provided a method of modular construction comprising: constructing at least one concrete void form, the at least one concrete void form comprising a steel frame having a top face, bottom face and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking; installing the at least one concrete void form at a construction site; and pouring concrete over or adjacent to the at least one concrete void form. According to another embodiment, the at least one sheet of corrugated steel decking comprises at least one of 16-gauge composite steel decking and 20-gauge composite steel decking. The at least one sheet of corrugated steel decking, and the steel frame, are engineered to withstand the pressure of poured concrete. According to an embodiment, the at least one concrete void form further comprises at least one bent steel plate.
- The step of constructing the at least one concrete void form may comprise at least one of welding and bolting together at least two steel tubes and at least two steel beams. One or more of a size, orientation, and thickness of the at least two steel tubes and the at least two steel beams may be selected based on one or more of a set of specifications for a project within which the at least one concrete void form will be installed and a specific location within a building where the at least one concrete void form will be installed. According to an embodiment, the at least two steel beams form a top rail and a bottom rail of the at least one concrete void form and the at least two steel tubes are welded in and form upright and horizontal components of the at least one concrete void form, creating a modular box shape. A set of dimensions and components of at least one concrete void form may vary depending on a set of specifications for a project employing the at least one concrete void form.
- The at least one concrete void form may comprise a plurality of concrete void forms. The plurality of concrete void forms may comprise concrete void forms of different shapes. According to an embodiment, the plurality of concrete void forms is connected by at least one of welding and bolting. According to an embodiment, the plurality of concrete void forms is bolted together using structural bolts and jumper plates. A set of specifications of the structural bolts may vary. The structural bolts may be selected based on a set of specifications for a given project.
- According to a further embodiment, the method of modular construction further comprises connecting the plurality of concrete void forms with threaded rod ties. The threaded rod ties may be specifically designed for use in a particular position along the plurality of concrete void forms. The threaded rod ties may be spaced 48" apart. According to an embodiment, the threaded rod ties are constructed of ¾" threaded rod. Connecting the plurality of concrete void forms with threaded rod ties may prevent shifting, separation and/or bowing of the plurality of concrete void forms before, during and/or after concrete pouring. The threaded rod ties may also support the live load of cast-in-place concrete poured over the plurality of concrete void forms.
- According to an embodiment, the method of modular construction further comprises affixing at least one of rebar mat and tied rebar to at least one of the four side faces and the top face, parallel to the at least one sheet of corrugated steel decking. At least one rebar mat may be affixed to at least one of the four side faces and the top face, parallel to the at least one sheet of corrugated steel decking, by at least one of welding and tying at least one rebar mat to the steel frame.
- According to an embodiment, the method of modular construction further comprises installing at least one additional concrete void form adjacent to the at least one concrete void form; and pouring concrete over or adjacent to the at least one additional concrete void form.
- The method of modular construction may further comprise installing at least one upper concrete void form on top of the concrete and the at least one concrete void form. The step of installing at least one upper concrete void form on top of the concrete and the at least one concrete void form may be completed before the concrete cures, thereby potentially expediting construction. Once cured, the poured concrete may act as a strong structural frame for the stacked concrete void forms.
- The method of modular construction may further comprise finishing an interior of the at least one concrete void form with at least one of steel studs, insulation, doors and trim, electrical, plumbing, HVAC, drywall, millwork, flooring, lighting and plumbing fixtures, finishes and furnishings, and thereby potentially expediting construction and reducing an amount of time between beginning construction and having a move-in ready, fully operational apartment, office, hospital or other building.
- According to an embodiment, the method of modular construction may further comprise transporting the concrete void form to the construction site. The step of constructing at least one concrete void form may be completed off-site, thereby making available the benefits of a manufacturing and mass production facility to create concrete superstructures of all kinds. Consequently, construction of the at least one concrete void form may not be subject to delays associated with inclement weather; workers can perform the work in a sheltered, safe, comfortable, and controlled environment; and the at least one concrete void form is protected from precipitation during construction. Completing construction of the at least one concrete void form off-site may reduce a quantity of material and personnel required at a given construction site, thereby reducing the environmental impact, costs and other challenges associated with same. According to an embodiment, the step of constructing at least one concrete void form is completed in an at least one of a temperature-controlled environment and a humidity-controlled environment. Construction of the at least one concrete void form in at least one of a temperature-controlled environment and a humidity-controlled environment.
- Various embodiments of the invention have been described in detail. Since changes in and or additions to the above-described best mode may be made without departing from the nature, spirit or scope of the invention, the invention is not to be limited to those details but only by the appended claims. Section headings herein are provided as organizational cues. These headings shall not limit or characterize the invention set out in the appended claims.
Claims (20)
- A concrete void form comprising a steel frame having a top face, a bottom face, and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking.
- The concrete void form of claim 1, further comprising at least one bent steel plate.
- The concrete void form of claim 1, wherein the steel frame comprises at least two steel tubes and at least two steel beams.
- The concrete void form of claim 1, wherein the at least one sheet of corrugated steel decking comprises at least one of 16-gauge composite steel decking and 20-gauge composite steel decking.
- The concrete void form of claim 1, further comprising at least one of rebar mat and tied rebar, affixed to the concrete void form parallel to a surface of the least one sheet of corrugated steel decking.
- The concrete void form of claim 1, further comprising at least one cast-in-place concrete wall in front of the at least one sheet of corrugated steel decking covering at least one of the four side faces.
- The concrete void form of claim 1, further comprising a cast-in-place concrete top layer above the top face and the at least one sheet of corrugated steel decking.
- A method of modular construction comprising:constructing at least one concrete void form, the at least one concrete void form comprising a steel frame having a top face, bottom face and four side faces, wherein at least one of the four side faces and the top face are covered with at least one sheet of corrugated steel decking;installing the at least one concrete void form at a construction site; andpouring concrete over or adjacent to the at least one concrete void form.
- The method of claim 8, wherein the at least one concrete void form further comprises at least one bent steel plate.
- The method of claim 8, wherein the at least one sheet of corrugated steel decking comprises at least one of 16-gauge composite steel decking and 20-gauge composite steel decking.
- The method of claim 8, further comprising:installing at least one additional concrete void form adjacent to the at least one concrete void form; andpouring concrete over or adjacent to the at least one additional concrete void form.
- The method of claim 8, further comprising installing at least one upper concrete void form on top of the concrete and the at least one concrete void form.
- The method of claim 12, wherein the step of installing at least one upper concrete void form on top of the concrete and the at least one concrete void form is completed before the concrete cures.
- The method of claim 8, wherein the step of constructing the at least one concrete void form is completed off-site.
- The method of claim 14, wherein the step of constructing the at least one concrete void form is completed in an at least one of a temperature-controlled environment and a humidity-controlled environment.
- The method of claim 8, further comprising affixing at least one of rebar mat and tied rebar to at least one of the four side faces and the top face, parallel to the at least one sheet of corrugated steel decking.
- The method of claim 8, wherein the at least one concrete void form comprises a plurality of concrete void forms.
- The method of claim 17, wherein the plurality of concrete void forms is connected by at least one of welding and bolting.
- The method of claim 17, further comprising connecting the plurality of concrete void forms with threaded rod ties.
- The method of claim 8, further comprising finishing an interior of the at least one concrete void form with at least one of steel studs, insulation, doors and trim, electrical, plumbing, HVAC, drywall, millwork, flooring, lighting and plumbing fixtures, finishes and furnishings.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US202263334167P | 2022-04-24 | 2022-04-24 | |
US202263398090P | 2022-08-15 | 2022-08-15 |
Publications (1)
Publication Number | Publication Date |
---|---|
EP4265861A1 true EP4265861A1 (en) | 2023-10-25 |
Family
ID=85980762
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP23166955.7A Pending EP4265861A1 (en) | 2022-04-24 | 2023-04-06 | Concrete void form and method of modular construction therewith |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP4265861A1 (en) |
CA (1) | CA3194539A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4660349A (en) * | 1984-07-23 | 1987-04-28 | Tricarico Rocco V | Method of erecting a building using preconstructed modular units |
WO2013086638A1 (en) * | 2011-12-14 | 2013-06-20 | Marion Investments Ltd. | Apparatus, systems and methods for modular construction |
WO2020102893A1 (en) * | 2018-11-19 | 2020-05-28 | Vero Solutions Inc. | Modular building systems |
-
2023
- 2023-03-29 CA CA3194539A patent/CA3194539A1/en active Pending
- 2023-04-06 EP EP23166955.7A patent/EP4265861A1/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4660349A (en) * | 1984-07-23 | 1987-04-28 | Tricarico Rocco V | Method of erecting a building using preconstructed modular units |
WO2013086638A1 (en) * | 2011-12-14 | 2013-06-20 | Marion Investments Ltd. | Apparatus, systems and methods for modular construction |
WO2020102893A1 (en) * | 2018-11-19 | 2020-05-28 | Vero Solutions Inc. | Modular building systems |
Also Published As
Publication number | Publication date |
---|---|
CA3194539A1 (en) | 2023-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dilger et al. | Shear reinforcement for concrete slabs | |
Losch et al. | State of the art of precast/prestressed concrete sandwich wall panels | |
KR20180115735A (en) | Construction of multi-storey buildings using steel wall trusses for laminated structures | |
Khare et al. | Seismic performance and design of precast concrete building structures: An overview | |
US11821198B2 (en) | Prefabricated building system and methods | |
JP2023514035A (en) | MODULAR COMPOSITE ACTION PANEL AND STRUCTURAL SYSTEM USING THE SAME | |
AU2011241464A1 (en) | A method of forming a structural element and a method of building a structure | |
CN116547432A (en) | Building component, building structure formed by building component and construction method of building structure | |
HRP20180344A2 (en) | Building support structure of connected metal pipes space grid | |
US3733762A (en) | Binary precast concrete triangulated building system | |
Li et al. | Pseudo-dynamic tests on masonry residential buildings seismically retrofitted by precast steel reinforced concrete walls | |
EP4265861A1 (en) | Concrete void form and method of modular construction therewith | |
US9062449B2 (en) | Wall construction system and method | |
US20230340775A1 (en) | Concrete void form and method of modular construction therewith | |
Stinger | Evaluation of alternative resistance mechanisms for progressive collapse | |
Graber | Feasibility of cross laminated timber panels in construction: a case study of Carbon12 | |
CN210105041U (en) | Self-supporting prefabricated steel reinforced concrete wallboard component, wall and structural system | |
Lárusson et al. | Prefabricated floor panels composed of fiber reinforced concrete and a steel substructure | |
CN116607641A (en) | Concrete space form and method for modular construction using the same | |
RU2303681C1 (en) | Method for floor or span structure erection | |
Mahdizadeh et al. | New approach to seismic rehabilitation of masonry school buildings | |
Sarkar et al. | Seismic Design of Expanded Polystyrene Core Panel Based Building Systems | |
Fiala et al. | Construction and static loading tests of experimental subtle frame from high performance concrete for energy efficient buildings | |
US2296863A (en) | Reinforced concrete floor construction | |
Gurung | Experimental Investigations of Full-Scale MetRock Structural Concrete Insulated Panels (SCIPs) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20240422 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC ME MK MT NL NO PL PT RO RS SE SI SK SM TR |