EP3602088A1 - Wire harness test system and method of operation thereof - Google Patents
Wire harness test system and method of operation thereofInfo
- Publication number
- EP3602088A1 EP3602088A1 EP18720662.8A EP18720662A EP3602088A1 EP 3602088 A1 EP3602088 A1 EP 3602088A1 EP 18720662 A EP18720662 A EP 18720662A EP 3602088 A1 EP3602088 A1 EP 3602088A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- test
- module
- processing unit
- connection
- central processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/50—Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
- G01R31/58—Testing of lines, cables or conductors
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/025—General constructional details concerning dedicated user interfaces, e.g. GUI, or dedicated keyboards
Definitions
- the present application relates to a wire harness test system and respective method of operation.
- test tables are the equipment used to guarantee the quality of the wire harness produced, wherein different tests such as electrical continuity, electrical insulation between circuits, presence and value of several components, connectors leak test, component color or stress tests, among other more specific tests are carried out. Depending on the complexity and type of components installed in the wire harness, the test may take more or less time and be divided into several steps to test the wire harness under different conditions .
- the module to be used at the software level, which involves setting it by indicating where it is connected in the test point matrix, which function each test point undertakes (whether it is a contact (connector position/cavity) , whether it is the detection of a function of the connector or the result of a specific test) , as well as assigning a name allusive to each test point so that it may be easily identifiable later.
- This step usually consists in uploading an image of the connector into the software and identifying in that image the different contacts and functionalities thereof so that in case of error the software shows the operator an illustrative image of the problem encountered.
- This initial work of configuring and integrating the test module, both at the physical level of assembly and at the software level, is a time-consuming manual process wherein a qualified operator for this task takes note of the position where each one is installed and using the manual of each module that informs on the function of each test point.
- errors frequently occur in the translation of the manual information on the various modules to the software, which later causes problems that are more difficult to diagnose. If the initial configuration is not correct at the time of the test of the wire harness, errors might arise as the result of wiring errors itself or improper module setting at the software level.
- test modules are connected to the interface cards by means of a cable and these are in turn connected to the expansion cards by means of a flat cable.
- expansion cards there is at least one rack of the test system in which the expansion cards are installed. This rack is usually connected to a computer running a test software that allows interaction with the operators during the testing process .
- each test module has a plug and a cable that allow establishing the connection between each module installed in the test table and the interface cards of the system.
- These interface cards provide electric power supply and the connection between the test points of the test system and the test points of the module.
- the test points of the test system arrive at the interface cards through a flat cable per each interface card. It establishes the connection between the interface cards and the expansion cards (test point cards) installed in the test system rack.
- the test systems associated with the wiring test are normally modular and their complexity is directly proportional to the number of test points required to test the wiring and types of test to be performed.
- a test system may consist of only one rack with a variable number of expansion cards or multiple racks to accommodate a larger number of expansion cards which translate into a larger number of test points.
- the number of expansion cards in a test system typically dictates the number of test points of the system. This means that if the test system rack(s) is (are) complete and there is a need to add another module because the wiring has evolved and has one more connector, the customer will have to purchase a new rack to add one or more expansion cards in order to connect the new module. This need is not only expensive, but also not always implementable since there may be no space available on the test table to accommodate one more rack or the test system itself may not be able to accommodate one more rack.
- Wiring can often change with a view to reducing the cost of the final product, adding new features or simply because there are new technological trends and manufacturers tend to wish for a current product.
- a test table is often used to test a wire harness reference or a wire harness family wherein the various wire harness are not very different from each other.
- test system developed is intended for use in the wire harness industry and aims at facilitating and harmonizing the integration of electrical test modules in the test table, making said table more flexible and capable of adapting to the test of different types of wiring.
- the present application describes a wiring test system characterized in that it comprises: - a central processing unit configured to run test algorithms to be implemented on at least one test table; at least one test table comprising at least one connection base mounted on the crossbars of said table; wherein
- connection base comprises an interconnection mechanism which establishes the connection thereof to the test table and test module;
- test module comprising an internal processing unit, an internal memory unit, a coupling structure for facilitating the physical connection to a connection base and a light indicator,
- central processing unit is adapted to establish bi-directional data communication with the internal processing unit of the test module via a connection base, via a data bus.
- the central processing unit comprises an interface terminal with the operator.
- the central processing unit is configured to map the test table according to a coordinate system.
- the central processing unit is configured to store the coordinates of all connection bases installed on the test table.
- the central processing unit is configured to map the connection bases installed on the test table according to a test zone and a storage zone.
- the interconnection mechanism of the connecting base comprises:
- the coupling structure of the test module comprises:
- a guiding mechanism configured to ensure alignment on the connection between the module and the connection base ;
- a locking mechanism comprising two quarter-turn anchors ;
- the light indicator of the test module is of the LED type.
- the present application discloses also a method of operating the wiring test system, characterized in that it is executed in the central processing unit of the system above described, comprising the following steps:
- the step of identifying the test module comprises accessing and reading the internal memory of each module by the central processing unit.
- the step of identifying the test module the central processing unit actuates the test module so as to emit a light signal.
- the assembly indication step sends the assembly coordinates of the test module to the interface terminal.
- a wiring test system designed to facilitate and harmonize the integration of electrical test modules into the test table is disclosed, making it more versatile and multipurpose in terms of the diversity of wire harness families that can be tested on the same equipment.
- the central processing unit determines which test modules need to be addressed, instructing the operator to carry out replacements between modules belonging to the test and storage zones.
- This configuration software abstraction allows the physical integration in the test table to be guaranteed quickly and easily, by means of a coupling structure present in the module and a connection base installed in the test table. This pair has cross characteristics that allow the installation of any module in any connection base present on the table, establishing both the electrical and pneumatic connection.
- test table represents only a structure supporting the test modules.
- the connection of each to the test table is made through connection bases, installed in the crossbars of the table. These bases have complementary connection characteristics to the coupling structure present in each module, thus complying with the connection requirements between module and test table.
- a central processing unit is responsible for managing all processing inherent to each test to be run, being connected to the test table and by extension to each connection base where the test module is installed, through a data bus. Depending on the specificities of each wire harness and the type of test to be run, the central processing unit will inform the operator on the test modules to be used.
- test table is divided into two distinct zones, a zone used for wiring testing and another used as a modules storage.
- the central processing unit has both zones mapped into memory, storing the positions of the connection bases according to an n-dimensional coordinate system, which may be of the 2D or 3D type.
- the test zone In the test zone are installed the necessary modules to test the wire harness or wire harness family that are currently in production. In turn, in the storage zone are stored the modules needed to test other wiring families that, however, will not be needed at the moment.
- the size of both zones varies depending on the requirements of the tests to be performed and the need to store the modules required for testing other wire harness families or wire harness versions that use different connectors.
- On the side of the central processing unit there is always information on which modules are in the test zone, which ones are in the storage zone and their position in both zones. To do this, the data bus connecting the central processing unit to each module installed on the test table, establishes a digital communication channel that allows accessing the information contained in the memory of each one and thus be able to identify a module.
- each module uses an opposite procedure. That is, at the time of integration of the bases connecting the modules to the test table, each one is connected to a communication channel of the central processing unit, via the data bus, which channel is stored within a non-volatile memory (for example: Communication channel No. 1 corresponds to the connection base in the position (x, y) of the test table) . This way it is possible to know the position of each connection base and the associated channel.
- a non-volatile memory for example: Communication channel No. 1 corresponds to the connection base in the position (x, y) of the test table
- the central processing unit After installing a module in one of these connection bases of the test table, the central processing unit will read the information from the memory contained in the module and in this way it is possible to know that module zzz is connected to the communication channel N°x which, in turn, corresponds to the connection base that is installed in the position (x, y) .
- N°x which, in turn, corresponds to the connection base that is installed in the position (x, y) .
- the software level there is a mapping between each position and the respective zone of the table to which it belongs.
- the central processing unit there is also information on which modules are required to test each wire harness, which allows the test algorithm to instruct the operator, at the beginning of the wiring test where other modules are required, to remove a module from the position (x, y) of the test zone and place it in the (x, y) position of the storage zone, as well as the reverse operation (remove from the storage zone to the test zone) in order to correctly set the table for that particular wire harness.
- This versatility allows the equipment to be much more versatile and to waive in many situations from the duplication of the test means.
- connection bases are arranged on said crossbars, and have specific positions (x, y) , which allow identifying the relative position of the module installed therein, both in the context of the test zone and the storage zone.
- a connection base is installed in each position of the table where it is necessary to install a new module to test the different wire harness families/variants.
- Said module coupling structure establishes the connection interface with the test table bases.
- a connection system comprising two screws for securing the module to the connection base, a plug for electrical connection with the test table and a plug for pneumatic connection to allow the movements of internal electro-pneumatic actuators of the module; a plug for robust interconnection for data transmission; a guiding mechanism that ensures perfect alignment between module and connection base during the replacement process in order to facilitate the process and prevent the electrical or pneumatic connection from being damaged during this process; a locking mechanism to facilitate the replacement process, which uses two quarter-turn anchors through which it is possible to lock/release the module in/from the position; a manipulation mechanism comprising two holes in which it is possible to introduce an appropriate tool which allows the manipulation of the module, in need of removing or installing it in a certain position.
- the locking system may be of the magnetic type, by placing magnets in the module coupling structure and in the connection base, facilitating the installation process.
- test algorithm is aided by the test algorithm to be run in the central processing unit and by light signals, for example LEDs, present either in front of the module or in the connection bases of the table, clearly indicating from where the module should be removed and where it should be placed.
- connection bases that support the modules have an interconnection mechanism that establishes the electrical, data and pneumatic connection to the module.
- This mechanism connects the base to the compressed air network of the test table through a pneumatic tube and to the data bus connecting the central processing unit installed inside the table. It is dimensioned to accommodate as many bases as needed.
- the data bus is modular and expandable depending on the needs, in particular on the number of test modules to be used.
- the connection between the data bus and central processing unit, which runs the test algorithm, is established through a USB cable, or through any other physical connection protocol between peripherals for data communication .
- FIGS 1 and 2 illustrate the test modules developed.
- Figure 3 illustrates the test table, in particular the connection base that receives the test module.
- Figure 4 illustrates the assembly of a test module on the table .
- Figure 5 illustrates the test table comprising a test zone and a storage zone.
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
- Insulated Conductors (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PT10999517 | 2017-03-29 | ||
PCT/IB2018/052047 WO2018178847A1 (en) | 2017-03-29 | 2018-03-26 | Wire harness test system and method of operation thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
EP3602088A1 true EP3602088A1 (en) | 2020-02-05 |
Family
ID=62063576
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18720662.8A Withdrawn EP3602088A1 (en) | 2017-03-29 | 2018-03-26 | Wire harness test system and method of operation thereof |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3602088A1 (en) |
MX (1) | MX2019011690A (en) |
WO (1) | WO2018178847A1 (en) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19500113C2 (en) * | 1995-01-04 | 1996-03-28 | Klaus Wurmhoeringer | Cable test adapter |
AU2001246540A1 (en) * | 2000-04-18 | 2001-10-30 | Wee Electrotest Engineering Gmbh | Method and device for testing cable trees |
JP4654100B2 (en) * | 2005-09-22 | 2011-03-16 | 矢崎総業株式会社 | Connector holding jig and wire harness wiring apparatus provided with the connector holding jig |
JP5566215B2 (en) * | 2010-07-29 | 2014-08-06 | 矢崎総業株式会社 | Mounting structure for continuity inspection jig |
ES2751372T3 (en) * | 2014-02-24 | 2020-03-31 | Airbus Defence And Space Sa | System for conducting electrical tests on electrical harnesses |
-
2018
- 2018-03-26 MX MX2019011690A patent/MX2019011690A/en unknown
- 2018-03-26 WO PCT/IB2018/052047 patent/WO2018178847A1/en unknown
- 2018-03-26 EP EP18720662.8A patent/EP3602088A1/en not_active Withdrawn
Also Published As
Publication number | Publication date |
---|---|
MX2019011690A (en) | 2020-07-14 |
WO2018178847A1 (en) | 2018-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10552283B2 (en) | Methods and apparatus to communicatively couple field devices to a remote terminal unit | |
EP3076250B1 (en) | Method and system for defining slot addresses | |
US8832344B2 (en) | Baseboard, extension module, and structure for connecting baseboard and extension module | |
IL152768A (en) | Retrofit kit for interconnect cabling system | |
US5455911A (en) | Communications protocol for use in transferring data over a serial bus | |
CN210038539U (en) | Hardware-in-loop test system capable of adapting to multiple controllers | |
CN101436170A (en) | SPI equipment communication circuit | |
CN111858197A (en) | Device, system and method for supporting multiple SSD tests | |
US5612680A (en) | Universal termination module for assembling wire harnesses having multiple diverse connectors | |
CN110855515A (en) | Vehicle-mounted CAN network test auxiliary device | |
CN2891082Y (en) | Expandable tester | |
CN116660719A (en) | Universal ATE interface sub-motherboard testing method based on FLEX testing system | |
CN113806146B (en) | Test transfer card design system and method thereof | |
US5859884A (en) | Electric circuit for selectively processing electrical signals | |
CN107832193B (en) | Based on I2Multi-board-card state monitoring method for C bus | |
EP3602088A1 (en) | Wire harness test system and method of operation thereof | |
JP2011519459A (en) | System and method for efficient association of power outlets and devices | |
CN110442097B (en) | Device and method for automatically identifying module address in distributed control system | |
CA2356318A1 (en) | Device for testing cables that are provided with plug connectors | |
US6358095B1 (en) | Consolidated automatic support system (CASS) flexible exchange adapter and interface device | |
CN115420918A (en) | Device and method for automatically testing multi-terminal complex cable | |
CN115173107A (en) | Network interface expansion device, bus module and network interface expansion method thereof | |
JP4659467B2 (en) | Control device update method | |
CN108490338B (en) | Test apparatus, test method, computer apparatus, and computer-readable storage medium | |
CN220983761U (en) | Device for selecting HIL engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20191029 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20221212 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20230425 |