- EP3530933B1 EP3530933B1 EP18793550.7A EP18793550A EP3530933B1 EP 3530933 B1 EP3530933 B1 EP 3530933B1 EP 18793550 A EP18793550 A EP 18793550A EP 3530933 B1 EP3530933 B1 EP 3530933B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pitch
- controller
- main controller
- power grid
- power outage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 49
- 230000008569 process Effects 0.000 claims description 14
- 230000004044 response Effects 0.000 claims description 11
- 238000010586 diagram Methods 0.000 description 6
- 238000005070 sampling Methods 0.000 description 5
- 238000001514 detection method Methods 0.000 description 4
- 230000002159 abnormal effect Effects 0.000 description 3
- 230000008859 change Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 3
- 238000011217 control strategy Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 210000003746 feather Anatomy 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000011897 real-time detection Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/022—Adjusting aerodynamic properties of the blades
- F03D7/0224—Adjusting blade pitch
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/0264—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor for stopping; controlling in emergency situations
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P9/00—Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P9/006—Means for protecting the generator by using control
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P9/00—Arrangements for controlling electric generators for the purpose of obtaining a desired output
- H02P9/10—Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load
- H02P9/107—Control effected upon generator excitation circuit to reduce harmful effects of overloads or transients, e.g. sudden application of load, sudden removal of load, sudden change of load for limiting effects of overloads
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/70—Adjusting of angle of incidence or attack of rotating blades
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/90—Braking
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/10—Purpose of the control system
- F05B2270/107—Purpose of the control system to cope with emergencies
- F05B2270/1071—Purpose of the control system to cope with emergencies in particular sudden load loss
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/30—Control parameters, e.g. input parameters
- F05B2270/309—Rate of change of parameters
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/30—Control parameters, e.g. input parameters
- F05B2270/337—Electrical grid status parameters, e.g. voltage, frequency or power demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02P—CONTROL OR REGULATION OF ELECTRIC MOTORS, ELECTRIC GENERATORS OR DYNAMO-ELECTRIC CONVERTERS; CONTROLLING TRANSFORMERS, REACTORS OR CHOKE COILS
- H02P2101/00—Special adaptation of control arrangements for generators
- H02P2101/15—Special adaptation of control arrangements for generators for wind-driven turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Definitions
- the present disclosure relates to the technical field of wind power generation, and in particular, to a method and a system for controlling wind turbine shutdown.
- EP 2108825 A2 discloses a method a system and method for reducing rotor loads in a wind turbine (10) that includes a brake (33) and one or more rotor blades (24) coupled to a rotor (18).
- a processor (42) reduces a generator overspeed threshold value by a predetermined amount and determines a brake-release threshold value.
- the brake (33) is applied to slow the rotor (18) if the generator/rotor speed exceeds the reduced generator/rotor overspeed threshold value.
- the brake (33) is applied to slow the rotor (18) until the generator/rotor speed is below the brake-release threshold value.
- the rate of change of the pitch angle of the rotor blade (24) may be varied as the blade (24) moves toward feather in response to the detected blade-pitch failure.
- a method and a system for controlling wind turbine shutdown are provided according to an embodiment of the present disclosure.
- a pitch system is controlled by a main control system to perform a variable-rate feathering under a power outage of power grid, and it is not necessary to remove a converter safety chain from a safety chain of the wind turbine.
- a method for controlling wind turbine shutdown includes: controlling, by a main controller of a main control system of a wind turbine in a case that the main controller receives a signal indicating power outage of power grid, a pitch system to perform a variable-rate feathering with a pitch safety chain maintained in a connected state, wherein: the signal indicating power outage of power grid is sent to the main controller by a converter controller in a case that the power outage of power grid determined by the converter controller; and the pitch safety chain is a safety chain between the main controller and a pitch controller of the pitch system.
- a system for controlling wind turbine shutdown includes a main controller of a main control system of a wind turbine, where:
- the converter controller determines that there is a power outage of power grid, and sends a signal indicating power outage of power grid to the main controller in a case that the power outage of power grid is determined. Thereby, it is the main controller that controls the pitch system to perform the variable-rate feathering.
- the main controller can control the variable-rate feathering without modifying a safety chain of the wind turbine, That is to say, without removing an converter safety chain from the safety chain of the wind turbine, so that the safety chain is unbroken in the hardware implementation.
- variable-rate feathering In a case that a wind turbine is required to be shut down under a certain operating condition such as a grid power outage, a variable-rate feathering is required for the shutdown so as to reduce a load of the wind turbine.
- the variable-rate feathering refers to a control strategy, where a pitch angle of a blade is feathered from a 0-degree position to a 90-degree position using different feathering rates in case of a specific fault of the wind turbine, and in such process, a degree of the pitch angle serves as a threshold for using the different feathering rates.
- Figure 1 shows a schematic diagram of variable-rate feathering.
- the horizontal axis represents the pitch angle of the blade
- v1, v2 and v3 are the feathering rates corresponding to the pitch angle of the blade being within a range of 0 to a1, a1 to a2, and a2 to a3, respectively.
- variable-rate feathering an emergency feathering with a high speed can be used at a moment the fault occurs, so as to reduce a forward load of the wind turbine.
- Slow featherings are adopted in a second angle range (a1 to a2) and a third angle range (a2 to a3), so as to reduce a backward load and ensure a safety performance of the wind turbine during the emergency shutdown.
- an impact on the wind turbine due to a resonant frequency between a wind condition and the wind turbine can be reduced by using the variable-rate feathering, thereby reducing a manufacture cost of a tower.
- FIG. 2 shows a schematic diagram of a simplified structure of a control system of a wind turbine.
- the control system of the wind turbine includes a power supply system, a pitch system, a converter and a main control system.
- the power supply system includes a grid power supply (corresponding to a grid input side 110 in the figure), a backup power supply 101, a direct current to direct current (DC/DC) power supply 104, and a charger 108.
- the pitch system includes a pitch motor 102, a frequency converter 103 and a pitch controller 105.
- the converter includes a converter controller 107.
- the main control system includes a main controller 106.
- a positive pole (That is to say, "+” end) of outputs of the charger 108, a "+” end of the backup power supply 101, and a “+” end of the DC/DC power supply are electrically connected.
- a negative pole (That is to say, "-" end) of the outputs of the charger 108, a "-" end of the backup power supply 101, and a "-" end of the DC/DC power supply are electrically connected.
- the grid input side 110 is connected to inputs of the charger 108.
- the grid input side 110 is configured to provide the wind turbine with a voltage required for operation. In a case that the wind turbine operates normally, the grid input side 110 provides alternating current power to the charger 108.
- the charger 108 charges the backup power supply 101, and provides operating power to the frequency converter 103 and DC/DC power supply 104.
- the DC/DC power supply 104 is configured to provide 24-Volt direct current power to the pitch controller 105.
- the backup power supply 101 is configured to continue supplying power to the pitch motor 102 in a case that the grid input side 110 is abnormal.
- the pitch controller 105 is configured to control, under control of the main controller 106 or according to a determination on faults by the pitch controller itself, operation of the pitch motor 102 via the frequency converter 103, so as to control pitch adjustment or feathering.
- the grid input side 110 is connected to a grid end inside the converter.
- the converter controller 107 is configured to detect a grid voltage, provide electromagnetic torque to the wind turbine, and transmit electricity to the grid from the wind turbine.
- a safety chain of the wind turbine refers to a safety chain system that protects the wind turbine.
- reliability of a control system is improved by designing a safety chain of the control system.
- the safety chain of the wind turbine is the last protection of the wind turbine, and has a priority higher than software protection of the wind turbine.
- the safety chain system is a protection using both software and hardware independent of a computer system.
- faulty nodes which may cause serious damage to the wind turbine is connected into a loop, which includes an emergency stop button installed in a main control cabinet at a bottom of the tower, an over speed module of the generator, a winding cable switch, a signal from a safety chain of the pitch system, an emergency stop button installed in a nacelle control cabinet, a vibration switch, an over speed signal of a programmable logic controller (Programmable Logic Controller, PLC), a signal to the safety chain of the pitch system, and a bus OK signal.
- a programmable logic controller Programmable Logic Controller
- the entire loop is powered off, so that the wind turbine enters a shutdown process of the emergency feathering and.
- the converter controller 107 detects a power outage of the power grid
- the converter controller 107 triggers disconnecting an converter safety chain between the converter controller 107 and the main controller 106 (a safety chain corresponding to point a in Figure 2 )
- the main controller 106 triggers disconnecting a pitch safety chain between the main controller 106 and the pitch controller 105 (a safety chain corresponding to point b in Figure 2 ).
- the wind turbine enters an emergency feathering mode, in which the pitch system performs the emergency feathering at a fixed rate.
- Such approach results in an increase of the load on the wind turbine.
- Figure 3 is a schematic flow chart of a safety-chain-based method for controlling wind turbine shutdown according to an embodiment of the present disclosure. As shown in Figure 3 , the method for controlling shutdown according to an embodiment of the present disclosure may include the steps S11 to S13.
- step S11 a grid voltage for a wind turbine is obtained according to a preset sampling period, and the obtained grid voltage is sent to a converter controller.
- the voltage of the grid input side of the wind power generator is obtained by a voltage obtaining device at a high speed.
- the obtained voltage is sent to the converter controller, so as to realize a rapid detection of the power outage of power grid by the converter controller.
- the voltage obtaining device may be selected according to practical application requirements. For example, a voltage sensor or a voltage obtaining circuit may be used.
- a sampling frequency of the voltage (That is to say, a reciprocal of the sampling period) should be much larger than a frequency of the grid voltage.
- the converter controller is used for detecting the operating condition of the power outage of power grid according to the obtained grid voltage in real-time.
- rapid determination of the operating condition of the power outage of power grid can be realized by using the voltage obtaining device which has the sampling frequency greater than the frequency of the grid voltage.
- Detection efficiency is effectively improved when compared with a conventional control system of the wind turbine in which the main controller or the pitch controller detects the power outage of power grid.
- step S12 an operating condition of a power outage of power grid is determined by the converter controller based on the grid voltage, and a signal indicating power outage of power grid is sent to a main controller of a main control system of the wind turbine by the converter controller in a case that the power outage of power grid is determined.
- the converter controller can determine whether there is the power outage of power grid according to a change of the grid voltage obtained by the voltage obtaining device.
- the converter controller can immediately determine that there is a power outage in a case that the received grid voltage is 0, and sends the signal indicating power outage of power grid to the main controller of the main control system of the wind turbine.
- the main controller can control, based on the signal indicating power outage of power grid, a variable-rate feathering of the wind turbine.
- step S13 a pitch system is controlled by the main controller to perform the variable-rate feathering in a case that the signal indicating power outage of power grid is received.
- the main controller can receive the signal indicating power outage of power grid sent by the converter controller in a case that communications between the converter controller and the main controller is normal.
- the pitch system can be controlled to perform the variable-rate feathering. Shutdown of the wind turbines is achieved in a manner of the variable-rate feathering, so that the load of the wind turbine is reduced.
- the main control system controls the pitch system to perform measurement on the variable-rate feathering in response to the converter controller detecting the power outage of power grid.
- such solution does not require any modification on hardware of the safety chain of the wind turbine, That is to say, does not require removing the converter safety chain.
- the control method according to the embodiment of the present disclosure may further include the following step.
- a converter safety chain between the converter controller and the main controller is controlled to be disconnected by the converter controller, to trigger generating a safety chain disconnection signal of the converter safety chain.
- the step S13 where a pitch system is controlled by the main controller to perform the variable-rate feathering in a case that the signal indicating power outage of power grid is received, includes the following step.
- the pitch system is controlled by the main controller to perform the variable-rate feathering in the case that the main controller detects the safe chain disconnection signal and receives the signal indicating power outage of power grid.
- the control method further includes a following step.
- the method further includes a following step.
- a safety chain (that is to say, the aforementioned pitch safety chain) between the main controller and the pitch controller is controlled to be disconnected by the main controller according to the safety chain disconnection signal detected by the main controller, to trigger the pitch system to perform the emergency feathering.
- the converter controller may still normally control the converter safety chain when detecting the signal indicating power outage of power grid.
- the main controller may detect a corresponding safety chain disconnection signal.
- the main controller does not directly trigger a disconnection of the pitch safety chain according to said disconnection signal, but further determines whether the safety chain disconnection signal at such case is caused by the power outage of power grid, in conjunction with whether the signal indicating power outage of power grid is received.
- the main controller receives the signal indicating power outage of power grid, it is determined that the safety chain disconnection signal is caused by the power outage of power grid. There is no need to control the pitch safety chain to be disconnected in such case.
- the emergency feathering is avoided under the operating condition of the power outage of power grid.
- the main controller only detects the safety chain disconnection signal and does not receive the signal indicating power outage of power grid, it is indicated that the safety chain disconnection signal may not be caused by the power outage of power grid, or may be caused by the power outage of power grid but there is an abnormity between the main controller and the converter controller. In such case, the pitch safety chain needs to be disconnected, so that the pitch system may perform the emergency feathering to realize the shutdown of the wind turbine.
- the disconnection of the converter safety chain does not directly trigger the emergency feathering, and the main controller determines according to logic determination whether it is required to disconnect the pitch safety chain.
- the variable-rate feathering is realized under the operating condition of the power outage of power grid, while the emergency feathering of the wind turbine may still be realized according to the safety chain disconnection signal of the hardware safety chain under other faults conditions including the communications fault. Safety of the wind turbine is therefore better guaranteed.
- control method may further include following steps when the main controller receives the signal indicating power outage of power grid.
- the signal indicating power outage of power grid is sent to the pitch controller of the pitch system by the main controller.
- a predetermined feathering operation for the operating condition of the power outage of power grid is stopped to be performed by the pitch controller, in response to a reception of the signal indicating power outage of power grid.
- the main controller in response to receiving the signal indicating power outage of power grid sent by the converter controller, sends the signal indicating power outage of power grid to the pitch controller.
- the pitch controller stops, according to the signal indicating power outage of power grid sent by the main controller, performing the predetermined feathering operation for the operating condition of the power outage of power grid.
- control method may further include the following step when the pitch controller receives the signal indicating power outage of power grid.
- a preconfigured voltage threshold of a backup power supply of the wind turbine for the emergency feathering is adjusted by the pitch controller from a first voltage threshold to a second voltage threshold, where the second voltage threshold is smaller than the first voltage threshold.
- the first voltage threshold is a threshold for the pitch controller.
- a pitch motor in the pitch system is controlled to perform the emergency feathering in a case that a voltage of the backup power supply is not greater than the first voltage threshold.
- a function of the backup power supply 101 is to continue supplying power to the pitch motor 102 when the grid voltage (That is to say, the grid input side shown in Figure 2 ) is abnormal (including but not being limited to the power outage of power grid).
- the pitch controller detects the voltage of the backup power supply. In a case that the voltage of the backup power supply 101 reaches or falls below said threshold, the pitch controller performs the operation of emergency feathering.
- the first voltage threshold is lowered by the pitch controller in response to receiving the signal indicating power outage of power grid.
- the pitch controller is preventing from triggering performing the emergency feathering due to a low voltage of the backup power supply, which may cause a failure of performing the variable-rate feathering in a case that the variable-rate feathering is to be performed,.
- where the pitch system is controlled to perform the variable-rate feathering by the main controller includes following steps.
- a variable-rate feathering instruction is sent to the pitch controller of the pitch system by the main controller.
- a pitch motor of the pitch system is controlled to perform the variable-rate feathering by the pitch controller according to the variable-rate feathering instruction.
- the method further includes following steps.
- Pitch angles of all blades of the wind turbine is acquired by the main controller from the pitch controller, according to a preset time interval.
- a blade having a feathering rate required to be adjusted and blade rate adjustment information is determined by the main controller according to a difference between the pitch angles of the blades.
- a feathering rate adjusting instruction is sent to the pitch controller by the main controller, according to the blade having the feathering rate required to be adjusted and the blade rate adjustment information.
- the feathering rate of the corresponding blade is adjusted by the pitch controller according to the feathering rate adjusting instruction.
- open-loop feathering refers to that a fixed feathering rate within each of angle ranges is sent to all the blades (three blades in general) without any adjusting). Therefore, it is difficult to ensure synchronization of the three blades.
- a blade 1 may reaches the critical angle a1 firstly and the other blades reaches a1 later. In such case, there will be an imbalance for the three blades, and such imbalance would increase the load of the wind turbine.
- the main controller in order to control all the blades to be consistent in the changes of the pitch angles during the feathering process, continuously acquires the pitch angle of each blade of the wind turbine via the pitch controller.
- the main controller sends, according to the difference between the pitch angles of different blades, the feathering rate adjusting instruction of the blade to the pitch controller. Accordingly, the pitch controller can adjust the feathering rate of the blade according to said instruction in real time, so that all the pitch angles change in a consistent manner.
- the main controller controls the variable-rate feathering and shutdown of the wind turbine under the operating condition of the power outage of power grid, and controls the feathering rate of all the blades in a closed loop.
- pitch motor of the pitch system to perform the variable-rate feathering by the pitch controller according to the variable-rate feathering instruction may include the following step.
- the pitch motor is controlled by the pitch controller to perform the variable-rate feathering according to the variable-rate feathering instruction and a predetermined first variable-rate feathering rule.
- the variable-rate feathering instruction may include a triggering instruction of the variable-rate feathering.
- the first variable-rate feathering rule is stored in advance in the pitch controller. Accordingly, in response to receiving the triggering instruction for controlling, the pitch controller may control, according to the predetermined first variable-rate feathering rule, the pitch motor to perform the variable-rate feathering.
- variable-rate feathering rule may be set or selected according to a practical requirement, for example, the variable-rate feathering scheme shown in Figure 1 may be adopted.
- variable-rate feathering instruction may further include a second variable-rate feathering rule.
- the pitch motor of the pitch system is controlled by the pitch controller to perform the variable-rate feathering according to the variable-rate feathering instruction may include the following step.
- the pitch motor is controlled by the pitch controller to perform the variable-rate feathering according to the second variable-rate feathering rule.
- variable-rate feathering instruction which is sent by the main controller when controlling the pitch controller to perform the variable-rate feathering, may include the second variable-rate feathering rule and the triggering instruction of the variable-rate feathering. That is to say, the pitch controller controls, according to the variable-rate feathering rule sent by the main controller, the pitch motor to perform the variable-rate feathering.
- a system for controlling wind turbine shutdown is provided according to an embodiment of the present disclosure, which corresponds to the control method shown in Figure 3 .
- the control system may include a grid voltage obtaining module 10, a converter controller 20, a main controller 30 of the main control system of the wind turbine, and a pitch system.
- the pitch system includes a pitch controller 40 and a pitch motor 50.
- the grid voltage obtaining module 10 is configured to obtain, according to a preset sampling period, a grid voltage for the wind turbine, and send the obtained grid voltage to the converter controller 20.
- the converter controller 20 is configured to determine, based on the grid voltage, an operating condition of a power outage of power grid; and to send a signal indicating power outage of power grid to the main controller 30 in a case that the power outage of power grid is determined.
- the main controller 30 is configured to control the pitch system to perform a variable-rate feathering in a case that the signal indicating power outage of power grid is received.
- the converter controller 20 is further configured to, when it is determined that there is a power outage of the power gird and the signal indicating power outage of power grid is sent to the main controller 30, control to disconnect a converter safety chain between the converter controller 20 and the main controller 30, to trigger generating a safety chain disconnection signal of the converter safety chain.
- the main controller 30 is configured to control the pitch system to perform the variable-rate feathering in a case that the safe chain disconnection signal is detected and the signal indicating power outage of power grid is received.
- the main controller 30 is further configured to stop, in the case that the safe chain disconnection signal is detected and the signal indicating power outage of power grid is received, an operation of disconnecting a pitch safety chain according to the safety chain disconnection signal, where the pitch safety chain is a safety chain between the main controller 30 and a pitch controller 40 of the pitch system.
- the main controller 30 is further configured to control, in a case that the signal indicating power outage of power grid is not received, a safety chain between the main controller 30 and the pitch controller 40 to be disconnected according to the detected safety chain disconnection signal, to trigger the pitch system to perform an emergency feathering.
- the main controller 30 is further configured to send, the signal indicating power outage of power grid to the pitch controller 40 of the pitch system in response to a reception of the signal indicating power outage of power grid.
- the pitch controller 40 is configured to stop, according to the signal indicating power outage of power grid, performing a predetermined feathering operation for the operating condition of the power outage of power grid in a case that the signal indicating power outage of power grid is received.
- the pitch controller 40 is further configured to adjust, in a case that the signal indicating power outage of power grid is received, a preconfigured voltage threshold of a backup power supply of the wind turbine for the emergency feathering, so that the preconfigured voltage threshold is adjusted a first voltage threshold to a second voltage threshold, where the second voltage threshold is smaller than the first voltage threshold.
- the first voltage threshold is a threshold for the pitch controller 40.
- the pitch motor 50 is controlled to perform the emergency feathering in a case that a voltage of the backup power supply is not greater than the first voltage threshold.
- the main controller 30 is configured to send a variable-rate feathering instruction to the pitch controller 40 of the pitch system.
- the pitch controller 40 is configured to control, according to the variable-rate feathering instruction, a pitch motor of the pitch system to perform the variable-rate feathering.
- the main controller 30 is further configured to, after sending the variable-rate feathering instruction to the pitch controller 40 of the pitch system, obtain pitch angles of blades of the wind turbine according to a preset time interval and from the pitch controller 40, determine a blade having a feathering rate required to be adjusted and blade rate adjustment information according to a difference between the pitch angles of the blades, and send a feathering rate adjusting instruction to the pitch controller 40 according to the blade having the feathering rate required to be adjusted and the blade rate adjustment information.
- the pitch controller 40 is further configured to adjust the feathering rate of the blade according to the feathering rate adjusting instruction corresponding thereto.
- the pitch controller 40 is configured to control, according to the variable-rate feathering instruction and a predetermined first variable-rate feathering rule, the pitch motor 50 to perform the variable-rate feathering.
- variable-rate feathering instruction may further include a second variable-rate feathering rule.
- the pitch controller 40 is configured to control, according to the second variable-rate feathering rule, the pitch motor 50 to perform the variable-rate feathering.
- the functional block shown in the block diagrams described above may be implemented using hardware, software, firmware, or a combination thereof.
- it may be, for example, an electronic circuit, an application specific integrated circuit (ASIC), any one of suitable firmware, a plug-in, and a functional cards.
- the element according to the present disclosure may be a program or a code segment configured to perform a required task.
- the program or code segment may be stored in a machine-readable medium, or may be transmitted over a transmission medium or communication link via a data signal carried in the signal carrier.
- the "machine-readable medium” may include any medium that can store or transfer information.
- the machine-readable medium may include, for example, an electronic circuit, a semiconductor memory device, an ROM, a flash memory, an erasable ROM (EROM), a floppy disk, a CD-ROM, an optical disk, a hard disk, an optical fiber medium, or a radio frequency (RF) link, and the like.
- the code segment may be downloaded via a computer network such as the Internet and an intranet.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Wind Motors (AREA)
- Control Of Eletrric Generators (AREA)
Claims (9)
- Procédé permettant de commander l'arrêt d'une éolienne, comprenant les étapes suivantes :
commander, au moyen d'une unité de commande principale (106, 30) d'un système de commande principal d'une éolienne, dans le cas où l'unité de commande principale (106, 30) reçoit un signal indiquant une coupure de courant du réseau électrique, un système de calage pour réaliser une mise en drapeau à vitesse variable sans déclencher une opération de déconnexion d'une chaîne de sécurité de calage, dans lequel :
le signal indiquant la coupure de courant du réseau électrique est envoyé à l'unité de commande principale (106, 30) par une unité de commande de convertisseur (107, 20) en cas de coupure de courant du réseau électrique, déterminée par l'unité de commande de convertisseur (107, 20) ; et la chaîne de sécurité de calage est une chaîne de sécurité entre l'unité de commande principale (106, 30) et une unité de commande de calage (105, 40) du système de calage. - Procédé selon la revendication 1, dans lequel la commande, au moyen d'une unité de commande principale (106, 30) d'un système de commande principal d'une éolienne dans le cas où l'unité de commande principale (106, 30) reçoit un signal indiquant une coupure de courant du réseau électrique, d'un système de calage pour réaliser une mise en drapeau à vitesse variable sans déclencher une opération de déconnexion d'une chaîne de sécurité de calage, comprend l'étape suivante :commander, au moyen de l'unité de commande principale (106, 30), le système de calage pour réaliser la mise en drapeau à vitesse variable sans déclencher l'opération de déconnexion de la chaîne de sécurité de calage, dans le cas où l'unité de commande principale (106, 30) détecte un signal de déconnexion sécurisée de chaîne et reçoit le signal indiquant une coupure de courant du réseau électrique,dans lequel le signal de déconnexion sécurisée de chaîne est généré par l'unité de commande de convertisseur (107, 20) et permet de déconnecter une chaîne de sécurité de convertisseur entre l'unité de commande de convertisseur (107, 20) et l'unité de commande principale (106, 30) lorsque le signal indiquant une coupure de courant du réseau électrique est envoyé à l'unité de commande principale (106, 30) par l'unité de commande de convertisseur (107, 20).
- Procédé selon la revendication 2, dans lequel le procédé comprend en outre l'étape suivante :
arrêter, au moyen de l'unité de commande principale (106, 30), le processus de déclenchement d'une opération de déconnexion de la chaîne de sécurité de calage selon le signal de déconnexion de chaîne de sécurité, dans le cas où l'unité de commande principale (106, 30) détecte le signal de déconnexion sécurisée de chaîne et reçoit le signal indiquant une coupure de courant du réseau électrique. - Procédé selon la revendication 1, dans lequel, dans le cas où l'unité de commande principale (106, 30) reçoit le signal indiquant une coupure de courant du réseau électrique, le procédé comprend en outre les étapes suivantes exécutées lorsque l'unité de commande principale (106, 30) reçoit le signal indiquant une coupure de courant du réseau électrique :
envoyer, au moyen de l'unité de commande principale (106, 30), le signal indiquant une coupure de courant du réseau électrique à l'unité de commande de calage (105, 40) du système de calage, de manière que l'unité de commande de calage (105, 40) cesse, en réponse à la réception du signal indiquant une coupure de courant du réseau électrique, de réaliser une opération de mise en drapeau prédéterminée pour la coupure de courant du réseau électrique, selon le signal indiquant la coupure de courant du réseau électrique. - Procédé selon la revendication 1, dans lequel la commande, au moyen de l'unité de commande principale (106, 30), du système de calage pour réaliser la mise en drapeau à vitesse variable sans déclencher l'opération de déconnexion de la chaîne de sécurité de calage comprend l'étape suivante :
envoyer, au moyen de l'unité de commande principale (106, 30), une instruction de mise en drapeau à vitesse variable à l'unité de commande de calage (105, 40), de manière que l'unité de commande de calage (105, 40) commande un moteur de calage (102, 50) du système de calage afin de réaliser la mise en drapeau à vitesse variable selon l'instruction de mise en drapeau à vitesse variable. - Système permettant de commander l'arrêt d'une éolienne, comprenant une unité de commande principale (106, 30) d'un système de commande principal d'une éolienne, dans lequel :l'unité de commande principale (106, 30) est configurée pour commander un système de calage afin de réaliser une mise en drapeau à vitesse variable sans déclencher une opération de déconnexion d'une chaîne de sécurité de calage dans le cas où l'unité de commande principale (106, 30) reçoit un signal indiquant une coupure de courant du réseau électrique ; dans lequel :le signal indiquant la coupure de courant du réseau électrique est envoyé à l'unité de commande principale (106, 30) par une unité de commande de convertisseur (107, 20) en réponse à la coupure de courant du réseau électrique, déterminée par l'unité de commande de convertisseur (107, 20) ; et la chaîne de sécurité de calage est une chaîne de sécurité entre l'unité de commande principale (106, 30) et une unité de commande de calage (105, 40) du système de calage.
- Système selon la revendication 6, dans lequel :l'unité de commande de courrier est configurée pour commander le système de calage afin de réaliser la mise en drapeau à vitesse variable sans déclencher l'opération de déconnexion de la chaîne de sécurité de calage, dans le cas où l'unité de commande principale (106, 30) détecte un signal de déconnexion sécurisée de chaîne et reçoit le signal indiquant une coupure de courant du réseau électrique,dans lequel le signal de déconnexion sécurisée de chaîne est généré par l'unité de commande de convertisseur (107, 20) pour déconnecter une chaîne de sécurité de convertisseur entre l'unité de commande de convertisseur (107, 20) et l'unité de commande principale (106, 30) lorsque le signal indiquant une coupure de courant du réseau électrique est envoyé à l'unité de commande principale (106, 30) par l'unité de commande de convertisseur (107, 20).
- Système selon la revendication 7, dans lequel :
l'unité de commande principale (106, 30) est configurée en outre pour arrêter une opération pour déclencher la déconnexion de la chaîne sécurité de calage selon le signal de déconnexion de chaîne de sécurité, dans le cas où l'unité de commande principale (106, 30) détecte le signal de déconnexion sécurisée de chaîne et reçoit le signal indiquant une coupure de courant du réseau électrique. - Système selon la revendication 6, dans lequel :
l'unité de commande principale (106, 30) est configurée en outre pour envoyer le signal indiquant une coupure de courant du réseau électrique à l'unité de commande de calage (105, 40) du système de calage, de manière que l'unité de commande de calage (105, 40) cesse, selon le signal indiquant une coupure de courant du réseau électrique, de réaliser une opération de mise en drapeau prédéterminée pour la coupure de courant du réseau électrique.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711349798.0A CN109931217B (zh) | 2017-12-15 | 2017-12-15 | 风力发电机组停机控制方法及系统 |
PCT/CN2018/082515 WO2019114161A1 (fr) | 2017-12-15 | 2018-04-10 | Procédé et système de commande d'arrêt pour ensemble générateur éolien |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3530933A1 EP3530933A1 (fr) | 2019-08-28 |
EP3530933A4 EP3530933A4 (fr) | 2019-12-25 |
EP3530933B1 true EP3530933B1 (fr) | 2022-08-31 |
Family
ID=66819903
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18793550.7A Active EP3530933B1 (fr) | 2017-12-15 | 2018-04-10 | Procédé et système de commande d'arrêt pour ensemble générateur éolien |
Country Status (5)
Country | Link |
---|---|
US (1) | US10823142B2 (fr) |
EP (1) | EP3530933B1 (fr) |
CN (1) | CN109931217B (fr) |
AU (1) | AU2018260979B2 (fr) |
WO (1) | WO2019114161A1 (fr) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112145343B (zh) * | 2019-06-27 | 2022-07-05 | 北京金风科创风电设备有限公司 | 变桨系统收桨控制方法、装置及计算机可读存储介质 |
CN110456269A (zh) * | 2019-07-01 | 2019-11-15 | 许昌许继风电科技有限公司 | 一种风电变桨系统故障录波方法及录波器 |
CN113833601B (zh) * | 2020-06-24 | 2022-11-08 | 北京金风科创风电设备有限公司 | 用于控制风力发电机同步收桨的方法、装置和设备 |
CN113852131A (zh) * | 2020-06-28 | 2021-12-28 | 新疆金风科技股份有限公司 | 风电场的功率控制方法及装置 |
CN111852768B (zh) * | 2020-07-13 | 2024-02-27 | 青岛池华电气科技有限公司 | 变桨系统电网侧自主紧急顺桨控制系统及方法 |
CN111963375B (zh) * | 2020-08-25 | 2023-09-19 | 成都阜特科技股份有限公司 | 一种桨叶控制方法及其风力发电机组 |
CN112145372B (zh) * | 2020-09-09 | 2024-05-14 | 上海电气风电集团股份有限公司 | 安全链的测试方法、控制装置及其风力发电机 |
CN114251224B (zh) * | 2020-09-25 | 2024-05-28 | 北京金风科创风电设备有限公司 | 变桨驱动器执行的变速率收桨控制方法及其装置 |
CN113090455B (zh) * | 2021-04-25 | 2022-05-24 | 中国华能集团清洁能源技术研究院有限公司 | 在电网掉电条件下风电机组桨距角控制方法、系统和设备 |
Family Cites Families (35)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10338127C5 (de) * | 2003-08-15 | 2015-08-06 | Senvion Se | Windenergieanlage mit einem Rotor |
EP2284391B1 (fr) * | 2004-07-23 | 2018-02-07 | Vestas Wind Systems A/S | Procédé de contrôle d'au moins une pale d'éolienne durant le processus d'arrêt du rotor dans un système d'éolienne, système de contrôle, éolienne et utilisation associée |
ES2327695B1 (es) * | 2006-10-11 | 2010-09-06 | GAMESA INNOVATION & TECHNOLOGY, S.L. | Sistema de giro de una pala de aerogenerador. |
US7745948B2 (en) * | 2007-11-28 | 2010-06-29 | General Electric Company | Emergency pitch drive unit for a wind turbine |
US7944067B2 (en) * | 2008-04-01 | 2011-05-17 | General Electric Company | System and method for reducing rotor loads in a wind turbine upon detection of blade-pitch failure and loss of counter-torque |
US8188610B2 (en) | 2008-09-08 | 2012-05-29 | General Electric Company | Wind turbine having a main power converter and an auxiliary power converter and a method for the control thereof |
US7719128B2 (en) * | 2008-09-30 | 2010-05-18 | General Electric Company | System and method for controlling a wind turbine during loss of grid power and changing wind conditions |
WO2010097482A1 (fr) * | 2009-02-27 | 2010-09-02 | Eolincyl, S.L. | Dispositif aérogénérateur tripale pour espaces réduits |
CN101893855B (zh) * | 2009-05-20 | 2011-10-19 | 天津瑞能电气有限公司 | 保证风电机组安全运行的控制方法 |
CA2707921C (fr) * | 2009-05-20 | 2013-10-29 | Mitsubishi Heavy Industries, Ltd. | Generateur eolien et methode de commande connexe |
JP5550283B2 (ja) * | 2009-08-06 | 2014-07-16 | 三菱重工業株式会社 | 風力発電装置、風力発電装置の制御方法、風力発電システム及び風力発電システムの制御方法 |
CN101776042A (zh) * | 2010-01-07 | 2010-07-14 | 南京科远自动化集团股份有限公司 | 风力发电控制系统后备安全链监控保护装置 |
JP5320311B2 (ja) * | 2010-01-18 | 2013-10-23 | 三菱重工業株式会社 | 可変速発電装置及びその制御方法 |
US20120087792A1 (en) | 2010-10-12 | 2012-04-12 | Clipper Windpower, Inc. | Emergency feather rate limit with proportionality to operating pitch angle and energy storage voltage |
US9068556B2 (en) * | 2010-11-26 | 2015-06-30 | Vestas Wind Systems A/S | Pilot circuitry for controlling the emergency feathering of a wind turbine |
DE102011079269A1 (de) * | 2011-07-15 | 2013-01-17 | Suzlon Energy Gmbh | Sicherheitskette und Verfahren zum Betreiben einer Windturbine |
CN102418662B (zh) * | 2011-12-27 | 2013-11-27 | 东方电气集团东方汽轮机有限公司 | 风力发电机安全运行控制系统 |
WO2013132635A1 (fr) * | 2012-03-08 | 2013-09-12 | 三菱重工業株式会社 | Dispositif de régulation de sortie et méthode de régulation de sortie pour éolienne |
CN102709944B (zh) * | 2012-05-24 | 2014-12-31 | 浙江运达风电股份有限公司 | 基于dgnr变桨系统的风力发电机组低电压穿越控制方法 |
CN102748213B (zh) * | 2012-07-10 | 2016-02-03 | 国电联合动力技术有限公司 | 一种风力发电机组紧急停机控制系统及方法 |
US8704393B2 (en) * | 2012-08-09 | 2014-04-22 | General Electric Company | System and method for controlling speed and torque of a wind turbine during post-rated wind speed conditions |
CN103089541B (zh) | 2013-02-20 | 2015-04-08 | 欣达重工股份有限公司 | 风力发电机组安全链控制系统 |
CN103306898B (zh) | 2013-07-08 | 2016-07-27 | 南车株洲电力机车研究所有限公司 | 一种兆瓦级风力发电机组变桨系统及其变桨控制方法 |
ES2527972B1 (es) * | 2013-08-02 | 2015-11-20 | Gamesa Innovation & Technology, S.L. | Gestión inteligente de la potencia durante una caída de tensión en los aerogeneradores |
CN103437954B (zh) * | 2013-08-12 | 2017-05-17 | 国家电网公司 | 一种风电变桨控制系统与风电变桨系统 |
US10662924B2 (en) * | 2013-11-21 | 2020-05-26 | Vestas Wind Systems A/S | Rotor blade control for high winds |
US10145361B2 (en) * | 2013-11-25 | 2018-12-04 | General Electric Company | Methods and systems to shut down a wind turbine |
CN104747372A (zh) * | 2015-04-20 | 2015-07-01 | 常州易驱动电气科技有限公司 | 一种电动柔性变桨控制系统 |
CN204663764U (zh) | 2015-05-20 | 2015-09-23 | 中船重工(武汉)凌久电气有限公司 | 一种应用超级电容的风力发电变桨控制系统 |
CN106468242B (zh) * | 2015-08-21 | 2019-05-14 | 上海昱章电气成套设备有限公司 | 风电变桨系统的安全链及风电变桨系统 |
EP3478960B1 (fr) * | 2016-06-30 | 2022-08-03 | Vestas Wind Systems A/S | Système de diagnostic, éolienne, procédé pour une eolienne et produit programme d'ordinateur associé |
CN106884760B (zh) * | 2016-11-25 | 2019-06-18 | 科诺伟业风能设备(北京)有限公司 | 一种风力发电机组紧急顺桨控制方法 |
CN106968886A (zh) * | 2017-05-18 | 2017-07-21 | 国电联合动力技术有限公司 | 一种风电机组的紧急收桨方法 |
CN207777068U (zh) * | 2017-09-25 | 2018-08-28 | 中国船舶重工集团海装风电股份有限公司 | 一种风力发电机组安全链 |
EP3670898B1 (fr) * | 2018-12-19 | 2022-09-21 | Vestas Wind Systems A/S | Commande d'une éolienne sur la base d'une référence de puissance combinée |
-
2017
- 2017-12-15 CN CN201711349798.0A patent/CN109931217B/zh active Active
-
2018
- 2018-04-10 WO PCT/CN2018/082515 patent/WO2019114161A1/fr unknown
- 2018-04-10 AU AU2018260979A patent/AU2018260979B2/en active Active
- 2018-04-10 US US16/303,275 patent/US10823142B2/en active Active
- 2018-04-10 EP EP18793550.7A patent/EP3530933B1/fr active Active
Also Published As
Publication number | Publication date |
---|---|
CN109931217B (zh) | 2020-05-12 |
WO2019114161A1 (fr) | 2019-06-20 |
US20200011295A1 (en) | 2020-01-09 |
AU2018260979A1 (en) | 2019-07-04 |
US10823142B2 (en) | 2020-11-03 |
EP3530933A1 (fr) | 2019-08-28 |
EP3530933A4 (fr) | 2019-12-25 |
CN109931217A (zh) | 2019-06-25 |
AU2018260979B2 (en) | 2020-06-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3530933B1 (fr) | Procédé et système de commande d'arrêt pour ensemble générateur éolien | |
US8487460B2 (en) | Wind energy installation with individual pitch devices | |
DK2267303T3 (en) | Apparatus for operating a wind turbine during a communication loss | |
EP2715125B1 (fr) | Parc éolien et procédé de fonctionnement d'un parc éolien | |
EP2902621B1 (fr) | Parc éolien et son procédé de fonctionnement | |
CN101893855B (zh) | 保证风电机组安全运行的控制方法 | |
EP2587609B1 (fr) | Dispositif et procédé d'alimentation électrique | |
US9551323B2 (en) | Power plant control during a low voltage or a high voltage event | |
CN102011699B (zh) | 一种风力发电机变桨距控制方法及系统 | |
EP2863512B1 (fr) | Système d'alimentation, son procédé de fonctionnement et dispositif de commande pour système d'alimentation | |
US8109723B2 (en) | Device and method for controlling wind turbine | |
CN111963375B (zh) | 一种桨叶控制方法及其风力发电机组 | |
US11149713B2 (en) | Control method, device and system for a wind turbine | |
US10024305B2 (en) | System and method for stabilizing a wind farm during one or more contingency events | |
CA2905643A1 (fr) | Parc eolien et procede de commande d'un parc eolien | |
KR20120018328A (ko) | 풍력 발전기용 블레이드 각 조절 구동 장치 | |
EP3734832B1 (fr) | Procédé, dispositif et système de commande de fonctionnement de générateur | |
CN112145343B (zh) | 变桨系统收桨控制方法、装置及计算机可读存储介质 | |
CN113175412A (zh) | 风电机组变桨系统的过压保护及恢复系统和方法 | |
CN102705159B (zh) | 安全收桨控制方法及装置 | |
CN220154814U (zh) | 全智能型坝顶发电机自动控制系统 | |
WO2024037696A1 (fr) | Protection haute tension d'électrolyseur dans un parc éolien |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20181109 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20191127 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F03D 7/02 20060101ALI20191121BHEP Ipc: F03D 7/00 20060101AFI20191121BHEP |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20220324 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1515459 Country of ref document: AT Kind code of ref document: T Effective date: 20220915 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018040064 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: GR Ref legal event code: EP Ref document number: 20220402068 Country of ref document: GR Effective date: 20221109 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20220831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221130 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1515459 Country of ref document: AT Kind code of ref document: T Effective date: 20220831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20221231 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20230102 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602018040064 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20230214 Year of fee payment: 6 |
|
26N | No opposition filed |
Effective date: 20230601 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20230410 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230410 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20230430 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230410 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220831 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230410 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602018040064 Country of ref document: DE Owner name: GOLDWIND SCIENCE & TECHNOLOGY CO., LTD., URUMQ, CN Free format text: FORMER OWNER: XINJIANG GOLDWIND SCIENCE & TECHNOLOGY CO. LTD., URUMQI, XINJIANG, CN |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230430 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GR Payment date: 20240312 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230410 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230410 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20240313 Year of fee payment: 7 Ref country code: FR Payment date: 20240213 Year of fee payment: 7 |