EP3722553A1 - Système de commande sous-marin - Google Patents

Système de commande sous-marin Download PDF

Info

Publication number
EP3722553A1
EP3722553A1 EP19167734.3A EP19167734A EP3722553A1 EP 3722553 A1 EP3722553 A1 EP 3722553A1 EP 19167734 A EP19167734 A EP 19167734A EP 3722553 A1 EP3722553 A1 EP 3722553A1
Authority
EP
European Patent Office
Prior art keywords
subsea
control system
energy
energy storage
supply line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP19167734.3A
Other languages
German (de)
English (en)
Other versions
EP3722553B1 (fr
Inventor
Kristian MIKALSEN
Tom Grimseth
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NOV Process and Flow Technologies AS
Original Assignee
NOV Subsea Products AS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NOV Subsea Products AS filed Critical NOV Subsea Products AS
Priority to EP19167734.3A priority Critical patent/EP3722553B1/fr
Publication of EP3722553A1 publication Critical patent/EP3722553A1/fr
Application granted granted Critical
Publication of EP3722553B1 publication Critical patent/EP3722553B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/02Surface sealing or packing
    • E21B33/03Well heads; Setting-up thereof
    • E21B33/035Well heads; Setting-up thereof specially adapted for underwater installations
    • E21B33/0355Control systems, e.g. hydraulic, pneumatic, electric, acoustic, for submerged well heads
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/16Control means therefor being outside the borehole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells
    • E21B43/121Lifting well fluids
    • E21B43/122Gas lift

Definitions

  • the present invention relates to a system and method for controlling a subsea device, such as a subsea isolation valve.
  • Subsea devices such as subsea isolation valves (SSIV), isolation valves for gas lift and isolation valves for MEG injection are commonly used in the interface between the wet end of a riser and a flowline.
  • SSIVs are used with risers, in particular dynamic risers, for the purpose of protecting a platform in case of fire, acting as a safety valve preventing gas from the export line from fueling the fire. From a safety analysis perspective SSIVs are not always legally required; however, operators are willing to protect the platform and the personnel at considerable cost. This is part of the strategy for prevention of major hazards.
  • SSIVs are traditionally controlled by direct hydraulic operation from a topside hydraulic power unit (HPU) via a dedicated control riser.
  • the control riser may have one or several hydraulic conduits, often also electrical cables for instrumentation, mostly valve position but also pressure.
  • a drawback with the traditional control system is the response time. This is a function of conduit size, conduit elasticity, fluid viscosity and the force provided by the emergency shutdown (ESD) return spring.
  • Slug detectors pressure sensor
  • a combination of a dynamic topside choke and a subsea slug detector can be used to manage slugs dynamically.
  • a dedicated control riser for only the purpose of providing slug detection is usually prohibitively costly.
  • An objective of the present invention is to provide an improved system for controlling subsea units (such as SSIVs, slug detectors, isolation valves for gas lift and isolation valves for MEG injection) which solves one or more of the identified drawbacks.
  • subsea units such as SSIVs, slug detectors, isolation valves for gas lift and isolation valves for MEG injection
  • the invention relates to a subsea control system for controlling a subsea device, wherein the control system comprises: a subsea control circuit for operating the subsea device, a subsea energy storage for providing energy to the subsea control circuit, a signal transmitter and a signal receiver arranged to provide signals to the subsea control circuit, and a flexible production riser.
  • the flexible production riser comprises: an outer sheath, a bore, and an energy supply line embedded between said outer sheath and bore and suitable for providing energy to the subsea energy storage.
  • An advantage of this control system is that the response time for operating the subsea device is reduced compared to previous control systems.
  • An advantage of this control system being independent of the size of the energy supply line is that it allows the inner diameter (ID) of the energy supply line to be reduced compared to previous energy supply lines.
  • An advantage of this control system having an energy supply line with a reduced ID is that it is less exposed to fatigue than larger conduits.
  • An advantage of this control system having an energy supply line with a reduced ID is that it may be embedded in a production riser in a cost-efficient manner.
  • An advantage of this control system having embedded the energy supply line in the production riser is that the cost of a separate energy supply riser is eliminated.
  • An advantage of this control system having embedded the energy supply line in the production riser is that a riser slot is made available.
  • the flexible production riser may comprise a signal line embedded between the outer sheath and the bore for providing communication between the signal transmitter and the signal receiver, wherein the signal line optionally may be the energy supply line.
  • control system which in addition to communicating wireless by means of radio or acoustic signals between the signal transmitter and the signal receiver may also communicate by cable by means of hydraulic, electric, optical, pneumatic, or similar signals.
  • the signal line may be a conduit similar to the energy supply line, and thus be embedded in the production riser in a cost-efficient manner.
  • An advantage of this control system having combined the signal line and the energy supply line is that one less line is required, or a line is made available.
  • the signal transmitter and the signal receiver may be arranged to provide signals from the subsea control circuit.
  • control system having two-way communication is that in addition to commanding operations of the subsea device, the control system may monitor the status of the control circuit and in particular the status of the subsea device.
  • the subsea device may be a subsea isolation valve, an isolation valve for gas lift or an isolation valve for MEG injection.
  • the energy supply line may be a hydraulic line with an inner diameter of less than 10 mm, preferably between 4-8 mm and more preferably 5-6 mm.
  • the subsea energy storage may be a hydraulic accumulator.
  • the subsea control circuit may comprise: a directional control valve, an actuator, and an outlet to sea.
  • the directional control valve is in fluid communication with the energy storage, the actuator and the outlet to sea.
  • the directional control valve comprises the signal receiver and is arranged to control the fluid flow between the energy storage and the actuator and the fluid flow between the actuator and the outlet to sea.
  • the actuator is arranged to drive the subsea device.
  • the signal line may be a hydraulic line.
  • control system which is hydraulically powered, but may be controlled by means of hydraulic, electric, optic, pneumatic, acoustic, radio or similar signals.
  • the energy supply line may be an electrical AC cable or an electrical DC cable with an outer diameter of less than 9 mm, preferably between 3-7 mm and more preferably 4-5 mm.
  • the electrical AC/DC cable may be a single-phase conductor and the flexible riser may have an electrical conductive armor which serves as a return conductor.
  • An advantage of the energy supply line with a reduced cross-section is that it is less stiff and that it frees up space in the production riser.
  • the subsea energy storage may be a battery, a capacitor or a combination thereof.
  • the subsea control circuit comprises: a digital control unit, an electric actuator, and variable speed drive.
  • the electrical control unit is in electrical communication with the energy supply line and in electrical communication with the energy storage.
  • the variable speed drive is in electrical communication with the energy storage and arranged to drive the electrical actuator.
  • the electrical actuator is arranged to drive the subsea device.
  • the electrical control unit comprises the signal receiver and arranged to transmit signals to the variable speed drive.
  • the signal line may be an electrical or optical line.
  • An advantage of this control system is that it is suitable for redundancy arrangements which may enhance the safety integrity level (SIL) rating radically.
  • SIL safety integrity level
  • the invention relates to a method for controlling a subsea device by means of a control system, wherein the control system comprises: a subsea control circuit for operating the subsea device, a subsea energy storage for providing energy to the subsea control circuit, a signal transmitter and a signal receiver for providing signals to the subsea control circuit, and a flexible production riser.
  • the flexible production riser may comprise: an outer sheath, a bore, and an energy supply line embedded between said outer sheath and bore and suitable for providing energy to the subsea energy storage.
  • the method comprises the steps of: charging the subsea energy storage by means of the energy supply line at a rate of 5-30 % of the subsea energy storage capacity per hour, preferably 10-25 %, more preferably 10-20 %; communicating with the subsea control circuit by means of the signal transmitter and the signal receiver; and operating the subsea device by means of the control circuit.
  • the invention relates to a system for controlling a subsea slug detector, wherein the control system comprises: a subsea control circuit for operating the subsea slug detector; and a flexible production riser.
  • the flexible production riser comprises: an outer sheath, a bore, an energy supply line embedded between said outer sheath and bore and suitable for providing energy to the subsea slug detector, and a signal line for transmitting a signal to and from the subsea slug detector.
  • the energy supply line optionally may be the signal line.
  • Fig. 1 shows the schematic of a fully hydraulic control system. This control system is used to control a subsea device 150 from topside 110.
  • the subsea device 150 is a valve. Relevant valve usage may be subsea isolation valves (SSIV), isolation valves for gas lift, isolation valves for MEG injection or similar.
  • the subsea device 150 in this case the valve, is operated by a control circuit 140 which is also located subsea, preferably as close to the subsea device 150 as possible.
  • the control circuit 140 comprise a plurality of interconnected components arranged to operate the subsea device 150.
  • An energy storage 130 is also located subsea, preferably as close to the subsea control circuit 140 as possible or even more preferably incorporated in the subsea control circuit 140.
  • This subsea energy storage 130 provides energy to the subsea control circuit 140 such that the subsea control circuit 140 may operate the subsea device 150.
  • the subsea energy storage 130 is a hydraulic accumulator. Several hydraulic accumulators may be used in parallel. Energy is provided to the subsea energy storage 130 through an energy supply line 121, i.e. a hydraulic energy supply line.
  • the subsea control circuit 140 is controlled from topside 110 by means of a signal transmitter located topside 110 which communicates with a signal receiver located subsea, part of the directional control valve (DCV) 142.
  • DCV directional control valve
  • the signal is in the form of a hydraulic pressure change.
  • the transmitter and receiver are then communicating through a signal line 122, i.e. a hydraulic line.
  • This hydraulic signal line and the hydraulic energy supply line are in these cases separate lines.
  • Prior art control systems have a direct operation of the subsea device 150, i.e. one or several energy supply lines 121 are connected directly to the subsea device 150 and no signal lines 122 are used.
  • a flexible production riser 120 extends from topside 110 to the subsea control circuit 140.
  • Such a flexible production riser 120 typically has a bore and an outer sheath.
  • the signal line 122 and/or the energy supply line 121 may be embedded between said outer sheath and said bore.
  • the energy supply line 121 may have a smaller ID than conventional energy supply lines 121.
  • the energy supply line 121 will gradually build up the energy level in the subsea energy storage 130.
  • the subsea energy storage 130 will have the capacity to store a sufficient amount of energy to operate the subsea device 150.
  • the subsea energy storage 130 may also have the capacity to supply energy to the subsea device 150 at a rate enabling it to operate within a required response time, e.g. in the event of an emergency shut down (ESD). In this way the energy supply line 121 may supply energy at a lower rate than what's required to operate the subsea device 150, i.e.
  • the response time of the subsea device 150 is no longer related to the supply line 121 size.
  • the subsea device 150 in the form of a valve may be closed by the biasing spring illustrated inside the actuator when the applied pressure in the actuator is bled off through the outlet to sea 143.
  • the subsea energy storage 130 may be a pneumatic accumulator. This requires that the energy supply line 121 is a pneumatic energy supply line 121.
  • the energy supply line 121 may be a conduit with an inner diameter (ID) less than 10 mm.
  • ID could preferably be even smaller, in the range of 4-8 mm or 5-6 mm. Such small conduits will have little impact on the riser production cost.
  • the charging rate of the subsea energy storage 130 in the form of an accumulator depends on the ID of the energy supply line 121 in the form of a hydraulic conduit. Said charging rate will increase with a larger ID.
  • the charging rate of the subsea energy storage 130 will also depend on the capacity of the subsea energy storage 130.
  • the capacity of the subsea energy storage 130 is scaled depending on the subsea device 150. Even though a high charge rate may be desirable, the ID of the energy supply line 121 should not be compromised. 10-15 % of the subsea energy storage 130 capacity per hour or 15-20% of the subsea energy storage 130 capacity per hour may be typical charging rates.
  • the size and/or number of accumulators is selected to provide sufficient energy to close and open the valve at least one time, preferably 5-10 times, providing sufficient flexibility in the use of the subsea device 150 considering that it may take hours to recharge the accumulator through the energy supply line 121.
  • the hydraulic subsea control circuit 140 in the embodiment of Fig. 1 comprises a hydraulically piloted directional control valve (DCV), an actuator and an outlet to sea 143.
  • DCV hydraulically piloted directional control valve
  • the actuator is in this embodiment hydraulically operated and arranged to drive the subsea device 150.
  • the actuator may be provided with a spring biasing the actuator to a default position, e.g. to provide fail safe close functionality.
  • the DCV 142 has a 3/2 configuration, meaning that it has three inlet/outlet ports and two valve positions.
  • the firs port is in fluid communication with the subsea energy storage 130
  • the second port is in fluid communication with the actuator
  • the third port is in fluid communication with the outlet to sea 143.
  • the first valve position connects the subsea energy storage 130 and the actuator while shutting off the outlet to sea 143.
  • the second valve position connects the actuator and the outlet to sea 143 while shutting off the subsea energy storage 130.
  • the DCV 142 may comprise the signal receiver. When the signal receiver comprised by the DCV 142 receives a signal from the signal transmitter, it may be arranged to operate the DCV 142 from the first valve position to the second valve position or vice versa.
  • the subsea storage 130, the DCV 142, the actuator and the outlet to sea 143 may be interconnected by means of a conduit with a larger ID than the energy supply line 121.
  • the actuator 141 In the first valve position, wherein the subsea energy storage 130 and the actuator 141 are connected, the actuator 141 will receive energy in the form of hydraulic pressure from the subsea energy storage 130. Said hydraulic pressure will cause the actuator 141 to operate the subsea device 150, e.g. open/close valve. In the second valve position, wherein the actuator and the outlet to sea 143 are connected, the applied hydraulic pressure will be vented through the outlet to sea 143. Due to the loss of pressure, the actuator 141 will be returned to its default position by the spring; thus, operating the subsea device 150 accordingly.
  • the DCV 142 will typically have a default position in which the subsea energy storage is disconnected from the actuator.
  • the outlet to sea 143 is arranged to drain the hydraulic pressure from the actuator 141 within the response requirements for emergency shut down (ESD) closure time.
  • Response time in this embodiment relates to the DCV 142 shifting from one valve position to another valve position, a bleed back of a volume of 2-4 cm 3 , which is in the seconds domain.
  • the response time relates to the bleed back of the volume of the actuator 141, typically 10 liters for a 10 inch valve and 25 liters for a 40 inch valve (1 inch equals 25,4 mm). This volume must be returned through the energy supply line 121, in which case 2-3 minutes for ESD is often accepted but can be difficult to achieve with lines of a reasonable size.
  • Fig. 2 shows the schematic of a partly hydraulic control system. This control system is also used to control a subsea device 250 from topside 210.
  • the embodiment of Fig. 2 is different from the embodiment of Fig. 1 in that it has a different type of communication between the signal transmitter and the signal receiver. Furthermore, the embodiment of Fig. 2 has a different type of DCV 242 than the embodiment of Fig. 1 .
  • the signal may be in the form of a radio signal, an electrical signal, an optical signal or an acoustic signal.
  • the transmitter and receiver may then communicate wirelessly or through a signal line 222, e.g. an electric line.
  • the signal line 222 may be embedded between the outer sheath and the bore of the flexible production riser 220. Such signal lines 222 and the hydraulic energy supply line 221 are in these cases separate lines.
  • Similar conduits as those described as energy supply lines 121 in Fig. 1 may be used to house the signal line 222.
  • the DCV 242 of Fig. 2 has a 4/2 configuration, meaning that it has four inlet/outlet ports and two valve positions.
  • the firs port is in fluid communication with the subsea energy storage 230
  • the second port is in fluid communication with a first side of the actuator 241
  • the third port is in fluid communication with a second side of the actuator 241
  • the fourth port is in fluid communication with the outlet to sea 243.
  • the first valve position connects the subsea energy storage 230 with the first side of the actuator 241 while connecting the second side of the actuator 241 with the return to sea 243.
  • the second valve position connects the subsea energy storage 230 with the second side of the actuator 241 while connecting the first side of the actuator 241 with the outlet to sea 243.
  • the accumulator energy is used to operate the actuator 241 in both directions, i.e. the actuator 241 is bidirectional, making the biasing spring superfluous.
  • the bidirectional actuator 241 (4/2 configuration) may have a shorter response time than the 3/2 configuration.
  • the bidirectional actuators 241 may be set up to have fail-to-last position functionality.
  • Fig. 3 shows the schematic of a digital control system. This control system is also used to control a subsea device 350 from topside 310.
  • the subsea device 350 is a valve. Relevant valve usage may be subsea isolation valves (SSIV), isolation valves for gas lift, isolation valves for MEG injection or similar.
  • the subsea device 350 in this case the valve, is operated by a digital control circuit 340 which is also located subsea, preferably as close to the subsea device 340 as possible.
  • An energy storage 330 is also located subsea, preferably as close to the control circuit 340 as possible or even more preferably incorporated in the control circuit 340. This subsea energy storage 330 provides energy to the control system such that the control system may operate the subsea device 350.
  • a digital control circuit 340 which is also located subsea, preferably as close to the subsea device 340 as possible.
  • An energy storage 330 is also located subsea, preferably as close to the control circuit 340 as possible or even more preferably incorporated in the control circuit 340. This subsea energy storage 330 provides energy to
  • the subsea energy storage 330 is a battery, e.g. a lithium-ion battery. Several batteries may be used in series or in parallel. Energy is provided to the subsea energy storage 330 through an energy supply line 321, i.e. an electric energy supply line.
  • the subsea control circuit 340 is controlled from topside 310 by means of a signal transmitter located topside 310 which communicates with a signal receiver located subsea.
  • the signal may be in the form of a radio signal, electrical signal, optical signal or acoustic signal.
  • the transmitter and receiver may then communicate wirelessly or through a signal line 322, e.g. an electric line.
  • a flexible production riser 320 extends from topside to the subsea control circuit.
  • Such a flexible production riser 320 typically has a bore and an outer sheath.
  • the signal line 322 and/or the energy supply line 321 may be embedded between said outer sheath and said bore.
  • the energy supply line 321 may have a smaller ID than conventional energy supply lines 321.
  • the energy supply line 321 will gradually charge the energy level in the subsea energy storage 330.
  • the subsea energy storage 330 will have the capacity to store a sufficient amount of energy to operate the subsea device 350.
  • the subsea energy storage 330 may also have the capacity to supply energy to the subsea device 350 at a rate enabling it to operate within a required response time, e.g. in the event of an emergency shut down (ESD). In this way the energy supply line 321 may supply energy at a lower rate than what's required to operate the subsea device 350, i.e. the response time of the subsea device 350 is no longer related to the supply line 321 size.
  • Similar conduits as those described as energy supply lines 121 in Fig. 1 may be embedded in the flexible production riser 320 to house the signal line 322 and/or electrical energy supply line 321.
  • This energy supply line 321 may be a cable with an outer diameter (OD) less than 9 mm. The OD could preferably be even smaller, in the range of 3-7 mm or 4-5 mm. Such small cables will have little impact on the riser production cost.
  • the charging rate of the subsea energy storage 330 in the form of a battery depends on the cross-section of the energy supply line 321 in the form of an electrical cable. Said charging rate will increase with a larger cross-section.
  • the charging rate of the subsea energy storage 330 will also depend on the capacity of the subsea energy storage 330.
  • the capacity of the subsea energy storage 330 is scaled depending on the subsea device 350. Even though a high charge rate may be desirable, the cross-section (and thus the outer diameter) of the energy supply line 321 should not be compromised. 10-15 % of the subsea energy storage 330 capacity per hour or 15-20% of the subsea energy storage 330 capacity per hour may be typical charging rates.
  • the electrical signal line 322 and the energy supply line 321 may be the same line.
  • An electrical control signal may be run into the power line, e.g. as a 100 kHz signal superimposed on the regular 60 Hz AC power feed.
  • the flexible production riser 320 may comprise a pipe armor. Energy may be delivered by a single electrically isolated line with current return via said pipe armor.
  • the electrical energy supply line 321 may be an electrical AC cable or an electrical DC cable.
  • the subsea energy storage 330 may be a capacitor, or it may even be a combination of a battery and a capacitor.
  • the digital subsea control circuit 340 in the embodiment of Fig. 3 comprises a digital control unit 344, a variable speed drive (VSD) 345 and an actuator 341 in the form of a motor.
  • VSD variable speed drive
  • energy is supplied through the energy supply line 321 in the flexible production riser 320.
  • the energy supply line 321 terminates in the digital control unit 344 which route the energy to the subsea energy storage 330, in this case a battery, a capacitor or a combination thereof. Some of the energy supplied by the energy supply line 321 is used to power the digital control unit 344.
  • the digital control unit 344 also comprise the signal receiver which may receive signals from the topside signal transmitter, either wirelessly or by means of the signal line 322. If the signal line 322 and the energy supply line 321 is the same line, the digital control unit 344 will split the energy from the signal.
  • the energy supply line 321 may terminate in the subsea energy storage 330.
  • the digital control unit 344 should then be connected to and powered by the subsea energy storage 330.
  • the digital control unit 344 should still comprise the signal receiver.
  • the digital control unit 340 may comprise a signal transmitter which communicates with a signal receiver located topside 310.
  • An example of information sent from the digital control unit 340 to topside 310 may be the status of or information from the subsea device 350, e.g. valve status, pressure/temperature readings, slug detection or similar.
  • the digital control unit 344 In order for the digital control unit 344 to transmit the status of or information from the subsea device 350, the digital control unit 344 must communicate with the subsea device 350. This may be done by means of an additional set of signal transmitter and signal receiver as already described.
  • the digital control unit 344 may be programmed to execute specific commands as a response to certain readings from the subsea device 350, such as open/close a valve if a triggering value is observed.
  • a variable speed drive (VSD) 345 is connected to and receives signals from the digital control unit 344. This may be done by means of an additional set of signal transmitter and signal receiver as already described.
  • the VSD 345 is connected to and receives energy from the subsea energy storage 330. On signal from the digital control unit 344, the VSD 345 will transform received electric energy into 3-phase current and rout it to a connected electric actuator 341, in this case a rotary electric motor.
  • the electric actuator 341 is connected to and drives the subsea device 350. Status of and readings from the electric actuator 341 may also be communicated to the digital control unit 344. This may be done by means of an additional set of signal transmitter and signal receiver as already described.
  • the control system may not need a subsea energy storage 330.
  • a slug detector doesn't require periods of increased energy supply and the steady supply of energy required by the slug detector may be a provided by the above-mentioned energy supply line 321. Operation of a slug detector requires simply a 4-20 mA circuit and thus a marginal cross section of copper. A twisted pair embedded in a tube for protection would be suitable. Coax is effective in cross section and signal immunity but difficult to terminate and for that reason has never been used extensively in the subsea industry.
  • control systems may also have several subsea components, e.g. a slug detector and a SSIV.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Fluid-Pressure Circuits (AREA)
EP19167734.3A 2019-04-08 2019-04-08 Système de commande sous-marin Active EP3722553B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP19167734.3A EP3722553B1 (fr) 2019-04-08 2019-04-08 Système de commande sous-marin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP19167734.3A EP3722553B1 (fr) 2019-04-08 2019-04-08 Système de commande sous-marin

Publications (2)

Publication Number Publication Date
EP3722553A1 true EP3722553A1 (fr) 2020-10-14
EP3722553B1 EP3722553B1 (fr) 2022-06-22

Family

ID=66102445

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19167734.3A Active EP3722553B1 (fr) 2019-04-08 2019-04-08 Système de commande sous-marin

Country Status (1)

Country Link
EP (1) EP3722553B1 (fr)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5544672A (en) * 1993-10-20 1996-08-13 Atlantic Richfield Company Slug flow mitigation control system and method
US6192680B1 (en) * 1999-07-15 2001-02-27 Varco Shaffer, Inc. Subsea hydraulic control system
WO2004057153A1 (fr) * 2002-12-23 2004-07-08 Norsk Hydro Asa Systeme et procede de prediction et de traitement de bouchons en formation dans un conduit d'ecoulement ou une colonne de production
US20040216884A1 (en) * 2003-05-01 2004-11-04 Cooper Cameron Corporation Subsea choke control system
WO2011017280A1 (fr) * 2009-08-02 2011-02-10 Cameron International Corporation Système et procédé de montage d'étiquette d'identification à fréquence radio de segment de colonne montante
GB2501094A (en) * 2012-04-11 2013-10-16 Managed Pressure Operations Method of handling a gas influx in a riser
US20150034384A1 (en) * 2012-03-12 2015-02-05 Managed Pressure Operations Pte. Ltd. Method of and apparatus for drilling a subterranean wellbore

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5544672A (en) * 1993-10-20 1996-08-13 Atlantic Richfield Company Slug flow mitigation control system and method
US6192680B1 (en) * 1999-07-15 2001-02-27 Varco Shaffer, Inc. Subsea hydraulic control system
WO2004057153A1 (fr) * 2002-12-23 2004-07-08 Norsk Hydro Asa Systeme et procede de prediction et de traitement de bouchons en formation dans un conduit d'ecoulement ou une colonne de production
US20040216884A1 (en) * 2003-05-01 2004-11-04 Cooper Cameron Corporation Subsea choke control system
WO2011017280A1 (fr) * 2009-08-02 2011-02-10 Cameron International Corporation Système et procédé de montage d'étiquette d'identification à fréquence radio de segment de colonne montante
US20150034384A1 (en) * 2012-03-12 2015-02-05 Managed Pressure Operations Pte. Ltd. Method of and apparatus for drilling a subterranean wellbore
GB2501094A (en) * 2012-04-11 2013-10-16 Managed Pressure Operations Method of handling a gas influx in a riser

Also Published As

Publication number Publication date
EP3722553B1 (fr) 2022-06-22

Similar Documents

Publication Publication Date Title
US11795776B2 (en) Manifolds for providing hydraulic fluid to a subsea blowout preventer and related methods
US6595487B2 (en) Electric actuator
US8020623B2 (en) Control module for subsea equipment
US8708054B2 (en) Dual path subsea control system
AU2013254435B2 (en) Oilfield apparatus and methods of use
US20020100589A1 (en) Methods and apparatus for hydraulic and electro-hydraulic control of subsea blowout preventor systems
EP2554785B1 (fr) Soupape de sécurité avec aménagements pour alimenter un insert de soupape de sécurité
EP3330478A1 (fr) Actif de système de puits intégré et protection contre la pression à intégrité élevée
US20070007001A1 (en) Redundant systems for downhole permanent installations
EP2554786B1 (fr) Soupape de sécurité à insert actionnée électriquement
BR102015027504A2 (pt) equipamento para sistema de controle de fluxo de fundo de poço exclusivamente elétrico
JP2016538493A6 (ja) 液圧流体を海中噴出防止装置に提供するマニホールドおよび関連方法
US20120175125A1 (en) Subsea pod pump
WO2010126777A1 (fr) Système et procédé de régulation et surveillance sous-marine
EP3722553B1 (fr) Système de commande sous-marin

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20210407

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: NOV PROCESS & FLOW TECHNOLOGIES AS

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20210913

RIN1 Information on inventor provided before grant (corrected)

Inventor name: GRIMSETH, TOM

Inventor name: MIKALSEN, KRISTIAN

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

INTC Intention to grant announced (deleted)
GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20220225

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602019016059

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1499893

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220715

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NO

Ref legal event code: T2

Effective date: 20220622

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220923

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220922

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1499893

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221024

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20221022

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602019016059

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20230323

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230530

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602019016059

Country of ref document: DE

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230408

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220622

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20231103

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230408

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230408

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240229

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NO

Payment date: 20240409

Year of fee payment: 6