EP3934931A1 - Charging station for charging electric vehicles - Google Patents
Charging station for charging electric vehiclesInfo
- Publication number
- EP3934931A1 EP3934931A1 EP20709540.7A EP20709540A EP3934931A1 EP 3934931 A1 EP3934931 A1 EP 3934931A1 EP 20709540 A EP20709540 A EP 20709540A EP 3934931 A1 EP3934931 A1 EP 3934931A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- phase
- charging
- supply
- current
- connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/67—Controlling two or more charging stations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/10—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles characterised by the energy transfer between the charging station and the vehicle
- B60L53/11—DC charging controlled by the charging station, e.g. mode 4
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/10—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles characterised by the energy transfer between the charging station and the vehicle
- B60L53/14—Conductive energy transfer
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/26—Arrangements for eliminating or reducing asymmetry in polyphase networks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/63—Monitoring or controlling charging stations in response to network capacity
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/12—Electric charging stations
Definitions
- the present invention is therefore based on the object of addressing at least one of the problems mentioned.
- a solution is to be proposed by means of which a charging station achieves the most symmetrical possible loading of a three-phase supply connection.
- At least an alternative solution to previously known solutions should be proposed.
- This change serves to change the load on the three phases. As long as each AC terminal only accesses one phase or, when accessing two or three phases, accesses these in the same way, i.e. draws the same amount of current, the last-mentioned change, in which only the last two phases were swapped, is basically superfluous. It would then suffice if the phase change device can only advance or turn back the connection for all three strands by one step, or for all three strands by two steps.
- the phase change device can in principle be designed mechanically, in which even a rotary switch or slide switch always changes the electrical connection for three phases, that is to say for each of the three strands mentioned.
- power semiconductor switches for example with IGBTs or thyristors.
- the use of power semiconductor switches has the advantage that electronic control of these phase change devices can be better achieved and that no signs of wear and tear can occur on switch contacts.
- the first connection line is switched to the second phase of the power supply, i.e. the second supply line, and correspondingly the second connection line to the third phase and the third connection line to the first phase.
- the first connection line is switched to the third phase, i.e. 240 °, the second connection line to the first phase and the third connection line to the second phase.
- the balancing control preferably has both of the aforementioned pieces of information, that is, both the information on the individual loads on the individual AC charging terminals and the overall load or phase distribution of the power supply.
- the underlying idea here is that an asymmetry in the three phases of the power supply is not only due to the AC charging terminals, but can also depend on other connected loads. In this case, the information about the load on each AC charging terminal would not allow conclusions to be drawn about the overall load situation of the three phases of the power supply.
- at least one active three-phase rectifier can be connected in the charging station, which can also lead to an asymmetrical load on the three phases of the power supply.
- the AC charging terminals with the greatest current consumption can be viewed first and set to minimize asymmetrical loading.
- the AC charging terminals with the greatest current load therefore also have the greatest influence on the asymmetrical load.
- Additional AC charging terminals with lower power consumption can then be set downstream, for example. Even if the optimal setting of all phase change devices of the AC charging terminals is possibly not achieved as a result, a comparatively good result can still be achieved with significantly less optimization effort.
- the balancing control may not be able to determine directly whether a single-phase, two-phase or three-phase so-called in-vehicle charger is connected. However, in any case according to one embodiment, it can each detect the current of the three connection lines of the relevant AC charging terminal and use this to identify which of the three connection lines carries a current and which does not. Such a measurement therefore shows whether the corresponding AC charging terminal is working single-phase, two-phase or three-phase.
- An improvement or refinement can be achieved by initially sorting the AC charging terminals into a first and second group, namely the AC charging terminals with single-phase power consumption in a first group and the AC charging terminals with two-phase power consumption in a second group and optionally the AC charging terminals (6) with three-phase power consumption in a third group.
- the above-described division according to the maximum phase current and also the proposed sequence of connection to the relevant supply lines are then carried out in groups. This also means that in the first group, the line with the maximum load is the only line that carries current.
- the following connection sequence is proposed for the maximum loaded strings. This can be done overall for all AC charging terminals with single-phase or two-phase or even three-phase power consumption or in groups for the first and second and possibly third groups. Accordingly, it is proposed that the first maximum loaded line, i.e. the maximum loaded line of the first AC terminal according to the sorting, be connected to the first supply line, the second maximum loaded line to the second supply line and the third maximum loaded line to the third supply line - strand.
- the first string with the maximum load i.e. the string with the maximum load of the first AC terminal according to the sorting, the second string with the maximum load is the string with the maximum load for the second AC terminal, and so on.
- the fourth maximally loaded line is also connected to the third supply line, the fifth maximum loaded line to the second supply line and the sixth maximum loaded line to the first supply line.
- the first and sixth maximum loaded line are then connected to the first supply line.
- the sorting is generally carried out with the reverse sequence, i.e. starting with the last maximally loaded line and then continuing the sequence with the penultimate, maximally loaded line, etc. until finally the first maximally loaded line.
- the reverse sequence i.e. starting with the last maximally loaded line and then continuing the sequence with the penultimate, maximally loaded line, etc. until finally the first maximally loaded line.
- sorting with the reverse sequence is proposed so that the last line with the maximum load is started and this is connected to the first supply line, the penultimate line with the maximum load is connected to the second supply line, and the third from the last line with the maximum load is connected to the third Supply line. Then the sequence is reversed again so that the fourth from last line with maximum load is also connected to the third, supply line, the fifth last to the second and the sixth from last to the first.
- the balancing control is especially prepared to carry out all the described functionalities in that it has a corresponding control program that can be implemented, for example, on a process computer that can form part of the balancing control.
- data channels, especially data lines are provided in order to connect the balancing control to the AC charging terminals, especially in order to be able to control the respective phase change device. This can also be used to transfer sensor data from current measurements for balancing control.
- connection lines would then be connected to the third, second and first supply line, i.e. first the second connection line of the third two-phase AC charging terminal (place 4) to the third supply line and the second connection line of the second three-phase AC charging terminal (place 5) to the second supply line, as well as a further connection line not mentioned in the above example (place 6) to the first supply line.
- two connection lines would be connected from the second three-phase AC charging terminal to the second supply line, and two connection lines would be connected from the third two-phase AC charging terminal to the third supply line.
- Another possibility is to split the three connection strings of each AC charging terminal into positive and negative sequence components and then only consider the negative sequence components for optimization, especially so that the phase positions of the negative sequence currents are switched so that the sum of all Negative system components in the optimization calculation results in zero or at least becomes minimal.
- the number of necessary switching processes of the phase change device be taken into account. It can be the case, for example, that an asymmetry of 40%, for example, can be reduced to 3% with a few switching processes, but a very high number of switchings is required to achieve a further reduction to 2%.
- a secondary condition that can be taken into account is to minimize the number of switchover processes. Using as few switching processes as possible can therefore be included as a secondary condition.
- at least one DC charging terminal with an upstream active rectifier is provided, the active rectifier is connected to the power supply and the active rectifier is prepared to load the three supply lines differently in order to avoid asymmetry of the currents in the power supply to reduce.
- the active rectifier is therefore provided to generate a first direct current, which may be further processed in the sub-terminals, and this can not only adjust the direct current to the desired level, but it can also be controlled on the AC side and control its three-phase input current. also with regard to each individual phase.
- Such an active rectifier can also be constructed like an inverter, whereas it is operated in the opposite direction, namely from alternating current to direct current.
- it is also possible here for such a rectifier / inverter to be operated bidirectionally. In that case, the DC charging terminal could also feed electrical power into the power supply, which is proposed as a preferred embodiment.
- This active rectifier can thus control the load on the three supply lines and the active rectifier is preferably controlled in such a way that it generates a negative sequence current with any phase and amplitude, if possible, and thus connects to the three-phase power supply, thereby creating an asymmetry of the currents in the power supply to reduce.
- the generation of such a negative sequence current refers to the method of symmetrical components, according to which a three-phase current is computationally broken down into a positive sequence or a positive sequence component and a negative sequence or negative sequence component, which can also be referred to as negative sequence current, by means of a transformation.
- a zero system or zero system current must also be taken into account, which can be neglected here.
- a zero-system current can indeed occur here, but it is assumed that there is essentially a de facto ohmic load from all of the electric vehicles to be charged thus a reduction in the asymmetry and thus a reduction in a negative sequence current component almost automatically leads to a reduction in the zero sequence current. It is therefore sufficient to consider the asymmetry. Nevertheless, it can preferably be provided that a zero sequence component is also taken into account and compensated for.
- the repetition time is selected in a range from 1 minute to 5 minutes. This is well below the duration of an average charging process for an electric vehicle, which can range from 15 minutes to several hours. It is therefore proposed that the connection assignment be checked and, if necessary, changed more often.
- the power supply is preferably connected to a network connection point of an electrical supply network, in particular via a transformer. It can thus be achieved that balancing the three phases of the power supply also has a correspondingly positive effect on the electrical supply network. As a result, the power quality in the network can be improved by means of the charging station, at least in comparison to the situation when no attention is paid to reducing the asymmetry of the three-phase power supply in the charging station.
- a method for charging electric vehicles by means of a charging station is also proposed. This method is based on a charging station that has several AC charging terminals, each of which is designed to charge an electric vehicle with alternating current.
- each AC charging terminal has three connection lines, each of which is connected to the three supply lines, and the three voltage phases are applied to the connection lines via the three supply lines.
- Each phase change device then changes a connection assignment between the three supply lines and the three connection lines in order to reduce a current asymmetry in the power supply. If a current asymmetry has become minimal, in particular zero, then of course the connection assignment does not need to be changed. But whenever a reduction in the current asymmetry is to be carried out, this phase change device can change the connection assignment. This is done individually for each AC charging terminal.
- the method use a charging station as explained in accordance with an embodiment described above.
- the method or a part thereof be implemented in the balancing control of the charging station.
- a charging station 1 is shown schematically, which is connected to an electrical supply network 4 via a network connection point 2.
- the charging station 1 has several AC charging terminals 6 and a DC charging terminal 8 with two sub-charging terminals, namely with two DC chargers 10.
- a power supply 12 is provided, which has a first, second and third supply line 21, 22 and 23 and a supply neutral conductor 20.
- the power supply 12 is connected to the network connection point 2 and there to a transformer 14 provided at the network connection point 2.
- the DC charging terminal 8 is connected to the three strings 21, 22 and 23 of the power supply 12 via an active rectifier 16.
- a connection to the supply neutral conductor 20 is not provided for the active rectifier, but can be provided according to one embodiment.
- Each AC charging terminal 6 is connected to the power supply 12 via a phase change device 18. The connection is made to the three supply lines 21, 22 and 23 as well as to the supply neutral conductor.
- connection neutral conductor 30 is only looped through the phase change device 18 and is not affected by switching processes.
- AC charging terminals 6 are shown by way of example in FIG. 1, but additional ones can be provided and the power supply 12 also indicates that they are still can be continued.
- Two of the four AC charging terminals 6 each have an electric vehicle connected with a single-phase in-vehicle charger, with the first phase being specifically only loaded, which is indicated by Ph1.
- An electric vehicle 24 is connected to another AC charging terminal, which also uses an in-vehicle charger which is single-phase, but is connected to a third phase, which is indicated by Ph3.
- An in-vehicle charger is also referred to in specialist circles as an onboard charger, which can therefore be used as a synonymous term.
- a fourth electric vehicle 24 is provided which uses a three-phase in-vehicle charger.
- the situation is that the first phase is loaded by two single-phase in-vehicle chargers, the second phase by none and the third phase by a single-phase in-vehicle charger.
- all three phases are ideally evenly loaded by the three-phase in-vehicle charger. Accordingly, the first phase is likely to be heavily overloaded and the second phase is likely to be heavily underloaded, so that overall there is a very asymmetrical load on the power supply 12.
- phase changing device 18 carries out a phase changeover or phase advancement so that the first phase that the single-phase in-vehicle charger uses the second connection line is switched, which then results in an interconnection with the second supply line.
- a single-phase vehicle-internal charger would then be connected to the first, second and third supply line.
- a balancing control 28 is provided for operating the charging station and in particular for controlling the phase change devices 18 in order to reduce or, if possible, minimize an asymmetrical load on the three-phase power supply.
- This balancing control 28 receives information about all currents or connecting lines or connecting lines of the AC charging terminals 6.
- a terminal sensor 34 is provided for each. The terminal sensor 34 thus supplies information about each current between each AC charging terminal and the power supply 12.
- each AC charging terminal 6 can be connected to each of the four currents, that is to say the three phase currents and the neutral conductor current, four current values are transmitted to the balancing control 28.
- the respective terminal sensor 34 or an evaluation unit coupled to it already converts these four currents using the symmetrical component method, namely into a positive sequence current li, n, a negative sequence current h, n and a zero sequence current lo, n.
- These currents can be transmitted to the balancing control 28 via a terminal sensor line 36 and this is indicated in FIG. 1 on the terminal sensor line 36.
- the index n for each of these partial currents indicates that such three currents are recorded for each of the AC charging terminals 6.
- the index n therefore stands for the respective number of the AC charging terminal. In the present illustrative case of FIG. 1, the index n would thus range from 1 to 4.
- the balancing control 28 can now determine an optimization based on these current values that it has received via the terminal sensor line 36 and then control the phase change devices 18 accordingly in order to make the connection assignments between the respective output connection 26 and the connection strings 31, 32 and 33 of the AC charging terminal 6 to be implemented by switching the phase change devices 18 accordingly.
- corresponding control signals can be transmitted from the balancing control 28 to the phase change devices 18 and for this purpose, for example, a terminal control line 38 can be provided to each phase change device 18.
- FIG. 1 additionally illustrates the use of the active rectifier 16 to further reduce any asymmetry of the currents in the power supply 12.
- the balancing control 28 receive corresponding current data from the power supply 12.
- a power supply sensor 40 is provided for this, which can detect all four currents of the power supply 12. He or an assigned evaluation unit can also provide a transformation using the symmetrical component method and accordingly determine a positive sequence current li, a negative sequence current I2 and a zero sequence current Io and feed it to the symmetry control 28 via a feed sensor line 42.
- the balancing controller 28 can generate a predefined negative sequence current component I2 soii as a setpoint value and feed it to the active rectifier 16 via a rectifier control line 44. Together with the power requirement of the DC charging terminal 8 and the setpoint value for the negative sequence current I2 soii, the active rectifier 16 can then be controlled in such a way that, after reverse transformation from the representation according to the symmetrical components, a corresponding three-phase current is drawn from the power supply 12. The active rectifier 16 and thus the DC charging terminal 8 are then supplied from the power supply 12, that is to say draws current, but at the same time switches on the negative sequence current that has been specified by the balancing control 28.
- FIG. 2 shows a flow diagram 200 for minimizing the asymmetry in a power supply line 12 of FIG. 1.
- a static phase symmetrization is carried out. This is indicated by the static balancing block 202. Accordingly, the phase change device for all AC charging terminals that are not used at the moment is successively shifted from one to the next AC charging terminal by one phase in order to achieve a leveling out. For the example in FIG. 1, assuming that none of the four AC charging terminals 6 shown is being used at the moment, that according to the illustration in FIG.
- phase change device 18 1, coming from the left, the first phase change device 18 remains as it is The next phase change device 18 is switched one switch position further to the right, the third is switched two positions further to the right and the fourth remains as it is. If there were a fifth, it would be indexed one position, the sixth by two, and so on.
- step 1 which is identified as S1 in FIG. 2 and comprises several blocks.
- a sorting of the AC- Charging terminals made according to the size of the maximum phase current of this AC charging terminal. Different variants can be considered.
- One variant is that only those AC charging terminals are taken into account in this sorting that have a single-phase or two-phase power consumption at the moment. According to the embodiment according to FIG. 1, this can also be recognized by the terminal sensor 34.
- the AC charging terminals are sorted in groups according to the size of the maximum phase currents. Accordingly, a first group can include all AC charging terminals that show a single-phase current load, and a second group can include all AC charging terminals that show a two-phase current load. If necessary, the AC charging terminals that show a three-phase current load can also be sorted into a third group.
- the connection branches with the maximum phase currents are then successively switched to the first, second and third phases in the sequence that resulted from the sorting block 204.
- the AC charging terminal with the fourth largest maximum phase current does not start from the beginning, but rather back in the same order.
- the AC charging terminal with the fourth largest maximum phase current is also switched to the third phase, the fifth largest maximum phase current is switched to the second phase and the sixth largest maximum phase current to the first.
- step 2 which is identified as S2 in Figure 2
- a further minimization of the asymmetry is proposed, which ideally leads to the currents in the current supply Lead, as the power supply 12 of Figure 1, are completely symmetrical, the asymmetry is at least very greatly minimized, in particular close to zero.
- One or more active rectifiers such as the active rectifier 16 of the embodiment of FIG. 1, are now used for this purpose.
- the total asymmetry remaining in spite of the measures according to variation block 206 is recorded in residual asymmetry determination block 208.
- this can be achieved by the power supply sensor 40, which transmits its detected result to the balancing control 28.
- a negative sequence current required for compensation can then be determined from this. This can be carried out in the opposing system determination block 210.
- the result would be a negative sequence current, such as the negative sequence current h soii in FIG. 1, which is given to the active rectifier 16 as a setpoint value.
- this conversion takes place in the rectifier control block 212, which converts this specification of the negative sequence current and thus actually switches the negative sequence current to the power supply 12, that is to the three currents present there or the three-phase current system present there.
- this final minimization of the asymmetry by means of the controlled rectifier can only compensate for a residual asymmetry. It is therefore proposed that the reduction of the asymmetry according to the implementation of the sorting block 204 and the variation block 206 be repeated regularly, namely according to a second repetition time T2.
- This second repetition time can be 1 minute or more, for example. It is also possible that it is several minutes and is, for example, 3 minutes or more. It should preferably be chosen to be less than 10 minutes.
- Example 1 Charging process with 1 pu DC (symmetrical AC load) and 0.33 pu AC on phase A (total current): Symmetrical
- example 1 there is thus an asymmetry of 50% due to the feeding in of a negative sequence current, e.g. has been reduced to 25% by the active rectifier 16 of the embodiment of FIG.
- Example 2 charging process with 1 p.u. DC (symmetrical AC load) and 4X0.33 p.u. AC on phase A (total current):
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention relates to a charging station (1) for charging electric vehicles (24), comprising a plurality of AC charging terminals (6), each for charging an electric vehicle (24) by means of alternating current, wherein each of the AC charging terminals (6) is connected to a three-phase current supply (12) via a phase-change device (18) in order to be supplied thereby with three-phase electrical current, wherein the current supply (12) has three supply lines (21, 22, 23) for providing three voltage phases, and each AC charging terminal (6) has three connection lines (31, 32, 33) for connecting to the three supply lines (21, 22, 23) for applying the three voltage phases to the connection lines (31, 32, 33), wherein each phase-change device (18) is configured to change a connection allocation between the three supply lines (21, 22, 23) and the three connection lines (31, 32, 33).
Description
Ladestation zum Laden von Elektrofahrzeugen Charging station for charging electric vehicles
Die vorliegende Erfindung betrifft eine Ladestation zum Laden von Elektrofahrzeugen und sie betrifft auch ein Verfahren zum Laden von Elektrofahrzeugen. The present invention relates to a charging station for charging electric vehicles and it also relates to a method for charging electric vehicles.
Elektrofahrzeuge erfreuen sich zunehmender Beliebtheit und so werden auch immer mehr und immer größere Ladestationen benötigt, die Elektrofahrzeuge aufladen. Große Ladestationen, die auch als Stromtankstellen bezeichnet werden können, können viele Elektrofahrzeuge gleichzeitig mit elektrischem Strom laden. Die dafür benötigte Leistung erhält eine solche Ladestation üblicherweise von einem elektrischen Versorgungsnetz, an das sie über einen Netzverknüpfungspunkt angeschlossen sein kann. Besonders bei großen Ladestationen kann ihr Leistungsbedarf dabei merkliche Auswirkungen auf das elektrische Versorgungsnetz haben. Dabei können Netzabschnitte oder der Netzverknüpfungspunkt mitunter eine Leistungsgrenze erreichen. Electric vehicles are enjoying increasing popularity and so more and more and larger charging stations are required to charge electric vehicles. Large charging stations, which can also be referred to as charging stations, can charge many electric vehicles with electricity at the same time. Such a charging station usually receives the power required for this from an electrical supply network to which it can be connected via a network connection point. Particularly in the case of large charging stations, their power requirements can have a noticeable impact on the electrical supply network. Network sections or the network connection point can sometimes reach a performance limit.
Um dem zu begegnen, kann das elektrische Versorgungsnetz und/oder der Netzverknüpfungspunkt hinsichtlich der Leistungsfähigkeit bzw. der Fähigkeit, Leistung zu übertragen, ausgebaut werden. Problematisch kann aber nicht nur die Leistungshöhe, sondern auch die Stromqualität sein, die durch die Ladestation beeinflusst werden kann. Eine Ladestation zum Laden von Elektrofahrzeugen wandelt dabei den elektrischen, dreiphasigen Wechselstrom, der aus dem elektrischen Versorgungsnetz bezogen wird, jeweils in Gleichstrom um. Dabei können in den verschiedenen Elektrofahrzeugtypen unterschiedliche Ladetechnologien
verbaut sein. Neben DC-Schnellladeoptionen haben nahezu alle Fahrzeuge, zumindest viele Fahrzeuge, auch noch sogenannte fahrzeuginterne Lader verbaut. Diese wandeln selbst einen Wechselstrom in einen Gleichstrom, haben also einen AC-Eingang und können daher auch synonym als AC-Lader bezeichnet werden. Solche fahrzeuginternen Lader sind entweder einphasig, zweiphasig oder dreiphasig mit einem AC-Anschluss verbunden. In diesem Fall wird das Elektrofahrzeug also mit ein-, zwei- oder dreiphasigem Wechselstrom versorgt und die Wandlung in Gleichstrom, also in einen DC- Ladestrom, erfolgt dann erst im Elektrofahrzeug. To counter this, the electrical supply network and / or the network connection point can be expanded with regard to the performance or the ability to transmit power. However, it is not only the level of performance that can be problematic, but also the power quality, which can be influenced by the charging station. A charging station for charging electric vehicles converts the electrical, three-phase alternating current, which is drawn from the electrical supply network, into direct current. Different charging technologies can be used in the various types of electric vehicle be installed. In addition to DC fast charging options, almost all vehicles, at least many vehicles, also have so-called in-vehicle chargers installed. These convert an alternating current into a direct current themselves, so they have an AC input and can therefore also be referred to synonymously as AC chargers. Such in-vehicle chargers are either single-phase, two-phase or three-phase connected to an AC connection. In this case, the electric vehicle is supplied with one-, two- or three-phase alternating current and the conversion into direct current, i.e. into a DC charging current, only takes place in the electric vehicle.
Welche Phasen eines dreiphasigen Versorgungsstrangs, der direkt oder indirekt an das elektrische Versorgungsnetz angeschlossen ist, besonders am Netzverknüpfungspunkt, belastet werden, ist dabei meist zufällig. Dadurch kann es bei mehreren zu ladenden Fahrzeugen zu einer starken Asymmetrie des Wechselstromsystems kommen. Werden also beispielsweise, um ein stark vereinfachendes Beispiel zu verwenden, drei Elektrofahrzeuge über ihren fahrzeuginternen Lader geladen, der jeweils nur einphasig arbeitet, kann die Belastung des dreiphasigen Systems in der Ladestation gleichmäßig sein, wenn jeder fahrzeuginterne Lader jeweils von einer anderen der drei Phasen seinen Strom bezieht. Beziehen aber beispielsweise alle drei Fahrzeuge mit ihrem fahrzeuginternen Lader ihren Strom zufällig von derselben Phase, zum Beispiel von der ersten Phase, so ist diese erste Phase stark belastet und die zweite und dritte Phase nicht oder weniger. Entsprechend ergibt sich eine asymmetrische Belastung, die sich von der Ladestation in das elektrische Versorgungsnetz auswirken kann. Which phases of a three-phase supply line, which is connected directly or indirectly to the electrical supply network, especially at the network connection point, is mostly random. This can lead to a strong asymmetry of the AC system when several vehicles are to be charged. If, for example, to use a simplistic example, three electric vehicles are charged via their in-vehicle charger, which only works in one phase, the load on the three-phase system in the charging station can be even if each in-vehicle charger is from a different one of the three phases Electricity. But if, for example, all three vehicles with their in-vehicle charger happen to draw their power from the same phase, for example from the first phase, this first phase is heavily loaded and the second and third phases are not or less. Accordingly, there is an asymmetrical load that can affect the electrical supply network from the charging station.
Um diesem Problem zu begegnen, kann versucht werden, an jedem AC-Ladepunkt, an dem also ein Elektrofahrzeug mit einem fahrzeuginternen Lader anzuschließen ist, jeweils eine der drei Phasen als Vorzugsphase vorzugeben, wobei diese Vorzugsphase von einem zum nächsten AC-Ladepunkt wechselt. Dadurch kann allerdings nicht berücksichtigt werden, dass die fahrzeuginternen Lader je nach Fahrzeug und Ladestand unterschiedlich viel Strom benötigen. Sind also von beispielsweise sechs AC-Ladepunkten jeweils zwei für die erste, zwei für die zweite und zwei für die dritte Phase vorgesehen, kann es trotzdem zu einer Asymmetrie kommen, wenn beispielsweise an beiden AC- Ladepunkten der ersten Phase zwei Fahrzeuge nur wenig Ladestrom benötigen, wohingegen an zwei weiteren AC-Ladepunkten für die zweite Phase zwei Fahrzeuge angeschlossen sind, die einen hohen Ladestrom benötigen. Gleiches gilt, wenn an den beispielhaft genannten sechs AC-Ladepunkten beispielsweise nur an den beiden AC- Ladepunkten für die erste Phase Elektrofahrzeuge angeschlossen sind und geladen werden.
Es kommt hinzu, dass es neben einphasigen fahrzeuginternen Ladern auch zweiphasige und dreiphasige gibt. To counter this problem, an attempt can be made to specify one of the three phases as the preferred phase at each AC charging point, i.e. at which an electric vehicle with an in-vehicle charger is to be connected, with this preferred phase changing from one AC charging point to the next. However, this does not take into account that the in-vehicle chargers require different amounts of electricity depending on the vehicle and charge level. If, for example, there are six AC charging points, two each are provided for the first, two for the second and two for the third phase, an asymmetry can still occur if, for example, two vehicles require only little charging current at both AC charging points in the first phase , whereas two vehicles are connected to two additional AC charging points for the second phase, which require a high charging current. The same applies if electric vehicles are connected and charged at the six AC charging points mentioned as an example, for example only at the two AC charging points for the first phase. In addition, there are two-phase and three-phase chargers in addition to single-phase in-vehicle chargers.
Ebenfalls kann es Vorkommen, dass beispielsweise im sogenannten Flotteneinsatz, bei dem ein Verkehrs- oder Logistikunternehmen viele Elektrofahrzeuge hat und eine eigene Ladestation betreibt, viele AC-Ladepunkte mit wenig Schnellladepunkten kombiniert werden. Dies ist dadurch begründet, dass in einem solchen Fall häufig die Fahrzeuge der Flotte in einer kontinuierlichen Nachtladung geladen werden, wozu viele AC-Ladepunkte benötigt werden. Zusätzlich dazu können aber wenige Schnellladepunkte vorgesehen sein, falls ein Fahrzeug der Flotte zwischenzeitlich aufgeladen werden muss und ein solches Laden nicht bis zur Nachtladung warten kann. Solche Schnellladepunkte sind welche, die zum Bereitstellen eines DC-Ladestroms Gleichstromsteller aufweisen, um für die Schnellladung hohe Gleichströme zu erzeugen. Solche Gleichstromsteller als Teil der Schnellladepunkte sind dann Teil der Ladestation und können dreiphasig an eine entsprechende dreiphasige Versorgungsleitung in der Ladestation angeschlossen sein. Somit ist zusätzlich zu beachten, dass manche Ladestationen eine solche Kombination von DC-Ladern und AC-Ladepunkten aufweisen. It can also happen that, for example, in so-called fleet operations, where a transport or logistics company has many electric vehicles and operates its own charging station, many AC charging points are combined with few quick charging points. The reason for this is that, in such a case, the vehicles in the fleet are often charged in a continuous night charge, for which many AC charging points are required. In addition to this, however, a few quick charging points can be provided if a vehicle in the fleet has to be charged in the meantime and such charging cannot wait until night charging. Such fast charging points are those which have DC choppers for providing a DC charging current in order to generate high direct currents for fast charging. Such DC choppers as part of the fast charging points are then part of the charging station and can be connected in three phases to a corresponding three-phase supply line in the charging station. It should also be noted that some charging stations have such a combination of DC chargers and AC charging points.
Eine solche Struktur kann zusätzlich die Symmetrie des dreiphasigen Versorgungssystems in der Ladestation und damit die Symmetrie in dem elektrischen Versorgungsnetz beeinflussen, an das die Ladestation angeschlossen ist. Das Deutsche Patent- und Markenamt hat in der Prioritätsanmeldung zur vorliegenden Anmeldung folgenden Stand der Technik recherchiert: DE 10 2013 204 256 A1 , DE 10 2017 116 886 A1 , EP 3 184 352 A1 , EP 3 549 814 A1 , WO 2012/ 128 626 A2. Such a structure can also influence the symmetry of the three-phase supply system in the charging station and thus the symmetry in the electrical supply network to which the charging station is connected. The German Patent and Trademark Office researched the following prior art in the priority application for the present application: DE 10 2013 204 256 A1, DE 10 2017 116 886 A1, EP 3 184 352 A1, EP 3 549 814 A1, WO 2012/128 626 A2.
Der vorliegenden Erfindung liegt somit die Aufgabe zugrunde, zumindest eines der genannten Probleme zu adressieren. Insbesondere soll eine Lösung vorgeschlagen wer- den, durch die eine Ladestation eine möglichst symmetrische Belastung eines dreiphasigen Versorgungsanschlusses erreicht. Zumindest soll zu bisher bekannten Lösungen eine alternative Lösung vorgeschlagen werden. The present invention is therefore based on the object of addressing at least one of the problems mentioned. In particular, a solution is to be proposed by means of which a charging station achieves the most symmetrical possible loading of a three-phase supply connection. At least an alternative solution to previously known solutions should be proposed.
Somit geht die Erfindung aus von einer Ladestation zum Laden von Elektrofahrzeugen mit mehreren AC-Ladeterminals. Jedes AC-Ladeterminal ist jeweils zum Laden eines Elektrofahrzeugs durch Wechselstrom vorgesehen. Außerdem ist jedes AC-Ladeterminal jeweils über eine Phasenwechselvorrichtung an eine dreiphasige Stromzuführung angeschlossen, um dadurch mit elektrischem dreiphasigen Strom versorgt zu werden. Die
Stromzuführung weist somit drei Versorgungsstränge auf, zum Bereitstellen von drei Spannungsphasen. Jeder der drei Versorgungsstränge weist somit jeweils im Betrieb eine Spannungsphase auf. Dazu kann beispielsweise ein dreiadriges Kabel vorgesehen sein oder ein entsprechendes Schienensystem mit wenigstens drei Schienen. Jedes AC-Ladeterminal, das synonym auch als Wechselspannungsladeterminal bezeichnet werden kann, weist drei Anschlussstränge auf, zum Anschließen an die drei Versorgungsstränge der Stromzuführung, um die drei Spannungsphasen der drei Versorgungsstränge an die drei Anschlussstränge anzulegen. Es wird also jeweils ein Versorgungsstrang mit einem Anschlussstrang elektrisch verbunden. Auf diese Art und Weise ist somit jedes AC-Ladeterminal an die Stromzuführung angeschlossen. The invention is thus based on a charging station for charging electric vehicles with several AC charging terminals. Each AC charging terminal is designed to charge an electric vehicle with alternating current. In addition, each AC charging terminal is connected to a three-phase power supply via a phase change device, in order to be supplied with electrical three-phase power. The Power supply thus has three supply lines for providing three voltage phases. Each of the three supply lines thus has a voltage phase during operation. For this purpose, for example, a three-wire cable or a corresponding rail system with at least three rails can be provided. Each AC charging terminal, which can also be referred to synonymously as an alternating voltage charging terminal, has three connection lines for connection to the three supply lines of the power supply, in order to apply the three voltage phases of the three supply lines to the three connection lines. A supply line is therefore electrically connected to a connection line. In this way, every AC charging terminal is connected to the power supply.
Jede Phasenwechselvorrichtung ist dazu eingerichtet, eine Anschlusszuordnung zwischen den drei Versorgungssträngen und den drei Anschlusssträngen zu verändern. Beispielsweise kann an einem AC-Ladeterminal der erste Anschlussstrang mit dem ersten Versorgungsstrang verbunden sein und der zweite Anschlussstrang mit dem zweiten Versorgungsstrang und schließlich der dritte Anschlussstrang mit dem dritten Versorgungsstrang. Die Phasenwechselvorrichtung kann diese Zuordnung ändern, zum Beispiel für das genannte Beispiel auf eine Zuordnung, bei der nach einer Veränderung der erste Anschlussstrang mit dem zweiten Versorgungsstrang, der zweite Anschlussstrang mit dem dritten Versorgungsstrang und der dritte Anschlussstrang mit dem ersten Versorgungsstrang elektrisch verbunden ist. Es kann aber eine noch weitere Änderung vorgenommen werden, nach der dann, um bei dem letztgenannten Beispiel zu bleiben, der erste Anschlussstrang mit dem dritten Versorgungsstrang, der zweite Anschlussstrang mit dem ersten Versorgungsstrang und der dritte Anschlussstrang mit dem zweiten Versorgungsstrang elektrisch verbunden sind. Diese beiden beispielhaft beschriebenen Veränderungen der Strangzuordnung und damit Veränderung der Phasenzuordnung kann auch als Verdrehen dieser Zuordnung verstanden werden und insoweit können die Phasenwechselvorrichtungen jeweils auch als Phasendrehvorrichtungen ausgebildet sein. Theoretisch kommen aber auch weitere Veränderungen der Zuordnung zwischen Anschlusssträngen und Versorgungssträngen in Betracht, zum Beispiel, um wieder das vorstehende Beispiel aufzugreifen, so, dass der erste Anschlussstrang mit dem ersten Versorgungsstrang verbunden ist, der zweite Anschlussstrang aber mit dem dritten Versorgungsstrang und der dritte Anschlussstrang mit dem zweiten Versorgungsstrang.
Diese Veränderung dient dazu, die Belastung der drei Phasen zu verändern. Solange jedes AC-Terminal jeweils nur auf eine Phase zugreift oder beim Zugriff auf zwei oder drei Phasen auf diese jeweils gleich zugreift, also gleich viel Strom entnimmt, ist die letztgenannte Veränderung, bei der nur die letzten beiden Phasen getauscht wurden, im Grunde überflüssig. Es würde dann also reichen, wenn die Phasenwechselvorrichtung jeweils nur den Anschluss für alle drei Stränge um einen Schritt, oder für alle drei Stränge um zwei Schritte vorschieben kann bzw. zurückdrehen kann. Each phase change device is set up to change a connection assignment between the three supply lines and the three connection lines. For example, at an AC charging terminal, the first connection line can be connected to the first supply line and the second connection line to the second supply line and finally the third connection line to the third supply line. The phase change device can change this assignment, for example for the example mentioned to an assignment in which, after a change, the first connection line is electrically connected to the second supply line, the second connection line is electrically connected to the third supply line and the third connection line is electrically connected to the first supply line. Yet another change can be made, after which, to stay with the last-mentioned example, the first connection line is electrically connected to the third supply line, the second connection line is electrically connected to the first supply line and the third connection line is electrically connected to the second supply line. These two changes in the strand assignment, described by way of example, and thus a change in the phase assignment can also be understood as a rotation of this assignment and to this extent the phase change devices can each also be designed as phase rotation devices. Theoretically, however, further changes in the assignment between connection lines and supply lines come into consideration, for example, to take up the above example again, so that the first connection line is connected to the first supply line, but the second connection line is connected to the third supply line and the third connection line with the second supply line. This change serves to change the load on the three phases. As long as each AC terminal only accesses one phase or, when accessing two or three phases, accesses these in the same way, i.e. draws the same amount of current, the last-mentioned change, in which only the last two phases were swapped, is basically superfluous. It would then suffice if the phase change device can only advance or turn back the connection for all three strands by one step, or for all three strands by two steps.
Die Phasenwechselvorrichtung kann grundsätzlich mechanisch ausgeführt werden, bei der sogar ein Drehschalter oder Schiebeschalter immer die galvanische Verschaltung für drei Phasen, also jeweils für die genannten drei Stränge verändert. Es kommt aber auch in Betracht, dies mit Leistungshalbleiterschaltern zu realisieren, zum Beispiel mit IGBTs oder mit Thyristoren. Die Verwendung von Leistungshalbleiterschaltern hat den Vorteil, dass eine elektronische Steuerung dieser Phasenwechselvorrichtungen besser erreicht werden kann und dass keine Verschleißerscheinungen an Schalterkontakten auftreten können. The phase change device can in principle be designed mechanically, in which even a rotary switch or slide switch always changes the electrical connection for three phases, that is to say for each of the three strands mentioned. However, it is also possible to implement this with power semiconductor switches, for example with IGBTs or thyristors. The use of power semiconductor switches has the advantage that electronic control of these phase change devices can be better achieved and that no signs of wear and tear can occur on switch contacts.
Durch diese Verwendung der Phasenwechselvorrichtungen wird erreicht, dass die Anschlussstränge jeweils so mit den Versorgungssträngen verbunden werden können, dass möglichst alle drei Phasen gleich belastet werden. Da alle AC-Ladeterminals, zumindest alle betrachteten AC-Ladeterminals, solche Phasenwechselvorrichtungen aufweisen, kann für die Gesamtheit dieser AC-Ladeterminals eine möglichst gleichmäßige Belastung der drei Phasen erreicht werden. This use of the phase change devices ensures that the connection lines can each be connected to the supply lines in such a way that, if possible, all three phases are loaded equally. Since all AC charging terminals, at least all AC charging terminals under consideration, have such phase change devices, a load on the three phases that is as uniform as possible can be achieved for all of these AC charging terminals.
Eine bevorzugte Ausführungsform, die auch gut mit den übrigen Ausführungsformen kombiniert werden kann, besteht darin, bereits eine Art statische Phasensymmetrierung vorzusehen. Dazu wird vorgeschlagen, alle Phasenwechselvorrichtungen der in dem Moment nicht genutzten AC-Ladeterminals gleichmäßig zwischen einer Stellung von 0°, 120° und 240° zu schalten. Das betrifft besonders den Fall, wenn die Phasenwechselvorrichtungen als Phasendrehvorrichtungen ausgebildet sind, dasselbe Ergebnis kann aber auch mit anderen Phasenwechselvorrichtungen erreicht werden. Von den in dem Moment nicht genutzten AC-Ladeterminals wird demnach eines so eingestellt bzw. geschaltet, dass die erste Phase der Stromzuführung, die hier als 0° bezeichnet wird, auf den ersten Anschlussstrang geschaltet wird und entsprechend die zweite Phase auf den zweiten und die dritte Phase auf den dritten Anschlussstrang.
Bei einem weiteren unbenutzten AC-Ladeterminal wird der erste Anschlussstrang auf die zweite Phase der Stromzuführung, also den zweiten Versorgungsstrang, geschaltet, und entsprechend der zweite Anschlussstrang auf die dritte Phase und der dritte Anschlussstrang auf die erste Phase. Bei einem noch weiteren in dem Moment nicht genutzten AC- Ladeterminal wird der erste Anschlussstrang auf die dritte Phase, also 240°, geschaltet, der zweite Anschlussstrang entsprechend auf die erste Phase und der dritte Anschlussstrang auf die zweite Phase. A preferred embodiment, which can also be combined well with the other embodiments, is to provide a type of static phase symmetry. For this purpose, it is proposed that all phase change devices of the AC charging terminals not used at the moment be switched evenly between a position of 0 °, 120 ° and 240 °. This applies particularly to the case when the phase change devices are designed as phase rotation devices, but the same result can also be achieved with other phase change devices. Of the AC charging terminals that are not in use at the moment, one is accordingly set or switched so that the first phase of the power supply, which is referred to here as 0 °, is switched to the first connection string and the second phase to the second and the third phase to the third connection line. In another unused AC charging terminal, the first connection line is switched to the second phase of the power supply, i.e. the second supply line, and correspondingly the second connection line to the third phase and the third connection line to the first phase. In the case of another AC charging terminal that is not in use at the moment, the first connection line is switched to the third phase, i.e. 240 °, the second connection line to the first phase and the third connection line to the second phase.
Hier liegt die Überlegung zugrunde, dass besonders einphasige fahrzeuginterne Lader durch ihren Anschlussstecker so vorbereitet sind, dass sie in dem Anschlussstecker immer denselben Anschlusspin als aktiven Anschlusspin verwenden und damit ihren Strom immer von demselben Anschlussstrang bekommen, also beispielsweise immer von dem ersten. Durch diese vorgeschlagene statische Phasensymmetrierung wird nun erreicht, dass der erste Anschlussstrang aber immer an unterschiedlichen Versorgungssträngen angeschlossen ist. Eine beschriebene bautechnisch bedingte einseitige Belas- tung eines Anschlussstrangs wird damit durch die Phasenwechselvorrichtungen möglichst gleichmäßig auf die drei Versorgungsstränge verteilt und dadurch kann schon ein großer erster Schritt in Richtung symmetrischer Belastung gemacht werden. Es ist auch zu beachten, dass diese statische Phasensymmetrierung, bei der die Phasenwechselvorrichtungen der nicht genutzten AC-Ladepunkte voreingestellt werden, im stromlosen Zustand vorgenommen werden und damit zu einer geringen Belastung bzw. zu einem geringen Verschleiß der involvierten Komponenten führt, besonders der Phasenwechselvorrichtung. This is based on the idea that single-phase in-vehicle chargers in particular are prepared by their connector so that they always use the same connector pin as the active connector pin and thus always get their power from the same connector line, for example always from the first one. This proposed static phase balancing now ensures that the first connection line is always connected to different supply lines. A one-sided loading of a connection line due to structural engineering as described is thus distributed as evenly as possible to the three supply lines by the phase change devices, and as a result a major first step towards symmetrical loading can be made. It should also be noted that this static phase balancing, in which the phase change devices of the unused AC charging points are preset, is carried out in the de-energized state and thus leads to a low load or low wear of the components involved, especially the phase change device.
Vorzugsweise ist eine Symmetrierungssteuerung zum Steuern der Phasenwechselvorrichtung vorgesehen, wobei die Symmetrierungssteuerung dazu vorbereitet ist, die Pha- senwechselvorrichtungen zu steuern, um eine Phasenasymmetrie der Versorgungsstränge zu verringern, insbesondere zu minimieren. Idealerweise wird eine Phasensymmetrie der Versorgungsstränge, also der drei Phasen, erreicht. Ob tatsächlich eine Phasensymmetrierung gelingt, hängt besonders auch davon ab, wie viele AC-Ladeterminals die Ladestation aufweist und natürlich, welche Genauigkeit für eine solche Phasensymmetrie zugrunde gelegt wird. A balancing control for controlling the phase change device is preferably provided, the balancing control being prepared to control the phase change devices in order to reduce, in particular to minimize, a phase asymmetry of the supply lines. Ideally, a phase symmetry of the supply lines, i.e. the three phases, is achieved. Whether a phase symmetry actually succeeds depends in particular on how many AC charging terminals the charging station has and, of course, what accuracy is used as a basis for such a phase symmetry.
Besonders ist die Symmetrierungssteuerung so ausgebildet, dass sie eine Asymmetrie der drei Phasen der Stromzuführung auch quantitativ erfasst und die Phasenwechselvorrichtungen einzeln ansteuern kann, um für jede Phasenwechselvorrichtung jeweils eine geeignete Einstellung zu finden und vorzunehmen.
Außerdem oder alternativ kann die Symmetrierungssteuerung auch die einzelnen Phasenbelastungen jedes AC-Ladeterminals quantitativ erfassen und abhängig davon für jedes AC-Ladeterminal einzeln eine geeignete Anschlusszuordnung finden, die für die Gesamtheit aller AC-Ladeterminals der Ladestation zu einer möglichst symmetrischen Belastung führt. In particular, the balancing control is designed such that it also quantitatively detects an asymmetry of the three phases of the power supply and can control the phase change devices individually in order to find and make a suitable setting for each phase change device. In addition or as an alternative, the balancing control can also quantitatively record the individual phase loads of each AC charging terminal and, depending on this, find a suitable connection assignment for each AC charging terminal, which leads to the most symmetrical load possible for all AC charging terminals of the charging station.
Vorzugsweise verfügt die Symmetrierungssteuerung über beide genannten Informationen, also sowohl über die Information der einzelnen Belastungen der einzelnen AC- Ladeterminals als auch über die insgesamte Belastung bzw. Phasenaufteilung der Stromzuführung. Hier liegt besonders der Gedanke zugrunde, dass eine Asymmetrie der drei Phasen der Stromzuführung nicht nur auf die AC-Ladeterminals zurückzuführen ist, sondern auch von weiteren, angeschlossenen Lasten abhängen kann. In diesem Fall würde nämlich die Information über die Belastung jeder AC-Ladeterminals nicht erlauben, auf die Gesamtbelastungssituation der drei Phasen der Stromzuführung zurückzuschließen. Beispielsweise kann in der Ladestation wenigstens ein aktiver dreiphasiger Gleich- richter angeschlossen sein, der ebenfalls zu einer asymmetrischen Belastung der drei Phasen der Stromzuführung führen kann. The balancing control preferably has both of the aforementioned pieces of information, that is, both the information on the individual loads on the individual AC charging terminals and the overall load or phase distribution of the power supply. The underlying idea here is that an asymmetry in the three phases of the power supply is not only due to the AC charging terminals, but can also depend on other connected loads. In this case, the information about the load on each AC charging terminal would not allow conclusions to be drawn about the overall load situation of the three phases of the power supply. For example, at least one active three-phase rectifier can be connected in the charging station, which can also lead to an asymmetrical load on the three phases of the power supply.
Gemäß einer Ausgestaltung wird vorgeschlagen, dass die Symmetrierungssteuerung dazu vorbereitet ist, die AC-Ladeterminals nach ihrer momentanen Stromabnahme zu sortieren und davon abhängig die Phasenwechselvorrichtungen zur Minimierung der Phasenasymmetrie der Versorgungsstränge zu steuern. Auf diese Art und Weise kann ein aufwendiges Optimierungsprogramm, das außerdem oder alternativ in der Symmetrierungssteuerung implementiert sein könnte, was gemäß einer Ausführungsform auch vorgeschlagen wird, vermieden werden. According to one embodiment, it is proposed that the balancing control be prepared to sort the AC charging terminals according to their current consumption and to control the phase change devices as a function of this in order to minimize the phase asymmetry of the supply lines. In this way, a complex optimization program that could also or alternatively be implemented in the balancing control, which is also proposed according to one embodiment, can be avoided.
Somit können besonders die AC-Ladeterminals mit der größten momentanen Stromab- nähme zuerst betrachtet und zur Minimierung einer asymmetrischen Belastung eingestellt werden. Die AC-Ladeterminals mit der größten Strombelastung haben somit auch auf die asymmetrische Belastung den größten Einfluss. Weitere AC-Ladeterminals mit geringerer Stromabnahme können dann beispielsweise nachgelagert eingestellt werden. Selbst wenn hierdurch möglicherweise nicht die optimale Einstellung aller Phasenwechselvor- richtungen der AC-Ladeterminals erreicht wird, so kann hierdurch doch mit deutlich geringerem Optimierungsaufwand ein immer noch vergleichsweise gutes Ergebnis erzielt werden.
Außerdem oder alternativ wird vorgeschlagen, die AC-Ladeterminals danach zu sortieren, ob sie einphasig, zweiphasig oder dreiphasig arbeiten. Hier liegt der Gedanke zu Grunde, dass abhängig davon, ob sie einphasig, zweiphasig oder dreiphasig arbeiten, das Verändern der Phasenzuordnung entsprechend andere Auswirkungen hat. Dem kann in einem ersten Schritt durch eine solche Sortierung Rechnung getragen werden. This means that the AC charging terminals with the greatest current consumption can be viewed first and set to minimize asymmetrical loading. The AC charging terminals with the greatest current load therefore also have the greatest influence on the asymmetrical load. Additional AC charging terminals with lower power consumption can then be set downstream, for example. Even if the optimal setting of all phase change devices of the AC charging terminals is possibly not achieved as a result, a comparatively good result can still be achieved with significantly less optimization effort. In addition or as an alternative, it is proposed to sort the AC charging terminals according to whether they work single-phase, two-phase or three-phase. The underlying idea here is that, depending on whether you are working single-phase, two-phase or three-phase, changing the phase assignment will have different effects. This can be taken into account in a first step through such a sorting.
Ob jeweils ein einphasiger, zweiphasiger oder dreiphasiger sogenannter fahrzeuginterner Lader angeschlossen ist, kann die Symmetrierungssteuerung möglicherweise nicht unmittelbar erfassen. Sie kann aber, jedenfalls gemäß einer Ausführungsform, jeweils den Strom der drei Anschlussstränge des betreffenden AC-Ladeterminals erfassen und daran erkennen, welcher der drei Anschlussstränge einen Strom führt und welcher keinen führt. Eine solche Messung ergibt also, ob das entsprechende AC-Ladeterminal einphasig, zweiphasig oder dreiphasig arbeitet. The balancing control may not be able to determine directly whether a single-phase, two-phase or three-phase so-called in-vehicle charger is connected. However, in any case according to one embodiment, it can each detect the current of the three connection lines of the relevant AC charging terminal and use this to identify which of the three connection lines carries a current and which does not. Such a measurement therefore shows whether the corresponding AC charging terminal is working single-phase, two-phase or three-phase.
Wurde nun erkannt, dass ein AC-Terminal dreiphasig arbeitet, so kann dies sinnvollerweise für die Betrachtung der Symmetrierungssteuerung aussortiert werden bzw. nach hinten sortiert werden. Weiterhin kann die Sortierung vorsehen, dass AC-Ladeterminals, die einphasig arbeiten, nach vorne sortiert werden und diejenigen, die zweiphasig arbeiten, in der Sortierung dahinter, also nachrangig betrachtet werden. Zumindest ist es sinnvoll, einphasig arbeitende AC-Ladeterminals und zweiphasig arbeitende AC- Ladeterminals in unterschiedliche Gruppen zu sortieren. Dem liegt nämlich auch der Gedanke zugrunde, dass beim Drehen aller drei Phasen im einphasigen Fall faktisch eine Phase vollständig gewechselt wird, also beispielsweise wird von einer vollständigen Belastung der ersten Phase auf eine vollständige Belastung der zweiten Phase gewechselt. If it has now been recognized that an AC terminal is working in three phases, this can sensibly be sorted out for the consideration of the balancing control or sorted backwards. The sorting can also provide that AC charging terminals that work in one phase are sorted to the front and those that work in two phases are considered in the sorting behind, that is, of secondary importance. At least it makes sense to sort single-phase AC charging terminals and two-phase AC charging terminals into different groups. This is based on the idea that when turning all three phases in the single-phase case, one phase is actually completely changed, for example, a change is made from a full load of the first phase to a full load of the second phase.
Beim Wechsel aller drei Phasen eines zweiphasigen AC-Ladeterminals wird faktisch aber nur eine der beiden belasteten Phase gewechselt. Beispielsweise wird dabei von einer gleichmäßigen Belastung der ersten und zweiten Phase auf eine gleichmäßige Belastung der zweiten und dritten Phase gewechselt. Damit wurde faktisch die Belastung der zweiten Phase nicht geändert. When changing all three phases of a two-phase AC charging terminal, in fact, only one of the two loaded phases is changed. For example, a change is made from uniform loading of the first and second phases to uniform loading of the second and third phases. In fact, this did not change the burden of the second phase.
Besonders bevorzugt werden diese beiden Sortierungen kombiniert und zunächst nach dem Kriterium sortiert, ob ein AC-Ladeterminal einphasig, zweiphasig oder dreiphasig arbeitet und dann anschließend in den drei entstehenden Gruppen bzw. nach Aussortierung der dreiphasigen Gruppe in den verbleibenden zwei Gruppen, nach momentaner Stromabnahme sortiert. Dann können beispielsweise die stromstärksten einphasigen
Ladeterminals für eine erste Vergleichmäßigung der Belastung verändert werden und anschließend die stromstärksten AC-Ladeterminals, die zweiphasig arbeiten, für eine weitere Vergleichmäßigung herangezogen werden. It is particularly preferred to combine these two sortings and initially sort them according to the criterion of whether an AC charging terminal works single-phase, two-phase or three-phase and then sorted into the three resulting groups or, after sorting out the three-phase group, into the remaining two groups according to the current consumption . Then, for example, the most powerful can single-phase Charging terminals are changed for a first equalization of the load and then the most powerful AC charging terminals, which work in two phases, are used for a further equalization.
Es kommt aber auch in Betracht, dass auf eine Sortierung danach, ob die AC- Ladeterminal einphasig, zweiphasig oder dreiphasig arbeiten, verzichtet wird, wenn sich heraussteilen sollte, dass sich einphasige fahrzeuginterne Lader etablieren und daher ohnehin nur mit einphasigen fahrzeuginternen Ladern zu rechnen ist und damit ohnehin nur mit AC-Ladeterminals zu rechnen ist, die einphasig arbeiten. Gelegentliche Ungenau- igkeiten dadurch, dass doch einmal ein zweiphasiger fahrzeuginterner Lader vorkommt, können hingenommen werden, wenn dadurch, wie beschrieben, der Steuerungsaufwand verringert werden kann. However, it is also possible that a sorting according to whether the AC charging terminals work single-phase, two-phase or three-phase is dispensed with if it should emerge that single-phase in-vehicle chargers are establishing themselves and therefore only single-phase in-vehicle chargers are to be expected anyway and that means that only AC charging terminals that work in single-phase can be expected anyway. Occasional inaccuracies due to the fact that a two-phase in-vehicle charger does occur can be accepted if, as described, the control effort can be reduced as a result.
Gemäß einer Ausgestaltung wird vorgeschlagen, dass die Symmetrierungssteuerung dazu vorbereitet ist, die AC-Ladeterminals insbesondere mit einphasiger oder zweiphasiger Stromaufnahme nach ihrer momentanen Stromabnahme zu sortieren, und das so durchzuführen, dass zu jedem dieser AC-Ladeterminals jeweils der Anschlussstrang mit der größten Stromaufnahme als maximal belasteter Strang identifiziert wird und jeweils seine Stromaufnahme als maximaler Phasenstrom des AC-Ladeterminals berücksichtigt wird. Darauf aufbauend werden die AC-Ladeterminals dann nach ihrem maximalen Phasenstrom in einer Stromreihenfolge sortiert. Weiter ist die Symmetrierungssteuerung dazu vorbereitet, dass dafür die Phasenwechselvorrichtung die Anschlusszuordnung jeweils so einstellt oder verändert, dass die maximal belasteten Stränge gemäß der Stromreihenfolge wechselnd an einen ersten, zweiten und dritten Versorgungsstrang der drei Versorgungsstränge angeschlossen werden. Bei den AC-Ladeterminals mit einphasiger Stromaufnahme ist somit der einzige Strang auch gleichzeitig der maximal belastete Strang. Dieser wird dann wechselnd von einem zum nächsten AC-Ladeterminal an den ersten, zweiten und dritten Versorgungsstrang angeschlossen bzw. damit elektrisch verbunden. According to one embodiment, it is proposed that the balancing control is prepared to sort the AC charging terminals, in particular with single-phase or two-phase power consumption, according to their current consumption, and to do this in such a way that for each of these AC charging terminals, the connection line with the greatest power consumption as The maximum loaded string is identified and its current consumption is taken into account as the maximum phase current of the AC charging terminal. Building on this, the AC charging terminals are then sorted according to their maximum phase current in a current sequence. Furthermore, the balancing control is prepared so that the phase change device sets or changes the connection assignment so that the maximum loaded strings are alternately connected to a first, second and third supply strand of the three supply strings according to the current sequence. In the case of the AC charging terminals with single-phase power consumption, the only string is also the string with the maximum load. This is then alternately connected from one to the next AC charging terminal to the first, second and third supply line or electrically connected to it.
Bei den AC-Terminals mit zweiphasiger Stromaufnahme liegen somit zwei stromführende Stränge vor, und die können theoretisch auch gleich stark belastet sein. Dann kann einer dieser beiden Stränge beliebig ausgewählt werden, zum Beispiel jeweils der erste der beiden Stränge. In der tatsächlichen Umsetzung wird es aber so sein, dass nie zwei identische Ströme gemessen werden und daher einer der beiden Stränge als maximal belasteter Strang identifiziert werden wird, sei der Vorsprung gegenüber dem anderen Strang auch noch so gering.
Ist nun dieser maximal belastete Strang jedes AC-Ladeterminals mit zweiphasiger Stromaufnahme dem ersten, zweiten oder dritten Versorgungsstrang zugeordnet, also an ihn angeschlossen bzw. damit elektrisch verbunden, so wird vorgeschlagen, den verbleibenden zweiten stromführenden Strang an den folgenden Versorgungsstrang anzu- schließen. Dazu wird die zuvor gewählte Zählung des ersten, zweiten und dritten Versorgungsstrangs zugrunde gelegt und entsprechend folgt der zweite Versorgungsstrang auf den ersten, der dritte Versorgungsstrang folgt auf den zweiten und der erste Versorgungsstrang folgt auf den dritten. Entsprechend wird also der zweite stromführende Strang an den zweiten, dritten bzw. ersten Versorgungsstrang angeschlossen bzw. damit elektrisch verbunden. In the case of the AC terminals with two-phase power consumption, there are two current-carrying strings, and theoretically they can also be loaded equally. One of these two strands can then be selected as desired, for example the first of the two strands. In the actual implementation, however, it will be the case that two identical currents are never measured and therefore one of the two strings will be identified as the string with the maximum load, no matter how small the lead over the other string. If this maximum loaded line of each AC charging terminal with two-phase power consumption is assigned to the first, second or third supply line, i.e. connected to it or electrically connected to it, it is proposed to connect the remaining second current-carrying line to the following supply line. For this purpose, the previously selected counting of the first, second and third supply line is used and accordingly the second supply line follows the first, the third supply line follows the second and the first supply line follows the third. Accordingly, the second current-carrying branch is connected to the second, third or first supply branch or is electrically connected to it.
Dadurch ist eine klare Vorgabe und Handlungsstruktur geschaffen, nach der die maximal belasteten Stränge und dann nachfolgend die zweiten stromführenden Stränge, falls vorhanden, an die jeweiligen Versorgungsstränge angeschlossen werden. Eines aufwendigen Optimierungsalgorithmus bedarf es dazu nicht. Werden auch AC-Ladeterminals (6) mit dreiphasiger Stromaufnahme mit einbezogen, wird insbesondere vorgeschlagen, dass einer der verbleibenden Stränge an den folgenden Versorgungsstrang, nämlich den zweiten, dritten bzw. ersten Versorgungsstrang (22, 23, 21) angeschlossen wird. Für den verbleibenden dritten Strang bleibt dann nur noch ein freier Versorgungsstrang übrig. Eine Verbesserung oder Verfeinerung kann dadurch erreicht werden, dass die AC- Ladeterminals zunächst in eine erste und zweite Gruppe sortiert werden, nämlich die AC- Ladeterminals mit einphasiger Stromaufnahme in eine erste Gruppe und die AC- Ladeterminals mit zweiphasiger Stromaufnahme in eine zweite Gruppe und optional die AC-Ladeterminals (6) mit dreiphasiger Stromaufnahme in eine dritte Gruppe. Die vorbe- schriebene Aufteilung nach maximalem Phasenstrom und ebenfalls die vorgeschlagene Reihenfolge des Anschließens an die betreffenden Versorgungsstränge wird dann gruppenweise vorgenommen. Das bedeutet auch, dass in der ersten Gruppe grundsätzlich jeweils der maximal belastete Strang der einzige stromführende Strang ist. This creates a clear specification and structure of action, according to which the maximum loaded strings and then the second current-carrying strings, if any, are connected to the respective supply strings. A complex optimization algorithm is not required for this. If AC charging terminals (6) with three-phase power consumption are also included, it is proposed in particular that one of the remaining strings be connected to the following supply line, namely the second, third or first supply line (22, 23, 21). Only one free supply line then remains for the remaining third line. An improvement or refinement can be achieved by initially sorting the AC charging terminals into a first and second group, namely the AC charging terminals with single-phase power consumption in a first group and the AC charging terminals with two-phase power consumption in a second group and optionally the AC charging terminals (6) with three-phase power consumption in a third group. The above-described division according to the maximum phase current and also the proposed sequence of connection to the relevant supply lines are then carried out in groups. This also means that in the first group, the line with the maximum load is the only line that carries current.
Gemäß einer besonderen Option wird die folgende Anschlussreihenfolge für die maximal belasteten Stränge vorgeschlagen. Dies kann sowohl insgesamt für alle AC- Ladeterminals mit einphasiger oder zweiphasiger oder auch dreiphasiger Stromaufnahme durchgeführt werden oder gruppenweise jeweils für die erste und zweite und ggf. dritte Gruppe.
Demnach wird vorgeschlagen, dass der erste maximal belastete Strang, also der maximal belastete Strang des gemäß Sortierung ersten AC-Terminals, an den ersten Versorgungsstrang angeschlossen wird, der zweite maximal belastete Strang an den zweiten Versorgungsstrang und der dritte maximal belastete Strang an den dritten Versorgungs- sträng. Dabei ist erste maximal belastete Strang, also der maximal belastete Strang des gemäß Sortierung ersten AC-Terminals, der zweite maximal belastete Strang der maximal belastete Strang des zweiten AC-Terminals, und so weiter. According to a special option, the following connection sequence is proposed for the maximum loaded strings. This can be done overall for all AC charging terminals with single-phase or two-phase or even three-phase power consumption or in groups for the first and second and possibly third groups. Accordingly, it is proposed that the first maximum loaded line, i.e. the maximum loaded line of the first AC terminal according to the sorting, be connected to the first supply line, the second maximum loaded line to the second supply line and the third maximum loaded line to the third supply line - strand. The first string with the maximum load, i.e. the string with the maximum load of the first AC terminal according to the sorting, the second string with the maximum load is the string with the maximum load for the second AC terminal, and so on.
Für den vierten bis sechsten wird dann aber eine umgekehrte Reihenfolge vorgeschlagen, sodass nämlich der vierte maximal belastete Strang ebenfalls an den dritten Versor- gungsstrang angeschlossen wird, der fünfte maximal belastete Strang an den zweiten Versorgungsstrang und der sechste maximal belastete Strang an den ersten Versorgungsstrang. An dem ersten Versorgungsstrang ist dann also der erste und sechste maximal belastete Strang angeschlossen. For the fourth to sixth, however, a reverse order is proposed, so that the fourth maximally loaded line is also connected to the third supply line, the fifth maximum loaded line to the second supply line and the sixth maximum loaded line to the first supply line. The first and sixth maximum loaded line are then connected to the first supply line.
Durch diese Umkehr der Reihenfolge für den vierten bis sechsten wird vermieden, dass der erste Versorgungsstrang stärker als die übrigen beiden Versorgungsstränge belastet wird. Diese Gefahr bestände nämlich, wenn der erste Versorgungsstrang mit dem maximal belasteten Strang und vierten maximal belasteten Strang angeschlossen werden würde. Im Übrigen wird vorgeschlagen, dieses Prinzip auch für die weiteren Stränge vorzuschlagen, also besonders den siebten bis neunten maximal belasteten Strang an den ersten bis dritten anzuschließen und den zehnten bis zwölften maximal belasteten Strang wieder in umgekehrter Reihenfolge an den dritten bis ersten Versorgungsstrang anzuschließen, und so weiter. This reversal of the sequence for the fourth through the sixth prevents the first supply line from being loaded more heavily than the other two supply lines. This risk would exist if the first supply line were connected to the maximum loaded line and the fourth maximum loaded line. In addition, it is proposed that this principle also be proposed for the other lines, i.e. especially to connect the seventh to ninth maximum loaded line to the first to third and to reconnect the tenth to twelfth maximum loaded line to the third to first supply line in reverse order, and so on.
Gemäß einer Ausführungsform wird vorgeschlagen, dass generell die Durchführung der Sortierung mit umgekehrtem Ablauf vorgenommen wird, also mit dem letzten maximal belasteten Strang begonnen wird und der Ablauf dann beim vorletzten maximal belasteten Strang fortsetzt, usw. bis schließlich zum ersten maximal belasteten Strang. Dadurch kann erreicht werden, dass bei den ersten Umsortierungsschritten keine zu großen Stromveränderungen vorgenommen werden. Wird mit dem Strang begonnen, der den größten Strom führt, könnte im ungünstigen Fall zu einer vorübergehenden starken Erhöhung der Asymmetrie führen. Beginnt man aber mit den kleinsten Strömen, werden die Stränge mit den größten Strömen erste getauscht, wenn eine Symmetrierung schon teilweise erreicht wurde.
Besonderes wird eine Sortierung mit umgekehrtem Ablauf so vorgeschlagen, dass mit dem letzten maximal belasteten Strang begonnen wird, und dieser an den ersten Versorgungstrang angeschlossen wird, der vorletzte maximal belastete Strang an den zweiten Versorgungsstrang angeschlossen wird, und der drittletzte maximal belastete Strang an den dritten Versorgungsstrang. Dann wird die Reihenfolge wieder umgekehrt, so dass der viertletzte maximal belastete Strang auch an den dritten, Versorgungsstrang angeschlossen wird, der fünft letzte an den zweiten und der sechstletzte an den ersten. Die Symmetrierungssteuerung ist zur Durchführung all der beschriebenen Funktionalitäten besonders dadurch dazu vorbereitet, dass sie ein entsprechendes Steuerungsprogramm aufweist, das beispielsweise auf einem Prozessrechner implementiert sein kann, der einen Teil der Symmetrierungssteuerung bilden kann. Weiterhin sind Datenkanäle, besonders Datenleitungen, vorgesehen, um die Symmetrierungssteuerung mit den AC-Ladeterminals zu verbinden, besonders, um die jeweilige Phasenwechselvorrichtung ansteuern zu können. Hierüber können auch Sensordaten von Strommessungen zur Symmetrierungssteuerung übertragen werden. According to one embodiment, it is proposed that the sorting is generally carried out with the reverse sequence, i.e. starting with the last maximally loaded line and then continuing the sequence with the penultimate, maximally loaded line, etc. until finally the first maximally loaded line. In this way it can be achieved that in the first re-sorting steps, no changes in the current that are too great are made. Starting with the strand that carries the greatest current could, in the worst case, lead to a temporary strong increase in the asymmetry. But if you start with the smallest currents, the strands with the largest currents are first swapped when a symmetry has already been partially achieved. In particular, sorting with the reverse sequence is proposed so that the last line with the maximum load is started and this is connected to the first supply line, the penultimate line with the maximum load is connected to the second supply line, and the third from the last line with the maximum load is connected to the third Supply line. Then the sequence is reversed again so that the fourth from last line with maximum load is also connected to the third, supply line, the fifth last to the second and the sixth from last to the first. The balancing control is especially prepared to carry out all the described functionalities in that it has a corresponding control program that can be implemented, for example, on a process computer that can form part of the balancing control. Furthermore, data channels, especially data lines, are provided in order to connect the balancing control to the AC charging terminals, especially in order to be able to control the respective phase change device. This can also be used to transfer sensor data from current measurements for balancing control.
Für solche Sensordaten können entsprechende Stromsensoren an den AC- Ladeterminals vorgesehen sein und das kann auch bedeuten, dass solche Stromsensoren an den Phasenwechselvorrichtungen oder den Anschlusssträngen vorgesehen sind. Es kommt auch in Betracht, dass jedes AC-Ladeterminal selbst über Stromsensoren verfügt und die entsprechenden Daten über entsprechende Datenkanäle, wie zum Beispiel Datenleitungen, an die Symmetrierungssteuerung überträgt. Die Symmetrierungssteuerung kann auch über Daten und/oder Steuerungskanäle mit einem aktiven Gleichrichter verbunden sein, um über diesen eine Symmetrierung zumindest teilweise durchzuführen. Gemäß einer Ausgestaltung wird vorgeschlagen, dass die Symmetrierungssteuerung dazu vorbereitet ist, alle Anschlussstränge nach ihrer Stromaufnahme in eine Strangreihenfolge zu sortieren, unabhängig des jeweiligen AC-Ladeterminals, die Phasenwechselvorrichtungen die Anschlusszuordnung jeweils so einstellt oder verändert, dass alle Anschlussstränge gemäß ihrer Strangreihenfolge wechselnd an den ersten, zweiten und dritten Versorgungsstrang der drei Versorgungsstränge angeschlossen werden, und dann insbesondere die nächsten drei Anschlussstränge an den dritten, zweiten und ersten Versorgungsstrang, wobei
als Randbedingung geprüft wird, dass zu keinem AC-Ladeterminal zwei oder drei Anschlussstränge an denselben Versorgungsstrang angeschlossen werden. Corresponding current sensors can be provided on the AC charging terminals for such sensor data, and that can also mean that such current sensors are provided on the phase change devices or the connection lines. It is also possible that each AC charging terminal has its own current sensors and transmits the corresponding data to the balancing control via corresponding data channels, such as data lines. The balancing control can also be connected to an active rectifier via data and / or control channels in order to at least partially carry out balancing via this. According to one embodiment, it is proposed that the balancing control is prepared to sort all connection lines into a string sequence according to their power consumption, regardless of the respective AC charging terminal, the phase change devices each set or change the connection assignment so that all connection lines are alternately connected to the first, second and third supply lines of the three supply lines are connected, and then in particular the next three connection lines to the third, second and first supply line, wherein As a boundary condition it is checked that no two or three connection lines are connected to the same supply line for any AC charging terminal.
Bei dieser Ausgestaltung wird somit zunächst nicht nach ein-, zwei- und dreiphasigen AC-Terminals unterschieden. Es werden alle Anschlussstränge nach ihrer Stromaufnah- me in eine Strangreihenfolge sortiert. Bspw. könnte in der Strangreihenfolge ein erster Anschlussstrang eines ersten einphasigen AC-Ladeterminals an Platz 1 stehen, der dritte Anschlussstrang eines zweiten dreiphasigen AC-Ladeterminals an Platz 2 und sein zweiter Anschlussstrang an Platz 5. An den Plätzen 3 und 4 könnten dann bspw. der erste und zweite Anschlussstrang eines dritten zweiphasigen AC-Ladeterminals stehen. Dann würde der erste Anschlussstrang des ersten AC-Ladeterminal (Platz 1) an den ersten Versorgungsstrang angeschlossen werden, der dritte Anschlussstrang des zweiten dreiphasigen AC-Ladeterminals (Platz 2) an den zweiten Versorgungsstrang und der erste Anschlussstrang des dritten zweiphasigen AC-Ladeterminals (Platz 3) an den dritten Versorgungsstrang. Die nächsten drei Anschlussstränge würden dann an den dritten, zweiten und ersten Versorgungsstrang angeschlossen werden, also zunächst der zweite Anschlussstrang des dritten zweiphasigen AC-Ladeterminals (Platz 4) an den dritten Versorgungsstrang und der zweite Anschlussstrang des zweiten dreiphasigen AC-Ladeterminals (Platz 5) an den zweiten Versorgungsstrang, sowie ein weiterer, im oberen Bsp. nicht erwähnter Anschlussstrang (Platz 6) an den ersten Versorgungsstrang. In diesem Fall wären aber vom zweiten dreiphasigen AC-Ladeterminal zwei Anschlussstränge an den zweiten Versorgungstrang angeschlossen, und vom dritten zweiphasigen AC-Ladeterminal wären zwei anschlussstränge an den dritten Versorgungsstrang angeschlossen. In this embodiment, no distinction is made between one, two and three-phase AC terminals. All connection lines are sorted into a line sequence according to their power consumption. E.g. In the string sequence, a first connection branch of a first single-phase AC charging terminal could be at position 1, the third connection branch of a second three-phase AC charging terminal at position 2 and its second connection branch at position 5. At positions 3 and 4, for example, the first and a second connection line of a third two-phase AC charging terminal. Then the first connection line of the first AC charging terminal (place 1) would be connected to the first supply line, the third connection line of the second three-phase AC charging terminal (place 2) to the second supply line and the first connection line of the third two-phase AC charging terminal (place 3) to the third supply line. The next three connection lines would then be connected to the third, second and first supply line, i.e. first the second connection line of the third two-phase AC charging terminal (place 4) to the third supply line and the second connection line of the second three-phase AC charging terminal (place 5) to the second supply line, as well as a further connection line not mentioned in the above example (place 6) to the first supply line. In this case, however, two connection lines would be connected from the second three-phase AC charging terminal to the second supply line, and two connection lines would be connected from the third two-phase AC charging terminal to the third supply line.
Das soll nicht sein und deshalb wird das als Randbedingung geprüft. Im vorliegenden Fall würde bereits die Zuordnung des zweiten Anschlussstrangs des dritten zweiphasigen AC-Ladeterminals (Platz 4) an den dritten Versorgungsstrang nicht zugelassen werden, und stattdessen an den nächsten Versorgungsstrang angeschlossen, sofern die Randbedingung das zulässt. Der zweite Anschlussstrang des zweiten dreiphasigen AC- Ladeterminals (Platz 5) könnte dann den Platz übernehmen und an den ersten Versor- gungsstrang angeschlossen werden, wenn die Prüfung der Randbedingung das zulässt. That should not be the case and therefore it is checked as a boundary condition. In the present case, the assignment of the second connection line of the third two-phase AC charging terminal (place 4) to the third supply line would not be permitted, and instead would be connected to the next supply line, provided that the boundary conditions permit this. The second connection line of the second three-phase AC charging terminal (place 5) could then take over the place and be connected to the first supply line if the check of the boundary conditions permits.
Gemäß einer Ausführungsform wird vorgeschlagen, dass die Symmetrierungssteuerung dazu vorbereitet ist, dass zur Minimierung der Phasenasymmetrie eine Anschlusszuordnung über eine Optimierungsrechnung basierend auf den Stromaufnahmen der An-
schlussstränge aller AC-Ladeterminals bestimmt wird. Das wird zumindest für AC- Ladeterminals mit einphasiger oder zweiphasiger Stromaufnahme vorgeschlagen, wenn nämlich besonders angenommen werden darf, dass AC-Ladeterminals mit dreiphasiger Stromaufnahme zudem eine im Wesentlichen auf alle drei Phasen gleich verteilte Strom- aufnahme aufweisen. Sollte sich aber heraussteilen, dass AC-Ladeterminals mit dreiphasiger Stromaufnahme bezogen auf die drei Phasen ungleichmäßig, besonders stark ungleichmäßig arbeitet, so kann vorgesehen sein, AC-Ladeterminals mit dreiphasiger Stromaufnahme ebenfalls in die Optimierungsrechnung mit einzubeziehen. According to one embodiment, it is proposed that the balancing control is prepared so that, in order to minimize the phase asymmetry, a connection assignment via an optimization calculation based on the power consumption of the connection connecting lines of all AC charging terminals is determined. This is suggested at least for AC charging terminals with single-phase or two-phase power consumption, namely if it can be particularly assumed that AC charging terminals with three-phase power consumption also have power consumption that is essentially equally distributed over all three phases. If, however, it should emerge that AC charging terminals with three-phase power consumption in relation to the three phases work unevenly, particularly unevenly, then AC charging terminals with three-phase power consumption can also be included in the optimization calculation.
Eine Optimierungsrechnung kann beispielsweise so ausgeführt werden, dass für jedes AC-Ladeterminal ein Vektor mit drei Elementen vorgesehen ist, in dem die Stromwerte der drei Phasen stehen. Die Optimierungsrechnung kann dann beispielsweise die Werte jedes Vektors, gegebenenfalls bis auf den ersten, sukzessive durchtauschen und jedes Mal eine Summe aller Vektoren bilden und prüfen, in welchem Fall die drei Elemente des entstehenden Summenvektors die geringsten Abweichungen untereinander haben. Eine andere Möglichkeit besteht darin, einen idealen Stromwert für alle drei Phasen der Stromzuführung zu berechnen und die Elemente in jedem der genannten einzelnen Vektoren zu tauschen, um diesen Idealwert zu erreichen. Dieser Idealwert lässt sich leicht dadurch berechnen, dass sämtliche Stromwerte der drei Phasen aller AC- Ladeterminals aufaddiert und durch drei geteilt werden. Eine weitere Möglichkeit besteht darin, für die drei Anschlussstränge jedes AC- Ladeterminals jeweils eine Zerlegung in Mit- und Gegensystemkomponente vorzunehmen und dann zur Optimierung nur noch die Gegensystemkomponente zu betrachten, besonders derart, dass die Phasenlagen der Gegensystemströme so weitergeschaltet werden, dass die Summe aller Gegensystemkomponenten bei der Optimierungsrechnung null ergibt bzw. zumindest minimal wird. An optimization calculation can be carried out, for example, in such a way that a vector with three elements is provided for each AC charging terminal, in which the current values of the three phases are. The optimization calculation can then, for example, successively swap the values of each vector, possibly except for the first, and each time form a sum of all vectors and check in which case the three elements of the resulting sum vector have the smallest deviations from one another. Another possibility is to calculate an ideal current value for all three phases of the power supply and to swap the elements in each of the individual vectors mentioned in order to achieve this ideal value. This ideal value can easily be calculated by adding up all current values of the three phases of all AC charging terminals and dividing them by three. Another possibility is to split the three connection strings of each AC charging terminal into positive and negative sequence components and then only consider the negative sequence components for optimization, especially so that the phase positions of the negative sequence currents are switched so that the sum of all Negative system components in the optimization calculation results in zero or at least becomes minimal.
Optional wird für die Optimierungsrechnung vorgeschlagen, dass die Anzahl notwendiger Umschaltvorgänge der Phasenwechselvorrichtung berücksichtigt wird. Es kann beispielsweise sein, dass eine Asymmetrie von beispielsweise 40 % mit wenigen Umschalt- vorgängen auf 3 % reduziert werden kann, aber eine sehr hohe Anzahl an Umschaltun- gen benötigt wird, um eine weitere Reduzierung auf 2 % zu erreichen. Besonders kann als eine Nebenbedingung berücksichtigt werden, die Anzahl der Umschaltvorgänge zu minimieren. Möglichst wenige Umschaltvorgänge zu verwenden kann somit als Nebenbedingung einfließen.
Gemäß einer Ausführungsform wird vorgeschlagen, dass wenigstens ein DC- Ladeterminal mit vorgeschaltetem aktiven Gleichrichter vorgesehen ist, der aktive Gleichrichter mit der Stromzuführung verbunden ist und der aktive Gleichrichter dazu vorbereitet ist, die drei Versorgungsstränge unterschiedlich zu belasten, um eine Asymmetrie der Ströme in der Stromzuführung zu verringern. Das DC-Ladeterminal ist somit dazu vorbereitet, wenigstens einen Gleichstrom zum Laden eines Elektrofahrzeugs bereitzustellen. Dazu kann das DC-Ladeterminal, das auch als Gleichstromladeterminal bezeichnet werden kann, mehrere DC-Unterterminals aufweisen, die auch als DC-Lader oder Gleichstromlader bezeichnet werden können. Hier kann jeweils ein Elektrofahrzeug zum Laden angeschlossen werden, ohne dass das Elektrofahrzeug selbst eine eigene Ladestromsteuerung aufweisen muss. For the optimization calculation, it is optionally proposed that the number of necessary switching processes of the phase change device be taken into account. It can be the case, for example, that an asymmetry of 40%, for example, can be reduced to 3% with a few switching processes, but a very high number of switchings is required to achieve a further reduction to 2%. In particular, a secondary condition that can be taken into account is to minimize the number of switchover processes. Using as few switching processes as possible can therefore be included as a secondary condition. According to one embodiment, it is proposed that at least one DC charging terminal with an upstream active rectifier is provided, the active rectifier is connected to the power supply and the active rectifier is prepared to load the three supply lines differently in order to avoid asymmetry of the currents in the power supply to reduce. The DC charging terminal is thus prepared to provide at least one direct current for charging an electric vehicle. For this purpose, the DC charging terminal, which can also be referred to as a direct current charging terminal, can have several DC sub-terminals, which can also be referred to as a DC charger or direct current charger. An electric vehicle can be connected here for charging without the electric vehicle itself having to have its own charging current control.
Zum Erzeugen eines ersten Gleichstroms, der in den Unterterminals gegebenenfalls noch weiter aufbereitet wird, ist somit der aktive Gleichrichter vorgesehen und dieser kann nicht nur den Gleichstrom der gewünschten Höhe nachsteuern, sondern er kann auch AC-seitig gesteuert werden und insoweit seinen dreiphasigen Eingangsstrom steuern, und zwar auch hinsichtlich jeder einzelnen Phase. Ein solcher aktiver Gleichrichter kann dafür auch wie ein Wechselrichter aufgebaut sein, wohingegen er in umgekehrter Richtung betrieben wird, nämlich vom Wechselstrom zum Gleichstrom. Tatsächlich ist es dabei auch möglich, dass ein solcher Gleichrichter/Wechselrichter bidirektional betrieben wird. In dem Fall könnte das DC-Ladeterminal auch elektrische Leistung auf die Stromzuführung einspeisen, was als eine bevorzugte Ausgestaltung vorgeschlagen wird. The active rectifier is therefore provided to generate a first direct current, which may be further processed in the sub-terminals, and this can not only adjust the direct current to the desired level, but it can also be controlled on the AC side and control its three-phase input current. also with regard to each individual phase. Such an active rectifier can also be constructed like an inverter, whereas it is operated in the opposite direction, namely from alternating current to direct current. In fact, it is also possible here for such a rectifier / inverter to be operated bidirectionally. In that case, the DC charging terminal could also feed electrical power into the power supply, which is proposed as a preferred embodiment.
Durch diesen aktiven Gleichrichter kann somit die Belastung der drei Versorgungsstränge gesteuert werden und vorzugsweise wird der aktive Gleichrichter so gesteuert, dass er einen Gegensystemstrom möglichst mit beliebiger Phase und Amplitude erzeugt und damit auf die dreiphasige Stromzuführung aufschaltet, um dadurch eine Asymmetrie der Ströme in der Stromzuführung zu verringern. This active rectifier can thus control the load on the three supply lines and the active rectifier is preferably controlled in such a way that it generates a negative sequence current with any phase and amplitude, if possible, and thus connects to the three-phase power supply, thereby creating an asymmetry of the currents in the power supply to reduce.
Das Erzeugen eines solchen Gegensystemstroms bezieht sich auf die Methode der symmetrischen Komponenten, demnach ein dreiphasiger Strom in ein Mitsystem bzw. eine Mitsystemkomponente und ein Gegensystem bzw. eine Gegensystemkomponente, die auch als Gegensystemstrom bezeichnet werden kann, durch eine Transformation rechentechnisch zerlegt wird. Grundsätzlich ist auch noch ein Nullsystem oder Nullsystemstrom zu beachten, der hier vernachlässigt werden kann. Zwar kann hier ein Nullsystemstrom auftreten, allerdings wird davon ausgegangen, dass im Wesentlichen eine faktisch ohmsche Belastung durch all die zu ladenden Elektrofahrzeuge vorliegt und
damit eine Verringerung der Asymmetrie und damit Verringerung einer Gegensystemstromkomponente quasi automatisch zu einer Verringerung des Nullsystemstroms führt. Die Betrachtung der Asymmetrie reicht somit aus. Dennoch kann vorzugsweise vorgesehen sein, eine Nullsystemkomponente mit zu berücksichtigen und mit zu kom- pensieren. The generation of such a negative sequence current refers to the method of symmetrical components, according to which a three-phase current is computationally broken down into a positive sequence or a positive sequence component and a negative sequence or negative sequence component, which can also be referred to as negative sequence current, by means of a transformation. In principle, a zero system or zero system current must also be taken into account, which can be neglected here. A zero-system current can indeed occur here, but it is assumed that there is essentially a de facto ohmic load from all of the electric vehicles to be charged thus a reduction in the asymmetry and thus a reduction in a negative sequence current component almost automatically leads to a reduction in the zero sequence current. It is therefore sufficient to consider the asymmetry. Nevertheless, it can preferably be provided that a zero sequence component is also taken into account and compensated for.
Jedenfalls wird insoweit vorgeschlagen, zum Verringern der Asymmetrie einen Gegensystemstrom vorzugeben und zusammen mit einem zum Laden der an das DC- Ladeterminal angeschlossenen Elektrofahrzeuge benötigten Mitsystemstrom von der Stromzuführung zu beziehen. Aus dem berechneten Gegensystemstrom und dem benötigte Mitsystemstrom können dazu die tatsächlichen drei Ströme der drei Phasen berechnet werden und der aktive Gleichrichter kann so angesteuert werden, dass er diese drei Ströme aus der Stromzuführung bezieht. Damit schaltet der aktive Gleichrichter den Gegensystemstrom auf die dreiphasige Stromzuführung auf. Vorzugsweise ist vorgesehen, dass die Symmetrierungssteuerung dazu vorbereitet ist, den aktiven Gleichrichter zum Verringern der Asymmetrie der Ströme anzusteuern. Das kann besonders bedeuten, dass zum einen die Symmetrierungssteuerung Sensordaten über die dreiphasige Stromzuführung bekommt, gegebenenfalls einschließlich einer Information über einen Strom eines Nullleiters der Stromzuführung. Außerdem wird vorgeschlagen, dass die Symmetrierungssteuerung über eine Datenverbindung, insbesondere eine Datenleitung verfügt, mit der der aktive Gleichrichter angesteuert werden kann. Vorzugsweise wird darüber zumindest ein Sollwert für einen von dem aktiven Gleichrichter auf die dreiphasige Stromzuführung aufzuschaltenden Gegensystemstrom übertragen, den die Symmetrierungssteuerung zuvor berechnet hat. Besonders ist hier vorteilhaft, wenn die Symmetrierungssteuerung sowohl diesen aktiven Gleichrichter als auch die Phasenwechselvorrichtungen ansteuern kann. Im Übrigen können natürlich auch mehrere DC-Ladeterminals und mehrere aktive Gleichrichter vorgesehen sein. In any case, it is proposed to reduce the asymmetry to specify a negative sequence current and to draw it from the power supply together with a positive sequence current required for charging the electric vehicles connected to the DC charging terminal. From the calculated negative sequence current and the required positive sequence current, the actual three currents of the three phases can be calculated and the active rectifier can be controlled so that it draws these three currents from the power supply. The active rectifier then switches the negative sequence current to the three-phase power supply. It is preferably provided that the balancing control is prepared to control the active rectifier to reduce the asymmetry of the currents. This can mean in particular that, on the one hand, the balancing control receives sensor data via the three-phase power supply, possibly including information about a current of a neutral conductor of the power supply. It is also proposed that the balancing control has a data connection, in particular a data line, with which the active rectifier can be controlled. At least one setpoint value for a negative sequence current to be switched from the active rectifier to the three-phase power supply, which the balancing control has previously calculated, is preferably transmitted via this. It is particularly advantageous here if the balancing control can control both this active rectifier and the phase change devices. Incidentally, several DC charging terminals and several active rectifiers can of course also be provided.
Gemäß einer Ausgestaltung ist die Ladestation dazu vorbereitet, dass das Verändern der Anschlusszuordnung nach Überschreiten eines Asymmetrieschwellwertes wiederholt wird, der ein Maß einer Asymmetrie der Stromzuführung ist, oder in einem wiederkehrenden Zyklus wiederholt wird, wobei insbesondere der wiederkehrende Zyklus fortlaufend nach einer Wiederholzeit wiederholt durchlaufen wird, wobei die Wiederholzeit kürzer ist als ein durchschnittlicher Ladevorgang eines Elektrofahrzeugs. Demnach wird also vor-
geschlagen, die Anschlusszuordnung auch während eines Ladeprozesses zu überprüfen und gegebenenfalls zu verändern. Hier wurde besonders erkannt, dass sich auch die Belastung der dreiphasigen Stromzuführung während eines Ladevorgangs ändern kann. Besonders wurde erkannt, dass beim Laden von Elektrofahrzeugen häufig anfangs hohe Ladeströme auftreten, die sich dann nach und nach reduzieren. Außerdem kann sich die Belastungssituation der Stromzuführung auch ständig dadurch ändern, dass ein Fahrzeug die Ladestation verlässt und/oder ein Fahrzeug neu an die Ladestation angeschlossen wird. According to one embodiment, the charging station is prepared so that changing the connection assignment is repeated after an asymmetry threshold value is exceeded, which is a measure of an asymmetry in the power supply, or is repeated in a recurring cycle, in particular the recurring cycle being repeated continuously after a repetition time , the repetition time is shorter than an average charging process of an electric vehicle. According to this, beaten to check the connection assignment during a charging process and to change it if necessary. It was particularly recognized here that the load on the three-phase power supply can also change during a charging process. It was particularly recognized that when charging electric vehicles, high charging currents often occur at the beginning, which are then gradually reduced. In addition, the load situation of the power supply can also constantly change because a vehicle leaves the charging station and / or a vehicle is newly connected to the charging station.
Die Wiederholzeit wird insbesondere in einem Bereich von 1 min bis 5 min gewählt. Das liegt deutlich unter der Dauer eines durchschnittlichen Ladevorgangs eines Elektrofahrzeugs, die im Bereich von 15 min bis mehreren Stunden liegen kann. Es wird somit vorgeschlagen, dass deutlich öfter die Anschlusszuordnung überprüft und gegebenenfalls verändert wird. The repetition time is selected in a range from 1 minute to 5 minutes. This is well below the duration of an average charging process for an electric vehicle, which can range from 15 minutes to several hours. It is therefore proposed that the connection assignment be checked and, if necessary, changed more often.
Vorzugsweise wird die Stromzuführung dauerhaft überwacht, insbesondere werden dauerhaft die Ströme der drei Versorgungsstränge überwacht dabei auch die Asymmetrie überwacht. Wrd diese zu groß, wird eine Symmetrierung wiederholt. Das kann durch Vorgabe eines Asymmetrieschwellwertes erfolgen. The power supply is preferably continuously monitored; in particular, the currents of the three supply lines are continuously monitored, while the asymmetry is also monitored. If this becomes too large, symmetrization is repeated. This can be done by specifying an asymmetry threshold.
Vorzugsweise ist die Stromzuführung an einem Netzverknüpfungspunkt eines elektrischen Versorgungsnetzes angeschlossen, insbesondere über einen Transformator. Somit kann erreicht werden, dass eine Symmetrierung der drei Phasen der Stromzuführung sich auch entsprechend positiv auf das elektrische Versorgungsnetz auswirkt. Dadurch kann mittels der Ladestation die Stromqualität im Netz verbessert werden, jedenfalls im Vergleich zu der Situation, wenn in der Ladestation nicht auf eine Verringerung einer Asymmetrie der dreiphasigen Stromzuführung geachtet wird. Erfindungsgemäß wird auch ein Verfahren zum Laden von Elektrofahrzeugen mittels einer Ladestation vorgeschlagen. Dieses Verfahren legt eine Ladestation zugrunde, die mehrere AC-Ladeterminals aufweist, die jeweils zum Laden eines Elektrofahrzeugs durch Wechselstrom ausgebildet sind. Gemäß dem Verfahren wird jedes der AC-Ladeterminals über eine Phasenwechselvorrichtung, die an eine dreiphasige Stromzuführung der La- destation angeschlossen ist, mit elektrischem dreiphasigen Strom versorgt. Das kann auch bedeuten, dass die entsprechenden drei Phasen an einem Eingang des AC- Ladeterminals anliegen, aber nur teilweise abgerufen werden. Natürlich fließt nur dann Strom, wenn auch ein Elektrofahrzeug angeschlossen ist.
Durch die Stromzuführung, die drei Versorgungsstränge aufweist, werden dann drei Spannungsphasen bereitgestellt. Jeder der drei Versorgungsstränge weist also eine der drei Spannungsphasen auf. The power supply is preferably connected to a network connection point of an electrical supply network, in particular via a transformer. It can thus be achieved that balancing the three phases of the power supply also has a correspondingly positive effect on the electrical supply network. As a result, the power quality in the network can be improved by means of the charging station, at least in comparison to the situation when no attention is paid to reducing the asymmetry of the three-phase power supply in the charging station. According to the invention, a method for charging electric vehicles by means of a charging station is also proposed. This method is based on a charging station that has several AC charging terminals, each of which is designed to charge an electric vehicle with alternating current. According to the method, each of the AC charging terminals is supplied with electrical three-phase current via a phase change device which is connected to a three-phase power supply of the charging station. This can also mean that the corresponding three phases are present at an input of the AC charging terminal, but are only partially called up. Of course, electricity only flows when an electric vehicle is connected. The power supply, which has three supply lines, then provides three voltage phases. Each of the three supply lines thus has one of the three voltage phases.
Außerdem weist jedes AC-Ladeterminal drei Anschlussstränge auf, die jeweils an die drei Versorgungsstränge angeschlossen sind, und über die drei Versorgungsstränge werden die drei Spannungsphasen an die Anschlussstränge angelegt. Jede Phasenwechselvorrichtung verändert dann zum Verringern einer Stromasymmetrie in der Stromzuführung eine Anschlusszuordnung zwischen den drei Versorgungssträngen und den drei Anschlusssträngen. Soweit eine Stromasymmetrie minimal, insbesondere null geworden ist, braucht dann natürlich die Anschlusszuordnung nicht verändert zu werden. Aber immer dann, wenn eine Verringerung der Stromasymmetrie durchgeführt werden soll, kann diese Phasenwechselvorrichtung die Anschlusszuordnung verändern. Das wird also entsprechend bei jedem AC-Ladeterminal einzeln vorgenommen. In addition, each AC charging terminal has three connection lines, each of which is connected to the three supply lines, and the three voltage phases are applied to the connection lines via the three supply lines. Each phase change device then changes a connection assignment between the three supply lines and the three connection lines in order to reduce a current asymmetry in the power supply. If a current asymmetry has become minimal, in particular zero, then of course the connection assignment does not need to be changed. But whenever a reduction in the current asymmetry is to be carried out, this phase change device can change the connection assignment. This is done individually for each AC charging terminal.
Vorzugsweise wird vorgeschlagen, dass das Verfahren eine Ladestation verwendet, wie sie gemäß einer vorstehend beschriebenen Ausführungsform erläutert wurde. Besonders wird vorgeschlagen, dass das Verfahren oder ein Teil davon in der Symmetrierungssteuerung der Ladestation implementiert ist. It is preferably proposed that the method use a charging station as explained in accordance with an embodiment described above. In particular, it is proposed that the method or a part thereof be implemented in the balancing control of the charging station.
Nachfolgend wird die Erfindung beispielhaft anhand von Ausführungsformen unter Bezugnahme auf die begleitenden Figuren näher erläutert. Figur 1 zeigt eine Ladestation in einer schematischen Darstellung. The invention is explained in more detail below by way of example using embodiments with reference to the accompanying figures. Figure 1 shows a charging station in a schematic representation.
Figur 2 zeigt ein Ablaufdiagramm für ein Verfahren zum Laden von Elektrofahrzeugen. FIG. 2 shows a flow chart for a method for charging electric vehicles.
In Figur 1 ist schematisch eine Ladestation 1 gezeigt, die über einen Netzanschlusspunkt 2 an ein elektrisches Versorgungsnetz 4 angeschlossen ist. Die Ladestation 1 weist dabei mehrere AC-Ladeterminals 6 auf sowie ein DC-Ladeterminal 8 mit zwei Unterladetermi- nals, nämlich mit zwei DC-Ladern 10. In FIG. 1, a charging station 1 is shown schematically, which is connected to an electrical supply network 4 via a network connection point 2. The charging station 1 has several AC charging terminals 6 and a DC charging terminal 8 with two sub-charging terminals, namely with two DC chargers 10.
Zur Versorgung der AC-Ladeterminals 6 und des DC-Ladeterminals 8 ist eine Stromzuführung 12 vorgesehen, die einen ersten, zweiten und dritten Versorgungsstrang 21 , 22 bzw. 23 und einen Versorgungsnullleiter 20 aufweist. Die Stromzuführung 12 ist dabei an dem Netzanschlusspunkt 2 angeschlossen und dort an einen am Netzanschlusspunkt 2 vorgesehenen T ransformator 14.
Das DC-Ladeterminal 8 ist über einen aktiven Gleichrichter 16 an die drei Stränge 21 , 22 und 23 der Stromzuführung 12 angeschlossen. Eine Verbindung mit dem Versorgungsnullleiter 20 ist für den aktiven Gleichrichter nicht vorgesehen, kann gemäß einer Ausführungsform aber vorgesehen sein. Jedes AC-Ladeterminal 6 ist jeweils über eine Phasenwechselvorrichtung 18 an die Stromzuführung 12 angeschlossen. Der Anschluss erfolgt dabei sowohl an die drei Versorgungsstränge 21 , 22 und 23 als auch an den Versorgungsnullleiter. To supply the AC charging terminals 6 and the DC charging terminal 8, a power supply 12 is provided, which has a first, second and third supply line 21, 22 and 23 and a supply neutral conductor 20. The power supply 12 is connected to the network connection point 2 and there to a transformer 14 provided at the network connection point 2. The DC charging terminal 8 is connected to the three strings 21, 22 and 23 of the power supply 12 via an active rectifier 16. A connection to the supply neutral conductor 20 is not provided for the active rectifier, but can be provided according to one embodiment. Each AC charging terminal 6 is connected to the power supply 12 via a phase change device 18. The connection is made to the three supply lines 21, 22 and 23 as well as to the supply neutral conductor.
Jedes AC-Ladeterminal 6 ist über einen ersten, zweiten und dritten Anschlussstrang 31 , 32 und 33 an den ersten, zweiten bzw. dritten Versorgungsstrang 21 , 22 und 23 ange- schlossen. Der besseren Übersichtlichkeit halber sind die Bezugszeichen nur bei einem AC-Ladeterminal 6 eingezeichnet, gelten aber für die übrigen AC-Ladeterminals 6, die den identischen Aufbau und identischen Anschluss in der Figur 1 aufweisen, gleichermaßen. Über einen Nullleiteranschluss 30 ist jedes AC-Ladeterminal 6 zudem an den Versorgungsnullleiter 20 angeschlossen. Jedes AC-Ladeterminal 6 weist zudem einen drei- phasigen Ausgangsanschluss 26 auf, an den das jeweils zu ladende Elektrofahrzeug 24 angeschlossen werden kann. Each AC charging terminal 6 is connected to the first, second and third supply lines 21, 22 and 23 via a first, second and third connection line 31, 32 and 33. For the sake of clarity, the reference symbols are only drawn in for one AC charging terminal 6, but apply equally to the other AC charging terminals 6, which have the identical structure and identical connection in FIG. 1. Each AC charging terminal 6 is also connected to the supply neutral 20 via a neutral conductor connection 30. Each AC charging terminal 6 also has a three-phase output connection 26 to which the respective electric vehicle 24 to be charged can be connected.
Der dreiphasige Ausgangsanschluss 26 kann in seiner Anschlusszuordnung zu den drei Anschlusssträngen 31 , 32 und 33 durch die Phasenwechselvorrichtung 18 verändert werden. Figur 1 zeigt dazu dieselbe Einstellung für jede der gezeigten vier Phasenwech- selvorrichtungen 18. Die Phasenwechselvorrichtung 18 ist dabei als gekoppelter Dreifachschalter dargestellt, der somit die Anschlusszuordnung für alle drei Phasen zugleich verändern kann und insoweit im elektrotechnischen Sinne für das dreiphasige System eine Phasendrehung um 120° oder 240° erreichen kann. Das ist in Figur 1 jeweils dadurch angedeutet, dass zusätzlich zur Symbolik oberhalb der Stromzuführung 12 zu jedem AC-Ladeterminal 6 0°, 120° oder 240° geschrieben steht. Insoweit können die gezeigten Phasenwechselvorrichtungen 18 auch als Phasendrehvorrichtungen bzw. jeweils als Phasendrehschalter bezeichnet werden. Es kommen aber auch andere Arten der Umsetzung für das Verändern der Anschlusszuordnung in Betracht. The three-phase output connection 26 can be changed in its connection assignment to the three connection branches 31, 32 and 33 by the phase change device 18. FIG. 1 shows the same setting for each of the four phase change devices 18 shown. The phase change device 18 is shown as a coupled triple switch, which can thus change the connection assignment for all three phases at the same time and, in the electrical engineering sense, a phase change by 120 for the three-phase system ° or 240 °. This is indicated in FIG. 1 by the fact that in addition to the symbols above the power supply 12 to each AC charging terminal 6, 0 °, 120 ° or 240 ° is written. In this respect, the phase change devices 18 shown can also be referred to as phase rotation devices or respectively as phase rotation switches. However, other types of implementation for changing the connection assignment are also possible.
Der Anschlussnullleiter 30 ist übrigens jeweils nur durch die Phasenwechselvorrichtung 18 durchgeschleift und ist von Umschaltvorgängen nicht betroffen. Incidentally, the connection neutral conductor 30 is only looped through the phase change device 18 and is not affected by switching processes.
In der Figur 1 sind vier AC-Ladeterminals 6 beispielhaft gezeigt, es können aber noch weitere vorgesehen sein und auch die Stromzuführung 12 deutet an, dass sie noch
weitergeführt werden kann. Von den vier AC-Ladeterminals 6 ist bei zweien jeweils ein Elektrofahrzeug mit einem einphasigen fahrzeuginternen Lader angeschlossen, wobei hier konkret die erste Phase nur belastet wird, was durch Ph1 gekennzeichnet ist. An ein weiteres AC-Ladeterminal ist ein Elektrofahrzeug 24 angeschlossen, das ebenfalls einen fahrzeuginternen Lader verwendet, der einphasig ausgebildet ist, allerdings an eine dritte Phase angeschlossen ist, was durch Ph3 gekennzeichnet ist. Ein fahrzeuginterner Lader wird in Fachkreisen auch als Onboard-Lader bezeichnet, was somit als synonymer Begriff verwendet werden kann. Schließlich ist ein viertes Elektrofahrzeug 24 vorgesehen, das einen dreiphasigen fahrzeuginternen Lader verwendet. Für die in Figur 1 exemplarisch dargestellte Situation der gezeigten vier AC- Ladeterminals 6 ergibt sich somit die Situation, dass die erste Phase von zwei einphasigen fahrzeuginternen Ladern belastet wird, die zweite Phase von keinem und die dritte Phase von einem einphasigen fahrzeuginternen Lader. Außerdem werden alle drei Phasen im Idealfall gleichmäßig von dem dreiphasigen fahrzeuginternen Lader belastet. Demnach dürfte die erste Phase stark überbelastet sein und die zweite Phase stark unterbelastet, sodass sich insgesamt eine sehr asymmetrische Belastung der Stromzuführung 12 ergibt. Four AC charging terminals 6 are shown by way of example in FIG. 1, but additional ones can be provided and the power supply 12 also indicates that they are still can be continued. Two of the four AC charging terminals 6 each have an electric vehicle connected with a single-phase in-vehicle charger, with the first phase being specifically only loaded, which is indicated by Ph1. An electric vehicle 24 is connected to another AC charging terminal, which also uses an in-vehicle charger which is single-phase, but is connected to a third phase, which is indicated by Ph3. An in-vehicle charger is also referred to in specialist circles as an onboard charger, which can therefore be used as a synonymous term. Finally, a fourth electric vehicle 24 is provided which uses a three-phase in-vehicle charger. For the situation of the four AC charging terminals 6 shown as an example in FIG. 1, the situation is that the first phase is loaded by two single-phase in-vehicle chargers, the second phase by none and the third phase by a single-phase in-vehicle charger. In addition, all three phases are ideally evenly loaded by the three-phase in-vehicle charger. Accordingly, the first phase is likely to be heavily overloaded and the second phase is likely to be heavily underloaded, so that overall there is a very asymmetrical load on the power supply 12.
In diesem veranschaulichten Beispiel könnte leicht Abhilfe dadurch geschaffen werden, dass für eines der beiden AC-Ladeterminals, die auf der ersten Phase belastet sind, die Phasenwechselvorrichtung 18 eine Phasenumschaltung oder Phasenweiterschaltung vornimmt, sodass die erste Phase, die der einphasige fahrzeuginterne Lader verwendet, auf den zweiten Anschlussstrang geschaltet wird, wodurch dann eine Verschaltung mit dem zweiten Versorgungsstrang resultiert. Als Ergebnis wäre dann jeweils ein einphasiger fahrzeuginterner Lader mit dem ersten, zweiten bzw. dritten Versorgungsstrang verschaltet. In this illustrated example, this could easily be remedied in that for one of the two AC charging terminals that are loaded on the first phase, the phase changing device 18 carries out a phase changeover or phase advancement so that the first phase that the single-phase in-vehicle charger uses the second connection line is switched, which then results in an interconnection with the second supply line. As a result, a single-phase vehicle-internal charger would then be connected to the first, second and third supply line.
Zum Betreiben der Ladestation und besonders zum Ansteuern der Phasenwechselvorrichtungen 18 zum Verringern oder möglichst Minimieren einer asymmetrischen Belastung der dreiphasigen Stromzuführung ist eine Symmetrierungssteuerung 28 vorgesehen. Diese Symmetrierungssteuerung 28 erhält Informationen über alle Ströme bzw. An- schlussstränge bzw. Anschlussleitungen der AC-Ladeterminals 6. Dazu ist jeweils ein Terminalsensor 34 vorgesehen. Der Terminalsensor 34 liefert somit Informationen über jeden Strom zwischen jedem AC-Ladeterminal und der Stromzuführung 12. Dazu kann zu jedem AC-Ladeterminal 6 zu jedem der vier Ströme, also den drei Phasenströmen und
dem Nullleiterstrom, jeweils vier Stromwerte an die Symmetrierungssteuerung 28 übertragen werden. A balancing control 28 is provided for operating the charging station and in particular for controlling the phase change devices 18 in order to reduce or, if possible, minimize an asymmetrical load on the three-phase power supply. This balancing control 28 receives information about all currents or connecting lines or connecting lines of the AC charging terminals 6. A terminal sensor 34 is provided for each. The terminal sensor 34 thus supplies information about each current between each AC charging terminal and the power supply 12. For this purpose, each AC charging terminal 6 can be connected to each of the four currents, that is to say the three phase currents and the neutral conductor current, four current values are transmitted to the balancing control 28.
Es kommt aber auch in Betracht, dass der jeweilige Terminalsensor 34 oder eine damit gekoppelte Auswerteeinheit aus diesen vier Strömen bereits eine Umrechnung nach der Methode der symmetrischen Komponenten vornimmt, nämlich in einen Mitsystemstrom li,n, einen Gegensystemstrom h,n und einen Nullsystemstrom lo,n. Diese Ströme können über eine Terminalsensorleitung 36 zur Symmetrierungssteuerung 28 übertragen werden und das ist in der Figur 1 an der Terminalsensorleitung 36 angedeutet. Der Index n zu jedem dieser Teilströme deutet an, das solche drei Ströme für jedes der AC- Ladeterminals 6 erfasst wird. Der Index n steht somit für die jeweilige Nummer des AC- Ladeterminals. Im vorliegenden veranschaulichenden Fall der Figur 1 würde der Index n somit von 1 bis 4 reichen. However, it is also possible that the respective terminal sensor 34 or an evaluation unit coupled to it already converts these four currents using the symmetrical component method, namely into a positive sequence current li, n, a negative sequence current h, n and a zero sequence current lo, n. These currents can be transmitted to the balancing control 28 via a terminal sensor line 36 and this is indicated in FIG. 1 on the terminal sensor line 36. The index n for each of these partial currents indicates that such three currents are recorded for each of the AC charging terminals 6. The index n therefore stands for the respective number of the AC charging terminal. In the present illustrative case of FIG. 1, the index n would thus range from 1 to 4.
Die Symmetrierungssteuerung 28 kann nun basierend auf diesen Stromwerten, die sie über die Terminalsensorleitung 36 erhalten hat, eine Optimierung bestimmen und dann entsprechend die Phasenwechselvorrichtungen 18 ansteuern, um die Anschlusszuordnungen zwischen dem jeweiligen Ausgangsanschluss 26 und den Anschlusssträngen 31 , 32 und 33 des AC-Ladeterminals 6 durch entsprechendes Schalten der Phasenwechselvorrichtungen 18 umzusetzen. Dazu können entsprechende Steuersignale von der Symmetrierungssteuerung 28 an die Phasenwechselvorrichtungen 18 übertragen werden und dazu kann beispielsweise eine Terminalsteuerleitung 38 zu jeder Phasenwechselvorrichtung 18 vorgesehen sein. The balancing control 28 can now determine an optimization based on these current values that it has received via the terminal sensor line 36 and then control the phase change devices 18 accordingly in order to make the connection assignments between the respective output connection 26 and the connection strings 31, 32 and 33 of the AC charging terminal 6 to be implemented by switching the phase change devices 18 accordingly. For this purpose, corresponding control signals can be transmitted from the balancing control 28 to the phase change devices 18 and for this purpose, for example, a terminal control line 38 can be provided to each phase change device 18.
Figur 1 veranschaulicht zusätzlich die Verwendung des aktiven Gleichrichters 16 zur weiteren Verringerung einer etwaigen Asymmetrie der Ströme in der Stromzuführung 12. Dazu wird zunächst vorgeschlagen, dass die Symmetrierungssteuerung 28 entsprechen- de Stromdaten von der Stromzuführung 12 erhält. Dafür ist ein Stromzufuhrsensor 40 vorgesehen, der alle vier Ströme der Stromzuführung 12 erfassen kann. Auch er oder eine zugeordnete Auswerteeinheit kann eine Transformation nach der Methode der symmetrischen Komponenten vorsehen und entsprechend einen Mitsystemstrom li, einen Gegensystemstrom I2 und einen Nullsystemstrom Io bestimmen und der Symmet- rierungssteuerung 28 über eine Zufuhrsensorleitung 42 zuführen. Daraus, natürlich unter Berücksichtigung der erfassten Ströme der AC-Ladeterminals 6, kann die Symmetrierungssteuerung 28 eine vorzugebende Gegensystemstromkomponente I2 soii als Sollwert erzeugen und über eine Gleichrichtersteuerleitung 44 dem aktiven Gleichrichter 16 zufüh- ren.
Zusammen mit dem Strombedarf des DC-Ladeterminals 8 und dem Sollwert für den Gegensystemstrom I2 soii kann der aktive Gleichrichter 16 dann so gesteuert werden, dass, nach Rücktransformation aus der Darstellung gemäß den symmetrischen Komponenten, ein entsprechender dreiphasiger Strom aus der Stromzuführung 12 entnommen wird. Damit wird dann der aktive Gleichrichter 16 und damit das DC-Ladeterminal 8 aus der Stromzuführung 12 versorgt, entnimmt also Strom, schaltet dabei aber gleichzeitig den Gegensystemstrom, den die Symmetrierungssteuerung 28 vorgegeben hat, auf. Damit kann eine weitere Vergleichmäßigung der Ströme in der Stromzuführung 12 erreicht werden. Figur 2 zeigt ein Ablaufdiagramm 200 zur Minimierung der Asymmetrie in einer Stromzuführung 12 der Figur 1. Zunächst wird in einem Schritt 0, der in Figur 2 als SO angedeutet ist, eine statische Phasensymmetrierung vorgenommen. Das deutet der statische Symmetrierungsblock 202 an. Demnach wird die Phasenwechselvorrichtung für alle in dem Moment nicht genutzten AC-Ladeterminals sukzessive von einem zum nächsten AC- Ladeterminal um eine Phase weitergeschoben, um insoweit eine Vergleichmäßigung zu erhalten. Für das Beispiel der Figur 1 könnte das bedeuten, in der Annahme, dass in dem Moment keines der gezeigten vier AC-Ladeterminals 6 genutzt ist, dass gemäß der Darstellung der Figur 1 von links kommend die erste Phasenwechselvorrichtung 18 bleibt, wie sie ist, die nächste Phasenwechselvorrichtung 18 um eine Schaltstellung weiter nach rechts geschaltet wird, die dritte um zwei Stellungen weiter nach rechts geschaltet wird und die vierte wieder so bleibt wie sie ist. Gäbe es eine fünfte, würde diese wieder um eine Stellung weitergeschaltet werden, die sechste um zwei, und so weiter. FIG. 1 additionally illustrates the use of the active rectifier 16 to further reduce any asymmetry of the currents in the power supply 12. To this end, it is first proposed that the balancing control 28 receive corresponding current data from the power supply 12. A power supply sensor 40 is provided for this, which can detect all four currents of the power supply 12. He or an assigned evaluation unit can also provide a transformation using the symmetrical component method and accordingly determine a positive sequence current li, a negative sequence current I2 and a zero sequence current Io and feed it to the symmetry control 28 via a feed sensor line 42. From this, naturally taking into account the recorded currents of the AC charging terminals 6, the balancing controller 28 can generate a predefined negative sequence current component I2 soii as a setpoint value and feed it to the active rectifier 16 via a rectifier control line 44. Together with the power requirement of the DC charging terminal 8 and the setpoint value for the negative sequence current I2 soii, the active rectifier 16 can then be controlled in such a way that, after reverse transformation from the representation according to the symmetrical components, a corresponding three-phase current is drawn from the power supply 12. The active rectifier 16 and thus the DC charging terminal 8 are then supplied from the power supply 12, that is to say draws current, but at the same time switches on the negative sequence current that has been specified by the balancing control 28. A further equalization of the currents in the power supply 12 can thus be achieved. FIG. 2 shows a flow diagram 200 for minimizing the asymmetry in a power supply line 12 of FIG. 1. First, in a step 0, which is indicated in FIG. 2 as SO, a static phase symmetrization is carried out. This is indicated by the static balancing block 202. Accordingly, the phase change device for all AC charging terminals that are not used at the moment is successively shifted from one to the next AC charging terminal by one phase in order to achieve a leveling out. For the example in FIG. 1, assuming that none of the four AC charging terminals 6 shown is being used at the moment, that according to the illustration in FIG. 1, coming from the left, the first phase change device 18 remains as it is The next phase change device 18 is switched one switch position further to the right, the third is switched two positions further to the right and the fourth remains as it is. If there were a fifth, it would be indexed one position, the sixth by two, and so on.
Damit wird eine gute Basis geschaffen, dass jedenfalls beim Verbinden von einphasigen fahrzeuginternen Ladern eine ungefähr gleichmäßige Verteilung der Phasen als Startbe- dingung erreicht werden kann. Sind schon Fahrzeuge zum Laden an AC-Ladeterminals angeschlossen, wird die vorgeschlagene statische Phasensymmetrierung nur für die bis dahin nicht genutzten AC-Ladeterminals vorgeschlagen. Sobald Fahrzeuge angeschlossen werden, liegt zunächst eine ganz gute Symmetrierung als Startbedingung vor. Diese angeschlossenen Fahrzeuge bzw. die entsprechenden AC-Ladeterminals können dann aber in eine weiterführende Minimierung der Asymmetrie einbezogen werden, wie sie in den folgenden Schritten durchgeführt wird. This creates a good basis so that an approximately even distribution of the phases can be achieved as a starting condition, at least when connecting single-phase in-vehicle chargers. If vehicles are already connected to AC charging terminals for charging, the proposed static phase balancing is only proposed for the AC charging terminals that have not been used until then. As soon as vehicles are connected, there is initially a very good symmetry as a start condition. These connected vehicles or the corresponding AC charging terminals can then be included in a further minimization of the asymmetry, as is carried out in the following steps.
Entsprechend wird dann zur konkreten Minimierung der Asymmetrie als nächstes der Schritt 1 vorgeschlagen, der in Figur 2 als S1 gekennzeichnet ist und mehrere Blöcke umfasst. Zunächst wird nämlich in dem Sortierungsblock 204 eine Sortierung der AC-
Ladeterminals nach der Größe des jeweils maximalen Phasenstroms dieses AC- Ladeterminals vorgenommen. Dabei kommen verschiedene Varianten in Betracht. Eine Variante ist, dass nur die AC-Ladeterminals in dieser Sortierung berücksichtigt werden, die in dem Moment eine einphasige oder zweiphasige Stromaufnahme haben. Auch das kann gemäß der Ausführung nach Figur 1 durch den Terminalsensor 34 jeweils erkannt werden. Correspondingly, in order to specifically minimize the asymmetry, the next step proposed is step 1, which is identified as S1 in FIG. 2 and comprises several blocks. Initially, a sorting of the AC- Charging terminals made according to the size of the maximum phase current of this AC charging terminal. Different variants can be considered. One variant is that only those AC charging terminals are taken into account in this sorting that have a single-phase or two-phase power consumption at the moment. According to the embodiment according to FIG. 1, this can also be recognized by the terminal sensor 34.
Eine andere Variante ist, dass die AC-Ladeterminals gruppenweise nach Größe der maximalen Phasenströme sortiert werden. Demnach kann eine erste Gruppe alle AC- Ladeterminals umfassen, die eine einphasige Strombelastung zeigen, und eine zweite Gruppe alle AC-Ladeterminals umfassen, die eine zweiphasige Strombelastung zeigen. Gegebenenfalls können auch noch die AC-Ladeterminals, die eine dreiphasige Strombelastung zeigen, in eine dritte Gruppe sortiert werden. Another variant is that the AC charging terminals are sorted in groups according to the size of the maximum phase currents. Accordingly, a first group can include all AC charging terminals that show a single-phase current load, and a second group can include all AC charging terminals that show a two-phase current load. If necessary, the AC charging terminals that show a three-phase current load can also be sorted into a third group.
Mit dieser Sortierung, sei es nun gruppenweise oder anderweitig, wird die Minimierung der Asymmetrie in dem Variationsblock 206 fortgesetzt. In dem Variationsblock 206 werden dann in der Reihenfolge, wie sie sich aus dem Sortierungsblock 204 ergeben hat, die Anschlussstränge mit den maximalen Phasenströmen sukzessive auf die erste, zweite und dritte Phase geschaltet. Das ist besonders so zu verstehen, dass für das AC- Ladeterminal mit dem größten maximalen Phasenstrom dieser auf die erste Phase geschaltet wird, für das AC-Ladeterminal mit dem zweitgrößten maximalen Strom dieser auf die zweite Phase geschaltet wird und für das AC-Ladeterminal mit dem drittgrößten maximalen Phasenstrom dieser auf die dritte Phase geschaltet wird. With this sorting, be it in groups or otherwise, the minimization of the asymmetry in the variation block 206 is continued. In the variation block 206, the connection branches with the maximum phase currents are then successively switched to the first, second and third phases in the sequence that resulted from the sorting block 204. This should be understood in such a way that for the AC charging terminal with the largest maximum phase current this is switched to the first phase, for the AC charging terminal with the second largest maximum current it is switched to the second phase and for the AC charging terminal with it the third largest maximum phase current this is switched to the third phase.
Bei dem AC-Ladeterminal mit dem viertgrößten maximalen Phasenstrom geht es aber nicht von vorn los, sondern dieselbe Reihenfolge zurück. Von dem AC-Ladeterminal mit dem viertgrößten maximalen Phasenstrom wird dieser also auch auf die dritte Phase geschaltet, der fünftgrößte maximale Phasenstrom wird auf die zweite Phase geschaltet und der sechstgrößte maximale Phasenstrom auf die erste. In the case of the AC charging terminal with the fourth largest maximum phase current, however, it does not start from the beginning, but rather back in the same order. The AC charging terminal with the fourth largest maximum phase current is also switched to the third phase, the fifth largest maximum phase current is switched to the second phase and the sixth largest maximum phase current to the first.
All dies, also besonders der Vorgang in dem Sortierungsblock 204 und in dem Variationsblock 206, wird für AC-Ladeterminals wie die AC-Ladeterminals 6 vorgeschlagen und entsprechend mit den Phasenwechselvorrichtungen, wie den Phasenwechselvorrichtun- gen 18 der Figur 1 umgesetzt. All of this, especially the process in the sorting block 204 and in the variation block 206, is proposed for AC charging terminals such as the AC charging terminals 6 and implemented accordingly with the phase change devices such as the phase change devices 18 of FIG.
Im Schritt 2, der in Figur 2 als S2 gekennzeichnet ist, wird eine weitere Minimierung der Asymmetrie vorgeschlagen, die idealerweise dazu führt, dass die Ströme in der Stromzu-
führung, wie der Stromzuführung 12 der Figur 1 , vollständig symmetrisch werden, die Asymmetrie zumindest sehr stark minimiert wird, insbesondere nahe null. In step 2, which is identified as S2 in Figure 2, a further minimization of the asymmetry is proposed, which ideally leads to the currents in the current supply Lead, as the power supply 12 of Figure 1, are completely symmetrical, the asymmetry is at least very greatly minimized, in particular close to zero.
Dazu wird nun ein oder gegebenenfalls mehrere aktive Gleichrichter eingesetzt, wie der aktive Gleichrichter 16 der Ausführungsform der Figur 1 . Dazu wird in dem Restasymmet- riebestimmungsblock 208 die trotz der Maßnahmen gemäß dem Variationsblock 206 verbleibende Gesamtasymmetrie erfasst. Das kann besonders bezugnehmend auf die Ausführungsform der Figur 1 durch den Stromzuführsensor 40 erreicht werden, der sein erfasstes Ergebnis an die Symmetrierungssteuerung 28 gibt. Daraus kann dann ein zum Kompensieren benötigter Gegensystemstrom bestimmt werden. Das kann in dem Ge- gensystembestimmungsblock 210 durchgeführt werden. Das Ergebnis wäre ein Gegensystemstrom, wie der Gegensystemstrom h soii der Figur 1 , der an den aktiven Gleichrichter 16 als Sollwert gegeben wird. Entsprechend erfolgt diese Umsetzung im Gleichrich- teransteuerblock 212, der diese Vorgabe des Gegensystemstroms umsetzt und somit faktisch den Gegensystemstrom auf die Stromzuführung 12, also auf die dort vorhande- nen drei Ströme bzw. das dort vorhandene dreiphasige Stromsystem aufschaltet. One or more active rectifiers, such as the active rectifier 16 of the embodiment of FIG. 1, are now used for this purpose. For this purpose, the total asymmetry remaining in spite of the measures according to variation block 206 is recorded in residual asymmetry determination block 208. With particular reference to the embodiment in FIG. 1, this can be achieved by the power supply sensor 40, which transmits its detected result to the balancing control 28. A negative sequence current required for compensation can then be determined from this. This can be carried out in the opposing system determination block 210. The result would be a negative sequence current, such as the negative sequence current h soii in FIG. 1, which is given to the active rectifier 16 as a setpoint value. Correspondingly, this conversion takes place in the rectifier control block 212, which converts this specification of the negative sequence current and thus actually switches the negative sequence current to the power supply 12, that is to the three currents present there or the three-phase current system present there.
Im Idealfall kann dadurch ein symmetrisches dreiphasiges Stromsystem in der Stromzuführung 12 erreicht werden. In the ideal case, a symmetrical three-phase power system can be achieved in the power supply 12.
Es ist dabei zu beachten, dass Ladevorgänge von Elektrofahrzeugen üblicherweise nicht langanhaltend stationär und unverändert ablaufen, sondern dass besonders der Lade- ström mit der Zeit abfällt. Besonders zu Beginn eines Ladeprozesses kann der anfängliche Ladestrom erheblich absinken, zum Beispiel von 100 % auf 30 % oder noch weniger. Zumindest kann sich der Ladevorgang zum Ende hin, wenn der Ladezustand bei 80% liegt, verlangsamen. Mit dieser Änderung kann sich somit auch die Asymmetrie verändern. Besonders kann sie sich vergrößern bzw. wieder auftreten, nachdem die Minimie- rung der Asymmetrie gemäß dem Ablauf der Figur 2 erfolgreich war. Daher wird vorgeschlagen, den Schritt 2, also die Durchführungen in dem Restasymmetriebestimmungsblock 208, dem Gegensystembestimmungsblock 210 und dem Gleichrichteransteuer- block 212 häufig zu wiederholen. Auch eine Aktivierung bestimmter Lasten wie Vorrichtungen zum Kühlen, Heizen, prädiktiven Klimatisieren während oder am Ende des Lade- Vorgangs kann die Leistungsaufnahme beeinflussen. It should be noted here that charging processes for electric vehicles usually do not take a long-term, stationary and unchanged course, but rather that the charging flow in particular drops over time. Particularly at the beginning of a charging process, the initial charging current can drop considerably, for example from 100% to 30% or even less. At least the charging process can slow down towards the end when the state of charge is 80%. With this change, the asymmetry can also change. In particular, it can increase or occur again after the minimization of the asymmetry according to the sequence of FIG. 2 has been successful. It is therefore proposed to repeat step 2, that is to say the implementation in the residual asymmetry determination block 208, the negative sequence determination block 210 and the rectifier control block 212, frequently. Activation of certain loads such as devices for cooling, heating, predictive air conditioning during or at the end of the charging process can also influence the power consumption.
Das ist in Figur 2 durch eine Rückführung im Bereich des Schrittes S2 angedeutet. Diese Wiederholung kann zu einer ersten Wiederholungszeit Ti wiederholt werden. Diese erste Wederholungszeit Ti kann sehr klein gewählt werden, zum Beispiel im Bereich von 1 min
oder sie kann als 10 s oder kleiner gewählt werden. Tatsächlich sind all diese Ausführungen in den Blöcken 208, 210 und 212 computerisiert umsetzbar und daher schnell wiederholbar. Es kommt daher selbst in Betracht, dass die Ausführungen der Blöcke 208, 210 und 212 im Wesentlichen kontinuierlich bzw. quasi kontinuierlich, nämlich gemäß einer Computertaktrate, wiederholt werden. This is indicated in FIG. 2 by a return in the area of step S2. This repetition can be repeated at a first repetition time Ti. This first repetition time Ti can be selected to be very small, for example in the region of 1 min or it can be chosen to be 10 seconds or less. In fact, all of these explanations in blocks 208, 210 and 212 can be implemented in a computerized manner and can therefore be quickly repeated. It is therefore even possible that the executions of blocks 208, 210 and 212 are repeated essentially continuously or quasi continuously, namely according to a computer clock rate.
Es wurde aber auch erkannt, dass diese finale Minimierung der Asymmetrie mittels des gesteuerten Gleichrichters nur eine Restasymmetrie ausgleichen kann. Daher wird vorgeschlagen, auch die Verringerung der Asymmetrie gemäß den Durchführungen des Sortierungsblocks 204 und des Variationsblocks 206 regelmäßig zu wiederholen, nämlich gemäß einer zweiten Wiederholungszeit T2. Diese zweite Wiederholungszeit kann beispielsweise 1 min betragen oder größer sein. Es kommt auch in Betracht, dass sie mehrere Minuten beträgt und beispielsweise 3 min beträgt oder darüber gewählt wird. Vorzugsweise ist sie kleiner als 10 min zu wählen. However, it was also recognized that this final minimization of the asymmetry by means of the controlled rectifier can only compensate for a residual asymmetry. It is therefore proposed that the reduction of the asymmetry according to the implementation of the sorting block 204 and the variation block 206 be repeated regularly, namely according to a second repetition time T2. This second repetition time can be 1 minute or more, for example. It is also possible that it is several minutes and is, for example, 3 minutes or more. It should preferably be chosen to be less than 10 minutes.
Damit kann dann erreicht werden, dass im Grunde grobe oder starke Ungleichbelastun- gen, wie sie durch viele fahrzeuginterne einphasige oder zweiphasige Lader zu erwarten sind, zunächst über die Phasenwechselvorrichtungen, wie die Phasenwechselvorrichtungen 18, verringert werden bzw. vergleichmäßigt werden, und erst eine verbleibende Restasymmetrie durch den aktiven Gleichrichter noch weiter verringert oder sogar eliminiert wird. Nachfolgend sind noch zwei konkrete Beispiele möglicher Asymmetrien mit den verschiedenen Lösungsvorschlägen angegeben. In this way it can then be achieved that basically rough or strong unequal loads, as can be expected from many single-phase or two-phase chargers inside the vehicle, are initially reduced or evened out via the phase change devices, such as the phase change devices 18, and only a remaining one Residual asymmetry is further reduced or even eliminated by the active rectifier. Two specific examples of possible asymmetries with the various proposed solutions are given below.
Dabei ist zu beachten, dass den beiden Beispielen in den Tabellen "Symmetrische Komponenten" eine Darstellung und Betrachtung gemäß der Methode der symmetrischen Komponenten zugrunde liegt. Darin bezeichnet h den Mitsystemstrom, I2 den Gegensys- temstrom und Io den Nullsystemstrom. Die Asymmetrie lasy berechnet sich daraus nach der folgenden Formel: 100
It should be noted that the two examples in the "Symmetrical Components" tables are based on a representation and consideration using the symmetrical component method. Here h denotes the positive sequence current, I2 the negative sequence current and Io the zero sequence current. The asymmetry lasy is calculated using the following formula: 100
Die Stromwerte beider Beispiele sind auf einen Referenzwert normiert. The current values of both examples are normalized to a reference value.
Beispiel 1 : Ladevorgang mit 1 p.u. DC (symmetrische AC-Belastung) und 0,33 p.u. AC an Phase A (Gesamtstrom):
SymmetrischeExample 1: Charging process with 1 pu DC (symmetrical AC load) and 0.33 pu AC on phase A (total current): Symmetrical
Phasenwerte Phase values
Komponenten Components
Damit ergibt sich die Asymmetrie: This results in the asymmetry:
I2 + J 0 I2 + J 0
Ja sy = 50 % Yes sy = 50%
k k
Einspeisen eines zusätzlichen Gegensystemstroms durch den DC-Lader: Feeding in an additional negative sequence current through the DC charger:
Symmetrische Symmetrical
Phasenwerte Phase values
Komponenten Components
Gesamtstrom nach Kompensation des Gegensystems: Total current after compensation of the negative sequence:
Symmetrische Symmetrical
Phasenwerte Phase values
Komponenten Components
Damit ergibt sich die Asymmetrie:
This results in the asymmetry:
Im Beispiel 1 ist somit eine Asymmetrie von 50% durch das Einspeisen eines Gegensystemstroms, z.B. durch den aktiven Gleichrichter 16 der Ausführungsform der Figur 1 , auf 25% gesenkt worden. In example 1 there is thus an asymmetry of 50% due to the feeding in of a negative sequence current, e.g. has been reduced to 25% by the active rectifier 16 of the embodiment of FIG.
Beispiel 2: Ladevorgang mit 1 p.u. DC (symmetrische AC-Belastung) und 4X0,33 p.u. AC an Phase A (Gesamtstrom): Example 2: charging process with 1 p.u. DC (symmetrical AC load) and 4X0.33 p.u. AC on phase A (total current):
Symmetrische Symmetrical
Phasenwerte Phase values
Komponenten Components
Damit ergibt sich die Asymmetrie: 114 %This results in the asymmetry: 114%
Phasendrehung von AC Ladepunkt vier um 240° und AC Ladepunkt 3 um 120°: Phase rotation of AC charging point four by 240 ° and AC charging point 3 by 120 °:
Symmetrische Symmetrical
Phasenwerte Phase values
Komponenten Components
Damit ergibt sich die Asymmetrie:
This results in the asymmetry:
Gesamtstrom nach Kompensation des Gegensystems:
Symmetrische Total current after compensation of the negative sequence: Symmetrical
Phasenwerte Phase values
Komponenten Components
Damit ergibt sich die Asymmetrie: This results in the asymmetry:
I2 + J 0 I2 + J 0
Ja sy = 14 % Yes sy = 14%
k k
Beim 2. Beispiel lag anfänglich eine noch größere gesamte Asymmetrie vor, nämlich von 1 14%. Sie wurde in einem ersten Schritt, das könnte dem Schritt S1 der Figur 2 entspre- chen, durch Wechsel einiger Phasenzuordnungen auf 28% reduziert. Dazu wurde an einem vierten AC-Ladeterminal, das könnte dem ganz rechts in Figur 1 dargestellten AC- Ladeterminal 6 entsprechen, eine Phasendrehung von 240° durchgeführt. Es wurden also die Anschlussstränge um zwei Zähler weitergeschaltet, bezogen auf Figur 1 also der erste Anschlussstrang 31 auf den dritten Versorgungsstrang 23, sowie 32 auf 21 und 33 auf 22. In the second example, there was initially an even greater overall asymmetry, namely of 1 14%. In a first step, which could correspond to step S1 in FIG. 2, it was reduced to 28% by changing some phase assignments. For this purpose, a phase rotation of 240 ° was carried out on a fourth AC charging terminal, which could correspond to the AC charging terminal 6 shown on the far right in FIG. The connection lines were thus switched on by two counters, in relation to FIG. 1 that is the first connection line 31 to the third supply line 23, and 32 to 21 and 33 to 22.
Außerdem wurde an einem dritten AC-Ladeterminal, das könnte dem rechts vorletzten in Figur 1 dargestellten AC-Ladeterminal 6 entsprechen, eine Phasendrehung von 120° durchgeführt. Es wurden dort also die Anschlussstränge um einen Zähler weitergeschaltet, bezogen auf Figur 1 also der erste Anschlussstrang 31 auf den zweiten Versorgungs- sträng 22, sowie 32 auf 23 und 33 auf 21 . In addition, a phase rotation of 120 ° was carried out at a third AC charging terminal, which could correspond to the penultimate AC charging terminal 6 shown on the right in FIG. There the connection lines were therefore switched on by a counter, based on FIG. 1 that is the first connection line 31 to the second supply line 22, and 32 to 23 and 33 to 21.
In einem zweiten Schritt, der dem Schritt S2 der Figur 2 entsprechen kann, konnte durch das Einspeisen eines Gegensystemstroms, z.B. durch den aktiven Gleichrichter 16 der Ausführungsform der Figur 1 , die Asymmetrie weiter auf 14% gesenkt werden.
In a second step, which can correspond to step S2 in FIG. 2, by feeding in a negative sequence current, e.g. by the active rectifier 16 of the embodiment of FIG. 1, the asymmetry can be further reduced to 14%.
Claims
Ansprüche Expectations
1. Ladestation (1) zum Laden von Elektrofahrzeugen (24), umfassend: A charging station (1) for charging electric vehicles (24), comprising:
mehrere AC-Ladeterminals (6), jeweils zum Laden eines Elektrofahrzeugs (24) durch Wechselstrom, wobei several AC charging terminals (6), each for charging an electric vehicle (24) using alternating current, wherein
- jedes der AC-Ladeterminals (6) jeweils über eine Phasenwechselvorrichtung - Each of the AC charging terminals (6) each via a phase change device
(18) an eine dreiphasige Stromzuführung (12) angeschlossen ist, um dadurch mit elektrischem dreiphasigen Strom versorgt zu werden, wobei die Stromzuführung (12) drei Versorgungsstränge (21 ,22,23) aufweist, zum Bereitstellen von drei Spannungsphasen, (18) is connected to a three-phase power supply (12) in order to be supplied with electrical three-phase current, the power supply (12) having three supply lines (21, 22, 23) for providing three voltage phases,
- jedes AC-Ladeterminal (6) drei Anschlussstränge (31 ,32,33) aufweist, zum - Each AC charging terminal (6) has three connection lines (31, 32,33) for
Anschließen an die drei Versorgungsstränge (21 ,22,23), zum Anlegen der drei Spannungsphasen an die Anschlussstränge (31 ,32,33), wobei jede Phasenwechselvorrichtung (18) dazu eingerichtet ist, eine Anschlusszuordnung zwischen den drei Versorgungssträngen (21 ,22,23) und den drei Anschlusssträngen (31 ,32,33) zu verändern. Connection to the three supply lines (21, 22, 23) for applying the three voltage phases to the connection lines (31, 32, 33), each phase change device (18) being set up to assign a connection between the three supply lines (21, 22, 23) and the three connecting lines (31, 32, 33).
2. Ladestation (1) nach Anspruch 1 , umfassend: 2. Charging station (1) according to claim 1, comprising:
eine Symmetrierungssteuerung (28) zum Steuern der Phasenwechselvorrichtungen (18), wobei a balancing control (28) for controlling the phase change devices (18), wherein
die Symmetrierungssteuerung (28) dazu vorbereitet ist, die Phasenwechsel- Vorrichtungen (18) zu steuern, um eine Phasenasymmetrie der Versorgungsstränge (21 ,22,23) zu verringern, insbesondere zu minimieren. the balancing control (28) is prepared to control the phase change devices (18) in order to reduce, in particular to minimize, a phase asymmetry of the supply lines (21, 22, 23).
3. Ladestation (1) nach Anspruch 1 oder 2, 3. charging station (1) according to claim 1 or 2,
dadurch gekennzeichnet, dass characterized in that
eine bzw. die Symmetrierungssteuerung (28) dazu vorbereitet ist, one or the balancing control (28) is prepared for
- die AC-Ladeterminals (6) nach ihrer momentanen Stromabnahme zu sortieren und/oder - To sort the AC charging terminals (6) according to their current consumption and / or
die AC-Ladeterminals (6) danach zu sortieren, ob sie einphasig, zweiphasig oder dreiphasig arbeiten, to sort the AC charging terminals (6) according to whether they work single-phase, two-phase or three-phase,
und davon abhängig die Phasenwechselvorrichtungen (18) zur Minimierung der Phasenasymmetrie der Versorgungsstränge (21 ,22,23) zu steuern. and to control the phase change devices (18) as a function thereof in order to minimize the phase asymmetry of the supply lines (21, 22, 23).
4. Ladestation (1) nach einem der vorstehenden Ansprüche, 4. charging station (1) according to one of the preceding claims,
dadurch gekennzeichnet, dass
die Symmetrierungssteuerung (28) dazu vorbereitet ist, die AC- Ladeterminals (6), insbesondere mit einphasiger oder zweiphasiger Stromaufnahme, nach ihrer momentanen Stromabnahme zu sortieren, oder die AC-Ladeterminals (6) mit einphasiger Stromaufnahme in eine erste Gruppe zu sortieren, die AC-Ladeterminals (6) mit zweiphasiger Stromaufnahme in eine zweite Gruppe und optional die AC-Ladeterminals (6) mit dreiphasiger Stromaufnahme in eine dritte Gruppe zu sortieren und gruppenweise nach ihrer momentanen Stromabnahme zu sortieren wobei zu jedem dieser AC-Ladeterminals (6) jeweils der Anschlussstrang mit der größten Stromaufnahme als maximal belasteter Strang identifiziert wird, und jeweils seine Stromaufnahme als maximaler Phasenstrom des AC- Ladeterminals (6) berücksichtigt wird, characterized in that the balancing control (28) is prepared to sort the AC charging terminals (6), in particular with single-phase or two-phase power consumption, according to their current consumption, or to sort the AC charging terminals (6) with single-phase power consumption into a first group which To sort AC charging terminals (6) with two-phase power consumption into a second group and optionally the AC charging terminals (6) with three-phase power consumption into a third group and sort them in groups according to their current consumption, with each of these AC charging terminals (6) the connection string with the greatest current consumption is identified as the string with the maximum load, and its current consumption is taken into account as the maximum phase current of the AC charging terminal (6),
die AC-Ladeterminals (6) nach ihrem maximalen Phasenstrom in einer Stromreihenfolge sortiert werden, ggf. gruppenweise, the AC charging terminals (6) are sorted according to their maximum phase current in a current sequence, possibly in groups,
- die Phasenwechselvorrichtungen (18) die Anschlusszuordnung jeweils so einstellt oder verändert, dass die maximal belasteten Stränge gemäß der Stromreihenfolge wechselnd an den ersten, zweiten und dritten Versorgungsstrang (21 ,22,23) der drei Versorgungsstränge (21 ,22,23) angeschlossen werden, und bei den AC-Ladeterminals (6) mit zweiphasiger Stromauf- nähme vorzugsweise der zweite stromführende Strang an den folgenden- The phase change devices (18) each set or change the connection assignment so that the maximum loaded strings are alternately connected to the first, second and third supply strings (21, 22, 23) of the three supply strings (21, 22, 23) according to the current sequence , and in the case of the AC charging terminals (6) with two-phase power consumption, preferably the second current-carrying line to the following one
Versorgungsstrang, nämlich den zweiten, dritten bzw. ersten Versorgungsstrang (22,23,21) angeschlossen wird, und ggf. bei den AC-Ladeterminals (6) mit dreiphasiger Stromaufnahme insbesondere einer der verbleibenden Stränge an den folgenden Versorgungsstrang, nämlich den zweiten, dritten bzw. ersten Versorgungsstrang (22,23,21) angeschlossen wird, Supply line, namely the second, third or first supply line (22,23,21) is connected, and possibly at the AC charging terminals (6) with three-phase power consumption in particular one of the remaining lines to the following supply line, namely the second, third or the first supply line (22,23,21) is connected,
wobei die Anschlusszuordnung insbesondere so erfolgt, dass gemäß der Stromreihenfolge, ggf. gruppenweise, whereby the connection allocation is carried out in such a way that according to the current sequence, if necessary in groups,
der erste maximal belastete Strang an den ersten Versorgungsstrang angeschlossen ist, the first line with maximum load is connected to the first supply line,
- ein zweiter maximal belasteter Strang an den zweiten Versorgungsstrang angeschlossen ist, - a second maximum loaded line is connected to the second supply line,
ein dritter maximal belasteter Strang an den dritten Versorgungsstrang angeschlossen ist, a third, maximally loaded line is connected to the third supply line,
ein vierter maximal belasteter Strang an den dritten Versorgungsstrang an- geschlossen ist, a fourth, maximally loaded line is connected to the third supply line,
ein fünfter maximal belasteter Strang an den zweiten Versorgungsstrang angeschlossen ist, und
ein sechster maximal belasteter Strang an den ersten Versorgungsstrang angeschlossen ist. a fifth, maximally loaded line is connected to the second supply line, and a sixth maximally loaded line is connected to the first supply line.
5. Ladestation (1) nach einem der vorstehenden Ansprüche, 5. charging station (1) according to one of the preceding claims,
dadurch gekennzeichnet, dass characterized in that
- die Symmetrierungssteuerung (28) dazu vorbereitet ist, alle Anschlussstränge nach ihrer Stromaufnahme in eine Strangreihenfolge zu sortieren, unabhängig des jeweiligen AC-Ladeterminals (6), - the balancing control (28) is prepared to sort all connection lines according to their power consumption in a string sequence, regardless of the respective AC charging terminal (6),
die Phasenwechselvorrichtungen (18) die Anschlusszuordnung jeweils so einstellt oder verändert, dass alle Anschlussstränge gemäß ihrer Strangrei- henfolge wechselnd an den ersten, zweiten und dritten Versorgungsstrang the phase change devices (18) each set or change the connection assignment so that all connection lines alternate according to their line sequence to the first, second and third supply line
(21 ,22,23) der drei Versorgungsstränge (21 ,22,23) angeschlossen werden, und dann insbesondere die nächsten drei Anschlussstränge an den dritten, zweiten und ersten Versorgungsstrang, wobei (21, 22, 23) of the three supply lines (21, 22, 23) are connected, and then in particular the next three connection lines to the third, second and first supply line, wherein
als Randbedingung geprüft wird, dass zu keinem AC-Ladeterminal zwei oder drei Anschlussstränge an denselben Versorgungsstrang angeschlossen werden. As a boundary condition it is checked that no two or three connection lines are connected to the same supply line for any AC charging terminal.
6. Ladestation (1) nach einem der vorstehenden Ansprüche, 6. charging station (1) according to one of the preceding claims,
dadurch gekennzeichnet, dass characterized in that
die Symmetrierungssteuerung (28) dazu vorbereitet ist, dass zur Minimie- rung der Phasenasymmetrie eine Anschlusszuordnung über eine Optimierungsrechnung basierend auf den Stromaufnahmen der Anschlussstränge (31 ,32,33) aller AC-Ladeterminals (6) bestimmt wird, zumindest der AC- Ladeterminals (6) mit einphasiger oder zweiphasiger Stromaufnahme, wobei optional the balancing control (28) is prepared so that, in order to minimize the phase asymmetry, a connection assignment is determined via an optimization calculation based on the power consumption of the connection strings (31, 32, 33) of all AC charging terminals (6), at least the AC charging terminals ( 6) with single-phase or two-phase power consumption, with optional
- eine Anzahl notwendiger Umschaltvorgänge der Phasenwechselvorrichtungen (18) berücksichtigt wird, insbesondere dass als eine Nebenbedingung berücksichtigt wird, die Anzahl der Umschaltvorgänge zu minimieren. - A number of necessary switching processes of the phase change devices (18) is taken into account, in particular that minimizing the number of switching processes is taken into account as a secondary condition.
7. Ladestation (1) nach einem der vorstehenden Ansprüche, 7. charging station (1) according to one of the preceding claims,
dadurch gekennzeichnet, dass characterized in that
wenigstens ein DC-Ladeterminal (8) mit vorgeschaltetem aktiven Gleichrichter (16) vorgesehen ist, at least one DC charging terminal (8) with an upstream active rectifier (16) is provided,
der aktive Gleichrichter (16) mit der Stromzuführung verbunden (12) ist, und
der aktive Gleichrichter (16) dazu vorbereitet ist, die drei Versorgungsstränge (21 ,22,23) unterschiedlich zu belasten, insbesondere einen Gegensystemstrom (I2) auf die dreiphasige Stromzuführung aufzuschalten, um eine Asymmetrie der Ströme in der Stromzuführung (12) zu verringern, wobei insbesondere die Symmetrierungssteuerung (28) dazu vorbereitet ist, den aktiven Gleichrichter (16) zum Verringern der Asymmetrie der Ströme anzusteuern. the active rectifier (16) is connected to the power supply (12), and the active rectifier (16) is prepared to load the three supply lines (21, 22, 23) differently, in particular to switch a negative sequence current (I2) to the three-phase power supply in order to reduce asymmetry of the currents in the power supply (12), wherein in particular the balancing control (28) is prepared to control the active rectifier (16) to reduce the asymmetry of the currents.
8. Ladestation (1) nach einem der vorstehenden Ansprüche, 8. charging station (1) according to one of the preceding claims,
dadurch gekennzeichnet, dass characterized in that
- die Ladestation (1) dazu vorbereitet ist, das Verändern der Anschlusszuordnung nach Überschreiten eines Asymmetrieschwellwertes wiederholt wird, der ein Maß einer Asymmetrie der Stromzuführung ist, oder in einem wiederkehrenden Zyklus wiederholt wird, wobei insbesondere - The charging station (1) is prepared to repeat the changing of the connection assignment after an asymmetry threshold value is exceeded, which is a measure of an asymmetry of the power supply, or is repeated in a recurring cycle, in particular
der wiederkehrende Zyklus fortlaufend nach einer Wiederholzeit (T2) wieder- holt durchlaufen wird, die kürzer als ein durchschnittlicher Ladevorgang eines Elektrofahrzeugs (24) gewählt wird, wobei the recurring cycle is continuously run through after a repetition time (T2), which is selected to be shorter than an average charging process of an electric vehicle (24), wherein
die Wederholzeit (T2) insbesondere in einem Bereich von einer Minute bis fünf Minuten gewählt wird. the repetition time (T2) is selected in particular in a range from one minute to five minutes.
9. Ladestation (1) nach einem der vorstehenden Ansprüche, 9. charging station (1) according to one of the preceding claims,
dadurch gekennzeichnet, dass characterized in that
die Stromzuführung an einen Netzverknüpfungspunkt (2) eines elektrischen Versorgungsnetzes angeschlossen ist, insbesondere über einen Transformator (14). the power supply is connected to a network junction (2) of an electrical supply network, in particular via a transformer (14).
10. Verfahren zum Laden von Elektrofahrzeugen (24) mittels einer Ladestation (1) und die Ladestation (1) weist mehrere AC-Ladeterminals (6) auf, die jeweils zum10. A method for charging electric vehicles (24) by means of a charging station (1) and the charging station (1) has several AC charging terminals (6), each of which is connected to
Laden eines Elektrofahrzeugs (24) durch Wechselstrom ausgebildet sind, wobei jedes der AC-Ladeterminals (6) über eine Phasenwechselvorrichtung (18), die an eine dreiphasige Stromzuführung (12) der Ladestation (1) angeschlossen ist, mit elektrischem dreiphasigen Strom versorgt wird, - durch die Stromzuführung (12), die drei Versorgungsstränge (21 ,22,23) aufweist, drei Spannungsphasen bereitgestellt werden, Charging of an electric vehicle (24) are formed by alternating current, each of the AC charging terminals (6) being supplied with electrical three-phase current via a phase change device (18) which is connected to a three-phase power supply (12) of the charging station (1), - three voltage phases are provided by the power supply (12), which has three supply lines (21, 22, 23),
jedes AC-Ladeterminal (6) drei Anschlussstränge (31 ,32,33) aufweist, die jeweils an die drei Versorgungsstränge (21 ,22,23) angeschlossen sind, und
über die die drei Spannungsphasen an die Anschlussstränge (31 ,32,33) angelegt werden, wobei each AC charging terminal (6) has three connection lines (31, 32, 33) which are each connected to the three supply lines (21, 22, 23), and via which the three voltage phases are applied to the connecting lines (31, 32, 33), with
jede Phasenwechselvorrichtung (18) zum Verringern einer Stromasymmetrie in der Stromzuführung (18) eine Anschlusszuordnung zwischen den drei Versorgungssträngen (21 ,22,23) und den drei Anschlusssträngen (31 ,32,33) verändert. each phase change device (18) changes a connection assignment between the three supply lines (21, 22, 23) and the three connection lines (31, 32, 33) to reduce a current asymmetry in the power supply (18).
1 1 . Verfahren nach Anspruch 10, 1 1. Method according to claim 10,
dadurch gekennzeichnet, dass characterized in that
es eine Ladestation (1) gemäß einem der Ansprüche 1 bis 9 verwendet.
it uses a charging station (1) according to one of claims 1 to 9.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102019105661.6A DE102019105661A1 (en) | 2019-03-06 | 2019-03-06 | Charging station for charging electric vehicles |
PCT/EP2020/055700 WO2020178341A1 (en) | 2019-03-06 | 2020-03-04 | Charging station for charging electric vehicles |
Publications (1)
Publication Number | Publication Date |
---|---|
EP3934931A1 true EP3934931A1 (en) | 2022-01-12 |
Family
ID=69770892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20709540.7A Pending EP3934931A1 (en) | 2019-03-06 | 2020-03-04 | Charging station for charging electric vehicles |
Country Status (5)
Country | Link |
---|---|
US (1) | US20220185141A1 (en) |
EP (1) | EP3934931A1 (en) |
CN (1) | CN113544006A (en) |
DE (1) | DE102019105661A1 (en) |
WO (1) | WO2020178341A1 (en) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102017119819A1 (en) * | 2017-08-29 | 2019-02-28 | Delfortgroup Ag | Method for applying registration marks on wrapping paper for smoking articles |
US11447027B2 (en) * | 2019-07-19 | 2022-09-20 | Schneider Electric USA, Inc. | AC EVSE cluster load balancing system |
DE102019135654A1 (en) * | 2019-12-23 | 2021-06-24 | Compleo Charging Solutions Ag | Charging infrastructure arrangement for charging electric vehicles and operating methods therefor |
DE102019135655A1 (en) * | 2019-12-23 | 2021-06-24 | Compleo Charging Solutions Ag | Charging infrastructure arrangement for charging electric vehicles and operating methods therefor |
CN112217264A (en) * | 2020-10-21 | 2021-01-12 | 阳光电源股份有限公司 | Charging pile and charging unit thereof |
CN112659941B (en) * | 2020-11-19 | 2024-07-02 | 南京鼎牌电器有限公司 | Ordered balance charging system based on permanent magnet change-over switch |
CN113659595B (en) * | 2021-07-27 | 2024-07-02 | 国创移动能源创新中心(江苏)有限公司 | Three-phase balance control method and device for alternating current charging system |
DE102022209176A1 (en) * | 2021-09-05 | 2023-03-09 | Chargex Gmbh | Device for charging electrical devices, in particular electric vehicles |
WO2023154394A1 (en) * | 2022-02-11 | 2023-08-17 | ENEL X Way S.r.l. | Systems and methods of phase detection and mapping for electric vehicle service equipment |
GB2621139A (en) * | 2022-08-02 | 2024-02-07 | 3Ti Energy Hubs Ltd | A controller |
GB2618396B (en) * | 2022-09-12 | 2024-10-09 | Myenergi Ltd | Reducing phase imbalance in a polyphase electrical system |
DE102023105145A1 (en) * | 2023-03-02 | 2024-09-05 | Brusa Elektronik Ag | MULTI-PHASE INVERTER AND PHASE LOAD BALANCING METHODS |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102010024138A1 (en) * | 2010-06-17 | 2011-12-22 | Siemens Aktiengesellschaft | Device for mains voltage symmetrization |
NL2006446C2 (en) * | 2011-03-22 | 2012-09-25 | Epyon B V | System for charging the battery of at least one electric vehicle, charger and method. |
FR2993514B1 (en) * | 2012-07-20 | 2015-12-04 | Schneider Electric Ind Sas | METHOD AND DEVICE FOR DISTRIBUTING ELECTRICAL ENERGY |
DE102013204256A1 (en) * | 2013-03-12 | 2014-09-18 | Bayerische Motoren Werke Aktiengesellschaft | Charging device for an electric vehicle |
US20160327615A1 (en) * | 2015-05-05 | 2016-11-10 | Seaward Group | Method and apparatus for a portable electric vehicle supply equipment tester |
DK3184352T3 (en) * | 2015-12-22 | 2023-07-31 | Zaptec Ip As | SYSTEM AND METHOD FOR DYNAMIC PHASE LOAD DISTRIBUTION WHEN CHARGING ELECTRIC VEHICLES |
CN106099962A (en) * | 2016-08-22 | 2016-11-09 | 国网江苏省电力公司盐城供电公司 | A kind of electric automobile charging station is actively engaged in the system and method for electrical network regulation |
DE102016123924A1 (en) * | 2016-12-09 | 2018-06-14 | Dr. Ing. H.C. F. Porsche Aktiengesellschaft | Modular power electronics for charging an electrically powered vehicle |
DE102017116886A1 (en) * | 2017-07-26 | 2019-01-31 | Wobben Properties Gmbh | Charging station with dynamic charging current distribution |
DE102017213682A1 (en) * | 2017-08-07 | 2019-02-07 | Continental Automotive Gmbh | A battery charging device for a motor vehicle, a method for operating a motor vehicle-side battery charging device, high-voltage vehicle electrical system and use of a battery charging device |
CN107681672A (en) * | 2017-11-15 | 2018-02-09 | 清华大学 | The interactive approach of charging pile interactive terminal and charging pile access power network |
DE102018205041A1 (en) * | 2018-04-04 | 2019-10-10 | Audi Ag | Method for assigning a connection information and charging device |
-
2019
- 2019-03-06 DE DE102019105661.6A patent/DE102019105661A1/en active Pending
-
2020
- 2020-03-04 WO PCT/EP2020/055700 patent/WO2020178341A1/en unknown
- 2020-03-04 EP EP20709540.7A patent/EP3934931A1/en active Pending
- 2020-03-04 CN CN202080018950.0A patent/CN113544006A/en active Pending
- 2020-03-04 US US17/436,340 patent/US20220185141A1/en active Pending
Also Published As
Publication number | Publication date |
---|---|
US20220185141A1 (en) | 2022-06-16 |
CN113544006A (en) | 2021-10-22 |
DE102019105661A1 (en) | 2020-09-10 |
WO2020178341A1 (en) | 2020-09-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3934931A1 (en) | Charging station for charging electric vehicles | |
DE102018106308B4 (en) | Modulation index improvement through intelligent battery | |
DE102017100138A1 (en) | Method for operating a subscriber on a supply network | |
DE102007021089B3 (en) | Method for controlling parallel-connected backup power sources and device with parallel-connected backup power sources | |
EP2348597A1 (en) | Equalisation of the partial outputs flowing over the individual phases of a multi-phase alternating current | |
WO2018193097A1 (en) | Charging station for charging multiple electric vehicles, in particular electric cars | |
EP2735468A2 (en) | Method for charging a traction battery | |
DE102012104560B4 (en) | Detecting the string configuration for a multi-string inverter | |
WO2018233958A1 (en) | Method for operating a plurality of usage units for a wear compensation in an energy supply device, and energy supply device | |
DE102016123923A1 (en) | loader | |
EP2371047A1 (en) | Multilevel converter as reactive power compensator having active power symmetrization | |
EP3576246B1 (en) | Method for operating a loading system with multiple loading points | |
EP2919352A1 (en) | Method for operating an electric subscriber, an electrical measuring point in a subscriber network and an electrical subscriber and electric measuring point | |
EP2544327B1 (en) | Energy storage assembly and fluctuating load | |
EP2810351A1 (en) | Charging device | |
EP2859366B1 (en) | Method and a device for determining the internal resistance of battery cells of a battery | |
DE102014217657A1 (en) | Inverter for solar power generation | |
DE102015111553A1 (en) | Device and method for inductive transmission of electrical energy | |
DE102019217450A1 (en) | Charging station and method for charging a consumer with load sharing | |
DE102019209854A1 (en) | Vehicle electrical system | |
WO2019166342A1 (en) | Device for connecting a sub-network to an alternating voltage network and method for controlling an electrical power | |
EP3297115B1 (en) | Assembly with an energy storage device and energy converter for absorbing electrical energy from a power network and discharge of electrical energy to the power network | |
EP2389723B1 (en) | Method for parallel control of transformers with tap changers | |
DE102017212785A1 (en) | Phase unbalance minimization | |
EP2701260B1 (en) | Method for operating an automation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20211006 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) |