EP4144921A1 - Chaussure de roche - Google Patents
Chaussure de roche Download PDFInfo
- Publication number
- EP4144921A1 EP4144921A1 EP22191500.2A EP22191500A EP4144921A1 EP 4144921 A1 EP4144921 A1 EP 4144921A1 EP 22191500 A EP22191500 A EP 22191500A EP 4144921 A1 EP4144921 A1 EP 4144921A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- box
- pile
- rock
- shoe
- rock shoe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011435 rock Substances 0.000 title claims abstract description 75
- 238000004026 adhesive bonding Methods 0.000 claims abstract description 4
- 239000003292 glue Substances 0.000 claims description 4
- 239000004570 mortar (masonry) Substances 0.000 claims description 4
- 238000012544 monitoring process Methods 0.000 claims 1
- 239000004567 concrete Substances 0.000 description 12
- 239000000463 material Substances 0.000 description 12
- 239000002689 soil Substances 0.000 description 10
- 230000002787 reinforcement Effects 0.000 description 8
- 229910000831 Steel Inorganic materials 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 239000011178 precast concrete Substances 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 229920006335 epoxy glue Polymers 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 239000000654 additive Substances 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 235000019271 petrolatum Nutrition 0.000 description 1
- 238000003825 pressing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 231100000817 safety factor Toxicity 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/72—Pile shoes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/52—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
- E02D5/523—Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
- E02D5/526—Connection means between pile segments
Definitions
- This invention relates to a rock shoe according to the preamble of claim 1.
- the invention also relates to a pile according to the preamble of claim 8.
- a reinforced concrete pile is always provided with some type of tip protection in order that the concrete would not break from its corners when driven into the soil.
- the concrete piles are brought to a worksite by a lorry and are stored in proximity to the pile-driving site.
- a pile driver is a heavy tracked machine which is to be moved on the worksite as little as possible.
- the piles are generally fetched from a worksite store by hauling them with a long wire to the pile driver, whereby the driven end of the pile is trailed along the ground. The transport of the pile also requires protecting the tip of the pile.
- This so-called rock shoe is conical in shape in such a way that the side of the pile does not hit the inclined rock surface.
- the point part of the rock shoe is formed by a hardened dowel (standard SIS 811192) which has been fastened with a screw to a rigid sleeve welded with reinforcement plates to a bottom plate, a thickness of which is generally of the order of 20 mm.
- Application FI20012026 discloses another way of reinforcing a bottom plate and attaching a point dowel to a shoe structure. This form of reinforcement displaces more of the packed till overlying the rock surface and is therefore easier to become damaged.
- piles of various lengths can often be seen rising from the ground.
- the pile is driven into the soil until at the final strokes it can be shown that it bears the loads according to plan.
- some length of a 12-16 m long standard pile always remains to be cut off.
- the driven piles can be cast in advance to a shorter length.
- a precast concrete manufacturing plant has these shorter piles in store, because cast concrete requires approximately a month to achieve the final strength without chemical additives.
- the above-described rock shoe is cast onto the end of the standard pile.
- Swedish standard SIS 811197 from 1973 discloses a retrofittable rock shoe in which the standard point structure has been attached to a tall box which is wedged to a lower end of a standard pile.
- the rock shoe is exposed to considerable forces during installation of the pile both in a vertical and lateral direction, and these forces tend to break the end of the concrete pile.
- Pile-driving guidelines PO2016 disclose the Finnish test requirements in part 2, chapter 3.9.4.
- the problem with a retrofittable rock shoe is the clearance remaining between the box of the rock shoe and the pile, which clearance is required in order that the box could be installed to the end of the pile.
- Concrete piles were manufactured for a long time outside in large battery moulds having side plates fastened to a bottom plate at regular intervals (Peter Alheid: Seminar paper: Betongp ⁇ lar i Sverige, interior picture on page 7, pile seminar 2014). One had to be able to move on top of the mould e.g. by using planks, and the steel reinforcements and steel parts were installed between the side plates.
- a rock shoe to be retrofitted to a ready-made pile is disclosed in publication WO 2007/080217 , Fig. 6.
- a collar made from a thin plate engages the surface of a concrete pile by means of depressions made in the steel plate.
- a shock wave is reflected back from the tip of the pile as a tension wave which the joint between the rock shoe and the pile must be able to transmit.
- a required minimum value of resistance to the tensile force in the joint can be considered to be a yield force of 320 kN (corresponds to a mass of 32 tonnes) of the anchor rods of Swedish standard SIS 811196 (4 anchor rods d 16 material Ks40). It is clear that considering the manufacturing tolerances, the depressions as described in the application cannot transmit such tensile force.
- Application FI 20185944 discloses a rock shoe fastened to a splice of a standard pile (Fig. 6).
- the application does not disclose a possible box of the rock shoe.
- the idea is to join a rock shoe to a regular splice, thus reducing storage need of the precast concrete manufacturing plant.
- the support wedges 203 of the rock shoe (support reinforcements under a bottom plate) are arranged in such a way that they support both of the structure of the rock shoe and the components of the joint system.
- the locking forces are transmitted via locking members, in the standard rock shoe the bottom plate is reinforced in a diagonal direction. In the solution, the reinforcement plate transmitting the driving forces from the point 202 to the pile 100 cannot be located at the lock housing 41.
- the soil material overlying the rock surface is generally packed till, and when piles are test driven into the soil and removed for testing, there is often a strong layer of till remaining between the reinforcements, which has bent the reinforcement plates.
- the lock structure is located unprotected in a critical position exposed to considerable forces from the oblique rock surface and from the hard layer of soil overlying it.
- the locking structure is furthermore located outside the corrosion-protective concrete structure, so designing must be done with rust allowance (min. 2 mm / side) or with non-rusting lock parts, which would mean for standard piles, regardless of whether a point was joined to them or not, significant additional cost due to the material.
- the object of this invention is to provide an improved rock shoe and a pile equipped with the rock shoe.
- the objective according to the invention is achieved with a rock shoe according to claim 1 and with a pile according to claim 8.
- the rock shoe according to the invention comprises a bottom plate, to a front surface of which a point part has been attached, and a box attached to the bottom plate, into which box the end of the pile is insertable. Further, the rock shoe comprises a clamping ring arranged around the box for clamping the box against sides of the pile.
- the invention provides significant advantages.
- the rock shoe according to the invention is easily connectable to the end of a pile. Thereby the number of standard piles to be kept in store may be reduced.
- the rock shoe according to the invention may be brought to the worksite and joined to the end of the pile on the site.
- Fig. 1 and 2 show a rock shoe 1 according to one embodiment of the invention, which rock shoe is fixable to an end of a reinforced concrete pile 20 for example by gluing or by means of joint members.
- the pile may be square or rectangle shaped in cross-section.
- the end of the pile 20 may be equipped with a joint part 21 to which the rock shoe 1 is fixable.
- the rock shoe 1 may be fastened directly to the end of the pile 20 without the joint part 21, for example by gluing.
- the pile comprises reinforcement bars in a longitudinal direction of the pile, for example deformed bars, which are normally located in the concrete at corners of the pile.
- the rock shoe 1 comprises a bottom plate 2, a back surface 3 of which is arranged against the end of the concrete pile to which the rock shoe 1 is to be fastened.
- the rock shoe 1 further comprises a point part 5 attached to a front surface 4 of the bottom plate 2.
- Support wedges 17 supporting the point part 5 have further been attached to the front surface 4 of the bottom plate 2.
- the rock shoe 1 is made from steel.
- Joint members 6 have been fastened to the bottom plate 2 for fastening the rock shoe 1 to the joint part 21 of the end of the pile.
- the joint members 6 are located on an opposite side of the bottom plate 2 relative to the point part 5.
- a first end of the joint member 6 has been joined to the bottom plate 2 for example by welding.
- a second end of the joint member 6 is fixable to the joint part of the end of the pile, e.g. to a pile splice.
- the joint part 21 may comprise a locking member to which the second end of the joint member 6 is fitted and fastened.
- the rock shoe 1 also comprises a collar-type box 7 extending away from the back surface 3 of the bottom plate 2.
- the box 7 is in cross-section of the same shape as the end of the pile, but is in internal diameter larger than the end of the pile.
- the box 7 encloses the joint members 6.
- the height of the box 7 may be greater than the length of the joint members 6.
- a first end of the box 7 has been fastened to the back surface or to the edges of the bottom plate 2.
- the box 7 is open at its second end, whereby the end of the pile may be inserted into the box 7.
- the first end of the box 7, i.e. the end to be fastened to the bottom plate is open.
- the internal diameters of the box 7 are larger than the end of the pile, whereby the end of the pile is insertable in the box 7.
- the empty spaces and/or weld holes of the box 7 may be filled with stiff material, for example petroleum jelly, preventing moisture from spreading inside the box 7.
- openings 9 Through the sides of the box 7 there are openings 9 through which the position of the joint members 6 may be monitored and the joint members 6 guided in such a way that the joint members 6 fit the joint part 21 of the end of the pile when the pile is lowered onto the rock shoe 1.
- the openings 9 are located in alignment with the second ends of the joint members 6.
- the openings 9 may be located at corners of the box 7. In case the rock shoe 1 is glued to the end of the pile 20, excess glue may exit through the openings 9.
- the empty spaces at the corners of the box 7 may be filled with a filling material, for example grouting mortar, epoxy glue etc. The filling material may be fed into the box 7 through the openings 9.
- the corners of the box 7 may be partly open.
- the open corner portions 18 extend from the second end of the box 7 towards the first end.
- the open corner portions 18 make the box 7 more flexible, whereby the sides of the box 7 may be clamped against the sides of the pile.
- the rock shoe 1 comprises a clamping ring 10 for clamping/pressing the box 7 against sides of the pile either directly or indirectly, for example by means of shims 11.
- the clamping ring 10 has been arranged around the box 7, typically at the second end of the box 7.
- the clamping ring 10 has been positioned at the open corner portions 18 of the box 7.
- the length of the open corner portions 18 of the box 7 is greater, typically 1-3 cm greater, than the height of the clamping ring 10.
- the clamping ring 10 is placed around the box 7 at the second end of the box 7.
- the clamping ring 10 comprises screw holes 19, whereby the clamping ring 10 has been fastened to the box 7 by means of screws, for example self-drilling screws.
- a clearance Between the clamping ring 10 and the box 7 on each side there is a clearance, the extent of which is typically 2-3 mm.
- Shims 11 may be inserted in the clearances, which shims press the box 7 against the sides of the pile.
- a lower edge of the shims 11 may also be made wedge-shaped for example by grinding.
- the shims 11 may be driven into the clearances with a hammer.
- the clamping ring 10 may be driven onto the wedge-shaped shims 11 for example with a small sledgehammer.
- the rock shoe 1 may be provided with a clamping ring 10 according to Fig. 3-5 .
- the box 7 shown in Fig. 3 may be like that of the embodiment of Fig. 1 and 2 .
- the bottom plate 2, the point part 5, the support wedges 17 and/or the joint members 6 of the rock shoe 1 of Fig. 3 may be like those of the embodiment of Fig. 1 and 2 .
- the clamping ring 10 comprises four clamping parts 12. One clamping part 12 has been arranged against each side of the box 7. The clamping parts 12 have been attached to each other at each corner of the box 7.
- middle part 12.1 In the middle of the clamping part 12 there is a middle part 12.1 arranged against the side of the box.
- the middle part 12.1 is straight.
- the middle part 12.1 is shorter than the side of the box 7 against which the middle part 12.1 is arranged.
- end parts 12.2 which are inclined relative to the middle part 12.1.
- the end parts 12.2 are directed away from the box 7.
- the end parts 12.2 are at an obtuse angle ⁇ , for example at an angle ⁇ of 120-160 degrees relative to the middle part 12.1.
- the clamping parts 12 on adjacent sides of the box 7 are attached to each other by the end parts 12.2.
- the ends of adjacent end parts 12.2 abut against each other.
- a clamping screw 14 is inserted through the holes 13 of adjacent end parts 12.2. Nuts 15 are screwed onto both ends of the clamping screw 14. Between the nut 15 and the end part 12.2 there is a washer 16. When the nuts 15 are tightened, the end parts 12.2 abut against each other. The obliquity of the clamping screw 14 relative to the washers 16 may be adjusted by changing the length of the end parts 12.2, by placing an additional plate between ends of the end parts 12.2 and/or by using a washer 16 which is thicker or thinner from the side towards the end of the end part 12.2 than from the opposite side towards the middle part 12.1. The nuts 15 are first tightened in such a way that the clearances are removed. Thereby, at each corner of the box 7, there are openings of approximately the same size between the end parts 12.2. Finally, the nuts 15 are tightened to a desired tightening torque for example with a torque wrench.
- the inner surfaces of the box 7 and the end of the pile 20 are cleaned. If necessary, dirt, for example dried laitance etc., is removed for example with a wire brush.
- a layer of mortar or glue may be arranged on the inner surfaces of the box 7.
- the rock shoe 1 is installed with a jack to the end of the pile in a horizontal position, while supporting the other end of the pile.
- the rock shoe 1 is installed in a vertical position. In this case the rock shoe 1 is supported for example with the installation box (bottom plate, side plates and support blocks) to the vertical position and the pile is dropped for example by a pile driver into the box 7 of the rock shoe.
- the sides of the box 7 are clamped against the sides of the pile with the clamping ring 10 in the above-described manner.
- the empty spaces at the corners of the box 7 may be filled with a filling material, for example grouting mortar, epoxy glue etc.
- the filling material is fed into the box 7 through the openings 9 on the sides.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FIU20214092U FI13042Y1 (fi) | 2021-09-02 | 2021-09-02 | Kalliokärki |
Publications (1)
Publication Number | Publication Date |
---|---|
EP4144921A1 true EP4144921A1 (fr) | 2023-03-08 |
Family
ID=78475468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP22191500.2A Pending EP4144921A1 (fr) | 2021-09-02 | 2022-08-22 | Chaussure de roche |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP4144921A1 (fr) |
FI (1) | FI13042Y1 (fr) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI85901B (fi) * | 1989-09-08 | 1992-02-28 | Leimet Oy | Bergsko. |
US6039298A (en) * | 1997-09-12 | 2000-03-21 | Stier; Peter | Tapered steel post |
FI20012026A (fi) | 2001-10-19 | 2003-04-20 | Emeca Oy | Teräsputkipaalun kalliokärki |
FI20020402A (fi) | 2002-03-01 | 2003-09-02 | Lujabetoni Oy | Betonipaalun levykenkä |
WO2007080217A1 (fr) | 2006-01-09 | 2007-07-19 | Lujabetoni Oy | Structure en pointe d'une pile en beton arme |
RU186633U1 (ru) * | 2018-07-12 | 2019-01-28 | Дмитрий Владимирович Коровин | Свая забивная |
WO2020009867A1 (fr) * | 2018-07-02 | 2020-01-09 | Origin Point Brands, Llc | Support de poteau ayant une capacité de réglage angulaire étendue |
FI20185944A1 (fi) | 2018-11-07 | 2020-05-08 | Leimet Oy | Paaluliitos |
-
2021
- 2021-09-02 FI FIU20214092U patent/FI13042Y1/fi active IP Right Grant
-
2022
- 2022-08-22 EP EP22191500.2A patent/EP4144921A1/fr active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FI85901B (fi) * | 1989-09-08 | 1992-02-28 | Leimet Oy | Bergsko. |
US6039298A (en) * | 1997-09-12 | 2000-03-21 | Stier; Peter | Tapered steel post |
FI20012026A (fi) | 2001-10-19 | 2003-04-20 | Emeca Oy | Teräsputkipaalun kalliokärki |
FI20020402A (fi) | 2002-03-01 | 2003-09-02 | Lujabetoni Oy | Betonipaalun levykenkä |
WO2007080217A1 (fr) | 2006-01-09 | 2007-07-19 | Lujabetoni Oy | Structure en pointe d'une pile en beton arme |
WO2020009867A1 (fr) * | 2018-07-02 | 2020-01-09 | Origin Point Brands, Llc | Support de poteau ayant une capacité de réglage angulaire étendue |
RU186633U1 (ru) * | 2018-07-12 | 2019-01-28 | Дмитрий Владимирович Коровин | Свая забивная |
FI20185944A1 (fi) | 2018-11-07 | 2020-05-08 | Leimet Oy | Paaluliitos |
Also Published As
Publication number | Publication date |
---|---|
FI13042Y1 (fi) | 2021-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6264402B1 (en) | Method and apparatus for forming piles in place | |
US5707180A (en) | Method and apparatus for forming piles in-situ | |
CN100567659C (zh) | 铁塔的基础构造 | |
US4911582A (en) | Concrete replacement wall and method of constructing the wall | |
JP4750562B2 (ja) | 杭頭部とプレキャスト桁との接続構造 | |
AU2004101058A4 (en) | Earth Retention and Piling Systems | |
WO2005005752A1 (fr) | Ensemble fondation pour batiment | |
KR100657655B1 (ko) | 지반안정공법용 조립식 파일 | |
KR100773110B1 (ko) | 프리스트레스트 고강도 콘크리트 말뚝과 외관 강관부착 콘크리트 말뚝의 합성말뚝, 그 시공방법 및 그에 사용되는 관입보조말뚝 | |
EP4144921A1 (fr) | Chaussure de roche | |
US7351013B2 (en) | Unitary pile jacking sleeve for installing and compressively loading piling without overhead access and without disrupting a super-structure | |
KR100933220B1 (ko) | 보강토 옹벽의 배부름 현상에 대한 보수 및 보강방법과이에 사용되는 소일네일 구조체 | |
KR200201561Y1 (ko) | 강관파일 두부보강구조 | |
EP1046753B1 (fr) | Procédé et dispositif pour la réalisation en place de colonnes | |
AU763775B2 (en) | Method and apparatus for forming piles in place | |
KR102051386B1 (ko) | 휨 및 전단성능이 보강된 고강도 콘크리트파일에 두부보강용 강관캡이 구비된 파일 시공 방법 | |
CA2264197C (fr) | Methode et dispositif de battage | |
KR20020066608A (ko) | 강재말뚝과 콘크리트기초와의 보강결합을 위한 결합구 및이를 이용한 결합구조 | |
CN215105252U (zh) | 一种可分节施工的桩底后压浆钢筋混凝土先张法预应力空心方桩 | |
KR102685846B1 (ko) | Phc 파일용 두부 보강캡 | |
JP7557984B2 (ja) | 既存工場における鉄骨柱脚の固定方法およびそれが適用された建屋 | |
KR102613053B1 (ko) | 견고한 합성거동 및 효율적인 시공효율을 발휘하는 phc 벽체와 rc 벽체의 합벽 및 그 시공방법 | |
KR200397340Y1 (ko) | 콘크리트 말뚝의 두부 보강 구조 | |
JP7051058B2 (ja) | 既存用水路の補修工法 | |
JP4809399B2 (ja) | 壁面パネル及びそれを用いた盛土構造物の施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20230906 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |