EP3964647B1 - Tool for dismounting travellers for concreting large arches of viaducts - Google Patents

Tool for dismounting travellers for concreting large arches of viaducts Download PDF

Info

Publication number
EP3964647B1
EP3964647B1 EP19926748.5A EP19926748A EP3964647B1 EP 3964647 B1 EP3964647 B1 EP 3964647B1 EP 19926748 A EP19926748 A EP 19926748A EP 3964647 B1 EP3964647 B1 EP 3964647B1
Authority
EP
European Patent Office
Prior art keywords
tool
concreting
viaducts
carriages
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP19926748.5A
Other languages
German (de)
French (fr)
Other versions
EP3964647A4 (en
EP3964647A1 (en
Inventor
David CASTUERA PINTO
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Grupo Empresarial Tecozam Sl
Original Assignee
Gestion Y Actividades Secozam Sl
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gestion Y Actividades Secozam Sl filed Critical Gestion Y Actividades Secozam Sl
Publication of EP3964647A1 publication Critical patent/EP3964647A1/en
Publication of EP3964647A4 publication Critical patent/EP3964647A4/en
Application granted granted Critical
Publication of EP3964647B1 publication Critical patent/EP3964647B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C19/00Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges

Definitions

  • the present invention refers to a tool for removing the concreting carriages for large viaduct arches, which can be used in the construction of these civil engineering structures.
  • KR 2010 0033632 A discloses the preamble of independent claim 1.
  • the tool for removing the concreting carriages for large viaduct arches of the invention has a configuration that allows it to be dismantled and removed from the deck of the viaduct itself once it is built, with the participation of other conventional auxiliary means (cranes) at a reduced cost.
  • the tool consists of:
  • the tool will also include its own means of propulsion or means of coupling to a towing vehicle. But in addition, it has been found to have the following advantages:
  • the tool of the invention (1) for removing the carriages (2) for concreting the large arches (30) of viaducts (3) is used for removing carriages (2) of the type used for concreting the viaduct (3) (see figs 1 and 2 ), and according to the invention it consists of (see fig 3 ):
  • the running gear (5) includes brakes to completely immobilise it during the lowering and sling (8) lengthening stages, in order to avoid accidents.
  • the running gear (5) will ideally comprise bogies (50) arranged under the cross member (6) to move along rails (33) arranged on the deck (31) of the viaduct (3), it is preferred that the brakes consist of blocks, not shown, arranged under said bogies (50) and clamps for fixing said blocks to the rails (33).
  • the cross member (6) consists of two 18 metre long HEB600 beams (60) separated by 0.900 m, and with transverse ties with diagonals (61) that tie the upper and lower parts together with a maximum spacing of 2.00 m, with the HEB600 beams connected perpendicularly and at the bottom by two 3.00 m reinforced HEB300 beams (62), 6.415 m apart, with two bogies (50), positioned underneath the HEB300 beams, with two wheels 2.65 m apart.
  • Each suspension bridge (7) consists of two movable lateral sectors (70) (see detail of fig 3 ), each of which has a half-cradle (71) to accommodate the end of a pin (72), from which the corresponding lateral sling (8) is suspended (the sectors (70) being movable to allow their separation and to allow the clevis, not shown, of the union between the pin (72) and the sling (8)), and consisting of a safety link between both sectors (70) to prevent their accidental separation.
  • These safety links ideally consist of couplings (66) linked to opposing lugs (67).
  • the tool (1) may be supplemented by means of removable lateral spacers (20) for said carriages (2) of length greater than the distance from the carriage to the corresponding edge of the deck (31) and which is provided with anchors (80) (see fig 5 ) for the slings (8), to prevent the slings from touching the deck (31) of the viaduct.
  • the supplementary spacers (20) consist of beams (81), eccentric with respect to their connection with the carriage, at whose ends two anchors (80) are arranged for two end brackets (85) of each sling (8).
  • the tool (1) in this specific embodiment also includes a hitch (77) to a towing vehicle.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Description

    OBJECT OF THE INVENTION
  • The present invention refers to a tool for removing the concreting carriages for large viaduct arches, which can be used in the construction of these civil engineering structures.
  • BACKGROUND TO THE INVENTION
  • In civil engineering works, for the construction of certain arched viaducts, concreting carriages are used that move along the bottom and side of each arch as it is manufactured as an auxiliary tool to, for example, carry the formwork, which is used in the manufacture in concrete of the arches, and for the assembly and disassembly of all their associated elements. KR 2010 0033632 A discloses the preamble of independent claim 1.
  • These carriages are easy to position at the start of the work on the arch, since they are generally at ground level, but once the arch is finished, removing them is a significant logistical problem, due to the great working heights, which, in many cases, are impossible to reach with cranes from below.
  • This problem is solved with the tool of this invention.
  • DESCRIPTION OF THE INVENTION
  • The tool for removing the concreting carriages for large viaduct arches of the invention has a configuration that allows it to be dismantled and removed from the deck of the viaduct itself once it is built, with the participation of other conventional auxiliary means (cranes) at a reduced cost.
  • According to the invention the tool consists of:
    • running gear to move along the deck of the viaduct in order to move the carriage to one of the ends of the arch as it descends from it,
    • a cross member mounted on that running gear, perpendicular to the deck and of a length greater than the width of that deck such that it projects on both sides,
    • some suspension bridges with lateral slings, arranged on both sides of the cross member and therefore on both sides of the deck and outside of it, and
    • the slings (cables and/or chains), which are fixed to said suspension bridges, wherein each suspension bridge consisting of two movable lateral sectors, each of which is provided with a half-cradle to accommodate the end of a pin, from which the corresponding lateral sling is suspended, all this in order to suspend the carriage by lowering it using the slings to different heights, lower each time, and to be able to transport it by means of the running gear to one of the ends of the arch, where it will reach a point where it can be carried from below. In order to be able to position the carriage at different heights, it is necessary to use some means of lowering it, for example, a pair of cranes, each of which will take a side sling and lower it in synchronisation with the other.
  • The tool will also include its own means of propulsion or means of coupling to a towing vehicle. But in addition, it has been found to have the following advantages:
    • It eliminates the need to use marine means (barges) on which to deposit the load, once lowered from its position by means of Heavy Lifting equipment or self-propelled cranes (high costs, complicated logistics in interior works - rivers or dams -, low availability of barges, etc.).
    • Eliminates the need to use high tonnage crawler cranes for moving the suspended load, so marine methods can be avoided (high cost of transport and assembly of the cranes and low availability of crawler cranes, etc.).
    • It provides an option to lower the load to accessible areas in complex ravines, without the need to prepare access routes to the equipment's vertical descent points.
    BRIEF DESCRIPTION OF THE DRAWINGS
    • Figures 1A, 1B and 1C show a side view of a sequence for use of the tool of the invention, with a first stage shown in fig. 1A, of unhooking the carriage using two cranes that handle the lateral slings, a second stage shown in figure 1B in which the carriage is moved laterally using the movement of the running gear and a third stage shown in fig. 1C in which the slings are lengthened to lower the carriage so that the lateral movement can be continued towards the start of the arch and the carriage can then be removed.
    • Figures 2A, 2B and 2C show the sequence of Figures 1A, 1B and 1C but in a perspective view.
    • Figure 3 shows a detailed view of the tool of the invention in a perspective view with an enlarged view of a side area of the cross member so that the corresponding suspension bridge can be appreciated.
    • Figure 4 shows an elevation view of the tool of the invention.
    • Figure 5 shows a side view of the tool of the invention.
    DESCRIPTION OF A PRACTICAL IMPLEMENTATION OF THE INVENTION
  • The tool of the invention (1) for removing the carriages (2) for concreting the large arches (30) of viaducts (3) is used for removing carriages (2) of the type used for concreting the viaduct (3) (see figs 1 and 2), and according to the invention it consists of (see fig 3):
    • running gear (5) to move along the deck (31) of the viaduct (3) in order to move the carriage (2) to one end of the arch (30) as it is lowered,
    • a cross member (6) mounted on that running gear (5), perpendicular to the deck (31), and with a length greater than the width of the deck (31) so as to project on both sides,
    • some bridges for suspending (7) (see detail of fig 3) some lateral slings (8), arranged on both sides of the cross member (6) and on both sides of the deck (31) and outside of it, and
    • the slings (8) (cables and/or chains), which are fixed to those suspending bridges (7), wherein each suspension bridge consisting of two movable lateral sectors, each of which is provided with a half-cradle to accommodate the end of a pin, from which the corresponding lateral sling is suspended.
  • With this, it is possible to suspend the trolley (2) by lowering it using the slings (8) to different heights, lower each time, and to move it by means of the running gear (5) towards one end of the arch (30) with the assistance of some means of lowering, which, in this example, is a pair of cranes (100) (see figs 1A, 1B, 1C), each of which will hold one side sling (8) and lower it simultaneously with the others in as many lowering-sideways movement steps as are necessary, depending on the length of the slings (8).
  • It has been envisaged that the running gear (5) includes brakes to completely immobilise it during the lowering and sling (8) lengthening stages, in order to avoid accidents. As the running gear (5) will ideally comprise bogies (50) arranged under the cross member (6) to move along rails (33) arranged on the deck (31) of the viaduct (3), it is preferred that the brakes consist of blocks, not shown, arranged under said bogies (50) and clamps for fixing said blocks to the rails (33).
  • For a specific embodiment where the carriage weighs 50 tons and the width of the viaduct deck (31) is 15 metres wide, it is preferable (see fig 3) that the cross member (6) consists of two 18 metre long HEB600 beams (60) separated by 0.900 m, and with transverse ties with diagonals (61) that tie the upper and lower parts together with a maximum spacing of 2.00 m, with the HEB600 beams connected perpendicularly and at the bottom by two 3.00 m reinforced HEB300 beams (62), 6.415 m apart, with two bogies (50), positioned underneath the HEB300 beams, with two wheels 2.65 m apart.
  • Each suspension bridge (7) consists of two movable lateral sectors (70) (see detail of fig 3), each of which has a half-cradle (71) to accommodate the end of a pin (72), from which the corresponding lateral sling (8) is suspended (the sectors (70) being movable to allow their separation and to allow the clevis, not shown, of the union between the pin (72) and the sling (8)), and consisting of a safety link between both sectors (70) to prevent their accidental separation. These safety links ideally consist of couplings (66) linked to opposing lugs (67).
  • The provision of some work platforms (74) with their corresponding guardrails (75) and ladders (76) on the cross member (6), around or next to the suspension bridges (7) so that the operators can tie the slings to pins, extend the slings, etc.
  • If the carriage (2) is smaller than the deck (31) (see figs 3 to 5), the tool (1) may be supplemented by means of removable lateral spacers (20) for said carriages (2) of length greater than the distance from the carriage to the corresponding edge of the deck (31) and which is provided with anchors (80) (see fig 5) for the slings (8), to prevent the slings from touching the deck (31) of the viaduct. In the specific example shown in the figures, the supplementary spacers (20) consist of beams (81), eccentric with respect to their connection with the carriage, at whose ends two anchors (80) are arranged for two end brackets (85) of each sling (8).
  • The tool (1) in this specific embodiment also includes a hitch (77) to a towing vehicle.
  • Having sufficiently described the nature of the invention, as well as how it functions in practice, it must be stated that the provisions set out above and shown in the accompanying figures may be changed in some details as long as these do not alter the fundamental principle.

Claims (11)

  1. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3), the type of carriage (2) that is used for concreting the viaduct and that consist of:
    - running gear (5) to move along the viaduct (3) deck (31) in order to move the carriage (2) to one end of the arch (30) as it is lowered,
    - a cross member (6) mounted on that running gear (5), perpendicular to the deck (31), and with a length greater than the width of the deck (31) so as to project on both sides,
    - some bridges for suspending (7) some lateral slings (8), arranged on both sides of the cross member (6) and on both sides of the deck (31) and outside it, and
    - the slings (8), which are fixed to said suspension bridges (7); characterised by each suspension bridge (7) consisting of two movable lateral sectors (70), each of which is provided with a half-cradle (71) to accommodate the end of a pin (72), from which the corresponding lateral sling (8) is suspended.
  2. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to claim 1 characterised by it including a safety link between the movable lateral sectors (70) of the suspension bridges (7) to prevent their accidental separation.
  3. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to claim 2 characterised by the safety link consisting of couplings (66) linked to opposing lugs (67)
  4. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to any of the preceding claims characterised by the running gear (5) including brakes.
  5. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to any of the preceding claims characterised by the running gear (5) including bogies (50) arranged under the cross member (6) that move along rails (33) arranged on the deck (31) of the viaduct (3).
  6. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to claim 5 characterised by the brakes consisting of blocks arranged under the bogies (50) and clamps for fixing said blocks to the rails (33).
  7. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to any of claims 5 or 6 characterised by the cross member (6) consisting of two HEB600 beams (60) of 18 metres in length 0.900 m apart, and with transverse ties with diagonals (61) that tie the upper and lower parts together with a maximum spacing of 2.00 metres, with the HEB600 beams being connected perpendicularly and at the bottom by two 3.00 metre reinforced HEB300 beams (62), 6.415 metres apart, with two bogies (50), positioned underneath the HEB300 beams, with two wheels 2.65 m apart.
  8. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to any of the preceding claims characterised by including work platforms (74) arranged on the cross member (6), around or next to the suspension bridges (7).
  9. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to any of the preceding claims characterised by including some removable lateral spacers (20) for the carriages (2), longer than the distance from the carriage to the corresponding edge of the deck (31) and provided with anchors (80) for the slings (8), to prevent the slings touching the deck (31) of the viaduct.
  10. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to claim 9 characterised by the supplementary spacers (20) consisting of beams (81) eccentric with respect to their connection with the carriage, at the ends of which two anchors (80) are arranged for two end brackets (85) of each sling (8).
  11. Tool (1) for removing carriages (2) used for concreting the large arches (30) of viaducts (3) according to any of the preceding claims characterised by including a hitch (77) to a towing vehicle.
EP19926748.5A 2019-04-29 2019-04-29 Tool for dismounting travellers for concreting large arches of viaducts Active EP3964647B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/ES2019/070288 WO2020221944A1 (en) 2019-04-29 2019-04-29 Tool for dismounting travellers for concreting large arches of viaducts

Publications (3)

Publication Number Publication Date
EP3964647A1 EP3964647A1 (en) 2022-03-09
EP3964647A4 EP3964647A4 (en) 2023-04-26
EP3964647B1 true EP3964647B1 (en) 2024-05-01

Family

ID=73029693

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19926748.5A Active EP3964647B1 (en) 2019-04-29 2019-04-29 Tool for dismounting travellers for concreting large arches of viaducts

Country Status (3)

Country Link
EP (1) EP3964647B1 (en)
PT (1) PT3964647T (en)
WO (1) WO2020221944A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114561878B (en) * 2022-04-18 2023-09-05 中交路桥建设有限公司 Arch rib lateral balance swivel construction method
CN116791491B (en) * 2023-08-28 2023-11-21 湖南路桥建设集团有限责任公司 Continuous rigid frame bridge box girder hanging basket suspension casting device and suspension casting process

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101028868B1 (en) * 2008-09-22 2011-04-12 진성토건 주식회사 Lifting and moving apparatus temporary structure end segment of bridge and end segment for bridge structure method using the same
KR101259031B1 (en) * 2012-10-16 2013-04-29 컨텍이앤씨 주식회사 Form traveller having transversal frame, and launching method for the same
US8671490B1 (en) * 2013-03-06 2014-03-18 Mark Carney Bridge span replacement system
KR101657994B1 (en) * 2014-05-22 2016-09-20 김남열 Form traveler, and bridge construction method for using the same
KR101562290B1 (en) * 2015-01-28 2015-10-21 주식회사 한국교량 Form traveller with supporting point reaction control device and vertical member and bridge construction method

Also Published As

Publication number Publication date
EP3964647A4 (en) 2023-04-26
PT3964647T (en) 2024-08-07
WO2020221944A1 (en) 2020-11-05
EP3964647A1 (en) 2022-03-09

Similar Documents

Publication Publication Date Title
US20220333320A1 (en) Method for removal of temporary support system for road bridge pre-fabricated small box girder-type concealed bent cap, and equipment therefor
US5511268A (en) Construction of large structures by robotic crane placement of modular bridge sections
JP7568805B2 (en) Method for moving heavy objects using a heavy object moving device and a heavy object moving device
CN102182147B (en) Steel box girder erection method
WO1996005375A9 (en) Construction of large structures by robotic crane placement of modular bridge sections
EP3964647B1 (en) Tool for dismounting travellers for concreting large arches of viaducts
JP6533109B2 (en) Bridge demolition method
CN106087768B (en) A kind of method of the assembled mobile formwork in the narrow short transition time section of bridge tunnel
JP2014015808A (en) Method for constructing scaffold for rebuilding construction of bridge, and apparatus for constructing scaffold for construction
CN107201719B (en) Viaduct anti-collision wall template hoisting transfer machine and anti-collision wall construction method
JP5890060B1 (en) Bridge dismantling method using erection girder
JP6876573B2 (en) Suspended scaffolding device
CN115305835A (en) Construction method for erecting double-section whole-section steel truss girder by using girder erection crane
CN105019357A (en) Method for mounting specially-shaped precast bridge decks on open lattice steel beams of arched bridge
JP2006028881A (en) Self-propelled pc floor slab erecting machine and pc floor slab erecting method
JP5918056B2 (en) Bridge erection method
CN112921838B (en) Method for dismantling suspension line non-hinge rib arch bridge
CN106480825A (en) Railway nonstandard Beams Erection Construction engineering method
CN113026528A (en) Method for mounting mountain forest space curve steel structure plank road
CN109537466B (en) Positioning method for suspending steel structure beam in air
JP6672545B2 (en) Removal member removal method and member replacement method
KR200363059Y1 (en) Upper bridge structure construcion system with precast segment deck or box using a lifting traveller
CN213202204U (en) Overhead hoist is demolishd to real abdomen section limit case of truss-like combination arched bridge
JP7107862B2 (en) Bridge construction method
JP2023000184A (en) Mobile protective device and method for dismantling construction scaffold

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20211028

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RIN1 Information on inventor provided before grant (corrected)

Inventor name: CASTUERA PINTO, DAVID

A4 Supplementary search report drawn up and despatched

Effective date: 20230323

RIC1 Information provided on ipc code assigned before grant

Ipc: B66C 19/00 20060101ALI20230317BHEP

Ipc: E01D 21/00 20060101AFI20230317BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20240111

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602019051751

Country of ref document: DE

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Ref document number: 3964647

Country of ref document: PT

Date of ref document: 20240807

Kind code of ref document: T

Free format text: AVAILABILITY OF NATIONAL TRANSLATION

Effective date: 20240731

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: GRUPO EMPRESARIAL TECOZAM SL

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20240501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240901

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240501

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240802

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1682498

Country of ref document: AT

Kind code of ref document: T

Effective date: 20240501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20240501