EP3735514A1 - Device at tunnel boring machine arranged for drilling operations without operators in the borehole - Google Patents

Device at tunnel boring machine arranged for drilling operations without operators in the borehole

Info

Publication number
EP3735514A1
EP3735514A1 EP18898967.7A EP18898967A EP3735514A1 EP 3735514 A1 EP3735514 A1 EP 3735514A1 EP 18898967 A EP18898967 A EP 18898967A EP 3735514 A1 EP3735514 A1 EP 3735514A1
Authority
EP
European Patent Office
Prior art keywords
tunnel
boring machine
boring
borehole
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP18898967.7A
Other languages
German (de)
French (fr)
Other versions
EP3735514A4 (en
EP3735514B1 (en
Inventor
Per Olav Haughom
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Norhard Asset AS
Original Assignee
Norhard As
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Norhard As filed Critical Norhard As
Priority claimed from PCT/NO2018/050314 external-priority patent/WO2019135682A1/en
Publication of EP3735514A1 publication Critical patent/EP3735514A1/en
Publication of EP3735514A4 publication Critical patent/EP3735514A4/en
Application granted granted Critical
Publication of EP3735514B1 publication Critical patent/EP3735514B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B10/00Drill bits
    • E21B10/08Roller bits
    • E21B10/12Roller bits with discs cutters
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/046Directional drilling horizontal drilling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/04Directional drilling
    • E21B7/06Deflecting the direction of boreholes
    • E21B7/062Deflecting the direction of boreholes the tool shaft rotating inside a non-rotating guide travelling with the shaft
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/1093Devices for supporting, advancing or orientating the machine or the tool-carrier
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/11Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • E21D9/11Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
    • E21D9/112Making by using boring or cutting machines with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines by means of one single rotary head or of concentric rotary heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F13/00Transport specially adapted to underground conditions

Definitions

  • This invention concerns a tunnel-boring machine which is designed and adapted for carry ing out directional-boring operations over long stretches, typically 2-3 k , without opera- tors in the borehole. More particularly, it relates to a tunnel-boring machine comprising a frame, a rotating boring head with rolling disc cutters supported at a front end of a first frame portion, and a second, polygonal frame portion that extends rearwards from the first frame portion.
  • Today's technology for boring holes through rock formations may, in the main, be divided into two main categories:
  • Machines that bore with diameters up to about 1.5 m and are generally operated from a control unit out in the open.
  • chines are operated with operators in the borehole.
  • a machine operator is posi- tioned in an operator cabin connected to the machine itself and controls the ma chine functions.
  • a boring machine for boring tunnels of a non-circular cross section is known, the boring machine being provided with two main cutters that each form semi circular side portions of the borehole, whereas upper and lower elongated trimming cut ters take out a straight ceiling portion and a straight floor portion which connect the two semi-circular side portions.
  • the cutters are supported in a front unit which is connected to a rear unit via jacks that provide feeding of the cutters as they work into the material that is to be removed.
  • the rear unit has a sectioned frame, wherein a straight main section may rest on the floor of the tunnel, semi-circular side sections may be clamped against the side walls of the tunnel by means of actuators moving the side sections sideways rela tive to the main section, and a straight top section may be clamped against the ceiling of the tunnel by means of actuators moving the top section sideways relative to the main section.
  • W02008010189 A2 discloses a mining robot provided with a propulsion system including drive rollers arranged at end portions of two pairs of telescopic legs supporting a robot body on a surface under, possibly under and over, the robot as the legs are pivotable into different positions relative to the robot body.
  • the drive rollers provide for the robot to be able to move in a passage that is defined by said surfaces.
  • a boring machine provided with a boom carrying a cutter head via a rotary joint
  • a frame is provided with a driving apparatus which, via tracks, can provide for movement of the boring machine, and the frame is provided with several devices for anchoring the boring machine to surrounding surfaces during a boring opera tion.
  • the cutter head is pressed against the material that is to be removed, by the boom being moved in its longitudinal direction relative to the clamped frame.
  • the present invention has for its object to remedy, or at least reduce, one or more of the drawbacks of the prior art.
  • the object is achieved according to the invention through the features that are specified in the description that follows and in the claims.
  • the invention provides a tunnel-boring machine arranged to bore circular holes through a rock formation, the tunnel-boring machine comprising a boring head (drill bit) rotating around the longitudinal axis of the borehole and being provided with rolling disc cutters or rolling discs which, by rotation of the boring head, break material loose when subjected to compressive forces against the rock.
  • the rotation of the boring head is provided by a driv- ing apparatus, typically in the form of one or more electromotors with step-down gearing between the motor(s) and the boring head.
  • an anchoring unit is arranged, which is axially movable on a portion of a frame in the tunnel-boring ma chine and is provided with a set of radially displaceable anchoring feet that can be clamped against a surrounding borehole wall and constitute the anchoring attachments for one or more feeding cylinders that are attached to the anchoring unit and the frame, so that the tunnel-boring machine may be pushed in its longitudinal direction and apply a desired feeding force to the boring head.
  • the frame is provided with a set of supporting roll- ers near the boring head.
  • the supporting rollers rest against the borehole wall and pro vides for the boring head to be stabilized sideways.
  • the anchoring unit is placed behind the supporting rollers and is so arranged that each anchoring foot can be adjusted individ ually.
  • the direction of the boring machine can be given an angular change by pivoting about one or more of the supporting rollers, so that the direction of boring and thereby the direction of the borehole is changed.
  • the data used for setting the desired directional change may come from a directional-control unit placed at some distance be hind the tunnel-boring machine.
  • cuttings that is broken loose by the boring head may be transported away from the boring head by, for example, water flushing and a mechanical transport device suitable for the purpose. The mixture of cuttings and water may be carried into a pumping unit by means of said transport device.
  • the mixture of water and cuttings is carried through pipes or hoses to a collecting point outside the borehole.
  • a transport device (tractor) is arranged in association with the tunnel-boring machine, which makes it possible, by means of electrically or hydraulically driven wheels or track sections, to move the boring machine in the borehole.
  • the wheels or track sections are arranged on radially movable structures which can push the wheels or track sections against the borehole wall to achieve sufficient friction.
  • control unit typically arranged in an operator cabin, and necessary equipment for power supply and for handling cables, hoses and pipes, typically arranged on drums.
  • the invention is defined by the independent claim.
  • the dependent claims define advanta geous embodiments of the invention.
  • the invention relates, more specifically, to a tunnel-boring machine comprising a frame, a rotating boring head with rolling disc cutters supported at a front end of a first frame por tion, and a second, polygonal frame portion extending rearwards from the first frame por- tion, characterized by an anchoring unit, which is provided with several radially movable anchoring feet, being rotationally rigidly arranged on the second frame portion and being arranged to be displaceable in a longitudinal direction of a longitudinal axis of the tunnel boring machine by means of at least one hydraulic feeding cylinder; a transport device, which is arranged to move the tunnel-boring machine in a borehole, being connected to the frame; and the transport device comprising several wheel sets, each wheel set includ ing at least one wheel that is connected to a driving motor, and the wheel sets being sup ported in bogies which are pivotally connected to telescopic structures which are radially displaceable by means of hydraulic cylinders.
  • a transport device may be in association with a pumping unit and be arranged to feed cuttings into the pumping unit.
  • the first frame portion may be provided with several supporting rollers which, by abutment against a surrounding borehole wall, form a pivot point in a change of direction by the tun nel-boring machine by individual radial displacement of the anchoring feet.
  • the wheel sets may form part of a drive-track arrangement. At least one of the wheel sets may include a steered wheel arranged in a wheel attach ment which is pivotable around a king pin by means of a third cylinder.
  • the boring operation may be controllable from an operator cabin outside the borehole.
  • Figure 1 shows a side view of a tunnel-boring machine placed inside a borehole in a rock formation that is shown in section;
  • Figure 2 shows, on a larger scale, a perspective drawing of a tunnel-boring machine with a boring head and an anchoring unit;
  • Figure 3 shows, on a larger scale, anchoring feet in a section of the tunnel-boring machine
  • Figure 4 shows, on a smaller scale, a perspective drawing of the tunnel-boring ma chine with a boring head, an anchoring unit, a tractor and a pumping unit arranged in a borehole that is shown in an axial section;
  • Figure 5 shows, on a larger scale, a perspective drawing of the anchoring feet with displacing devices
  • Figure 6 shows a perspective drawing of a transport device (tractor) connected to the tunnel-boring machine
  • Figure 7 shows a perspective drawing of the transport device provided with wheels
  • Figure 8 shows the transport device in a side view
  • Figure 9 shows a side view of the transport device with steered-wheel support
  • Figure 10 shows a cross section X-X according to figure 8 through the transport de vice;
  • Figure 11 shows, on a smaller scale, a principle drawing of the directional control of the tunnel-boring machine.
  • Figure 12 shows an end view seen in the direction A-A according to figure 11 of the anchoring feet in the activated position.
  • a borehole 2 is bored through a rock formation 1 by means of a tunnel-boring machine 3 which is provided with a boring head 4 with rolling disc cutters 5.
  • the tunnel-boring machine 3 is further provided with a frame 6 comprising a first frame portion 6a, shown here as a portion with a circular cross section, and a sec ond frame portion 6b shown here as a portion with a substantially quadrangular cross sec tion.
  • a driving apparatus (not shown) for rotating the boring head 4 projecting from an end of the first frame portion 6a is installed.
  • the first frame portion 6a is provided with supporting rollers 9 arranged near the boring head 4.
  • the supporting rollers 9 are arranged to rest against a borehole wall 2a formed by the boring head 4, in order thereby to position the boring head 4 radially.
  • Axial feeding force on the boring head 4 is provided by an anchoring unit 7 which is rota- tionally rigidly displaceable on the second frame portion 6b.
  • the anchoring unit 7 is pro vided with several anchoring feet 11, shown here as four anchoring feet 11 , which can be pressed against the borehole wall 2a by means of first hydraulic cylinders 16 in order thereby to form an anchoring for a feeding cylinder 10 connected to the anchoring unit 7 and the frame 6, typically the first frame portion 6a, and arranged to push the frame 6 rela tive to the anchoring unit 7 and thereby relative to the surrounding borehole wall 2a to which the anchoring unit 7 is clamped.
  • the second frame portion 6b provides a travelling path for the anchoring unit 7 with a length adapted to a preferred length of stroke of the feeding sequence, that is to say the length of stroke of the feeding cylinder 10.
  • the sec- ond frame portion is provided with sliding rails 8 against which the anchoring unit 7 is rest ing supportingly.
  • the anchoring unit 7 By the anchoring unit 7 being arranged in a rotationally rigid manner on the polygonal second frame portion, a torque from the boring head 4 may be transmitted to the borehole wall 2a via the anchoring unit 7.
  • the radial displacement of the anchoring feet 11 relative to the frame 6, 6b is provided by means of first and second links 13, 14 connected to the anchoring feet 11 and to a sliding structure 15 via first and second link joints 17, 18 and connected to first hydraulic cylin ders 16 by third link joints 19.
  • the first hydraulic cylinders 16 displace the anchoring feet 11 radially by a displacement of the third link joints 19 relative to the sliding structure 15 in the longitudinal direction of the second frame portion 6b.
  • FIG. 1 , 4 and 6-10 The tunnel-boring machine 3 may be transported in and out through the borehole 2 with a transport device (tractor) 20 placed behind the actual boring machine 3, where it is connected to the second frame portion 6b.
  • a number of wheels 21 form several wheel sets 21a, which are possibly provided with tracks (not shown), and are arranged on bogies 22 which, via bolt connections 23, are articulately supported in telescopic structures 24 that are radially displaceable by means of second hydraulic cylinders 25.
  • the telescopic structures 24 are, in turn, connected to a frame structure 26 (see figures 6 and 7).
  • the wheels 21 are driven by electric or hydraulic motors 27.
  • One of the wheels 28 may be attached to a wheel attachment 31 as a steered wheel pivotably supported on a king pin 29 so that the wheel 28 may be given an angle 32 relative to a longitudinal axis 33 of the tractor. Thereby the direction of motion of the tunnel-boring machine 3 can be controlled during transport in and out.
  • a third hydraulic cylinder 30 controls the direction of the steered wheel 28.
  • the out-transport of cuttings may be carried out with a pumping unit 34 connected to the tunnel-boring machine 3, placed behind the transport device 20 here and with a transport device 35, for example a conveyor belt car rying cuttings from the boring head 4 up into the pumping unit 34. From the pumping unit 34 a mixture of cuttings and added water is pumped out through pipes or hoses 36.
  • Power and control cables run from cable drums 37 outside the borehole 2 in to the tunnel boring machine 3 inside the borehole 2.
  • a cabin 38 for manned operation of the boring operation is placed outside the borehole 2.
  • the direction of the borehole 2 is controlled by the longitudinal axis 33 of the tunnel-boring machine 3 being given an angular dis placement around a pivot point 41 formed by one or more of the supporting rollers 9 ar ranged on the frame 6 near the boring head 4 so that an axis 39 forms an angle 40 with the centre axis of the borehole 2, represented by the earlier position of the longitudinal axis 33 of the tunnel-boring machine 3.
  • the angular displacement is provided by the an- choring feet 11 being set by individual radial movements 42 (see figure 12) in two planes by means of the first hydraulic cylinders 16.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

A tunnel-boring machine (3) comprising a frame (6), a rotating boring head (4) with rolling disc cutters (5) supported at a front end of a first frame portion (6a), a second, polygonal frame portion (6b) extending rearwards from the first frame portion (6a), and a longitudinal axis (33), in which an anchoring unit (7) provided with several radially displaceable anchoring feet (1 1) is arranged in a rotationally rigid manner on the second frame portion (6b), displaceable in the longitudinal direction of the tunnel-boring machine (3) by means of at least one hydraulic feeding cylinder (10), a transport device (20) arranged to move the tunnel-boring machine (3) in a borehole (2) is connected to the frame (6), and the transport device (20) comprises several wheel sets (21 a), each wheel set (21 a) including at least one wheel (21) which is connected to a driving motor (27), and the wheel sets (21 a) being supported in bogies (23) which are pivotably connected to telescopic structures (24) which are radially displaceable by means of hydraulic cylinders (25).

Description

DEVICE AT TUNNEL BORING MACHINE ARRANGED FOR DRILLING OPERATIONS WITHOUT OPERATORS IN THE BOREHOLE
This invention concerns a tunnel-boring machine which is designed and adapted for carry ing out directional-boring operations over long stretches, typically 2-3 k , without opera- tors in the borehole. More particularly, it relates to a tunnel-boring machine comprising a frame, a rotating boring head with rolling disc cutters supported at a front end of a first frame portion, and a second, polygonal frame portion that extends rearwards from the first frame portion.
Today's technology for boring holes through rock formations may, in the main, be divided into two main categories:
• Machines that bore with diameters up to about 1.5 m and are generally operated from a control unit out in the open.
• When the diameter of the borehole is from about 1.5 m and upwards, the ma
chines are operated with operators in the borehole. A machine operator is posi- tioned in an operator cabin connected to the machine itself and controls the ma chine functions.
With today's requirements for safety and HSE, there will be extensive safety measures to meet rules and regulations. An extensive system with ventilation and safe escape routes is expensive, especially for long boreholes. When the machines are arranged for only mi- nor maintenance works inside the borehole, the machines must be transported out for any major repairs. This is demanding and expensive operations, especially in long boreholes.
Directional control of today's unmanned tunnel-boring machines has limitations when the turning radius of the borehole prevents a line of sight from the outside in to the tunnel boring machine. Mass that is broken loose from the boring operation must be transported out by conveyor belts or rail cars. All this requires operators in the borehole for operating and maintaining the equipment.
Today's market asks for cost-effective machine solutions with no operators inside the borehole during the boring operations. From AU708331 B2, a boring machine for boring tunnels of a non-circular cross section is known, the boring machine being provided with two main cutters that each form semi circular side portions of the borehole, whereas upper and lower elongated trimming cut ters take out a straight ceiling portion and a straight floor portion which connect the two semi-circular side portions. The cutters are supported in a front unit which is connected to a rear unit via jacks that provide feeding of the cutters as they work into the material that is to be removed. The rear unit has a sectioned frame, wherein a straight main section may rest on the floor of the tunnel, semi-circular side sections may be clamped against the side walls of the tunnel by means of actuators moving the side sections sideways rela tive to the main section, and a straight top section may be clamped against the ceiling of the tunnel by means of actuators moving the top section sideways relative to the main section.
W02008010189 A2 discloses a mining robot provided with a propulsion system including drive rollers arranged at end portions of two pairs of telescopic legs supporting a robot body on a surface under, possibly under and over, the robot as the legs are pivotable into different positions relative to the robot body. The drive rollers provide for the robot to be able to move in a passage that is defined by said surfaces.
From US2012032494 A1 , a boring machine provided with a boom carrying a cutter head via a rotary joint is known. A frame is provided with a driving apparatus which, via tracks, can provide for movement of the boring machine, and the frame is provided with several devices for anchoring the boring machine to surrounding surfaces during a boring opera tion. The cutter head is pressed against the material that is to be removed, by the boom being moved in its longitudinal direction relative to the clamped frame.
The present invention has for its object to remedy, or at least reduce, one or more of the drawbacks of the prior art. The object is achieved according to the invention through the features that are specified in the description that follows and in the claims.
The invention provides a tunnel-boring machine arranged to bore circular holes through a rock formation, the tunnel-boring machine comprising a boring head (drill bit) rotating around the longitudinal axis of the borehole and being provided with rolling disc cutters or rolling discs which, by rotation of the boring head, break material loose when subjected to compressive forces against the rock. The rotation of the boring head is provided by a driv- ing apparatus, typically in the form of one or more electromotors with step-down gearing between the motor(s) and the boring head.
To provide the necessary push force (feeding force) axially on boring head, an anchoring unit is arranged, which is axially movable on a portion of a frame in the tunnel-boring ma chine and is provided with a set of radially displaceable anchoring feet that can be clamped against a surrounding borehole wall and constitute the anchoring attachments for one or more feeding cylinders that are attached to the anchoring unit and the frame, so that the tunnel-boring machine may be pushed in its longitudinal direction and apply a desired feeding force to the boring head.
To control the direction of the borehole, the frame is provided with a set of supporting roll- ers near the boring head. The supporting rollers rest against the borehole wall and pro vides for the boring head to be stabilized sideways. The anchoring unit is placed behind the supporting rollers and is so arranged that each anchoring foot can be adjusted individ ually. Thereby the direction of the boring machine can be given an angular change by pivoting about one or more of the supporting rollers, so that the direction of boring and thereby the direction of the borehole is changed. The data used for setting the desired directional change may come from a directional-control unit placed at some distance be hind the tunnel-boring machine. cuttings that is broken loose by the boring head may be transported away from the boring head by, for example, water flushing and a mechanical transport device suitable for the purpose. The mixture of cuttings and water may be carried into a pumping unit by means of said transport device.
From the pumping unit, the mixture of water and cuttings is carried through pipes or hoses to a collecting point outside the borehole.
To be able to move the tunnel-boring machine into and out of the borehole, a transport device (tractor) is arranged in association with the tunnel-boring machine, which makes it possible, by means of electrically or hydraulically driven wheels or track sections, to move the boring machine in the borehole. The wheels or track sections are arranged on radially movable structures which can push the wheels or track sections against the borehole wall to achieve sufficient friction.
To prevent the tunnel-boring machine from rotating around the longitudinal axis of the borehole while being moved, it is an advantage if at least one of the driving wheels or one of the track sections is supported in joints so that, by means of a hydraulic cylinder, said wheel or track section can be given a directional change relative to the longitudinal axis of the borehole.
Outside the borehole are placed a control unit, typically arranged in an operator cabin, and necessary equipment for power supply and for handling cables, hoses and pipes, typically arranged on drums. The invention is defined by the independent claim. The dependent claims define advanta geous embodiments of the invention.
The invention relates, more specifically, to a tunnel-boring machine comprising a frame, a rotating boring head with rolling disc cutters supported at a front end of a first frame por tion, and a second, polygonal frame portion extending rearwards from the first frame por- tion, characterized by an anchoring unit, which is provided with several radially movable anchoring feet, being rotationally rigidly arranged on the second frame portion and being arranged to be displaceable in a longitudinal direction of a longitudinal axis of the tunnel boring machine by means of at least one hydraulic feeding cylinder; a transport device, which is arranged to move the tunnel-boring machine in a borehole, being connected to the frame; and the transport device comprising several wheel sets, each wheel set includ ing at least one wheel that is connected to a driving motor, and the wheel sets being sup ported in bogies which are pivotally connected to telescopic structures which are radially displaceable by means of hydraulic cylinders.
A transport device may be in association with a pumping unit and be arranged to feed cuttings into the pumping unit.
The first frame portion may be provided with several supporting rollers which, by abutment against a surrounding borehole wall, form a pivot point in a change of direction by the tun nel-boring machine by individual radial displacement of the anchoring feet.
The wheel sets may form part of a drive-track arrangement. At least one of the wheel sets may include a steered wheel arranged in a wheel attach ment which is pivotable around a king pin by means of a third cylinder. The boring operation may be controllable from an operator cabin outside the borehole.
In what follows, an example of a preferred embodiment is described, which is visualized in the accompanying drawings, in which:
Figure 1 shows a side view of a tunnel-boring machine placed inside a borehole in a rock formation that is shown in section;
Figure 2 shows, on a larger scale, a perspective drawing of a tunnel-boring machine with a boring head and an anchoring unit;
Figure 3 shows, on a larger scale, anchoring feet in a section of the tunnel-boring machine; Figure 4 shows, on a smaller scale, a perspective drawing of the tunnel-boring ma chine with a boring head, an anchoring unit, a tractor and a pumping unit arranged in a borehole that is shown in an axial section;
Figure 5 shows, on a larger scale, a perspective drawing of the anchoring feet with displacing devices; Figure 6 shows a perspective drawing of a transport device (tractor) connected to the tunnel-boring machine;
Figure 7 shows a perspective drawing of the transport device provided with wheels; Figure 8 shows the transport device in a side view; Figure 9 shows a side view of the transport device with steered-wheel support; Figure 10 shows a cross section X-X according to figure 8 through the transport de vice;
Figure 11 shows, on a smaller scale, a principle drawing of the directional control of the tunnel-boring machine; and
Figure 12 shows an end view seen in the direction A-A according to figure 11 of the anchoring feet in the activated position.
Reference is first made to figures 1 to 5. A borehole 2 is bored through a rock formation 1 by means of a tunnel-boring machine 3 which is provided with a boring head 4 with rolling disc cutters 5. The tunnel-boring machine 3 is further provided with a frame 6 comprising a first frame portion 6a, shown here as a portion with a circular cross section, and a sec ond frame portion 6b shown here as a portion with a substantially quadrangular cross sec tion. In the first frame portion 6a, a driving apparatus (not shown) for rotating the boring head 4 projecting from an end of the first frame portion 6a is installed. The first frame portion 6a is provided with supporting rollers 9 arranged near the boring head 4. The supporting rollers 9 are arranged to rest against a borehole wall 2a formed by the boring head 4, in order thereby to position the boring head 4 radially. Axial feeding force on the boring head 4 is provided by an anchoring unit 7 which is rota- tionally rigidly displaceable on the second frame portion 6b. The anchoring unit 7 is pro vided with several anchoring feet 11, shown here as four anchoring feet 11 , which can be pressed against the borehole wall 2a by means of first hydraulic cylinders 16 in order thereby to form an anchoring for a feeding cylinder 10 connected to the anchoring unit 7 and the frame 6, typically the first frame portion 6a, and arranged to push the frame 6 rela tive to the anchoring unit 7 and thereby relative to the surrounding borehole wall 2a to which the anchoring unit 7 is clamped. The second frame portion 6b provides a travelling path for the anchoring unit 7 with a length adapted to a preferred length of stroke of the feeding sequence, that is to say the length of stroke of the feeding cylinder 10. The sec- ond frame portion is provided with sliding rails 8 against which the anchoring unit 7 is rest ing supportingly. By the anchoring unit 7 being arranged in a rotationally rigid manner on the polygonal second frame portion, a torque from the boring head 4 may be transmitted to the borehole wall 2a via the anchoring unit 7.
The radial displacement of the anchoring feet 11 relative to the frame 6, 6b is provided by means of first and second links 13, 14 connected to the anchoring feet 11 and to a sliding structure 15 via first and second link joints 17, 18 and connected to first hydraulic cylin ders 16 by third link joints 19. The first hydraulic cylinders 16 displace the anchoring feet 11 radially by a displacement of the third link joints 19 relative to the sliding structure 15 in the longitudinal direction of the second frame portion 6b. Reference is now made to figures 1 , 4 and 6-10. The tunnel-boring machine 3 may be transported in and out through the borehole 2 with a transport device (tractor) 20 placed behind the actual boring machine 3, where it is connected to the second frame portion 6b. A number of wheels 21 form several wheel sets 21a, which are possibly provided with tracks (not shown), and are arranged on bogies 22 which, via bolt connections 23, are articulately supported in telescopic structures 24 that are radially displaceable by means of second hydraulic cylinders 25. The telescopic structures 24 are, in turn, connected to a frame structure 26 (see figures 6 and 7). The wheels 21 are driven by electric or hydraulic motors 27.
Reference is now made to figure 9. One of the wheels 28 may be attached to a wheel attachment 31 as a steered wheel pivotably supported on a king pin 29 so that the wheel 28 may be given an angle 32 relative to a longitudinal axis 33 of the tractor. Thereby the direction of motion of the tunnel-boring machine 3 can be controlled during transport in and out. A third hydraulic cylinder 30 controls the direction of the steered wheel 28.
Reference is again made to figures 1 and 4. The out-transport of cuttings may be carried out with a pumping unit 34 connected to the tunnel-boring machine 3, placed behind the transport device 20 here and with a transport device 35, for example a conveyor belt car rying cuttings from the boring head 4 up into the pumping unit 34. From the pumping unit 34 a mixture of cuttings and added water is pumped out through pipes or hoses 36.
Power and control cables run from cable drums 37 outside the borehole 2 in to the tunnel boring machine 3 inside the borehole 2.
A cabin 38 for manned operation of the boring operation is placed outside the borehole 2.
Reference is now made to figures 11 and 12. The direction of the borehole 2 is controlled by the longitudinal axis 33 of the tunnel-boring machine 3 being given an angular dis placement around a pivot point 41 formed by one or more of the supporting rollers 9 ar ranged on the frame 6 near the boring head 4 so that an axis 39 forms an angle 40 with the centre axis of the borehole 2, represented by the earlier position of the longitudinal axis 33 of the tunnel-boring machine 3. The angular displacement is provided by the an- choring feet 11 being set by individual radial movements 42 (see figure 12) in two planes by means of the first hydraulic cylinders 16.
It should be noted that all the above-mentioned embodiments illustrate the invention, but do not limit it, and persons skilled in the art may construct many alternative embodiments without departing from the scope of the attached claims. In the claims, reference numbers in brackets are not to be regarded as restrictive.
The use of the verb "to comprise" and its different forms does not exclude the presence of elements or steps that are not mentioned in the claims. The indefinite article "a" or "an" before an element does not exclude the presence of several such elements.
The fact that some features are indicated in mutually different dependent claims does not indicate that a combination of these features cannot be used with advantage.

Claims

C l a i m s
1. A tunnel-boring machine (3) comprising
a frame (6)
a rotating boring head (4) with rolling disc cutters (5) supported at a front end of a first frame portion (6a), and
a second, polygonal frame portion (6b) extending rearwards from the first frame portion (6a), c h a r a c t e r i z e d i n that
an anchoring unit (7) which is provided with several radially displaceable anchoring feet (11) is arranged in a rotationally rigid manner on the second frame portion (6b) and is arranged to be displaceable in a longitudinal direction of a longitudinal axis (33) of the tunnel-boring machine (3) by means of at least one hydraulic feeding cylinder (10);
a transport device (20), which is arranged to move the tunnel-boring ma chine (3) in a borehole
(2), is connected to the frame (6); and
the transport device (20) comprises several wheel sets (21a), each wheel set (21a) including at least one wheel (21) that is connected to a driving motor (27), and the wheel sets (21a) are supported in bogies (23) which are pivotably connected to telescopic structures (24) which are radially displaceable by means of hydraulic cylinders (25).
The tunnel-boring machine (3) according to claim 1 , wherein a transport device (35) is connected to a pumping unit (34) and is arranged to feed mcuttings into the pumping unit (34).
3. The tunnel-boring machine (3) according to claim 1 , wherein the first frame por tion (6a) is provided with several supporting rollers (9) which, by abutment against a surrounding borehole wall, form a pivot point (41) by a directional change (40) of the tunnel-boring machine (3) by individual radial displacement of the anchoring feet (11).
4. The tunnel-boring machine (3) according to claim 1 , wherein the wheel sets (21a) form part of a drive-track arrangement.
5. The tunnel-boring machine (3) according to claim 1 , wherein at least one of the wheel sets (21a) comprises a steered wheel (28) arranged in a wheel attach ment (31) which is pivotable around a king pin (29) by means of a third cylinder (30).
6. The tunnel-boring machine (3) according to claim 1 , wherein the boring opera tion is controllable from an operator cabin (38) outside the borehole (2).
EP18898967.7A 2018-01-02 2018-12-18 Device at tunnel boring machine arranged for drilling operations without operators in the borehole Active EP3735514B1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
NO20180005 2018-01-02
NO20181428A NO20181428A1 (en) 2018-01-02 2018-11-07 Device at the tunnel drill adapted for drilling operations without manning inside the borehole
PCT/NO2018/050314 WO2019135682A1 (en) 2018-01-02 2018-12-18 Device at tunnel boring machine arranged for drilling operations without operators in the borehole

Publications (3)

Publication Number Publication Date
EP3735514A1 true EP3735514A1 (en) 2020-11-11
EP3735514A4 EP3735514A4 (en) 2021-12-08
EP3735514B1 EP3735514B1 (en) 2023-02-15

Family

ID=67432570

Family Applications (1)

Application Number Title Priority Date Filing Date
EP18898967.7A Active EP3735514B1 (en) 2018-01-02 2018-12-18 Device at tunnel boring machine arranged for drilling operations without operators in the borehole

Country Status (2)

Country Link
EP (1) EP3735514B1 (en)
NO (1) NO20181428A1 (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB254839A (en) * 1925-05-08 1926-07-15 Douglas Whitaker Improvements in or relating to tunnelling machines
GB894206A (en) * 1958-08-11 1962-04-18 Bade & Co Gmbh A mine tunnelling machine
FR1254331A (en) * 1960-04-16 1961-02-17 Goodman Mfg Co Improvements to tunnel boring machines
US3485309A (en) * 1967-08-08 1969-12-23 Alkirk Inc Earth boring apparatus
US3784257A (en) * 1972-02-16 1974-01-08 Atlas Copco Ab Steering system for a tunnel boring machine
NO317774B1 (en) * 2003-03-11 2004-12-13 Sira Kvina Kraftselskap Device by rock drill
WO2008010189A2 (en) * 2006-07-18 2008-01-24 Gfl Mining Services Ltd Vehicle
NO333300B1 (en) * 2008-06-05 2013-04-29 Norwegian Hard Rock Drilling As Device by rock drill
NO333280B1 (en) * 2009-05-06 2013-04-29 Norwegian Hard Rock Drilling As Control device for rock drill.

Also Published As

Publication number Publication date
EP3735514A4 (en) 2021-12-08
NO20181428A1 (en) 2019-07-03
EP3735514B1 (en) 2023-02-15

Similar Documents

Publication Publication Date Title
RU2753485C2 (en) Machine carrying a rock cutting device
CA2705842C (en) Heading machine
US11434762B2 (en) Mobile underground tunnel borer arrangement
US2684834A (en) Horizontal boring machine
CN114127382A (en) Square drill rod assembly for drilling equipment and method for ground processing
WO2009105005A1 (en) Boom arrangement for a rock drill and rock drill rig
US3951215A (en) Mobile drilling and bolting machine
CN108166925A (en) A kind of gob side entry retaining joint-cutting and anchor cable drill carriage
US3399738A (en) Raise driver
US2734723A (en) Ttnttfn
US5113969A (en) Displaceable working platform with extensible boom
WO2019135682A1 (en) Device at tunnel boring machine arranged for drilling operations without operators in the borehole
EP3735514B1 (en) Device at tunnel boring machine arranged for drilling operations without operators in the borehole
AU708156B2 (en) Underground mining drill rig
RU2695196C2 (en) Installation for drilling of rock and method of side installation in predetermined position of drilling device
EP1685309B1 (en) Boring rig
US9810024B2 (en) Drill system
CN111684143B (en) Tunneling combination machine with sharp-angle cutter
CA1183556A (en) Method and apparatus for rock mining
US2822159A (en) Shaft or tunnel boring apparatus
US5390983A (en) Roadbed profiler and method of profiling
CN113738338B (en) Automatic drilling angle adjusting system, drilling work mechanism and mine drill carriage
RU2126888C1 (en) Heading machine
CN113931666A (en) Anchor cable beam construction device and method
CN117703264A (en) Miniature raise boring machine

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200610

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NORHARD ASSET AS

A4 Supplementary search report drawn up and despatched

Effective date: 20211109

RIC1 Information provided on ipc code assigned before grant

Ipc: E21B 10/12 20060101ALI20211103BHEP

Ipc: E21B 7/06 20060101ALI20211103BHEP

Ipc: E21B 7/04 20060101ALI20211103BHEP

Ipc: E21B 7/00 20060101ALI20211103BHEP

Ipc: E21B 4/18 20060101ALI20211103BHEP

Ipc: E21B 3/00 20060101ALI20211103BHEP

Ipc: E21D 9/11 20060101ALI20211103BHEP

Ipc: E21D 9/10 20060101AFI20211103BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20221111

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018046277

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1548314

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230315

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20230215

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1548314

Country of ref document: AT

Kind code of ref document: T

Effective date: 20230215

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230615

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230515

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230615

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230516

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602018046277

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231213

Year of fee payment: 6

26N No opposition filed

Effective date: 20231116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230215

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20231214

Year of fee payment: 6

Ref country code: IT

Payment date: 20231121

Year of fee payment: 6

Ref country code: FR

Payment date: 20231221

Year of fee payment: 6

Ref country code: DE

Payment date: 20231220

Year of fee payment: 6