EP4206420A1 - Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine - Google Patents
Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine Download PDFInfo
- Publication number
- EP4206420A1 EP4206420A1 EP21383234.8A EP21383234A EP4206420A1 EP 4206420 A1 EP4206420 A1 EP 4206420A1 EP 21383234 A EP21383234 A EP 21383234A EP 4206420 A1 EP4206420 A1 EP 4206420A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- post
- tensioning
- tower
- vertical plane
- wind turbine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000004873 anchoring Methods 0.000 claims description 27
- 229910000831 Steel Inorganic materials 0.000 description 5
- 239000010959 steel Substances 0.000 description 5
- 238000005452 bending Methods 0.000 description 4
- 210000002435 tendon Anatomy 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 230000006837 decompression Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/16—Prestressed structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Definitions
- the present invention relates to a post-tensioning system for a tower of a wind turbine that manages the quasi-permanent loads on the tower to counter them, reducing their impact and making it possible to decrease the required amount of overall post-tension force in the tower of the wind turbine.
- the invention also relates to a post-tensioned tower of a wind turbine comprising the post-tensioning system.
- the invention relates to a method of post-tensioning a tower of a wind turbine.
- Concrete towers of wind turbines, and concrete parts of hybrid towers, preferably made of steel and concrete, are commonly provided with a post-tension system (e.g., cables, tendons, wires, strands%) in order to ensure that the concrete is under compression stresses during the most of the wind turbine lifetime. That is, in order to avoid undesirable tension stresses in the structure that would lead to excessive cracks in concrete and fatigue in reinforcements.
- a post-tension system e.g., cables, tendons, wires, strands
- the post-tensioning elements e.g., tendons
- the post-tensioning elements are uniformly distributed along the tower perimeter, so that the resultant post-tension force falls approximately in the central axis of the tower, avoiding in this way eccentric forces due to the post-tension system.
- Wind industry standards and guidelines usually require a minimum amount of post-tension so that no decompression occurs in concrete under Quasi-permanent load level.
- This load level also known as D3 or S3 load level, depending on the guideline
- D3 or S3 load level is the one that is only exceeded during 1% of the wind turbine lifetime. That is, by applying the minimum post-tension force required by guidelines, it is ensured that the structure will be subjected only to compressive stresses during the 99% of the wind turbine lifetime.
- the post-tensioning system for a tower of a wind turbine of the present invention solves all the above-mentioned drawbacks.
- the present invention relates to a post-tensioning system for a tower of a wind turbine that manages the quasi-permanent loads on the tower to counter them, reducing their impact and making it possible to decrease the required amount of overall post-tension force in the tower of the wind turbine, due to the fact that the bending moment of the so called Quasi-permanent load (M qp ) can be much higher in the predominant wind direction than in other directions (in perpendicular direction, in the opposite direction%), the load level related to a probability of exceedance of 1% is not the same in every direction.
- the post-tensioning system for a tower of a wind turbine wherein the tower comprises at least:
- the line of action of a force is the geometric representation of how the force is applied, i.e., the line through the point at which the force is applied in the same direction as the vector of the force.
- the resultant post-tension force also makes possible to reduce the amount and/or quality of the concrete of the concrete tower part.
- Each tensioning element comprises a set of strands.
- first ends and the second ends of the tensioning elements are disposed in a symmetrical way with respect to the first vertical plane.
- the number of strands of the tensioning elements disposed upwards from the first vertical plane is greater than the number of strands of the tensioning elements disposed downwards from the first vertical plane.
- a first post-tensioning force that exerts, in use, the tensioning elements disposed upwards from the first vertical plane is greater than a second post-tensioning force that exerts, in use, the tensioning elements disposed downwards from the first vertical plane.
- the first ends of the tensioning elements are disposed in a symmetrical way with respect to the first vertical plane, while the second ends of the tensioning elements are disposed in a non-symmetrical way with respect to the first vertical plane.
- the number of second ends of the tensioning elements disposed upwards from the first vertical plane is greater than the number of second ends of the tensioning elements disposed downwards from the first vertical plane.
- the resultant post-tension force is contained in a second vertical plane perpendicular to the first vertical plane, the second vertical plane containing the predominant wind direction.
- the resultant post-tension force also intersects with an additional horizontal plane located at the upper end in a second intersection point.
- the first intersection point and the second intersection point are located at the same distance from the first vertical plane.
- the first intersection point and the second intersection point are located at a different distance from the first vertical plane.
- the tensioning elements are distributed homogeneously along a circumference of the tower.
- the tensioning elements are distributed heterogeneously along a circumference of the tower.
- the first surface of the upper end is located in an adaptor of the tower, preferably a steel adaptor or a concrete adaptor of a better quality than the concrete of the concrete tower part of the tower, being the upper end of the post-tensioning system of the invention the adaptor.
- the second surface of the lower end is located in a tower foundation of the tower, being the lower end of the post-tensioning system of the invention the tower foundation.
- the first surface of the upper end and/or the second surface of the lower end are located in a surface of the concrete tower part of the tower, being the upper end of the post-tensioning system of the invention an upper part of the concrete tower part and the lower end of the post-tensioning system of the invention a lower part of the concrete tower part.
- the first surface of the upper end is located in a steel tower bottom flange of a steel tower part disposed above the concrete tower part of the tower, being the upper end of the post-tensioning system of the invention the steel tower part disposed above the concrete tower part of the tower.
- the invention also relates to a post-tensioned tower of a wind turbine comprising the post-tensioning system for a tower of a wind turbine. Also, the invention relates to a wind turbine comprising the post-tensioned tower.
- the invention relates to a method of post-tensioning a tower of a wind turbine, wherein the tower comprises at least:
- the step of disposing in the concrete tower part a plurality of tensioning elements comprises a step of disposing the first ends and the second ends of the tensioning elements in a symmetrical way with respect to the first vertical plane.
- the step of disposing in the concrete tower part a plurality of tensioning elements comprises a step of disposing a greater number of strands of the tensioning elements disposed upwards from the first vertical plane than the number of strands of the tensioning elements disposed downwards from the first vertical plane.
- the step of disposing in the concrete tower part a plurality of tensioning elements comprises a step of disposing at least one tensioning element with fewer strands in the downwind side than in the upwind side.
- the step of exerting a resultant post-tension force comprises a step of exerting a first post-tensioning force by means of the tensioning elements disposed upwards from the first vertical plane and exerting a second post-tensioning force by means of the tensioning elements disposed downwards from the first vertical plane, wherein the first post-tensioned force is greater than the second post-tensioned force.
- the step of disposing in the concrete tower part a plurality of tensioning elements comprises disposing the first ends of the tensioning elements in a symmetrical way with respect to the first vertical plane, and disposing the second ends of the tensioning elements in a non-symmetrical way with respect to the first vertical plane.
- the step of disposing in the concrete tower part a plurality of tensioning elements comprises disposing a greater number of second ends of the tensioning elements upwards from the first vertical plane than the number of second ends of the tensioning elements disposed downwards from the first vertical plane.
- the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action contained in a second vertical plane perpendicular to the first vertical plane, the second vertical plane containing the predominant wind direction.
- the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action which also intersects with an additional horizontal plane located at the upper end in a second intersection point.
- the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point and the second intersection point are located at the same distance from the first vertical plane.
- the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point and the second intersection point are located at a different distance from the first vertical plane.
- the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point and/or the second intersection point are located at a distance between 0.1m and 3m from the first vertical plane.
- the invention is described in detail as follows. It relates to a post-tensioning system for a tower of a wind turbine, wherein the tower (1) comprises at least:
- the tensioning elements (9) are configured to exert a resultant post-tension force (P) comprising a line of action (D) which intersects with a horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1), (contained in a space defined within the upwind side).
- P post-tension force
- the first surface (8) of the upper end (18) is located in an adaptor (16) of the tower (1), as shown in Figure 12 , being the upper end (18) of the post-tensioning system of the invention the adaptor.
- the second surface (7) of the lower end (17) is located in a tower foundation (15) of the tower (1), as shown in Figure 13 , being the lower end (17) of the post-tensioning system of the invention the tower foundation.
- the first surface (8) of the upper end (18) and/or the second surface (7) of the lower end (17) are located in a surface of the concrete tower part (3) of the tower, being the upper end (18) of the post-tensioning system of the invention an upper part of the concrete tower part (3) and the lower end (17) of the post-tensioning system of the invention a lower part of the concrete tower part (3).
- the resultant post-tension force (P) comprises a line of action (D) which intersects with the horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1), as can be seen in Figure 5 , wherein the number of strands (14) forming each tensioning element (9) is the same, and the first ends (10) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1) and to a second vertical plane (PV2) perpendicular to the first vertical plane (PV1), the second vertical plane (PV2) containing the predominant wind direction (W).
- the second ends (11) of the tensioning elements (9) are disposed in an asymmetrical way with respect to the first vertical plane (PV1) and in a symmetrical way with respect to the second vertical plane (PV2).
- first ends (10) and/or the second ends (11) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1).
- each tensioning element (9) comprises a set of strands (14).
- the number of strands (14) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) is greater than the number of strands (14) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1) despite comprising the same number of tensioning elements (9) upwards than downwards from the first vertical plane (PV1).
- a first post-tensioning force (P1) that exerts, in use, the tensioning elements (9) disposed upwards from the first vertical plane (PV1) is greater than a second post-tensioning force (P2) that exerts, in use, the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- the first ends (10) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1), while the second ends (11) of the tensioning elements (9) are disposed in a non-symmetrical way with respect to the first vertical plane (PV1).
- the number of second ends (11) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) may be greater than the number of second ends (11) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- the first ends (10) and the second ends (11) of the tensioning elements (9) are disposed in a symmetrical way with respect to the second vertical plane (PV2).
- the resultant post-tension force (P) also intersects with an additional horizontal plane (PH2) located at the upper end (18) in a second intersection point (12).
- P additional horizontal plane
- the first intersection point (11) and the second intersection point (12) are located at a different distance from the first vertical plane (PV1).
- the first intersection point (11) and the second intersection point (12) are located at the same distance from the first vertical plane (PV1).
- the first intersection point (11) and/or the second intersection point (12) are located at a distance between 0.1m and 3m from the first vertical plane (PV1).
- the first set of anchoring elements (12) and/or the second set of anchoring elements (13) are nuts, bolts or a combination of them.
- the invention also relates to a post-tensioned tower of a wind turbine (1) comprising the post-tensioning system for a tower of a wind turbine. Also, the invention relates to a wind turbine (1) comprising the post-tensioned tower.
- the invention relates to a method of post-tensioning a tower of a wind turbine, wherein the tower comprises at least:
- the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) in a symmetrical way with respect to the first vertical plane (PV1), and the second ends (11) of the tensioning elements (9) in a non-symmetrical way with respect to the first vertical plane (PV1).
- the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) in a symmetrical way with respect to the second vertical plane (PV2), and the second ends (11) of the tensioning elements (9) in a symmetrical way with respect to the second vertical plane (PV2).
- the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) and the second ends (11) of the tensioning elements (9) in a symmetrical way with respect to the first vertical plane (PV1).
- the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing a greater number of strands (14) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) than the number of strands (14) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) and the second ends (11) of the tensioning elements (9) in a symmetrical way with respect to the second vertical plane (PV2).
- the step of exerting a resultant post-tension force comprises a step of exerting a first post-tensioning force (P1) by means of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) and a second post-tensioning force (P2) by means of the tensioning elements (9) disposed downwards from the first vertical plane (PV1), wherein the first post-tensioned force (P1) is greater than the second post-tensioned force (P2).
- the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing a greater number of second ends (12) of the tensioning elements (9) upwards from the first vertical plane (PV1) than the number of second ends (12) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- the step of exerting a resultant post-tension force (P) is carried out exerting the resultant post-tension force (P) in a line of action contained in a second vertical plane (PV2) perpendicular to the first vertical plane (PV1), the second vertical plane (PV2) containing the predominant wind direction (W).
- the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point (11) and/or the second intersection point (12) are located at a distance between 0.1m and 3m from the first vertical plane (PV1).
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Combustion & Propulsion (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- Wind Motors (AREA)
Abstract
Description
- The present invention relates to a post-tensioning system for a tower of a wind turbine that manages the quasi-permanent loads on the tower to counter them, reducing their impact and making it possible to decrease the required amount of overall post-tension force in the tower of the wind turbine.
- The invention also relates to a post-tensioned tower of a wind turbine comprising the post-tensioning system.
- Also, the invention relates to a method of post-tensioning a tower of a wind turbine.
- Concrete towers of wind turbines, and concrete parts of hybrid towers, preferably made of steel and concrete, are commonly provided with a post-tension system (e.g., cables, tendons, wires, strands...) in order to ensure that the concrete is under compression stresses during the most of the wind turbine lifetime. That is, in order to avoid undesirable tension stresses in the structure that would lead to excessive cracks in concrete and fatigue in reinforcements.
- Commonly, the post-tensioning elements (e.g., tendons) are uniformly distributed along the tower perimeter, so that the resultant post-tension force falls approximately in the central axis of the tower, avoiding in this way eccentric forces due to the post-tension system.
- Wind industry standards and guidelines usually require a minimum amount of post-tension so that no decompression occurs in concrete under Quasi-permanent load level. This load level (also known as D3 or S3 load level, depending on the guideline) is the one that is only exceeded during 1% of the wind turbine lifetime. That is, by applying the minimum post-tension force required by guidelines, it is ensured that the structure will be subjected only to compressive stresses during the 99% of the wind turbine lifetime.
- However, due to the fact that the wind does not actually blow with the same intensity in every direction, the load level related to a probability of exceedance of 1% is not the same in every direction, resulting in asymmetrical loads on the concrete tower or a concrete part of a hybrid tower. This can lead to collapse of the tower in case of extreme winds.
- The post-tensioning system for a tower of a wind turbine of the present invention solves all the above-mentioned drawbacks.
- The present invention relates to a post-tensioning system for a tower of a wind turbine that manages the quasi-permanent loads on the tower to counter them, reducing their impact and making it possible to decrease the required amount of overall post-tension force in the tower of the wind turbine, due to the fact that the bending moment of the so called Quasi-permanent load (Mqp) can be much higher in the predominant wind direction than in other directions (in perpendicular direction, in the opposite direction...), the load level related to a probability of exceedance of 1% is not the same in every direction.
- The post-tensioning system for a tower of a wind turbine, wherein the tower comprises at least:
- a vertical axis;
- a concrete tower part comprising:
∘ an upwind side and a downwind side, wherein the upwind side and the downwind side are defined, in use, from a first vertical plane containing the vertical axis and being perpendicular to a predominant wind direction, upwards and downwards respectively, from the first vertical plane; and the system comprising:- an upper end comprising a first surface and a lower end comprising a second surface;
- a plurality of tensioning elements, wherein each one of the tensioning elements comprises a first end located in the upper end and a second end located in the lower end;
- a first set of anchoring elements configured to anchor the first ends of the tensioning elements towards the first surface;
- a second set of anchoring elements configured to anchor the second ends of the tensioning elements towards the second surface;
- The line of action of a force is the geometric representation of how the force is applied, i.e., the line through the point at which the force is applied in the same direction as the vector of the force.
- In this way, at least the horizontal component of the resultant post-tension force caused by the tensioning elements so configured causes a bending moment countering the bending moment of the so-called Quasi-permanent load (Mqp) in the predominant wind direction.
- The resultant post-tension force also makes possible to reduce the amount and/or quality of the concrete of the concrete tower part.
- Additionally, since fatigue load cycles act mainly in the predominant wind direction, the resultant post-tensioning force helps to counter their impact as well, reducing fatigue damage in structure.
- The bending moment caused by the resultant post-tension force must be added to extreme loads when calculating ultimate state verifications, since extreme loads can act in any direction.
- Each tensioning element comprises a set of strands.
- Optionally, the first ends and the second ends of the tensioning elements are disposed in a symmetrical way with respect to the first vertical plane.
- Preferably, the number of strands of the tensioning elements disposed upwards from the first vertical plane is greater than the number of strands of the tensioning elements disposed downwards from the first vertical plane.
- Also preferably, a first post-tensioning force that exerts, in use, the tensioning elements disposed upwards from the first vertical plane is greater than a second post-tensioning force that exerts, in use, the tensioning elements disposed downwards from the first vertical plane.
- Optionally, the first ends of the tensioning elements are disposed in a symmetrical way with respect to the first vertical plane, while the second ends of the tensioning elements are disposed in a non-symmetrical way with respect to the first vertical plane. Preferably, the number of second ends of the tensioning elements disposed upwards from the first vertical plane is greater than the number of second ends of the tensioning elements disposed downwards from the first vertical plane.
- Optionally, the resultant post-tension force is contained in a second vertical plane perpendicular to the first vertical plane, the second vertical plane containing the predominant wind direction.
- Optionally, the resultant post-tension force also intersects with an additional horizontal plane located at the upper end in a second intersection point. Preferably, the first intersection point and the second intersection point are located at the same distance from the first vertical plane. Also preferably, the first intersection point and the second intersection point are located at a different distance from the first vertical plane.
- Optionally, the tensioning elements are distributed homogeneously along a circumference of the tower.
- Optionally, the tensioning elements are distributed heterogeneously along a circumference of the tower.
- Optionally, the first surface of the upper end is located in an adaptor of the tower, preferably a steel adaptor or a concrete adaptor of a better quality than the concrete of the concrete tower part of the tower, being the upper end of the post-tensioning system of the invention the adaptor.
- Optionally, the second surface of the lower end is located in a tower foundation of the tower, being the lower end of the post-tensioning system of the invention the tower foundation.
- Optionally, the first surface of the upper end and/or the second surface of the lower end are located in a surface of the concrete tower part of the tower, being the upper end of the post-tensioning system of the invention an upper part of the concrete tower part and the lower end of the post-tensioning system of the invention a lower part of the concrete tower part.
- Optionally, the first surface of the upper end is located in a steel tower bottom flange of a steel tower part disposed above the concrete tower part of the tower, being the upper end of the post-tensioning system of the invention the steel tower part disposed above the concrete tower part of the tower.
- The invention also relates to a post-tensioned tower of a wind turbine comprising the post-tensioning system for a tower of a wind turbine. Also, the invention relates to a wind turbine comprising the post-tensioned tower.
- Also, the invention relates to a method of post-tensioning a tower of a wind turbine, wherein the tower comprises at least:
- a vertical axis;
- a concrete tower part comprising:
∘ an upwind side and a downwind side, wherein the upwind side and the downwind side are defined, in use, from a first vertical plane containing the vertical axis and being perpendicular to a predominant wind direction, upwards and downwards respectively, from the first vertical plane; and the method carried out with the post-tensioning system described above and comprising:- a step of disposing in the concrete tower part a plurality of tensioning elements, wherein each one of the tensioning elements comprises a first end located in the upper end and a second end located in the lower end;
- a step of anchoring a first set of anchoring elements in the first ends of the tensioning elements towards the first surface;
- a step of anchoring a second set of anchoring elements in the second ends of the tensioning elements towards the second surface; and
- a step of exerting a resultant post-tension force comprising a line of action which intersects with a horizontal plane located at the lower end in a first intersection point upwards from the first vertical plane, by means of the tensioning elements.
- Optionally, the step of disposing in the concrete tower part a plurality of tensioning elements comprises a step of disposing the first ends and the second ends of the tensioning elements in a symmetrical way with respect to the first vertical plane.
- Optionally, the step of disposing in the concrete tower part a plurality of tensioning elements comprises a step of disposing a greater number of strands of the tensioning elements disposed upwards from the first vertical plane than the number of strands of the tensioning elements disposed downwards from the first vertical plane.
- Optionally, the step of disposing in the concrete tower part a plurality of tensioning elements comprises a step of disposing at least one tensioning element with fewer strands in the downwind side than in the upwind side.
- Optionally, the step of exerting a resultant post-tension force comprises a step of exerting a first post-tensioning force by means of the tensioning elements disposed upwards from the first vertical plane and exerting a second post-tensioning force by means of the tensioning elements disposed downwards from the first vertical plane, wherein the first post-tensioned force is greater than the second post-tensioned force.
- Optionally, the step of disposing in the concrete tower part a plurality of tensioning elements comprises disposing the first ends of the tensioning elements in a symmetrical way with respect to the first vertical plane, and disposing the second ends of the tensioning elements in a non-symmetrical way with respect to the first vertical plane. Preferably, the step of disposing in the concrete tower part a plurality of tensioning elements comprises disposing a greater number of second ends of the tensioning elements upwards from the first vertical plane than the number of second ends of the tensioning elements disposed downwards from the first vertical plane.
- Optionally, the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action contained in a second vertical plane perpendicular to the first vertical plane, the second vertical plane containing the predominant wind direction.
- Optionally, the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action which also intersects with an additional horizontal plane located at the upper end in a second intersection point. Preferably, the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point and the second intersection point are located at the same distance from the first vertical plane. Also preferably, the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point and the second intersection point are located at a different distance from the first vertical plane.
- Optionally, the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point and/or the second intersection point are located at a distance between 0.1m and 3m from the first vertical plane.
-
-
Figure 1 shows a lateral view of a wind turbine with different constituent parts of the tower wherein the post-tensioning system of the present invention is disposed, according to the invention. -
Figure 2 shows a top view of the concrete tower part of the tower of a wind turbine wherein the post-tensioning system of the present invention is disposed. -
Figure 3 shows a lateral view of the concrete tower part shown inFigure 2 , wherein a first embodiment of the post-tensioning system of the present invention is represented. -
Figure 4 shows in the upper part, the upper end of the concrete tower part shown inFigure 3 and in the lower part, the lower end of the concrete tower part shown inFigure 3 . -
Figure 5 shows the resultant post-tension force exerted by the tensioning elements of the system ofFigure 3 . -
Figure 6 shows a detail of the anchoring elements of the tensioning elements, wherein each tensioning element comprises several strands. -
Figure 7 shows a lateral view of the concrete tower part shown inFigure 2 , wherein a second embodiment of the post-tensioning system of the present invention is represented. -
Figure 8 shows in the upper part, the upper end of the concrete tower part shown inFigure 7 and in the lower part, the lower end of the concrete tower part shown inFigure 7 , showing how the tensioning elements disposed upwards from the first vertical plane comprises a greater number of strands than the number of strands of the tensioning elements disposed downwards from the first vertical plane (only represented in the lower end). -
Figure 9 shows the resultant post-tension force exerted by the tensioning elements in another embodiment of the system of the invention, wherein the line of action of the resultant post-tension force intersects the additional horizontal plane located at the upper end in a second intersection point displaced from the vertical axis of the tower. -
Figure 10 shows the resultant post-tension force exerted by the tensioning elements in another embodiment of the system of the invention, wherein the line of action of the resultant post-tension force is parallel to the vertical axis of the tower. -
Figure 11 shows a lateral view of the concrete tower part shown inFigure 2 , wherein a third embodiment of the post-tensioning system of the present invention is represented, being P1 greater than P2. -
Figure 12 shows the step of anchoring one anchoring element of the first set of anchoring elements in the first end of a tensioning element, wherein the tensioning element comprises several strands. -
Figure 13 shows the step of anchoring one anchoring element of the second set of anchoring elements in the second end of the tensioning element, wherein the tensioning element comprises several strands (not shown). - The invention is described in detail as follows. It relates to a post-tensioning system for a tower of a wind turbine, wherein the tower (1) comprises at least:
- a vertical axis (2);
- a concrete tower part (3) comprising:
∘ an upwind side (4) and a downwind side (5), wherein the upwind side (4) and the downwind side (5) are defined, in use, from a first vertical plane (PV1) containing the vertical axis (2) and being perpendicular to a predominant wind direction (W), upwards and downwards respectively, from the first vertical plane (PV1); and
the system comprising:- an upper end (18) comprising a first surface (8) and a lower end (17) comprising a second surface (7);
- a plurality of tensioning elements (9), wherein each one of the tensioning elements (9) comprises a first end (10) located in the upper end (18) and a second end (11) located in the lower end (17);
- a first set of anchoring elements (12) configured to anchor the first ends (10) of the tensioning elements (9) towards the first surface (8);
- a second set of anchoring elements (13) configured to anchor the second ends (11) of the tensioning elements (9) towards the second surface (7);
- As can be seen in
Figure 5 , the tensioning elements (9) are configured to exert a resultant post-tension force (P) comprising a line of action (D) which intersects with a horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1), (contained in a space defined within the upwind side). - Preferably, the first surface (8) of the upper end (18) is located in an adaptor (16) of the tower (1), as shown in
Figure 12 , being the upper end (18) of the post-tensioning system of the invention the adaptor. - Preferably, the second surface (7) of the lower end (17) is located in a tower foundation (15) of the tower (1), as shown in
Figure 13 , being the lower end (17) of the post-tensioning system of the invention the tower foundation. - Preferably, as shown in
Figures 3 ,5 ,7 ,9, 10 and 11 , the first surface (8) of the upper end (18) and/or the second surface (7) of the lower end (17) are located in a surface of the concrete tower part (3) of the tower, being the upper end (18) of the post-tensioning system of the invention an upper part of the concrete tower part (3) and the lower end (17) of the post-tensioning system of the invention a lower part of the concrete tower part (3). - In the preferred embodiment shown in
Figures 3 and 4 , the resultant post-tension force (P) comprises a line of action (D) which intersects with the horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1), as can be seen inFigure 5 , wherein the number of strands (14) forming each tensioning element (9) is the same, and the first ends (10) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1) and to a second vertical plane (PV2) perpendicular to the first vertical plane (PV1), the second vertical plane (PV2) containing the predominant wind direction (W). Preferably, the second ends (11) of the tensioning elements (9) are disposed in an asymmetrical way with respect to the first vertical plane (PV1) and in a symmetrical way with respect to the second vertical plane (PV2). - In another embodiment, the first ends (10) and/or the second ends (11) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1).
- As can be seen in
Figure 6 , each tensioning element (9) comprises a set of strands (14). - In another embodiment shown in
Figure 8 , the number of strands (14) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) is greater than the number of strands (14) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1) despite comprising the same number of tensioning elements (9) upwards than downwards from the first vertical plane (PV1). - In another embodiment, a first post-tensioning force (P1) that exerts, in use, the tensioning elements (9) disposed upwards from the first vertical plane (PV1) is greater than a second post-tensioning force (P2) that exerts, in use, the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- In the embodiment shown in
Figure 4 , the first ends (10) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1), while the second ends (11) of the tensioning elements (9) are disposed in a non-symmetrical way with respect to the first vertical plane (PV1). As can be seen inFigure 4 , the number of second ends (11) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) may be greater than the number of second ends (11) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1). In the embodiment shown inFigure 4 , the first ends (10) and the second ends (11) of the tensioning elements (9) are disposed in a symmetrical way with respect to the second vertical plane (PV2). - In another embodiment shown in
Figures 9 and 10 , the resultant post-tension force (P) also intersects with an additional horizontal plane (PH2) located at the upper end (18) in a second intersection point (12). Preferably, as shown inFigure 9 , the first intersection point (11) and the second intersection point (12) are located at a different distance from the first vertical plane (PV1). Also preferably, as shown inFigure 10 , the first intersection point (11) and the second intersection point (12) are located at the same distance from the first vertical plane (PV1). In this embodiment, the same asymmetrical distribution in the upper end (18) and in the lower end (17) of the first ends (10) and the second ends (11), respectively, of the tensioning elements (9), as well as the tensioning elements (9) being disposed parallel to the vertical axis (2) of the tower (1), is given. - Preferably, the first intersection point (11) and/or the second intersection point (12) are located at a distance between 0.1m and 3m from the first vertical plane (PV1).
- Preferably, the first set of anchoring elements (12) and/or the second set of anchoring elements (13) are nuts, bolts or a combination of them.
- The invention also relates to a post-tensioned tower of a wind turbine (1) comprising the post-tensioning system for a tower of a wind turbine. Also, the invention relates to a wind turbine (1) comprising the post-tensioned tower.
- Also, the invention relates to a method of post-tensioning a tower of a wind turbine, wherein the tower comprises at least:
- a vertical axis (2);
- a concrete tower part (3) comprising:
∘ an upwind side (4) and a downwind side (5), wherein the upwind side (4) and the downwind side (5) are defined, in use, from a first vertical plane (PV1) containing the vertical axis (2) and being perpendicular to a predominant wind direction (W), upwards and downwards respectively, from the first vertical plane (PV1); and
the method carried out with the post-tensioning system described above and comprising:- a step of disposing in the concrete tower part (3) a plurality of tensioning elements (9), wherein each one of the tensioning elements (9) comprises a first end (10) located in the upper end (18) and a second end (11) located in the lower end (17);
- a step of anchoring a first set of anchoring elements (12) in the first ends (10) of the tensioning elements (9) towards the first surface (8), as shown in
Figure 12 ; - a step of anchoring a second set of anchoring elements (13) in the second ends (11) of the tensioning elements (9) towards the second surface (7), as shown in
Figure 13 ; and - a step of exerting a resultant post-tension force (P) comprising a line of action (D) which intersects with a horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1), by means of the tensioning elements (9).
- In the embodiment shown in
Figure 4 , the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) in a symmetrical way with respect to the first vertical plane (PV1), and the second ends (11) of the tensioning elements (9) in a non-symmetrical way with respect to the first vertical plane (PV1). Preferably, the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) in a symmetrical way with respect to the second vertical plane (PV2), and the second ends (11) of the tensioning elements (9) in a symmetrical way with respect to the second vertical plane (PV2). - In the embodiment shown in
Figure 8 , the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) and the second ends (11) of the tensioning elements (9) in a symmetrical way with respect to the first vertical plane (PV1). Preferably, the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing a greater number of strands (14) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) than the number of strands (14) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1). Preferably, the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing the first ends (10) and the second ends (11) of the tensioning elements (9) in a symmetrical way with respect to the second vertical plane (PV2). - In another embodiment shown in
figure 11 , the step of exerting a resultant post-tension force (P) comprises a step of exerting a first post-tensioning force (P1) by means of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) and a second post-tensioning force (P2) by means of the tensioning elements (9) disposed downwards from the first vertical plane (PV1), wherein the first post-tensioned force (P1) is greater than the second post-tensioned force (P2). - In the embodiment shown in
Figure 4 , the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9) comprises disposing a greater number of second ends (12) of the tensioning elements (9) upwards from the first vertical plane (PV1) than the number of second ends (12) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1). - In the embodiment shown in
Figure 4 , the step of exerting a resultant post-tension force (P) is carried out exerting the resultant post-tension force (P) in a line of action contained in a second vertical plane (PV2) perpendicular to the first vertical plane (PV1), the second vertical plane (PV2) containing the predominant wind direction (W). - Optionally, the step of exerting a resultant post-tension force is carried out exerting the resultant post-tension force in a line of action such that the first intersection point (11) and/or the second intersection point (12) are located at a distance between 0.1m and 3m from the first vertical plane (PV1).
Claims (18)
- A post-tensioning system for a tower of a wind turbine, wherein the tower (1) comprises at least:• a vertical axis (2);• a concrete tower part (3) comprising:characterised in that the tensioning elements (9) are configured to exert a resultant post-tension force (P) comprising a line of action (D) which intersects with a horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1).
∘ an upwind side (4) and a downwind side (5), wherein the upwind side (4) and the downwind side (5) are defined, in use, from a first vertical plane (PV1) containing the vertical axis (2) and being perpendicular to a predominant wind direction (W), upwards and downwards respectively, from the first vertical plane (PV1); and
the system comprising:• an upper end (18) comprising a first surface (8) and a lower end (17) comprising a second surface (7);• a plurality of tensioning elements (9), wherein each one of the tensioning elements (9) comprises a first end (10) located in the upper end (18) and a second end (11) located in the lower end (17);• a first set of anchoring elements (12) configured to anchor the first ends (10) of the tensioning elements (9) towards the first surface (8);• a second set of anchoring elements (13) configured to anchor the second ends (11) of the tensioning elements (9) towards the second surface (7); - The post-tensioning system for a tower of a wind turbine according to claim 1, characterised in that the first ends (10) and the second ends (11) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1).
- The post-tensioning system for a tower of a wind turbine according to claim 1, characterised in that the first ends (10) of the tensioning elements (9) are disposed in a symmetrical way with respect to the first vertical plane (PV1), while the second ends (11) of the tensioning elements (9) are disposed in a non-symmetrical way with respect to the first vertical plane (PV1).
- The post-tensioning system for a tower of a wind turbine according to claim 3, characterised in that the number of second ends (11) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) is greater than the number of second ends (11) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- The post-tensioning system for a tower of a wind turbine according to any one of the previous claims, characterised in that each tensioning element (9) comprises a set of strands (14).
- The post-tensioning system for a tower of a wind turbine according to claim 5, characterised in that the number of strands (14) of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) is greater than the number of strands (14) of the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- The post-tensioning system for a tower of a wind turbine according to any one of the previous claims, characterised in that a first post-tensioning force (P1) that exerts, in use, the tensioning elements (9) disposed upwards from the first vertical plane (PV1) is greater than a second post-tensioning force (P2) that exerts, in use, the tensioning elements (9) disposed downwards from the first vertical plane (PV1).
- The post-tensioning system for a tower of a wind turbine according to any one of the previous claims, characterised in that the resultant post-tension force (P) is contained in a second vertical plane (PV2) perpendicular to the first vertical plane (PV1), the second vertical plane (PV2) containing the predominant wind direction (W).
- The post-tensioning system for a tower of a wind turbine according to any one of the previous claims, characterised in that the resultant post-tension force (P) also intersects with an additional horizontal plane (PH2) located at the upper end (18) in a second intersection point (12).
- The post-tensioning system for a tower of a wind turbine according to claim 9, characterised in that the first intersection point (11) and the second intersection point (12) are located at the same distance from the first vertical plane (PV1).
- The post-tensioning system for a tower of a wind turbine according to claim 9, characterised in that the first intersection point (11) and the second intersection point (12) are located at a different distance from the first vertical plane (PV1).
- The post-tensioning system for a tower of a wind turbine according to any one of the claims 9 to 11, characterised in that the first intersection point (11) and/or the second intersection point (12) are located at a distance between 0.1m and 3m from the first vertical plane (PV1).
- A post-tensioned tower of a wind turbine (1) comprising the post-tensioning system for a tower of a wind turbine of any one of the previous claims.
- A wind turbine (1) comprising the post-tensioned tower of claim 13.
- A method of post-tensioning a tower of a wind turbine, wherein the tower comprises at least:• a vertical axis (2);• a concrete tower part (3) comprising:
∘ an upwind side (4) and a downwind side (5), wherein the upwind side (4) and the downwind side (5) are defined, in use, from a first vertical plane (PV1) containing the vertical axis (2) and being perpendicular to a predominant wind direction (W), upwards and downwards respectively, from the first vertical plane (PV1); and
the method carried out with the post-tensioning system of any one of claims 1 to 12 and comprising:• a step of disposing in the concrete tower part (3) a plurality of tensioning elements (9), wherein each one of the tensioning elements (9) comprises a first end (10) located in the upper end (18) and a second end (11) located in the lower end (17);• a step of anchoring a first set of anchoring elements (12) in the first ends (10) of the tensioning elements (9) towards the first surface (8);• a step of anchoring a second set of anchoring elements (13) in the second ends (11) of the tensioning elements (9) towards the second surface (7); and• a step of exerting a resultant post-tension force (P) comprising a line of action (D) which intersects with a horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1), by means of the tensioning elements (9). - The method of post-tensioning a tower of a wind turbine according to claim 15, characterised in that the step of exerting a resultant post-tension force (P) comprising a line of action (D) which intersects with a horizontal plane (PH1) located at the lower end (17) in a first intersection point (11) upwards from the first vertical plane (PV1) comprises a step of exerting a first post-tensioning force (P1) by means of the tensioning elements (9) disposed upwards from the first vertical plane (PV1) and a second post-tensioning force (P2) by means of the tensioning elements (9) disposed downwards from the first vertical plane (PV1), wherein the first post-tensioning force (P1) is greater than the second post-tensioning force (P2).
- The method of post-tensioning a tower of a wind turbine according to claim 15, characterised in that the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9), wherein each one of the tensioning elements (9) comprises a first end (10) located in the upper end (18) and a second end (11) located in the lower end (17) comprises a step of disposing at least one tensioning element (9) with fewer strands (14) in the downwind side (5) than in the upwind side (4).
- The method of post-tensioning a tower of a wind turbine according to claim 15, characterised in that the step of disposing in the concrete tower part (3) a plurality of tensioning elements (9), wherein each one of the tensioning elements (9) comprises a first end (10) located in the upper end (18) and a second end (11) located in the lower end (17) comprises disposing more tensioning elements (9) in the upwind side (4) than in the downwind side (5).
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP21383234.8A EP4206420A1 (en) | 2021-12-29 | 2021-12-29 | Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine |
AU2022424241A AU2022424241A1 (en) | 2021-12-29 | 2022-12-01 | Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine |
PCT/EP2022/084108 WO2023126123A1 (en) | 2021-12-29 | 2022-12-01 | Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP21383234.8A EP4206420A1 (en) | 2021-12-29 | 2021-12-29 | Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine |
Publications (1)
Publication Number | Publication Date |
---|---|
EP4206420A1 true EP4206420A1 (en) | 2023-07-05 |
Family
ID=79025213
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21383234.8A Pending EP4206420A1 (en) | 2021-12-29 | 2021-12-29 | Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP4206420A1 (en) |
AU (1) | AU2022424241A1 (en) |
WO (1) | WO2023126123A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160032608A1 (en) * | 2013-03-21 | 2016-02-04 | Alstom Renewable Technologies | Towers |
US20160305405A1 (en) * | 2013-12-06 | 2016-10-20 | Wobben Properties Gmbh | Wind turbine comprising a segmented tower and foundation |
US20160312431A1 (en) * | 2013-12-18 | 2016-10-27 | Wobben Properties Gmbh | Arrangement with a concrete foundation and a tower and a method for erecting a tower |
-
2021
- 2021-12-29 EP EP21383234.8A patent/EP4206420A1/en active Pending
-
2022
- 2022-12-01 AU AU2022424241A patent/AU2022424241A1/en active Pending
- 2022-12-01 WO PCT/EP2022/084108 patent/WO2023126123A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160032608A1 (en) * | 2013-03-21 | 2016-02-04 | Alstom Renewable Technologies | Towers |
US20160305405A1 (en) * | 2013-12-06 | 2016-10-20 | Wobben Properties Gmbh | Wind turbine comprising a segmented tower and foundation |
US20160312431A1 (en) * | 2013-12-18 | 2016-10-27 | Wobben Properties Gmbh | Arrangement with a concrete foundation and a tower and a method for erecting a tower |
Also Published As
Publication number | Publication date |
---|---|
WO2023126123A1 (en) | 2023-07-06 |
AU2022424241A1 (en) | 2024-06-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4040980B2 (en) | Prestressed synthetic truss girder and manufacturing method thereof | |
JP4488745B2 (en) | Wind turbine | |
KR100555249B1 (en) | Bridge constructing method using even-sectioned i-type rolled steel beam having increased section intensity and i-type rolled steel beam manufactured with uneven steel plate | |
JP5503253B2 (en) | Structure | |
KR100946739B1 (en) | Long-span bridge construction method using prestressed concrete girder | |
CN102635186A (en) | Double-layer spoke type space string-structure steel roof truss and pre-stressed tension method thereof | |
CN111364611B (en) | Assembly type prestress self-resetting node | |
KR20120073858A (en) | Structual member making method using preflex baem and psc beam and the bridge construction method threrewith | |
US20220178158A1 (en) | Device and method for reinforcing round section wood beam by combination of prestressed frp sheet and high strength steel wire rope | |
EP4206420A1 (en) | Post-tensioning system for a tower of a wind turbine, post-tensioned tower of a wind turbine and method of post-tensioning a tower of a wind turbine | |
CN112982787B (en) | Large-span beam with reinforced concrete and prestressed inhaul cable coupled | |
CN107829444B (en) | Wind turbine generator system prestressing force foundation structure | |
CN111395210B (en) | Method for improving bearing capacity of truss girder bridge by using external prestressed tendons | |
KR102509254B1 (en) | A method of measuring the displacement information of a girder capable of calculating the rotational displacement information of a PSC type I girder and a bridge construction method using the same | |
CN210140764U (en) | Double-fold-line-shaped bridge span assembly stiffened through inhaul cable | |
CN218150007U (en) | Prestressing force reinforced structure of door type rigid frame factory building | |
CN112283045A (en) | Framework type external prestress anti-fatigue steel tower structure | |
KR101120163B1 (en) | Construction method for temporary bridge | |
JPH10205430A (en) | Construction method for wind power generator | |
KR100561034B1 (en) | Connecting method for segmental prestressed preflex steel composite beam | |
KR101341830B1 (en) | Psc girder making method using upper and lower psc tendon with straight tendon setting structure | |
CN219213502U (en) | Prestressed solid square pile mold and prestressed solid square pile | |
KR102321582B1 (en) | PSC I-type girder capable of adjusting transverse displacement using the tension member of the upper flange | |
CN113737656B (en) | Construction method for cooperatively tensioning cover beam prestressed steel beam and stay cable | |
CN112482870B (en) | Pole tower in-situ lifting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20231229 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: NUNEZ POLO, MIGUEL Inventor name: ARLABAN GABEIRAS, TERESA Inventor name: GARDUNO ESTEBANEZ, AITOR |