EP3515786A1 - Method for operating a railway control unit, method for operating a railway network and railway control unit - Google Patents
Method for operating a railway control unit, method for operating a railway network and railway control unitInfo
- Publication number
- EP3515786A1 EP3515786A1 EP17752136.6A EP17752136A EP3515786A1 EP 3515786 A1 EP3515786 A1 EP 3515786A1 EP 17752136 A EP17752136 A EP 17752136A EP 3515786 A1 EP3515786 A1 EP 3515786A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- railway
- computer readable
- control unit
- sector
- readable map
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 51
- 238000013507 mapping Methods 0.000 claims abstract description 7
- 101100400452 Caenorhabditis elegans map-2 gene Proteins 0.000 description 14
- 238000012423 maintenance Methods 0.000 description 5
- 238000004590 computer program Methods 0.000 description 3
- 239000003550 marker Substances 0.000 description 2
- 235000003197 Byrsonima crassifolia Nutrition 0.000 description 1
- 240000001546 Byrsonima crassifolia Species 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L21/00—Station blocking between signal boxes in one yard
- B61L21/04—Electrical locking and release of the route; Electrical repeat locks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/04—Automatic systems, e.g. controlled by train; Change-over to manual control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/22—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails
- B61L23/30—Control, warning or like safety means along the route or between vehicles or trains for controlling traffic in two directions over the same pair of rails using automatic section blocking
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/12—Preparing schedules
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L19/00—Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
- B61L19/06—Interlocking devices having electrical operation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L19/00—Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
- B61L19/06—Interlocking devices having electrical operation
- B61L2019/065—Interlocking devices having electrical operation with electronic means
Definitions
- the invention relates to a method for operating a railway control unit.
- a railway control unit is operated by a preconfig- ured interlocking system for controlling a railway network.
- the preconfigured interlocking system may comprise hardware and/or software cmponents. The design, the preconfiguration and the testing of the preconfigured interlocking system is very time consuming.
- the precon- figured interlocking system stays unchanged as far as possi ⁇ ble. Only once in a while necessary updates and/or mainte ⁇ nance is done to the preconfigured interlocking system. Nor ⁇ mally, the updates and/or maintenance cannot be done during operation of the preconfigured interlocking system.
- the preconfigured interlocking system needs to be turned off for the time of updating and/or maintenance and cannot operate for this time.
- failures e.g. broken sensors, broken signals and/or broken data connections, may cause that the preconfigured interlocking system cannot oper ⁇ ate within a sector of the railway network.
- One aim of the invention is to provide an enhanced method for operating a railway control unit, particularly for the case that the preconfigured interlocking system cannot operate.
- the railway control unit has access to a computer read ⁇ able map mapping a railway network and selects temporarily a sector (18) on this readable map (2) representing a part of the railway network, wherein the railway control unit deter ⁇ mines possible route sections within the sector of the com ⁇ puter readable map.
- a selection logic of the railway control unit when applied to the determined possible route sections, identifies permissi ⁇ ble routes passing through the sector of the computer readable map. This method is used instead or additionally to the preconfigured interlocking system to control the operation of the railway control unit.
- the selected sectors can be understood as a partial cut-out of the computer readable map, thus, mapping a part of the railway network, but not the entire network.
- the sector in this sense, resembles as window which defines the boundaries of the cut-out area.
- a possible route section is allocable to a railway vehicle and goes typically from one signal to the next/neighbouring signal.
- a possible route section with respect to the sector might also go from an entrance-exit-point 20 to the
- next/neighbouring signal 8 or vice versa.
- the permissible route sections are subsequently selected from all possible route sections by applying the selection logic of the railway control unit.
- the selection logic identifies permissible routes on the basis of at least one rule as ex ⁇ plained further below.
- the invention is based on the finding that, in general, a preconfigured interlocking system controls the operation of a railway control unit.
- the preconfigured interlocking system has been programmed offline, so that routes are given by the programming in detail. Changes can be made only via updates to the preconfigured interlocking system or maintenance at the preconfigured interlocking system.
- the invention is based on the finding that a second interlocking system, which works analogous to the first named preconfigured interlocking system - and, hence, would be pre- configured as well -, or part of it is not suitable as fall back version. Maintaining a second preconfigured interlocking system or part of it would not be an economical way to pro ⁇ vide a backup system.
- a second preconfigured interlocking system would operate in the case of an update of the first named interlocking system or in the case of maintenances at the first named interlocking system.
- a second preconfigured interlocking system can ⁇ not operate.
- the invention is based on the idea, that the railway control unit does not need any preconfigured routes through a section of the railway network. Instead, possible route sections can be determined within the sector of a computer readable map, particularly by means of a software, wherein the computer readable map maps the railway network. Further, a selection logic of the railway control unit, when applied to the deter ⁇ mined possible route sections, can identify permissible routes passing through the sector of the computer readable map .
- the railway control unit can work dynamically.
- the section of the railway network may be selected in that way, that it includes a failed component of the railway network, e.g. a failed sig ⁇ nal, a failed track switch or similar. Further, the section of the railway network may be selected in that way, that it includes components under maintenance.
- the method for operating the railway control unit can be used additional to the preconfigured interlocking software. Advan ⁇ tageously, the method for operating the railway control unit can be used as a fall back method and/or as a temporary backup method.
- the method for operating the railway control unit may be used instead of a preconfigured inter ⁇ locking software.
- the railway network comprises rails (also tracks), track switches, and/or signals as components.
- Sig- nals may be active signals and/or (passive) marker boards.
- the railway network and its components are mapped within the computer readable map.
- the computer readable map may map rails of the railway network, track switches of the railway network, and/or signals of the railway network.
- the computer readable map may comprise positions of the track switches and/or states of the signals.
- the computer readable map may represent the railway network.
- the sector of the computer readable map expediently represents a sector of the railway network.
- the computer readable map may be available in form of a node-edge-model.
- the possible route sections are allocable to a railway vehicle.
- the permis ⁇ sible routes are allocable to a railway vehicle.
- the section of the computer readable map comprises at least two entrance-exit-points, at which the sector can be entered and/or exited. In this way, each track going into and/or out of the section forms/comprises an en ⁇ trance-exit-point. The number of entrance-exit-points may be minimised.
- the at least two entrance-exit-points are con ⁇ nected with each other.
- any of the entrance-exit- points may be connected with at least one other of the en ⁇ trance-exit-points .
- the sector of the computer readable map com- prises signals. Any possible route may go from an entrance- exit-point to the next/neighbouring signal or vice versa. Moreover, any possible route may go from one signal to the next/neighbouring signal. If there is no signal between a first of the entrance-exit-points and a second of the en- trance-exit-points, a possible route can also go from the first entrance-exit-point to the second entrance-exit-point.
- any permissible route goes from one of the entrance-exit-points to another entrance- exit-point of the sector.
- the selection logic identifies permissible routes on the basis of at least one rule. It is preferred that, for the identification of permissible routes, any route section is allowed to be set only once for the same time respectively by the selection logic.
- Conflicting route sections may share any of the same track section. Further, conflicting route sections may overlap at least partially. It is advantageous that, for the identifica ⁇ tion of permissible routes, conflicting route sections are identified by the selection logic. Moreover, it is preferred that, for the identification of permissible routes, conflicting route sections are not al ⁇ lowed to be set for the same time by the selection logic. In this way, at any track section at least one railway vehicle is allowed at the same time respectively.
- One of the determined possible route sections may comprises a track switch. If one of the determined possible route sec ⁇ tions comprises a track switch, advantageously, for the iden- tification of permissible routes the respective route section is allowed to be set by the selection logic, if the track switch at the respective route section is positioned cor ⁇ rectly as required.
- one of the determined possible route sections comprises a track switch
- the respective route section is allowed to be set by the selection logic, if the track switch at the respective route section can be positioned correctly as re ⁇ quired .
- the possible route sections within the sector of the computer readable map are determined automatically and/or in real time. Further, it is preferred that the permissible routes through the sector of the computer readable map are determined automatically and/or in real time.
- the determina ⁇ tion may be partial automatic, when a sub-step of the deter ⁇ mination is executed by an acting person, e. g. the acting person may enter a parameter or similar.
- the determination may be fully automatic, when the determination takes place without manually influences of a person.
- a determination in real time may be, for example, a determination during operating the railway control unit. Moreover, a determination in real time may be, for example, a determina- tion after selecting the sector of the railway network.
- the invention and/or the described embodiments thereof may be realised - at least partially or completely - in software and/or in hardware, latter e. g. by means of a special elec- trical circuit.
- the invention and/or the described embodiments thereof may be realised - at least partially or completely - by means of a computer readable medium having a software, which software, when executed on a computer, realises the method described above.
- the invention refers to a method for operating a railway network.
- an operator and/or a computer selects a sector of a computer readable map of the railway network, the railway control unit is operated by the method described above and the identified permissible routes are outputted .
- the computer may be the previous named computer and/or another computer.
- the operator may be the (acting) person named before and/or another person.
- a railway vehicle is allocated to a path, which path may be selected out of the identified permissible routes.
- the path may be a selected permis- sible route.
- the path may be selected by the operator and/or by the computer.
- the selection of the path may be manually and/or automatically.
- the railway vehi ⁇ cle may travel on the path through the sector of the railway network .
- the railway vehicle may get the instruction, if and/or when the railway vehicle is permitted to enter the next route section of the path.
- the railway vehicle may get the instruction by the operator and/or by the computer.
- a signal is allowed to be ig ⁇ nored .
- the section of the railway network comprises at least one track switch. It is preferred that the position, also state, of the at least one track switch is detected, particularly during the method for operating the railway control unit and/or during the method for operating the railway network.
- the position of the at least one track switch may be detected by the software and/or hardware, by the operator and/or by the computer program. Hence, the detection may be manually and/or automatically.
- At least one of the determined possible route section may be set by the selection logic. If the set possible route section comprises at least one track switch, the at least one track switch may be positioned correctly according to the respec- tive route section, particularly during the method for operating the railway control unit and/or during the method for operating the railway network.
- the at least one track switch may be positioned by the software and/or hardware, by the op ⁇ erator and/or by the computer program. Hence, the positioning of the at least one track switch may be manually and/or auto ⁇ matically.
- one path is se ⁇ lected out of the identified permissible routes. If the path comprises at least one track switch, the at least one track switch may be positioned correctly according to the selected path .
- a request if the railway vehicle can enter the section of the railway network, may be received. Further, if a railway vehicle wants to enter the section of the railway network, information about the position of the railway vehicle may be received. The request and/or the information may be received during the method for operating the railway con ⁇ trol unit and/or during the method for operating the railway network. The request and/or the information may be received by the software and/or hardware, by the operator and/or by the computer program.
- a request if the railway vehicle can exit the section of the railway network, may be sent.
- information about a position of the railway vehicle may be sent.
- the request and/or the information may be sent during the method for operating the railway control unit and/or during the method for operating the railway net ⁇ work.
- the request and/or the information may be sent by the software and/or hardware, by the operator and/or by the com ⁇ puter program.
- the invention relates to a railway control unit.
- the railway control unit comprises a computer readable medium, which computer readable medium comprises a software with a selection logic.
- the computer is embodied to have access to a computer readable map mapping a railway network.
- the software when executed, cause the rail ⁇ way control unit to determine possible route sections within a sector of the computer readable map. Further, the software, when executed, cause the railway control unit to identify permissible routes passing through the sector of the computer readable map by means of the selection logic, when the selec ⁇ tion logic is applied to the determined possible route sec ⁇ tions .
- the railway control unit may be used to execute the method mentioned above.
- features, which are mentioned in con ⁇ nection with the method may also refer the last mentioned railway control unit.
- FIG 1 a schematic overview of a computer readable map
- FIG 2 a schematic overview of a sector of the computer
- FIG 1 schematically shows a computer readable map 2 mapping a railway network.
- the railway network comprises rails (also called tracks), track switches and/or signals as components.
- the railway network and its components are mapped within the computer readable map 2.
- the computer readable map 2 maps the rails 4, the track switches 6 and the signals 8.
- the computer readable map 2 comprise positions of the track switches and states of the signals (not shown) .
- the computer readable map 2 represents the railway network .
- the computer readable map 2 is available in form of a node-edge-model 10.
- the rails 4 of the railway network are represented by edges 12 of the node-edge-model 10.
- the track switches 6 of the railway network are represented by nodes 14 of the node-edge-model 10.
- the node-edge-model 10 comprises squares 16 representing the signals 8, particularly active signal and/or marker boards, of the railway network.
- An operator selects a sector 18 of the computer readable map 2 of the railway network.
- the sector 18 of the computer read- able map 2 represents a sector of the railway network.
- the sector 18 of the computer readable map 2 comprises two entrance-exit-points 20, at which the sector 18 can be en ⁇ tered and/or exited.
- each track 4 going into and/or out of the section forms/comprises an entrance-exit- point 20.
- the two entrance-exit-points 20 are connected with each other.
- a railway control unit (not shown) has access to the computer readable map 2.
- FIG 2 shows the sector 18 of the computer readable map 2 il ⁇ lustrated in FIG 1, to which is referred.
- the railway control unit (not shown) determines possible route sections 22 within the sector 18 of the computer read ⁇ able map 2. Any possible route goes from an entrance-exit- point 20 to the next/neighbouring signal 8 or vice versa. Moreover, principally a possible route can go from one signal 8 to the next/neighbouring signal 8.
- the possible route sections 22 are named "A”, “B”, “C”, “D”, ⁇ ⁇ ", “F”, “G” and “H”.
- the possible route sections 22 are displaced vertically in respect to the rails 4 for a clear illustration.
- the possible route sections 22 within the sector 18 of the railway network are determined automatically and in real time .
- a selection logic of the railway control unit when applied to the determined possible route sec- tions 22, identifies permissible routes passing through the sector 18 of the computer readable map 2. Any permissible route goes from one entrance-exit-point 20 to another en ⁇ trance-exit-point 20 of the sector 18.
- the possible route sections 22 are allocable to a railway ve ⁇ hicle.
- the permissible routes are allocable to a railway vehicle.
- a possible route section 22 and/or a permissible route can be travelled by a railway vehicle.
- any route sec ⁇ tion 22 is allowed to be set only once for the same time re ⁇ spectively by the selection logic.
- the route section 22 "A" is allowed to be set only once for the same time .
- conflicting route sections 22 which share any of the same track section, are identified by the selection logic. For example, the route section 22 "A” is conflicting with the route sec- tion 22 "C", “D”, ⁇ ⁇ " and "H".
- the signals 8 are positioned shifted alongside the track 4 to each other, particularly within one track section.
- the posi- tion of the signal 8 between the route section 22 "A” and “B” (upper signal 8 at the respective track 4) is shifted along ⁇ side the track 4 in respect to the signal 8 between the route section 22 "C” and “D” (lower signal 8 at the respective track 4) .
- the route sections 22 "A” and “C” share part of the same track section, namely the part between the upper and the lower signals 8 of the respective track 4.
- the route section 22 "A” is not only conflicting with “D", ⁇ ⁇ " and "H", but also with "C".
- conflicting route sections 22 are not allowed to be set for the same time by the selection logic.
- each of the determined possible route sec ⁇ tions 22 comprises a track switch 6 respectively.
- the posi ⁇ tion of the track switches 6 are detected manually and/or automatically .
- the position of the track switches 6 cannot be manipulated. Moreover, the first case may apply, if a track switch 6 of a route section 22 does not need to be ma ⁇ nipulated .
- a route section 22 is allowed to be set by the selec ⁇ tion logic, if the track switch 6 at the respective route section 22 is positioned correctly as required.
- the route section 22 "E” is allowed to be set by the selec ⁇ tion logic, if the track switch 6 at the respective route section 22 "E” is positioned straight/normal .
- the position of the track switches 6 can be manipulated, particularly manually or automatically.
- the track switch 6 of a route section 22, which route section 22 is set by the selection logic is po ⁇ sitioned correctly according to the respective route section 22.
- the track switch 6 at the respective route section 22 is positioned correctly as required.
- the identified permissible routes are outputted, particularly by the railway control unit, e. g. to the operator.
- the per ⁇ missible routes are "A-B", "E-F” for railway vehicles going from left to right according the drawing and "C-D", "G-H" for railway vehicles going from right to left according the draw ⁇ ing .
- the position of the track switches 6 can be ma- nipulated.
- a railway vehicle wants to enter the sector 18 of the railway network (mapped by the sector 18 of the computer readable map 2) .
- a request if the railway vehicle can enter the section 18 of the railway network, is received and/or information about the position of the railway vehicle is received. For example, the operator receives the request that a railway ve ⁇ hicle wants to enter the sector 18 coming from the left ac ⁇ cording the drawing.
- a railway vehicle is allocated to a path, which is selected out of the identified permissible routes. The selection and the allocation is done by the operator. For example, the permissible route "A-B" is selected as path and allocated to the railway vehicle.
- the railway vehicle gets the instruction, if and/or when the railway vehicle is permitted to enter the next route section 22 of the path. The instruction is given/sent by the opera ⁇ tor. When the railway vehicle gets the permission to enter the next route section 22, a signal 8 is allowed to be ig- nored.
- the track switch 6 at the route section 22 "A” is positioned correctly according the requirements and the route section 22 "A” is set by the selection logic for the railway vehicle. Hence, the railway vehicle is permitted to enter the route section 22 "A" of the path "A-B". The route section 22 "A” is not allowed to be set again by the selection logic.
- a second railway vehicle wants to enter the sector of the railway network.
- the operator receives the request that the second railway vehicle wants to enter the sector coming from the right according the drawing.
- the route section 22 "A” is already set and, hence, not allowed to be set again by the selection logic.
- the route section 22 "C” is conflicting with “A”.
- route section 22 "C” is not allowed to be set.
- the route "C-D” is not permissible.
- the only route sections 22, which are not conflicting with “A”, are "F” and "G”. Since "F” is going the wrong way, "G” will be selected.
- the permissible route through the sector is "G-H". Therefore, the permissible route "G-H" is selected as path and allocated to the second railway vehicle.
- the track switch 6 at the route section 22 "G” is positioned correctly according the requirements and the route section 22 "G” is set by the selection logic for the second railway vehicle.
- the second railway vehicle is permitted to enter the route section 22 "G” of the path "G- H” .
- the route section 22 "G” is not allowed to be set again by the selection logic.
- the first mentioned railway vehicle arrives at the signal 8 at the end of route section "A", before the sec ⁇ ond railway vehicle arrives the signal 8 at the end of the route section "G".
- the route section 22 "B” is confliction with "G”.
- the first mentioned railway vehicle does not get any permission to enter the next route section 22 "B”.
- the first mentioned railway vehicle has to wait.
- route section 22 "A” can be released. As soon as the route section 22 "B” is setable, it will be set.
- the route section 22 "H” is se ⁇ table, because no conflicting route section 22 is set.
- the track switch 6 within the route section “H” has to be positioned according the requirements - and, thus, has to be po ⁇ sitioned straight/normal .
- the route section 22 "H” is set by the selection logic and the second railway vehicle gets the permission to enter the route section "H”.
- the signal 8 between "G” and “H” is allowed to be ignored.
- the route section 22 "G” is released. As soon as the route section 22 "G” is released, the route section 22 "B” is setable.
- the track switch 6 within the route section 22 "B” has to be positioned according the re ⁇ quirements - and, thus, has to be positioned bended/reverse .
- the route section 22 "B” is set by the selection logic and the first mentioned railway vehicle gets the permission to enter the route section 22 "B".
- the signal 8 between "A” and "B” is allowed to be ignored.
- the first mentioned railway vehicle and/or the second railway vehicle wants to exit the sector 18 of the railway network
- a request of the first mentioned railway vehicle and/or the second railway vehicle if it can exit the sector of the railway network, is sent, particularly to the opera ⁇ tor.
- the operator gives the permission to exit the sector 18.
- the route section 22 "B” is released.
- the sec ⁇ ond railway vehicle exits the sector 18, the route section 22 "H” is released.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1616188.7A GB2554380A (en) | 2016-09-23 | 2016-09-23 | Method for operating a railway control unit, method for operating a railway network and railway control unit |
PCT/EP2017/070719 WO2018054616A1 (en) | 2016-09-23 | 2017-08-16 | Method for operating a railway control unit, method for operating a railway network and railway control unit |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3515786A1 true EP3515786A1 (en) | 2019-07-31 |
EP3515786B1 EP3515786B1 (en) | 2024-05-22 |
EP3515786C0 EP3515786C0 (en) | 2024-05-22 |
Family
ID=57539843
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP17752136.6A Active EP3515786B1 (en) | 2016-09-23 | 2017-08-16 | Method for operating a railway control unit, method for operating a railway network and railway control unit |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3515786B1 (en) |
ES (1) | ES2992058T3 (en) |
GB (1) | GB2554380A (en) |
WO (1) | WO2018054616A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114137940A (en) * | 2021-11-29 | 2022-03-04 | 卡斯柯信号有限公司 | The method of automatically switching the interval occupancy logic check according to the interval running direction |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110281981B (en) * | 2019-05-08 | 2021-06-11 | 卡斯柯信号(成都)有限公司 | Track traffic route conflict processing and alarming method based on playback file |
CN110641524B (en) * | 2019-10-31 | 2021-11-02 | 中铁二院工程集团有限责任公司 | Method for continuously controlling train based on movement authorization generated by interlocking |
CN111080742B (en) * | 2019-12-02 | 2023-05-23 | 北京恒泰实达科技股份有限公司 | Automatic generation method and system of subway line network diagram |
CN111953433B (en) * | 2020-08-31 | 2021-06-08 | 郑州铁路职业技术学院 | Railway interlocking signal management system |
CN113212503B (en) * | 2021-05-11 | 2023-03-10 | 卡斯柯信号(成都)有限公司 | Detection method for rail transit vehicle shunting plan conflict |
AU2023352756A1 (en) | 2022-09-26 | 2025-03-06 | Parallel Systems, Inc. | Rail authority system and/or method |
US11964682B1 (en) | 2022-10-31 | 2024-04-23 | Parallel Systems, Inc. | Rail control system and/or method |
US11981363B1 (en) | 2022-11-18 | 2024-05-14 | Parallel Systems, Inc. | System and/or method for remote operation of a rail vehicle |
WO2024258578A1 (en) * | 2023-06-15 | 2024-12-19 | Parallel Systems, Inc. | Railway switch management system and/or method |
US12275444B2 (en) | 2023-07-17 | 2025-04-15 | Parallel Systems, Inc. | Remote rail monitoring system and/or method |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19950185A1 (en) * | 1999-10-19 | 2001-06-13 | Abb Patent Gmbh | Arrangement to optimise journeys by route-bound traffic, e.g. trains; has data stores in vehicle and track sections and transmission devices to determine routes independently and automatically |
JP2001143187A (en) * | 1999-11-12 | 2001-05-25 | Sony Corp | Information processing device and method and program storage medium |
JP5624956B2 (en) * | 2011-07-28 | 2014-11-12 | 株式会社日立製作所 | Course control program generation method and course control apparatus |
JP5825677B2 (en) * | 2012-03-07 | 2015-12-02 | 株式会社日立製作所 | Course control program generation method and computer system |
WO2014010070A1 (en) * | 2012-07-13 | 2014-01-16 | 株式会社日立製作所 | Method for selecting alternate operating route for train, and system therefor |
-
2016
- 2016-09-23 GB GB1616188.7A patent/GB2554380A/en not_active Withdrawn
-
2017
- 2017-08-16 EP EP17752136.6A patent/EP3515786B1/en active Active
- 2017-08-16 WO PCT/EP2017/070719 patent/WO2018054616A1/en unknown
- 2017-08-16 ES ES17752136T patent/ES2992058T3/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114137940A (en) * | 2021-11-29 | 2022-03-04 | 卡斯柯信号有限公司 | The method of automatically switching the interval occupancy logic check according to the interval running direction |
CN114137940B (en) * | 2021-11-29 | 2024-03-12 | 卡斯柯信号有限公司 | Method for automatically switching section occupation logic inspection according to section running direction |
Also Published As
Publication number | Publication date |
---|---|
EP3515786B1 (en) | 2024-05-22 |
EP3515786C0 (en) | 2024-05-22 |
ES2992058T3 (en) | 2024-12-05 |
GB201616188D0 (en) | 2016-11-09 |
GB2554380A (en) | 2018-04-04 |
WO2018054616A1 (en) | 2018-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3515786A1 (en) | Method for operating a railway control unit, method for operating a railway network and railway control unit | |
JP4375253B2 (en) | Signal security system | |
US11110944B2 (en) | Vehicle control system, travel management device, resource management device, vehicle control method, and program | |
AU2018222956B2 (en) | Method for controlling the circulation of vehicles in a network | |
KR102202468B1 (en) | Centralized controlling system of train based on cloud and method thereof | |
KR20190042962A (en) | Method for sharing common resource in rain-centric distributed train control system and system thereof | |
US10214226B2 (en) | Method for operating a train safety assembly, train safety assembly and rail vehicle comprising a train safety assembly | |
BR102015006010B1 (en) | Method to reset a piece of lane detection equipment | |
US6122590A (en) | Process and device for control and monitoring a traffic control system | |
US10618535B2 (en) | Protection method and protection system for a rail network | |
US10829136B2 (en) | Security method and security system for a railway network | |
CN116149303B (en) | Test method and device for remote limit driving mode of train | |
US10899373B2 (en) | Safety method and safety system for a railway network | |
US20210146976A1 (en) | Vehicle control system, resource management device, vehicle control method, and program | |
US20180319415A1 (en) | Safety Method And Safety System For A Railway Network | |
CN110505993B (en) | Method and device for regulating at least one route of a railroad device | |
CN114435433A (en) | Method and device for verifying automatic trigger route conflict | |
JP6925154B2 (en) | Signal control device and method | |
JPH0723096B2 (en) | Interlocking device | |
Wall | Cross Signals | |
JP6713357B2 (en) | On-board equipment, train, and signal security system | |
HK40012277A (en) | Method and apparatus for setting at least one route for a railway installation | |
JP2024000223A (en) | Ground control device and route assignment method | |
BR102018076845B1 (en) | RESET METHOD AND AUTOMATIC TRAIN CONTROL SYSTEM | |
JPH0723095B2 (en) | Interlocking device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190212 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS MOBILITY LIMITED |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20210312 |
|
RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS MOBILITY LIMITED |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
RAP3 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SIEMENS MOBILITY LIMITED |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20231221 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602017082106 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
U01 | Request for unitary effect filed |
Effective date: 20240606 |
|
U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT SE SI Effective date: 20240620 |
|
U20 | Renewal fee for the european patent with unitary effect paid |
Year of fee payment: 8 Effective date: 20240819 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240922 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240823 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240910 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240822 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240922 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240823 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240822 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2992058 Country of ref document: ES Kind code of ref document: T3 Effective date: 20241205 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20241121 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20241105 Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602017082106 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20240522 |
|
26N | No opposition filed |
Effective date: 20250225 |