EP3939896A1 - Functional module for bringing to a dosing station positioned in a processing chamber of a containment and method for same - Google Patents

Functional module for bringing to a dosing station positioned in a processing chamber of a containment and method for same Download PDF

Info

Publication number
EP3939896A1
EP3939896A1 EP20405021.5A EP20405021A EP3939896A1 EP 3939896 A1 EP3939896 A1 EP 3939896A1 EP 20405021 A EP20405021 A EP 20405021A EP 3939896 A1 EP3939896 A1 EP 3939896A1
Authority
EP
European Patent Office
Prior art keywords
element carrier
functional module
functional elements
transfer
medium lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
EP20405021.5A
Other languages
German (de)
French (fr)
Inventor
Matteo Giuliani
Andrea Roncarà
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pharma Integration SRL
Original Assignee
Pharma Integration SRL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pharma Integration SRL filed Critical Pharma Integration SRL
Priority to EP20405021.5A priority Critical patent/EP3939896A1/en
Priority to CA3186113A priority patent/CA3186113A1/en
Priority to US18/014,460 priority patent/US20230257148A1/en
Priority to PCT/IB2021/056440 priority patent/WO2022013830A1/en
Priority to CN202180061065.5A priority patent/CN116234753A/en
Priority to JP2023501637A priority patent/JP2023534219A/en
Priority to KR1020237005381A priority patent/KR20230038565A/en
Publication of EP3939896A1 publication Critical patent/EP3939896A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B55/00Preserving, protecting or purifying packages or package contents in association with packaging
    • B65B55/02Sterilising, e.g. of complete packages
    • B65B55/027Packaging in aseptic chambers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B3/00Packaging plastic material, semiliquids, liquids or mixed solids and liquids, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B3/003Filling medical containers such as ampoules, vials, syringes or the like
    • B65B3/006Related operations, e.g. scoring ampoules
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B55/00Preserving, protecting or purifying packages or package contents in association with packaging
    • B65B55/02Sterilising, e.g. of complete packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B3/00Packaging plastic material, semiliquids, liquids or mixed solids and liquids, in individual containers or receptacles, e.g. bags, sacks, boxes, cartons, cans, or jars
    • B65B3/003Filling medical containers such as ampoules, vials, syringes or the like

Definitions

  • the invention relates to a functional module for leading to a dosing station positioned in a process space of a containment and is provided there for the aseptic filling of vessels with a liquid.
  • the containment is intended for placement in an installation room, with the containment and process room being enclosed in a housing.
  • the functional module comprises an element carrier, functional elements intended for installation on the element carrier and medium lines intended for connection to the functional elements.
  • the subject matter of the invention is a method for bringing the conceived functional module to the dosing station.
  • the invention is based on the object of at least reducing manual activities in the process room and thereby making the workflow more efficient in terms of time expenditure, less error-prone, higher quality and with little outlay on equipment.
  • a special device has to be developed and a method using the device has to be proposed.
  • the designed functional module is intended for the introduction to a dosing station positioned in a process room of a containment and there for the aseptic filling of vessels with a liquid.
  • the containment is intended for placement in an installation room, with the containment and process room being enclosed in a housing.
  • the functional module includes an element carrier, functional elements that are intended for installation on the element carrier, and medium lines that are connected to the functional elements.
  • the assembly as an assembly, consisting of element carrier, functional elements accommodated by this and medium lines connected to it, can be moved from a retracted initial position through a transfer port leading into the process space into an extended working position at the dosing station.
  • the function module is used for the aseptic filling of a plurality of vessels, which are combined in a container, with a pharmacological or toxic liquid.
  • a pharmacological or toxic liquid When handling liquids that are sensitive to oxygen, they are overlaid with an inert gas, e.g. nitrogen.
  • the containment housing has a rear wall that delimits the process space as a component.
  • the transfer port is formed by an opening provided in a molding of a flanged joint installed in the back panel.
  • the function module is installed at the transfer port in such a way that it protrudes into a transfer cell adjacent to the process room and can extend into the installation room, or the function module extends completely freely into the installation room.
  • the external connection or the external connections and an actuator for moving the assembly consisting of an element carrier with a front piece, functional elements accommodated by the element carrier and medium lines connected to them, are accessible from the installation room.
  • the transfer cell can be open to the installation room, e.g. due to a wall opening in the outer wall.
  • the assembled subassembly comprising the element carrier, the functional elements held by it and the medium lines connected to it, is in the transfer cell, and a front piece sitting at the forefront on the element carrier is positioned in the transfer port.
  • this assembled assembly is guided like a sled or supported and moved out of the transfer cell to the dosing station until the end piece on the rear of the element carrier hits the transfer port.
  • the assembly is moved out into the working position by pushing it out from the transfer cell or by pulling it out from the process room, e.g. by means of a robot installed in the process room.
  • the functional module according to the invention is described in detail below in two different versions and as a method of the assembly process, the preparation of operational readiness and the use of the functional module.
  • the containment 9 surrounded by a housing 90 here in the form of an isolator standing in the installation room 8 , is shown in its basic structure for the purpose of explaining the internal division of space, the existing walls and the equipment.
  • a transparent pane 911 is usually seated in the front wall 910 , while an interchangeable unit 95 is inserted in the rear wall 912 .
  • the housing 90 further includes the upper roof surface 91 , the lower floor surface 92 , the rear outer wall 900 with the transfer fitting 903 installed therein and the first and second side surfaces 916 , 918 , which together with the front and rear walls 910 , 912 the containment 9 demarcate to the outside.
  • the passage 917 on the inlet side is located in the first side surface 916 , while the second side surface 916 has the passage 919 on the outlet side.
  • the porch 913 extends into the installation space 8, as well as an inclined, downward-sloping intermediate floor 914 towards the lowest area of the rear wall 912 .
  • the horizontal space divider 915 runs from the upper section of the front wall 910 to the rear wall 912 and from there each horizontally, the upper cell wall 901 and the lower cell wall 902 to the rear outer wall 900 .
  • the front area 94 and the rear area 99 are thus formed by the housing 90 and existing walls.
  • the front area 94 is structured into the roof space 98 divided above the space divider 915 , the floor space 97 present below the intermediate floor 914 , and the process space 93 located between the roof space 98 and the floor space 97 .
  • the transfer cell 96 is formed in the rear space 99 between the upper cell wall 901 and the lower cell wall 902 .
  • a transfer fitting 903 advantageously designed as a rapid transfer port (RTP), in the rear outer wall 900 serves to introduce pre-sterilized components into the transfer cell 96 in a protected manner.
  • glove ports 905 are provided, usually in pairs, to perform 96 activities while maintaining the sterile atmosphere in the transfer cell.
  • the equipment of the containment 9 includes a dosing station 3 set up in the process space 93 to which the functional module 2 - here in the first version - is brought from the transfer cell 96 through a transfer port 260 into the working position.
  • the first version of the function module 2 is the subject of the sequence of figures 1A to 5, after their detailed description the practical assembly process and the application of the device are explained.
  • a flange connection 20 installed in a recess in the exchange unit 95 has the transfer port 260 .
  • the function module 2 is fixed but installed on the flange connection 20 so that it can be extended.
  • An essential part of the function module 2 is the element carrier 23 .
  • a robot 1 has the manipulation element 12 guided by its pivotable arm 11 , for example in the form of a gripper.
  • the robot 1 can advantageously be anchored with its foot 10 below the exchangeable unit 95 on the rear wall 912 .
  • this pair of figures illustrates the functional module 2 previously assembled without being equipped with the functional elements 230 and without connected medium lines 231 , which extends out of the transfer port 260 into the process space 93 has approached the dosing station 3 .
  • the front piece 24 fixed to the element carrier 23 is moved forward in the process space 93 and the end piece 25 fills the transfer port 260 , at least partially sealing it.
  • the cover ring 26 rests against the exchange unit 95 on the side of the process space 93 .
  • the assembled functional module 2 can now be seen equipped with the functional elements 230 , but still without the medium lines 231 connected .
  • the medium lines 231 are now also connected to it, specifically in each case directly at the junction with the functional elements 230 .
  • the functional module 2 is in the real working position, ie pulled out of the transfer port 260 into the process chamber 93 at the dosing station 3 and standing with the end piece 25 in the transfer port 260 and at least partially sealing it.
  • the function module 2 according to the second version - currently in the retracted initial position - is not permanently installed on the flange connection 20 , in contrast to the first version , but can be pushed into this dock through wall opening 904 to flanged joint 20 with access through its open transfer port 260.
  • the functional module 2 has a container 28 that is sealed off from the outside, in whose sterile interior 29 the completely equipped element carrier 23 is accommodated in the retracted initial position, pre-sterilized. In the container 28 there is a passage 280 which is closed almost automatically in the initial position and through which the equipped element carrier 23 can be moved out into the extended working position.
  • the element carrier 23 fitted with the functional elements 230 rests in the container 28 and is therefore not at the dosing station 3 .
  • the front piece 24 closes the passage 280 in a gas-tight manner.
  • the excess length of the medium lines 231 connected to the functional elements 230 lie in the interior 29 of the container 28 and lead to the connection 232 .
  • a medium line 231 exiting from the connection 232 could advantageously be divided into the individual functional elements 230 by branching.
  • a separate medium line 231 with excess length to a respective connection 232 will preferably extend to each functional element 230 .
  • the feed part 286 is driven, which means that the front piece 24 is gradually removed from the passage 280 and at the same time the element carrier 23, together with its equipment, moves out of the container 28 , into the processing space 93 , up to the extended working position the dosing station 3 approach.
  • the end piece 25 abuts inside the container 28 in its front area.
  • the previously existing excess length of the medium line 231 is stretched.
  • the liquid to be processed at the dosing station 3 is fed from the outside to the connection 232 , conveyed into the medium line 231 and via it into the functional elements 230 .
  • vessels to be filled are advantageously transported to the dosing station 3 with the manipulation element 12 of the robot 1 .
  • the vials are filled, for example with a pharmacological liquid, by means of the functional elements 230 , which are now also in the dosing station 3 and are held by the element carrier 23 .
  • the cannula-like functional elements 230 dip into the vials, which are open at the top.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Apparatus For Disinfection Or Sterilisation (AREA)
  • Basic Packing Technique (AREA)
  • External Artificial Organs (AREA)
  • Manipulator (AREA)

Abstract

Das konzipierte Funktionsmodul (2) ist zum Heranführen an eine in einem Prozessraum (93) eines Containments (9) positionierte Dosierstation (3) und dort zum aseptischen Befüllen von Gefässen mit einer Flüssigkeit bestimmt. Das Containment (9) ist zur Platzierung in einem Aufstellraum (8) vorgesehen, wobei Containment (9) und Prozessraum (93) von einem Gehäuse (90) umschlossen sind. Das Funktionsmodul (2) umfasst einen Elementeträger (23), Funktionselemente (230), die zur Installation am Elementeträger (23) bestimmt sind, und Mediumsleitungen (231), welche an die Funktionselemente (230) angeschlossen werden. Der Zusammenbau als Baugruppe, bestehend aus Elementeträger (23), von diesem aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), ist aus einer eingefahrenen Ausgangsstellung durch ein in den Prozessraum (93) führenden Transferport (260) in eine ausgefahrene Arbeitsstellung an die Dosierstation (3) bewegbar. Das Funktionsmodul (2) dient dem aseptischen Befüllen einer Mehrzahl von Gefässen, die in einem Gebinde zusammengefasst sind, mit einer pharmakologischen oder toxischen Flüssigkeit. In einer zweiten Ausführungsform weist das Funktionsmodul (2) ein gasdichtes Behältnis (28) mit-einem sterilisierten Innenraum (29) auf, in dem eine montierte und sterilisierte Baugruppe, bestehend aus dem Elementeträger (23), von diesem aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), untergebracht ist. Schliesslich wird ein Verfahren zum Heranführen des Funktionsmoduls (2) an die im Prozessraum (93) positionierte Dosierstation (3) vorgeschlagen.The designed functional module (2) is intended to be brought to a dosing station (3) positioned in a process space (93) of a containment (9) and there for the aseptic filling of vessels with a liquid. The containment (9) is intended for placement in an installation room (8), the containment (9) and process room (93) being enclosed by a housing (90). The functional module (2) comprises an element carrier (23), functional elements (230) intended for installation on the element carrier (23), and medium lines (231) which are connected to the functional elements (230). The assembly as a module, consisting of element carrier (23), functional elements (230) accommodated by it and medium lines (231) connected to it, can be moved from a retracted initial position through a transfer port (260) leading into the process space (93) to an extended working position the dosing station (3) is movable. The function module (2) serves to aseptically fill a plurality of vessels, which are combined in a container, with a pharmacological or toxic liquid. In a second embodiment, the functional module (2) has a gas-tight container (28) with a sterilized interior (29) in which an assembled and sterilized assembly consisting of the element carrier (23), the functional elements (230) and connected to it medium lines (231) is housed. Finally, a method for bringing the functional module (2) to the dosing station (3) positioned in the process space (93) is proposed.

Description

Anwendungsgebiet der ErfindungField of application of the invention

Die Erfindung betrifft ein Funktionsmodul zum Heranführen an eine in einem Prozessraum eines Containments positionierte Dosierstation und ist dort zum aseptischen Befüllen von Gefässen mit einer Flüssigkeit vorgesehen. Das Containment ist zur Platzierung in einem Aufstellraum bestimmt, wobei Containment und Prozessraum von einem Gehäuse umschlossen sind. Das Funktionsmodul umfasst einen Elementeträger, zur Installation am Elementeträger bestimmte Funktionselemente und zum Anschluss an die Funktionselemente vorgesehene Mediumsleitungen. Ferner hat die Erfindung ein Verfahren zum Heranführen des konzipierten Funktionsmoduls an die Dosierstation zum Gegenstand.The invention relates to a functional module for leading to a dosing station positioned in a process space of a containment and is provided there for the aseptic filling of vessels with a liquid. The containment is intended for placement in an installation room, with the containment and process room being enclosed in a housing. The functional module comprises an element carrier, functional elements intended for installation on the element carrier and medium lines intended for connection to the functional elements. Furthermore, the subject matter of the invention is a method for bringing the conceived functional module to the dosing station.

Stand der TechnikState of the art

Bis anhin müssen die Bestandteile von Funktionsmodulen für Dosierstationen an Füllmaschinen zur aseptischen Abfüllung von Flüssigkeiten in Gefässe, insbesondere Vials für Pharmaka, mittels Rapid-Transfer-Ports (RTP) in den Prozessraum von Containments zunächst eingeschleust werden. Im Prozessraum erfolgt dann der Zusammenbau der Bestandteile, so dass ein Handeingriff in den Prozessraum notwendig ist. Dieser Arbeitsablauf gestaltet sich zeitaufwendig, ist hinsichtlich Fehlmanipulationen und dem Eintrag von Verunreinigungen risikobehaftet sowie anlagen-technisch kostspielig.Until now, the components of functional modules for dosing stations on filling machines for the aseptic filling of liquids in containers, in particular vials for pharmaceuticals, first had to be introduced into the process space of containments using Rapid Transfer Ports (RTP). The components are then assembled in the process room, so that manual intervention in the process room is necessary. This workflow is time-consuming, involves risk with regard to incorrect manipulations and the entry of contamination, and is expensive in terms of plant technology.

Aufgabe der Erfindungobject of the invention

Angesichts der bisher unvollkommenen Lösung im gemäss obigem Stand der Technik skizzierten Fachgebiet, liegt der Erfindung die Aufgabe zugrunde, manuelle Tätigkeiten im Prozessraum zumindest zu reduzieren und dadurch den Arbeitsablauf bezüglich zeitlichem Aufwand effizienter, weniger fehleranfällig, qualitativ höherwertig und mit geringem apparativem Aufwand zu gestalten. Dabei gilt insbesondere, das Risiko einer Kontamination durch manuelle Tätigkeiten im Prozessraum auszuschliessen. Hierzu sind eine spezielle Vorrichtung zu entwickeln und ein Verfahren mit Anwendung der Vorrichtung vorzuschlagen.In view of the hitherto incomplete solution in the technical field outlined according to the prior art above, the invention is based on the object of at least reducing manual activities in the process room and thereby making the workflow more efficient in terms of time expenditure, less error-prone, higher quality and with little outlay on equipment. In particular, there is a risk of contamination from manual activities in the process room rule out. For this purpose, a special device has to be developed and a method using the device has to be proposed.

Übersicht über die ErfindungOverview of the invention

Das konzipierte Funktionsmodul ist zum Heranführen an eine in einem Prozessraum eines Containments positionierte Dosierstation und dort zum aseptischen Befüllen von Gefässen mit einer Flüssigkeit bestimmt. Das Containment ist zur Platzierung in einem Aufstellraum vorgesehen, wobei Containment und Prozessraum von einem Gehäuse umschlossen sind. Das Funktionsmodul umfasst einen Elementeträger, Funktionselemente, die zur Installation am Elementeträger bestimmt sind, und Mediumsleitungen, welche an die Funktionselemente angeschlossen werden. Der Zusammenbau als Baugruppe, bestehend aus Elementeträger, von diesem aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen, ist aus einer eingefahrenen Ausgangsstellung durch ein in den Prozessraum führenden Transferport in eine ausgefahrene Arbeitsstellung an die Dosierstation bewegbar.The designed functional module is intended for the introduction to a dosing station positioned in a process room of a containment and there for the aseptic filling of vessels with a liquid. The containment is intended for placement in an installation room, with the containment and process room being enclosed in a housing. The functional module includes an element carrier, functional elements that are intended for installation on the element carrier, and medium lines that are connected to the functional elements. The assembly as an assembly, consisting of element carrier, functional elements accommodated by this and medium lines connected to it, can be moved from a retracted initial position through a transfer port leading into the process space into an extended working position at the dosing station.

Nachstehend sind besonders vorteilhafte Details zum Funktionsmodul angegeben: Das Funktionsmodul dient dem aseptischen Befüllen einer Mehrzahl von Gefässen, die in einem Gebinde zusammengefasst sind, mit einer pharmakologischen oder toxischen Flüssigkeit. Beim Handling von Flüssigkeiten mit Sauerstoff-Sensivität erfolgt eine Überlagerung mit einem Schutzgas, z.B. Stickstoff. Das Gehäuse des Containments hat eine den Prozessraum begrenzende Rückwand als Bestandteil. Der Transferport wird von einer Öffnung, die in einem Formteil einer in der Rückwand installierten Flanschverbindung vorgesehen ist, gebildet.Particularly advantageous details of the function module are given below: The function module is used for the aseptic filling of a plurality of vessels, which are combined in a container, with a pharmacological or toxic liquid. When handling liquids that are sensitive to oxygen, they are overlaid with an inert gas, e.g. nitrogen. The containment housing has a rear wall that delimits the process space as a component. The transfer port is formed by an opening provided in a molding of a flanged joint installed in the back panel.

Speziell beim Funktionsmodul erster Version besitzt der Elementeträger ein zuvorderst fest angeordnetes Frontstück und ein hinten fest angeordnetes Endstück. Das Frontstück kommt in der eingefahrenen Ausgangsstellung im Transferport zu liegen. Das Endstück hingegen ist dazu bestimmt, in der ausgefahrenen Arbeitsstellung am Transferport anzuschlagen und Durchlass für die an das Funktionsmodul herangeführten Mediumsleitungen zu gewähren. Das am Transferport installierte Funktionsmodul ragt in der eingefahrenen Ausgangsstellung in eine zum Prozessraum benachbarte Transferzelle hinein. Der Transferport bildet eine Schnittstelle zwischen dem Prozessraum und der Transferzelle. In einer zum Gehäuse des Containments gehörenden Aussenwand, welche die Transferzelle zum Aufstellraum hin begrenzt, sind vorgesehen:

  1. a) eine Transfer-Armatur, vorzugsweise als Rapid Transfer Port (RTP) ausgebildet, bestimmt zum geschützten Einschleusen der vorsterilisierten Funktionselemente und Mediumsleitungen in die Transferzelle; und
  2. b) Handschuheingriffe, in der Regel paarweise, um unter Wahrung der sterilen Atmosphäre in der Transferzelle Tätigkeiten auszuführen, insbesondere Montagearbeiten, nämlich die Bestückung des Elementeträgers mit Funktionselementen und daran anzuschliessende Mediumsleitungen.
Especially in the case of the first version of the function module, the element carrier has a front piece that is fixed at the front and an end piece that is fixed at the rear. The front piece comes to rest in the retracted initial position in the transfer port. The end piece, on the other hand, is designed to hit the transfer port in the extended working position and to allow passage for the medium lines leading to the functional module. The function module installed at the transfer port protrudes into a retracted initial position transfer cell adjacent to the process space. The transfer port forms an interface between the process room and the transfer cell. In an outer wall belonging to the containment housing, which delimits the transfer cell to the installation room, the following are provided:
  1. a) a transfer fitting, preferably designed as a rapid transfer port (RTP), intended for the protected introduction of the pre-sterilized functional elements and medium lines into the transfer cell; and
  2. b) Glove handles, usually in pairs, in order to carry out activities while maintaining the sterile atmosphere in the transfer cell, in particular assembly work, namely equipping the element carrier with functional elements and medium lines to be connected to it.

Speziell beim Funktionsmodul zweiter Version weist dieses auf:

  1. a) ein gasdichtes Behältnis mit einem sterilisierten Innenraum; und
  2. b) eine im Behältnis montierte und sterilisierte Baugruppe, bestehend aus dem Elementeträger, von diesem aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen, die zu einem externen Anschluss bzw. zu externen Anschlüssen führen, sowie dem zuvorderst am Elementeträger fest angeordneten Frontstück.
In der eingefahrenen Ausgangsstellung steht die Baugruppe innerhalb des Behältnisses und dabei schliesst das Frontstück eine Passage am Behältnis gasdicht ab. Zum Erreichen der Arbeitsstellung ist die Baugruppe, mit dem Frontstück voran, aus dem Behältnis heraus durch den Transferport in den Prozessraum an die Dosierstation bewegbar.Especially with the second version of the function module, this shows:
  1. a) a gas-tight container with a sterilized interior; and
  2. b) an assembly assembled and sterilized in the container, consisting of the element carrier, functional elements accommodated by it and medium lines connected to it, which lead to an external connection or to external connections, as well as the front piece firmly arranged at the element carrier.
In the retracted initial position, the assembly is within the container and the front piece closes a passage on the container in a gas-tight manner. To reach the working position, the assembly can be moved, with the front piece first, out of the container through the transfer port into the process space at the dosing station.

Am Funktionsmodul sind vorhanden:

  1. a) ein oder mehrere aussen am Behältnis sitzende Anschlüsse, mit denen die Mediumsleitungen aus dem Inneren des Behältnisses verbunden sind, wobei der bzw. die Anschlüsse zum Verbinden mit zumindest einer Versorgungsleitung bestimmt sind; und
  2. b) ein aussen am Behältnis vorhandenes Stellorgan für das Bewegen der Baugruppe, bestehend aus Elementeträger mit Frontstück, vom Elementeträger aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen.
The function module has:
  1. a) one or more connections located on the outside of the container, with which the medium lines from the interior of the container are connected, the connection(s) being intended for connection to at least one supply line; and
  2. b) an actuator on the outside of the container for moving the assembly, consisting of an element carrier with a front piece, functional elements accommodated by the element carrier and medium lines connected to it.

Das Funktionsmodul ist am Transferport so installiert, dass es in eine zum Prozessraum benachbarte Transferzelle hineinragt und sich bis in den Aufstellraum erstrecken kann oder sich das Funktionsmodul in Gänze frei in den Aufstellraum erstreckt. Der externe Anschluss bzw. die externen Anschlüsse und ein Stellorgan für das Bewegen der Baugruppe, bestehend aus Elementeträger mit Frontstück, vom Elementeträger aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen, sind vom Aufstellraum zugänglich. Die Transferzelle kann zum Aufstellraum hin offen sein, z.B. aufgrund einer in der Aussenwand vorhandenen Wandöffnung.The function module is installed at the transfer port in such a way that it protrudes into a transfer cell adjacent to the process room and can extend into the installation room, or the function module extends completely freely into the installation room. The external connection or the external connections and an actuator for moving the assembly, consisting of an element carrier with a front piece, functional elements accommodated by the element carrier and medium lines connected to them, are accessible from the installation room. The transfer cell can be open to the installation room, e.g. due to a wall opening in the outer wall.

Speziell bei Verwendung des Funktionsmoduls erster Version werden folgende wesentliche Verfahrensschritte ausgeführt:

  1. a) ausserhalb des Prozessraums Bereitstellung des Elementeträgers mit den bestückten Funktionselementen und den daran angeschlossenen Mediumsleitungen; und
  2. b) Heranführen der montierten Baugruppe, bestehend aus Elementeträger, von diesem aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen, im dekontaminierten bzw. sterilisierten Zustand, aus der eingefahrenen Ausgangsstellung, durch den in der den Prozessraum begrenzenden Gehäusewand vorgesehenen abgedichteten Transferport in die ausgefahrene Arbeitsstellung an die Dosierstation.
Especially when using the first version of the function module, the following essential procedural steps are carried out:
  1. a) Outside of the process room, provision of the element carrier with the equipped functional elements and the medium lines connected to it; and
  2. b) Bringing the assembled assembly, consisting of element carrier, functional elements accommodated by it and medium lines connected to it, in the decontaminated or sterilized state, from the retracted starting position through the sealed transfer port provided in the housing wall delimiting the process space into the extended working position at the dosing station .

Nachstehend sind besonders vorteilhafte Details zum Verfahren bei Verwendung des Funktionsmoduls erster Version angegeben: In einer zum Prozessraum benachbarten, zum Aufstellraum hin hermetisch abschliessbaren Transferzelle erfolgen die Bereitstellung und der Zusammenbau von Elementeträger mit Funktionselementen und Mediumsleitungen unter Wahrung aseptischer Bedingungen. Bei anteilig in den Prozessraum ausgefahrenem Elementeträger öffnet das am Elementeträger zuvorderst fest sitzende Frontstück den Transferport zwischen Prozessraum und Transferzelle. In dieser Stellung erfolgt durch Einleitung von Dekontaminationsmittel, vorzugsweise vonseiten des Prozessraums und zugleich vonseiten der Transferzelle, die Dekontamination von Prozessraum, Transferzelle und Elementeträger. Anschliessend werden die vorsterilisierten Funktionselemente und Mediumsleitungen durch die Transfer-Armatur, unter Wahrung aseptischer Bedingungen, in die Transferzelle eingeschleust. Schliesslich erfolgen mit Nutzung der Handschuheingriffe, unter Wahrung der sterilen Atmosphäre in der Transferzelle, die Bestückung des Elementeträgers mit Funktionselementen und daran der Anschluss der Mediumsleitungen.Particularly advantageous details of the method when using the first version of the function module are given below: In a transfer cell adjacent to the process room and hermetically sealable from the installation room, the provision and assembly of element carriers with function elements and medium lines takes place while maintaining aseptic conditions. When the element carrier is partially extended into the process space, the front piece that is firmly attached to the element carrier opens the transfer port between the process space and the transfer cell. In this position, the process space, transfer cell is decontaminated by introducing decontamination means, preferably from the process space and at the same time from the transfer cell and element carrier. The pre-sterilized functional elements and medium lines are then introduced into the transfer cell through the transfer fitting, while maintaining aseptic conditions. Finally, using the glove ports while maintaining the sterile atmosphere in the transfer cell, the element carrier is equipped with functional elements and the medium lines are connected to them.

In der Ausgangsstellung steht die montierte Baugruppe, umfassend den Elementeträger, von diesem aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen, in der Transferzelle, und ein zuvorderst am Elementeträger sitzendes Frontstück ist im Transferport positioniert. Zum Erreichen der Arbeitsstellung wird diese montierte Baugruppe schlittenartig geführt oder gestützt aus der Transferzelle an die Dosierstation ausgefahren, bis das am Elementeträger hinten sitzende Endstück am Transferport anschlägt. Das Herausfahren der Baugruppe in die Arbeitsstellung erfolgt durch Ausschieben vonseiten der Transferzelle oder durch Herausziehen vonseiten des Prozessraums, z.B. mittels eines im Prozessraum installierten Roboters.In the initial position, the assembled subassembly, comprising the element carrier, the functional elements held by it and the medium lines connected to it, is in the transfer cell, and a front piece sitting at the forefront on the element carrier is positioned in the transfer port. To reach the working position, this assembled assembly is guided like a sled or supported and moved out of the transfer cell to the dosing station until the end piece on the rear of the element carrier hits the transfer port. The assembly is moved out into the working position by pushing it out from the transfer cell or by pulling it out from the process room, e.g. by means of a robot installed in the process room.

Speziell bei Verwendung des Funktionsmoduls zweiter Version werden folgende wesentliche Verfahrensschritte ausgeführt:

  1. a) Bereitstellung des Funktionsmoduls, umfassend:
    • aa) ein gasdichtes Behältnis mit einem sterilisierten Innenraum; und
    • ab) die im Behältnis montierte und sterilisierte Baugruppe, bestehend aus einem Elementeträger mit Frontstück, vom Elementeträger aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen, die zu einem gemeinsamen externen Anschluss oder jeweiligen Anschlüssen führen, wobei die Baugruppe in der Ausgangsstellung eingefahren innerhalb des Behältnisses steht und dabei das Frontstück eine Passage am Behältnis gasdicht abschliesst, und zum Erreichen der Arbeitsstellung, die Baugruppe mit dem Frontstück voran, sich schlittenartig geführt aus dem Behältnis an die Dosierstation ausfahren lässt;
  2. b) Installation des Funktionsmoduls in der Ausgangsstellung abgedichtet am Transferport, so dass die Aussenfläche des Frontstücks in den Prozessraum weist;
  3. c) Dekontamination des Prozessraums und zeitgleich der Aussenfläche des Frontstücks;
  4. d) Vorschub der Baugruppe an die Dosierstation zwecks Erreichen der Arbeitsstellung; und zuletzt
  5. e) Verbinden von Versorgungsleitungen mit dem externen Anschluss bzw. den externen Anschlüssen, wobei
  6. f) der Verfahrensschritt e) alternativ zwischen den Verfahrensschritten c) und d) oder zwischen den Verfahrensschritten b) und c) erfolgen kann.
Especially when using the second version of the function module, the following essential procedural steps are carried out:
  1. a) Provision of the functional module, comprising:
    • aa) a gas-tight container with a sterilized interior; and
    • ab) the assembly assembled and sterilized in the container, consisting of an element carrier with a front piece, functional elements accommodated by the element carrier and medium lines connected to it, which lead to a common external connection or to respective connections, with the assembly being retracted in the initial position and standing within the container the front piece closes off a passage on the container in a gas-tight manner, and to reach the working position, the module can be moved out of the container to the dosing station, guided like a sled, with the front piece first;
  2. b) Installation of the functional module in the initial position sealed at the transfer port, so that the outer surface of the front piece into the process space points;
  3. c) Decontamination of the process space and at the same time the outer surface of the front piece;
  4. d) advancing the assembly to the dosing station in order to reach the working position; and last
  5. e) connecting supply lines to the external connection or the external connections, wherein
  6. f) process step e) can alternatively take place between process steps c) and d) or between process steps b) and c).

Nachstehend sind besonders vorteilhafte Details zum Verfahren bei Verwendung des Funktionsmoduls zweiter Version angegeben: Das Funktionsmodul wird am Transferport so installiert, dass:

  1. a) das Funktionsmodul in eine zum Prozessraum benachbarte Transferzelle hineinragt und sich bis in den Aufstellraum erstrecken kann oder sich das Funktionsmodul in Gänze frei in den Aufstellraum erstreckt; und
  2. b) der externe Anschluss bzw. die externen Anschlüsse und ein Stellorgan für das Bewegen der Baugruppe, bestehend aus dem Elementeträger mit Frontstück, vom Elementeträger aufgenommenen Funktionselementen und daran angeschlossenen Mediumsleitungen, vom Aufstellraum und/oder von der Transferzelle zugänglich sind.
Particularly advantageous details on the procedure when using the second version of the function module are given below: The function module is installed at the transfer port in such a way that:
  1. a) the function module protrudes into a transfer cell adjacent to the process room and can extend into the installation room or the function module extends freely into the installation room in its entirety; and
  2. b) the external connection or the external connections and an actuator for moving the assembly, consisting of the element carrier with front piece, functional elements accommodated by the element carrier and medium lines connected to them, are accessible from the installation room and/or from the transfer cell.

Kurzbeschreibung der beigefügten ZeichnungenBrief description of the attached drawings

Es zeigen:

Figur 1A -
ein Containment mit Blick in den Prozessraum und in diesen in die Arbeitsstellung ausgefahrenem Funktionsmodul erster Version, in Perspektivansicht;
Figur 1B -
den Aufbau gemäss Figur 1A, in transparenter Seitenansicht;
Figur 2A
- das Funktionsmodul aus Figur 1A, in perspektivischer Explosivansicht;
Figur 2B -
die Darstellung gemäss Figur 2A, in gewechselter perspektivischer Explosivansicht;
Figur 3A -
das unbestückte Funktionsmodul aus Figur 1A in die Arbeitsstellung in den Prozessraum ausgefahren, in Perspektivansicht;
Figur 3B
- die Darstellung gemäss Figur 3A, in gewechselter Perspektivansicht;
Figur 4A -
die Darstellung gemäss Figur 3B, mit in das Funktionsmodul eingesetzten Funktionselementen, in Perspektivansicht;
Figur 4B -
die Darstellung gemäss Figur 4A, in gewechselter Perspektivansicht;
Figur 5
- die Darstellung gemäss Figur 4A, mit in das Funktionsmodul eingesetzten Funktionselementen und angeschlossenen Mediumsleitungen, in Perspektivansicht;
Figur 6 -
das Containment gemäss Figur 1A mit in der Transferzelle eingebautem Funktionsmodul zweiter Version, Baugruppe bestehend aus Elementeträger, Funktionselementen und Mediumsleitungen, in eingefahrener Ausgangsstellung, im Behältnis ruhend, in transparenter Seitenansicht;
Figur 7A -
das Funktionsmodul aus Figur 6, in der eingefahrenen Ausgangsstellung, in Perspektivansicht;
Figur 7B -
die Darstellung gemäss Figur 7A, in der ausgefahrenen Arbeitsstellung, in Perspektivansicht;
Figur 7C -
das Funktionsmodul aus Figur 6, in perspektivischer Explosivansicht;
Figur 8A -
einen vergrösserten Ausschnitt aus Figur 6, mit dem Funktionsmodul in transparenter Ansicht;
Figur 8B -
die Darstellung gemäss Figur 8A, mit dem Funktionsmodul in ausgefahrener Arbeitsstellung; und
Figur 8C -
das vergrösserte Detail X1 aus Figur 8B.
Show it:
Figure 1A -
a containment with a view into the process space and into the first version of the functional module extended into the working position, in a perspective view;
Figure 1B -
according to the structure Figure 1A , in transparent side view;
Figure 2A
- the function module off Figure 1A , in exploded perspective view;
Figure 2B -
the representation according to Figure 2A , in alternate perspective exploded view;
Figure 3A -
the unequipped function module Figure 1A extended into the working position in the process room, in perspective view;
Figure 3B
- according to the illustration Figure 3A , in alternate perspective view;
Figure 4A -
the representation according to Figure 3B , with functional elements used in the functional module, in a perspective view;
Figure 4B -
the representation according to Figure 4A , in alternate perspective view;
figure 5
- according to the illustration Figure 4A , with functional elements used in the functional module and connected medium lines, in a perspective view;
Figure 6 -
the containment according to Figure 1A with second version function module installed in the transfer cell, assembly consisting of element carrier, function elements and medium lines, in retracted starting position, resting in the container, transparent side view;
Figure 7A -
the function module figure 6 , in the retracted starting position, in perspective view;
Figure 7B -
the representation according to Figure 7A , in the extended working position, in perspective view;
Figure 7C -
the function module figure 6 , in exploded perspective view;
Figure 8A -
an enlarged section figure 6 , with the functional module in transparent view;
Figure 8B -
the representation according to Figure 8A , with the functional module in the extended working position; and
Figure 8C -
the enlarged detail X1 Figure 8B .

Ausführunqsbeispieleexamples

Mit Bezug auf die beiliegenden Zeichnungen erfolgt nachstehend die detaillierte Beschreibung des erfindungsgemässen Funktionsmoduls in zwei verschiedenen Versionen und dazu als Verfahren der Montageablauf, das Herstellen der Betriebsbereitschaft sowie die Anwendung des Funktionsmoduls.With reference to the accompanying drawings, the functional module according to the invention is described in detail below in two different versions and as a method of the assembly process, the preparation of operational readiness and the use of the functional module.

Für die gesamte weitere Beschreibung gilt folgende Festlegung: Sind in einer Figur zum Zweck zeichnerischer Eindeutigkeit Bezugsziffern enthalten, aber im unmittelbar zugehörigen Beschreibungstext nicht erläutert, so wird auf deren Erwähnung in vorangehenden oder nachfolgenden Figurenbeschreibungen Bezug genommen.The following definition applies to the entire further description: Are in a figure contain reference numbers for the purpose of clarity in the drawing, but are not explained in the directly associated description text, reference is made to their mention in the preceding or following descriptions of the figures.

Figuren 1A und 1BFigures 1A and 1B

Das von einem Gehäuse 90 umgebene Containment 9, hier in Gestalt eines im Aufstellraum 8 stehenden Isolators, ist im prinzipiellen Aufbau zwecks Erläuterung der internen Raumaufteilung, der vorhandenen Wandungen und der apparativen Ausstattung dargestellt. In der Frontwand 910 sitzt üblicherweise eine durchsichtige Scheibe 911, während in die Rückwand 912 eine Wechseleinheit 95 eingesetzt ist. Das Gehäuse 90 umfasst ferner die obere Dachfläche 91, die untere Bodenfläche 92, die hintere Aussenwand 900 mit der darin installierten Transfer-Armatur 903 sowie die erste und zweite Seitenfläche 916,918, welche zusammen mit der Front- und Rückwand 910,912 das Containment 9 nach aussen abgrenzen. In der ersten Seitenfläche 916 befindet sich der eingangsseitige Durchlass 917, während die zweite Seitenfläche 916 den ausgangsseitigen Durchlass 919 aufweist. Vom unterhalb der Scheibe 911 gelegenen unteren Abschnitt der Frontwand 910 erstrecken sich der Vorbau 913 in den Aufstellraum 8 sowie ein schräg, abwärts geneigter Zwischenboden 914 hin zum untersten Bereich der Rückwand 912. Ausserdem verlaufen der horizontale Raumteiler 915 vom oberen Abschnitt der Frontwand 910 hin zur Rückwand 912 und von dieser jeweils horizontal, die obere Zellwand 901 sowie die untere Zellwand 902 zur hinteren Aussenwand 900.The containment 9 surrounded by a housing 90 , here in the form of an isolator standing in the installation room 8 , is shown in its basic structure for the purpose of explaining the internal division of space, the existing walls and the equipment. A transparent pane 911 is usually seated in the front wall 910 , while an interchangeable unit 95 is inserted in the rear wall 912 . The housing 90 further includes the upper roof surface 91 , the lower floor surface 92 , the rear outer wall 900 with the transfer fitting 903 installed therein and the first and second side surfaces 916 , 918 , which together with the front and rear walls 910 , 912 the containment 9 demarcate to the outside. The passage 917 on the inlet side is located in the first side surface 916 , while the second side surface 916 has the passage 919 on the outlet side. From the lower section of the front wall 910 located below the pane 911 , the porch 913 extends into the installation space 8, as well as an inclined, downward-sloping intermediate floor 914 towards the lowest area of the rear wall 912 . In addition, the horizontal space divider 915 runs from the upper section of the front wall 910 to the rear wall 912 and from there each horizontally, the upper cell wall 901 and the lower cell wall 902 to the rear outer wall 900 .

Vom Gehäuse 90 und vorhandenen Wandungen werden somit der Frontbereich 94 und der Rückraum 99 gebildet. Der Frontbereich 94 strukturiert sich in den oberhalb des Raumteilers 915 abgeteilten Dachraum 98, den unterhalb des Zwischenbodens 914 vorhandenen Bodenraum 97 sowie den zwischen Dachraum 98 und Bodenraum 97 liegenden Prozessraum 93. Im Rückraum 99 entsteht zwischen der oberen Zellwand 901 und der unteren Zellwand 902 die Transferzelle 96. Eine Transfer-Armatur 903, vorteilhaft als Rapid Transfer Port (RTP) ausgebildet, in der hinteren Aussenwand 900 dient dem geschützten Einschleusen von vorsterilisierten Bauteilen in die Transferzelle 96. Ferner sind in der Aussenwand 900 Handschuheingriffe 905 vorgesehen, in der Regel paarweise, um unter Wahrung der sterilen Atmosphäre in der Transferzelle 96 Tätigkeiten auszuführen.The front area 94 and the rear area 99 are thus formed by the housing 90 and existing walls. The front area 94 is structured into the roof space 98 divided above the space divider 915 , the floor space 97 present below the intermediate floor 914 , and the process space 93 located between the roof space 98 and the floor space 97 . The transfer cell 96 is formed in the rear space 99 between the upper cell wall 901 and the lower cell wall 902 . A transfer fitting 903 , advantageously designed as a rapid transfer port (RTP), in the rear outer wall 900 serves to introduce pre-sterilized components into the transfer cell 96 in a protected manner. Furthermore, in the outer wall 900 glove ports 905 are provided, usually in pairs, to perform 96 activities while maintaining the sterile atmosphere in the transfer cell.

Die apparative Ausstattung des Containments 9 umfasst eine im Prozessraum 93 eingerichtete Dosierstation 3, an welche das Funktionsmodul 2 - hier in erster Version - aus der Transferzelle 96 durch einen Transferport 260 in die Arbeitsstellung herangeführt ist. Die erste Version des Funktionsmoduls 2 ist Gegenstand der Figurenfolge 1A bis 5, nach deren detaillierter Beschreibung werden der praktische Montageablauf und die Anwendung der Vorrichtung erläutert. Eine in einer Aussparung in der Wechseleinheit 95 eingebaute Flanschverbindung 20 weist den Transferport 260 auf. Das Funktionsmodul 2 ist fest, aber ausfahrbar an der Flanschverbindung 20 installiert. Wesentlicher Bestandteil des Funktionsmoduls 2 ist der Elementeträger 23. Zum Heranfahren an die Dosierstation 3 besitzt ein Roboter 1 das von dessen schwenkbarem Arm 11 geführte Manipulierorgan 12, z.B. in Gestalt eines Greifers. Vorteilhaft lässt sich der Roboter 1 mit seinem Fuss 10 unterhalb der Wechseleinheit 95 an der Rückwand 912 verankern.The equipment of the containment 9 includes a dosing station 3 set up in the process space 93 to which the functional module 2 - here in the first version - is brought from the transfer cell 96 through a transfer port 260 into the working position. The first version of the function module 2 is the subject of the sequence of figures 1A to 5, after their detailed description the practical assembly process and the application of the device are explained. A flange connection 20 installed in a recess in the exchange unit 95 has the transfer port 260 . The function module 2 is fixed but installed on the flange connection 20 so that it can be extended. An essential part of the function module 2 is the element carrier 23 . In order to approach the dosing station 3 , a robot 1 has the manipulation element 12 guided by its pivotable arm 11 , for example in the form of a gripper. The robot 1 can advantageously be anchored with its foot 10 below the exchangeable unit 95 on the rear wall 912 .

Figuren 2A und 2BFigures 2A and 2B

Anhand dieses Figurenpaares werden die wesentlichen Bestandteile des Funktionsmoduls 2 beschrieben. Dazu gehören:

  1. a) die Flanschverbindung 20, welche aus einer ersten Dichtung 21, einer im Durchmesser kleineren zweiten Dichtung 21', einer dritten Dichtung 27, dem Deckring 22 und dem Formteil 26 mit seinem Transferport 260 besteht;
  2. b) das Frontstück 24 mit dem daran zu befestigenden Griff 240;
  3. c) das Endstück 25 mit dem daran zu befestigenden Griff 250; und
  4. d) der Elementeträger 23, der zur Bestückung mit den Funktionselementen 230 bestimmt ist.
The essential components of the function module 2 are described on the basis of this pair of figures. This includes:
  1. a) the flange connection 20 , which consists of a first seal 21 , a second seal 21 ' with a smaller diameter, a third seal 27 , the cover ring 22 and the molded part 26 with its transfer port 260 ;
  2. b) the front piece 24 with the handle 240 to be attached thereto;
  3. c) the end piece 25 with the handle 250 to be attached thereto; and
  4. d) the element carrier 23 which is intended to be equipped with the functional elements 230 .

Figuren 3A und 3BFigures 3A and 3B

Nur zwecks Übersichtlichkeit, jedoch so nicht im praktischen Montageablauf, illustriert dieses Figurenpaar das bisher ohne Bestückung mit den Funktionselementen 230 und ohne angeschlossene Mediumsleitungen 231 zusammengebaute Funktionsmodul 2, welches aus dem Transferport 260 heraus in den Prozessraum 93 an die Dosierstation 3 herangefahren ist. In der gezeigten Arbeitsstellung steht das am Elementeträger 23 fixierte Frontstück 24 vorgefahren im Prozessraum 93 und das Endstück 25 füllt, zumindest partiell abdichtend, den Transferport 260 aus. Von der in der Wechseleinheit 95 eingebauten Flanschverbindung 20 liegt der Deckring 26 vonseiten des Prozessraums 93 an der Wechseleinheit 95 an.Only for the sake of clarity, but not in the practical assembly process, this pair of figures illustrates the functional module 2 previously assembled without being equipped with the functional elements 230 and without connected medium lines 231 , which extends out of the transfer port 260 into the process space 93 has approached the dosing station 3 . In the working position shown, the front piece 24 fixed to the element carrier 23 is moved forward in the process space 93 and the end piece 25 fills the transfer port 260 , at least partially sealing it. From the flange connection 20 installed in the exchange unit 95 , the cover ring 26 rests against the exchange unit 95 on the side of the process space 93 .

Figuren 4A und 4BFigures 4A and 4B

Wiederum in Arbeitsstellung und zum Zweck der Übersichtlichkeit, aber weiterhin nicht konform mit dem praktischen Montageablauf, ist das zusammengebaute Funktionsmodul 2 nun mit Bestückung mit den Funktionselementen 230 zu sehen, allerdings noch immer ohne angeschlossene Mediumsleitungen 231.Again in the working position and for the sake of clarity, but still not in conformity with the practical assembly process, the assembled functional module 2 can now be seen equipped with the functional elements 230 , but still without the medium lines 231 connected .

Figur 5figure 5

In Komplettierung des Zusammenbaus des mit den Funktionselementen 230 bestückten Funktionsmoduls 2 sind an dieses nun auch die Mediumsleitungen 231 angeschlossen, nämlich jeweils direkt an die Einmündung in die Funktionselemente 230. Das Funktionsmodul 2 befindet sich, wie in der Praxis, in der realen Arbeitsstellung, d.h. aus dem Transferport 260 heraus in den Prozessraum 93 an die Dosierstation 3 vorgezogen und mit dem Endstück 25 im Transferport 260 stehend und diesen zumindest partiell abdichtend.In order to complete the assembly of the functional module 2 equipped with the functional elements 230 , the medium lines 231 are now also connected to it, specifically in each case directly at the junction with the functional elements 230 . As in practice, the functional module 2 is in the real working position, ie pulled out of the transfer port 260 into the process chamber 93 at the dosing station 3 and standing with the end piece 25 in the transfer port 260 and at least partially sealing it.

Montageablauf und Anwendung des Funktionsmoduls erster Version Assembly process and application of the function module first version

Vorbereitung und Produktionsstart laufen in folgenden Schritten ab:

  1. 1. Der unbestückte Elementeträger 23, d.h. es sind noch keine Funktionselemente 230 eingesetzt und keine Mediumsleitungen 231 angeschlossen, wird aus der eingefahrenen Ausgangsstellung in eine Zwischenstellung bewegt, in welcher zwischen dem Prozessraum 93 und der Transferzelle 96 der partiell offene Transferport 260 Gasdurchlass ermöglicht.
  2. 2. Während der Zwischenstellung erfolgt die Dekontamination des Prozessraums 93, welche sich somit den Elementeträger 23 umspülend durch den partiell offenen Transferport 260 auch in die Transferzelle 96 erstreckt.
  3. 3. Nach der Dekontamination von Prozessraum 93, Elementeträger 23 und Transferzelle 96 werden unter Wahrung des Reinraumstatus' vorsterilisierte Funktionselemente 230 und Mediumsleitungen 231 in die Transferzelle 96 eingeschleust. Das geschützte Einschleusen der vorsterilisierten Bauteile in die Transferzelle 96 geschieht mittels der Transfer-Armatur 903.
  4. 4. Der Elementeträger 23 wird in die eingefahrene Ausgangsstellung zurückgebracht, d.h. dieser steht in der Transferzelle 96, und nun erfolgt die Bestückung des Elementeträgers 23 mit den Funktionselementen 230 und der Anschluss der Mediumsleitungen 231 an die Funktionselemente 230. Diese Montagearbeiten werden von einem Bediener zur Wahrung der sterilen Atmosphäre in der Transferzelle 96 mittels der Handschuheingriffe 905 ausgeführt.
  5. 5. Soweit behandelt und montiert, kann jetzt der komplett bestückte Elementeträger 23 aus der Transferzelle 96 heraus, in den Prozessraum 93 bis an die Dosierstation 3 vorgeschoben werden.
  6. 6. Vorteilhaft werden mit dem Manipulierorgan 12 des Roboters 1, insbesondere mit pharmakologischer Flüssigkeit zu befüllende Gefässe, vorzugsweise oben offene Vials, an die Dosierstation 3 transportiert.
  7. 7. Beim Füllvorgang wird die Flüssigkeit über die Mediumsleitungen 231 und die kanülenartigen Funktionselemente 230 zugeführt, welche in die Gefässe eintauchen.
Preparation and start of production take place in the following steps:
  1. 1. The unequipped element carrier 23 , ie no functional elements 230 have been inserted and no medium lines 231 are connected, is moved from the retracted starting position to an intermediate position in which the partially open transfer port 260 allows gas passage between the process space 93 and the transfer cell 96.
  2. 2. During the intermediate position, the decontamination of the process space 93 takes place, which thus extends around the element carrier 23 through the partially open transfer port 260 and also into the transfer cell 96 .
  3. 3. After the decontamination of the process room 93 , element carrier 23 and transfer cell 96 are pre-sterilized while maintaining the clean room status Functional elements 230 and medium lines 231 introduced into the transfer cell 96 . The pre-sterilized components are introduced into the transfer cell 96 in a protected manner by means of the transfer fitting 903 .
  4. 4. The element carrier 23 is returned to the retracted starting position, ie it is in the transfer cell 96 , and now the element carrier 23 is fitted with the functional elements 230 and the medium lines 231 are connected to the functional elements 230 . This assembly work is carried out by an operator using the glove ports 905 to maintain the sterile atmosphere in the transfer cell 96 .
  5. 5. Insofar as it has been treated and assembled, the completely equipped element carrier 23 can now be pushed out of the transfer cell 96 into the process space 93 up to the dosing station 3.
  6. 6. Advantageously, the manipulation organ 12 of the robot 1 is used to transport vessels to be filled, in particular with pharmacological liquid, preferably vials that are open at the top, to the dosing station 3 .
  7. 7. During the filling process, the liquid is supplied via the medium lines 231 and the cannula-like functional elements 230 , which dip into the vessels.

Montageablauf und Anwendung des Funktionsmoduls zweiter Version Assembly process and application of the second version function module Figur 6figure 6

Die interne Raumaufteilung, die vorhandenen Wandungen und die apparative Ausstattung des gezeigten Containments 9 sind gegenüber dem Figurenpaar 1A+1B im Prinzip unverändert, so dass darauf Bezug genommen wird. Jetzt jedoch kommt eine zweite Version des Funktionsmoduls 2 zum Einsatz, das anhand der Figurenfolge 6 bis 8C abgehandelt wird. Ferner ist nun anstelle der in der hinteren Aussenwand 900 installierten Transfer-Vorrichtung 903 der Zugang in die Transferzelle 96 über eine simple Wandöffnung 904 möglich oder der Wandabschnitt zumindest entlang der Transferzelle 96 ist gänzlich offen.The internal division of space, the existing walls and the equipment of the containment 9 shown are in principle unchanged compared to the pair of figures 1A+1B, so that reference is made thereto. Now, however, a second version of the functional module 2 is used, which is dealt with using the sequence of figures 6 to 8C. Furthermore, instead of the transfer device 903 installed in the rear outer wall 900 , access to the transfer cell 96 is now possible via a simple wall opening 904 or the wall section at least along the transfer cell 96 is completely open.

Das Funktionsmodul 2 gemäss zweiter Version - gegenwärtig in eingefahrener Ausgangsstellung - ist im Gegensatz zur ersten Version nicht permanent fest an der Flanschverbindung 20 installiert, sondern lässt sich an diese nach Einschieben durch die Wandöffnung 904 an der Flanschverbindung 20 mit Zugang durch deren offenen Transferport 260 andocken. Das Funktionsmodul 2 hat ein nach aussen abgedichtetes Behältnis 28, in dessen sterilem Innenraum 29 ist in eingefahrener Ausgangsstellung, vorsterilisiert, der komplett bestückte Elementeträger 23 untergebracht. Im Behältnis 28 ist eine in der Ausgangsstellung quasi automatisch verschlossene Passage 280, durch die sich der bestückte Elementeträger 23 in die ausgefahrene Arbeitsstellung herausbewegen lässt.The function module 2 according to the second version - currently in the retracted initial position - is not permanently installed on the flange connection 20 , in contrast to the first version , but can be pushed into this dock through wall opening 904 to flanged joint 20 with access through its open transfer port 260. The functional module 2 has a container 28 that is sealed off from the outside, in whose sterile interior 29 the completely equipped element carrier 23 is accommodated in the retracted initial position, pre-sterilized. In the container 28 there is a passage 280 which is closed almost automatically in the initial position and through which the equipped element carrier 23 can be moved out into the extended working position.

Figuren 7A bis 7CFigures 7A to 7C

Anhand dieser Figurenfolge werden die wesentlichen Bestandteile des Funktionsmoduls 2 zweiter Version beschrieben. Dazu gehören:

  1. a) das gasdichte Behältnis 28 mit den äusseren Montageelementen 282, dem sterilen Innenraum 29 und der von einem frontseitig vorhandenen Fensterstück 281 umrandeten verschliessbaren Passage 280;
  2. b) der Elementeträger 23 mit den darin eingesetzten Funktionselementen 230, dem Frontstück 24 und dem Endstück 25 sowie den hier nicht sichtbaren Mediumsleitungen 231 (s. Figur 8A-8C);
  3. c) der Deckel 285 für den hinteren Verschluss des Behältnisses 28; und
  4. d) das Vorschubteil 286, z.B. als Spindel ausgebildet, und das Stellorgan 287, hier in Form eines Drehrades.
The essential components of the function module 2, second version, are described on the basis of this sequence of figures. This includes:
  1. a) the gas-tight container 28 with the outer assembly elements 282 , the sterile interior 29 and the closable passage 280 bordered by a window piece 281 present on the front;
  2. b) the element carrier 23 with the functional elements 230 inserted therein, the front piece 24 and the end piece 25 as well as the medium lines 231 (not visible here) (see Fig. Figure 8A-8C );
  3. c) the lid 285 for the rear closure of the container 28 ; and
  4. d) the feed part 286 , for example designed as a spindle, and the actuator 287 , here in the form of a rotary wheel.

Figur 8AFigure 8A

In eingefahrener Ausgangsstellung ruht der mit den Funktionselementen 230 bestückte Elementeträger 23 im Behältnis 28 und steht somit nicht an der Dosierstation 3. Das Frontstück 24 verschliesst die Passage 280 gasdicht. Die mit den Funktionselementen 230 verbundenen Mediumsleitungen 231 liegen mit Überlänge im Innenraum 29 des Behältnisses 28 und führen zum Anschluss 232. Als ein Beispiel für die Struktur der Mediumsleitungen 231 könnte sich vorteilhaft eine vom Anschluss 232 abgehende Mediumsleitung 231 durch Verzweigung auf die einzelnen Funktionselemente 230 aufteilen. Bevorzugt jedoch wird sich zu jedem Funktionselement 230 eine separate Mediumsleitung 231 mit Überlänge zu einem jeweiligen Anschluss 232 erstrecken.In the retracted starting position, the element carrier 23 fitted with the functional elements 230 rests in the container 28 and is therefore not at the dosing station 3 . The front piece 24 closes the passage 280 in a gas-tight manner. The excess length of the medium lines 231 connected to the functional elements 230 lie in the interior 29 of the container 28 and lead to the connection 232 . As an example of the structure of the medium lines 231 , a medium line 231 exiting from the connection 232 could advantageously be divided into the individual functional elements 230 by branching. However, a separate medium line 231 with excess length to a respective connection 232 will preferably extend to each functional element 230 .

Vor Produktionsstart, d.h. das Funktionsmodul 2 befindet sich noch in eingefahrener Ausgangsstellung, ist es erforderlich, den Prozessraum 93 und dabei zugleich die Aussenfläche des Frontstücks 24, welches gegenwärtig den Innenraum 29 hermetisch abschliesst, zu dekontaminieren.Before the start of production, ie the functional module 2 is still in the retracted starting position, it is necessary to decontaminate the process space 93 and at the same time the outer surface of the front piece 24 which currently hermetically seals the interior 29 .

Figuren 8B und 8CFigures 8B and 8C

Mit Betätigung des Stellorgans 287 wird das Vorschubteil 286 angetrieben, dadurch entfernt sich sukzessive das Frontstück 24 von der Passage 280 und zugleich bewegt sich der Elementeträger 23 samt seiner Bestückung aus dem Behältnis 28 heraus, in den Prozessraum 93 hinein, bis in die ausgefahrene Arbeitsstellung an die Dosierstation 3 heran. Innerlich des Behältnisses 28, in dessen Frontbereich, schlägt das Endstück 25 an. Mit dem Ausfahren des Elementeträgers 23 wird die zuvor vorhandene Überlänge der Mediumsleitung 231 gestreckt. Im Produktionsprozess wird die an der Dosierstation 3 zu verarbeitende Flüssigkeit von aussen dem Anschluss 232 zugeführt, in die Mediumsleitung 231 und darüber in die Funktionselemente 230 gefördert.When the actuator 287 is actuated, the feed part 286 is driven, which means that the front piece 24 is gradually removed from the passage 280 and at the same time the element carrier 23, together with its equipment, moves out of the container 28 , into the processing space 93 , up to the extended working position the dosing station 3 approach. The end piece 25 abuts inside the container 28 in its front area. With the extension of the element carrier 23 , the previously existing excess length of the medium line 231 is stretched. In the production process, the liquid to be processed at the dosing station 3 is fed from the outside to the connection 232 , conveyed into the medium line 231 and via it into the functional elements 230 .

Für den Einsatz des Funktionsmoduls 2 erster Version (Figuren 1A-5) und zweiter Version (Figuren 6-8C) gilt, dass vorteilhaft mit dem Manipulierorgan 12 des Roboters 1 zu befüllende Gefässe, z.B. ein Gebinde mit vier Vials, an die Dosierstation 3 transportiert werden. Mittels der nun ebenfalls in der Dosierstation 3 stehenden, vom Elementeträger 23 gehaltenen Funktionselemente 230, werden die Vials befüllt, beispielsweise mit einer pharmakologischen Flüssigkeit. Beim Füllvorgang tauchen die kanülenartigen Funktionselemente 230 in die oben offenen Vials ein. Beim Handling von Flüssigkeiten mit Sauerstoff-Sensivität erfolgt die Befüllung mit einer Überlagerung mit einem Schutzgas, z.B. Stickstoff.For the use of the function module 2 first version ( Figures 1A-5 ) and second version ( Figures 6-8C ) it applies that vessels to be filled, for example a container with four vials, are advantageously transported to the dosing station 3 with the manipulation element 12 of the robot 1 . The vials are filled, for example with a pharmacological liquid, by means of the functional elements 230 , which are now also in the dosing station 3 and are held by the element carrier 23 . During the filling process, the cannula-like functional elements 230 dip into the vials, which are open at the top. When handling liquids that are sensitive to oxygen, filling is carried out with an overlay of an inert gas, eg nitrogen.

Claims (16)

Funktionsmodul (2), das zum Heranführen an eine in einem Prozessraum (93) eines Containments (9) positionierte Dosierstation (3) und dort zum aseptischen Befüllen von Gefässen mit einer Flüssigkeit bestimmt ist, wobei: a) das Containment (9) zur Platzierung in einem Aufstellraum (8) vorgesehen ist; b) das Containment (9) und der Prozessraum (93) von einem Gehäuse (90) umschlossen sind; und c) das Funktionsmodul (2) aufweist: ca) einen Elementeträger (23); cb) Funktionselemente (230), bestimmt zur Installation am Elementeträger (23); und cc) Mediumsleitungen (231), vorgesehen zum Anschluss an die Funktionselemente (230), dadurch gekennzeichnet, dass d) der Zusammenbau als Baugruppe, bestehend aus Elementeträger (23), von diesem aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), aus einer eingefahrenen Ausgangsstellung durch ein in den Prozessraum (93) führenden Transferport (260) in eine ausgefahrene Arbeitsstellung an die Dosierstation (3) bewegbar ist. Functional module ( 2 ), which is intended to be brought to a dosing station ( 3 ) positioned in a process space ( 93 ) of a containment ( 9 ) and there for the aseptic filling of vessels with a liquid, wherein: a) the containment ( 9 ) is provided for placement in an installation room ( 8 ); b) the containment ( 9 ) and the process space ( 93 ) are enclosed by a housing ( 90); and c) the functional module ( 2 ) has: ca) an element carrier ( 23 ); cb) functional elements (230 ) intended for installation on the element carrier ( 23 ); and cc) medium lines ( 231 ), provided for connection to the functional elements (230 ), characterized in that d) the assembly as a module, consisting of element carrier ( 23 ), functional elements ( 230 ) accommodated by this and medium lines ( 231 ) connected to it, from a retracted initial position through a transfer port ( 260 ) leading into the process space ( 93 ) into an extended working position can be moved to the dosing station ( 3 ). Funktionsmodul (2) nach Anspruch 1, dadurch gekennzeichnet, dass a) das Funktionsmodul (2) dem aseptischen Befüllen einer Mehrzahl von Gefässen dient, die in einem Gebinde zusammengefasst sind, mit einer pharmakologischen oder toxischen Flüssigkeit; und b) beim Handling von Flüssigkeiten mit Sauerstoff-Sensivität eine Überlagerung mit einem Schutzgas, z.B. Stickstoff, erfolgt. Functional module ( 2 ) according to claim 1, characterized in that a) the functional module ( 2 ) is used for the aseptic filling of a plurality of vessels, which are combined in a container, with a pharmacological or toxic liquid; and b) when handling liquids that are sensitive to oxygen, an inert gas, eg nitrogen, is superimposed. Funktionsmodul (2) nach zumindest einem der Ansprüche 1 und 2, dadurch gekennzeichnet, dass a) das Gehäuse (90) des Containments (9) eine den Prozessraum (93) begrenzende Rückwand (912) als Bestandteil hat; und b) der Transferport (260) von einer Öffnung, die in einem Formteil (26) einer in der Rückwand (912) installierten Flanschverbindung (20) vorgesehen ist, gebildet wird. Functional module ( 2 ) according to at least one of claims 1 and 2, characterized in that a) the housing ( 90 ) of the containment ( 9 ) has a rear wall ( 912 ) delimiting the process space ( 93 ) as a component; and b) the transfer port (260 ) is formed by an opening provided in a molding ( 26 ) of a flange connection ( 20 ) installed in the rear wall ( 912). will. Funktionsmodul (2) nach zumindest einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass a) der Elementeträger (23) ein zuvorderst fest angeordnetes Frontstück (24) und ein hinten fest angeordnetes Endstück (25) besitzt; wobei: b) das Frontstück (24) in der eingefahrenen Ausgangsstellung im Transferport (260) zu liegen kommt; und c) das Endstück (25) dazu bestimmt ist, in der ausgefahrenen Arbeitsstellung am Transferport (260) anzuschlagen und einen Durchlass für die an das Funktionsmodul (2) herangeführten Mediumsleitungen (231) bildet. Functional module ( 2 ) according to at least one of claims 1 to 3, characterized in that a) the element carrier ( 23 ) has a front piece ( 24 ) fixed at the front and an end piece ( 25 ) fixed at the rear; whereby: b) the front piece ( 24 ) comes to rest in the retracted starting position in the transfer port ( 260); and c) the end piece ( 25 ) is intended to hit the transfer port ( 260 ) in the extended working position and forms a passage for the medium lines ( 231 ) leading to the functional module ( 2 ). Funktionsmodul (2) nach zumindest einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass a) das am Transferport (260) installierte Funktionsmodul (2) in der eingefahrenen Ausgangsstellung in eine zum Prozessraum (93) benachbarte Transferzelle (96) hineinragt; und b) der Transferport (260) eine Schnittstelle zwischen dem Prozessraum (93) und der Transferzelle (96) bildet. Functional module ( 2 ) according to at least one of claims 1 to 3, characterized in that a) the functional module ( 2 ) installed at the transfer port ( 260 ) in the retracted starting position protrudes into a transfer cell ( 96 ) adjacent to the process space ( 93 ); and b) the transfer port (260 ) forms an interface between the process space ( 93 ) and the transfer cell ( 96 ). Funktionsmodul (2) nach Anspruch 5, dadurch gekennzeichnet, dass in einer zum Gehäuse (90) des Containments (9) gehörenden Aussenwand (900), welche die Transferzelle (96) zum Aufstellraum (8) hin begrenzt, vorgesehen sind: a) eine Transfer-Armatur (903), vorzugsweise als Rapid Transfer Port (RTP) ausgebildet, bestimmt zum geschützten Einschleusen der vorsterilisierten Funktionselemente (230) und Mediumsleitungen (231) in die Transferzelle (96); und b) Handschuheingriffe (905), in der Regel paarweise, um unter Wahrung der sterilen Atmosphäre in der Transferzelle (96) Tätigkeiten auszuführen, insbesondere Montagearbeiten, nämlich die Bestückung des Elementeträgers (23) mit Funktionselementen (230) und daran anzuschliessende Mediumsleitungen (231). Functional module ( 2 ) according to Claim 5, characterized in that in an outer wall ( 900 ) belonging to the housing ( 90 ) of the containment ( 9 ) and delimiting the transfer cell ( 96 ) towards the installation space (8 ), the following are provided: a) a transfer fitting ( 903 ), preferably designed as a rapid transfer port (RTP), intended for the protected introduction of the pre-sterilized functional elements (230 ) and medium lines ( 231 ) into the transfer cell (96 ); and b) glove ports ( 905 ), usually in pairs, in order to carry out activities while maintaining the sterile atmosphere in the transfer cell ( 96 ), in particular assembly work, namely equipping the element carrier ( 23 ) with functional elements ( 230 ) and medium lines ( 231 ) to be connected thereto . Funktionsmodul (2) nach zumindest einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass a) das Funktionsmodul (2) aufweist: aa) ein gasdichtes Behältnis (28) mit einem sterilisierten Innenraum (29); und ab) eine im Behältnis (28) montierte und sterilisierte Baugruppe, bestehend aus dem Elementeträger (23), von diesem aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), die zu einem externen Anschluss (232) bzw. zu externen Anschlüssen (232) führen, sowie dem zuvorderst am Elementeträger (23) fest angeordneten Frontstück (24); wobei: b) die Baugruppe in der Ausgangsstellung eingefahren innerhalb des Behältnisses (28) steht und dabei das Frontstück (24) eine Passage (280) am Behältnis (28) gasdicht abschliesst; und c) zum Erreichen der Arbeitsstellung die Baugruppe, mit dem Frontstück (24) voran, aus dem Behältnis (28) heraus durch den Transferport (260) in den Prozessraum (93) an die Dosierstation (3) bewegbar ist. Functional module ( 2 ) according to at least one of claims 1 to 3, characterized in that a) the functional module ( 2 ) has: aa) a gas-tight container ( 28 ) with a sterilized interior ( 29 ); and ab) an assembly assembled and sterilized in the container ( 28 ), consisting of the element carrier ( 23 ), functional elements ( 230 ) accommodated by it and medium lines ( 231 ) connected thereto, which lead to an external connection ( 232 ) or to external connections ( 232 ) as well as the front piece ( 24 ) firmly arranged at the foremost on the element carrier (23 ); whereby: b) the subassembly is retracted in the starting position within the container ( 28 ) and the front piece ( 24 ) closes off a passage ( 280 ) on the container ( 28 ) in a gas-tight manner; and c) to reach the working position, the assembly, with the front piece ( 24 ) first, can be moved out of the container ( 28 ) through the transfer port ( 260 ) into the process space ( 93 ) at the dosing station ( 3 ). Funktionsmodul (2) nach Anspruch 7, dadurch gekennzeichnet, dass daran vorhanden sind: a) ein oder mehrere aussen am Behältnis (28) sitzende Anschlüsse (232), mit denen die Mediumsleitungen (231) aus dem Inneren des Behältnisses (28) verbunden sind, wobei der bzw. die Anschlüsse (232) zum Verbinden mit zumindest einer Versorgungsleitung bestimmt sind; und b) ein aussen am Behältnis (28) vorhandenes Stellorgan (287) für das Bewegen der Baugruppe, bestehend aus Elementeträger (23) mit Frontstück (24), vom Elementeträger (23) aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231). Functional module ( 2 ) according to claim 7, characterized in that there are: a) one or more connections ( 232 ) on the outside of the container ( 28 ) to which the medium lines ( 231 ) from the interior of the container ( 28 ) are connected, the connection(s ) (232 ) for connection to at least one supply line are determined; and b) an actuator ( 287 ) on the outside of the container ( 28 ) for moving the assembly, consisting of an element carrier (23 ) with a front piece ( 24 ), functional elements (230 ) accommodated by the element carrier ( 23 ) and medium lines (231 ) connected thereto. Funktionsmodul (2) nach zumindest einem der Ansprüche 7 und 8, dadurch gekennzeichnet, dass a) dieses am Transferport (260) so installiert ist, dass es in eine zum Prozessraum (93) benachbarte Transferzelle (96) hineinragt und sich bis in den Aufstellraum (8) erstrecken kann oder sich das Funktionsmodul (2) in Gänze frei in den Aufstellraum (8) erstreckt; und b) der externe Anschluss (232) bzw. die externen Anschlüsse (232) und ein Stellorgan (287) für das Bewegen der Baugruppe, bestehend aus dem Elementeträger (23) mit Frontstück (24), vom Elementeträger (23) aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), vom Aufstellraum (8) zugänglich sind; wobei c) die Transferzelle (96) zum Aufstellraum (8) hin offen sein kann, z.B. aufgrund einer in der Aussenwand (900) vorhandenen Wandöffnung (904). Functional module ( 2 ) according to at least one of claims 7 and 8, characterized in that a) this is installed at the transfer port ( 260 ) in such a way that it protrudes into a transfer cell ( 96 ) adjacent to the process room ( 93 ) and can extend into the installation room ( 8 ) or the functional module ( 2 ) is completely free extends into the installation room ( 8 ); and b) the external terminal (232) or the external terminals (232) and an actuator (287) for moving the assembly consisting of the element carrier (23) with a front piece (24), the element carrier functional elements received (23) (230 ) and medium lines ( 231 ) connected thereto, are accessible from the installation room (8); whereby c) the transfer cell ( 96 ) can be open to the installation room ( 8 ), for example due to a wall opening ( 904 ) in the outer wall (900 ). Verfahren zum Heranführen des Funktionsmoduls (2) gemäss einem oder mehreren der Ansprüche 1 bis 6, an eine in einem Prozessraum (93) eines Containments (9) positionierte Dosierstation (3) und dort zum aseptischen Befüllen von Gefässen mit einer Flüssigkeit bestimmt, wobei: a) das Containment (9) zur Platzierung in einem Aufstellraum (8) bestimmt ist; b) das Containment (9) und der Prozessraum (93) von einem Gehäuse (90) umschlossen ist; und c) das Funktionsmodul (2) aufweist: ca) einen Elementeträger (23); cb) Funktionselemente (230), bestimmt zur Installation am Elementeträger (23); und cc) Mediumsleitungen (231), bestimmt zum Anschluss an die Funktionselemente (230), gekennzeichnet durch die Abfolge der Verfahrensschritte: d) ausserhalb des Prozessraums (93) Bereitstellung des Elementeträgers (23) mit den bestückten Funktionselementen (230) und den daran angeschlossenen Mediumsleitungen (231); und e) Heranführen der montierten Baugruppe, bestehend aus Elementeträger (23), von diesem aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), im dekontaminierten bzw. sterilisierten Zustand, aus einer eingefahrenen Ausgangsstellung, durch einen in einer den Prozessraum (93) begrenzenden Gehäusewand (912) vorgesehenen abgedichteten Transferport (913) in eine ausgefahrene Arbeitsstellung an die Dosierstation (3). Method for bringing the functional module ( 2 ) according to one or more of claims 1 to 6 to a dosing station ( 3 ) positioned in a process space (93 ) of a containment ( 9 ) and intended there for the aseptic filling of vessels with a liquid, wherein: a) the containment ( 9 ) is intended for placement in an installation room ( 8 ); b) the containment ( 9 ) and the process space ( 93 ) are enclosed by a housing ( 90); and c) the functional module ( 2 ) has: ca) an element carrier ( 23 ); cb) functional elements (230 ) intended for installation on the element carrier ( 23 ); and cc) medium lines ( 231 ), intended for connection to the functional elements ( 230 ), characterized by the sequence of the method steps: d) outside the process space (93 ), providing the element carrier (23 ) with the equipped functional elements (230 ) and the medium lines ( 231 ) connected thereto; and e) Bringing the assembled assembly, consisting of element carrier ( 23 ), functional elements ( 230 ) received by it and medium lines ( 231 ) connected to it, in the decontaminated or sterilized state, from a retracted initial position, through a process chamber ( 93 ) into a sealed transfer port ( 913 ) provided on the delimiting housing wall ( 912 ) into an extended working position on the dosing station ( 3 ). Verfahren nach Anspruch 10, dadurch gekennzeichnet, dass in einer zum Prozessraum (93) benachbarten, zum Aufstellraum (8) hin hermetisch abschliessbaren Transferzelle (96) die Bereitstellung und der Zusammenbau von Elementeträger (23) mit Funktionselementen (230) und Mediumsleitungen (231) unter Wahrung aseptischer Bedingungen erfolgen.Method according to Claim 10, characterized in that in a transfer cell (96 ) which is adjacent to the process space ( 93 ) and can be hermetically sealed off from the installation space (8), the provision and assembly of the element carrier (23 ) with functional elements (230 ) and medium lines ( 231 ) be carried out under aseptic conditions. Verfahren nach zumindest einem der Ansprüche 10 und 11, dadurch gekennzeichnet, dass a) bei anteilig in den Prozessraum (93) ausgefahrenem Elementeträger (23) das am Elementeträger (23) zuvorderst fest sitzende Frontstück (24) den Transferport (260) zwischen Prozessraum (93) und Transferzelle (96) öffnet und in dieser Stellung durch Einleitung von Dekontaminationsmittel, vorzugsweise vonseiten des Prozessraums (93) und zugleich vonseiten der Transferzelle (96), die Dekontamination von Prozessraum (93), Transferzelle (96) und Elementeträger (23) erfolgt; anschliessend b) die vorsterilisierten Funktionselemente (230) und Mediumsleitungen (231) durch die Transfer-Armatur (903), unter Wahrung aseptischer Bedingungen, in die Transferzelle (96) eingeschleust werden; und schliesslich c) mit Nutzung der Handschuheingriffe (905) unter Wahrung der sterilen Atmosphäre in der Transferzelle (96), die Bestückung des Elementeträgers (23) mit Funktionselementen (230) und daran der Anschluss der Mediumsleitungen (231) erfolgen. Method according to at least one of claims 10 and 11, characterized in that a) when the element carrier ( 23 ) is partially extended into the process space ( 93 ), the front piece ( 24 ) that is first and foremost firmly seated on the element carrier ( 23 ) opens the transfer port ( 260 ) between the process space ( 93 ) and transfer cell ( 96 ) and in this position by introduction the decontamination of the process space ( 93 ), transfer cell ( 96 ) and element carrier ( 23 ) is carried out by decontamination means, preferably on the part of the process space ( 93 ) and at the same time on the part of the transfer cell ( 96); subsequently b) the pre-sterilized functional elements (230) and fluid lines (231) are introduced through the transfer valve (903) while maintaining aseptic conditions in the transfer cell (96); and finally c) using the glove ports ( 905 ) while maintaining the sterile atmosphere in the transfer cell ( 96 ), the element carrier (23 ) is fitted with functional elements (230 ) and the medium lines ( 231 ) are connected thereto. Verfahren nach zumindest einem der Ansprüche 10 bis 12, dadurch gekennzeichnet, dass a) in der Ausgangsstellung die montierte Baugruppe, bestehend aus Elementeträger (23), von diesem aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), in der Transferzelle (96) steht und ein zuvorderst am Elementeträger (23) sitzendes Frontstück (24) im Transferport (260) positioniert ist; während b) zum Erreichen der Arbeitsstellung diese montierte Baugruppe aus der Transferzelle (96) bis an die Dosierstation (3) ausgefahren wird. Method according to at least one of claims 10 to 12, characterized in that a) in the starting position, the mounted assembly consisting of element carrier (23) of this recorded function elements (230) and connected thereto, medium lines (231) is in the transfer cell (96) and a foremost seated on the element carrier (23) front piece (24 ) is positioned in the transfer port ( 260 ); while b) to reach the working position, this assembled assembly is moved out of the transfer cell ( 96 ) to the dosing station ( 3 ). Verfahren nach zumindest einem der Ansprüche 10 bis 13, dadurch gekennzeichnet, dass a) zum Erreichen der Arbeitsstellung die montierte Baugruppe, bestehend aus dem Elementeträger (23) mit Frontstück (24), vom Elementeträger (23) aufgenommenen Funktionselementen (230), daran angeschlossenen Mediumsleitungen (231), schlittenartig geführt oder gestützt aus der Transferzelle (96) herausgefahren wird, bis das am Elementeträger (23) hinten sitzende Endstück (25) am Transferport (260) anschlägt; wobei b) das Herausfahren der Baugruppe in die Arbeitsstellung durch Ausschieben vonseiten der Transferzelle (96) oder durch Herausziehen vonseiten des Prozessraums (93), z.B. mittels eines im Prozessraum (93) installierten Roboters (1), erfolgt. Method according to at least one of claims 10 to 13, characterized in that a) to reach the working position, the assembled assembly, consisting of the element carrier (23 ) with front piece ( 24 ), the element carrier (23 ) accommodated functional elements (230 ), medium lines ( 231 ) connected to them, guided like a carriage or supported from the transfer cell (96 ) is moved out until the end piece (25 ) seated at the rear of the element carrier (23 ) strikes the transfer port ( 260); whereby b) the assembly is moved out into the working position by being pushed out by the transfer cell ( 96 ) or by being pulled out by the processing space ( 93 ), eg by means of a robot (1) installed in the processing space (93). Verfahren zum Heranführen des Funktionsmoduls (2) gemäss einem oder mehreren der Ansprüche 1 bis 3 und 7 bis 9, an eine in einem Prozessraum (93) eines Containments (9) positionierte Dosierstation (3) und dort zum aseptischen Befüllen von Gefässen mit einer Flüssigkeit bestimmt, wobei: a) das Containment (9) zur Platzierung in einem Aufstellraum (8) bestimmt ist; b) das Containment (9) und der Prozessraum (93) von einem Gehäuse (90) umschlossen ist, gekennzeichnet durch die Abfolge der Verfahrensschritte: c) Bereitstellung des Funktionsmoduls (2), umfassend: ca) ein gasdichtes Behältnis (28) mit einem sterilisierten Innenraum (29); und cb) die im Behältnis (28) montierte und sterilisierte Baugruppe, bestehend aus einem Elementeträger (23) mit Frontstück (24), vom Elementeträger (23) aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), die zu einem gemeinsamen externen Anschluss (232) oder jeweiligen Anschlüssen (232) führen, wobei: cc) die Baugruppe in der Ausgangsstellung eingefahren innerhalb des Behältnisses (28) steht und dabei das Frontstück (24) eine Passage (280) am Behältnis (28) gasdicht abschliesst; und cd) zum Erreichen der Arbeitsstellung, die Baugruppe mit dem Frontstück (24) voran, sich schlittenartig geführt aus dem Behältnis (28) an die Dosierstation (3) ausfahren lässt; d) Installation des Funktionsmoduls (2) in der Ausgangsstellung abgedichtet am Transferport (260), so dass die Aussenfläche des Frontstücks (24) in den Prozessraum (93) weist; e) Dekontamination des Prozessraums (93) und zeitgleich der Aussenfläche des Frontstücks (24); f) Vorschub der Baugruppe an die Dosierstation (3) zwecks Erreichen der Arbeitsstellung; und zuletzt g) Verbinden von Versorgungsleitungen mit dem externen Anschluss (232) bzw. den externen Anschlüssen (232), wobei h) der Verfahrensschritt g) alternativ zwischen den Verfahrensschritten e) und f) oder zwischen den Verfahrensschritten d) und e) erfolgen kann. Method for bringing the functional module ( 2 ) according to one or more of claims 1 to 3 and 7 to 9 to a dosing station ( 3 ) positioned in a process space ( 93 ) of a containment ( 9 ) and there for the aseptic filling of vessels with a liquid determined, where: a) the containment ( 9 ) is intended for placement in an installation room ( 8 ); b) the containment ( 9 ) and the process space ( 93 ) are enclosed by a housing ( 90 ), characterized by the sequence of the method steps: c) provision of the functional module ( 2 ), comprising: ca) a gas-tight container ( 28 ) with a sterilized interior ( 29 ); and cb) the in the container ( 28 ) mounted and sterilized assembly, consisting of an element carrier ( 23 ) with front piece ( 24 ), the element carrier ( 23 ) accommodated functional elements ( 230 ) and connected medium lines ( 231 ), which lead to a common external connection ( 232 ) or respective terminals ( 232 ), wherein: cc) the subassembly is retracted in the starting position within the container ( 28 ) and the front piece ( 24 ) closes off a passage ( 280 ) on the container ( 28 ) in a gas-tight manner; and cd) in order to reach the working position, the assembly with the front piece ( 24 ) in front, can be moved out of the container ( 28 ) to the dosing station ( 3 ) in a sled-like manner; d) installation of the functional module (2 ) in the initial position sealed at the transfer port ( 260 ) so that the outer surface of the front piece ( 24 ) points into the process space (93 ); e) decontamination of the processing space (93 ) and at the same time the outer surface of the front piece ( 24 ); f) advancing the assembly to the dosing station ( 3 ) in order to reach the working position; and last g) connecting supply lines to the external connection ( 232 ) or the external connections ( 232 ), wherein h) method step g) can alternatively take place between method steps e) and f) or between method steps d) and e). Verfahren nach Anspruch 15, dadurch gekennzeichnet, dass a) man das Funktionsmodul (2) am Transferport (260) so installiert, dass das Funktionsmodul (2) in eine zum Prozessraum (93) benachbarte Transferzelle (96) hineinragt und sich bis in den Aufstellraum (8) erstrecken kann oder sich das Funktionsmodul (2) in Gänze frei in den Aufstellraum (8) erstreckt; und b) der externe Anschluss (232) bzw. die externen Anschlüsse (232) und ein Stellorgan (287) für das Bewegen der Baugruppe, bestehend aus dem Frontstück (24) mit Elementeträger (23), von diesem aufgenommenen Funktionselementen (230) und daran angeschlossenen Mediumsleitungen (231), vom Aufstellraum (8) und/oder von der Transferzelle (96) zugänglich ist. Method according to claim 15, characterized in that a) the function module ( 2 ) is installed at the transfer port ( 260 ) in such a way that the function module ( 2 ) protrudes into a transfer cell ( 96 ) adjacent to the process room ( 93 ) and can extend into the installation room ( 8 ) or the function module ( 2 ) extends freely into the installation space ( 8 ) in its entirety; and b) the external connection ( 232 ) or the external connections ( 232 ) and an actuator ( 287 ) for moving the assembly, consisting of the front piece ( 24 ) with element carrier ( 23 ), functional elements ( 230 ) accommodated by this and thereon connected medium lines ( 231 ), from the installation room ( 8 ) and/or from the transfer cell ( 96 ).
EP20405021.5A 2020-07-17 2020-07-17 Functional module for bringing to a dosing station positioned in a processing chamber of a containment and method for same Pending EP3939896A1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
EP20405021.5A EP3939896A1 (en) 2020-07-17 2020-07-17 Functional module for bringing to a dosing station positioned in a processing chamber of a containment and method for same
CA3186113A CA3186113A1 (en) 2020-07-17 2021-07-16 Functional module for moving to a dosing station positioned in a process chamber of a containment system and corresponding method
US18/014,460 US20230257148A1 (en) 2020-07-17 2021-07-16 Functional Module for Moving to a Dosing Station Positioned in a Process Chamber of a Containment System and Corresponding Method
PCT/IB2021/056440 WO2022013830A1 (en) 2020-07-17 2021-07-16 Functional module for bringing close to a metering station positioned in a process chamber of a containment, and associated method
CN202180061065.5A CN116234753A (en) 2020-07-17 2021-07-16 Functional module for moving to a batching station located in a processing zone of a containment and method thereof
JP2023501637A JP2023534219A (en) 2020-07-17 2021-07-16 A functional module for guiding to a dosing station located in a processing chamber of a containment vessel and a method therefor
KR1020237005381A KR20230038565A (en) 2020-07-17 2021-07-16 Functional module and associated method for accessing a weighing station located in a process chamber of a containment vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP20405021.5A EP3939896A1 (en) 2020-07-17 2020-07-17 Functional module for bringing to a dosing station positioned in a processing chamber of a containment and method for same

Publications (1)

Publication Number Publication Date
EP3939896A1 true EP3939896A1 (en) 2022-01-19

Family

ID=72046837

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20405021.5A Pending EP3939896A1 (en) 2020-07-17 2020-07-17 Functional module for bringing to a dosing station positioned in a processing chamber of a containment and method for same

Country Status (7)

Country Link
US (1) US20230257148A1 (en)
EP (1) EP3939896A1 (en)
JP (1) JP2023534219A (en)
KR (1) KR20230038565A (en)
CN (1) CN116234753A (en)
CA (1) CA3186113A1 (en)
WO (1) WO2022013830A1 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2635335A1 (en) * 2010-11-01 2013-09-11 GE Healthcare UK Limited Pierce and fill device
EP2976117A1 (en) * 2013-03-22 2016-01-27 Amgen Inc. Injector and method of assembly
EP3028946A1 (en) * 2014-12-05 2016-06-08 F. Hoffmann-La Roche AG Preparing a double chamber container
EP3335844A1 (en) * 2016-12-15 2018-06-20 Pharma Integration S.R.L. Constructive structure of a containment, intended for automated production of pharmaceutical or biotechnical article
EP3356238A1 (en) * 2015-09-30 2018-08-08 Muffin Incorporated Systems and methods for filling and sealing vials

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8030080B2 (en) * 2006-01-18 2011-10-04 Argos Therapeutics, Inc. Systems and methods for processing samples in a closed container, and related devices
ES2447315B1 (en) * 2013-07-30 2014-09-10 Grifols Worldwide Operations Limited Machine and procedure for filling pharmaceutical product containers
ES2856339T3 (en) * 2013-08-26 2021-09-27 Equashield Medical Ltd Robotic system for compounding drugs

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2635335A1 (en) * 2010-11-01 2013-09-11 GE Healthcare UK Limited Pierce and fill device
EP2976117A1 (en) * 2013-03-22 2016-01-27 Amgen Inc. Injector and method of assembly
EP3028946A1 (en) * 2014-12-05 2016-06-08 F. Hoffmann-La Roche AG Preparing a double chamber container
EP3356238A1 (en) * 2015-09-30 2018-08-08 Muffin Incorporated Systems and methods for filling and sealing vials
EP3335844A1 (en) * 2016-12-15 2018-06-20 Pharma Integration S.R.L. Constructive structure of a containment, intended for automated production of pharmaceutical or biotechnical article

Also Published As

Publication number Publication date
JP2023534219A (en) 2023-08-08
US20230257148A1 (en) 2023-08-17
WO2022013830A1 (en) 2022-01-20
CA3186113A1 (en) 2022-01-20
CN116234753A (en) 2023-06-06
KR20230038565A (en) 2023-03-20

Similar Documents

Publication Publication Date Title
DE60025708T2 (en) MULTI-STAGE SINGLE DRIVE FOR FOUP DOOR OPENING SYSTEM
DE102015005780B4 (en) Device for producing three-dimensional objects
DE602004004682T2 (en) A method for the sterile dosing of vials
EP2388561A1 (en) Laboratory device for sample preparation
DE102008018516A1 (en) Device for filling containers
EP2279122B1 (en) Gripping device for picking up containers and closures and for closing the containers
DE2624156A1 (en) DEVICE FOR THE TREATMENT OF FLAT WORK PIECES WITH LIQUIDS AND / OR GASES
EP0588070A1 (en) Safety filling and emptying nozzle for liquid, viscous or powdery materials
WO2022063667A1 (en) Beta component of a transfer system for a sterile isolation region, sterile isolation region, aseptic filling system, and method for operating such a filling system
DE4031472A1 (en) DEVICE FOR STERILIZING, FILLING AND SEALING A FILL OPENING
DE102020102768A1 (en) Isolator system for filling a container with a liquid, transfer station for transferring a container and method therefor
EP2059446B1 (en) Device for treating flexible, tubular structures
DE69324069T2 (en) Method and device for wet chemical treatment of semiconductor wafers and other objects
EP3939896A1 (en) Functional module for bringing to a dosing station positioned in a processing chamber of a containment and method for same
EP3789305B1 (en) Installation comprising a container for aseptically filling a powder
EP3931106B1 (en) Machine arrangement and method for filling and sealing containers
EP1847368B1 (en) Method and device for radiation hardening
EP1593622B1 (en) Transport container for sterile products
DE2750172C3 (en) Drive device for an automatic incubator
DE3343193A1 (en) GAS TUNGSTEN ARCH WELDING DEVICE
DE567510C (en) Method and device for aseptic filling and closing of bottles, vessels and the like. like
EP1092348B1 (en) Process and apparatus for eradicating pests in organic bulk goods
DE69402735T2 (en) System and method for engaging a sealing window within an opening of an containment cell
EP4240653B1 (en) Closing apparatus for closing pharmaceutical containers
EP1497181A1 (en) Method and device for inert gas rinsing of containers

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20220701

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

TPAC Observations filed by third parties

Free format text: ORIGINAL CODE: EPIDOSNTIPA

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230322