EP3812531B1 - Profile system for holding a flat element - Google Patents

Profile system for holding a flat element Download PDF

Info

Publication number
EP3812531B1
EP3812531B1 EP19204645.6A EP19204645A EP3812531B1 EP 3812531 B1 EP3812531 B1 EP 3812531B1 EP 19204645 A EP19204645 A EP 19204645A EP 3812531 B1 EP3812531 B1 EP 3812531B1
Authority
EP
European Patent Office
Prior art keywords
profile
profile system
balcony
fastening
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP19204645.6A
Other languages
German (de)
French (fr)
Other versions
EP3812531A1 (en
Inventor
René Bangratz
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hertkorn Regina
Original Assignee
Hertkorn Regina
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hertkorn Regina filed Critical Hertkorn Regina
Priority to EP19204645.6A priority Critical patent/EP3812531B1/en
Publication of EP3812531A1 publication Critical patent/EP3812531A1/en
Application granted granted Critical
Publication of EP3812531B1 publication Critical patent/EP3812531B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/064Gutters
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1851Filling panels, e.g. concrete, sheet metal panels
    • E04F11/1853Glass panels

Definitions

  • the invention relates to a profile system for holding a surface element for a fall protection device such as a railing or a railing construction for balconies or terraces.
  • All-glass railings are known as fall protection for balconies, terraces or loggias of buildings. These all-glass railings are transparent without any annoying posts or the like.
  • the all-glass railings can be arranged and clamped in support profiles. U-profiles are used in particular as support profiles.
  • Balcony drainage is carried out by balcony drains, gutters or gargoyles. For all drainage systems, it must be ensured that there is a sufficient gradient to lead the water away from the building and that the drains, gutters or gargoyles do not become blocked. Otherwise there is a risk of backflow, which can lead to various types of damage. Balcony floor slabs or terrace floors are usually made of in-situ concrete, for example. which are then equipped with gutters and/or balcony railings.
  • the EP 2 025 827 A1 discloses a "finish profile arrangement for balconies, terraces and the like".
  • the finish profile arrangement for the vertical front surfaces of balconies or terraces enables the covering by a finish profile, wherein the front surfaces are covered by the finish profile at least in a horizontal partial area and the finish profile has at least one drainage opening for draining any accumulating liquid.
  • the finish profile has an anchoring leg that can be anchored in the balcony below the top of the balcony and a cover leg that protrudes from the anchoring leg towards the top of the balcony and covers the respective front surface at least in part. Furthermore, an elongated cover panel is attached to the finish profile, creating a gap through which accumulating water can pass.
  • a solution for arranging a gutter on a balcony floor slab or a terrace is known.
  • a support profile is arranged on the front of the balcony and can be used as a finishing profile for balconies or terraces, in order to arrange a gutter profile on this that can be moved relative to the support profile.
  • the gutter profile can be attached at different heights relative to the support profile depending on the desired incline, so that the gutters have the necessary gradient even in front of longer balcony fronts or terraces, with the support profile always being attached parallel to the balcony or terrace floor on the front.
  • the EN 10 2017 000 145 A1 discloses a "gutter drainage system for draining surface water from surfaces (balconies, terraces, flat roofs) in the outdoor area".
  • the system can be used to create gutter drainage systems.
  • An edge support is designed for creating gutter drainage systems.
  • the edge support has an L-shaped base profile, with a horizontal support surface between the vertical web at the top and a vertical web at the bottom.
  • the EP 3 056 632 A1 discloses an "edge edging for balcony and terrace floors".
  • the disclosure relates to an edge edging for balcony and terrace floors and similar floor slabs, which can be used both in new buildings and in renovation work.
  • the edge edging for balcony and terrace floors for fastening to a floor slab of a balcony and terrace floor that is present on the building is characterized in that a frame profile with integrated railing fastening and integrated balcony drainage is used for the edge edging, which is securely positioned on the floor slab along a hook web arranged on the frame profile according to the invention, on fastening hook elements arranged at a distance from one another on the side edge of the floor slab or on the floor slab, and is also firmly connected to the floor slab by means of support elements.
  • the DE 297 14 562 U1 discloses a gutter of a balcony, whereby the gradient of the gutter can be adjusted by means of a height-adjustable holder.
  • the object of the invention is therefore to provide a supporting frame made of profiles which, compared to the known supporting frames, enables simple assembly and a sophisticated facade design.
  • a profile system for a fall protection device such as a railing or a railing construction with a base profile that has the function of a holding or support profile in combination with a drainage device for controlled balcony or terrace drainage is disclosed.
  • a fall protection device such as a railing or a railing construction with a base profile that has the function of a holding or support profile in combination with a drainage device for controlled balcony or terrace drainage.
  • at least two functionally different components in the balcony or terrace construction are combined to form a profile system, so that both the function of a support or holding profile and also the function of drainage are fulfilled with a simple assembly option.
  • the base or support profile itself can be designed in a one-piece or multi-piece design.
  • the one-piece design can have railing posts, for example.
  • the profile joints of the base profile are designed to be stretchable, for example, with EPDM molded parts and a permanently elastic joint.
  • the base profile can be designed with a fall protection device made of aluminum or steel or as a post railing. The inner edge of the base profile pointing towards the floor no longer needs to be covered or covered thanks to the combined design in the profile system according to the invention.
  • the base profile is combined with the drainage device with an openly accessible water-carrying channel to form the profile system mentioned.
  • the water-carrying channel is made of aluminum, metal, stainless steel or plastic.
  • the water runs into the water-carrying channel or drainage channel so that defined drainage takes place.
  • the water is guided in this channel and not in a hollow chamber.
  • Side covers or cover parts which are round or rectangular, for example, can be arranged so that good stability is achieved.
  • a dirt grid can be placed on the gutter.
  • the dirt grid is designed, for example, as an expanded metal grid or as a perforated sheet.
  • the dirt grid can be inserted or thickened. It can have holes in the form of a perforated sheet or slots. The holes can be flush or deeper than the side walls of the gutter.
  • the dirt grid can be designed so that it can be swung out or in. It is made of a thin metal such as the perforated sheet mentioned or of a mesh fabric.
  • the fall protection devices in one embodiment as glass railings, which are held by the base profile, are made of up to 2 x 10 mm thick laminated glass with a total thickness of approx. 21.5 mm.
  • the glass railings can be precisely fine-tuned in their alignment in the base profile.
  • the profile system according to the invention with the base profile and the drainage device has the advantage that it can be designed variably and can be mounted very easily with different fastening brackets. This can be done, for example, with an adjustable side mounting, an adjustable mounting from above or by combining two fastening brackets with a multi-adjustable mounting.
  • the height of the coverings of the balconies or terraces can be made variable and can be easily handled with different mounting options thanks to the different designs and/or arrangement options of the profile system.
  • the profile system according to the invention allows the lower areas of the profile system, i.e. the drainage channel or the building structure or a substructure, to be covered without a cover by an adapted design of the glass pane. This is done by "pulling down" the surface element or the glass pane, i.e. extending over the front side and thus eliminating the need for a separate cover.
  • the railing construction can therefore also be installed without posts, for example.
  • a profile system 100 with a one-piece first base profile 1 is shown.
  • a surface element 5, in particular a glass pane 5, is clamped in the base profile 1.
  • the surface element 5 can alternatively be made of metal, plastic or the like.
  • a fastening bracket connected to the base profile 1 is arranged for side mounting 7.
  • the one-piece first base profile 1 has a panel in the lateral outward direction 11 and a panel in the lateral inward direction 12. Furthermore, a bottom panel 13 is formed.
  • the glass pane 5 clamped in the first base profile 1 is held by glazing seals 15 arranged on both sides of the glass pane 5.
  • the glass pane 5 can be adjusted in its vertical alignment by adjusting elements 16 for the glazing within the first base profile 1. This enables precise fine adjustment of the glass pane 5 by the adjusting elements.
  • the glass pane 5 is inserted within a clamping shoe 17 arranged in the base area of the first one-piece base profile 1.
  • the base profile is drained 18 away from the base area of the first base profile 1.
  • the profile system 100 with the first base profile 1 and the drainage channel 21 can be hung in the fastening bracket for the side mounting 7.
  • a lifting protection 14 prevents the profile system 100 from being hung out of the fastening bracket for the side mounting 7. This enables the installation by hanging the profile system 100 in combination with the further adjustment option of the adjustment of the glass pane 5 by the adjusting elements 16 for the glazing, a multiple influence on the arrangement, positioning and adjustment of the glass pane 5 of the balcony railing is possible.
  • the entire construction can be moved vertically in height.
  • the fastening bracket for the side mounting 7 is designed with a corrugation.
  • a first opening 29 is made in the fastening bracket for the side mounting 7, the diameter of which is slightly larger than the hole for a first fastening screw 31 to be inserted.
  • a first nut 29 is placed, which is also designed with corrugations at least on its side of the fastening bracket for the side mounting 7. After screwing in the first fastening screw 31, a certain amount of play is available in order to move the fastening bracket for the side mounting 7 up or down in the vertical direction. The height of the arrangement can thus be adjusted.
  • the advantage of this design is that, if necessary, subsequent adjustment is possible by loosening the screw connection and moving it again. No gluing, filling or similar is carried out for fastening, so that the arrangement remains adjustable within a limited range.
  • a drainage channel 21 is formed beneath a floor covering 19 of a balcony or terrace.
  • a dirt grid 22 is inserted or clipped into the drainage channel 21.
  • the dirt grid 22 can be designed to be able to be swung in and out.
  • the dirt grid 22 can be made of aluminum, stainless steel, plastic or the like.
  • a drain nozzle 23 is formed which opens into a drain pipe 24.
  • the channel drainage through the drain nozzle 23 is suitable for standard HT [high temperature] pipes. These HT pipes can be used for sewage pipes. They are heat-resistant up to approx. 95°, if this is required.
  • the direction of the arrow A indicates the flow direction of the water for drainage.
  • Fig.2 shows a further embodiment of the profile system 100.
  • a different fastening bracket for mounting from above 8 is shown.
  • a second hole 32 is made and a second nut 22 is arranged on the leg, which is adjustable on the grooved leg.
  • the second fastening screw 34 to be inserted is designed by the formation of the second hole 32, which, like the first hole 31, has an enlarged diameter compared to the hole for the second fastening screw 34 to be inserted, so that the fastening screw 34 has some play when inserted and the profile system 100 can thus be adjusted in two directions.
  • This construction of the embodiment shown is designed to be movable in the horizontal and vertical directions. This is shown by the arrows B and C.
  • Fig.3 shows the profile system 100 with a one-piece first base profile 1 with a two-piece adjustable fastening bracket 9.
  • the arrow direction in two directions on the two-piece fastening bracket 9 indicates the possibility of adjustment in the vertical direction on the screw connection in this position by the direction of the arrow B and the possibility of adjustment in the horizontal direction by the direction of the arrow C.
  • the thick arrows A on the balcony surface and in the balcony covering 19 show the direction of flow of the water.
  • a perforated sheet 20 is arranged on the first base profile 1. Between this perforated sheet 20 and the balcony covering 19, the water can flow in the direction of the drainage channel 21 and be drained through the drain connection 23 through the drain pipe 24.
  • the profile system 100 can be moved in height and width, i.e. horizontally and vertically.
  • a dirt grid 22' is arranged, which differs from the design of the illustrations from Fig.1 and Fig.2 designed and arranged.
  • a thermal insulation composite system 25 is formed in the lower area below the floor area of the first base profile 1.
  • Fig.4 shows a profile system 100 with a two-part second base profile 2 with the fastening bracket for the side mounting 7.
  • the second part of the second base profile 2 is connected to the first part of the base profile 2, in which the glass pane 5 is clamped, by a screw connection.
  • This first part of the second two-part base profile 2 is designed with a leg pointing outwards, away from the building or the balcony covering 19, referred to as "fall protection" made of aluminum 3. It is a soffit panel 13.
  • the glass pane 5 can be finely adjusted by spreading the adjusting element for the glazing 16 by means of the screw to be inserted within the first part of the two-part second base profile 2 and its vertical position can also be adjusted.
  • Fig.5 represents a profile system 100 with a two-part second base profile 2 with an attached fall protection device made of steel 4.
  • an inner cover 12 is formed in an upper area of the base profile 2 pointing in the direction of the upper edge of the glass pane 5, extending around a differently designed leg.
  • Fig. 6a shows the profile system 100 with the two-part second base profile 2.
  • the second part of the base profile 2 has a post railing 6 attached.
  • the filling profiles run vertically.
  • This embodiment is used in particular for posts or round or square bars and various hollow and solid profiles.
  • a post railing 6 is thus formed.
  • the fastening bracket is designed for side mounting 7. This fastening bracket 7 is secured in its position by the anti-lifting device 14.
  • the drainage channel 21 is accessible from the outside or from above, i.e. from the top of the balcony covering 19.
  • the post railing 6 has a filling, in particular with a glass pane 5.
  • Fig. 6b shows the profile system 100 with the two-part second base profile 2 and the attached post railing 6.
  • An internal glass pane is arranged as a surface element 5 and is supported linearly over the height edges.
  • the posts of the post railing 6 are freely positioned horizontally in the profile system 100.
  • the surface element 5 or the glass pane is supported linearly on the support post or post of the post railing 6.
  • Fig.7 represents the profile system 100.
  • the drain pipe 24, which is arranged on the drain connection 23, has a curved design and is designed such that the water flowing into the drainage channel 21 is directed away to a front side facing away from the building wall below the glass pane 5.
  • the drain pipe 24 is bent.
  • An upper part, which leads out of the drain connection 23, is approximately vertical.
  • Another part of the drain pipe 24 is arranged approximately horizontally after the bend. The flow direction of the drained water from the drainage channel 21 is therefore towards the side facing away from the building.
  • a two-part fastening bracket 10 is formed, which is placed on a balcony slab.
  • FIG.8 The individual figures 8a to 8d show different holder designs for the glass pane 5.
  • Fig. 8a represents the fastening of the glass pane 5 with several point holders 27, and
  • Fig. 8b shows the fastening of the glass pane 5 with flat holders 28.
  • Fig. 8c represents the execution after the Fig. 8a with several point holders 27 in section and
  • Fig. 8d shows the embodiment according to the Fig. 8b with flat holders 28, also in section.
  • the glass pane 5 is drawn downwards in this illustration, so that it covers the entire construction of the profile system 100 in the direction of the side facing away from the structure 26 in a visually uniform and advantageous manner, so that no separate cladding needs to be arranged.
  • the glass pane 5 can, for example, be made of a crystal-clear, transparent glass pane 5 in an upper area, which is opposite to the subsurface or floor on which the structure 26 is arranged, and can be matt or translucent in a lower area facing the floor, so that the construction for fastening and draining the profile system 100 is "invisibly" clad from the outside.
  • the support posts or posts of the post railing can alternatively be mounted so that they can be moved using angles and can therefore be freely adjusted. In this embodiment, no more holes need to be drilled into the surface elements or glass panes.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Description

Die Erfindung betrifft ein Profilsystem zur Halterung eines Flächenelements für eine Absturzsicherung wie ein Geländer bzw. eine Geländerkonstruktion für Balkone oder Terrassen.The invention relates to a profile system for holding a surface element for a fall protection device such as a railing or a railing construction for balconies or terraces.

Stand der TechnikState of the art

Bekannt sind Vorrichtungen wie rahmenlose Ganzglasgeländer als Absturzsicherungen für Balkone, Terrassen oder Loggien von Gebäuden. Diese Ganzglasgeländer weisen eine Transparenz ohne störende Pfosten o.dgl. auf. Die Ganzglasgeländer können in Tragprofilen angeordnet und eingespannt gehalten sein. Als Tragprofile kommen insbesondere U-Profile zum Einsatz.Devices such as frameless all-glass railings are known as fall protection for balconies, terraces or loggias of buildings. These all-glass railings are transparent without any annoying posts or the like. The all-glass railings can be arranged and clamped in support profiles. U-profiles are used in particular as support profiles.

Eine Balkonentwässerung erfolgt durch Balkonabläufe, durch Rinnen oder durch Wasserspeier. Bei allen Entwässerungen muss dafür gesorgt werden, dass ein ausreichendes Gefälle das Wasser vom Gebäude wegführt und dass die Abläufe, Rinnen oder Speier nicht verstopfen. Sonst besteht die Gefahr eines Rückstaus, der zu verschiedenen Schäden führen kann. Üblicherweise werden Balkonbodenplatten oder Terrassenböden beispielsweise aus Ortbeton hergestellt, die dann danach mit Regenrinnen und/oder Balkongeländern ausgestattet werden.Balcony drainage is carried out by balcony drains, gutters or gargoyles. For all drainage systems, it must be ensured that there is a sufficient gradient to lead the water away from the building and that the drains, gutters or gargoyles do not become blocked. Otherwise there is a risk of backflow, which can lead to various types of damage. Balcony floor slabs or terrace floors are usually made of in-situ concrete, for example. which are then equipped with gutters and/or balcony railings.

Die EP 2 025 827 A1 offenbart eine "Abschlussprofilanordnung für Balkone, Terrassen und dergleichen". Die Abschlussprofilanordnung für die senkrechten Stirnflächen von Balkonen oder Terrassen ermöglicht die Abdeckung durch ein Abschlussprofil, wobei die Stirnflächen zumindest in einem horizontalen Teilbereich vom Abschlussprofil abdeckt ist und das Abschlussprofil wenigstens eine Entwässerungsöffnung zur Abfuhr von anfallender Flüssigkeit aufweist. Das Abschlussprofil weist einen unterhalb der Balkonoberseite im Balkon verankerbaren Verankerungsschenkel und einen sich vom Verankerungsschenkel in Richtung zur Oberseite des Balkons vortretenden, die jeweilige Stirnfläche zumindest bereichsweise abdeckenden Abdeckschenkel auf. Des Weiteren ist eine langgestreckte Abdeckblende am Abschlussprofil angebracht, wobei ein Zwischenraum entsteht, über den anfallendes Wasser hindurchtreten kann.The EP 2 025 827 A1 discloses a "finish profile arrangement for balconies, terraces and the like". The finish profile arrangement for the vertical front surfaces of balconies or terraces enables the covering by a finish profile, wherein the front surfaces are covered by the finish profile at least in a horizontal partial area and the finish profile has at least one drainage opening for draining any accumulating liquid. The finish profile has an anchoring leg that can be anchored in the balcony below the top of the balcony and a cover leg that protrudes from the anchoring leg towards the top of the balcony and covers the respective front surface at least in part. Furthermore, an elongated cover panel is attached to the finish profile, creating a gap through which accumulating water can pass.

Aus der DE 195 35 187 A1 ist eine Lösung zur Anordnung einer Regenrinne an einer Balkonbodenplatte oder einer Terrasse bekannt. Bei dieser Lösung wird ein stirnseitig am Balkon angeordnetes, als Abschlussprofil für Balkone oder Terrassen einsetzbares Trägerprofil angeordnet, um an diesem ein gegenüber dem Trägerprofil relativ verschiebbar angeordnetes Rinnenprofil anzuordnen. Das Rinnenprofil kann dabei entsprechend der jeweils gewünschten Neigung in unterschiedlicher Höhe gegenüber dem Trägerprofil befestigt werden, so dass auch vor längeren Balkonfronten oder Terrassen die Regenrinnen das notwendige Gefälle aufweisen, wobei das Trägerprofil stirnseitig stets parallel zum Balkon- bzw. Terrassenboden befestigt wird.From the DE 195 35 187 A1 A solution for arranging a gutter on a balcony floor slab or a terrace is known. In this solution, a support profile is arranged on the front of the balcony and can be used as a finishing profile for balconies or terraces, in order to arrange a gutter profile on this that can be moved relative to the support profile. The gutter profile can be attached at different heights relative to the support profile depending on the desired incline, so that the gutters have the necessary gradient even in front of longer balcony fronts or terraces, with the support profile always being attached parallel to the balcony or terrace floor on the front.

Die DE 10 2017 000 145 A1 offenbart ein "Rinnen- Abwassersystem zum Ableiten von Flächenwasser auf Flächen (Balkone, Terrassen, Flachdächern) im Au-ßenbereich". Mit dem System können Rinnen-Abwassersysteme realisiert werden. Es ist ein Randträger zur Erstellung von Rinnen-Abwassersystemen ausgebildet. Der Randträger weist ein L-förmiges Grundprofil auf, zwischen dessen vertikalem Steg oben und einem vertikalen Steg unten eine horizontale Auflagefläche liegt.The EN 10 2017 000 145 A1 discloses a "gutter drainage system for draining surface water from surfaces (balconies, terraces, flat roofs) in the outdoor area". The system can be used to create gutter drainage systems. An edge support is designed for creating gutter drainage systems. The edge support has an L-shaped base profile, with a horizontal support surface between the vertical web at the top and a vertical web at the bottom.

Die EP 3 056 632 A1 offenbart eine "Randeinfassung für Balkon- und Terrassenböden". Die Offenbarung betrifft eine Randeinfassung für Balkon- und Terrassenböden und ähnliche Bodenplatten, die sowohl bei Neubauten wie auch bei Sanierungsarbeiten eingesetzt werden kann. Die Randeinfassung für Balkon- und Terrassenböden zur Befestigung an einer am Bauwerk vorhandenen Bodenplatte eines Balkon- und Terrassenbodens zeichnet sich dadurch aus, dass für die Randeinfassung ein Rahmenprofil mit integrierter Geländerbefestigung und integrierter Balkonentwässerung eingesetzt wird, dass entlang eines am erfindungsgemäßen Rahmenprofils angeordneten Hakensteges, an am Seitenrand der Bodenplatte oder auf der Bodenplatte voneinander beabstandet angeordneter Befestigungshakenelemente, an der Bodenplatte lagesicher positioniert, und zudem mittels Stützelementen fest mit der Bodenplatte verbunden wird.The EP 3 056 632 A1 discloses an "edge edging for balcony and terrace floors". The disclosure relates to an edge edging for balcony and terrace floors and similar floor slabs, which can be used both in new buildings and in renovation work. The edge edging for balcony and terrace floors for fastening to a floor slab of a balcony and terrace floor that is present on the building is characterized in that a frame profile with integrated railing fastening and integrated balcony drainage is used for the edge edging, which is securely positioned on the floor slab along a hook web arranged on the frame profile according to the invention, on fastening hook elements arranged at a distance from one another on the side edge of the floor slab or on the floor slab, and is also firmly connected to the floor slab by means of support elements.

Die DE 297 14 562 U1 offenbart eine Regenrinne eines Balkons, wobei das Gefälle der Regenrinne mittels einem höhenverstellbaren Halter einstellbar ist.The DE 297 14 562 U1 discloses a gutter of a balcony, whereby the gradient of the gutter can be adjusted by means of a height-adjustable holder.

Diese genannten Lösungen sind sehr montageintensiv. Nach der Fertigstellung der Balkonbodenplatte bzw. der Terrassenbodenplatte wird die Regenrinne angebracht und nachfolgend die Balkongeländer befestigt und aufwändig ausgerichtet. In die bereits fertiggestellten Bodenplatten dürfen jegliche Befestigungselemente nur so eingebracht werden, dass die Bodenplatten durch das Einbringen von Befestigungselementen statisch nicht geschwächt und/oder derartig beschädigt werden, dass die Bodenplatten aufgrund dieser Beschädigungen dann unter Witterungseinfluss einem verstärkten Verschleiß unterworfen sind. Die genannten Anordnungen zur Entwässerung sind nach der Montage von davor angeordneten Brüstungen bzw. Balkongeländern üblicherweise nicht mehr zugänglich.These solutions require a lot of assembly. After the balcony floor slab or terrace floor slab has been completed, the gutter is installed and then the balcony railings are attached and carefully aligned. Any fastening elements may only be inserted into the already completed floor slabs in such a way that the floor slabs are not weakened statically by the insertion of fastening elements and/or damaged to such an extent that the floor slabs are then subject to increased wear and tear due to the effects of the weather. The drainage arrangements mentioned are usually no longer accessible after the parapets or balcony railings arranged in front of them have been installed.

Nachteilig an den bekannten Abschlussprofilanordnungen oder Abwassersystemen ist, dass sie getrennt von der Halterung der Balkonbrüstung bzw. Balustrade durch Trag- bzw. Halteprofile angebracht werden müssen und sowohl die aufwändige und teure Fertigung aus verschiedenen Teilen und der optische Eindruck, den diese Tragrahmen und die Abschlussprofilanordnungen vermitteln, soweit sie für Balkone und Terrassen eingesetzt werden, nicht den Ansprüchen an eine moderne Fassadengestaltung entspricht.The disadvantage of the known end profile arrangements or drainage systems is that they have to be installed separately from the bracket of the balcony parapet or balustrade by means of support or holding profiles and both the complex and expensive production from different parts and the visual impression that these support frames and the end profile arrangements convey, insofar as they are used for balconies and terraces, do not meet the requirements of a modern facade design.

Aufgabe der Erfindung ist es daher, einen Tragrahmen aus Profilen zur Verfügung zu stellen, der gegenüber den bekannten Tragrahmen eine einfache Montage und eine anspruchsvolle Fassadengestaltung ermöglicht.The object of the invention is therefore to provide a supporting frame made of profiles which, compared to the known supporting frames, enables simple assembly and a sophisticated facade design.

Offenbarung der ErfindungDisclosure of the invention

Die Erfindung wird durch die Merkmale des Hauptanspruchs offenbart. Ausführungsformen und Weiterbildungen sind Gegenstand der sich an den Hauptanspruch anschließenden weiteren Ansprüche.The invention is disclosed by the features of the main claim. Embodiments and developments are the subject of the further claims following the main claim.

Es wird ein Profilsystem für eine Absturzsicherung wie ein Geländer bzw. eine Geländerkonstruktion mit einem Grundprofil, das die Funktion eines Halte- bzw. Tragprofils hat, in Kombination mit einer Entwässerungsvorrichtung zur kontrollierten Balkon- bzw. Terrassenentwässerung offenbart. Dabei werden erfindungsgemäß wenigstens zwei funktionell unterschiedliche Bauteile im Balkon- bzw. Terrassenbau zu einem Profilsystem kombiniert, so dass sowohl die Funktion eines Trag- bzw. Halteprofils und auch die Funktion der Entwässerung mit einer einfachen Montagemöglichkeit erfüllt werden.A profile system for a fall protection device such as a railing or a railing construction with a base profile that has the function of a holding or support profile in combination with a drainage device for controlled balcony or terrace drainage is disclosed. According to the invention, at least two functionally different components in the balcony or terrace construction are combined to form a profile system, so that both the function of a support or holding profile and also the function of drainage are fulfilled with a simple assembly option.

Es können dabei unterschiedliche Geländer-Varianten ausgebildet sein. Das Grund- bzw. Halteprofil selbst kann in einer einteiligen oder mehrteiligen Ausführungsform ausgebildet sein. Die einteilige Ausführung kann beispielsweise Geländerpfosten aufweisen. Die Profilstöße des Grundprofils sind beispielsweise dehnfähig mit EPDM-Formteilen und einer dauerelastischen Fuge ausgebildet. Das Grundprofil kann mit einer Absturzsicherung in Aluminium bzw. Stahl oder als Pfostengeländer ausgebildet sein. Die innere, in Richtung eines Bodens zeigende Kante des Grundprofils muss durch die erfindungsgemäße kombinierte Ausbildung in dem Profilsystem nicht mehr verblendet oder abgedeckt werden.Different railing variants can be designed. The base or support profile itself can be designed in a one-piece or multi-piece design. The one-piece design can have railing posts, for example. The profile joints of the base profile are designed to be stretchable, for example, with EPDM molded parts and a permanently elastic joint. The base profile can be designed with a fall protection device made of aluminum or steel or as a post railing. The inner edge of the base profile pointing towards the floor no longer needs to be covered or covered thanks to the combined design in the profile system according to the invention.

Das Grundprofil ist mit der Entwässerungsvorrichtung mit einer offen zugänglichen wasserführenden Rinne zum genannten Profilsystem kombiniert. Die wasserführende Rinne ist insbesondere aus Aluminium, Metall bzw. Edelstahl oder auch Kunststoff ausgebildet. Das Wasser läuft in die wasserführende Rinne bzw. Abflussrinne, so dass eine definierte Entwässerung erfolgt. Das Wasser wird in dieser Rinne und nicht in einer Hohlkammer geführt. Es können seitliche Deckel bzw. Abdeckteile, die beispielsweise rund oder rechteckig ausgebildet sind, angeordnet werden, so dass eine gute Stabilität erzielt wird.The base profile is combined with the drainage device with an openly accessible water-carrying channel to form the profile system mentioned. The water-carrying channel is made of aluminum, metal, stainless steel or plastic. The water runs into the water-carrying channel or drainage channel so that defined drainage takes place. The water is guided in this channel and not in a hollow chamber. Side covers or cover parts, which are round or rectangular, for example, can be arranged so that good stability is achieved.

Es kann auf der Rinne ein insbesondere herausnehmbares Schmutzgitter angeordnet werden. Das Schmutzgitter ist beispielsweise als Streckmetallgitter oder als Lochblech ausgebildet. Das Schmutzgitter kann eingelegt oder eingedickt werden. Es kann Löcher in Form eines Lochblechs oder Schlitze aufweisen. Die Löcher können bündig oder tiefer als die Seitenwände der Rinne ausgebildet sein. Das Schmutzgitter kann aus- bzw. einschwenkbar ausgebildet sein. Es ist aus einem dünnen Metall wie das genannte Lochblech oder aus einem Maschengewebe ausgebildet.A dirt grid, particularly a removable one, can be placed on the gutter. The dirt grid is designed, for example, as an expanded metal grid or as a perforated sheet. The dirt grid can be inserted or thickened. It can have holes in the form of a perforated sheet or slots. The holes can be flush or deeper than the side walls of the gutter. The dirt grid can be designed so that it can be swung out or in. It is made of a thin metal such as the perforated sheet mentioned or of a mesh fabric.

Die Absturzsicherungen in einem Ausführungsbeispiel als Glasgeländer, die durch das Grundprofil gehalten werden, sind insbesondere aus bis zu 2 x 10 mm starken Verbundscheibengläsern mit einer Gesamtstärke von ca. 21,5 mm ausgebildet. Die Glasgeländer können durch in ihrer Ausrichtung im Grundprofil exakt feinjustiert werden.The fall protection devices in one embodiment as glass railings, which are held by the base profile, are made of up to 2 x 10 mm thick laminated glass with a total thickness of approx. 21.5 mm. The glass railings can be precisely fine-tuned in their alignment in the base profile.

Das erfindungsgemäße Profilsystem mit dem Grundprofil und der Entwässerungsvorrichtung hat dabei den Vorteil, dass es variabel ausgestaltet werden kann und sehr einfach mit verschiedenen Befestigungskonsolen montiert werden kann. Dies kann beispielsweise mit einer verstellbaren Seitenmontage, einer verstellbaren Montage von oben oder durch die Kombination von zwei Befestigungskonsolen durch eine mehrfach justierbare Montage erfolgen. Die Höhe der Beläge der Balkone oder Terrassen sind in der Höhe variabel ausbildbar und durch die verschiedenen Ausbildungen und/oder Anordnungsmöglichkeiten des Profilsystems gut durch unterschiedliche Montagemöglichkeiten zu handhaben.The profile system according to the invention with the base profile and the drainage device has the advantage that it can be designed variably and can be mounted very easily with different fastening brackets. This can be done, for example, with an adjustable side mounting, an adjustable mounting from above or by combining two fastening brackets with a multi-adjustable mounting. The height of the coverings of the balconies or terraces can be made variable and can be easily handled with different mounting options thanks to the different designs and/or arrangement options of the profile system.

Durch das erfindungsgemäße Profilsystem können die unteren Bereiche des Profilsystems, also die Entwässerungsrinne bzw. der Baukörper oder eine Unterkonstruktion, ohne eine Abdeckung durch eine angepasste Ausführungsform der Glasscheibe verblendet werden. Das erfolgt dadurch, dass das Flächenelement bzw. die Glasscheibe "heruntergezogen" wird, also über die Stirnseite hinweg reicht und dadurch eine gesonderte Abdeckung entfällt. Die Geländerkonstruktion kann dadurch beispielsweise auch ohne Pfosten angebracht werden.The profile system according to the invention allows the lower areas of the profile system, i.e. the drainage channel or the building structure or a substructure, to be covered without a cover by an adapted design of the glass pane. This is done by "pulling down" the surface element or the glass pane, i.e. extending over the front side and thus eliminating the need for a separate cover. The railing construction can therefore also be installed without posts, for example.

Weitere Vorteile und vorteilhafte Ausgestaltungen der Erfindung sind der nachfolgenden Figurenbeschreibung, den Zeichnungen und den Ansprüchen entnehmbar.Further advantages and advantageous embodiments of the invention can be taken from the following description of the figures, the drawings and the claims.

Nachfolgend werden Ausführungsbeispiele der erfindungsgemäßen Lösung anhand der beigefügten schematischen Zeichnungen näher erläutert. Es zeigt:

Fig. 1
zeigt ein Profilsystem mit einem einteiligen Grundprofil und einer Befestigungskonsole für eine Seitenmontage,
Fig. 2
stellt das Profilsystem mit dem einteiligen Grundprofil mit der Befestigungskonsole für die Montage von oben dar,
Fig. 3
zeigt das Profilsystem mit dem einteiligen Grundprofil mit einer zweiteiligen justierbaren Befestigungskonsole,
Fig. 4
zeigt ein Profilsystem mit dem zweiteiligen Grundprofil mit einer aufgesetzten Absturzsicherung in Aluminium mit der Befestigungskonsole für die Seitenmontage auf einer Betonplatte,
Fig. 5
stellt ein Profilsystem mit einem zweiteiligen Grundprofil mit einer aufgesetzten Absturzsicherung in Stahl dar,
Fig. 6a
zeigt das Profilsystem mit dem zweiteiligen Grundprofil mit einem aufgesetzten Pfostengeländer,
Fig. 6b
zeigt das Profilsystem mit dem zweiteiligen Grundprofil mit dem aufgesetzten Pfostengeländer mit einem innenliegenden Flächenelement,
Fig. 7
zeigt das Profilsystem mit einem weiteren Ausführungsbeispiel der Ausbildung des Abflussrohrs, wobei die Fig. 1 - 7 im Schnitt dargestellt sind,
Fig. 8 a - d
stellt das Profilsystem mit dem zweiteiligen Grundprofil mit direkt aufgesetzten Glasscheiben dar,
Fig. 8a
zeigt die Glasscheibe mit einem Punkthalter,
Fig. 8b
zeigt die Glasscheibe mit einem Flachhalter, wobei die Fig. 8a und 8b in einer Ansicht von vorne dargestellt sind,
Fig. 8 c
stellt die Glasscheibe mit dem Punkthalter und
Fig. 8d
zeigt die Glasscheibe mit dem Flachhalter,
wobei die Fig. 8c und 8d im Schnitt gezeigt sind.In the following, embodiments of the solution according to the invention are explained in more detail using the attached schematic drawings. It shows:
Fig.1
shows a profile system with a one-piece base profile and a mounting bracket for side mounting,
Fig.2
represents the profile system with the one-piece base profile with the mounting bracket for mounting from above,
Fig.3
shows the profile system with the one-piece base profile with a two-piece adjustable mounting bracket,
Fig.4
shows a profile system with the two-part base profile with an attached fall protection in aluminum with the mounting bracket for side mounting on a concrete slab,
Fig.5
represents a profile system with a two-part base profile with an attached fall protection device in steel,
Fig. 6a
shows the profile system with the two-part base profile with an attached post railing,
Fig. 6b
shows the profile system with the two-part base profile with the attached post railing with an internal surface element,
Fig.7
shows the profile system with another embodiment of the design of the drain pipe, where the Fig. 1 - 7 shown in section,
Fig. 8 a - d
represents the profile system with the two-part base profile with directly attached glass panes,
Fig. 8a
shows the glass pane with a point holder,
Fig. 8b
shows the glass pane with a flat holder, whereby the Fig. 8a and 8b shown in a front view,
Fig. 8c
places the glass pane with the point holder and
Fig. 8d
shows the glass pane with the flat holder,
where the Fig. 8c and 8d shown in section.

Die in Figuren 2, 5, 6a, 6b und 8 dargestellten Profilsysteme weisen keine Stellelemente für das Flächenelement auf. Diese Profilsysteme liegen außerhalb der beanspruchte Erfindung.In the Figures 2 , 5 , 6a , 6b and 8th The profile systems shown do not have any adjusting elements for the surface element. These profile systems are outside the scope of the claimed invention.

In Fig. 1 ist ein Profilsystem 100 mit einem einteiligen ersten Grundprofil 1 dargestellt. Im Grundprofil 1 wird ein Flächenelement 5, insbesondere eine Glasscheibe 5, klemmend gehalten. Das Flächenelement 5 kann alternativ auch aus Metall, Kunststoff o.dgl. ausgebildet sein. Es ist eine mit dem Grundprofil 1 verbundene Befestigungskonsole für eine Seitenmontage 7 angeordnet. Das einteilige erste Grundprofil 1 weist eine Blende in der seitlichen Richtung nach Außen 11 und eine Blende in der seitlichen Richtung nach innen 12 auf. Des Weiteren ist eine Untersichtblende 13 ausgebildet.In Fig.1 a profile system 100 with a one-piece first base profile 1 is shown. A surface element 5, in particular a glass pane 5, is clamped in the base profile 1. The surface element 5 can alternatively be made of metal, plastic or the like. A fastening bracket connected to the base profile 1 is arranged for side mounting 7. The one-piece first base profile 1 has a panel in the lateral outward direction 11 and a panel in the lateral inward direction 12. Furthermore, a bottom panel 13 is formed.

Die im erste Grundprofil 1 geklemmt gehaltene Glasscheibe 5 wird durch beidseitig der Glasscheibe 5 angeordnete Verglasungsdichtungen 15 gehalten. Die Glasscheibe 5 kann durch Stellelemente 16 für die Verglasung innerhalb des ersten Grundprofils 1 in ihrer vertikalen Ausrichtung eingestellt werden. Dadurch erfolgt eine exakte Feinjustierung der Glasscheibe 5 durch die Stellelemente. Die Glasscheibe 5 ist innerhalb eines im Bodenbereich des ersten einteiligen Grundprofils 1 angeordneten Klemmschuh 17 eingesetzt. Es erfolgt eine Grundprofil-Entwässerung 18 weg vom Bodenbereich des ersten Grundprofils 1.The glass pane 5 clamped in the first base profile 1 is held by glazing seals 15 arranged on both sides of the glass pane 5. The glass pane 5 can be adjusted in its vertical alignment by adjusting elements 16 for the glazing within the first base profile 1. This enables precise fine adjustment of the glass pane 5 by the adjusting elements. The glass pane 5 is inserted within a clamping shoe 17 arranged in the base area of the first one-piece base profile 1. The base profile is drained 18 away from the base area of the first base profile 1.

Das Profilsystem 100 mit dem ersten Grundprofil 1 und der Entwässerungsrinne 21 kann in die Befestigungskonsole für die Seitenmontage 7 eingehängt werden. Eine Aushebesicherung 14 verhindert das Aushängen des Profilsystems 100 aus der Befestigungskonsole für die Seitenmontage 7. Somit ermöglicht die Montage durch das Einhängen des Profilsystems 100 in Kombination mit der weiteren Einstellmöglichkeit der Justierung der Glasscheibe 5 durch die Stellelemente 16 für die Verglasung ein mehrfaches Einwirken auf die Anordnung, Positionierung und Einstellung der Glasscheibe 5 des Balkongeländers. Die gesamte Konstruktion ist in der Höhe in vertikaler Richtung verschiebbar. Dazu ist die Befestigungskonsole für die Seitenmontage 7 mit einer Riffelung ausgebildet. In die Befestigungskonsole für die Seitenmontage 7 ist eine erste Öffnung 29 eingebracht, deren Durchmesser etwas vergrößert gegenüber der Bohrung für eine einzubringende erste Befestigungsschraube 31 ist. An der einem Baukörper 26 abgewandten Seite wird eine erste Mutter 29 platziert, die zumindest an ihrem der Befestigungskonsole für die Seitenmontage 7 ebenfalls geriffelt ausgebildet ist. Nach dem Einschrauben der ersten Befestigungsschraube 31 ist ein gewisses Spiel vorhanden, um die Befestigungskonsole für die Seitenmontage 7 in der Vertikalrichtung nach oben bzw. unten zu verschieben. Somit kann die Höhe der Anordnung eingestellt werden. Der Vorteil dieser Ausbildung ist, dass bei Bedarf eine nachträgliche Einstellung durch eine Lockerung der Verschraubung und eine erneute Verschiebung möglich ist. Es werden keinerlei Verklebungen, Ausfüllungen o.dgl. zur Befestigung durchgeführt, so dass die Anordnung in begrenztem Rahmen verstellbar bleibt.The profile system 100 with the first base profile 1 and the drainage channel 21 can be hung in the fastening bracket for the side mounting 7. A lifting protection 14 prevents the profile system 100 from being hung out of the fastening bracket for the side mounting 7. This enables the installation by hanging the profile system 100 in combination with the further adjustment option of the adjustment of the glass pane 5 by the adjusting elements 16 for the glazing, a multiple influence on the arrangement, positioning and adjustment of the glass pane 5 of the balcony railing is possible. The entire construction can be moved vertically in height. For this purpose, the fastening bracket for the side mounting 7 is designed with a corrugation. A first opening 29 is made in the fastening bracket for the side mounting 7, the diameter of which is slightly larger than the hole for a first fastening screw 31 to be inserted. On the side facing away from a building structure 26, a first nut 29 is placed, which is also designed with corrugations at least on its side of the fastening bracket for the side mounting 7. After screwing in the first fastening screw 31, a certain amount of play is available in order to move the fastening bracket for the side mounting 7 up or down in the vertical direction. The height of the arrangement can thus be adjusted. The advantage of this design is that, if necessary, subsequent adjustment is possible by loosening the screw connection and moving it again. No gluing, filling or similar is carried out for fastening, so that the arrangement remains adjustable within a limited range.

Unterhalb eines Bodenbelags 19 eines Balkons oder einer Terrasse ist eine Entwässerungsrinne 21 ausgebildet. In die Entwässerungsrinne 21 ist ein Schmutzgitter 22 eingelegt oder eingeclipst. Das Schmutzgitter 22 kann ein- und ausschwenkbar ausgebildet sein. Das Schmutzgitter 22 kann aus Aluminium, Edelstahl, Kunststoff o.dgl. ausgebildet sein. Es ist ein Abflussstutzen 23 ausgebildet, der in ein Abflussrohr 24 mündet. Die Rinnenentwässerung durch den Abflussstutzen 23 ist für Standard-HT[Hochtemperatur]-Rohre geeignet. Diese HT-Rohre können für Abwasserleitungen verwendet werden. Sie sind bis ca. 95° wärmebeständig, insoweit dies benötigt wird. Die Pfeilrichtung A gibt die Fließrichtung des Wassers zur Entwässerung an.A drainage channel 21 is formed beneath a floor covering 19 of a balcony or terrace. A dirt grid 22 is inserted or clipped into the drainage channel 21. The dirt grid 22 can be designed to be able to be swung in and out. The dirt grid 22 can be made of aluminum, stainless steel, plastic or the like. A drain nozzle 23 is formed which opens into a drain pipe 24. The channel drainage through the drain nozzle 23 is suitable for standard HT [high temperature] pipes. These HT pipes can be used for sewage pipes. They are heat-resistant up to approx. 95°, if this is required. The direction of the arrow A indicates the flow direction of the water for drainage.

Fig. 2 zeigt eine weitere Ausführungsform des Profilsystems 100. Dabei ist eine andere Befestigungskonsole für eine Montage von oben 8 dargestellt. An der Befestigungskonsole 8 ist in ihrem oberen, zum Balkonbelag 19 zeigenden Bereich ein sich in Horizontalrichtung erstreckender Schenkel der Befestigungskonsole für die Montage von oben 8 ausgebildet. Dieser Schenkel ist zusätzlich durch eine Verschraubung sicher befestigt. Dazu wird eine zweite Bohrung 32 eingebracht und an dem Schenkel eine zweite Mutter 22 angeordnet, die an dem geriffelt ausgebildeten Schenkel verstellbar ist. Die einzubringende zweite Befestigungsschraube 34 ist durch die Ausbildung der zweiten Bohrung 32, die ebenso wie die erste Bohrung 31 einen vergrößerten Durchmesser gegenüber der Bohrung für die einzubringende zweite Befestigungsschraube 34 hat, so ausgebildet, dass die Befestigungsschraube 34 beim Einbringen etwas Spiel hat und das Profilsystem 100 somit in zwei Richtungen verstellbar ist. Diese dargestellte Konstruktion des gezeigten Ausführungsbeispiels ist in horizontaler und in vertikaler Richtung verschieblich ausgebildet. Dies wird durch die Pfeile B und C dargestellt. Fig.2 shows a further embodiment of the profile system 100. A different fastening bracket for mounting from above 8 is shown. On the fastening bracket 8, in its upper area facing the balcony covering 19, a leg of the fastening bracket for mounting from above 8 is formed, which extends in the horizontal direction. This leg is additionally secured by a Screw connection securely fastened. For this purpose, a second hole 32 is made and a second nut 22 is arranged on the leg, which is adjustable on the grooved leg. The second fastening screw 34 to be inserted is designed by the formation of the second hole 32, which, like the first hole 31, has an enlarged diameter compared to the hole for the second fastening screw 34 to be inserted, so that the fastening screw 34 has some play when inserted and the profile system 100 can thus be adjusted in two directions. This construction of the embodiment shown is designed to be movable in the horizontal and vertical directions. This is shown by the arrows B and C.

Fig. 3 zeigt das Profilsystem 100 mit einem einteiligen ersten Grundprofil 1 mit einer zweiteiligen justierbaren Befestigungskonsole 9. Die Pfeilrichtung in zwei Richtungen an der zweiteiligen Befestigungskonsole 9 deutet die Verstellmöglichkeit in vertikaler Richtung an der Verschraubung in dieser Position durch die Pfeilrichtung B und die Verstellmöglichkeit in horizontaler Richtung durch die Pfeilrichtung C an. Die dicken Pfeile A an der Balkonoberfläche und im Balkonbelag 19 zeigen die Fließrichtung des Wassers. Am ersten Grundprofil 1 ist ein Lochblech 20 angeordnet. Zwischen diesem Lochblech 20 und dem Balkonbelag 19 kann das Wasser in Richtung der Entwässerungsrinne 21 abfließen und durch den Abflussstutzen 23 durch das Abflussrohr 24 abgeleitet werden. Das Profilsystem 100 ist in der Höhe und der Breite, also horizontal und vertikal verfahrbar. Es ist ein Schmutzgitter 22' angeordnet, dass abweichend von der Ausführung der Darstellungen aus Fig. 1 und Fig. 2 ausgebildet und angeordnet ist. Fig.3 shows the profile system 100 with a one-piece first base profile 1 with a two-piece adjustable fastening bracket 9. The arrow direction in two directions on the two-piece fastening bracket 9 indicates the possibility of adjustment in the vertical direction on the screw connection in this position by the direction of the arrow B and the possibility of adjustment in the horizontal direction by the direction of the arrow C. The thick arrows A on the balcony surface and in the balcony covering 19 show the direction of flow of the water. A perforated sheet 20 is arranged on the first base profile 1. Between this perforated sheet 20 and the balcony covering 19, the water can flow in the direction of the drainage channel 21 and be drained through the drain connection 23 through the drain pipe 24. The profile system 100 can be moved in height and width, i.e. horizontally and vertically. A dirt grid 22' is arranged, which differs from the design of the illustrations from Fig.1 and Fig.2 designed and arranged.

Im unteren Bereich unterhalb des Bodenbereichs des ersten Grundprofils 1 ist ein Wärmedämm-Verbundsystem 25 ausgebildet.In the lower area below the floor area of the first base profile 1, a thermal insulation composite system 25 is formed.

Fig. 4 zeigt ein Profilsystem 100 mit einem zweiteiligen zweiten Grundprofil 2 mit der Befestigungskonsole für die Seitenmontage 7. Durch eine Schraubverbindung ist der zweite Teil des zweiten Grundprofils 2 mit dem ersten Teil des Grundprofils 2, in dem die Glasscheibe 5 klemmend gehalten ist, verbunden. Dieser erste Teil des zweiten zweiteiligen Grundprofils 2 ist mit einem nach au-ßen, vom Gebäude bzw. dem Balkonbelag 19 weg zeigenden Schenkel, als "Absturzsicherung" aus Aluminium 3 bezeichnet, ausgebildet. Es ist eine Untersichtblende 13 angeordnet. Die Glasscheibe 5 kann durch die Spreizung des Stellelements für die Verglasung 16 durch die einzubringende Schraube innerhalb des ersten Teils des zweiteiligen zweiten Grundprofils 2 feinjustiert und in ihrer Vertikalstellung zusätzlich verstellt werden. Fig.4 shows a profile system 100 with a two-part second base profile 2 with the fastening bracket for the side mounting 7. The second part of the second base profile 2 is connected to the first part of the base profile 2, in which the glass pane 5 is clamped, by a screw connection. This first part of the second two-part base profile 2 is designed with a leg pointing outwards, away from the building or the balcony covering 19, referred to as "fall protection" made of aluminum 3. It is a soffit panel 13. The glass pane 5 can be finely adjusted by spreading the adjusting element for the glazing 16 by means of the screw to be inserted within the first part of the two-part second base profile 2 and its vertical position can also be adjusted.

Fig. 5 stellt ein Profilsystem 100 mit einem zweiteiligen zweiten Grundprofil 2 mit einer aufgesetzten Absturzsicherung in Stahl 4 dar. Am zweiten Teil des zweiteiligen Grundprofils 2, das zwischen dem ersten Teil des Grundprofils 2, in dem die Glasscheibe 5 klemmend gehalten ist, und dem Balkonbelag 19 ausgebildet ist, ist eine Blende innen 12 in einem oberen, in Richtung der Oberkante der Glasscheibe 5 zeigenden Bereich des Grundprofils 2 um einen abweichend ausgestalteten Schenkel herumreichend ausgebildet. Fig.5 represents a profile system 100 with a two-part second base profile 2 with an attached fall protection device made of steel 4. On the second part of the two-part base profile 2, which is formed between the first part of the base profile 2, in which the glass pane 5 is clamped, and the balcony covering 19, an inner cover 12 is formed in an upper area of the base profile 2 pointing in the direction of the upper edge of the glass pane 5, extending around a differently designed leg.

Fig. 6a zeigt das Profilsystem 100 mit dem zweiteiligen zweiten Grundprofil 2. Der zweite Teil des Grundprofils 2 weist ein aufgesetztes Pfostengeländer 6 auf. Bei einem Pfostengeländer allgemein verlaufen die Füllprofile lotrecht. Diese Ausführungsform wird insbesondere bei Pfosten bzw. runden oder vierkantigen Stäben und verschiedenen Hohl- und Vollprofilen verwendet. Es ist also ein Pfostengeländer 6 ausgebildet. Des Weiteren ist die Befestigungskonsole zur Seitenmontage 7 ausgebildet. Diese Befestigungskonsole 7 wird durch die Aushebesicherung 14 in ihrer Position gesichert. Die Entwässerungsrinne 21 ist von außen bzw. von oben, also der Oberseite des Balkonbelags 19 her, zugänglich. Das Pfostengeländer 6 weist eine Füllung insbesondere mit einer Glasscheibe 5 auf. Fig. 6a shows the profile system 100 with the two-part second base profile 2. The second part of the base profile 2 has a post railing 6 attached. In a post railing in general, the filling profiles run vertically. This embodiment is used in particular for posts or round or square bars and various hollow and solid profiles. A post railing 6 is thus formed. Furthermore, the fastening bracket is designed for side mounting 7. This fastening bracket 7 is secured in its position by the anti-lifting device 14. The drainage channel 21 is accessible from the outside or from above, i.e. from the top of the balcony covering 19. The post railing 6 has a filling, in particular with a glass pane 5.

Fig. 6b zeigt das Profilsystem 100 mit dem zweiteiligen zweiten Grundprofil 2 und dem aufgesetzten Pfostengeländer 6. Es ist eine innenliegende Glasscheibe als Flächenelement 5 angeordnet und linienförmig über die Höhenkanten gelagert. Die Pfosten des Pfostengeländers 6 sind frei horizontal im Profilsystem 100 positioniert. Das Flächenelement 5 bzw. die Glasscheibe ist linienförmig am Tragpfosten bzw. Pfosten des Pfostengeländers 6 gelagert. Fig. 6b shows the profile system 100 with the two-part second base profile 2 and the attached post railing 6. An internal glass pane is arranged as a surface element 5 and is supported linearly over the height edges. The posts of the post railing 6 are freely positioned horizontally in the profile system 100. The surface element 5 or the glass pane is supported linearly on the support post or post of the post railing 6.

Fig. 7 stellt das Profilsystem 100 dar. Das Abflussrohr 24, das an dem Abflussstutzen 23 angeordnet ist, weist eine gebogene Ausbildung auf und ist so ausgebildet, dass das in die Entwässerungsrinne 21 einfließende Wasser zu einer der Gebäudewand abgewandten Vorderseite unterhalb der Glasscheibe 5 weggeleitet ist. Das Abflussrohr 24 ist abgeknickt ausgebildet. Ein oberer Teil, der aus dem Abflussstutzen 23 herausführt, ist in etwa senkrecht ausgebildet. Ein weiterer Teil des Abflussrohrs 24 ist nach dem ausgebildeten Knick in etwa waagerecht angeordnet. Die Fließrichtung des abgeleiteten Wassers aus der Entwässerungsrinne 21 ist daher hin zur der dem Gebäude abgewandten Seite. Es ist eine zweiteilige Ausbildung einer Befestigungskonsole 10 ausgebildet, die auf eine Balkonplatte aufgesetzt ist. Fig.7 represents the profile system 100. The drain pipe 24, which is arranged on the drain connection 23, has a curved design and is designed such that the water flowing into the drainage channel 21 is directed away to a front side facing away from the building wall below the glass pane 5. The drain pipe 24 is bent. An upper part, which leads out of the drain connection 23, is approximately vertical. Another part of the drain pipe 24 is arranged approximately horizontally after the bend. The flow direction of the drained water from the drainage channel 21 is therefore towards the side facing away from the building. A two-part fastening bracket 10 is formed, which is placed on a balcony slab.

Fig. 8 mit den Einzelfiguren 8a bis 8d stellt unterschiedliche Halter-Ausbildungen für die Glasscheibe 5 dar. Fig.8 The individual figures 8a to 8d show different holder designs for the glass pane 5.

Fig. 8a stellt die Befestigung der Glasscheibe 5 mit mehreren Punkthaltern 27 dar, und Fig. 8a represents the fastening of the glass pane 5 with several point holders 27, and

Fig. 8b zeigt die Befestigung der Glasscheibe 5 mit Flachhaltern 28. Fig. 8b shows the fastening of the glass pane 5 with flat holders 28.

Fig. 8c stellt die Ausführung nach der Fig. 8a mit mehreren Punkthaltern 27 im Schnitt dar und Fig. 8c represents the execution after the Fig. 8a with several point holders 27 in section and

Fig. 8d zeigt die Ausführungsform nach der Fig. 8b mit Flachhaltern 28 ebenfalls im Schnitt. Die Glasscheibe 5 ist in dieser Darstellung nach unten gezogen, so dass sie die gesamte Konstruktion des Profilsystems 100 in Richtung der vom Baukörper 26 nach außen abgewandten Seite optisch einheitlich und vorteilhaft abdeckt, so dass keine gesonderte Verkleidung mehr angeordnet werden muss. Die Glasscheibe 5 kann beispielsweise in einem oberen Bereich, der vom Untergrund bzw. Boden, auf dem der Baukörper 26 angeordnet ist, entgegengesetzt ist, aus einer glasklaren, durchsichtigen Glasscheibe 5 ausgebildet und in einem unteren, zum Boden zeigenden Bereich, matt bzw. durchscheinend ausgebildet sein, so dass die Konstruktion zur Befestigung und Entwässerung des Profilsystems 100 von außen "unsichtbar" verkleidet ist. Fig. 8d shows the embodiment according to the Fig. 8b with flat holders 28, also in section. The glass pane 5 is drawn downwards in this illustration, so that it covers the entire construction of the profile system 100 in the direction of the side facing away from the structure 26 in a visually uniform and advantageous manner, so that no separate cladding needs to be arranged. The glass pane 5 can, for example, be made of a crystal-clear, transparent glass pane 5 in an upper area, which is opposite to the subsurface or floor on which the structure 26 is arranged, and can be matt or translucent in a lower area facing the floor, so that the construction for fastening and draining the profile system 100 is "invisibly" clad from the outside.

Die Tragpfosten bzw. Pfosten des Pfostengeländers können alternativ über Winkel verschieblich gelagert und dadurch frei stellbar ausgebildet sein. Bei diesem Ausführungsbeispiel müssen in den Flächenelementen bzw. Glasscheiben keine Bohrungen mehr angeordnet werden.The support posts or posts of the post railing can alternatively be mounted so that they can be moved using angles and can therefore be freely adjusted. In this embodiment, no more holes need to be drilled into the surface elements or glass panes.

Alle in der Beschreibung, den nachfolgenden Ansprüchen und den Zeichnungen dargestellten Merkmale können sowohl einzeln als auch in beliebiger Kombination miteinander erfindungswesentlich sein.All features presented in the description, the following claims and the drawings can be essential to the invention both individually and in any combination with one another.

BezugszeichenlisteList of reference symbols

11
Erstes Grundprofil einteiligFirst basic profile one-piece
22
Zweites Grundprofil zweiteiligSecond basic profile two-part
33
Absturzsicherung AluminiumFall protection aluminum
44
Absturzsicherung StahlFall protection steel
55
FlächenelementSurface element
66
Pfostengeländer mit FüllungPost railing with filling
77
Befestigungskonsole SeitenmontageMounting bracket side mounting
88th
Befestigungskonsole Montage von obenMounting bracket mounting from above
99
Zweiteilige Befestigungskonsole mit MontageTwo-part mounting bracket with assembly
1010
Befestigungskonsole auf BalkonplatteMounting bracket on balcony slab
1111
Blende außenCover outside
1212
Blende innenPanel inside
1313
UntersichtblendeSoffit panel
1414
AushebesicherungAnti-lift device
1515
VerglasungsdichtungenGlazing seals
1616
Stellelement für VerglasungAdjusting element for glazing
1717
KlemmschuhClamp shoe
1818
Grundprofil-EntwässerungBasic profile drainage
1919
BalkonbelagBalcony covering
2020
LochblechPerforated sheet
2121
Entwässerungsvorrichtung: EntwässerungsrinneDrainage device: drainage channel
2222
SchmutzgitterDirt grid
22'22'
SchmutzgitterDirt grid
2323
AbflussstutzenDrain nozzle
2424
Abflussrohrdrain pipe
2525
WärmedämmverbundsystemThermal insulation composite system
2626
BaukörperBuilding structure
2727
PunkthalterPoint holder
2828
FlachhalterFlat holder
2929
Erste BohrungFirst drilling
3030
Erste MutterFirst mother
3131
Erste BefestigungsschraubeFirst fastening screw
3232
Zweite BohrungSecond drilling
3333
Zweite MutterSecond mother
3434
Zweite BefestigungsschraubeSecond fastening screw
AA
Pfeil Fließrichtung WasserArrow flow direction water
BB
Pfeil Bewegungsrichtung Profilsystem 100 vertikalArrow movement direction profile system 100 vertical
CC
Pfeil Bewegungsrichtung Profilsystem 100 horizontalArrow movement direction profile system 100 horizontal
DD
Pfeil Bewegungsrichtung Feinjustierung FlächenelementArrow Direction of movement Fine adjustment Surface element
100100
ProfilsystemProfile system

Claims (15)

  1. Profile system (100) for holding a flat element (5) for arrangement on a structural body of a balcony or a terrace of a building, wherein the profile system (100) comprises a first base profile (1) or a second base profile (2) which has the functions of a holding or supporting profile for the flat element (5), as well as a dewatering device (21) combined with it and forming a dewatering gutter for a controlled dewatering of balconies or terraces,
    characterized in that
    the profile system (100) comprises adjusting elements allowing a fine adjustment of the flat element (5), and in that the profile system includes an adjustable fastening console for lateral mounting (7), an adjustable fastening console for mounting from above (8), a two-part fastening console (9) or a two-part fastening console placeable onto a balcony slab (10), wherein mounting of the profile system (100) takes place by suspension via an adjustable fastening console for lateral mounting (7), an adjustable fastening console for mounting from above (8), a two-part fastening console (9) or a two-part fastening console placed onto a balcony slab (10), combined with a fine adjustment of the flat element (5), where appropriate, and in that fastening-construction related tolerances of the structural body (26) are compensated and a slope of adjustable inclination of the dewatering gutter (21) towards a drain port (23) is formed in such a way that a directed water removal is effected by multiple adjustments of the fastening console for lateral mounting (7) or of the fastening consoles for mounting from above (9) or the two-part fastening console (10) placed onto the balcony slab, where appropriate in combination with a fine-adjustment of the flat element,.
  2. Profile system (100) according to claim 1, characterized in that the dewatering device (21) is configured as a dewatering gutter (21) and to be freely accessible from the direction of a balcony covering (19).
  3. Profile system (100) according to one of the preceding claims, characterized in that the dewatering device (21) comprises a dirt guard (22, 22').
  4. Profile system (100) according to claim 3, characterized in that the dirt guard (22, 22') is configured to be removable or to be pivotable inwards or outwards.
  5. Profile system (100) according to one of the preceding claims, characterized in that the first base profile (1) is configured in one part.
  6. Profile system (100) according to one of the preceding claims 1 to 4, characterized in that the second base profile (2) is configured in two parts.
  7. Profile system (100) according to one of the preceding claims, characterized in that the first and the second base profile (1, 2) comprise a fall protection of aluminium (3) or a fall protection of steel (4) or a post railing (6).
  8. Profile system (100) according to one of the preceding claims, characterized in that an unhook protector (14) is formed.
  9. Profile system (100) according to one of the preceding claims, characterized in that dewatering takes places by the dewatering gutter (21) into the drain port (23) and further into a drain pipe (24).
  10. Profile system (100) according to claim 9, characterized in that the drain pipe (24) is formed to point perpendicularly in the direction of sub ground of a building or curved and partially horiztonally leading away from the building.
  11. Profile system (100) according to one of the preceding claims, characterized in the the flat element (5) is configured as a glass pane (5).
  12. Profile system (100) according to one of the preceding claims, characterized in that the flat element (5) is held in a clamped manner in the base profile (1, 2) or is arranged on a post railing (6) fastened by means of point holders (27) or flat holders (28).
  13. Profile system (100) according to one of the preceding claims, characterized in that a cover is arranged on the outside (11) on a side of the base profile (1, 2) pointing away from the building.
  14. Profile system (100) according to one of the preceding claims, characterized in that a cover (12) is arranged on the inside, on a side of the base profile (1, 2) pointing towards the balcony covering (19).
  15. Profile system (100) according to one of the preceding claims, characterized in that a cover bottom view cover (13) is arranged below the building, in a direction towards a floor.
EP19204645.6A 2019-10-22 2019-10-22 Profile system for holding a flat element Active EP3812531B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP19204645.6A EP3812531B1 (en) 2019-10-22 2019-10-22 Profile system for holding a flat element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP19204645.6A EP3812531B1 (en) 2019-10-22 2019-10-22 Profile system for holding a flat element

Publications (2)

Publication Number Publication Date
EP3812531A1 EP3812531A1 (en) 2021-04-28
EP3812531B1 true EP3812531B1 (en) 2024-05-01

Family

ID=68392706

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19204645.6A Active EP3812531B1 (en) 2019-10-22 2019-10-22 Profile system for holding a flat element

Country Status (1)

Country Link
EP (1) EP3812531B1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4230820A1 (en) * 2022-02-19 2023-08-23 René Bangratz Base profile with multi-groove profile
EP4230819A1 (en) * 2022-02-19 2023-08-23 René Bangratz Groove profile

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2731454B1 (en) 1995-03-10 1997-04-25 Horizal SLAB FIXING DEVICE FOR GUARDRAIL SUPPORT BAR
DE19535187C2 (en) 1995-09-22 1998-01-29 Schlueter Systems Gmbh Fastening system for attaching gutters to balcony or terrace ends
DE19612505A1 (en) * 1996-03-29 1997-10-02 Walter Gutjahr Dewatering system for balcony with breastwork
DE29714562U1 (en) * 1997-08-14 1997-10-16 Dorenwendt Wolfgang Fixing system for gutters
DE202007011416U1 (en) 2007-08-16 2009-01-02 Gutjahr, Walter End profile arrangement for balconies, terraces and the like.
DE102015001891B4 (en) * 2015-02-14 2016-09-15 Klaus Peter Abel Edging for balcony and terrace floors
GB2528147B (en) * 2015-03-09 2017-05-24 Pure Vista Ltd System and method for adjusting alignment of a panel
DE102017000145A1 (en) 2017-01-10 2018-07-12 Manuel Wolf Gutter drainage system for the removal of surface water on surfaces (balconies, terraces, flat roofs ..) in the outdoor area. With the system, gutter sewage systems in all dimensions can be realized very easily and quickly.

Also Published As

Publication number Publication date
EP3812531A1 (en) 2021-04-28

Similar Documents

Publication Publication Date Title
EP3812531B1 (en) Profile system for holding a flat element
DE2142733C3 (en) Flashing frame for roof windows lying in the roof area
DE102015001891B4 (en) Edging for balcony and terrace floors
EP0457012B1 (en) Drain for floors or roofs
DE102019007427A1 (en) Profile system for holding a surface element
EP0725194B1 (en) Drainage device for balconies
DE19822353A1 (en) Rain water gutter mounting
CH701903B1 (en) Fairing and drainage element for the faces of components such as balcony slabs, patios, walkways, flat roofs.
EP3418471B1 (en) Cover for a glass railing device
DE19520419C2 (en) Fastening device for balcony cladding elements
AT12302U1 (en) SHUTTER
DE102005031674B4 (en) Attachment balcony and water inlet box for the same
DE19941462B4 (en) Railing support with gutter profile
DE102007017612A1 (en) Frame for a balcony or a terrace and method for its production
EP1970499A2 (en) Edge and eave finishing profile with a universal, height-adjustable edge facing for all linings of balconies, terraces and flat roofs
DE202006010927U1 (en) Edging for a building's roof, especially a flat roof, has an elbow fixing and a strip fastened on one of the elbow's two legs
DE102017131240A1 (en) Cover for a glass railing device
DE102017000145A1 (en) Gutter drainage system for the removal of surface water on surfaces (balconies, terraces, flat roofs ..) in the outdoor area. With the system, gutter sewage systems in all dimensions can be realized very easily and quickly.
EP4230820A1 (en) Base profile with multi-groove profile
WO2004104318A1 (en) Cover for an area of balconies, floors, roofs, or facades
DE102022000750A1 (en) Basic profile with multiple groove profile
DE102013102617A1 (en) Method for shielding a free area
DE10333347A1 (en) Balcony swing door has a surrounding plastic or metal frame and a clip-fit rain drainage profile
WO2021190782A1 (en) Closure device
DE102020130223A1 (en) Eaves drip profile

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210803

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 502019011170

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: E04F0011180000

Ipc: E04D0013064000

Ref legal event code: R079

Ipc: E04D0013064000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: E04F 11/18 20060101ALI20231218BHEP

Ipc: E04D 13/064 20060101AFI20231218BHEP

INTG Intention to grant announced

Effective date: 20240118

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH