EP3678105B1 - Procédé de mesure de grandeurs électriques en utilisant un internet des objets. - Google Patents

Procédé de mesure de grandeurs électriques en utilisant un internet des objets. Download PDF

Info

Publication number
EP3678105B1
EP3678105B1 EP18862742.6A EP18862742A EP3678105B1 EP 3678105 B1 EP3678105 B1 EP 3678105B1 EP 18862742 A EP18862742 A EP 18862742A EP 3678105 B1 EP3678105 B1 EP 3678105B1
Authority
EP
European Patent Office
Prior art keywords
power
iot sensors
iot
power data
metering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP18862742.6A
Other languages
German (de)
English (en)
Other versions
EP3678105A4 (fr
EP3678105C0 (fr
EP3678105A1 (fr
Inventor
Tae Hyo Ahn
Hyun Kwon Ahn
Han Soo Kim
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Starkoff Co Ltd
Original Assignee
Starkoff Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Starkoff Co Ltd filed Critical Starkoff Co Ltd
Priority to EP21204812.8A priority Critical patent/EP3971854B1/fr
Publication of EP3678105A1 publication Critical patent/EP3678105A1/fr
Publication of EP3678105A4 publication Critical patent/EP3678105A4/fr
Application granted granted Critical
Publication of EP3678105C0 publication Critical patent/EP3678105C0/fr
Publication of EP3678105B1 publication Critical patent/EP3678105B1/fr
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R22/00Arrangements for measuring time integral of electric power or current, e.g. electricity meters
    • G01R22/06Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
    • G01R22/061Details of electronic electricity meters
    • G01R22/063Details of electronic electricity meters related to remote communication
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C19/00Electric signal transmission systems
    • G08C19/02Electric signal transmission systems in which the signal transmitted is magnitude of current or voltage
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q9/00Arrangements in telecontrol or telemetry systems for selectively calling a substation from a main station, in which substation desired apparatus is selected for applying a control signal thereto or for obtaining measured values therefrom
    • GPHYSICS
    • G08SIGNALLING
    • G08CTRANSMISSION SYSTEMS FOR MEASURED VALUES, CONTROL OR SIMILAR SIGNALS
    • G08C17/00Arrangements for transmitting signals characterised by the use of a wireless electrical link
    • G08C17/02Arrangements for transmitting signals characterised by the use of a wireless electrical link using a radio link
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/40Arrangements in telecontrol or telemetry systems using a wireless architecture
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q2209/00Arrangements in telecontrol or telemetry systems
    • H04Q2209/60Arrangements in telecontrol or telemetry systems for transmitting utility meters data, i.e. transmission of data from the reader of the utility meter

Definitions

  • the present disclosure relates to a virtualization structure of a power/energy & electricity quality analyzing device and a method for acquiring, transmitting and processing meter data using the same; and more particularly, to the virtualization structure of the power/energy & electricity quality analyzing device which remotely analyzes and provides electrical physical quantities such as power/energy and/or power quality consumed in at least one facility by performing a process of analyzing the power data acquired from each of IoT sensors via at least one gateway over a network if each of the IoT sensors installed in each of inlet lines in each of distribution boards of the facility transmits power data corresponding to power consumed by electric devices electrically connected with each of the distribution boards, and the method for acquiring, transmitting and processing the meter data using the same.
  • the electric power measurement & electricity quality analysis measurement device functions such that a user uses the measuring device to measure the current I(t) flowing on each phase and the voltage V(t) between phases of the power line, then the measuring device numerically processes and displays the data required for a meter result.
  • the conventional general metering device calculates the electrical energy with a calculating device such as a power processor using values of a current/voltage sensor, post-processes and transmits the electrical energy via data bus inside the metering device, to thereby allow the electrical energy to be displayed on a screen of the metering device.
  • a calculating device such as a power processor using values of a current/voltage sensor, post-processes and transmits the electrical energy via data bus inside the metering device, to thereby allow the electrical energy to be displayed on a screen of the metering device.
  • Such a metering device is used to analyze a problem in an electrical circuit or to monitor the quality of supplied electricity by measuring a current, a voltage, or a phase flowing in the electrical circuit by connecting to a distribution board or an instrument if necessary.
  • the conventional metering device has, as well as the inconveniences of having to install a metering device that connects with a plurality of power lines by mobilizing an electrician on-site as needed and having to download and analyze the necessary data from the storage device of the measurement device, the economic problem that requires the constant operation of expensive equipment for time series analysis spanning over a long time period.
  • these metering devices are connected to a communication network to configure a system for monitoring the electricity supply status and operation status of the industrial sites from a remote control room.
  • a communication network to configure a system for monitoring the electricity supply status and operation status of the industrial sites from a remote control room.
  • an expensive measurement device must be installed on required devices or equipment separately on the industrial sites and must be run 24 hours a day
  • the procedure to register the on-site measurement device in the network for each site is essential for the installation. If it is installed per distribution board, it is impossible to analyze the operation status of the electric devices of each unit of the distribution board. Also, to monitor each of the electric devices, expensive monitoring equipment must be installed for each of the electric devices, and its maintenance becomes infeasible.
  • US-A-2017063566 descibes a metering method using an Internet of Things (IoT).
  • IoT Internet of Things
  • a method for metering at least one electrical physical quantity by using an Internet of Things including steps of: (a) if each of IoT sensors installed in each of inlet lines in each of distribution boards of at least one facility transmits power data corresponding to power consumed by one or more electric devices electrically connected with each of the distribution boards, a metering server performing a process of acquiring the power data transmitted from each of the IoT sensors via at least one gateway over a network; and (b) the metering server performing a process of analyzing the power data acquired from each of the IoT sensors, to thereby meter the electrical physical quantity corresponding to total power consumed in the facility, characterised in that at the step of (b), the metering server performs (i) a process of acquiring each of power singularities occurring periodically, by analyzing the power data acquired from each of the IoT sensors, and (ii) a process of synchronizing the power data acquired from each of the IoT sensors by using IoT sensors
  • Fig. 1 is a drawing schematically illustrating a facility where a virtual metering system is applied in accordance with one example embodiment of the present disclosure.
  • At least one main distribution board D into which an external power is inlet may be installed at the facility such as a house, apartment, building, plant, etc.
  • One or more loads which are one or more electric devices, may be electrically connected with the main distribution board D, or one or more sub-distribution boards D1, D2, and D3 may be electrically connected with the main distribution board D.
  • loads which are one or more electric devices, may be electrically connected with the main distribution board D, or one or more sub-distribution boards D1, D2, and D3 may be electrically connected with the main distribution board D.
  • one or more of the loads i.e., the electric devices
  • each of the distribution boards in the facility may be electrically connected with one another in a hierarchy
  • each of the electric devices L1, L2, L3, ..., and L12 may be electrically connected with the terminal distribution boards D11, D12, and D13, to thereby allow implementation of an electric circuit for driving the loads in the facility.
  • the structure of the distribution boards and the electric devices is simplified in Fig.
  • Fig. 1 shows circuit configuration of the main distribution board D, the sub-distribution boards D1, D2, and D3, and the terminal distribution boards D11, D12, and D13, however, circuit configuration of the sub-distribution boards in multiple levels of the hierarchy may be implemented between the main distribution board and the terminal distribution boards.
  • each of IoT sensor groups S, S1, S2, S3, S11, S12, and S13 of the IoT sensors for detecting power consumption data may be installed on each of the inlet lines of each of the distribution boards D, D1, D2, D3, D11, D12, and D13 in Fig. 1 .
  • the power consumption data may correspond to the power consumed by the electric devices electrically connected with each of the distribution boards.
  • each of the IoT sensor groups S, S1, S2, S3, S11, S12, and S13 may be installed on each of the inlet lines of each of the distribution boards D, D1, D2, D3, D11, D12, and D13, may detect instantaneous current and instantaneous voltage of the power supplied via each of the distribution boards, and may acquire power consumption information for metering the power consumption by using the instantaneous current and the instantaneous voltage detected per each predetermined sampling period.
  • each of the IoT sensor groups S, S1, S2, S3, S11, S12, and S13 may include one or more IoT sensors which acquire the power consumption information corresponding to the instantaneous current and the instantaneous voltage on the inlet lines. That is, the IoT sensors are installed by the number appropriate to wiring types of the inlet lines, and the power information on the inlet lines may be metered by the IoT sensor groups installed on the inlet lines.
  • each of the IoT sensor groups S, S1, S11, S12, S13, and S1N may be connected with a gateway GW over a network, and the gateway GW may be connected with a metering server 100 over the network.
  • the gateway GW may be installed by multiple numbers in the facility, and each of the gateways GW may be connected with the IoT sensors located in predetermined areas.
  • each of the IoT sensor groups S, S1, S11, S12, and S13 may be connected with the gateway GW via wireless communication.
  • the wireless communication may be in a mesh topology. That is, each of the IoT sensors included in the IoT sensor groups may be connected with the gateway GW over a mesh network.
  • the metering server 100 may include a communication part 110 and a processor 120.
  • the communication part 110 may acquire the power data transmitted from each of the IoT sensors via at least one gateway over the network.
  • the processor 120 may synchronize and analyze the power data acquired via the communication part 110, to thereby meter at least one of electric physical quantities, e.g., the power, electric energy, electricity quality, etc., corresponding to the power consumed in the facility, and may analyze power pattern in time series corresponding to the power data, to thereby monitor the power consumed in the facility separately for each of usages and for each of the electric devices.
  • electric physical quantities e.g., the power, electric energy, electricity quality, etc.
  • elementary electric physical quantities including the instantaneous voltage and the instantaneous current may be measured at each of the distribution boards in the facility.
  • the metering server may perform a process of metering the electric physical quantities such as the power, the electric energy, the electricity quality, etc. corresponding to the power consumed in the facility, and the virtual metering system may be configured by using the metering server.
  • a method for acquiring, transmitting, and processing meter data in the virtual metering system configured as such in accordance with one example of the present disclosure is described by referring to Figs. 3 to 10 , as follows.
  • Each of the IoT sensors installed in each of the inlet lines in each of the distribution boards of the facility may acquire the power consumption information, e.g., the instantaneous voltage and the instantaneous current, corresponding to the power consumed by each of the electric devices electrically connected with each of the distribution boards, and may transmit the power consumption information to the metering server 100 as the power data via the gateway GW
  • the IoT sensors may be installed by the appropriate number on each of the inlet lines of each of the distribution boards according to each of the wiring types of each of the distribution boards. That is, each of the IoT sensors may be installed on each of the inlet lines of each of the distribution boards according to measurement points.
  • At least one IoT sensor including a voltage sensor and a current sensor may be used, since the voltage V1 and the current I1 of the line L1, and the voltage VN and the current IN of the line N are required for metering the elementary electric physical quantities.
  • the wiring type of the distribution board is three-phase three-wire two-clamp current type
  • at least three IoT sensors including the voltage sensors and the currents sensors may be used, since the voltage V1 of the line L1, the voltage V2 of the line L2, the voltage V3 of the line L3, and the voltage VN of the line N, and the current I1 of the line L1 and the current I3 of the line L3 are required for metering the elementary electric physical quantities.
  • the wiring type of the distribution board is three-phase three-wire type
  • at least three IoT sensors including the voltage sensors and the current sensors may be used, since the voltage V1 and the current I1 of the line L1, the voltage V2 and the current I2 of the line L2, the voltage V3 and the current I3 of the line L3, and the voltage VN of the line N are required for metering the elementary electric physical quantities.
  • the wiring type of the distribution board is three-phase four-wire type
  • at least three IoT sensors including the voltage sensors and the current sensors may be used, since the voltage V1 and the current I1 of the line L1, the voltage V2 and the current I2 of the line L2, the voltage V3 and the current I3 of the line L3, and the voltage VN and the current IN of the line N are required for metering the elementary electric physical quantities.
  • each of the IoT sensors may acquire the power consumption information to be used for metering the electric physical quantities such as the power, the electric energy, the electricity quality, etc. for each predetermined sampling period, by using the instantaneous voltage and the instantaneous current detected by the voltage sensor and the current sensor in real-time from each of the inlet lines of each of the distribution boards.
  • each of the IoT sensors may transmit the power consumption information acquired for each predetermined sampling period as the power data to the metering server 100 via the gateway GW for each predetermined transmission period.
  • each of the IoT sensors may transmit the power data in a form of data packets. That is, a measurement value 1, a measurement value 2, ..., and a measurement value M, which are the power consumption information acquired for each predetermined sampling period, may be transmitted in a form of a single data packet.
  • the communication part 110 of the metering server 100 may acquire the power data transmitted from each of the IoT sensors, included in each of the IoT sensor groups S, S1, S2, S3, S11, S12, and S13 at each of the measurement points which is each of the inlet lines of each of the distribution boards D, D1, D2, D3, D11, D12, and D13, via at least one gateway GW over the network.
  • the metering server 100 may perform a process of acquiring the power data from each of the IoT sensors for each predetermined transmission period, where each of the IoT sensors acquires the power consumption information for each predetermined sampling period from each of the inlet lines of each of the distribution boards D, D1, D2, D3, D11, D12, and D13.
  • the power data may include the power consumption information acquired as corresponding to the predetermined sampling period by each of the IoT sensors during the predetermined transmission period.
  • the processor 120 of the metering server 100 may perform a process of synchronizing the power data acquired from each of the IoT sensors, and a process of analyzing the synchronized power data, to thereby meter the electrical physical quantity corresponding to total power consumed in the facility.
  • the metering server 100 may perform (i) a process of identifying a 1-st to an N-th IoT sensors S11 installed on at least one specific inlet line of a specific distribution board D11 by referring to location information on each of the IoT sensors, and (ii) a process of metering the electrical physical quantities, such as the power, the electric energy, the electricity quality, etc., consumed by each of specific electric devices L1, L2, L3, and L4 electrically connected with the specific distribution board by referring to the power data acquired from the 1-st to the N-th IoT sensors S11, where the 1-st to the N-th IoT sensors are among the IoT sensors, the specific inlet line is among the inlet lines, the specific distribution board is among the distribution boards, and the specific electric devices are among the electric devices.
  • each of the IoT sensors may include the voltage sensor and the current sensor, and one or more IoT sensors may be installed on each of the distribution boards according to each of the wiring types of each of the distribution boards. Therefore, the IoT sensors installed on each of the inlet lines of each of the distribution boards must be grouped in order to meter the elementary electric physical quantities such as the instantaneous voltage, the instantaneous current, etc. supplied via each of the distribution boards according to each of the wiring types. And the electric physical quantities corresponding to the power supplied via each of the distribution boards may be metered by analyzing the power data of each of the IoT sensor groups S, S1, S2, S3, S11, S12, and S13 in conjunction with one another.
  • the metering server 100 meters the electric physical quantities such as the power, the electric energy, the electricity quality, etc., by using the power consumption information, i.e., elementary quantity information of the electricity including the instantaneous voltage, the instantaneous current, etc., acquired from the IoT sensors.
  • the power consumption information i.e., elementary quantity information of the electricity including the instantaneous voltage, the instantaneous current, etc.
  • the electric physical quantity cannot be accurately measured, unless pieces of the power data acquired from three IoT sensors are synchronized.
  • each of the IoT sensors may incorporate synchronization information into the power data when transmitting the power data, and the metering server 100 may synchronize the power data acquired from each of the IoT sensors by referring to the synchronization information.
  • each of the IoT sensors may incorporate the synchronization information such as a transmission net-increasing counting variable, a long-period parameter, etc. into a packet of the power data, and transmit the packet. Also, each of the IoT sensors may transmit the synchronization information as a flag on the data packet.
  • each of the IoT sensors may have an RTC (Real Time Clock) embedded therein or may not have the RTC embedded therein, and processes of synchronizing the power data for each case are described.
  • an IoT sensor without the RTC may have its own embedded clock for digital processing.
  • the metering server 100 may synchronize the power data acquired from the specific IoT sensor by using the net-increasing counting variable. Especially, even if part of the transmitted data is lost due to the network failure, etc., whether the data is lost can be determined by using the net-increasing counting variable, and in addition, the synchronization may be performed by using the data excluding the lost data. Also, as can be seen in (B) of Fig.
  • a time range of the long-period parameter may be set as a period which efficiently represents variations in each load corresponding to each of the electric devices.
  • a minimal time range may be set as appropriate multiples, a few to ten times, of the characteristic period of the load, and the power data acquired from each of the IoT sensors may be synchronized by using the long-period parameter within the set time range. That is, the the long-period parameter is set as the periodically-reset counting variable such that the long-period parameter corresponds to a time range including a period where the variations in each of the loads corresponding to each of the electric devices are reflected.
  • the power data may be synchronized by allowing a counting value of the long-period parameter to be the net-increasing counting variable, that is, a counting variable whose value net-increases whenever the power data is transmitted.
  • RTC Real Time Clock
  • the time range including a period where the variations in each of the loads corresponding to each of the electric devices are reflected may be set using the time information of the RTC in the IoT sensor.
  • part of output values from the RTC embedded in at least one specific IoT sensor among the IoT sensors may be used as the net-increasing counting variable. That is, absolute time information of the RTC may be converted into relative time information, and the power data are synchronized by using this.
  • the power data may be synchronized with the absolute time information including minutes, seconds, hundredths of second as the net-increasing counting variable.
  • initial synchronization of each of the IoT sensors may also be required.
  • the metering server 100 may synchronize operation of each of the IoT sensors when the IoT sensors are initially installed, separate from synchronizing the power data acquired from each of the IoT sensors by using the synchronization information. That is, if at least one broadcast signal is acquired from the IoT sensors over a mesh network when the IoT sensors are initially installed, the metering server 100 may synchronize initial operation states of the IoT sensors by initializing each starting time of each measurement and the synchronization information, e.g., the long-period counting variable, of each of the IoT sensors.
  • the synchronization information e.g., the long-period counting variable
  • the metering server 100 is described as performing a process of synchronizing the power data transmitted from each of the IoT sensors or the operation of each of the IoT sensors.
  • the gateway GW may perform the process of synchronizing the power data transmitted from each of the IoT sensors or the operation of each of the IoT sensors.
  • the gateway may synchronize and transmit the power data acquired from each of the IoT sensors to the metering server 100.
  • the gateway GW may perform one of (i) a process of synchronizing the power data received from at least one specific IoT sensor among the IoT sensors by using the net-increasing counting variable as the synchronization information where the net-increasing counting variable increases whenever the specific IoT sensor transmits the power data, (ii) a process of synchronizing the power data received from the specific IoT sensor by using the time range corresponding to the long-period parameter as the synchronization information, where the long-period parameter is a periodically-reset counting variable, and (iii) a process of synchronizing the power data received from the specific IoT sensor by using both the net-increasing counting variable and the long-period parameter as the synchronization information. And then the gateway GW may perform a process of transmitting the synchronized power data to the metering server 100.
  • the gateway GW may perform one of (i) a process of synchronizing the power data acquired from at least one specific IoT sensor among the IoT sensors by using the time range corresponding to the long-period parameter as the synchronization information, where the long-period parameter is the value of the RTC (Real Time Clock) embedded in the specific IoT sensor, and (ii) a process of synchronizing the power data acquired from the specific IoT sensor by using the time range corresponding to the long-period parameter as the synchronization information, where part of values of the RTC embedded in the specific IoT sensor is used as the net-increasing counting variable for the long-period parameter.
  • the gateway GW may transmit the synchronized power data to the metering server 100.
  • the gateway GW may perform a process of initializing (i) each starting time of each measurement by each of the IoT sensors and (ii) the synchronization information on each of the IoT sensors, by referring to each broadcast signal from each of the IoT sensors over the network.
  • the metering server 100 performs (i) a process of acquiring each of power singularities occurring periodically, by analyzing the power data acquired from each of the IoT sensors, and (ii) a process of synchronizing the power data acquired from each of the IoT sensors by using each of the power singularities.
  • the power data shows three-phase power pattern
  • pieces of the power data on the three-phase power may be synchronized by using each of points of time of each of the power singularities.
  • the power pattern changes in each of phases ph1, ph2, and ph3, as a synchronization time.
  • the metering server 100 may perform one of (i) a process of determining, as the synchronization time, a point of time when at least one statistical value changes, and (ii) a process of determining, as the synchronization time, a point of time when each on/off power fingerprint of each load is acquired.
  • the statistical value is acquired by analyzing the power data using the power singularities, and each on/off power fingerprint of the each load corresponds to each of the electric devices in the facility.
  • each of the IoT sensors compresses and transmits the detected power data, to thereby reduce the size of the transmission data and increase the transmission speed of the data over the network.
  • each of the IoT sensors may perform one of (i) a process of compressing and transmitting one or more power parameters, representing at least one real-time power fluctuation during a period of the specific event, as the power data, and (ii) a process of compressing and transmitting (ii-1) the power parameters corresponding to the real-time power fluctuation during a preset period or (ii-2) one or more pattern codes corresponding to one or more characteristic shapes of at least one power pattern in time series, as the power data.
  • each of the IoT sensors may detect the power patterns by using the instantaneous voltage and the instantaneous current, and may compress and transmit event information together with the power information, such as an average of the power, a standard deviation of variation in the power, the voltage, the current, a PF (power factor), an average of periods of changes, a deviation of the periods, etc. which are the power parameters representing statistical characteristics of power fluctuation, acquired from the detected power patterns.
  • the power information such as an average of the power, a standard deviation of variation in the power, the voltage, the current, a PF (power factor), an average of periods of changes, a deviation of the periods, etc. which are the power parameters representing statistical characteristics of power fluctuation, acquired from the detected power patterns.
  • each of the IoT sensors may transmit the data packets of the power data including an average of the measurement values, a standard deviation of the measurement values, one or more starting points of one or more events, one or more event codes (or one or more event shapes), and event shape data, or may compress and transmit them as compressed measurement values as shown in (B) of Fig. 7 .
  • the metering server 100 may acquire real-time power pattern information using the acquired event information on the events at the points of time of the power fluctuation, and may perform a process of metering the power, a process of measuring the electricity quality, a process of monitoring the power consumption, etc. using the real-time power pattern information.
  • each of the IoT sensors may perform a process of compressing and transmitting (i) the power parameters corresponding to the real-time power fluctuation during a preset transmission period or (ii) the pattern codes corresponding to the characteristic shapes of the power pattern in time series, as the power consumption data.
  • the parameters representative of the power fluctuation during the preset transmission period may be compressed and transmitted.
  • the pattern codes may be acquired by encoding one or more specific power patterns occurring in response to the operation of the specific electric device.
  • the pattern codes may include at least one code corresponding to an on/off state unique to the electric device, which occurs when the electric device is turned on/off, according to the characteristic of the electric device.
  • the power data may include at least part of voltage information, current information, power information, energy information, harmonics information, flicker information, imbalance information, and main signaling information.
  • the voltage information may include Vrms, Vpk, voltage crest factor (CF), Vrms 1/2 , Vfund, etc
  • the current information may include Amps, Apk, A crest factor, Amps 1/2 , Afund, etc.
  • the power information may include Watts, PF (power factor), etc.
  • the energy information may include kWh, energy loss, etc.
  • the harmonics information may include harmonic order, inter-harmonic order, volts, Amps, Watts, phase angle, etc.
  • the flicker information may include Pit, Pst (1 min), Pinst, etc.
  • the imbalance information may include Volts, Amps, etc.
  • the main signaling information may include threshold levels, signaling frequency, relative V%, absolute V3s (3 sec avg.), etc.
  • Installation errors of the IoT sensors may be installation errors in a PT (potential transformer) for voltage measurement and a CT (current transformer) for current measurement.
  • PT potential transformer
  • CT current transformer
  • signs of measured W values may be inverted due to discordance in directions of the PT (potential transformer) for voltage measurement and the CT (current transformer) for current measurement, and the measured values may be calibrated by using an equation 1 as follows.
  • P t Mc ⁇ v t ⁇ i t
  • v is a voltage sample
  • i is a current sample
  • Mc is a calibration constant including a sign.
  • the measurement values of the IoT sensors may be calibrated using the equation 1 and then transmitted, or the metering server 100 may calibrate the measurement values acquired from the IoT sensors using the equation 1, to thereby meter the power.
  • mis-wiring matrices Mi and Mv corresponding to each of the wiring types may be used for calibration.
  • Mv may be a mis-wiring PT matrix
  • Mi may be a mis-wiring CT matrix.
  • a condition that the power consumption at each of phases L1, L2, and L3 during a power supply period e.g., 50Hz or 60 Hz, has a plus sign (minus in case of a plant), and a condition that PT phases of each of the phases L1, L2, and L3 are phase-lead or phase-lag by 120 degrees among one another, may be used to determine the mis-wiring matrices Mv and Mi.
  • a current preservation law Kirchhoff's circuit law
  • a closed loop voltage law an energy law
  • the IoT sensors installed in the facility may have deviation in metered values from previously installed measurement devices due to different installation conditions, deterioration from extended use, an error in initial installation, etc.
  • the metering server 100 may calibrate the metered values by using calibration coefficients per gateway and calibration coefficients per IoT sensors.
  • v may be the voltage sample
  • i may be the current sample
  • V may be rms voltage
  • I may be rms current
  • P may be power watt
  • S may be apparent power VA
  • Q may be reactive power var.
  • the metering server 100 may calibrate each of the measurement values of at least one phase of a single-phase type or a multi-phase type among the measurement values thereof, by using total power.
  • the metering server 100 may calibrate each of the measurement values of the IoT sensors, with the single-phase type or the multi-phase type, of a same ancestor in the hierarchy, by using each value of each of the phases measured at each of the IoT sensors. As one example, if three-phase balanced power is measured differently as shown in Fig. 6 , then the power at each phase may be calibrated by using the total power.
  • the measurement values may be calibrated by using standard measured values acquired via a standard measuring device.
  • the measurement values of the electrical physical quantity may be calibrated, by using the standard measured values acquired via the standard measuring device provided by a power provider.
  • the metering server 100 may meter the electric physical quantities such as the voltage, the current, the frequency, the power factor, a voltage/current unbalanced neutral current, active/reactive/apparent power maximum/minimum values, active/reactive electrical energy, apparent electrical energy, electrical energy measurement accuracy, and integrated electrical energy, etc.
  • the metering server 100 may meter the electric physical quantities such as sag/swell, transient, harmonics THD and TDD, harmonics for each order, K-factor, etc. for analysis of the electricity quality.
  • the metering server 100 may perform a process of acquiring the power pattern in time series corresponding to the power consumed by the electric devices electrically connected with each of the distribution boards from each of the inlet lines of the distribution boards in the facility, and a process of analyzing the acquired power pattern in time series and monitoring the consumed power for each of the usages and for each of the electric devices.
  • the metering server 100 may perform (i) a process of analyzing at least one power pattern in time series as shown in Fig. 8 , to thereby detect each of operation states of each of independent loads included in each of the electric devices electrically connected with each of the distribution boards, and (ii) a process of classifying the independent loads, whose operation states have been detected, into groups of subordinate independent loads having dependency based on their own time-behaviors (T1, T2, T3, and T4) based dependency, to thereby map each of the independent loads onto each of the electric devices and monitor the behavior of each of the electric devices.
  • T1, T2, T3, and T4 time-behaviors
  • the distribution board whose inlet line has the IoT sensors S11 installed for detecting the power pattern, is electrically connected with each of the electric devices R1, R2, and R3, and that the electric device R1 has independent loads M1, M2, and M3, the electric device R2 has independent loads M4, M5, and M6, and the electric device R3 has independent loads M7, M8, and M9.
  • the electric devices may be robots performing processes in a plant, and the independent loads may be motors driving the robots.
  • each of the electric devices R1, R2, and R3 may repeat specific operation for each predetermined time interval, and the independent loads (M1, M2, M3), (M4, M5, M6), and (M7, M8, M9) respectively located in each of the electric devices R1, R2, and R3 may operate with their own time intervals for repeated operation.
  • the power pattern to be used for detecting their behavior may show patterns repeated with the predetermined time interval as shown in (B) of Fig. 9 .
  • each of the independent loads M1, M4, and M7 respectively matches one of patterns #1, #2, and #3
  • each of the independent loads M2, M5, and M8 respectively matches one of patterns #4, #5, and #6
  • each of the independent loads M3, M6, and M9 respectively matches one of patterns #7, #8, and #9
  • patterns corresponding to the independent loads M1, M2, and M3 within a single electric device R1 are not exactly known.
  • the metering server 100 may analyze the patterns in (B) of Fig. 9 , for example, using Big Data analysis, and determine that patterns #1, #4, and #7 are repeated with their own time intervals, patterns #2, #5, and #8 are repeated with their own time intervals, and patterns #3, #6, and #9 are repeated with their own time intervals.
  • the metering server 100 may perform a process of determining specific subordinate independent loads among all the independent loads as located in the same electric device, wherein the operation states of the specific subordinate independent loads are repeated with a uniform time interval between occurrences and a uniform duration.
  • the metering server 100 may match the power patterns with the independent loads of the electric devices in (A) of Fig. 9 as Table 1 below.
  • Table 1 electric devices independent loads pattern
  • the metering server 100 may (i) analyze the power consumption information on a single distribution board using the method above, (ii) monitor each of the operation states of the electric devices electrically connected with the single distribution board and the operation states of the independent loads of each of the electric devices, and (iii) monitor the power consumption in the facility for each of the usages and for each of the electric devices separately.
  • one or more IoT sensors capable of detecting information on the power consumption may be installed on each of the inlet lines of the distribution boards.
  • the power data transmitted from each of the IoT sensors via at least one gateway over the network may be acquired, and the power data may be analyzed, to thereby allow the power pattern in time series to be acquired.
  • the present disclosure has an effect of detecting the power consumption information at the distribution boards by using the IoT sensors including the voltage sensors and the current sensors, and configuring a virtual metering system where the metering server therein meters the power, to thereby (i) minimize frequent errors in measuring the electrical energy, the electricity quality, etc. on-site due to incorrect meter installation, and (ii) provide opportunities for calibrating the installation errors remotely.
  • the present disclosure has another effect of minimizing the installation investment and post-installation operation costs by minimizing the commitment of the electricians required on-site, and easily installing and operating without stopping the operation of the on-site electrical facilities even during the operation of the on-site facilities, to thereby (i) provide real-time analysis of the electricity quality based on Big Data of real-time power and (ii) provide analysis and monitoring of the operation statuses of the on-site facilities in a coming smart factory.
  • the present disclosure has still another effect of monitoring the behavior of each of the electric devices by metering and analyzing the power supplied from each of the distribution boards to each of the electric devices, to thereby (i) analyze operation statuses of the electric devices in the facility in real-time, (ii) provide additional power-related real-time services by using electricity quality information and information on the behavior, etc. of the electric devices derived from real-time power usage information, and (iii) monitor energy use for each apparatus in a factory analyzed using real-time electrical energy usage pattern in the smart factory, etc.
  • the embodiments of the present disclosure as explained above may be implemented in a form of executable program command through a variety of computer means recordable to computer readable media.
  • the computer readable media may include solely or in combination, program commands, data files, and data structures.
  • the program commands recorded in the media may be components specially designed for the present disclosure or may be usable to those skilled in the art of computer software.
  • Computer readable media may include magnetic media such as hard disks, floppy disks, and magnetic tapes, optical media such as CD-ROMs and DVDs, magneto-optical media such as floptical disks and hardware devices such as ROM, RAM, and flash memory specially designed to store and carry out program commands.
  • Program commands may include not only a machine language code made by a complier but also a high level code that can be used by an interpreter etc., which may be executed by a computer.
  • the aforementioned hardware device may be configured as one or more software modules to perform the processes of the present disclosure and vice versa.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Power Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Computing Systems (AREA)
  • General Health & Medical Sciences (AREA)
  • Medical Informatics (AREA)
  • Signal Processing (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Arrangements For Transmission Of Measured Signals (AREA)

Claims (6)

  1. Procédé de mesure d'au moins une grandeur physique électrique à l'aide d'un Internet des objets, loT, comprenant les étapes suivantes :
    (a) si chacun des capteurs loT (S, S1, S2, S3, 511, S12, et S13) installés dans chacune des lignes d'entrée chacun des tableaux de distribution (D, D1, D2, D3, D11, D12, D13) d'au moins une installation transmet des données de puissance correspondant à la puissance consommée par un ou plusieurs dispositifs électriques (L1-L12) électriquement connectés à chacun des tableaux de distribution, un serveur de mesure (100) effectue un processus d'acquisition des données de puissance transmises par chacun des capteurs loT via au moins une passerelle, GW, sur un réseau ; et
    (b) le serveur de mesure (100) effectue un processus d'analyse des données de puissance acquises à partir de chacun des capteurs loT, pour mesurer ainsi la grandeur physique électrique correspondant à la puissance totale consommée dans l'installation, caractérisé en ce que
    à l'étape (b), le serveur de mesure (100) effectue (i) un processus d'acquisition de chacune des singularités de puissance se produisant périodiquement, en analysant les données de puissance acquises à partir de chacun des capteurs loT (S, S1, S2, S3, 511, S12, et S13), et (ii) un processus de synchronisation des données de puissance acquises à partir de chacun des capteurs loT en utilisant chacune des singularités de puissance.
  2. Procédé de la revendication 1, dans lequel, à l'étape (b), le serveur de mesure (100) effectue (i) un processus d'identification d'un 1er à un Nième capteurs loT installés sur au moins une ligne d'entrée spécifique d'un tableau de distribution spécifique en se référant à des informations de points de mesure sur chacun des capteurs loT, et (ii) un processus de mesure de la quantité physique électrique correspondant à la puissance consommée par chacun des dispositifs électriques spécifiques électriquement connectés au tableau de distribution spécifique en se référant aux données de puissance acquises à partir des 1er à Nième capteurs loT, dans lequel les 1er à Nième capteurs loT sont parmi les capteurs loT, la ligne d'entrée spécifique est parmi les lignes d'entrée, le tableau de distribution spécifique est parmi les tableaux de distribution, et les dispositifs électriques spécifiques sont parmi les dispositifs électriques.
  3. Procédé selon la revendication 1, dans lequel, à l'étape (a), le serveur de mesure (100) exécute un processus d'acquisition des données de puissance de chacun des capteurs loT pour chaque période de transmission prédéterminée, dans lequel chacun des capteurs loT acquiert des informations de consommation de puissance pour chaque période d'échantillonnage prédéterminée à partir de chacune des lignes d'entrée de chacun des tableaux de distribution, et dans lequel les données de puissance incluent les informations de consommation de puissance acquises comme correspondant à la période d'échantillonnage prédéterminée par chacun des capteurs loT au cours de la période de transmission prédéterminée.
  4. Procédé selon la revendication 1, dans lequel le serveur de mesure (100) effectue l'un parmi (i) un processus de détermination, en tant qu'heure de synchronisation, d'un moment où au moins une valeur statistique change, dans lequel la valeur statistique est acquise en analysant les données de puissance à l'aide des singularités de puissance et (ii) un processus de détermination, en tant qu'heure de synchronisation, d'un moment où chaque empreinte de puissance marche/arrêt de chaque charge est acquise, dans lequel ladite empreinte de puissance marche/arrêt correspond à chacun des dispositifs électriques de l'installation.
  5. Procédé selon la revendication 1, dans lequel, si un événement spécifique se produit, à l'étape (a), le serveur de mesure (100) exécute l'un parmi (i) un processus d'acquisition d'un ou plusieurs paramètres de puissance, représentant au moins une fluctuation de puissance en temps réel pendant une période de l'événement spécifique, en tant que données de puissance, à partir de chacun des capteurs loT, et (ii) un processus d'acquisition (ii-1) des paramètres de puissance correspondant à la fluctuation de puissance en temps réel pendant une période prédéfinie ou (ii-2) d'un ou plusieurs codes de motif correspondant à une ou plusieurs formes caractéristiques d'au moins un motif de puissance dans une série temporelle, en tant que données de puissance, à partir de chacun des capteurs loT.
  6. Procédé selon la revendication 1, dans lequel à l'étape (b),
    le serveur de mesure (100) exécute (i) un processus d'acquisition d'un motif de puissance en séries temporelles correspondant à la puissance consommée par les un ou plusieurs dispositifs électriques en analysant les données de puissance acquises à partir de chacun des capteurs IoT; et (ii)
    un processus d'analyse du motif de puissance en séries temporelles, afin de surveiller ainsi la puissance pour chacune des utilisations et pour chacun des dispositifs électriques.
EP18862742.6A 2017-09-28 2018-09-27 Procédé de mesure de grandeurs électriques en utilisant un internet des objets. Active EP3678105B1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP21204812.8A EP3971854B1 (fr) 2017-09-28 2018-09-27 Procédés de mesure de grandeurs physiques electriques en utilisant un internet des objets.

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020170126337A KR101934103B1 (ko) 2017-09-28 2017-09-28 전력/전력량 계측 및 전력품질 분석장치의 가상화 구조 및 이를 이용하여 계측 데이터를 획득, 전송 및 처리하는 방법
PCT/KR2018/011466 WO2019066513A1 (fr) 2017-09-28 2018-09-27 Structure de virtualisation pour mesure d'énergie/quantité d'énergie et appareil d'analyse de qualité d'énergie, et procédé d'acquisition, de transmission et de traitement de données de compteur l'utilisant

Related Child Applications (2)

Application Number Title Priority Date Filing Date
EP21204812.8A Division EP3971854B1 (fr) 2017-09-28 2018-09-27 Procédés de mesure de grandeurs physiques electriques en utilisant un internet des objets.
EP21204812.8A Division-Into EP3971854B1 (fr) 2017-09-28 2018-09-27 Procédés de mesure de grandeurs physiques electriques en utilisant un internet des objets.

Publications (4)

Publication Number Publication Date
EP3678105A1 EP3678105A1 (fr) 2020-07-08
EP3678105A4 EP3678105A4 (fr) 2021-03-31
EP3678105C0 EP3678105C0 (fr) 2023-07-19
EP3678105B1 true EP3678105B1 (fr) 2023-07-19

Family

ID=64959660

Family Applications (2)

Application Number Title Priority Date Filing Date
EP18862742.6A Active EP3678105B1 (fr) 2017-09-28 2018-09-27 Procédé de mesure de grandeurs électriques en utilisant un internet des objets.
EP21204812.8A Active EP3971854B1 (fr) 2017-09-28 2018-09-27 Procédés de mesure de grandeurs physiques electriques en utilisant un internet des objets.

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP21204812.8A Active EP3971854B1 (fr) 2017-09-28 2018-09-27 Procédés de mesure de grandeurs physiques electriques en utilisant un internet des objets.

Country Status (4)

Country Link
US (1) US11280817B2 (fr)
EP (2) EP3678105B1 (fr)
KR (1) KR101934103B1 (fr)
WO (1) WO2019066513A1 (fr)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2973071B1 (fr) * 2013-03-15 2020-05-06 Fluke Corporation Enregistrement et tracé de graphique automatiques de données de mesure
CN114391108A (zh) * 2019-08-02 2022-04-22 3M创新有限公司 用于检测和分析传感器安装和配置错误的多通道电力网监测系统
US11758308B2 (en) * 2019-10-11 2023-09-12 Schneider Electric USA, Inc. Systems and methods for improving frequency response of a high-speed data acquisition device
US20210160349A1 (en) * 2019-11-25 2021-05-27 Wiliot, LTD. System and method for determining insights from sensing inputs
CN115951123B (zh) * 2023-02-28 2023-06-30 国网山东省电力公司营销服务中心(计量中心) 一种基于无线通信的电能计量方法及系统
CN116184100B (zh) * 2023-04-27 2023-07-21 广东电网有限责任公司 一种电网电能质量的校准方法及装置
CN116827488B (zh) * 2023-08-30 2024-01-05 广东电网有限责任公司东莞供电局 基于区块链的电力数据传输控制方法、装置及存储介质
CN118336877B (zh) * 2024-06-13 2024-08-20 江苏达盈智慧科技股份有限公司 基于电力指纹的电池充电大模型异常识别方法

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101869555B1 (ko) * 2011-08-29 2018-06-21 한국전력공사 데이터 동기화를 이용한 원격 검침 방법 및 시스템
US20170063566A1 (en) * 2011-10-04 2017-03-02 Electro Industries/Gauge Tech Internet of things (iot) intelligent electronic devices, systems and methods
JP2014241465A (ja) * 2013-06-11 2014-12-25 株式会社東芝 署名生成装置、署名生成方法、署名生成プログラム、及び電力使用量計算システム
KR20160118813A (ko) * 2015-04-03 2016-10-12 한국전자통신연구원 이동통신망을 통해 원격 서버와 연결되는 게이트웨이 장치 및 그것의 ip관리 방법
KR20170035696A (ko) * 2015-09-23 2017-03-31 엘에스산전 주식회사 전력 계통 감시 장치
KR101631094B1 (ko) * 2015-11-06 2016-06-16 (주)클라루스코리아 건물의 설비, 전력 및 조명 통합 제어 시스템
KR101785829B1 (ko) * 2016-02-22 2017-10-17 호남대학교 산학협력단 저전력 광역 통신망을 이용한 ami 원격 모니터링 시스템
KR20180135374A (ko) * 2017-06-12 2018-12-20 엘지전자 주식회사 전류 센싱에 기반한 전력 소비 모니터링 방법, 무선 전력 센싱 장치 및 클라우드 장치

Also Published As

Publication number Publication date
EP3678105A4 (fr) 2021-03-31
US11280817B2 (en) 2022-03-22
EP3678105C0 (fr) 2023-07-19
EP3971854C0 (fr) 2023-07-12
EP3971854B1 (fr) 2023-07-12
US20200309828A1 (en) 2020-10-01
KR101934103B1 (ko) 2018-12-31
WO2019066513A1 (fr) 2019-04-04
EP3678105A1 (fr) 2020-07-08
EP3971854A1 (fr) 2022-03-23

Similar Documents

Publication Publication Date Title
EP3678105B1 (fr) Procédé de mesure de grandeurs électriques en utilisant un internet des objets.
US7920976B2 (en) Averaging in an intelligent electronic device
Thakare et al. Implementation of an energy monitoring and control device based on IoT
US11366145B2 (en) Intelligent electronic device with enhanced power quality monitoring and communications capability
US20050024234A1 (en) Reduced cost automatic meter reading system and method using locally communicating utility meters
CN105510865A (zh) 一种电力用户现场电能表故障远程判定方法
US20130211754A1 (en) Extensible Power Meter
CN105510859A (zh) 一种电子式互感器评估系统及方法
US10698012B2 (en) Power measuring system and power measuring method
CN114814711A (zh) 一种智能电表误差检测方法
AU2016324351B2 (en) Power analyser and method for the use thereof
CN117148262A (zh) 一种用于电能表的校验系统
Serrano et al. A low-cost smart plug with power quality and energy analyzer features
Munoz et al. Development of an IoT smart energy meter with power quality features for a smart grid architecture
CN115932385A (zh) 一种剩余电流监测方法、系统及单相智能电能表
CN110471021A (zh) 一种具有内置监控基表的电能表检定装置及方法
US20230314491A1 (en) Energy Meters and Energy Monitoring Systems and Methods
Nayak et al. Real-time IoT-based Power Quality Event Monitoring System for Smart Grid Application
Marellapudi et al. Low-Cost Industrial Monitoring Platform for Energy Efficiency and Optimized Plant Productivity
Bernal Heredia et al. Case study: Field evaluation of a low-cost circuit-level electrical submetering system
Wright et al. Power quality propagation measurements in smart grids
Aryani et al. Real-Time Data Acquisition and Monitoring of Three Phase Load Balance in Electricity Distribution
Mujawar et al. IoT-Based Smart Energy Meter for Recording Device-Level Electric Parameters
Ali et al. Smart monitoring and inspection of electrical installations based on the internet of things
Nagaraju et al. Networked electronic energy meters with power quality analysis

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200331

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20210302

RIC1 Information provided on ipc code assigned before grant

Ipc: H04Q 9/00 20060101ALI20210224BHEP

Ipc: G08C 19/02 20060101AFI20210224BHEP

Ipc: G08C 17/02 20060101ALI20210224BHEP

Ipc: G01R 22/06 20060101ALI20210224BHEP

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: EXAMINATION IS IN PROGRESS

17Q First examination report despatched

Effective date: 20220209

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20230214

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602018053793

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

U01 Request for unitary effect filed

Effective date: 20230725

U07 Unitary effect registered

Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI

Effective date: 20230728

U20 Renewal fee paid [unitary effect]

Year of fee payment: 6

Effective date: 20230831

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231020

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231019

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231119

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20231020

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602018053793

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20230719

26N No opposition filed

Effective date: 20240422

REG Reference to a national code

Ref country code: IE

Ref legal event code: MM4A

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230927

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230930

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230927

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230930

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240913

Year of fee payment: 7