EP3608200A1 - Rail station transportation dispatch method and system - Google Patents
Rail station transportation dispatch method and system Download PDFInfo
- Publication number
- EP3608200A1 EP3608200A1 EP18876592.9A EP18876592A EP3608200A1 EP 3608200 A1 EP3608200 A1 EP 3608200A1 EP 18876592 A EP18876592 A EP 18876592A EP 3608200 A1 EP3608200 A1 EP 3608200A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- plan
- station
- management module
- module
- station plan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 28
- 238000012545 processing Methods 0.000 claims abstract description 61
- 230000000593 degrading effect Effects 0.000 claims description 2
- 238000007726 management method Methods 0.000 abstract description 101
- 230000011664 signaling Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 238000012423 maintenance Methods 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000004590 computer program Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/04—Automatic systems, e.g. controlled by train; Change-over to manual control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/14—Following schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/30—Trackside multiple control systems, e.g. switch-over between different systems
- B61L27/33—Backup systems, e.g. switching when failures occur
Definitions
- the present disclosure relates to the field of automatic control technology, especially to a station transport dispatching method and system.
- Chinese high-speed railway signal system mainly includes subsystems like Chinese Train Control System (CTCS), Computer Based Interlocking system (CBI), Central Traffic Control (CTC), as well as some signal auxiliary systems, such as Centralized Signaling Monitoring (CSM), dispatching command wireless transmission system, power supply system, etc.
- CCS Chinese Train Control System
- CBI Computer Based Interlocking system
- CTC Central Traffic Control
- CSM Centralized Signaling Monitoring
- the train dispatchers are required to use the CTC system to carry out jobs like the formulation and delivery of train movement plan, the train route setting, the shunting operation, the release of dispatching command, the centralized control of signaling equipment, the equipment maintenance dispatching, the emergency traffic commanding, the arrival and departure operation during abnormality, etc.
- the dispatchers need to monitor the situation of train operation and signaling equipment such as train tracking, train position and speed, signal status, train route, and section block and so on through the screen wall and display of the CTC system.
- the CTC system is technical equipment with which the dispatching center (dispatcher) centrally controls the signaling equipment in a certain section and directly directs, manages the train operation.
- the CTC system is a highly automated dispatching and commanding system combined with computer technology, network communication technology and modernization controlling technology, which applies the design principle of intelligent decentralized self-discipline. It centers on the train operation adjustment plan control and takes the train operation and shunting operation into account.
- the CTC system consists of three parts: the dispatch center subsystem, the station subsystem, and the network subsystem among stations, as shown in FIG. 1 .
- the dispatch center subsystem is the core of the CTC system, and is mainly composed of server equipment and the terminal equipment in each dispatch station.
- the server equipment includes: a database server, an application server, a communication server, an interface server, an external information service server, and an external time server.
- the dispatch station user terminal equipment includes: a dispatcher workstation, an assistant dispatcher workstation, a comprehensive maintenance workstation, a station display workstation, a comprehensive query workstation, a shift supervisor workstation, a planner workstation, a dispatch maintenance workstation, and the like.
- the station autonomous machine is the key equipment of the CTC system and should meet the following functional requirements: it should be able to receive the train operation adjustment plan, direct operation commands from the dispatch center and direct operation commands from the station operator, and send them to the station interlocking system at the appropriate time to be executed after inspection with no conflicts; it should be able to receive the station signaling equipment status information in real time, track the train number, collect the actual train running data, and upload it to the dispatch center; it should be able to get the status of execution of the route commands by the station interlocking system, and make necessary adjustments to the relevant routes according to feedback information; it should be able to receive train time report and equipment status information from every two adjacent stations.
- the present disclosure provides a station transport dispatching method and system to solve the problem that the existing CTC system cannot meet the transport commanding needs.
- the present disclosure provides a station transport dispatching method, comprising:
- Some beneficial effects of the embodiments of the present disclosure may include that the station operator sends the station plan to the plan processing module through the station plan management module, and the plan processing module automatically parses the station plan into a corresponding operation route and sends it to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
- the method further comprises:
- the initialization process of the station plan management module is added, the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests stage plan from the storage query module.
- the method further comprising:
- a station plan request receipt returned from the storage query module specifically comprises:
- the processing procedure of hot/standby switchover by the station plan management module is added, which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system.
- the present application provides a station transport dispatching system, comprising: a plan processing module, a station plan management module, a route processing module, a storage query module, and a train arrival departure control module:
- the station operator sends the station plan to the plan processing module through the station plan management module, the plan processing module automatically parses the station plan into corresponding operation routes and sends them to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
- system further comprises a storage query module:
- the initialization process of the station plan management module is added, the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests a stage plan from the storage query module.
- system further comprises a station plan management module of standby machine and a station plan management module of hot machine:
- the station plan management module of standby machine is specifically configured to: if a receipt result is that the station plan request has been successfully loaded, update the interface display information according to the station plan information; if the station plan request receipt result returned from the storage query module is that the station plan request fails to load, send a request to load the entire station plan information to the station plan management module of hot machine; the station plan management module of hot machine is configured to send the entire station plan information to the station plan management module of standby machine.
- the processing flows of hot/standby switchover by the station plan management modules is added, which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system.
- FIG. 3 is a flowchart of a station transport dispatching method according to the embodiments of the present disclosure. As shown in FIG. 3 , the method comprises the following steps S301 to S308.
- Step 301 a station plan management module receives command inputted by user to issue station plan
- Step 302 the station plan management module issues the station plan to a plan processing module.
- Step 303 the plan processing module returns receipt of the station plan to the station plan management module.
- Step 304 the plan processing module parses the station plan into train route plan.
- Step 305 the plan processing module issues the parsed station route plan to a route processing module.
- Step 306 the route processing module forwards the received station route plan to a train arrival departure control module.
- Step 307 the station plan management module issues the station plan information to a storage query module for storing.
- Step 308 the storage query module returns storage receipt of the station plan information to the station plan management module.
- the station operator sends the station plan to the plan processing module through the station plan management module, the plan processing module automatically parses the station plan into corresponding operation routes and sends them to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
- FIG. 4 is a flowchart of Embodiment 2 of a station transport dispatching method according to the embodiments of the present disclosure. As shown in FIG. 4 , this embodiment comprises the following steps.
- Step 401 start programs of the station plan management module.
- Step 402 the station plan management module loads configurations and the system starts to run.
- Step 403 the station plan management module sends a request for loading station plan in the database to the storage query module.
- Step 404 the station plan management module sends a request for loading a train graph stage plan in the database to the storage query module.
- Step 405 the storage query module sends station plan information to the station plan management module.
- Step 406 the station plan management module updates interface display information according to the station plan information.
- Step 407 the storage query module sends train graph stage plan information to the station plan management module.
- Step 408 the station plan management module updates interface display information according to the train graph stage plan information.
- the initialization process of the station plan management module is added based on the embodiment in FIG. 3 , the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests a stage plan from the storage query module, receives the request receipt sent from the storage query module and updates the interface display information.
- FIG. 5 is a flowchart of Embodiment 3 of a station transport dispatching method according to the embodiments of the present disclosure.
- the station plan management module A (the station plan management module of the original standby machine) in this embodiment is the station plan management module of standby machine
- the station plan management module B (the station plan management module of the original hot machine) is the station plan management module of hot machine
- this embodiment includes the following steps.
- Step 501 starts programs of the station plan management module A.
- Step 502 the station plan management module A sends a request for loading station plan in the database to the storage query module.
- Step 503 the storage query module returns receipt of the station plan request to the station plan management module A.
- Step 504 if a receipt result is that the station plan request has been successfully loaded, the station plan management module A updates the interface display information according to the station plan information.
- Step 505 if the receipt result is that the station plan request fails to load, the station plan management module A sends a request to load the entire station plan information to the station plan management module B.
- Step 506 the station plan management module B sends the entire station plan information to the station plan management module A.
- Step 507 upgrade the station plan management module A as the hot one and sends information that the local machine is upgraded as the hot one to the station plan management module B.
- Step 508 degrades the station plan management module B is as the standby machine, and clears the cache.
- Step 509 the station plan management module A sends a request for train graph stage plan to the storage query module.
- Step 510 the storage query module sends a train graph stage plan to the station plan management module A.
- Step 511 the station plan management module A updates the cache.
- Step 512 the operator clicks on the "Update" button.
- Step 513 the station plan management module A updates the interface.
- the processing flows of hot/standby switchover by the station plan management module is added based on the embodiment in FIG. 3 , which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system.
- FIG. 2 is a schematic diagram of a station transport dispatching system in one embodiment of the present disclosure, as shown in FIG. 2 , the station transport dispatching system in this embodiment comprises: a plan processing module, station plan management modules, a route processing module, a storage query module, and a train arrival departure control module.
- the station plan management modules are set in train operation terminal A/train operation terminal B; the train arrival departure control module, the plan processing module and the route processing module are set in the station autonomous machine; and the storage query module is set in the station server:
- the operator sends the station plan to the plan processing module through the station plan management module, the plan processing module automatically parses the station plan into corresponding operation routes and sends them to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
- station transport dispatching system further comprises a storage query module:
- the initialization process of the station plan management module is added based on the embodiment in FIG. 2 , the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests a stage plan from the storage query module.
- station transport dispatching system further comprises a station plan management module of standby machine and a station plan management module of hot machine:
- the station plan management module of standby machine is specifically configured to: if a receipt result is that the station plan request has been successfully loaded, update the interface display information according to the station plan information; if the station plan request receipt result returned from the storage query module is that the station plan request fails to load, send a request to load the entire station plan information to the station plan management module of hot machine; the station plan management module of hot machine is configured to send the entire station plan information to the station plan management module of standby machine.
- the processing flows of hot/standby switchover by the station plan management module is added based on the embodiment in FIG. 2 , which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system.
- the embodiments of the present application can be provided as methods, systems or computer program products. Therefore, the present application can adopt the form of full hardware embodiments, full software embodiments, or embodiments combining software and hardware aspects. And the present application can adopt the form of computer program products implemented on one or more storage mediums with program codes usable for computer (including, but not limited to, magnetic disk storage, CD-ROM, optical memory, or the like).
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
Description
- The present application claims priority of the Chinese Patent Application No.
201711113188.0 filed on November 13, 2017 - The present disclosure relates to the field of automatic control technology, especially to a station transport dispatching method and system.
- Chinese high-speed railway signal system mainly includes subsystems like Chinese Train Control System (CTCS), Computer Based Interlocking system (CBI), Central Traffic Control (CTC), as well as some signal auxiliary systems, such as Centralized Signaling Monitoring (CSM), dispatching command wireless transmission system, power supply system, etc.
- The train dispatchers are required to use the CTC system to carry out jobs like the formulation and delivery of train movement plan, the train route setting, the shunting operation, the release of dispatching command, the centralized control of signaling equipment, the equipment maintenance dispatching, the emergency traffic commanding, the arrival and departure operation during abnormality, etc. In addition, the dispatchers need to monitor the situation of train operation and signaling equipment such as train tracking, train position and speed, signal status, train route, and section block and so on through the screen wall and display of the CTC system.
- The CTC system is technical equipment with which the dispatching center (dispatcher) centrally controls the signaling equipment in a certain section and directly directs, manages the train operation. The CTC system is a highly automated dispatching and commanding system combined with computer technology, network communication technology and modernization controlling technology, which applies the design principle of intelligent decentralized self-discipline. It centers on the train operation adjustment plan control and takes the train operation and shunting operation into account.
- The CTC system consists of three parts: the dispatch center subsystem, the station subsystem, and the network subsystem among stations, as shown in
FIG. 1 . - The dispatch center subsystem is the core of the CTC system, and is mainly composed of server equipment and the terminal equipment in each dispatch station. The server equipment includes: a database server, an application server, a communication server, an interface server, an external information service server, and an external time server. The dispatch station user terminal equipment includes: a dispatcher workstation, an assistant dispatcher workstation, a comprehensive maintenance workstation, a station display workstation, a comprehensive query workstation, a shift supervisor workstation, a planner workstation, a dispatch maintenance workstation, and the like.
- The station autonomous machine is the key equipment of the CTC system and should meet the following functional requirements: it should be able to receive the train operation adjustment plan, direct operation commands from the dispatch center and direct operation commands from the station operator, and send them to the station interlocking system at the appropriate time to be executed after inspection with no conflicts; it should be able to receive the station signaling equipment status information in real time, track the train number, collect the actual train running data, and upload it to the dispatch center; it should be able to get the status of execution of the route commands by the station interlocking system, and make necessary adjustments to the relevant routes according to feedback information; it should be able to receive train time report and equipment status information from every two adjacent stations.
- The present disclosure provides a station transport dispatching method and system to solve the problem that the existing CTC system cannot meet the transport commanding needs.
- The present disclosure provides a station transport dispatching method, comprising:
- receiving, by a plan processing module, station plan issued from a station plan management module;
- by the plan processing module, parsing the station plan into train route plan and issuing the train route plan to a route processing module;
- issuing, by the route processing module, the train route plan to a train arrival departure control module for processing;
- issuing, by the station plan management module, the station plan to a storage query module for storing.
- Some beneficial effects of the embodiments of the present disclosure may include that the station operator sends the station plan to the plan processing module through the station plan management module, and the plan processing module automatically parses the station plan into a corresponding operation route and sends it to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
- In one embodiment, the method further comprises:
- at startup of the station plan management module, sending a request to the storage query module to load station plan and train graph stage plan in a database;
- by the station plan management module, receiving station plan information and train graph stage plan information issued from the storage query module and updating interface display information according to the station plan information and the train graph stage plan information.
- In this embodiment, the initialization process of the station plan management module is added, the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests stage plan from the storage query module.
- In one embodiment, the method further comprising:
- sending, by a station plan management module of standby machine, request to load station plan in database to the storage query module during an hot/standby switchover;
- by the station plan management module of standby machine, receiving station plan request receipt returned from the storage query module and sending information to the station plan management module that the local machine is to be upgraded as the hot machine;
- upgrading the station plan management module of standby machine as new station plan management module of hot machine, and degrading the station plan management module of hot machine to new station plan management module of standby machine;
- by the new station plan management module of hot machine, sending a request for the train graph stage plan to the storage query module, receiving the train graph stage plan information issued from the storage query module, and updating the interface display information according to the train graph stage plan information.
- Receiving, by the original station plan management module of standby machine, a station plan request receipt returned from the storage query module specifically comprises:
- if the receipt result is that the station plan request has been successfully loaded, updating, by the original station plan management module of standby machine, the interface display information according to the station plan information;
- if the receipt result is that the station plan request fails to load, sending, by the original station plan management module of standby machine, a request to load the entire station plan information to the original station plan management module of hot machine;
- receiving, by the original station plan management module of standby machine, the entire station plan information sent from the original station plan management module of hot machine.
- In this embodiment, the processing procedure of hot/standby switchover by the station plan management module is added, which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system.
- The present application provides a station transport dispatching system, comprising: a plan processing module, a station plan management module, a route processing module, a storage query module, and a train arrival departure control module:
- the plan processing module is configured to receive station plan issued from a station plan management module, parse the station plan into train route plan, and issue the train route plan to the route processing module;
- the route processing module is configured to issue the train route plan to the train arrival departure control module for processing;
- the station plan management module is configured to issue the station plan to the plan processing module for processing, and issue the plan station to the storage query module for storing; receive station plan information and train graph stage plan information issued from the storage query module and update interface display information according to the station plan information and the train graph stage plan information.
- In the station transport dispatching system of this embodiment, the station operator sends the station plan to the plan processing module through the station plan management module, the plan processing module automatically parses the station plan into corresponding operation routes and sends them to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
- In one embodiment, the system further comprises a storage query module:
- the station plan management module is configured to send request to load station plan and a train graph stage plan in a database to the storage query module;
- receive the station plan information and the train graph stage plan information issued from the storage query module and update interface display information according to the station plan information and the train graph stage plan information;
- the storage query module is configured to receive the station plan and store it in a database, receive request for the station plan and request for the stage plan sent from the station plan management module, and send station plan request receipt and stage plan request receipt to the station plan management module.
- In this embodiment, the initialization process of the station plan management module is added, the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests a stage plan from the storage query module.
- In one embodiment, the system further comprises a station plan management module of standby machine and a station plan management module of hot machine:
- the station plan management module of standby machine is configured to send a request to load station plan in a database to the storage query module during an hot/standby switchover, and receive a station plan request receipt returned from the storage query module; after being upgraded to the new station plan management module of hot machine, send a request for train graph stage plan to the storage query module, and receive the train graph stage plan information sent from the storage query module, and update the interface display information according to the train graph stage plan information;
- the station plan management module of hot machine is configured to receive information sent from the station plan management module of standby machine that the local machine is upgraded as the hot one during the hot/standby switchover.
- The station plan management module of standby machine is specifically configured to: if a receipt result is that the station plan request has been successfully loaded, update the interface display information according to the station plan information;
if the station plan request receipt result returned from the storage query module is that the station plan request fails to load, send a request to load the entire station plan information to the station plan management module of hot machine;
the station plan management module of hot machine is configured to send the entire station plan information to the station plan management module of standby machine. - In this embodiment, the processing flows of hot/standby switchover by the station plan management modules is added, which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system.
- Other features and advantages of the present disclosure will be set forth in the description which follows, parts of them will be apparent from the description, or may be learned by implementing the present disclosure. The objectives and other advantages of the present disclosure can be realized and obtained by the description, claims and structure particularly specified in the drawings attached thereto.
- The technical solutions of the present disclosure will be further described in detail below through the accompanying drawings and embodiments.
- The drawings are to provide a further understanding of the present disclosure, and they constitute a part of the specification, the drawings together with the description of the specification are intended to explain principles of the present disclosure, rather than to limit the present disclosure. In the drawings:
-
FIG. 1 is a structural schematic view of the CTC system in the prior art; -
FIG. 2 is a schematic diagram of a station transport dispatching system in one embodiment of the present disclosure; -
FIG. 3 is a flowchart of Embodiment 1 of a station transport dispatching method according to the embodiments of the present disclosure; -
FIG. 4 is a flowchart of Embodiment 2 of a station transport dispatching method according to the embodiments of the present disclosure; -
FIG. 5 is a flowchart of Embodiment 3 of a station transport dispatching method according to the embodiments of the present disclosure. - The preferred embodiments of the present disclosure will be described below with reference to the accompanying drawings. It should be understood that, the preferred embodiments described herein are used to illustrate and explain the present disclosure only, not to limit the present disclosure.
-
FIG. 3 is a flowchart of a station transport dispatching method according to the embodiments of the present disclosure. As shown inFIG. 3 , the method comprises the following steps S301 to S308. -
Step 301, a station plan management module receives command inputted by user to issue station plan -
Step 302, the station plan management module issues the station plan to a plan processing module. -
Step 303, the plan processing module returns receipt of the station plan to the station plan management module. -
Step 304, the plan processing module parses the station plan into train route plan. -
Step 305, the plan processing module issues the parsed station route plan to a route processing module. -
Step 306, the route processing module forwards the received station route plan to a train arrival departure control module. -
Step 307, the station plan management module issues the station plan information to a storage query module for storing. -
Step 308, the storage query module returns storage receipt of the station plan information to the station plan management module. - In the station transport dispatching method in this embodiment, the station operator sends the station plan to the plan processing module through the station plan management module, the plan processing module automatically parses the station plan into corresponding operation routes and sends them to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
-
FIG. 4 is a flowchart of Embodiment 2 of a station transport dispatching method according to the embodiments of the present disclosure. As shown inFIG. 4 , this embodiment comprises the following steps. -
Step 401, start programs of the station plan management module. -
Step 402, the station plan management module loads configurations and the system starts to run. -
Step 403, the station plan management module sends a request for loading station plan in the database to the storage query module. -
Step 404, the station plan management module sends a request for loading a train graph stage plan in the database to the storage query module. -
Step 405, the storage query module sends station plan information to the station plan management module. -
Step 406, the station plan management module updates interface display information according to the station plan information. -
Step 407, the storage query module sends train graph stage plan information to the station plan management module. -
Step 408, the station plan management module updates interface display information according to the train graph stage plan information. - For the station transport dispatching method in this embodiment, the initialization process of the station plan management module is added based on the embodiment in
FIG. 3 , the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests a stage plan from the storage query module, receives the request receipt sent from the storage query module and updates the interface display information. -
FIG. 5 is a flowchart of Embodiment 3 of a station transport dispatching method according to the embodiments of the present disclosure. As shown inFIG. 5 , the station plan management module A (the station plan management module of the original standby machine) in this embodiment is the station plan management module of standby machine, and the station plan management module B (the station plan management module of the original hot machine) is the station plan management module of hot machine, this embodiment includes the following steps. -
Step 501, starts programs of the station plan management module A. -
Step 502, the station plan management module A sends a request for loading station plan in the database to the storage query module. -
Step 503, the storage query module returns receipt of the station plan request to the station plan management module A. -
Step 504, if a receipt result is that the station plan request has been successfully loaded, the station plan management module A updates the interface display information according to the station plan information. -
Step 505, if the receipt result is that the station plan request fails to load, the station plan management module A sends a request to load the entire station plan information to the station plan management module B. -
Step 506, the station plan management module B sends the entire station plan information to the station plan management module A. -
Step 507, upgrade the station plan management module A as the hot one and sends information that the local machine is upgraded as the hot one to the station plan management module B. -
Step 508, degrades the station plan management module B is as the standby machine, and clears the cache. -
Step 509, the station plan management module A sends a request for train graph stage plan to the storage query module. -
Step 510, the storage query module sends a train graph stage plan to the station plan management module A. -
Step 511, the station plan management module A updates the cache. -
Step 512, the operator clicks on the "Update" button. -
Step 513, the station plan management module A updates the interface. - For the station transport dispatching method in this embodiment, ,the processing flows of hot/standby switchover by the station plan management module is added based on the embodiment in
FIG. 3 , which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system. -
FIG. 2 is a schematic diagram of a station transport dispatching system in one embodiment of the present disclosure, as shown inFIG. 2 , the station transport dispatching system in this embodiment comprises: a plan processing module, station plan management modules, a route processing module, a storage query module, and a train arrival departure control module. The station plan management modules are set in train operation terminal A/train operation terminal B; the train arrival departure control module, the plan processing module and the route processing module are set in the station autonomous machine; and the storage query module is set in the station server: - the plan processing module is configured to receive station plan issued from the station plan management module, parse the station plan into train route plan, and issue the train route plan to the route processing module;
- the route processing module is configured to issue the train route plan to the train arrival departure control module for processing;
- the station plan management module is configured to issue the plan station to the storage query module for storing.
- In the station transport dispatching system of this embodiment, the operator sends the station plan to the plan processing module through the station plan management module, the plan processing module automatically parses the station plan into corresponding operation routes and sends them to the route processing module and the train arrival departure control module, which realizes the timely and effective delivery of the station plan, and realizes the convenient dispatching of the station transport.
- Wherein the station transport dispatching system further comprises a storage query module:
- the station plan management module is configured to send a request to load station plan and train graph stage plan in the database to the storage query module;
- receive the station plan information and the train graph stage plan information issued from the storage query module and update interface display information according to the station plan information and the train graph stage plan information.
- For the station transport dispatching system of this embodiment, the initialization process of the station plan management module is added based on the embodiment in
FIG. 2 , the station plan management module sends a request for loading the station plan information in the database to the storage query module and requests a stage plan from the storage query module. - Wherein the station transport dispatching system further comprises a station plan management module of standby machine and a station plan management module of hot machine:
- the station plan management module of standby machine is configured to : send a request to load station plan in the database to the storage query module during an hot/standby switchover, and receive station plan request receipt returned from the storage query module; after being upgraded as the new station plan management module of hot machine, send a request for train graph stage plan to the storage query module, and receive the train graph stage plan information sent from the storage query module, and update the interface display information according to the train graph stage plan information;
- the station plan management module of hot machine is configured to receive information sent from the station plan management module of standby machine that the local machine is to be upgraded as the hot one during the hot/standby switchover.
- The station plan management module of standby machine is specifically configured to: if a receipt result is that the station plan request has been successfully loaded, update the interface display information according to the station plan information;
if the station plan request receipt result returned from the storage query module is that the station plan request fails to load, send a request to load the entire station plan information to the station plan management module of hot machine;
the station plan management module of hot machine is configured to send the entire station plan information to the station plan management module of standby machine. - For the station transport dispatching system in this embodiment, ,the processing flows of hot/standby switchover by the station plan management module is added based on the embodiment in
FIG. 2 , which ensures secure operation of the station transport dispatching system, and improves disaster tolerance performance of the station transport dispatching system. - Those skilled in the art should understand that, the embodiments of the present application can be provided as methods, systems or computer program products. Therefore, the present application can adopt the form of full hardware embodiments, full software embodiments, or embodiments combining software and hardware aspects. And the present application can adopt the form of computer program products implemented on one or more storage mediums with program codes usable for computer (including, but not limited to, magnetic disk storage, CD-ROM, optical memory, or the like).
- Obviously, those skilled in the art can make various modifications and variations to the present disclosure without departing from the spirit and scope thereof. Thus, if these modifications and variations of the present disclosure are within the scope of the claims of the disclosure as well as their equivalents, the present disclosure is also intended to include these modifications and variations.
Claims (8)
- A station transport dispatching method, comprising:receiving, by a plan processing module, station plan issued from a station plan management module;by the plan processing module, parsing the station plan into train route plan and issuing the train route plan to a route processing module;issuing, by the route processing module, the train route plan to a train arrival departure control module for processing;issuing, by the station plan management module, the station plan to a storage query module for storing.
- The method of claim 1, wherein the method further comprises:sending, by the station plan management module at startup, a request to load station plan and train graph stage plan in the database, to the storage query module;by the station plan management module, receiving station plan information and train graph stage plan information issued from the storage query module, and updating interface display information according to the station plan information and the train graph stage plan information.
- The method of any of claims 1 to 2, further comprising:during hot/standby switchover, sending, by a station plan management module of standby machine, a request to load a station plan in the database, to the storage query module;by the station plan management module of standby machine, receiving a station plan request receipt returned from the storage query module, and sending to the station plan management module of hot machine the information that the local machine is upgraded to be a hot machine,;upgrading the station plan management module of standby machine to be a station plan management module of a new hot machine, and degrading the station plan management module of hot machine to be a station plan management module of a new standby machine;by the station plan management module of the new hot machine, sending a request for the train graph stage plan to the storage query module, receiving the train graph stage plan information issued from the storage query module, and updating the interface display information according to the train graph stage plan information.
- The method of any of claims 1 to 3, comprising:receiving, by the station plan management module of the original standby machine, a station plan request receipt returned from the storage query module,and specifically comprising:if the receipt result is that the station plan request has been successfully loaded, updating, by the station plan management module of the original standby machine, the interface display information according to the station plan information;if the receipt result is that the station plan request fails to load, sending, by the station plan management module of the original standby machine, a request to load the entire station plan information, to the station plan management module of the original hot machine;receiving, by the station plan management module of the original standby machine, the entire station plan information sent from the station plan management module of the original hot machine.
- A station transport dispatching system, comprising: a plan processing module, a station plan management module, a route processing module, a storage query module, and a train arrival departure control module:the plan processing module is configured to receive a station plan issued from a station plan management module, parse the station plan into a train route plan, and issue the train route plan to the route processing module;the route processing module is configured to issue the train route plan to the train arrival departure control module for processing;the station plan management module is configured to issue the station plan to the plan processing module for processing, and issue the plan station to the storage query module for storing; receive station plan information and train graph stage plan information issued from the storage query module, and update interface display information according to the station plan information and the train graph stage plan information.
- The system of claim 5, further comprising a storage query module:the station plan management module is configured to send a request to load station plan and train graph stage plan in the database to the storage query module;receive the station plan information and the train graph stage plan information issued from the storage query module, and update interface display information according to the station plan information and the train graph stage plan information;the storage query module is configured to receive the station plan and store it in the database, receive the request for the station plan and the request for the stage plan sent from the station plan management module, and send a station plan request receipt and stage plan request receipt to the station plan management module.
- The system of any of claims 5 to 6, further comprising a station plan management module of standby machine and a station plan management module of hot machine:the station plan management module of standby machine is configured to send a request to load station plan in the database to the storage query module during hot/standby switchover, and receive the station plan request receipt returned from the storage query module; after have been upgraded to be a station plan management module of a new hot machine, send a request for train graph stage plan to the storage query module, and receive the train graph stage plan information sent from the storage query module, and update the interface display information according to the train graph stage plan information;during the hot/standby switchover, the station plan management module of hot machine is configured to receive information sent from the station plan management module of standby machine that the local machine is upgraded to be the hot one.
- The system of any of claims 5 to 7, wherein
the station plan management module of standby machine is specifically configured to: if a receipt result is that the station plan request has been successfully loaded, update the interface display information according to the station plan information;
if the station plan request receipt result returned from the storage query module is that the station plan request fails to load, send to the station plan management module of hot machine a request to load the entire station plan information;
the station plan management module of hot machine is configured to send the entire station plan information to the station plan management module of standby machine.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RS20211262A RS62443B1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
HRP20211865TT HRP20211865T1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711113188.0A CN108032876B (en) | 2017-11-13 | 2017-11-13 | Station transportation scheduling method and system |
PCT/CN2018/085944 WO2019091063A1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3608200A1 true EP3608200A1 (en) | 2020-02-12 |
EP3608200A4 EP3608200A4 (en) | 2020-06-10 |
EP3608200B1 EP3608200B1 (en) | 2021-09-01 |
Family
ID=62092657
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18876592.9A Active EP3608200B1 (en) | 2017-11-13 | 2018-05-08 | Rail station transportation dispatch method and system |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP3608200B1 (en) |
CN (1) | CN108032876B (en) |
HR (1) | HRP20211865T1 (en) |
HU (1) | HUE056284T2 (en) |
RS (1) | RS62443B1 (en) |
WO (1) | WO2019091063A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3598701A4 (en) * | 2018-05-17 | 2020-04-01 | Crsc Research & Design Institute Group Co., Ltd. | Method and system for processing critical logic state |
CN114296422A (en) * | 2021-11-23 | 2022-04-08 | 卡斯柯信号有限公司 | Centralized station yard display and control method, equipment and medium based on CTC3.0 |
EP4101728A1 (en) * | 2021-06-11 | 2022-12-14 | ALSTOM Transport Technologies | System for locally managing railway traffic in railway stations |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108749859B (en) * | 2018-05-31 | 2020-06-26 | 北京全路通信信号研究设计院集团有限公司 | Train dispatching centralized control system and control method |
CN109249964A (en) * | 2018-09-14 | 2019-01-22 | 北京全路通信信号研究设计院集团有限公司 | Clock synchronization system based on dispatching centralized system |
CN111081159A (en) * | 2019-12-30 | 2020-04-28 | 株洲亿鸿精密科技发展有限公司 | Station platform LED intelligence ground mark |
CN111137328B (en) * | 2020-01-22 | 2024-02-20 | 卡斯柯信号有限公司 | Tramcar driving dispatching management system |
CN111332341B (en) * | 2020-02-18 | 2022-07-15 | 卡斯柯信号有限公司 | Realization method for entering route handling of centralized control station based on CTC3.0 |
CN111489277B (en) * | 2020-03-16 | 2023-07-18 | 中铁程科技有限责任公司 | Line data processing method, device, storage medium and computer equipment |
CN112511801A (en) * | 2020-11-19 | 2021-03-16 | 天津凯发电气股份有限公司 | Method for retrieving videos of auxiliary monitoring system by railway telecontrol monitoring system |
CN113147838B (en) * | 2021-04-02 | 2022-08-26 | 卡斯柯信号有限公司 | Automatic vehicle adding method for operation recovery of subway sudden accident |
CN113715879A (en) * | 2021-11-04 | 2021-11-30 | 北京全路通信信号研究设计院集团有限公司 | Shunting operation management and control method and system |
CN114312921B (en) * | 2021-11-23 | 2023-09-08 | 卡斯柯信号有限公司 | Column modulation conflict checking method, device, equipment and medium based on autonomous machine |
CN114394132B (en) * | 2021-12-30 | 2023-08-25 | 卡斯柯信号有限公司 | Improved method, equipment and medium for handling shunting route of dispatching centralized system |
CN115329417B (en) * | 2022-03-30 | 2024-06-07 | 西南交通大学 | Pivot column flow graph compiling method and system |
CN115257884B (en) * | 2022-08-19 | 2024-04-26 | 交控科技股份有限公司 | Rail transit energy-saving control method and device based on passenger carrying state |
CN115767015B (en) * | 2022-11-03 | 2023-08-08 | 广州非课信息科技有限公司 | Engineering personnel scheduling management system based on collaborative office platform |
CN116161088A (en) * | 2023-04-25 | 2023-05-26 | 北京全路通信信号研究设计院集团有限公司 | Train position determining method and system |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5950966A (en) * | 1997-09-17 | 1999-09-14 | Westinghouse Airbrake Company | Distributed positive train control system |
CN201371810Y (en) * | 2009-06-29 | 2009-12-30 | 中国铁道科学研究院运输及经济研究所 | Passenger station throat for passenger special line |
CN101767590B (en) * | 2010-03-02 | 2011-12-21 | 中国铁道科学研究院通信信号研究所 | Control method and system for combining management and control |
CN101934807B (en) * | 2010-08-24 | 2011-09-28 | 北京交大资产经营有限公司 | Train control system-based mobile authorization calculating method |
CN102194166A (en) * | 2011-04-20 | 2011-09-21 | 铁道部运输局 | Passenger transport information processing system based on in-depth data integration |
CN102358337B (en) * | 2011-08-10 | 2015-01-21 | 北京和利时系统工程有限公司 | Rail transit train monitoring system and method |
JP6038693B2 (en) * | 2013-03-11 | 2016-12-07 | 株式会社日立製作所 | Course control device, course control method, and course control program |
CN104773191B (en) * | 2014-01-15 | 2017-01-18 | 上海亨钧科技有限公司 | Automatic centralized enterprise railway control method and system thereof |
EP2974939B1 (en) * | 2014-07-17 | 2023-06-07 | Hitachi, Ltd. | Train management system |
CN105278379B (en) * | 2015-10-30 | 2018-02-23 | 中国铁道科学研究院通信信号研究所 | A kind of MTU depot centralized control system |
-
2017
- 2017-11-13 CN CN201711113188.0A patent/CN108032876B/en active Active
-
2018
- 2018-05-08 WO PCT/CN2018/085944 patent/WO2019091063A1/en unknown
- 2018-05-08 HU HUE18876592A patent/HUE056284T2/en unknown
- 2018-05-08 RS RS20211262A patent/RS62443B1/en unknown
- 2018-05-08 HR HRP20211865TT patent/HRP20211865T1/en unknown
- 2018-05-08 EP EP18876592.9A patent/EP3608200B1/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3598701A4 (en) * | 2018-05-17 | 2020-04-01 | Crsc Research & Design Institute Group Co., Ltd. | Method and system for processing critical logic state |
EP4101728A1 (en) * | 2021-06-11 | 2022-12-14 | ALSTOM Transport Technologies | System for locally managing railway traffic in railway stations |
CN114296422A (en) * | 2021-11-23 | 2022-04-08 | 卡斯柯信号有限公司 | Centralized station yard display and control method, equipment and medium based on CTC3.0 |
CN114296422B (en) * | 2021-11-23 | 2024-03-29 | 卡斯柯信号有限公司 | CTC 3.0-based station yard centralized display and control method, equipment and medium |
Also Published As
Publication number | Publication date |
---|---|
CN108032876B (en) | 2020-02-14 |
WO2019091063A1 (en) | 2019-05-16 |
RS62443B1 (en) | 2021-11-30 |
HRP20211865T1 (en) | 2022-03-04 |
EP3608200A4 (en) | 2020-06-10 |
EP3608200B1 (en) | 2021-09-01 |
CN108032876A (en) | 2018-05-15 |
HUE056284T2 (en) | 2022-02-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3608200B1 (en) | Rail station transportation dispatch method and system | |
CN100519293C (en) | Wireless locomotive signal dual-engine warm standby control method | |
US12020574B2 (en) | Cloud simulation apparatus and method for verifying rail transit-oriented full-automatic unmanned driving scene | |
EP3957542A1 (en) | Train autonomous control system and method based on vehicle-to-vehicle communication | |
CN102267477B (en) | Temporary speed-restricting command sending method and device of C3 system | |
CN106476857B (en) | A kind of rail traffic dispatching and command system and method | |
CN107831713B (en) | A kind of locomotive based on multistation field/railcar Dynamic Tracking and system | |
EP3747727B1 (en) | Data processing system and method | |
CN111232024A (en) | Intelligent running scheduling system and method for high-speed railway | |
CN105278379A (en) | Multiple-unit train maintenance base (station) centralized control system | |
EP3763598A1 (en) | Centralized train dispatch control system and control method | |
WO2022213588A1 (en) | Temporary speed restriction safe management method for multi-mode train control system | |
CN103707904A (en) | Temporary speed limiting method and temporary speed limiting system in urban rail transit CBTC (communication based train control system) mode | |
CN102211600A (en) | Temporary speed-limiting method, server and system | |
CN110197325B (en) | Motor train station operation management system and method | |
CN109992571A (en) | A kind of intelligent substation configuration file line closed loop check system and method for calibration | |
WO2023280140A1 (en) | Global-based inventory management system and method | |
CN109677463B (en) | Centralized control system for railway signal scheduling | |
CN102616255A (en) | CTC (centralized traffic control) management method and system of high-speed railway | |
CN111476519A (en) | Dynamic management method and system for international trade ship | |
CN108769215B (en) | Transportation information integration system | |
CN102616254B (en) | Control method, equipment and system for railway passenger special line station interlocking machine | |
CN108616518B (en) | Interface of dispatching centralized system, dispatching centralized system and information transmission method | |
CN102184471A (en) | Integrated management platform and passenger service system | |
CN108616591A (en) | Interface device and method for data exchange |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: TUEP Ref document number: P20211865 Country of ref document: HR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20191030 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20200513 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B61L 27/04 20060101ALI20200507BHEP Ipc: B61L 27/00 20060101AFI20200507BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20201215 |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20210517 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1425948 Country of ref document: AT Kind code of ref document: T Effective date: 20210915 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018023083 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20210901 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211201 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211201 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20211202 |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E056284 Country of ref document: HU |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: T1PR Ref document number: P20211865 Country of ref document: HR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220101 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220103 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602018023083 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211865 Country of ref document: HR Payment date: 20220502 Year of fee payment: 5 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 |
|
26N | No opposition filed |
Effective date: 20220602 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: UEP Ref document number: 1425948 Country of ref document: AT Kind code of ref document: T Effective date: 20210901 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20220531 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20220508 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220508 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220508 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211865 Country of ref document: HR Payment date: 20230504 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220508 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 |
|
REG | Reference to a national code |
Ref country code: HR Ref legal event code: ODRP Ref document number: P20211865 Country of ref document: HR Payment date: 20240429 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240517 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: HR Payment date: 20240429 Year of fee payment: 7 Ref country code: RS Payment date: 20240426 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20240517 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240508 Year of fee payment: 7 Ref country code: RO Payment date: 20240430 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20240430 Year of fee payment: 7 Ref country code: SE Payment date: 20240506 Year of fee payment: 7 Ref country code: HU Payment date: 20240502 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20210901 |