EP3633108A1 - Assembly of concrete blocks for covering a dyke - Google Patents

Assembly of concrete blocks for covering a dyke Download PDF

Info

Publication number
EP3633108A1
EP3633108A1 EP18000784.1A EP18000784A EP3633108A1 EP 3633108 A1 EP3633108 A1 EP 3633108A1 EP 18000784 A EP18000784 A EP 18000784A EP 3633108 A1 EP3633108 A1 EP 3633108A1
Authority
EP
European Patent Office
Prior art keywords
blocks
assembly
interstices
side surfaces
granular material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP18000784.1A
Other languages
German (de)
French (fr)
Inventor
I. Vermeij
J.P. Quataert
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Holcim Technology Ltd
Original Assignee
Holcim Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Holcim Technology Ltd filed Critical Holcim Technology Ltd
Priority to EP18000784.1A priority Critical patent/EP3633108A1/en
Priority to EP19780443.8A priority patent/EP3861172A1/en
Priority to PCT/IB2019/058370 priority patent/WO2020070656A1/en
Priority to MA053805A priority patent/MA53805A/en
Publication of EP3633108A1 publication Critical patent/EP3633108A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof

Definitions

  • the invention refers to an assembly of concrete blocks for covering a dyke for protection against wave attacks, comprising at least two concrete blocks, each substantially having the form of a polygonal prism comprising a ground surface and a prism perimeter surface having a contiguous series of at least six side surfaces, in particular eight side surfaces, wherein the concrete blocks are placed at a distance from each other so as to form interstices between the blocks.
  • the invention refers to a covering for a dyke for protection against wave attacks, comprising a plurality of concrete blocks arranged side by side, wherein the interstices between the blocks are filled with a granular material.
  • Dyke bodies are exposed to heavy loads due to the movements of waves and/or water. Where the waves are too high or the current too strong for a grass cover, setting a stone covering provides an enhanced stability. It has been common practice to make such coverings of stone blocks by using so-called basaltic columns of natural stone, each column having a cross-sectional area differing from that of a further column. The stone columns have been placed against each other so that they support each other. This resulted in a relatively smooth dyke cover with a much greater stability, as if the stones had simply been poured loose on the embankment.
  • blocks made of concrete instead of natural stone, such as basalt.
  • Concrete blocks for use as a protection of water banks have been described, e.g., in WO 2011/096795 A2 .
  • Concrete blocks may be produced as precast elements, so that their production may be done in a cost-efficient way and under controlled manufacturing conditions.
  • Concrete blocks are usually laid onto the dyke by means of machines, that grab and lay a plurality of blocks at once so as to increase the working speed. After the laying process, the interstices between the individual blocks are filled with granular material that holds the stones in their position relative to each other by frictional forces and increases the stability of the covering. Further, the granular material ensures the permeability of the covering so that water can drain.
  • a drawback of such a system is that the granular material arranged between the blocks is gradually washed out over time by the forces acting upon the granular material by the waves. As the granular material is washed out, the stability of the covering reduces substantially. Thus, there is a constant need to replace the granular material that has been washed out by new material, which involves high costs.
  • a covering as described comprising a plurality of blocks with granular material being arranged in the interstices
  • the individual blocks are interlocked with the granular material being interposed.
  • another known system for covering dykes comprises a number of blocks that interlock directly with each other in a form-locking manner resulting in a very rigid and stable structure that is able to spread the load on the covering to a bigger area.
  • sea water cannot easily flow off from the covering after a wave impact. Further, uplift forces can become high under the blocks of this interlocking system.
  • the instant invention aims at improving a concrete block coverage of a dyke for protection against wave attacks, that reduces the wash-out of granular material and therefore provides an increased stability and reduced maintenance requirements.
  • the invention provides an improved assembly of concrete blocks comprising at least two concrete blocks, wherein said at least two blocks are interconnected by means of a connecting beam integrally formed with said at least two blocks, said connecting beam having a ground surface that is aligned with the ground surface of said at least two blocks and having a height that corresponds to 50-80%, preferably 65-75%, of the height of said at least two blocks.
  • the blocks have a height of 30-40cm.
  • the height of the connecting beams is selected to be 50-80%, preferably 65-75%, of the total height of said at least two blocks, which proved to produce optimal results with regard to the prevention of a wash-out of granular material.
  • the total height of a block is defined as the perpendicular distance between the ground area of the block and its highest point. If the at least two blocks that are connected by means of a connecting beams are of different height, the average height of said two blocks is used as said total height.
  • connecting beams it is important to arrange the connecting beams so that their ground surface is aligned with the ground surface of said at least two blocks, so that the assembly, including the connecting beams, has a common ground area, which preferably is designed as a flat surface. Otherwise, granular material would tend to ingress into a gap formed between the connecting beams and the bedding layer, which would result in an undesired raising of the blocks.
  • each concrete block of the block assembly is connected to the adjoining concrete block by means of a connecting beam of the type mentioned above.
  • the invention provides an assembly of at least two concrete blocks that forms a rigid structure so that said assembly may be handled by a block laying machine in an easier way when compared to the handling of a corresponding plurality of loose blocks.
  • the assembly comprises at least four concrete blocks arranged in a grid within a rectangular bounding box, each block substantially having the form of a polygonal prism comprising a ground surface and a prism perimeter surface having a contiguous series of at least six side surfaces, in particular eight side surfaces, wherein the concrete blocks are placed at a distance from each other so as to form interstices between the blocks, wherein two of said at least four blocks are each interconnected by means of a connecting beam integrally formed with said two blocks, said connecting beam having a ground surface that is aligned with the ground surface of said two blocks and having a height that corresponds to 50-80%, preferably 65-75%, of the height of said two blocks.
  • the assembly consists of exactly four blocks arranged in a 2x2 grid within a rectangular bounding box.
  • Arranging the blocks of the assembly so that a rectangular bounding box is formed enables the placing of a plurality of such assemblies side by side in a regular pattern.
  • the blocks have the shape of irregularly formed prisms, the polygonal base of the prism therefore having no symmetry and the edges of the polygonal base having different lengths.
  • the blocks are each formed as a right prism.
  • the blocks of an assembly are shaped differently from one another, so that no block is identical with another block within the assembly.
  • the assembly comprises a first group of blocks and a second group of blocks, the blocks of the first group having a larger prism perimeter than the blocks of the second group, wherein blocks of the first group and blocks of the second group are preferably arranged alternately.
  • four connecting beams are provided each connecting two of said four blocks that are arranged consecutively along the direction of an edge of the bounding box.
  • the concrete blocks are placed at a distance from each other so as to form interstices between the blocks. According to a preferred embodiment, this means that the blocks of the assembly do not touch each other except where they are connected by said connecting beams.
  • the connecting beams are extending parallel to the edges of the bounding box.
  • the percentage of the open area, in a plan view, defined as the sum of the area of the interstices present between the blocks of the assembly and the interstices present between the blocks of the assembly and the bounding box, with reference to the total area enclosed by the bounding box may be selected to be 10-15%, preferably, 12-13%.
  • a preferred embodiment provides that two blocks that are interconnected by means of a connecting beam have opposed side surfaces confining at least one interstice between them, said opposed side surfaces extending in a non-parallel manner. In this way the interstice between two interconnected blocks narrows in one direction, which enhances the wedging effect and thus the friction between the granular material and the opposed side surfaces, said effect holding the granular material in place.
  • two blocks that are interconnected by means of a connecting beam have opposed side surfaces confining a first interstice at one side of said connecting beam and a second interstice at the other side of said connecting beam, wherein the opposed side surfaces confining the first interstice are inclined relative to each other and the opposed side surfaces confining he second interstice are inclined relative to each other.
  • Such an embodiment also results in the interstices having a narrowing geometry that increases the wedging of the granular material.
  • the interstices in a plan view, are designed to allow a maximum free space between the blocks corresponding to a circle having a diameter of 50mm, preferably 40 mm.
  • the bedding material comprises granular material that has a particle size of bigger than 40 mm or 50 mm respectively.
  • the side surfaces of the blocks facing the outside of the assembly may taper inwardly from the bottom to the top, in order to facilitate the demoulding of the concrete block from the mould.
  • each block preferably comprises a top surface and inclined surfaces each connecting an edge of the top surface with the side surfaces.
  • the top surface has the shape of a rectangle that, in a top view, is arranged at an acute angle with respect to the bounding box.
  • the concrete blocks are preferably made of a concrete that has a high compressive strength.
  • the compressive strength of the blocks after 28 days of curing is > 60 N/mm2.
  • a covering for a dyke for protection against wave attacks comprising a plurality of assemblies of concrete blocks as describe above that are arranged side by side, wherein the interstices between the blocks of each assembly and the interstices between adjoining assemblies are filled with a granular material.
  • the side by side arrangement is configured such that the blocks of one assembly rest against the blocks of the adjoining assembly, thereby increasing the overall stability of the covering.
  • the assemblies of concrete blocks are arranged on a filter layer comprising a granular material, said filter layer preferably being arranged on a geotextile and said geotextile preferably being arranged on a layer of clay.
  • the granular material arranged within the interstices has a particle size of between 4 and 32 mm, preferably 16 and 32 mm.
  • a granular material having a particularly high mass is used.
  • the granular material arranged within the interstices has a volumetric mass density of > 2'800 kg/m 3 , preferably 2'900-3'000 kg/m 3 .
  • the granular material arranged within the interstices is made of crushed or broken stone, preferably basalt.
  • Crushed or broken stone is characterized by an irregular shape, which enhances the interlocking effect prevailing between the stones.
  • the granular material of the filter layer has a particle size distribution characterized by a D90 > 50 mm.
  • interstices between the blocks of each assembly and the interstices between adjoining assemblies are dimensioned so as to prevent ingression of the granular material of the filter layer.
  • inventive covering and the inventive assembly of blocks can not only be used for covering dykes, but for covering any water-exposed slopes in general, such as banks, coasts, etc.
  • Fig. 1 shows a perspective view of an assembly consisting of four blocks
  • Fig. 2 is a top view of the assembly of Fig. 1
  • Fig. 3 is a sectional view along the line A-A of Fig. 2
  • Fig. 4 is a sectional view along the line B-B of Fig. 2
  • Fig. 5 is a sectional view along the line C-C of Fig. 2
  • Fig. 6 is a top view of a plurality of assemblies of Fig. 1 arranged side by side
  • Fig. 7 is a sectional view of a dyke with an inventive covering.
  • Fig. 1 illustrates an assembly 1 of four concrete blocks 2, 3, 4 and 5.
  • the blocks are each formed as right prisms having an irregularly formed polygonal ground surface 6 and a prism perimeter surface having a contiguous series of eight side surfaces 7.
  • the blocks have a rectangular top surface 8 that extends parallel to the ground surface 6.
  • the top surface 8 is smaller than the ground surface 6, wherein inclined surfaces 9 each connect an edge of the top surface 8 with two adjoining side surfaces 7.
  • the concrete blocks are placed at a distance from each other so as to form interstices 10 and 11 between the blocks, as can be seen in the top view according to Fig. 2 .
  • the blocks 2, 3, 4 and 5 are arranged in a grid of 2x2 blocks, wherein adjoining blocks are each interconnected by means of a connecting beam 12, 13, 14 and 15.
  • blocks 2 and 3 are interconnected by a connecting beam 13
  • blocks 3 and 4 are interconnected by a connecting beam 14
  • blocks 4 and 5 are interconnected by a connecting beam 15, and blocks 5 and 2 are interconnected by a connecting beam 12.
  • the blocks and the connecting beams together form a rigid ring-like structure, wherein the four blocks and the four connecting beams are cast as one single piece.
  • the diagonally arranged blocks 2 and 5 are smaller than the diagonally arranged blocks 3 and 5.
  • a first group of interstices 10 is formed on the exterior side of the connecting beams and a second group of interstices 11 is formed on the interior side of the connecting beams, wherein the interstices 11 are joined to form a single central compartment.
  • FIG. 2 the blocks 2, 3, 4 and 5 of assembly 1 are arranged within the rectangular bounding box 16, which facilitates the arrangement of a plurality of assemblies 1 as depicted in Fig. 6 .
  • the assemblies 1 are placed side by side in a manner that adjoining assemblies rest against each other except of block 4, which comprises a lateral extension beam 17, which rests against block 3 of an adjoining assembly.
  • interstices 18 are formed between the blocks of adjoining assemblies 1.
  • Fig. 6 shows that the blocks of adjoining assemblies interlock with each other by having edges of the blocks of one assembly extending into the bounding box of an adjoining assembly.
  • the open area of the dyke covering that is formed by the plurality of assemblies 1 is defined as the percentage of the accumulated areas, in a top view, of the interstices 10, 11 and 18, with reference to the total area covered by the assemblies or their bounding boxes respectively. In the present example, the open area is 12.35 %.
  • the open area in a top view, is shaped so as to prevent the granular material of a filter layer arranged below the blocks from entering into the interstices. Therefore, the interstices 10, 11, and 18 allow for a maximum free space between the blocks corresponding to a circle having a diameter of d, as shown in Fig. 2 , which in the present example is 50 mm.
  • the connecting beams are integrally formed with the blocks that they interconnect and have a ground surface that is aligned with the ground surface of the blocks. Further, the connecting beams have a height that corresponds to 50-80%; preferably 65-75%, of the height of the blocks, as can been seen in the cross sectional view according to Fig. 3 . The same applies for the lateral extension beam 17 as shown in Fig. 4 .
  • Fig. 5 illustrates that the transition from a connecting beam 12 to the adjoining concrete blocks 2 and 5 is formed by a sharp edge x, i.e. a right angle. The same applies to the other connecting beams 13, 14 and 15 and for the extension beam 17.
  • Fig. 7 illustrates a dyke 19 that has a covering consisting of a base layer 20 of clay, a geotextile arranged on the layer 20, a filter layer 21 consisting of a granular bed material and a layer 22 of assemblies 1 of blocks.
  • the covering as shown in Fig. 7 was subjected to the following stability test.
  • the test was conducted in an artificial testing facility having a flume that is 300 m long, 5 m wide and 9.5 m deep. Waves can be generated with a significant wave height of up to 2 m, with individual highest waves up to 5 m.
  • the stability of the covering in wave attacks must be tested on a large scale, because the damage mechanism is highly influenced by scale effects.
  • the objective of the investigation was to determine the stability factor of the inventive covering.
  • the wave height has been increased step-by-step, starting at a significant wave height of 1.5 m and ending at 1.9 m. These were short duration tests of approximately 1.5 hours each (at least 1000 waves).
  • the third test series was a long duration test, lasting 26 hours. No damage was identified at all after all of these tests. In particular, the wash-out of the granular material arranged in the interstices of the assemblies 1 was very low. The covering withstood the severe wave attack very well.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

In an assembly of concrete blocks for covering a dyke for protection against wave attacks, comprising at least two concrete blocks, each substantially having the form of a polygonal prism comprising a ground surface and a prism perimeter surface having a contiguous series of at least six side surfaces, in particular eight side surfaces, wherein the concrete blocks are placed at a distance from each other so as to form interstices between the blocks, at least two blocks are interconnected by means of a connecting beam integrally formed with said at least two blocks, said connecting beam having a ground surface that is aligned with the ground surface of said at least two blocks and having a height that corresponds to 50-80%, preferably 65-75%, of the height of said at least two blocks.

Description

  • The invention refers to an assembly of concrete blocks for covering a dyke for protection against wave attacks, comprising at least two concrete blocks, each substantially having the form of a polygonal prism comprising a ground surface and a prism perimeter surface having a contiguous series of at least six side surfaces, in particular eight side surfaces, wherein the concrete blocks are placed at a distance from each other so as to form interstices between the blocks.
  • Further, the invention refers to a covering for a dyke for protection against wave attacks, comprising a plurality of concrete blocks arranged side by side, wherein the interstices between the blocks are filled with a granular material.
  • Dyke bodies are exposed to heavy loads due to the movements of waves and/or water. Where the waves are too high or the current too strong for a grass cover, setting a stone covering provides an enhanced stability. It has been common practice to make such coverings of stone blocks by using so-called basaltic columns of natural stone, each column having a cross-sectional area differing from that of a further column. The stone columns have been placed against each other so that they support each other. This resulted in a relatively smooth dyke cover with a much greater stability, as if the stones had simply been poured loose on the embankment.
  • Nowadays, it is common to use blocks made of concrete instead of natural stone, such as basalt. Concrete blocks for use as a protection of water banks have been described, e.g., in WO 2011/096795 A2 . Concrete blocks may be produced as precast elements, so that their production may be done in a cost-efficient way and under controlled manufacturing conditions. Concrete blocks are usually laid onto the dyke by means of machines, that grab and lay a plurality of blocks at once so as to increase the working speed. After the laying process, the interstices between the individual blocks are filled with granular material that holds the stones in their position relative to each other by frictional forces and increases the stability of the covering. Further, the granular material ensures the permeability of the covering so that water can drain. A drawback of such a system, however, is that the granular material arranged between the blocks is gradually washed out over time by the forces acting upon the granular material by the waves. As the granular material is washed out, the stability of the covering reduces substantially. Thus, there is a constant need to replace the granular material that has been washed out by new material, which involves high costs.
  • In a covering as described, comprising a plurality of blocks with granular material being arranged in the interstices, the individual blocks are interlocked with the granular material being interposed. In contrast, another known system for covering dykes comprises a number of blocks that interlock directly with each other in a form-locking manner resulting in a very rigid and stable structure that is able to spread the load on the covering to a bigger area. However, due to said direct interlocking system, sea water cannot easily flow off from the covering after a wave impact. Further, uplift forces can become high under the blocks of this interlocking system.
  • Therefore, the instant invention aims at improving a concrete block coverage of a dyke for protection against wave attacks, that reduces the wash-out of granular material and therefore provides an increased stability and reduced maintenance requirements.
  • In order to solve these and other objects, the invention provides an improved assembly of concrete blocks comprising at least two concrete blocks, wherein said at least two blocks are interconnected by means of a connecting beam integrally formed with said at least two blocks, said connecting beam having a ground surface that is aligned with the ground surface of said at least two blocks and having a height that corresponds to 50-80%, preferably 65-75%, of the height of said at least two blocks. By providing a rigid connection between at least two concrete blocks, a relative movement between said interconnected blocks is prevented so as to reduce the risk of a wash out of the granular material that is arranged in the interstices between the blocks. Further, the connection beams divide the interstices into smaller compartments, which results in additional lateral barriers that hold the granular material in place. This minimizes the wash-out of the granular material, wherein the increased stability resulting therefrom enables to achieve well protected and stabilized dykes with blocks having a reduced height, therefore reducing the overall material cost of the solution. Preferably, the blocks have a height of 30-40cm.
  • According to the invention, the height of the connecting beams is selected to be 50-80%, preferably 65-75%, of the total height of said at least two blocks, which proved to produce optimal results with regard to the prevention of a wash-out of granular material.
  • The total height of a block is defined as the perpendicular distance between the ground area of the block and its highest point. If the at least two blocks that are connected by means of a connecting beams are of different height, the average height of said two blocks is used as said total height.
  • It is important to arrange the connecting beams so that their ground surface is aligned with the ground surface of said at least two blocks, so that the assembly, including the connecting beams, has a common ground area, which preferably is designed as a flat surface. Otherwise, granular material would tend to ingress into a gap formed between the connecting beams and the bedding layer, which would result in an undesired raising of the blocks.
  • Preferably, each concrete block of the block assembly is connected to the adjoining concrete block by means of a connecting beam of the type mentioned above.
  • The invention provides an assembly of at least two concrete blocks that forms a rigid structure so that said assembly may be handled by a block laying machine in an easier way when compared to the handling of a corresponding plurality of loose blocks.
  • According to a preferred embodiment, the assembly comprises at least four concrete blocks arranged in a grid within a rectangular bounding box, each block substantially having the form of a polygonal prism comprising a ground surface and a prism perimeter surface having a contiguous series of at least six side surfaces, in particular eight side surfaces, wherein the concrete blocks are placed at a distance from each other so as to form interstices between the blocks, wherein two of said at least four blocks are each interconnected by means of a connecting beam integrally formed with said two blocks, said connecting beam having a ground surface that is aligned with the ground surface of said two blocks and having a height that corresponds to 50-80%, preferably 65-75%, of the height of said two blocks.
  • Preferably, the assembly consists of exactly four blocks arranged in a 2x2 grid within a rectangular bounding box.
  • Arranging the blocks of the assembly so that a rectangular bounding box is formed enables the placing of a plurality of such assemblies side by side in a regular pattern.
  • Preferably, the blocks have the shape of irregularly formed prisms, the polygonal base of the prism therefore having no symmetry and the edges of the polygonal base having different lengths. Preferably, the blocks are each formed as a right prism.
  • In particular, the blocks of an assembly are shaped differently from one another, so that no block is identical with another block within the assembly.
  • Preferably, the assembly comprises a first group of blocks and a second group of blocks, the blocks of the first group having a larger prism perimeter than the blocks of the second group, wherein blocks of the first group and blocks of the second group are preferably arranged alternately.
  • According to a preferred embodiment of the invention, four connecting beams are provided each connecting two of said four blocks that are arranged consecutively along the direction of an edge of the bounding box.
  • As mentioned above, the concrete blocks are placed at a distance from each other so as to form interstices between the blocks. According to a preferred embodiment, this means that the blocks of the assembly do not touch each other except where they are connected by said connecting beams.
  • Preferably, the connecting beams are extending parallel to the edges of the bounding box.
  • In order to achieve a sufficient draining capacity, the percentage of the open area, in a plan view, defined as the sum of the area of the interstices present between the blocks of the assembly and the interstices present between the blocks of the assembly and the bounding box, with reference to the total area enclosed by the bounding box may be selected to be 10-15%, preferably, 12-13%.
  • In order to decrease the tendency of the granular material to be washed out, a preferred embodiment provides that two blocks that are interconnected by means of a connecting beam have opposed side surfaces confining at least one interstice between them, said opposed side surfaces extending in a non-parallel manner. In this way the interstice between two interconnected blocks narrows in one direction, which enhances the wedging effect and thus the friction between the granular material and the opposed side surfaces, said effect holding the granular material in place.
  • Preferably, two blocks that are interconnected by means of a connecting beam have opposed side surfaces confining a first interstice at one side of said connecting beam and a second interstice at the other side of said connecting beam, wherein the opposed side surfaces confining the first interstice are inclined relative to each other and the opposed side surfaces confining he second interstice are inclined relative to each other. Such an embodiment also results in the interstices having a narrowing geometry that increases the wedging of the granular material.
  • While increasing the open area of the assembly results in a desirable permeability for water, this also increases the risk of the bedding material arranged below the blocks to enter into the interstices from below. In order to prevent the bedding material from intruding into the interstices, a preferred embodiment provides that the interstices, in a plan view, are designed to allow a maximum free space between the blocks corresponding to a circle having a diameter of 50mm, preferably 40 mm. Here, it is assumed that the bedding material comprises granular material that has a particle size of bigger than 40 mm or 50 mm respectively.
  • As know per se, the side surfaces of the blocks facing the outside of the assembly may taper inwardly from the bottom to the top, in order to facilitate the demoulding of the concrete block from the mould.
  • In order to effectively dissipate the kinetic energy that is acting on the blocks when waves occur, each block preferably comprises a top surface and inclined surfaces each connecting an edge of the top surface with the side surfaces.
  • Preferably, the top surface has the shape of a rectangle that, in a top view, is arranged at an acute angle with respect to the bounding box.
  • The concrete blocks are preferably made of a concrete that has a high compressive strength. In particular, the compressive strength of the blocks after 28 days of curing is > 60 N/mm2.
  • According to a second aspect of the invention, a covering for a dyke for protection against wave attacks is provided, comprising a plurality of assemblies of concrete blocks as describe above that are arranged side by side, wherein the interstices between the blocks of each assembly and the interstices between adjoining assemblies are filled with a granular material.
  • Preferably, the side by side arrangement is configured such that the blocks of one assembly rest against the blocks of the adjoining assembly, thereby increasing the overall stability of the covering.
  • Preferably, the assemblies of concrete blocks are arranged on a filter layer comprising a granular material, said filter layer preferably being arranged on a geotextile and said geotextile preferably being arranged on a layer of clay.
  • Preferably, the granular material arranged within the interstices has a particle size of between 4 and 32 mm, preferably 16 and 32 mm.
  • In order to increase the stability of the covering, a granular material having a particularly high mass is used. Preferably, the granular material arranged within the interstices has a volumetric mass density of > 2'800 kg/m3, preferably 2'900-3'000 kg/m3.
  • Preferably, the granular material arranged within the interstices is made of crushed or broken stone, preferably basalt. Crushed or broken stone is characterized by an irregular shape, which enhances the interlocking effect prevailing between the stones.
  • Preferably, the granular material of the filter layer has a particle size distribution characterized by a D90 > 50 mm.
  • In particular, the interstices between the blocks of each assembly and the interstices between adjoining assemblies are dimensioned so as to prevent ingression of the granular material of the filter layer.
  • The inventive covering and the inventive assembly of blocks can not only be used for covering dykes, but for covering any water-exposed slopes in general, such as banks, coasts, etc.
  • The invention will now be described in more detail by reference to an exemplary embodiment illustrated in the attached drawings. In the drawings, Fig. 1 shows a perspective view of an assembly consisting of four blocks, Fig. 2 is a top view of the assembly of Fig. 1, Fig. 3 is a sectional view along the line A-A of Fig. 2, Fig. 4 is a sectional view along the line B-B of Fig. 2, Fig. 5 is a sectional view along the line C-C of Fig. 2, Fig. 6 is a top view of a plurality of assemblies of Fig. 1 arranged side by side and Fig. 7 is a sectional view of a dyke with an inventive covering.
  • Fig. 1 illustrates an assembly 1 of four concrete blocks 2, 3, 4 and 5. The blocks are each formed as right prisms having an irregularly formed polygonal ground surface 6 and a prism perimeter surface having a contiguous series of eight side surfaces 7. The blocks have a rectangular top surface 8 that extends parallel to the ground surface 6. The top surface 8 is smaller than the ground surface 6, wherein inclined surfaces 9 each connect an edge of the top surface 8 with two adjoining side surfaces 7.
  • The concrete blocks are placed at a distance from each other so as to form interstices 10 and 11 between the blocks, as can be seen in the top view according to Fig. 2. The blocks 2, 3, 4 and 5 are arranged in a grid of 2x2 blocks, wherein adjoining blocks are each interconnected by means of a connecting beam 12, 13, 14 and 15. In particular, blocks 2 and 3 are interconnected by a connecting beam 13, and blocks 3 and 4 are interconnected by a connecting beam 14, and blocks 4 and 5 are interconnected by a connecting beam 15, and blocks 5 and 2 are interconnected by a connecting beam 12. In this way, the blocks and the connecting beams together form a rigid ring-like structure, wherein the four blocks and the four connecting beams are cast as one single piece. The diagonally arranged blocks 2 and 5 are smaller than the diagonally arranged blocks 3 and 5.
  • A first group of interstices 10 is formed on the exterior side of the connecting beams and a second group of interstices 11 is formed on the interior side of the connecting beams, wherein the interstices 11 are joined to form a single central compartment.
  • As can be seen in Fig. 2 the blocks 2, 3, 4 and 5 of assembly 1 are arranged within the rectangular bounding box 16, which facilitates the arrangement of a plurality of assemblies 1 as depicted in Fig. 6. The assemblies 1 are placed side by side in a manner that adjoining assemblies rest against each other except of block 4, which comprises a lateral extension beam 17, which rests against block 3 of an adjoining assembly. As can be seen in Fig. 6, interstices 18 are formed between the blocks of adjoining assemblies 1. Further, Fig. 6 shows that the blocks of adjoining assemblies interlock with each other by having edges of the blocks of one assembly extending into the bounding box of an adjoining assembly.
  • The open area of the dyke covering that is formed by the plurality of assemblies 1 is defined as the percentage of the accumulated areas, in a top view, of the interstices 10, 11 and 18, with reference to the total area covered by the assemblies or their bounding boxes respectively. In the present example, the open area is 12.35 %.
  • The open area, in a top view, is shaped so as to prevent the granular material of a filter layer arranged below the blocks from entering into the interstices. Therefore, the interstices 10, 11, and 18 allow for a maximum free space between the blocks corresponding to a circle having a diameter of d, as shown in Fig. 2, which in the present example is 50 mm.
  • The connecting beams are integrally formed with the blocks that they interconnect and have a ground surface that is aligned with the ground surface of the blocks. Further, the connecting beams have a height that corresponds to 50-80%; preferably 65-75%, of the height of the blocks, as can been seen in the cross sectional view according to Fig. 3. The same applies for the lateral extension beam 17 as shown in Fig. 4.
  • Fig. 5 illustrates that the transition from a connecting beam 12 to the adjoining concrete blocks 2 and 5 is formed by a sharp edge x, i.e. a right angle. The same applies to the other connecting beams 13, 14 and 15 and for the extension beam 17.
  • Fig. 7 illustrates a dyke 19 that has a covering consisting of a base layer 20 of clay, a geotextile arranged on the layer 20, a filter layer 21 consisting of a granular bed material and a layer 22 of assemblies 1 of blocks.
  • The covering as shown in Fig. 7 was subjected to the following stability test. The test was conducted in an artificial testing facility having a flume that is 300 m long, 5 m wide and 9.5 m deep. Waves can be generated with a significant wave height of up to 2 m, with individual highest waves up to 5 m. The stability of the covering in wave attacks must be tested on a large scale, because the damage mechanism is highly influenced by scale effects.
  • The objective of the investigation was to determine the stability factor of the inventive covering.
  • The tests have been carried out on a scale of 1:1.5, which means that the dimensions of the blocks were 1.5 times smaller than in reality. Also the wave height was 1.5 times smaller than in reality. The slope angle and density of the blocks are on scale 1:1 according to the scaling laws derived from basic physics.
  • The dimensions of the scale model were as follows:
    • slope angle: 1:3.6
    • height of blocks: 0.199 m
    • average density of blocks: 2262 kg/m3
    • layer thickness of the filter layer 21: 0.08 m
    • grain size of the granular material of the filter layer 21: 11-35 mm, Df15 = 13 mm
    • grain size of the granular material filled into the interstices of the assemblies 1: 5-20 mm, Di15 = 6 mm
  • Three test series have been carried out:
    • Test 1: short duration tests with small wave steepness (relatively low waves)
    • Test 2: short duration test with large wave steepness (relatively short waves)
    • Test 3: long duration test with large wave steepness (relatively short waves).
  • In the first two test series the wave height has been increased step-by-step, starting at a significant wave height of 1.5 m and ending at 1.9 m. These were short duration tests of approximately 1.5 hours each (at least 1000 waves).
  • The third test series was a long duration test, lasting 26 hours.
    No damage was identified at all after all of these tests. In particular, the wash-out of the granular material arranged in the interstices of the assemblies 1 was very low. The covering withstood the severe wave attack very well.

Claims (21)

  1. Assembly of concrete blocks for covering a dyke for protection against wave attacks, comprising at least two concrete blocks, each substantially having the form of a polygonal prism comprising a ground surface and a prism perimeter surface having a contiguous series of at least six side surfaces, in particular eight side surfaces, wherein the concrete blocks are placed at a distance from each other so as to form interstices between the blocks, wherein said at least two blocks are interconnected by means of a connecting beam integrally formed with said at least two blocks, said connecting beam having a ground surface that is aligned with the ground surface of said at least two blocks and having a height that corresponds to 50-80%, preferably 65-75%, of the height of said at least two blocks.
  2. Assembly according to claim 1, wherein the assembly comprises at least four concrete blocks arranged in a grid within a rectangular bounding box, each block substantially having the form of a polygonal prism comprising a ground surface and a prism perimeter surface having a contiguous series of at least six side surfaces, in particular eight side surfaces, wherein the concrete blocks are placed at a distance from each other so as to form interstices between the blocks, wherein two of said at least four blocks are each interconnected by means of a connecting beam integrally formed with said two blocks, said connecting beam having a ground surface that is aligned with the ground surface of said two blocks and having a height that corresponds to 50-80%, preferably 65-75%, of the height of said two blocks.
  3. Assembly according to claim 1 or 2, wherein the assembly consists of four blocks arranged in a 2x2 grid within a rectangular bounding box.
  4. Assembly according to claim 2 or 3, wherein four connecting beams are provided, each connecting two of said four blocks that are arranged consecutively along the direction of an edge of the bounding box.
  5. Assembly according to any one of claims 1 to 4, wherein the blocks of the assembly do not touch each other except where they are connected by said connecting beams.
  6. Assembly according to any one of claims 2 to 5, wherein the connecting beams are extending parallel to the edges of the bounding box.
  7. Assembly according to any one of claims 2 to 6, wherein the percentage of the open area, in a plan view, defined as the sum of the area of the interstices present between the blocks of the assembly and the interstices present between the blocks of the assembly and the bounding box, with reference to the total area enclosed by the bounding box is 10-15%, preferably, 12-13%.
  8. Assembly according to any one of claims 1 to 7, wherein the assembly comprises a first group of blocks and a second group of blocks, the blocks of the first group having a larger prism perimeter than the blocks of the second group, wherein blocks of the first group and blocks of the second group are preferably arranged alternately.
  9. Assembly according to any one of claims 1 to 8, wherein two blocks that are interconnected by means of a connecting beam have opposed side surfaces confining at least one interstice between them, said opposed side surfaces extending in a non-parallel manner.
  10. Assembly according to any one of claims 1 to 9, wherein two blocks that are interconnected by means of a connecting beam have opposed side surfaces confining a first interstice at one side of said connecting beam and a second interstice at the other side of said connecting beam, wherein the opposed side surfaces confining the first interstice are inclined relative to each other and the opposed side surfaces confining he second interstice are inclined relative to each other.
  11. Assembly according to any one of claims 1 to 9, wherein the interstices, in a plan view, are designed to allow a maximum free space between the blocks corresponding to a circle having a diameter of 50mm, preferably 40mm.
  12. Assembly according to any one of claims 1 to 11, wherein the side surfaces of the blocks facing the outside of the assembly taper inwardly from the bottom to the top.
  13. Assembly according to any one of claims 1 to 12, wherein each block comprises a top surface and inclined surfaces each connecting an edge of the top surface with the side surfaces.
  14. Assembly according to claim 13, wherein the top surface has the shape of a rectangle that, in a top view, is arranged at an acute angle with respect to the bounding box.
  15. Covering for a dyke for protection against wave attacks, comprising a plurality of assemblies of concrete blocks according to any one of claims 1 to 14 arranged side by side, wherein the interstices between the blocks of each assembly and the interstices between adjoining assemblies are filled with a granular material.
  16. Covering according to claim 15, wherein the assemblies of concrete blocks are arranged on a filter layer comprising a granular material, said filter layer preferably being arranged on a geotextile and said geotextile preferably being arranged on a layer of clay.
  17. Covering according to claim 15 or 16, wherein the granular material arranged within the interstices has a particle size of between 4 and 32 mm, preferably 16 and 32 mm.
  18. Covering according to claim 15, 16 or 17, wherein the granular material arranged within the interstices has a volumetric mass density of > 2'800 kg/m3, preferably 2'900-3'000 kg/m3.
  19. Covering according to any one of claims 15 to 18, wherein the granular material arranged within the interstices is made of crushed or broken stone, preferably basalt.
  20. Covering according to any one of claims 16 to 19, wherein the granular material of the filter layer has a particle size distribution characterized by a D90 > 50mm.
  21. Covering according to any one of claims 16 to 20, wherein the interstices between the blocks of each assembly and the interstices between adjoining assemblies are dimensioned so as to prevent ingression of the granular material of the filter layer.
EP18000784.1A 2018-10-03 2018-10-03 Assembly of concrete blocks for covering a dyke Withdrawn EP3633108A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP18000784.1A EP3633108A1 (en) 2018-10-03 2018-10-03 Assembly of concrete blocks for covering a dyke
EP19780443.8A EP3861172A1 (en) 2018-10-03 2019-10-02 Assembly of concrete blocks for covering a dyke
PCT/IB2019/058370 WO2020070656A1 (en) 2018-10-03 2019-10-02 Assembly of concrete blocks for covering a dyke
MA053805A MA53805A (en) 2018-10-03 2019-10-02 SET OF CONCRETE BLOCKS TO COVER A DIKE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP18000784.1A EP3633108A1 (en) 2018-10-03 2018-10-03 Assembly of concrete blocks for covering a dyke

Publications (1)

Publication Number Publication Date
EP3633108A1 true EP3633108A1 (en) 2020-04-08

Family

ID=63794261

Family Applications (2)

Application Number Title Priority Date Filing Date
EP18000784.1A Withdrawn EP3633108A1 (en) 2018-10-03 2018-10-03 Assembly of concrete blocks for covering a dyke
EP19780443.8A Pending EP3861172A1 (en) 2018-10-03 2019-10-02 Assembly of concrete blocks for covering a dyke

Family Applications After (1)

Application Number Title Priority Date Filing Date
EP19780443.8A Pending EP3861172A1 (en) 2018-10-03 2019-10-02 Assembly of concrete blocks for covering a dyke

Country Status (3)

Country Link
EP (2) EP3633108A1 (en)
MA (1) MA53805A (en)
WO (1) WO2020070656A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3557669A (en) * 1968-06-19 1971-01-26 Matthew Robert Fenton Paving block and paving formed therewith
DE2611764A1 (en) * 1975-03-19 1976-09-30 Nederlanden Staat Bank lining for dykes - uses upward tapering piles with recessed sides to for granular material filled joints (NL210976)
EP0015426A1 (en) * 1979-02-15 1980-09-17 Dr. Barth GmbH Ground covering element with elevated areas on the top side separated by dummy gaps, group of such ground covering elements and process for manufacturing such elements
WO2011096795A2 (en) 2010-02-03 2011-08-11 Spekpannekoek B.V. Block for the protection of water banks and the like

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3557669A (en) * 1968-06-19 1971-01-26 Matthew Robert Fenton Paving block and paving formed therewith
DE2611764A1 (en) * 1975-03-19 1976-09-30 Nederlanden Staat Bank lining for dykes - uses upward tapering piles with recessed sides to for granular material filled joints (NL210976)
EP0015426A1 (en) * 1979-02-15 1980-09-17 Dr. Barth GmbH Ground covering element with elevated areas on the top side separated by dummy gaps, group of such ground covering elements and process for manufacturing such elements
WO2011096795A2 (en) 2010-02-03 2011-08-11 Spekpannekoek B.V. Block for the protection of water banks and the like

Also Published As

Publication number Publication date
EP3861172A1 (en) 2021-08-11
MA53805A (en) 2022-01-12
WO2020070656A1 (en) 2020-04-09

Similar Documents

Publication Publication Date Title
TW420743B (en) Revetment block
RU2009132549A (en) BLOCKING UNIT
CA1234294A (en) Breakwater construction element
KR101394208B1 (en) The eco-friendly stone net for protecting riverbank and sloping surface structure
US2766592A (en) Artificial blocks for structures exposed to the action of moving water
EP0165659B1 (en) Flexible blanket
KR101718903B1 (en) Revetment block for scour prevention
KR101234042B1 (en) Caisson and method for manufacturing of caisson with friction increased structure
GB2099054A (en) Marine protective structures and modular block constructions therefor
EP3633108A1 (en) Assembly of concrete blocks for covering a dyke
KR100743897B1 (en) construction method using block unit for building a breakwater
JP6674220B2 (en) Landing method by coral gravel accumulation, permeation structure and structure therefor
CN218373648U (en) A combination formula gabion protective structure for hydraulic engineering
KR100828222B1 (en) A multi functional block with hexagonal type
KR20060114815A (en) Method for constructing the coastline covering structures having a buffering function preventing the coastal erosion
KR20140106943A (en) Assembly type block for wave dissipation
CN208472649U (en) A kind of Gravity Type Casisson Berth structure setting friction pile in foundation
KR101452454B1 (en) Truncated pyramid block for reinforcing ground and foundation construction method using the truncated pyramid blocks
RU2512256C2 (en) Universal flexible protective concrete mat
KR200413124Y1 (en) Hexapod for prevention against wave abrasion of structure in water
JP6688156B2 (en) Landification method by coral gravel deposition, permeable structure and structure therefor
KR102239894B1 (en) Compound block
KR101052295B1 (en) Four-sided dam with double drips
KR101203149B1 (en) Block prevent erosion
KR20190107801A (en) A Ceramic Welding Contact Tip and Method of fabrication the same

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 20201009