EP4031725A1 - Temporary scaffolding rest - Google Patents
Temporary scaffolding restInfo
- Publication number
- EP4031725A1 EP4031725A1 EP20780311.5A EP20780311A EP4031725A1 EP 4031725 A1 EP4031725 A1 EP 4031725A1 EP 20780311 A EP20780311 A EP 20780311A EP 4031725 A1 EP4031725 A1 EP 4031725A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- scaffolding
- temporary
- rest
- upright
- stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
- E04G5/061—Consoles; Brackets specially adapted for attachment to scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/302—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members
- E04G7/306—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect
- E04G7/308—Scaffolding bars or members with non-detachably fixed coupling elements for connecting crossing or intersecting bars or members the added coupling elements are fixed at several bars or members to connect without tying means for connecting the bars or members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
- E04G7/34—Scaffolding bars or members with non-detachably fixed coupling elements with coupling elements using positive engagement, e.g. hooks or pins
Definitions
- Scaffolding structures typically comprise several different discrete and compact components which are connected to one another during installation at site in order to form a resultant scaffolding framework when erected.
- Many different connection methods are utilised; however, in the main, these involve erecting a plurality of upstands and then connecting a plurality of cross members therebetween.
- These cross members may include bracing members, walking boards, kick boards, guardrails etc.
- the speed at which scaffolding can be safely erected and dismantled is also important since labour time is often expensive. Some jobs may also have tight time-based access windows which makes quick and efficient installation and dismantling of the scaffolding important.
- United Kingdom Patent Publication No. 2533033 shows a lightweight safety panelling and accompanying scaffold system whereby the fitter raises the next section of panelling above his or head and immediately attaches it into its final position, at that raised height, to the scaffolding uprights adjacent the next row of scaffolding.
- the upper row of panelling is in its connected configuration immediately after the fitter has installed it from below.
- the only thing left for the fitter to do is secure it in that same position with a fastener.
- it is limited to relatively lightweight panelling and creates additional issues which make it difficult in practice to use safely and reliably.
- it requires very accurate placement of the upper portion of scaffold on the upper row from below (not an easy task to achieve when holding a more heavy-duty scaffolding guardrail). This method therefore may also typically require more than one fitter for safety reasons.
- a temporary scaffolding rest which temporarily supports a standby scaffolding component upon a scaffolding upright in a first temporary disconnected position which is laterally offset from the scaffolding upright for subsequent installation of said standby scaffolding component to a portion of said upright in a second installed position which is laterally inset from the first temporary disconnected position
- the temporary scaffolding rest comprising: - at least a temporary connector for temporarily connecting the temporary scaffolding rest to said portion of said scaffolding upright; and at least an elongated rest which extends laterally from the temporary connector in order to temporarily support a portion of said standby scaffolding adjacent said portion of said scaffolding upright in said first temporary disconnected laterally offset position ready for subsequent installation to said portion of said scaffolding upright in said second installed position.
- the temporary scaffolding rest further comprises at least a stand-off arm which extends inwardly from the connector past the scaffolding upright and at least partially projects into a working zone of the scaffolding in order allow said scaffolding component to be temporarily rested upon the scaffolding rest within the working zone.
- the connector is arranged to engage with an outward portion of said scaffolding upright which is outside of the working zone.
- the or each stand-off arm comprises a first substantially level portion and a second inclined portion.
- the second inclined portion of the or each stand-off arm comprises a rest profile for temporarily receiving a portion of a scaffolding component therein in a temporary resting configuration.
- the or each rest profile comprises a U-shaped recess.
- the or each stand-off arm comprises a return hook portion for retaining the scaffolding component upon the or each stand-off arm.
- the first substantially level portion of the stand-off arm is angled relative to the connecter so as to project into the working zone at an angle which allows the stand-off arm to pass around the inward scaffolding upright and into the working zone.
- the temporary scaffolding rest further comprises a pair of said stand-off arms, the pair of said stand-off arms being angled relative to one another so as to pass around the inward scaffolding upright.
- the pair of second inclined portions of the stand-off arm are angled relative to the first substantially level portions so as to align with one another.
- the pair of second inclined portions of the stand-off arms are inclined so as to position a lower surface of each rest profile at a height which is higher than the point at which the temporary scaffolding apparatus connects to the portion of scaffolding upright by the connector.
- the connector is adapted to connect with a connection cup of a scaffolding upright.
- the connector comprises a hooked nose which engages with the connection cup of the scaffolding upright.
- the temporary scaffolding rest further comprises a securing clip positioned at or toward a lower end of the upright spacer bar and which provides an additional point of attachment between the temporary scaffolding rest and the scaffolding upright.
- the temporary scaffolding rest further comprises at least a pair of temporary scaffolding rests according to the invention, wherein the temporary scaffolding rests are positioned longitudinally apart from one another along a front portion of a scaffolding working zone so as to allow a either end of a scaffolding component to be temporarily rested upon a temporary scaffolding rest provided at either end thereof.
- a method of erecting a row of scaffolding which is higher than the row of scaffolding upon which an installer is positioned, the method comprising the steps of:- connecting a first temporary scaffolding rest according to the invention to a first upper scaffolding upright; connecting a second temporary scaffolding rest according to the invention a second upper scaffolding upright; attaching the pair of upper scaffolding uprights to a pair of lower scaffolding uprights longitudinally spaced apart from one another; raising a scaffolding component above the height of the installer and resting said scaffolding component upon the rests of the temporary scaffolding rest in a disconnected configuration at either end of the row of scaffolding for subsequent connection of said scaffolding component to said first and second upper scaffolding uprights; the installer ascending to the upper row of scaffolding; and the installer connecting both ends of the rested scaffolding component to the adjacent upper scaffolding uprights.
- Fig. 1A is a rear perspective illustration of a temporary scaffolding rest of the present invention
- Fig. 2A is a rear perspective illustration of a temporary scaffolding rest of the present invention where the scaffolding rest is attached to a connecting cup of a scaffolding upright at its upper end and to a scaffolding upright tubular at its lower end;
- Fig. 2B is a front perspective illustration of the temporary scaffolding rest of Fig. 2A
- Fig. 2C is a transverse illustration of the temporary scaffolding rest of Fig. 2 A;
- Fig. 3A is a rear perspective illustration of a temporary scaffolding rest of the present invention while temporarily supporting a scaffolding guardrail component on either side of the scaffolding upright ready for subsequent attachment of the guardrails to the connecting cup of the scaffolding upright;
- Fig. 3B is a front perspective illustration of the temporary scaffolding rest of Fig. 3A
- Fig. 3C is a transverse illustration of the temporary scaffolding rest of Fig. 3 A;
- Fig. 4A is a rear perspective illustration of a temporary scaffolding rest of the present invention where each of the guardrail components have been removed from their temporary location and attached to the connecting cup of the upright;
- Fig. 4B is a front perspective illustration of the temporary scaffolding rest of Fig. 4A
- Fig. 4C is a transverse illustration of the temporary scaffolding rest of Fig. 4A;
- Fig. 5A is a plan-view cross section of a connector of the temporary scaffolding rest abutted against a tubular of a scaffolding upright whilst connected to a connecting cup of the scaffolding upright.
- the stand-off arms are not illustrated in this drawing;
- Fig. 5C is a further view of the Fig. 5B arrangement with the stand-off arms illustrated;
- Fig. 5D is a further view of the Fig. 5A arrangement with the stand-off arms illustrated;
- Fig. 6A is a rear-view illustration of the stand-off arms in isolation
- Fig. 6B is plan-view illustration of the stand-off arms in isolation
- Fig. 7A is a rear-view illustration of alternatively shaped stand-off arms in isolation
- Fig. 7B is a plan-view illustration of the alternatively shaped stand-off arms in isolation
- Fig. 8 is an illustration of an installation arm for use with the temporary scaffolding rest of the invention.
- Fig. 9A is a rear -view illustration of the stand-off arms in isolation according to a second embodiment of the invention where return hooks are provided toward the distal ends of the stand-off arms;
- Fig. 9B is plan-view illustration of the stand-off arms of Fig. 9A.
- components of scaffolding When components of scaffolding are connected to one another they typically create a "wall” of scaffolding which (typically in conjunction with other structures and / or other walls of scaffolding) defines a protected working area, or work zone (such as a walking platform or other area) on an inner side of the scaffolding wall.
- the scaffolding wall therefore has an inner, or front, side (toward or adjacent the working area) and a rear, or outer, side (toward the opposite unprotected side of the scaffolding - normally at a raised height above the ground).
- a temporary scaffolding rest generally designated 10, comprises a hook shaped connector 12 attached at its rear to a pair of stand-off arms 14 and an upright spacer bar 16 which projects downwardly therefrom.
- the upright spacer bar 16 is provided with a lower stand off block 18 projecting inwardly therefrom and which in turn is provided with a securing clip 20 projecting inwardly therefrom.
- the hook shaped connector 12 comprises a pair of side plates each having a hook shaped nose section 22, an attachment key 24 positioned therebetween and a bridge support 26 which connects each end of the hook shaped nose section 22 to one another.
- the connector 12 allows secure engagement with the lip of a connecting cup 28 of a scaffolding upright 30 in a known attachment fashion.
- each of the stand-off arms 14 project outwardly from the rear of the connector 12 at approximately 90 degrees to one another at a first level portion 35 in order to pass around and clear of a tubular 32 of a scaffolding upright 30.
- the arms 14 then change direction at 34 such that they project inwardly and parallel to one another at a second inclined portion 36.
- the inclined portions 36 are inclined relative to the level portions 35 in order to raise the ends thereof above that of the level portions 35.
- the stand-off arms 14 are each provided with a U-shaped recess 38 toward their distal ends which form a rest for temporarily receiving a component of scaffolding therein, as will be described subsequently.
- the upright spacer bar 16 projects downwardly from the rear of the hook shaped connector 12 and is formed of a square cross section bar.
- the lower stand-off block 18 is attached to the lower end of the upright spacer bar 16.
- the block 18 comprises a rectangular cross section and projects perpendicularly inwards from the upright spacer bar.
- the securing clip 20 has a pair of prongs projecting from its base, the width, radius and mechanical resilience of which are selected during manufacture to ensure that the clip 20 may securely engage with a standard tubular of a scaffolding upright and be retained securely thereupon.
- an installation arm 40 comprises an elongated handle 42 which is provided with a storage hook 44 and an engagement prong 46.
- the purpose of the installation arm 40 will be described subsequently.
- the storage hook 44 may be used to temporarily hook the arm onto components of scaffolding at the lower level to facilitate efficient installation.
- an installer will typically first erect a lower row of scaffolding as a first step.
- This lower row of scaffolding will typically comprise a series of lower scaffolding uprights at the corners of each section thereof, and at standard positions there-along.
- the temporary scaffolding rest 10 is first secured onto an additional detached scaffolding upright 30.
- this is achieved by engaging the hook shaped connector 12 into the lip of the connecting cup 28 of the detached upright whilst simultaneously securing the lower end of the rest 10 by pushing the attachment clip 20 around the tubular 32 of the upright 30.
- the upright 30 may have several connecting cups 28 provided along its length in order to allow for connection of components thereto at a variety of different heights.
- the scaffolding upright 30 (with attached rest 10) is then attached to one of the lower scaffolding uprights in the normal way in an appropriate position in order to form a vertically extended resultant upright having a rest 10 positioned at height thereon. This process is repeated for several uprights in order that several of the rests 10 are positioned at height upon their respective extended resultant uprights (thereby awaiting subsequent placement of the upper row of scaffolding therebetween).
- the arms 14 of each rest 10 all project inwardly into the protected work zone of the scaffolding framework.
- Cross-bracing components may now be attached between the extended resultant uprights if desired in order to structurally strengthen the resultant framework.
- the installer may also choose to pre-attach other small components (such as short end-piece guardrails) to the uprights prior to raising them onto the lower uprights if desired.
- other small components such as short end-piece guardrails
- the installer While remaining positioned at the lower row of scaffolding, the installer then retrieves a full-length guardrail (or whichever other desired scaffolding component is to be attached at the upper row of scaffolding) and holds one end thereof. This enables him to raise the other end above his head height and easily place a rail of that guardrail at that other end into the U-shaped recess 38 of a rest 10 at one end of the scaffolding framework. No elongating tool is required for this step since the full length of the rail can instead be used by the installer "walking” his or hands down the rail during installation. The installer can then rest the lower end of the guardrail on the lower row and let go of the guardrail.
- the guardrail will be retained in that position (raised at one end and laterally offset from the upright 30) by the engagement between the rail and recess 38 of the rest 10. It will be appreciated by the reader that the recess 38 allows the rail to be rested there within at any point along the length of the rail and hence positioning of the rail does not need to be particularly accurate.
- the installer then retrieves the installation arm 40, raises the other lower end of the guardrail to his chest height and then inserts the engagement prong 46 into the lower end of a tubular (commonly provided) of the other, lower, guardrail end.
- the outer side of the hook 44 will abut against the tubular of the guardrail to prevent the arm 40 sliding all the way into the interior of the tubular.
- the installer then grips the elongated handle 42 which allows him to lift that end of the guardrail into an elevated position above his head height such that he may easily then place the other end of the rail into the U-shaped recess at the next rest 10 of the previously installed elongated uprights.
- the recess 38 allows the rail to be rested there within at any point along the length of the rail and hence positioning of the rail does not need to be particularly accurate.
- the raised guardrail is therefore temporarily supported as a section of standby scaffolding in the offset position which is dictated by the position of the U-shaped recesses 38 on the stand-off arms 14.
- This step is repeated until several standby guardrails are suspended in the elevated and offset (relative to the upstands 30) position at the next intended row of scaffolding by several of the rests 10.
- the process provides a partially pre-prepared row of standby disconnected scaffolding at the next row above that where the installers are positioned.
- the installer then installs walk boards or other standing support on the partially pre prepared upper level of scaffolding and climbs on to that upper level of scaffolding by way of a ladder or other structure. At this point, the installer is partly protected from falling by the previously positioned, temporarily suspended standby and disconnected guardrails. Now positioned on the upper row of scaffolding, the installer then simply lifts the end corners of each disconnected guardrail from their standby laterally offset and disconnected position and moves them laterally onto the attachment cups of the adjacent uprights and attaches them thereto in the normal way in an installed position until that row of guardrails is securely installed and erection of that row of scaffolding is complete.
- the installer then unclips each of the apparatus from the uprights and begins the process again for the next upper row of scaffolding.
- the user may nonetheless elect to still utilise more than one installer if required or desired; however, the features and advantages of the apparatus mean that this may no longer be mandatory.
- each of the stand-off arms 114 project outwardly from the rear of the connector at approximately 90 degrees to one another at a first level portion 135.
- the arms 114 then change direction at 134 such that they project inwardly and parallel to one another at a second level portion 136.
- the arms 114 then change direction again at 135 such that they are angled inwardly towards one another at a third inclined portion 137.
- This arrangement facilitates passage of the arms 114 around and clear of a tubular of a scaffolding upright.
- the arms 114 are each provided with a U-shaped recess 138 which forms a rest for temporarily receiving a component of scaffolding therein.
- each of the stand-off arms 214 project outwardly from the rear of the connector at approximately 90 degrees to one another at a first level portion 235.
- the arms 214 then change direction at 234 and project parallel with one another at an end portion 237.
- each cradled recess 238 forms a rest for temporarily receiving a cross bar or other portion of a component of scaffolding therein; however, the vertical column 241 and hooked portions 243 act to minimise the possibility of the guard rail cradled thereby from accidentally being knocked out or otherwise removed from engagement therewith.
- this further embodiment of the invention works in substantially the same way as previously described embodiments whilst simply requiring the installer to navigate the cross bar of the guardrail or other scaffolding component past the hooked portion 243 and into the cradled recess 238 during placement of the upper portion of guardrail into the temporary offset and disconnected position.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Abstract
Description
Claims
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB201913618A GB201913618D0 (en) | 2019-09-20 | 2019-09-20 | Temporary Scaffolding Rest |
GBGB2001119.3A GB202001119D0 (en) | 2020-01-27 | 2020-01-27 | Temporary scaffolding rest |
PCT/GB2020/052277 WO2021053358A1 (en) | 2019-09-20 | 2020-09-21 | Temporary scaffolding rest |
Publications (1)
Publication Number | Publication Date |
---|---|
EP4031725A1 true EP4031725A1 (en) | 2022-07-27 |
Family
ID=72644493
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20780311.5A Pending EP4031725A1 (en) | 2019-09-20 | 2020-09-21 | Temporary scaffolding rest |
Country Status (4)
Country | Link |
---|---|
US (1) | US12084876B2 (en) |
EP (1) | EP4031725A1 (en) |
GB (1) | GB2589448B (en) |
WO (1) | WO2021053358A1 (en) |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1171126A (en) * | 1966-06-11 | 1969-11-19 | Burton Delingpole & Company Lt | Improvements in or relating to Scaffolding Clamps |
EP0995860A1 (en) * | 1998-05-08 | 2000-04-26 | ULMA C y E, S. COOP. | New process for mounting handrails in scaffolds |
ES2203270B1 (en) * | 2001-02-14 | 2005-02-16 | Ingenieria De Encofrados Y Servicios, S.L. | PERFECTION IN ANDAMIOS DE FACHADA. |
DE10243356B4 (en) * | 2002-07-22 | 2007-03-22 | Peri Gmbh | Dismountable scaffolding |
JP2005188275A (en) * | 2003-12-02 | 2005-07-14 | Sugikou:Kk | Preceding handrail for temporary scaffold |
EP1724414B1 (en) * | 2005-05-18 | 2016-02-03 | Combisafe International Ab | Temporary safety barrier system |
GB0614108D0 (en) * | 2006-07-15 | 2006-08-23 | Combisafe Int Ab | Scaffolding system |
GB2500025B (en) * | 2012-03-07 | 2019-02-13 | Turner Access Ltd | Scaffolding |
GB2503675B (en) * | 2012-07-03 | 2015-04-15 | Carl O'fee | Brackets |
GB2533033A (en) | 2014-10-27 | 2016-06-08 | Steelhoard Ltd | Safety panel for scaffolding and method of installation |
FR3031539B1 (en) * | 2015-01-08 | 2018-01-12 | Tubesca-Comabi | RETRACTABLE DEPORT ASSEMBLY FOR FACADE SCAFFOLDING |
NL2020375B1 (en) * | 2018-02-02 | 2019-08-12 | Brand Infrastructure Services B V | Scaffolding, coupling device and method for erecting a scaffolding |
DE102019002077A1 (en) * | 2019-03-25 | 2020-10-01 | Wilhelm Layher Verwaltungs-Gmbh | Railing device, namely leading railing for a scaffold |
DE102019002078A1 (en) * | 2019-03-25 | 2020-10-01 | Wilhelm Layher Verwaltungs-Gmbh | Guardrail post for a leading guardrail for a scaffold, scaffolding with a leading guardrail and method for moving a leading guardrail on a scaffold |
DE102019002287A1 (en) * | 2019-03-29 | 2020-10-01 | Wilhelm Layher Verwaltungs-Gmbh | Railing device, namely leading railing for a scaffold and method for assembling a railing device |
DE102019114913A1 (en) * | 2019-06-04 | 2020-12-10 | Manfred Rolle | Mounting adapters, safety railings, kit for a scaffolding and scaffolding and methods therefor |
-
2020
- 2020-09-21 GB GB2014820.1A patent/GB2589448B/en active Active
- 2020-09-21 US US17/761,923 patent/US12084876B2/en active Active
- 2020-09-21 EP EP20780311.5A patent/EP4031725A1/en active Pending
- 2020-09-21 WO PCT/GB2020/052277 patent/WO2021053358A1/en unknown
Also Published As
Publication number | Publication date |
---|---|
US12084876B2 (en) | 2024-09-10 |
WO2021053358A1 (en) | 2021-03-25 |
GB2589448B (en) | 2024-02-28 |
GB202014820D0 (en) | 2020-11-04 |
GB2589448A (en) | 2021-06-02 |
US20220372773A1 (en) | 2022-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU723378B2 (en) | Dismantable facade scaffold | |
RU2400609C2 (en) | Complex system of accident prevention support in construction | |
US5145030A (en) | Guard rail post | |
US4782914A (en) | Safety guard rail for scaffolding | |
AU2010346421B2 (en) | Scaffold and methods for installing or removing such a scaffold | |
US7909138B2 (en) | Ladder security bracket and safety system | |
EP1233122B1 (en) | Facade scaffolding | |
US9617747B2 (en) | Folding guard rail method and apparatus | |
US7735606B1 (en) | Scaffold support platform | |
US20060213722A1 (en) | Adjustable Wall Mounted Walkway with Optional Handrail Attachment | |
US7137478B2 (en) | Ladder safety cage | |
US20100032235A1 (en) | Safety arrangement for use in constructing a wood frame building | |
GB2533033A (en) | Safety panel for scaffolding and method of installation | |
US12084876B2 (en) | Temporary scaffolding rest | |
US6006862A (en) | Temporary guard rail assembly for scaffolding | |
US6015028A (en) | Pump jack hoisting apparatus including a safety railing for protecting workers from accidental falling | |
EP1978180A2 (en) | Simplified scaffolding tower | |
US20050061582A1 (en) | Movable and repositionable safety guard rails for scaffolding | |
US20040200668A1 (en) | Scaffolding system | |
GB2477812A (en) | Scaffolding tool for attaching handrail | |
US20060196724A1 (en) | Ladder bracket | |
JP2001107552A (en) | Temporary scaffold with safety handrail, and safety handrail provided on temporary scaffold | |
AU2008229925B2 (en) | A Scaffolding Arrangement and Method of Assembly | |
EP1876315A1 (en) | Integral safety system which can be used for construction | |
US20120285769A1 (en) | Scaffolding arrangement and method of assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20220324 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: WOTHERSPOON, ANDREW |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20230508 |